PRE FEASIBLITY REPORT for Manegaon Metal Stone Quarry Lease (M.L
Total Page:16
File Type:pdf, Size:1020Kb
PRE FEASIBLITY REPORT FOR Manegaon Metal Stone Quarry Lease (M.L. Area: 1.63 Hect) With production capacity 50000m3 AT VILL-MANEGAON, TEH - JABALPUR, DISTT – JABALPUR, MADHYA PRADESH PINCODE-482004 APPLICANT SHRI MUKESH SHARMA S/O SHRI SATYNARAYAN SHARMA 226-A SECTOR C, INDRAPURI BHOPAL, DIST. BHOPAL (MP) PRE-FEASIBILITY REPORT S. No. Content Page No. 1.0 Executive summary 4-5 2.0 Introduction of the project/ background information: 6-7 (i) identification of project & project proponent (ii) brief description of nature of the project (iii) need for the project & its importance to the country/region (iv) demand-supply gap (v) imports vs. Indigenous production (vi) export possibility (vii) domestic/export markets (viii) employment generation (direct and indirect) due to the project 3.0 Project description: 8-12 (i) type of project including interlinked and independent Projects, if any (ii) location (map showing general location, specific Location, and project boundary & project site layout) With coordinates (iii) details of alternative site considered (iv) size or magnitude of operation (v) project description with process details (vi) raw material required along with estimated Quantity, likely source, marketing area of final Products, mode of transport of raw material and Finished product (vii) resources optimization/ recycling and reuse envisaged In the project, if any, should be briefly outlined (viii) availability of water its source, energy /power Requirement and source (ix) quantity of waste to be generated (liquid and solid) And scheme for their management/disposal 2.0 Site analysis: 13-16 (i) connectivity (ii) land form, land use and land ownership (iii) topography along with map (iv) existing land use pattern {agriculture, non-agriculture, Forest, water bodies (including area Under CRZ)}, shortest distances from the periphery of the project to periphery of the forests, national park, Wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the gazette Notification (v) existing infrastructure (vi) soil classification (vii) climatic data from secondary sources (viii) social infrastructure available 5.0 Planning brief: 17 (i) Planning concept (type of industries, facilities, and Transportation etc.) Town and country Planning/development authority classification (ii) population projection (iii) land use planning (breakup along with green belt etc.) (iv) assessment of infrastructure demand (physical & Social) (v) amenities/facilities 6.0 Proposed infrastructure: 18-19 (i) industrial area (processing area) (ii) residential area (non processing area) (iii) green belt development (iv) social infrastructure (v) connectivity (vi) drinking water management (source & supply of Water) (vii) sewerage system (viii) industrial waste management (ix) solid waste management (x) power requirement & supply/source 7.0 Rehabilitation and resettlement (R & R) plan: 20 (i) policy to be adopted (central/state)in respect of the Project affected persons including home oustees, land Oustees and landless laborers (brief outline to be Given) 8.0 Project schedule & cost estimates: 20 (i) likely date of start of construction and likely date Of completion (time schedule for the project to be Given) (ii) estimated project cost along with analysis in terms of Economic viability of the project 9.0 Analysis of proposal: 20 (i) financial and social benefits with special emphasis on The benefit to the local people including tribal Population if any LIST OF TABLES Figure No. Name of Figures Page No. 1 Location Map 9 2 Environmental Setting Map 14 PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY: Table – 1 BRIEF OF THE PROJECT S. No. Particulars Details A. Nature of the Project Manegaon Metal Stone Quarry B. Size of the Project: 1 Quarry Lease area 1.63 Hect. 2. Proposed Production capacity 50000m3 C. Location Details: 3. Village Manegaon 4. Tehsil Jabalpur 5. District Jabalpur 6. State Madhya Pradesh 7. Lease area Coordinates N 23°04'14.53"- N 23°04'19.44" E79°54'31.02"E 79°54'38.15" 8. Toposheet No. 55M/16 D. Cost Details: 9 Total Project Cost Rs. 10 Laces /- 10. Cost of Environment Protection Measures Capital Cost: Rs. 5 Laces /- Recurring Cost: Rs.0.5lac per Annum E. Requirement of the project: 11. Water Requirement 6 KLD Source: Water will be purchased from nearby Villages panchayat 12. Power Requirement Electricity will not be required as workings will be in day shift only. 13. Man power Requirement 10 persons Source- Quarry plan ENVIRONMENTAL MANAGEMENT PLAN: S. No. Particulars Details 1 Air Quality Drilling will be done with water injection system & dust Management collector. Control Blasting will be carried out. Water sprinkling will be done during loading points / haul roads etc. Haul road will be kept wide & compact. Personal protective equipments will be provided to the workers working in high dust area. Regular maintenance of machinery and vehicles will be carried out to control dust emission during transportation. Green Belt will be developed around the lease boundary, haul roads and plantation will be done on undisturbed area, reclaimed area & mine office etc. 2 Water Quality No waste water will be generated during Quarry operation Management Septic tanks and soak pits will be provided for the disposal of domestic effluents generated from mine office. Garland drains will be provided at the toe of dumps to prevent the entry of rainwater into the Quarry pit. Rainwater falling in the Quarry pit will be collected in lower benches & will be used for dust suppression & green belt. Regular monitoring of ground water quality will be carried out. 3 Noise Quality Drilling will be carried out with the drills having sharp drill bits Management for noise reduction. Control Blasting will be carried out. Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Adequate silencers with AC cabins will be provided in Heavy Earth Moving Machines. Proper maintenance, oiling and greasing of machines at regular intervals will be done to reduce generation of noise. Green Belt will be developed around the lease boundary, haul roads and plantation will be done on undisturbed area, reclaimed area & mine office etc. Periodical monitoring will be done. 4 Solid Waste Top soil will be separately stacked & simultaneously used for Management plantation purpose. OB generated will be temporary stacked in eastern side of non mineralized area which will be backfilled in excavated area & rehabilitated by plantation at the conceptual stage. 5 Plantation Green Belt will be developed around the lease boundary, haul roads and plantation will be done on undisturbed area, reclaimed area, nearby workshop & mine office etc. Local species will be planted after consultation with local forest officer and as per CPCB guidelines 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION: (i) Identification of project and project proponent: Vill. Manegaon, Teh. - Jabalpur, Dist.- Jabalpur (M.P.)of Shri Mukesh Sharma Project Proponent Shri Mukesh Sharma S/o Shri Satynarayan Sharma 226-A sector C, Indrapuri Bhopal, Dist. Bhopal (MP) (ii) Brief description of nature of the project: The Quarry lease was sanctioned by collector Jabalpur in the name of Shri Mukesh Sharma vide their Letter No. vide letter no. 1538-Khanij/Q.L./2016-17 dated 14/09/2016 for a period of 10 years. From due date. Project Proponent has proposed Manegaon Stone quarry (M.L Area:1.63 ha.) production capacity 50000m3at Village- Manegaon, Tehsil- Jabalpur, District- Jabalpur, (M.P) .As per EIA Notification dated 18.03.2013, amended as on date, the project activity falls in Category ‘B’, Project or Activity 1(a) (4) therefore, this project requires Environmental Clearance from SEAC, MP. (iii) Need for the project and its importance to the country: With respect to the importance of the project to the nation, it can be well said that in a developing nation like India, cement is essential for infrastructural development. Thus, keeping in mind this requirement, Quarry of Stone boulder is essential for the nation`s growth. Shri Mukesh Sharma has proposed stone Quarry project in order to meet the requirement of Stone boulder for the construction work in nearby areas. (iv) Demand supply gap: Shri Mukesh Sharma has proposed stone quarry will meet the requirement/demand of Metal Stone quarry for the construction work in nearby areas (v) Imports vs. Indigenous production: As the stone availability from indigenous sources, the import of the same is not required. (vi) Export possibility There is no export possibility as these minerals are quite cheap and locally available in abundance. (vii) Domestic / Export Markets: These stone boulders have only domestic market as such will be consumed in local or nearby industries. (viii) Employment Generation (Direct and Indirect) due to the project: Direct and indirect employment will be generated due to the project. Unskilled / semi Skilled manpower can be sourced from the local area and skilled manpower will be sourced from outside. At present about 10 manpower including technical, supervisory staff, wage board employees, officers and staff will be engaged in the Quarry activities. 3.0 PROJECT DESCRIPTION: (i) Type of Project including interlinked and interdependent projects if any: Manegaon Metal Stone quarry (M.L Area:1.63 ha.) production capacity 50000m3 at Village- Manegaon, Tehsil- Jabalpur, District- Jabalpur, (M.P) of Shri Mukesh Sharma. Interlinked Project: There is no interlinked or interdependent project based on mineral produced. stone boulder after sorting and sizing will be sold directly to industries in open market. (ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates. LOCATION PLAN (iii) Details of alternative site consideration and basis of selecting the proposed site particularly the environmental considerations gone Sound are highlighted. The Quarry lease was sanctioned by collector Jabalpur in the name of Shri Mukesh Sharma vide their Letter No. vide letter no. 1538-Khanij/Q.L./2016-17 dated 14/09/2016 for a period of 10 years.