Social Monitoring Report

Project Number: 49377-001 March 2019 Period: Inception – December 2017

IND: District Roads II Sector Project

Submitted by: Madhya Pradesh Road Development Corporation Ltd.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LTD. (GOVERNMENT OF MADHYA PRADESH)

Loan No. 3437-IND: Madhya Pradesh District Road II Sector Project (MPDRIISP)

SOCIAL SAFEGUARD MONITORING REPORT

Reporting Period: Inception to December-2017

Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

ABBREVIATION

ADB - Asian Development Bank

BOQ - Bill of Quantity

CPR - Community Property Resources

CSC - Construction Supervision Consultant

GoI - Government of

GoMP - Government of Madhya Pradesh

GRC - Grievance Redress Committee

IP - Indigenous People

IPDF - Indigenous People Development Frameworks

IR - Involuntary Resettlement

JV - Joint Venture

LAR - Land Acquisition and Resettlement

MDR - Major District Roads

MP - Madhya Pradesh

MPDRIISP - Madhya Pradesh District Road II Sector Project

MPRDC - Madhya Pradesh Road Development Corporation

PIU - Project Implementation Unit

RF - Resettlement Framework

RoW - Right of Way

RP - Resettlement Plan

SDDR - Social Due Diligence Report

Social Safeguard Monitoring Report, Inception – December 2017 Page - 1 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

TABLE OF CONTENTS

1 INTRODUCTION AND PROJECTBACKGROUND ...... 3 2 BRIEF DESCRIPTION OF SUB-PROJECTS ...... 3 3 PROJECTS CATEGORIZATION ...... 7 4 RESETTLEMENT IMPACTS IN THE SUB-PROJECTS ...... 9 5 SOCIAL SAFEGUARD ACTIVITIES DURING THE REPORTING PERIOD ..... 10

5.1 IMPLEMENTATION OF SOCIAL SAFEGUARDS: ...... 10

5.2 VERIFICATION OF COMMUNITY STRUCTURES (CPRS) ...... 10 6 CONSULTATION WITH THE STAKEHOLDERS ...... 12 7 GRIEVANCE REDRESS ...... 15 8 INSTITUTIONAL ARRANGEMENT ...... 16 9 COMPLIANCE STATUS WITH RESPECT TO LOAN COVENANT ...... 16 10 CONCLUSIONS ...... 18

Annexure 1: Attendance of Participants during Public Consultation and Photographs ...... 19 Annexure-2: Details of State level and Divisional level GRCs Committee ...... 51

Social Safeguard Monitoring Report, Inception – December 2017 Page - 2 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

SEMI-ANNUAL SOCIAL SAFEGUARD MONITORING REPORT

1 INTRODUCTION AND PROJECTBACKGROUND The Madhya Pradesh state has a road network of about 127,000 km, of which about 4,700 km are national highways, 11,000 km are state highways, and 20,000 km are Major District Roads (MDR). Rural roads make up the balance of the road network. The Government of Madhya Pradesh (GoMP) has been using a combination of budgetary, Public-Private Partnership and ADB financing, to improve road network in Madhya Pradesh (MP). The project will complement the past and ongoing efforts under previously ADB funded road sector projects in the State of MP. MDRs form the key linkage between rural, peri-urban and urban areas. MDRs, have not been specifically targeted for improvement resulting in overall poor road network connectivity. GoMP has now proposed to improve the MDRs through the Madhya Pradesh District Road II Sector Project (MPDRIISP) financed by ADB. The Project will improve transport connectivity in the state by rehabilitating and upgrading MDRs hereby providing reliable road transport services in the state. The Project constitutes (i) rehabilitating and upgrading about 1468.245 km1 of MDRs; (ii) improving road maintenance and asset management; and (iii) developing an efficient accident response system. MPRDC specifically, targeting MDRs to form key linkage between rural, semi- urban and urban areas and complete state road connectivity. The project has identified, 57 stretches of existing Major District Roads (MDRs) with total length of about 1468.245 km under25 packages for widening and reconstruction. 2 BRIEF DESCRIPTION OF SUB-PROJECTS The proposed project for widening and reconstruction of MDRs from single lane/ intermediate lane/ two lane carriageway to intermediate/ two lane carriageway, the Madhya Pradesh Road Development Corporation (MPRDC), GoMP, aimed at improving the MDRs to provide reliable road transport services in the state. MPRDC has selected 57 subproject road stretches under 25 packages (package- 1{-1} has 5 contracts, package-2{} has 7 contracts and package-3 {Rewa} has 13 contracts) with total length of 1468.245 km.. All the 25 packages are scattered across the state in the districts of the Guna, Shivpuri, Ashok Nagar, Vidisha, , Dewas, , Sagar, Chhattarpur, Seoni, , Chindwara, Rewa, Sidhi, Singrauli, , and . The details of all concerned sub-projects are as under in Table-1.

1Initially the project envisaged the rehabilitation and construction of approximately 1530km.

Social Safeguard Monitoring Report, Inception – December 2017 Page - 3 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Table-1: Details of Package wise Subprojects and Progress

Date of Date of Progress Length Name of Road Name of Contractor Contract Commen- of the No. in K.M Signing cement Project Package Package-1 (Bhopal) Khatakia to Suthaliya via. M/s Bansal Construction NH-3, Kumbraj, Barod, Works Pvt. Ltd. & Pkg-1 Mragwas, Batawda, 70.79 Prakash Asphaltings& 10.05.2017 16.06.2017 7.46% Chanchoda, Binaganj, Toll Highways (India) Ltd Teligaon (MDR-6-10) (JV) Sirsod-Pichhore Road (MDR- 31.24 07-01) M/s KCC Buildcon Pvt. Pkg-2 03.05.2017 24.05.2017 8.90% Narwar-Chitori to Amola Ltd. 26.33 Road (MDR-07-01) Mungawali-Malahargarh 16.72 Road (MDR-08-04) Piprod-Thubon Road (MDR- M/s Gawar 7.74 Subproject Subproject Subproject 08-05) Construction Ltd. & Pkg-3 Not Not Not Belai-Kareela Mata Mandir M/s Atcon India Ltd. 17.72 Awarded Awarded Awarded Road (MDR-08-09) (JV) Bhounrasa-Malhargarh Road 20.13 (MDR-27-18) Sanwer-Chandravatiganj- M/s DineshChand R. Subproject Subproject Subproject Pkg-4 Gautampura Road (MDR-27- 33.94 Agrawal Infracon Pvt. Not Not Not 18) Ltd. Awarded Awarded Awarded -Kantaphod-Satwaas- M/s Dinesh Chand R. Pkg-5 Khategaon Road (MDR-10- 55.065 23.02.2017 19.04.2017 28.06% Agrawal 03) Package-2 (Jabalpur)

Gadarwara-Gotetoria Road 13.57 (MP-MDR-41-03)

Podar-Salichok-Babai- M/s Gannon Pkg-6 2 23.57 12.05.2017 24.07.2017 7.26% Sukhakhairi Road Dunkerley& Co. Ltd. (MP-MDR-41-12)

Kareli-Singhpur-Dangidhana 32.86 Road (MP-MDR-41-14)

Maharajpur-Sahajpur Road 24.45 (MP-MDR-31-08) Samnapur-Bilehra- NanhiDeori-Narayanpur M/s KCC BuildconPvt. Pkg-7 45.40 16.02.2017 26.04.2017 9.18% Road Ltd. (MP-MDR-31-29)

Kesali-Sahajpur Road 15.06 (MP-MDR-31-30) Garpehera-Dhamoni Road M/s KCC Buildcon Pvt. Pkg-8 35.33 16.02.2017 26.04.2017 8.50% (MP-MDR-31-14) Ltd.

2There is difference in nomenclature of name between DDR and Contract. However, its confirmed that it is one and the same road

Social Safeguard Monitoring Report, Inception – December 2017 Page - 4 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Date of Progress Length Name of Road Name of Contractor Contract Commen- of the No. in K.M Signing cement Project Package Barodiya-Dhamoni Road 19.81 (MP-MDR-31-15) Nauniya-Madanpura Road 1.81 (MP-MDR-31-23) Khurai-Rajwas Road 31.82 (MP-MDR-31-10) BariyaChoki-Lugasi-Garhi- Malhara Road 15.54 (MP-MDR-36-06) Bamitha-Dumra Road M/s IL&FS (Rajnagar to Dumra ) 28.07 Transportation (MP-MDR-35-07) Pkg- Networks Ltd. And Rajnagar-Bachhon Road 02.03.2017 26.04.2017 2.30% 10 23.85 IL&FS Engineering & (MP-MDR-35-10) Construction Company Khaparia-Banspahari Road 24.47 JV (MP-MDR-35-13) -Vikrampur- Rajnagar Road (Vikrampur to 10.24 Rajnagar)(MP-MDR-35-23) -Kanhiwada Road 21.79 M/s IL&FS (MP-MDR-37-07) Transportation Dharna-Asta-Dondiwada- Pkg- Networks Ltd. And Dharmakua Road 26.23 02.03.2017 26.04.2017 2.14% 11 IL&FS Engineering & (MP-MDR-37-11) Construction Company - Road 30.60 JV (MP-MDR-42-06) Rampayali-GarraChouki 27.56 Road (MP-MDR-42-16) Khairlanji-Agasi Road 28.96 (MP-MDR-42-18) M/s Pkg- SorathiaVeljiRatna& Laalbarra-Samnapur Road 19.05.2017 16.05.2017 7.13% 12 8.40 Co. M/s Ketan (MP-MDR-42-20) Construction Ltd (JV) Sitapathar-Mahkepaar- Goreghat Road 23.04 (MP-MDR-42-24) Chourai-Panjara-Chand Road 17.22 (MP-MDR-40-10) Pkg- Chand-Bichhua-Khamarpani M/s GHV (INDIA) Pvt. 59.30 01.05.2017 28.05.2017 5.78% 14 Road(MP-MDR-40-10) Ltd. Raymond Chowk – Saikheda 11.70 Road Package-3 (Rewa) Subproject Subproject Subproject Teonther – Shankargarh(MP- Subproject Not 14.60 Not Not Not MDR 43-09) Awarded Pkg- Awarded Awarded Awarded 15A Subproject Subproject Subproject Naigarhi – Garh Road (MP- Subproject Not 14.14 Not Not Not MDR 43-17) Awarded Awarded Awarded Awarded Pkg- Baheradabar – Piparahi – M/s Udit Infra world Subproj Subproject Subproject 19.70 15B Jadkud Road (MP-MDR 43- Pvt. Ltd. Rewa, M.P. ect Not Not Not

Social Safeguard Monitoring Report, Inception – December 2017 Page - 5 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Date of Progress Length Name of Road Name of Contractor Contract Commen- of the No. in K.M Signing cement Project Package 11) Awarde Awarded Awarded d Kirhai –Ramgarh – Subproject Subproject Subproject Mukundpur Road (MP-MDR 34.35 Subproject Not Awarded Not Not Not Pkg- 44-16) Awarded Awarded Awarded 16A Subproject Subproject Subproject Bhadanpur – Bhatura Road ( 20.05 Subproject Not Awarded Not Not Not MP-MDR 44-23) Awarded Awarded Awarded Subproj M/s ABC Associates JV Subproject Subproject Pkg- Jharkua – Raigon – Kasara ect Not 23.95 Bhati Associates Pvt. Not Not 16B (MP-MDR 44-19) Awarde Ltd., M.P. Awarded Awarded d HarfariKhaira – Misirgawan Subproject Subproject 25.99 M/s Prakash Asphalting Pkg- Road (MP-MDR 46-08) Not Not & Toll Highways (India) 22.09.2017 17 Chitrangi – Road Commence Commenc 22.67 Ltd., Indore (MP-MDR 46-02) d ed Persauna-Mada Road (MP- 12.615 M/s Barbrik Project Subproject Subproject Subproject Pkg- MDR 46-03) Limited, , Not Not Not 18A Mada-Ramgarh Road (MP- 19.87 Chattisgarh.- Awarded Awarded Awarded MDR 46-04) Subproject Subproject Subproject Pkg- Jhurai - Sarai Road (MP- M/s ShreejiInfraspace 31.44 Not Not Not 18B MDR 46-04) Pvt. Ltd., . Awarded Awarded Awarded M/s Shreeji Infrastructure India Pvt. Pkg- Sohagpur – Manpur Road 59.40 Ltd. – PRL Projects & 27.02.2017 15.07.2017 6.06% 19 (MP-MRD 46-01) Infrastructure Ltd. (SIIPL-PRL) (JV) Anuppur – Jaitpur Road (MP- 36.66 MDR 49-04) Gohparu – Rasmohni – Pkg- M/s GHV (INDIA) Pvt. Budhar (via Bathiya Road) 39.935 22.02.2017 24.03.2017 11.23% 20 Ltd. (MP-MDR 49-08) Pasgarhi – Deori – Janakpur 23.49 Road (MP-MDR 49-07) Jigna New Ramnagar to 24.20 Gorsarsri Road (MP-MDR) Subproject Subproject Subproject Pkg- GovindgarhTikrLaxmanapur Subproject Not 17.71 Not Not Not 21 Road (MP-MDR) Awarded Awarded Awarded Awarded BrohariManpur Road (MP- 16.83 MDR) DeotalabGarh Road (MP- 14.79 Subproject Subproject Subproject Pkg- MDR) Subproject Not Not Not Not 22A Latiyar-Hanumana Road Awarded 26.04 Awarded Awarded Awarded (MP-MDR) Sohagi-Teothar-Panwar- Subproject Subproject Subproject Pkg- 9.52 Subproject Not Daboura Road (MP-MDR) Not Not Not 22B Awarded Chakghat-Sonari Road (MP- 27.76 Awarded Awarded Awarded

Social Safeguard Monitoring Report, Inception – December 2017 Page - 6 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Date of Progress Length Name of Road Name of Contractor Contract Commen- of the No. in K.M Signing cement Project Package MDR) M/s Shreeji Infra space Subproject Subproject Subproject Pkg- Kotma - JaithariRajendragram Pvt. Ltd. – M/s Gour 52.21 Not Not Not 23 Road (MP-MDR) Road Tar Coat Pvt. Ltd. Awarded Awarded Awarded (JV)

By the end of this reporting period, MPRDC has awarded 13 contract packages and the civil works have also commenced in 12 packages. The supervision consultancy contract is awarded for Package-1 (Bhopal) is M/s URS Scott Wilson India Private Limited, India in association with M/s Aicons Engineering Pvt. Ltd., India, Package- 2 (Jabalpur) is M/s MSV International Inc., USA in joint venture with Highway Engineering Consultants India and Package-3 (Rewa) is M/s Intercontinental Consultants and Technocrats Pvt. Ltd., India in joint venture with Rodic Consultants Pvt. Ltd., India., The package wise details of supervision consultants in Table-2. Table-2: Name of Package Wise Supervision Consultant

Civil Work Package No./Name of Contract Name of Supervision Consultant Contract Contract Signing Package No. M/s URS Scott Wilson India Supervision Consultant Private Limited, India in Package-1 to 01-Mar-2017 for Package-1 (Bhopal) association with M/s Aicons Package-5 Engineering Pvt. Ltd., India M/s MSV International Inc., USA Supervision Consultants Package-6 to in joint venture with Highway 04-Mar-2017 for Package-2 (Jabalpur) Package-14 Engineering Consultants India M/s Intercontinental Consultants Supervision Consultants and Technocrats Pvt. Ltd., India in Package-15 to 27-Jan-2017 for Package-3 (Rewa) joint venture with Rodic Package-23 Consultants Pvt. Ltd., India.

3 PROJECTS CATEGORIZATION The project has been categorised as category ‘B’ for involuntary resettlement (IR) and Category ‘C’ for Indigenous People (IP) as per ADB’s Safeguard Policy Statement (SPS), 2009. The subprojects do not involve any land acquisition or involuntary resettlement impact on titled/ non-titled people except for Package-11. The construction of Package-11 envisages the temporary resettlement (livelihood) impact on nine households and the resettlement plan (RP) has been disclosed on ADB website. While for remaining subprojects the three social due diligence reports (DDR) confirming no resettlement impacts and availability of required right of way for construction of the subprojects have been prepared and disclosed on ADB

Social Safeguard Monitoring Report, Inception – December 2017 Page - 7 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

website. The subproject wise safeguard categorisation is provided in Table-3 below: Table-3: Details of Subprojects Impacts and Categorization No. of APs Package Actual Name of Road District as per RPs/ Category No. Impact DDRs Khatakia to Suthaliya via. NH-3, Pkg-1 Kumbraj, Barod, Mragwas, Batawda, Guna Nil Nil C Chanchoda, Binaganj, Teligaon Sirsod-Pichhore Road Pkg-2 Shivpuri Nil Nil C Narwar-Chitori to Amola Road Mungawali-Malahargarh Road Piprod-Thubon Road Ashok Pkg-3 Nagar, Nil Nil C Belai-Kareela Mata Mandir Road Vidisha Bhounrasa-Malhargarh Road Sanwer-Chandravatiganj- Pkg-4 Indore Nil Nil C Gautampura Road Bijawar-Kantaphod-Satwaas- Pkg-5 Dewas Nil Nil C Khategaon Road -Gotetoria Road Podar-Salichok-Babai-Sukhakhairi Pkg-6 Narsinghpur Nil Nil C Road Kareli-Singhpur-Dangidhana Road Maharajpur-Sahajpur Road Samnapur – Bilehra - NanhiDeori - Pkg-7 Sagar Nil Nil C Narayanpur Road Kesali-Sahajpur Road Garpehera-Dhamoni Road Barodiya-Dhamoni Road Pkg-8 Sagar Nil Nil C Nauniya-Madanpura Road Khurai-Rajwas Road BariyaChoki – Lugasi – Garhi - Malhara Road Bamitha-Dumra Road (Rajnagar to Dumra) Pkg-10 Chhatarpur Nil Nil C Rajnagar-Bachhon Road Khaparia-Banspahari Road Chhatarpur-Vikrampur-Rajnagar Road (Vikrampur to Rajnagar) Barghat-Kanhiwada Road Dharna-Asta-Dondiwada-Dharmakua Seoni, Pkg-11 9 9 B Road Balaghat Waraseoni-Katangi Road Rampayali-GarraChouki Road Pkg-12 Balaghat Nil Nil C Khairlanji-Agasi Road

Social Safeguard Monitoring Report, Inception – December 2017 Page - 8 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

No. of APs Package Actual Name of Road District as per RPs/ Category No. Impact DDRs Laalbarra-Samnapur Road Sitapathar-Mahkepaar-Goreghat Road Chourai-Panjara-Chand Road Pkg-14 Chand-Bichhua-Khamarpani Road Nil Nil C Raymond Chowk – Saikheda Road Teonther – ShankargarhRoad Pkg-15A Rewa Nil Nil C Naigarhi – Garh Road Baheradabar – Piparahi – Jadkud Pkg-15B Rewa Nil Nil C Road Kirhai –Ramgarh – Mukundpur Road Pkg-16A Satna Nil Nil C Bhadanpur – Bhatura Road Pkg-16B Jharkua – Raigon – Kasara Road Satna Nil Nil C HarfariKhaira – Misirgawan Road Pkg-17 Singrauli Nil Nil C Chitrangi – Garhwa Road Persauna-Mada Road Pkg-18A Sidhi Nil Nil C Mada-Ramgarh Road Pkg-18B Jhurai - Sarai Road Singrauli Nil Nil C Shahdol, Pkg-19 Sohagpur – Manpur Road Nil Nil C Umaria Anuppur – Jaitpur Road Gohparu – Rasmohni – Budhar (via Pkg-20 Shahdol Nil Nil C Bathiya Road) Pasgarhi – Deori – Janakpur Road Jigna New Ramnagar to Gorsarsri Road Rewa, Pkg-21 Shahdol, Nil Nil C GovindgarhTikrLaxmanapur Road Umaria Brohari - Manpur Road Deotalab Garh Road Pkg-22A Rewa Nil Nil C Latiyar-Hanumana Road Sohagi-Teothar-Panwar-Daboura Pkg-22B Road Rewa Nil Nil C Chakghat-Sonari Road Pkg-23 Kotma - Rajendragram Road Anuppur Nil Nil C

4 RESETTLEMENT IMPACTS IN THE SUB-PROJECTS During the reporting period, the subprojects did not cause any land acquisition and involuntary resettlement (permanent/ temporary) impacts on structures or livelihood. The MPRDC officials along with the consultant has conducted ground verification and site visits to all the subprojects and confirmed that the project does not cause any land acquisition and involuntary resettlement. All subproject roads construction works are being undertaken

Social Safeguard Monitoring Report, Inception – December 2017 Page - 9 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

within the available RoW. The contractors have been instructed to construct the road without affecting any titled, non-titled, built-up, private/public property/house boundary etc. and the contractors to provide adequate access to avoid any disruption of their livelihoods, if any. During the site visits, it has been verified that 132 hand pumps are likely to get affected and would require shifting. The summary of socio-economic and resettlement impacts is provided in Table-4. Table-4: Summary of Resettlement Impacts and Socio-Economic Details Package-1 Package-2 Package-3 Type of Impact Remark (Bhopal) (Jabalpur) (Rewa) 1. Temporary livelihood loss 0 9 0 2. Impact on CPRs Affected CPRs as per BOQ 60 217 101 Affected CPRs as per SDDR 0 0 0 Affected CPRs during 38 78 16 Construction

5 SOCIAL SAFEGUARD ACTIVITIES DURING THE REPORTING PERIOD 5.1 Implementation of social safeguards: In order to identify any resettlement impacts, during project implementations, the EA and the consultants have carried out several site visits and consultations with the people in the subproject areas during the reporting period. The implementation of the concerned subproject does not cause any land acquisition, resettlement of structures and livelihood impact during the reporting period. The public consultation will be continued throughout the project implementation period to ensure that no social/resettlement issues remain unaddressed. 5.2 Verification of Community Structures - Community Property Resources Impact on community property resources (CPR) is critical from the point of view of community. In terms of CPRs, only hand pumps are likely to be affected and the list provided in the Bill of Quantity (BOQ) has been verified on ground in accordance with the detailed design. As per the verification, 132 hand pumps (Package 1-38, Package 2- 78, Package 3- 16) are likely to be impacted. The contract package-wise list of affected hand pumps is provided in the Table-5. The provision of shifting of hand pumps have been incorporated in the civil contract and the hand pumps will be relocated in consultation with the community and sarpanch of the concerned village. During this reporting period no hand pumps are shifted/ relocated.

Social Safeguard Monitoring Report, Inception – December 2017 Page - 10 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Table-5: Community Structures as per Contract Agreements/ DDRs and during Implementation

Impact on Community Structures - CPRs Package No. of HP as per Actual no. Status of Shifting/ Target for No. Contract of HP to be Relocation Shifting Agreement/ BOQ Shifted

Shifting not initiated due to Target for rainy season and estimates Pkg-1 21 10 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-2 17 9 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-3 22 22 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-4 8 8 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-5 22 19 Shifting is being obtained from Dec-2018 PHED Deptt. Pkg-6 18 0 No hand pump impacted - Shifting not initiated due to Target for rainy season and estimates Pkg-7 30 12 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-8 26 8 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-10 50 5 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-11 24 24 Shifting is being obtained from Dec-2018 PHED Deptt.

Social Safeguard Monitoring Report, Inception – December 2017 Page - 11 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Impact on Community Structures - CPRs Package No. of HP as per Actual no. Status of Shifting/ Target for No. Contract of HP to be Relocation Shifting Agreement/ BOQ Shifted Shifting not initiated due to Target for rainy season and estimates Pkg-12 46 24 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-14 23 5 Shifting is being obtained from Dec-2018 PHED Deptt. Pkg-15B 3 0 No hand pump impacted - Shifting not initiated due to Target for rainy season and estimates Pkg-16B 16 8 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-17 30 6 Shifting is being obtained from Dec-2018 PHED Deptt. Pkg-18A 36 0 No hand pump impacted - Shifting not initiated due to Target for rainy season and estimates Pkg-18B 3 5 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-19 56 5 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-20 45 11 Shifting is being obtained from Dec-2018 PHED Deptt. Shifting not initiated due to Target for rainy season and estimates Pkg-23 22 8 Shifting is being obtained from Dec-2018 PHED Deptt.

6 CONSULTATION WITH THE STAKEHOLDERS The public consultation/meetings were organized with the local communities including construction workers as well as women about the importance of the project for their betterment. In the meetings people were made aware about

Social Safeguard Monitoring Report, Inception – December 2017 Page - 12 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

widening proposal, social issues, redress of grievances, if any, advantages of the project and documented their suggestion regarding project. The package- wise summary of issues discussed during consultations held with local people/communities given in Table-6: Table-6: Summary of Public Consultation Issues Discussed Response/ Outcome Package-1 (Bhopal)  Provide proper and better  The majority of the people have access to roads, markets, appreciated the project road construction hospitals, community work and benefit of the project road. centres and agriculture  People expect that the improved project produce. road will provide better accessibility to  Complains if any arise roads, markets, hospitals, community during construction. centres and agriculture operations.  Proper road safety  People were informed about the measuresshould be Grievance Redress Mechanism for provided during lodging the complaints, if any. construction near  For road safety measures, there is settlement areas/ market requirement of speed breaker/ rumble areas to avoid the accidents. strips in settlement areas/market areas to  Provide proper drainage avoid the accidents. system along the villages.  Construction of appropriate and effective  Shifting of hand pump near drainage system in residential the village before areas/market areas. construction of the road.  Hand pumps will be shifted after consultation with the villagers/community prior construction. Package-2 (Jabalpur)

 Complains if any arise  People were informed about the during construction. Grievance Redress Mechanism for lodging the complaints, if any and to  Provide proper drainage resolve the problem system along the villages.  Construction of appropriate and effective  Shifting of hand pump near drainage system in residential the village before areas/market areas. construction of the road.  Hand pumps will be shifted after consultation with the villagers/ community before construction. Package-3 (Rewa)  Provide proper and better  People expect that the improved project

Social Safeguard Monitoring Report, Inception – December 2017 Page - 13 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Issues Discussed Response/ Outcome access to markets and road will provide accessibility to markets agriculture produce and agriculture operations. material.  Reduction in travel time, traffic  Improve road connectivity congestion and vehicle operating cost. and reduce time to  Better access to health care, education, accessibility to health market and other social services. center, schools and other social institutions.  Positive impact of improved project road in terms of better quality of life and living  Proper road safety standards. measures should be provided during  Proper road safety measures in construction near village/ settlement areas/market areas to avoid market areas. the accidents.  Shifting of hand pump near  Shifting of hand pumps at appropriate the village before locations in consultation with villagers construction of the road. and sarpanch.  Provide proper drainage  Construction of drainage system in system along the villages. residential areas/market areas.

The public consultation were conducted to comprehend expectation from subprojects and also to understand the need and concerns of the local people including vulnerable and elderly population. The list of the consultations held with date, location and number of participants and photographs are attached as Annexure-1. The details of public consultations are presented in Table-7. Table-7: Details of Public Consultations Sl. Package Number of Date Village No Participants 1 19/09/2017 Package 5 Bijwar 05 2 20/09/2017 Package 1 Nathukapura 10 3 25/11/2017 Package 5 Bijwad 09 4 27/12/2017 Package 1 Mirgawas 07 5 28/12/2017 Package 2 Dulai 08 6 02/11/2017 Package 6 Gotetoria 09 7 02/11/2017 Package 6 Sukhakhedi 06 8 02/11/2017 Package 6 Amgaon 10 9 07/11/2017 Package 7 Maharajpur 15 10 07/11/2017 Package 7 Plop 15 11 07/11/2017 Package 7 Choka 05 12 06/11/2017 Package 8 Kuradi 10

Social Safeguard Monitoring Report, Inception – December 2017 Page - 14 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Sl. Package Number of Date Village No Participants 13 06/11/2017 Package 8 Barodia Kala 06 14 06/11/2017 Package 8 Tigra Khurd 07 15 04/11/2017 Package 10 Bariya Chowki 10 16 04/11/2017 Package 10 Deherra 08 17 04/11/2017 Package 10 Kurela 15 18 05/11/2017 Package 10 Patha 10 19 05/11/2017 Package 10 Vikrampur 10 20 09/11/2017 Package 11 Kosmi 05 21 09/10/2017 Package 11 Dharmakua 07 22 09/11/2017 Package 11 Sawanngi 07 23 10/11/2017 Package 12 Chikhalabad 10 24 10/11/2017 Package 12 Saleteka 10 25 10/11/2017 Package 12 Sundartola Dadiya 09 26 10/11/2017 Package 12 Sukhali 06 27 11/11/2017 Package 14 Badivada 09 28 11/11/2017 Package 14 Chand 15 29 08/09/2017 Package 19 Backle 11 30 08/09/2017 Package 19 Medhakl 04 31 06/09/2017 Package 20 Bhatiya 10 32 06/09/2017 Package 20 Gohparu 10 33 06/09/2017 Package 20 Jaitpur 12 34 09/09/2017 Package 20 Chakodiya 18 35 09/09/2017 Package 20 Bhatiya 13 36 09/09/2017 Package 20 Channodi 11

7 GRIEVANCE REDRESS MECHANISM Grievances Redress Mechanism of the subprojects is an integral part of agreed Resettlement Framework (RF). RF requires constitution of Grievance Redress Committees (GRC) at the State as well as PIU levels to deal with the disputes, complaints, receiving suggestions and facilitate timely implementation of the sub-project. GRC has been constituted in two levels. The state level GRC at MPRDC, Bhopal and Divisional Level/ PIU level GRC has been constituted vide No.21415 dated 31st March 2017. The order copies are attached as Annexure-2. A complaint register has been maintained at each division and also in the contractor’s camp for recording of complaints of local public and other stakeholders. During the reporting period, no any grievances were received from any of the community. During public consultation, most of the people told that they are not having any grievances against the subproject and project did not caused any impact on their private land, properties, structure and livelihood during this reporting period.

Social Safeguard Monitoring Report, Inception – December 2017 Page - 15 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

8 INSTITUTIONAL ARRANGEMENT The Executing Agency (EA) for the project is GoMP through MPRDC. MPRDC is wholly owned by GoMP. A Chief Engineer at MPRDC headquarter has been designated as person in charge for project implementation. MPRDC has appointed a social safeguard expert (SSE) for implementation and monitoring of social safeguard requirements. The SSE at MPRDC headquarters, reports to the Chief Engineer, is responsible for ensuring compliance with social safeguards of project roads. The SSE is supported by three R&R cum Social Development Specialists from each construction supervision consultants (CSC) on an intermittent basis. MPRDC has twelve divisional offices (Bhopal, Jabalpur, Sagar, , Chambal, , Indore, Sidhi, Shahdol, Narmadapuram, Seoni and Rewa) acting as Project Implementation Units (PIU) and, each is headed by a Divisional Manager (Tech.) who is of the rank of executive engineer, and is responsible for overall implementation in the field. At PIUs, one officer of the rank of assistant engineer has been given the additional charge of safeguards. R&R cum Social Development Specialists of CSCs have been mobilized during the reporting period. The details of inputs provided by the experts are given in table below.

S. No. Name of the Expert/ Package Input (Person Days) 1 Arbind Kumar Soni (Package-1) 40 Days 2 Naresh Singh (Package-2) 38 Days 2 T. Veer Raju (Package-3) 32 Days

9 COMPLIANCE STATUS WITH RESPECT TO LOAN COVENANT The compliance status with respect to loan covenant is presented in the Table-8 below: Table-8: Compliance Status of Loan Covenant S. Status of Loan Covenant Agency No. Compliance 1 GOI and the State will ensure that all land and GoI No land right of way required for Investment Program and acquisition and are made available in timely manner GoMP resettlement issues are involved in this project 2 Adequate compensation are provided prior to GoI No land the signing of relevant civil works contracts, and acquisition and and involuntary resettlement is carried out in GoMP resettlement accordance with the resettlement framework issues are (RF) and resettlement plans (RPs) agreed involved in this

Social Safeguard Monitoring Report, Inception – December 2017 Page - 16 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

S. Status of Loan Covenant Agency No. Compliance upon between the Government and ADB. An project RP will be prepared for each subproject involving land acquisition and resettlement and shall be submitted to ADB for review and approval prior to award of any related civil works contracts, if any. 3 GOI and the State will ensure that subprojects GoI No negative will not negatively impact on vulnerable and Impact on any groups such as indigenous people. In the GoMP groups event of their involvement in any of subprojects, the GOI and the states will ensure that the subprojects are carried out in accordance with the Indigenous People Development frameworks (IPDF) agreed up on between GOI and the states and the ADB and comply with ADBs policy on Indigenous People (1998). 4 In the event any issues related to indigenous GoI Agreed. No people arises in course of project and issue related to implementation, the borrower and the State GoMP indigenous shall ensure to address those issues in people is accordance with the applicable laws and anticipated. policies of the borrower, ADB’s policy on indigenous peoples (1998) and the Indigenous People Development Framework for the facility as agreed between the borrower, the State and ADB. In the case of any discrepancy between the borrower’s legislation and ADB’s policy shall prevail. 5 GOI and State will ensure that all civil works GoI Complied contractors comply with all applicable labour and laws, including those on occupational health GoMP and safety and do not employ child labour as defined in national legislation for construction and maintenance activities. Priority work will be given to people from the area where the works are implemented and men and women will receive equal pay for work of equal value. 6 Within six months of the Effective Date, the GoMP GRC has been State shall have established a grievance Constituted redress mechanism

Social Safeguard Monitoring Report, Inception – December 2017 Page - 17 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

10 CONCLUSIONS MPRDC confirms that the subprojects, during the reporting period did not cause any impacts on land, resettlement (temporary/ permanent, partial/full) impacts on structures and livelihood of titled as well as non-titled households. All road construction works were undertaken within the available RoW. The contractors have been clearly instructed to construct the road without affecting any boundary/fencing of built up property. In event of any conflict, the contractors were advised to get such incidents to the knowledge of supervision consultant and the local MPRDC office well in advance to find out alternate solutions.

Social Safeguard Monitoring Report, Inception – December 2017 Page - 18 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Annexure 1: Attendance of Participants during Public Consultation and Photographs

Social Safeguard Monitoring Report, Inception – December 2017 Page - 19 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 20 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 21 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 22 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 23 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Chapter 5: Evidence Based Photographs of Package 06

Date of Road Number Road Name Location of FGD FGD MP-MDR-41- Gadarwara-Gotetoria Road 02-11-2017 Gotetoria - Package 06 03 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Sardar Beg 65 Mohpani 2. Rajesh Nagvanshi 45 Malhanwada 3. Mahendra Singh Kaurav 48 Pawaria 4. Sundar Thakur 55 Gotetoria 5. Rajesh Goswami 38 Gotetoria 6. ShekhRishad 35 Chinchali 7. Deepak Sarathe 22 Gotetoria 8. Shivam 18 Gotetoria 9. Mahesh Nagvanshi 18 Gotetoria

Date of Road Number Road Name Location of FGD FGD MP-MDR-41- Podar-Salichok-Babai-Sukhakhedi Sukhakhedi - Package 02-11-2017 12 Road 06 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Pushpendra Singh Kaurav 20 Badabaglai 2. Satyanarayan 37 Sukhakhedi 3. Radheshyam Yadav 30 Sukhakhedi 4. Vinod Thakur 18 Sukhakhedi 5. Teekaram 25 Sukhakhedi 6. Naresh Kaurav 35 Sukhakhedi

Date of Road Number Road Name Location of FGD FGD MP-MDR-41- Kareli-Singhpur-Dangidhana Road 02-11-2017 Amgaon - Package 06 14 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Prakash Jatav 46 AmgaonBada 2. Buli Chand 63 AmgaonBada 3. Brijesh 48 AmgaonBada 4. Rajendra 46 Simariya 5. Prakash Rajput 42 Karoda 6. Umesh Kumar 35 Amgaoan 7. Meghraj 44 Oriya 8. Shamadkhan 20 Aamgaon 9. Girish Shrivastava 42 Karoda 10. DurgeshChorasiya 30 Amgaon

Social Safeguard Monitoring Report, Inception – December 2017 Page - 24 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Chapter 5: Evidence Based Photographs of Package 07

Date of Road Number Road Name Location of FGD FGD Maharajpur - Package SH-32 Maharajpur-Sahajpur Road 07-11-2017 07 LIST OF RESPONDENTS OF FGD Sr. No. Name (Teacher & Student) Age Village 1. G.S. Khadikar 41 Maharjapur 2. RajeshwariSthapak 50 Maharajpur 3. Om Prakash Chhipa 41 Maharajpur 4. Ashish Tiwari 39 Maharajpur 5. Rajesh Kumar Singh 50 Maharajpur 6. Satish Yadav Sarivan 7. Manoj Kadhi Panari 8. RohitAhirwar Khakhariya 9. Bahudur Lodi Student in Kewlari 10. Vivek Bansal the age Panari 11. MohitKurmi group of Maharajpur 12. IshuVishvakarma 17-18 Maharajpur 13. Brijesh Prajapati Maharajpur 14. Aniket Prajapati Simariya 15. Ajay Ladiya Maharajpur

Date of Road Number Road Name Location of FGD FGD MP-MDR-31- Samnapur- Bilehra- NanhiDeori - 07-11-2017 Plop - Package 06 29 Narayanpur Road LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Rameshwar 60 Plop 2. Mohanlal 60 Plop 3. Nathu 28 Plop 4. Amol Singh 65 Plop 5. Durg Singh 70 Plop 6. Ghanshyam 33 Plop 7. Kedar Singh 45 Plop 8. Balram 55 Plop 9. Gopal 37 Plop 10. Singh 65 Plop 11. Ram Kishan 40 Plop 12. Ranbeer 29 Plop 13. Kamal Singh 29 Plop 14. Gappu 40 Plop 15. Vakil 32 Plop

Social Safeguard Monitoring Report, Inception – December 2017 Page - 25 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Road Number Road Name Location of FGD FGD MP-MDR-31- Kesali-Sahajpur Road 07-11-2017 Choka - Package 07 30 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Mastram Thakur 40 Choka 2. Kamal Shah Yadav 41 Choka 3. Ram Gopal 41 Choka 4. Mukesh 30 Jhiriya 5. Ganesh 30 Adahrpur

Social Safeguard Monitoring Report, Inception – December 2017 Page - 26 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Chapter 6: Evidence Based Photographs of Package 08

Date of Road Number Road Name Location of FGD FGD MP-MDR-31-14 Garpehera-Dhamoni Road 06-11-2017 Kuradi - Package 08 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Guddu 20 Kuradi 2. Ram Charan 60 Kuradi 3. Ram Sahay 55 Kuradi 4. Kashi Bai 55 Kuradi 5. Dharma Bai 55 Kuradi 6. Ganesh Bai 50 Kuradi 7. Chote Lal 40 Bhojpura 8. Bhupen 20 Kuradi 9. Udham 20 Kuradi 10. Mathura Bai 40 Kuradi

Date of Road Number Road Name Location of FGD FGD Barodia Kala - Package MP-MDR-31-15 Barodya-Dhamoni Road 06-11-2017 08 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Ajay Kushwaha 18 Barodia Kala 2. Ram Das 20 Barodia Kala 3. Bhagwan Das 19 Barodia Kala 4. Ram Sewak 20 Barodia Kala 5. Raja 24 Mankheda 6. Dayaram 55 Bikor

Date of Road Number Road Name Location of FGD FGD TigraKhurd - Package MP-MDR-31-10 Khurai-Rajwas Road 06-11-2017 08 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Mulayam Singh 60 TigraKhurd 2. Raja Bhai 25 TigraKhurd 3. Babloo 36 TigraKhurd 4. Jasraj 50 TigraKhurd 5. Mithlesh 50 TigraKhurd 6. Pritam 28 TigraKhurd 7. Shripal 18 TigraKhurd

Chapter 7: Evidence Based Photographs of Package 10

Social Safeguard Monitoring Report, Inception – December 2017 Page - 27 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Road Number Road Name Location of FGD FGD BariyaChoki-Lugasi-Garhi- BariyaChowki - SH-12 04-11-2017 Malhara Road Package 10 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Narendra Kumar Patel 36 Nuna 2. Bhagwan Das Patel 35 Nuna 3. Ramesh Chand Patel 45 Nuna 4. Santosh Anuragi 35 Nuna 5. Santosh Kushwaha 36 Nuna 6. Durga Prasad Patel 40 Nuna 7. Khem Chand Patel 35 Nuna 8. Chandra ShekharAhirwar 30 Nuna 9. Devendra Vishwa Karma 32 Nuna 10. PrabhuDayal Patel 40 Nuna

Date of Road Number Road Name Location of FGD FGD Bamitha- Dumra - Road (Rajnagar MP-MDR-35-07 04-11-2017 Deherra - Package 10 to Dumra) LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Maniram Patel 68 Deherra 2. Balram Shastri 37 Deherra 3. Balram Tiwari 23 Deherra 4. Damali Patel 38 Deherra 5. Ratan Vishwakarma 23 Deherra 6. Virendra Patel 21 Deherra 7. Arvind Patel 26 Deherra 8. Prakash Chand Pal 26 Deherra

Social Safeguard Monitoring Report, Inception – December 2017 Page - 28 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Number Road Name Location of FGD FGD SH-5 Rajnagar-Bachhon Road 04-11-2017 Kurela - Package 10 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Yogendra Singh Parmar 20 Kurela 2. Lakhan Lal 35 Kurela 3. Rohit Singh Parmar 23 Kurela 4. Pramod 24 Kurela 5. Shailendra Singh 30 Kurela 6. Nasir Ali 38 Kurela 7. Karan Singh Bundela 25 Kurela 8. Janmay Jai 19 Kurela 9. Swami Prajapati 28 Kurela 10. Chatarpal Singh Parmar 20 Kurela 11. Rajesh Sahu 35 Kurela 12. Ram Swaroop 30 Kurela 13. Sundar Lal 35 Rajapur 14. Bhola Yadav 32 Suratpur 15. Manoj Patel 36 Kurela

Date of Road Number Road Name Location of FGD FGD MP-MDR-35-13 KhapariaBanspahari Road 05-11-2017 Patha - Package 10 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Atma Ram Tripathi 61 Patha 2. Dinesh Gupta 23 Patha 3. Santosh Rajput 35 Patha 4. Mahesh Gupta 30 Patha 5. Kalyan Singh Rajput 40 Patha 6. Hira Lal Raikarwar 35 Patha 7. Thakur Das Vishvakarma 62 Patha 8. Govind Das 48 Patha 9. Manish Dewedi 30 Patha 10. LalluAhirwar 50 Patha

Social Safeguard Monitoring Report, Inception – December 2017 Page - 29 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Road Number Road Name Location of FGD FGD Chhatarpur-Vikrampur- MP-MDR-35-23 Rajnagar Road (Vikrampur to 05-11-2017 Vikrampur - Package 10 Rajnagar) LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. ShubhamBundela 20 Vikrampur 2. Manvendra Singh 20 Vikrampur 3. Ramendra Singh 23 Vikrampur 4. Nitin Singh Bundela 20 Vikrampur 5. Hero Sen 18 Vikrampur 6. LakhanAhirwar 30 Vikrampur 7. Prince Bundela 18 Vikrampur 8. Rohit Raja 18 Vikrampur 9. Raja Baba Yadav 20 Vikrampur 10. Gaurav Raja 22 Vikrampur

Social Safeguard Monitoring Report, Inception – December 2017 Page - 30 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Chapter 8: Evidence Based Photographs of Package 11

Date of Road Number Road Name Location of FGD FGD MP-MDR-37-07 Barghat-Kanhiwada Road 09-11-2017 Kosmi – Package 11 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Mrs. TijiyaInwalai 50 Kosmi 2. Mrs. SaritaMadway 40 Kosmi 3. Urmila Kunal 45 Kosmi 4. Savitri Parte 40 Kosmi 5. Sampati Parte 35 Kosmi

Date of Road Number Road Name Location of FGD FGD Dharna-Asta-Dondiwada- Dharmakua - Package MP-MDR-37-11 09-10-2017 Dharmakua Road 11 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Iren Thakur 40 Dharmakua 2. NarndraTahkur 38 Dharmakua 3. Kanihiya Raga Dale 36 Dharmakua 4. HarlalHanumat 32 Dharmakua 5. NandkishoreTahkur 30 Dharmakua 6. Laxmi Prasad Hanumat 35 Dharmakua 7. Lal Chand Sharnagat 28 Dharmakua

Date of Road Number Road Name Location of FGD FGD MP-MDR-42-06 Waraseoni-Katangi Road 09-11-2017 Sawanngi - Package 11 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Dignamber Singh 52 Sawanngi 2. Ambu Lal 50 Sawanngi 3. Dhanraj 40 Sawanngi 4. SukchandThakere 31 Sawanngi 5. Mukesh Patel 25 Sawanngi 6. DailyramPancheshwar 20 Sawanngi 7. BhumeshwarMeshram 30 Sawanngi

Social Safeguard Monitoring Report, Inception – December 2017 Page - 31 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Chapter 9: Evidence Based Photographs of Package 12

Date of Road Number Road Name Location of FGD FGD Chikhalabad - Package SH-48 Rampayali-GarraChouki Road 10-11-2017 12 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Chandra ShekharDhankhade 45 Chikhalabad 2. SurjeshBaghel 32 Chikhalabad 3. Sharad Daharwal 40 Chikhalabad 4. GorishankarBaghela 61 Chikhalabad 5. Mahendra 41 Chikhalabad 6. LokeshBaghel 36 Chikhalabad 7. Sandeep Gokulpure 41 Chikhalabad 8. HamendraBithale 28 Chikhalabad 9. Dharmendra Sahare 35 Chikhalabad 10. Rahil Ranade 23 Chikhalabad

Date of Road Number Road Name Location of FGD FGD MP-MDR-42-18 Khairlanji-Agasi Road 10-11-2017 Saleteka - Package 12 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Omkar Gautam 40 Saleteka 2. UdelalGautam 70 Saleteka 3. EashwantBarekar 37 Saleteka 4. UttamNeware 50 Saleteka 5. GulchandBagade 52 Saleteka 6. BaliramRahagdale 55 Saleteka 7. Vinay Barekar 30 Saleteka 8. LalchandBurre 33 Saleteka 9. Sanjay Rout 30 Saleteka 10. Ashok Burre 28 Saleteka

Date of Road Number Road Name Location of FGD FGD SH-48 Laalbarra-Samnapur Road 10-11-2017 Sundar Tola - Package 12 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Than Singh 54 Sundar Tola 2. Yadav Rao Abhilekh 38 Sundar Tola 3. Mahesh Dabali 35 Sundar Tola 4. BudhajiTumsebani 62 Bamani 5. Rup ShankerTidke 36 Dadiya 6. Jairamji Lute 55 Bamani 7. DasrathNiware 35 MegarDerra 8. Laltesh Kumar 35 Dadiya 9. Rajendra Prasad 56 Amoli

Social Safeguard Monitoring Report, Inception – December 2017 Page - 32 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Date of Road Number Road Name Location of FGD FGD MP-MDR-42- Sitapathar-Mahkepaar-Goreghat 10-11-2017 Sukhali - Package 12 24 Road LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Sanjay 30 Sukhali 2. Sitaram Nayak 60 Sukhali 3. Sukhchand 50 Sukhali 4. Lekhraj 40 Sukhali 5. Meetaram 30 Sukhali 6. Sriram 29 Sukhali

Social Safeguard Monitoring Report, Inception – December 2017 Page - 33 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Chapter 10: Evidence Based Photographs of Package 14

Date of Road Number Road Name Location of FGD FGD SH-46 Chourai-Panjara-Chand Road 11-11-2017 Badivada – Package 14 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. Harinarayan 45 Badivada 2. HriomMasavad 29 Badivada 3. Vinod Badshah 51 Badivada 4. Jitendera Mishra 46 Badivada 5. Raju Sahu 38 Badivada 6. Mersingh 39 Badivada 7. SantramBadshah 45 Badivada 8. Manesh Verma 25 Badivada 9. ShubhamBanwari 20 Badivada

Date of Road Number Road Name Location of FGD FGD SH-46 Chand-Bichhua-Khamarpani Road 11-11-2017 Chand - Package 14 LIST OF RESPONDENTS OF FGD Sr. No. Name Age Village 1. KamleshVishvakarma Harnakhedi 2. JitendraMalavi Ranikhedi 3. Raj Kakodiya Dhagadiya 4. Abhishek Soni BadaNaganpur 5. AsharmaPaljinya Kowa Kheda 6. ShambhuMangrale Group of Harnakhedi 7. SatyajeetSahu Students in Titari 8. Arvind Yadav the Age Harnakhedi 9. Sid Sahu Group of MudiaKheda 10. Raja Bharat 18-20 Gohargaon 11. Gulshan Verma Mohargaon 12. Yogesh Bharat Mudiyakheda 13. ShubhanshuToriya Tanddhana 14. Raju Binsare Pathraman 15. NihalMehdole Kowakheda

Social Safeguard Monitoring Report, Inception – December 2017 Page - 34 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 35 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 36 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 37 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 38 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 39 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 40 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 41 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 42 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 43 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Photographs of Public Consultations

Social Safeguard Monitoring Report, Inception – December 2017 Page - 44 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 45 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 46 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 47 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 48 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 49 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Social Safeguard Monitoring Report, Inception – December 2017 Page - 50 Madhya Pradesh District Road II Sector Project (MPDRIISP),Loan No. 3437-IND

Annexure-2: Details of State level and Divisional level GRCs Committee

Social Safeguard Monitoring Report, Inception – December 2017 Page - 51