Application for Full Planning Permission Former Quinn

Total Page:16

File Type:pdf, Size:1020Kb

Application for Full Planning Permission Former Quinn APPLICATION FOR FULL PLANNING PERMISSION FORMER QUINN RADIATOR FACTORY, IMPERIAL PARK, NEWPORT APPLICATION FOR FULL PLANNING PERMISSION FOR THE CHANGE OF USE OF THE MAIN BUILDING FROM B2 (GENERAL INDUSTRIAL) AND B8 (STORAGE AND DISTRIBUTION) USE CLASS WITH ANCILLARY B1 (BUSINESS) USE TO FLEXIBLE USE CLASS COMPRISING B1 (BUSINESS), B2 (GENERAL INDUSTRIAL) AND B8 (STORAGE AND DISTRIBUTION) TO ALLOW THE SUBDIVISION OF THE BUILDING TO CREATE 5 NEW UNITS WITH ASSOCIATED WORKS PLANNING STATEMENT FEBRUARY 2021 F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use of Former Quinn Radiator Factory, Imperial Park Planning Statement Page 2 of 34 CONTENTS Chapter 1 Introduction Chapter 2 Site and Surroundings Chapter 3 Development Proposals Chapter 4 Planning Policy Context Chapter 5 Material Considerations Chapter 6 Summary and Conclusion APPENDICES Appendix 1 - Planning Policy Context F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 3 of 34 EXECUTIVE SUMMARY This Planning Statement outlines that, on the basis of and informed by a comprehensive review of both the policy and physical context of the application site, the site is considered to be suitable to accommodate a change of use for the sub-division of the main building to allow flexible uses of B2/B8 use classes per unit and general associated work, and therefore the proposals should be viewed favourably for the following reasons: The proposed development seeks to change the existing use factory to a variety of B Class Uses on a brownfield site within a sustainable location. It is considered that there are several material considerations in support of the application, including the following: • The site lies within settlement boundary limits and on an under-utilised, vacant brownfield site; • The principle of developing the site as an employment would be acceptable in principle in terms of the LDP; • The proposal will benefit economically both the city of Newport and the wider Cardiff Capital City Region; • The change of use will create employment opportunities in the locality and improve Imperial Park as an ‘employment hub’; • The development would not result in a harmful impact on the residential amenity of the neighbouring properties; • The proposals would not result in an adverse highways impact, and the parking provision is considered acceptable given the sustainable location of the site; • It is not envisaged that there would be any adverse impacts in respect of flood risk, PRoWs and landscape. Having regard to the above material considerations, it is considered that the proposed development represents an appropriate and policy compliant scheme, which makes good use of this existing site to the benefit of the wider community. Accordingly, it is considered that the proposed development comprises a high-quality employment scheme in a much-needed location and is acceptable by way of its location, design, scale, community safety and its minimal environmental impacts. We therefore respectfully request that this application be approved. F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 4 of 34 1.0 INTRODUCTION 1.1 This Planning Statement has been prepared in support of an application for Full Planning Permission, submitted on behalf of F55 Sterling Newport S. à r. l. in relation to the following development proposal at the Former Quinn Radiator Factory, Imperial Park, Newport. “APPLICATION FOR FULL PLANNING PERMISSION FOR THE CHANGE OF USE OF THE MAIN BUILDING FROM B2 (GENERAL INDUSTRIAL) AND B8 (STORAGE AND DISTRIBUTION) USE CLASS WITH ANCILLARY B1 (BUSINESS) USE TO FLEXIBLE USE CLASS COMPRISING B1 (BUSINESS), B2 (GENERAL INDUSTRIAL) AND B8 (STORAGE AND DISTRIBUTION) TO ALLOW THE SUBDIVISION OF THE BUILDING TO CREATE 5 NEW UNITS WITH ASSOCIATED WORKS.” 1.2 This Planning Statement outlines the context within which the application is made and provides a detailed examination of the main planning considerations raised by the proposals, together with reasoned justification in support of the proposed development. 1.3 The statement is structured as follows: • Section 2 provides a description of the characteristics of the site and surrounding area, and details regarding the planning history associated with the site; • Section 3 provides details of the development proposals; • Section 4 outlines the relevant planning policy framework in relation to the site and the development; • Section 5 analyses the key planning considerations arising from the proposed development (considering the planning policy context); • Section 6 sets out our conclusions. Documents submitted in support of Application 1.4 The following documents are submitted in support of the application, and should be read alongside this planning statement: • Planning Application Form; • Plans & Drawings; • Plans and Drawings: o 312_A(--)001B Proposed Site Plan; o 312_A(--)002A Proposed Ground Floor Plan; o 312_A(--)003A Proposed First Floor Plan; o 312_A(--)004A Proposed Roof Plan; o 312_A(--)005A Proposed Elevations; o 312_A(--)101A Prop. Unit 1 Ground Plan; o 312_A(--)102A Prop. Unit 2 Ground Plan; o 312_A(--)103A Prop. Unit 3 Ground Plan; o 312_A(--)104A Prop. Unit 4 Ground Plan; o 312_A(--)105A Prop. Unit 5 Ground Plan; o 312_A(--)204A Prop. Unit 4 First Plan; o 312_A(--)205A Prop. Unit 5 First Plan; o 312_A(--)301A Proposed SOUTH Elev. Ext-01; o 312_A(--)302A Proposed SOUTH Elev. Ext-02; o 312_A(--)303A Proposed SOUTH Elev. Ext-03; o 312_A(--)304A Proposed NORTH Elev. Ext-01; o 312_A(--)305A Proposed NORTH Elev. Ext-02; o 312_A(--)306A Proposed NORTH Elev. Ext-03; o 312_A(--)307A Proposed WEST Elev. Ext-01; o 312_A(--)308A Proposed WEST Elev. Ext-02; o 312_A(--)309A Proposed EAST Elev. Ext-01; F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 5 of 34 o 312_A(--)310A Proposed EAST Elev. Ext-02; o 312_A(--)500A Proposed Area Schedule; o 312_L(--)001A Existing Site Plan; o 312_L(--)002A Existing Ground Floor Plan; o 312_L(--)003A Existing First Floor Plan; o 312_L(--)004A Existing Roof Plan; o 312_L(--)005A Existing Elevations; o 312_L(--)301A Existing SOUTH Elev. Ext-01; o 312_L(--)302A Existing SOUTH Elev. Ext-02; o 312_L(--)303A Existing SOUTH Elev. Ext-03; o 312_L(--)304A Existing NORTH Elev. Ext-01; o 312_L(--)305A Existing NORTH Elev. Ext-02; o 312_L(--)306A Existing NORTH Elev. Ext-03; o 312_L(--)307A Existing WEST Elev. Ext-01; o 312_L(--)308A Existing WEST Elev. Ext-02; o 312_L(--)309A Existing EAST Elev. Ext-01; o 312_L(--)310A Existing EAST Elev. Ext-02; o 312_L(--)500A Existing Area Schedule; and o 312_L(--)1000A Location Plan. • Design and Access Statement; and • Transport Statement. F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 6 of 34 2.0 SITE AND SURROUNDINGS The Site 2.1 The site, Former Quinn Radiator Factory, sits within the Imperial Park situated on the outskirts of Newport which comprises manufacturing, distribution and warehousing facilities and offices. The site sits within a much larger and wider strategic employment area that includes Airbus, R&D centres, and Gocompare.com. The site itself, contains 6 units, currently for the uses of B2 (General Industrial) and (B8 Storage and Distribution). Ancillary to the factory is an office space which is established as a B1 (Business) use. The site is currently vacant. The site comprises approximately 16.49ha and the location is shown in the red line plan below: Aerial View of the Site 2.2 The site was most recently occupied by Quinn Radiators Limited as a radiator production facility. The site currently comprises a large warehouse building, two smaller warehouses and an ancillary office building. Access to the site is provided via an unnamed road that connects to the A48. The site is well located in terms of access to the M4 which enables travel to Newport, Cardiff, Swansea and Bristol. 2.3 Images depicting the site, including the warehouse and the associated offices, and its access are provided overleaf: F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 7 of 34 Image of Warehouse Building from the West Image of the Western Access to the Site F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 8 of 34 Image of the Roundabout located on the Site’s Western Boundary Image of the Main Warehouse/Distribution Building from the East F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 9 of 34 Image of Associated Offices from the East Image of Eastern Access to Site F55 Sterling Newport S. à r. l. February 2021 Proposed Change of Use, Imperial Park Planning Statement Page 10 of 34 The Surroundings 2.4 The site is bound by industrial development to the north and east within Imperial Park. The western boundary is bounded by a dual-carriageway from linking to the A48 and a small residential area further afield. South of the site is developed land, albeit it is vacant. 2.5 As forementioned, the site is located within an area allocated for employment uses and comprises a variety of companies / organisations including, most famously, Airbus, Dwr Cymru Welsh Water, NHS and Office for National Statistics (ONS). Employment unit north of the site 2.6 The site is located within a sustainable location – in close proximity to a number of local facilities and services. The site is within a close distance to Lloyds Bank, The Vanilla Pod Coffee Bar and the Parc Golf Club. 2.7 In terms of public transport provision, the nearest bus stop is located north of the site, 0.5km away and provides access to both Cardiff and Newport via sustainable travel.
Recommended publications
  • Petition: Support the M4 Relief Road Black Route
    Y Gwasanaeth Ymchwil | Research Service # Y Gwasanaeth Ymchwil | Research Service Petition: Support the M4 Relief Road Black Route Y Pwyllgor Deisebau | 9 Hydref 2018 Petitions Committee | 9 October 2018 Research Briefing: Petition Number: P-05-838 Petition title: Support the M4 Relief Road Black Route Text of petition: We call on the Welsh Government to continue with its plans to build the M4 Relief Road along the proposed Black Route, and following the announcement that the Welsh Government will table a debate on the M4 plans later this year, we call on the National Assembly to support the project. The need for a new motorway around Newport is overwhelming with the congestion around the Brynglas Tunnels negatively impacting on businesses and people from across South Wales. The first proposal for a relief road was published in 1991, almost 30 years ago. Although the failure to take action over three decades isn’t solely to blame, we believe it hasn’t helped the economic well-being of the current generation and has contributed towards: . The employment rate in Wales being an average of over 3% lower than the UK employment rate since the mid-1990s. The Welsh GVA per head being consistently lower than 75% of the UK average since the late-1990s with most recent figures showing that Cardiff’s GVA per head is the lowest 1 of the four UK capital cities. The Welsh Government’s analysis from March 2016 finds that a new M4 around Newport will improve connectivity within South Wales and with the rest of the UK which will: .
    [Show full text]
  • Welsh Government M4 Corridor Around Newport Environmental Statement Volume 1 Chapter 7: Air Quality M4CAN-DJV-EAQ-ZG GEN--REP-EN-0001.Docx
    Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Chapter 7: Air Quality M4CAN-DJV-EAQ-ZG_GEN--REP-EN-0001.docx At Issue | March 2016 CVJV/AAR 3rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Contents Page 7 Air Quality 7-1 7.1 Introduction 7-1 7.2 Legislation and Policy Context 7-1 7.3 Assessment Methodology 7-7 7.4 Baseline Environment 7-28 7.5 Mitigation Measures Forming Part of the Scheme Design 7-35 7.6 Assessment of Potential Land Take Effects 7-35 7.7 Assessment of Potential Construction Effects 7-35 7.8 Assessment of Potential Operational Effects 7-42 7.9 Additional Mitigation and Monitoring 7-49 7.10 Assessment of Land Take Effects 7-53 7.11 Assessment of Construction Effects 7-53 7.12 Assessment of Operational Effects 7-53 7.13 Assessment of Cumulative Effects 7-53 7.14 Inter-relationships 7-54 7.15 Summary of Effects 7-54 Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 7 Air Quality 7.1 Introduction 7.1.1 This chapter examines the potential effect of the Scheme on local and regional air quality during both the construction and operational phases. 7.1.2 The Scheme would transfer approximately 30-45% of traffic from the existing M4, between Junctions 23A and 29, onto the new section of motorway to the south of Newport. Traffic related pollution in the urban areas adjacent to the existing M4 is therefore predicted to improve as a result of the Scheme.
    [Show full text]
  • 2013-10-18 Sewta Reposnse to Nafw
    NAfW Environment and Sustainability Committee Review of M4 Proposals 1. Thank you for the opportunity to respond to the National Assembly for Wales Environment and Sustainability Committee review of the M4 Corridor Enhancement Measures. We are pleased to provide our views on the process and proposals to date. 2. Sewta is the alliance of local authorities charged with developing transport policy and delivering transport projects on behalf of the 10 local authorities in South East Wales and their partners, both in the transport industry and in organisations representing users’ interests. 3. Sewta’s membership includes the local authorities of Blaenau Gwent, Bridgend, Caerphilly, Cardiff, Merthyr Tydfil, Monmouthshire, Newport, Rhondda Cynon Taff, Torfaen and the Vale of Glamorgan. Partners are the Confederation of Passenger Transport, Arriva Trains Wales, Network Rail, Bus Users UK, Passenger Focus and Sustrans. Sewta works closely with the Welsh Government. 4. The M4 Motorway is a key element of the national and regional transport network, with a significant influence on travel patterns and economic performance. Accordingly, Sewta places great importance on engagement in the process to review existing provision and address known issues. 5. For the purposes of our response we have identified two distinct elements in the M4 proposals consultation and engagement processes: A. Original schemes consultation June and July 2012 (four highway options comprising, widening existing M4, two options to revise the Southern Distributor Road, and a new dual carriage way to the south of Newport, with common public transport elements); and B. Revised Scheme published 23 rd September 2013 (3 highway options to the south of Newport) 6.
    [Show full text]
  • Submission to the Public Local Inquiry M4 Corridor Around Newport
    September 2016 Submission to the Public Local Inquiry into the M4 corridor around Newport Summary We contest the proposed development for the following principal reasons: . The ‘need’ argument is based on flawed Transport Planning Objectives dating from 2007 which have been substantially unrevised since that date. The ‘need’ argument is unproven. Outside two hours a day for around 150 days per year, the current motorway copes well with existing traffic flows. Adding reasonable alternatives would suffice until at least 2037. The approach of the Welsh Government – ‘predict and provide’ – has long been discredited as a valid means of transport planning. The Welsh Government approach has failed to consider reasonable alternatives (including the ‘Blue Route’ via the Llanwern steelworks road, and alternatives relating to ‘common/complementary measures’, ‘public transport measures’, ‘junction closures’, and these measures in combination). The transport forecast is fundamentally unrealistic and this finding undermines entirely the Welsh Government’s rationale for infrastructure development. The proposed benefit – a 4-9 minute saving for 6,000 vehicles per day, for 150 or so days per year – is not commensurate to any degree with either the proposed expenditure or the proposed environmental destruction. The proposed benefit accrues principally to wealthy white men and worsens outcomes for those living in poverty. The sustainable development report is not fit for purpose. To conclude that the proposed development is sustainable (principally on the basis of economic benefit) is contrary to the word and spirit of sustainability. The economic appraisal is not fit for purpose. The Welsh Government’s approach of allocating ‘medium’ noise sensitivity to residential receptors is unique and unwarranted: the Planning Inspectorate, Highways Agency and Transport Scotland routinely classify residential receptors as being of ‘high’ sensitivity to noise.
    [Show full text]
  • Welsh Government M4 Corridor Around Newport Summary Proof of Evidence – Traffic
    Welsh Government M4 Corridor around Newport Summary Proof of Evidence – Traffic Adran yr Economi a’r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting Road) Scheme 201- The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting Road) (Amendment) Scheme 201- The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201- The M4 Motorway (West of Magor to East of Castleton) and the A48(M) Motorway (West of Castleton to St Mellons)(Variation of Various Schemes) Scheme 201- The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and the M48 Motorway (Junction 23 (East of Magor) Connecting Road) and The London to Fishguard Trunk Road (east of Magor to Castleton) (Side Roads) Order 201- The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and the M48 Motorway (Junction 23 (East of Magor) Connecting Road) and the London to Fishguard Trunk Road (East of Magor to Castleton)) Compulsory Purchase Order 201- The M4 Motorway (Junction 23 (East Of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East Of Magor) Connecting Road) (Supplementary) Scheme 201- The Welsh Ministers (The M4 Motorway (Junction 23 (East Of
    [Show full text]
  • Newport City Council 2017 Air Quality Progress Report
    Newport City Council Newport City Council 2017 Air Quality Progress Report In fulfillment of Part IV of the Environment Act 1995 Local Air Quality Management September 2017 LAQM Progress Report 2017 i Newport City Council Local Authority Peter Mackintosh Officer Senior Scientific Officer Department Environmental Health Law & Regulation Room 719 Civic Centre Address Godfrey Road Newport NP20 4UR Telephone 01633 210850 E-mail [email protected] Report Reference Final V1_1 number Date September 2017 LAQM Progress Report 2017 ii Newport City Council Executive Summary This report covers the 2016 monitoring period. Air quality in Newport has shown little sign of improvement compared to the previous (2015) round of monitoring. Twenty five new diffusion tube locations have been added during 2016. Twelve of the existing fifty five tubes have been relocated making a total of eighty monitoring locations, and two automatic stations. Of these new locations several new exceedances have been encountered which include: Caerphilly Road, Cefn Road and George Street for which new AQMAs should be considered. Monitoring sites along the M4 corridor appear to have been impacted by the Brynglas Tunnel works. A marked improvement in air quality along some sections of the M4 may be attributed to the night closures, reducing the overall volume of road traffic emissions. During 2016 work has continued on drafting a revised air quality action plan which will be ready for public consultation in due course. The results of this report recommend the following actions: 1. Declare New AQMAs for: a. Cefn Road b. Caerphilly Road c. George Street Revise AQMA boundaries for: d.
    [Show full text]
  • M4 Corridor Around Newport the Plan Strategic Appraisal of Alternatives Considered During Consultation
    Welsh Government M4 Corridor Around Newport The Plan Strategic Appraisal of Alternatives Considered During Consultation July 2014 Welsh Government M4 Corridor around Newport Strategic Appraisal of Alternatives Considered during draft Plan Consultation Contents Page Executive Summary 1 1 Introduction 9 1.1 Context 9 1.2 Treatment of Alternatives 10 2 Problems, Aims and Transport Planning Objectives 12 2.1 Problems on the M4 Corridor around Newport 12 2.2 Aims for the M4 Corridor around Newport 13 2.3 Transport Planning Objectives for the M4 Corridor around Newport 14 3 Alternatives Raised during draft Plan Consultation 15 4 Appraisal 18 4.1 Grade-separated A48 Southern Distributor Road (SDR) and upgraded A4810 Steelworks Access Road (SAR) also known as the ‘Blue Route’ 24 4.2 Alignment of the Motorway to the south of Magor 57 4.3 Alignment of the Motorway to the west of Wilcrick Hill 61 4.4 Tunnel under the River Usk 63 4.5 Barrage across the River Usk 67 4.6 Tunnel widening at Brynglas 73 4.7 Motorway to the north of Newport 77 4.8 Public Transport 79 4.9 Do Nothing Strategy (Do Minimum Scenario) 89 5 Conclusions and Next Steps 97 Appendices Appendix A List of alternatives put forward during the draft Plan Consultation Appendix B Impact of the Blue Route on Local Planning Policy Allocations | Issue 1 | July 2014 Welsh Government M4 Corridor around Newport Strategic Appraisal of Alternatives Considered during draft Plan Consultation Executive Summary Purpose of this report The purpose of this report is to appraise, at a strategic level alternatives put forward during the draft Plan Consultation.
    [Show full text]
  • M4 CORRIDOR AROUND NEWPORT Objectors’ Suggested Alternatives Report March 2017 OBJECTORS’ SUGGESTED ALTERNATIVES
    M4 CORRIDOR AROUND NEWPORT Objectors’ Suggested Alternatives Report March 2017 OBJECTORS’ SUGGESTED ALTERNATIVES The Welsh Government published draft Orders for the M4 Corridor around Newport (the Scheme) in March 2016. Objections have been received and will be heard at the Public Local Inquiry which commenced on 28 February 2017 at Newport Lysaght Institute. Suggested alternatives to the Scheme have been received by the Welsh Government. While the Welsh Government is not promoting or supporting these suggested alternatives, it is obliged to consider them so that the Inspectors conducting the Public Local Inquiry can report on their relative merits in their report to the Welsh Ministers. The Inspectors cannot recommend that a suggested alternative be adopted, but they could advise the Welsh Ministers that one or more of them warrant further investigation. In such an event, and if such investigations were undertaken that conclude an alternative should be adopted, it would then need to be the subject of new statutory draft Orders which themselves would be open to formal objection. One or more of the suggested alternatives might, if adopted, affect your property and/or interest. This Objectors’ Suggested Alternatives Report shows details of the suggested alternatives. Anyone wishing to object to or support any of the Objectors’ Suggested Alternatives should do so by 10 May 2017 by writing to Orders Branch at the address below, or by email [email protected]. Orders Branch Department for Economy and Infrastructure Welsh Government Offices Cathays Park Cardiff CF10 3NQ All comments received will be passed to the Inspectors for consideration. The Inspectors may be required to disclose the comments and the identity of the authors at the Inquiry, unless there are special reasons to the contrary.
    [Show full text]
  • Draft Plan Consultation Document
    Number: WG19741 Welsh Government draft Plan Consultation Document M4 Corridor around Newport Date of issue: 23 September 2013 Responses by: 16 December 2013 Contents Glossary 1 7 Appraisal 29 Overview 3 7.1 Appraisal Summary Tables (ASTs) 29 How to respond and further information 5 7.2 draft Plan (Preferred Strategy) 30 Data protection 6 7.3 Reasonable Alternatives to the draft Plan 37 Public drop-in exhibitions 6 7.4 Do Minimum scenario 48 1 Background 7 7.5 Comparative Performance 53 2 Consequences of Doing Nothing 9 8 Next steps 55 2.1 Capacity 9 2.2 Resilience 13 2.3 Safety 13 2.4 Sustainable development 14 3 Problems, Aims and Goals of the M4 Corridor 15 around Newport 3.1 Relationship to M4 CEM Programme 15 3.2 Problems on the M4 Corridor around 15 Newport 3.3 Aims for the M4 Corridor around Newport 16 3.4 Goals of the M4 Corridor around Newport 17 4 Previous Work 18 5 The draft Plan 22 5.1 The draft Plan (Preferred Strategy) 22 5.2 Reasonable Alternatives to the draft Plan 23 5.3 Do Minimum Scenario 25 6 Assessments of the draft Plan 26 Contents (continued) Tables Figures Table 1: draft Plan Complementary Measures 3 Figure 1: The Location of the M4 around Newport 8 Table 2: Drop-in Exhibitions 6 Figure 2: Observed and Forecast Week Day 9 Table 3: draft Plan Complementary Measures 23 Period Flow to Capacity Table 4: Red Route Complementary Measures 24 Figure 3: Average 12-Hour Traffic Volumes 10 Table 5: Complementary Measures 25 Figure 4: M4 Junction J26-27 - Traffic Growth 10 Table 6: Assessment of the draft Plan – Black 30 Index
    [Show full text]
  • The M4 Motorway and A449 Trunk Road (Junction 24, Coldra, Newport
    THE LONDON GAZETTE FRIDAY 10 DECEMBER 2010 SUPPLEMENT No. 1 261 The M4 Motorway and A449 Trunk Road (Junction 24, The M4 Trunk Road (Junction 25, Westbound Off Slip Coldra, Newport) (Temporary Prohibition of Vehicles Road, St Julians, Newport) (Temporary Prohibition of & 10 mph Speed Limit) Order 2009 No. 2009/440 Vehicles) Order 2009 No. 2009/195 (W.25). - Enabling (W.45). - Enabling power: Road Traffic Regulation Act power: Road Traffic Regulation Act 1984, s. 14 (1) (4). - 1984, s. 14 (1) (4). - Made: 25.02.2009. Coming into force: Made: 02.02.2009. Coming into force: 16.02.2009. Effect: 02.03.2009. Effect: None. Territorial extent & None. Territorial extent & classification: W. Local. - In classification: W. Local. - In English and Welsh English and Welsh Unpublished Unpublished The M4 Trunk Road (Junction 38, Margam, Neath The M4 Motorway (Junction 23A (Magor) to Junction Port Talbot) (Temporary Prohibition of Vehicles) 29 (Castleton)) (Temporary 50 MPH Speed Limit) Order 2009 No. 2009/1337 (W.122). - Enabling power: Order 2009 No. 2009/31 (W.10). - Enabling power: Road Road Traffic Regulation Act 1984, s. 14 (1) (4). - Made: Traffic Regulation Act 1984, s. 14 (1) (4). - Made: 29.05.2009. Coming into force: 08.06.2009. Effect: None. 06.01.2009. Coming into force: 12.01.2009. Effect: None. Territorial extent & classification: W. Local. - In English Territorial extent & classification: W. Local. - In English and Welsh Unpublished and Welsh Unpublished The M4 Trunk Road (Junction 38 (Margam) to The M4 Motorway (Junction 26, Malpas, Near Junction 40 (Taibach), Neath Port Talbot) (Temporary Newport) (Temporary Traffic Restrictions) Order 2009 Traffic Restrictions) Order 2009 No.
    [Show full text]
  • The London Gazette Bp Gjutjjorttp
    Number 54038 7065 The London Gazette bp gJutJjorttp Registered as a Newspaper at the Post Office THURSDAY, ISra MAY 1995 State Intelligence CROWN OFFICE DEPARTMENT OF TRANSPORT House of Lords, London SW1A OPW TOWN AND COUNTRY PLANNING ACT 1990 15th May 1995 Proposed Stopping-up of a Highway at Oldham The QUEEN has been pleased by Warrant under Her Royal Sign The Secretary of State for Transport hereby gives notice that on the Manual dated 15th May 1995 to appoint Miss Diana Barbara application of Oldham Metropolitan Borough Council, he proposes Eaglestone to be a Circuit Judge in accordance with the Courts to make an Order under section 247 of the above Act, which will Act 1971. authorise the stopping-up of an unnamed highway at the rear of Nos. (2 SI) (C.I.P. Denyer) 2-16 John Street, Springhead, Oldham, from its junction with School Street to its junction with Shaw Street. If the Order is made, the stopping-up will be authorised only in Order to enable the development described in the Schedule to this notice to be carried out in accordance with the planning permission THE WELSH OFFICE granted to Mrs. S. Fletcher by Oldham Metropolitan Borough Council, on 26th May 1994, under Ref. 31354/94/S. Y SWYDDFA GYMREIG Copies of the draft Order and relevant plan may be inspected at all reasonable hours during the 28 days commencing on 18th May 1995, at the Technical Services Department, Oldham Metropolitan ROAD TRAFFIC REGULATION ACT 1984 Borough Council, Henshaw House, Cheapside, Oldham OL11NY, The M4 Motorway Brynglas Tunnels and Malpas Road Relief and may be obtained, free of charge, from the Department of Scheme Transport (quoting Ref.
    [Show full text]
  • Magor to Castleton Junction Strategy Review
    Welsh Assembly Government Transport Wales New M4 Project - Magor to Castleton Junction Strategy Review April 2006 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third Ove Arup & Partners Ltd party 4 Pierhead Street, Capital Waterside, Cardiff CF10 4QP Tel +44 (0)29 2047 3727 Fax +44 (0)29 2047 2277 www.arup.com Job number 117300 1 Welsh Assembly Government Transport Wales New M4 Project - Magor to Castleton Junction Strategy Review Contents Page 1 INTRODUCTION 1 2 OPTIONS CONSIDERED 2 2.1 Intermediate Junction Options 2 2.2 Direct Link To A449 2 2.3 Eastern Junction Connecting into Nash Road and Meadows Road 3 2.4 Eastern Junction Connecting into Meadows Road Only 4 2.5 Eastern Junction Connecting into Meadows Road with a Possible Link to Corporation Road 4 2.6 Western Junction Connecting to A48 East of LG Factory 5 2.7 Western Junction with Connection to the A48 via Duffryn Link Road 6 3 TRAFFIC ASSESSMENT OF JUNCTION OPTIONS 7 3.1 Interim Traffic Model 7 3.2 No Intermediate Junctions 8 3.3 Eastern Junction Connecting into Meadows Road Only 8 3.4 Eastern Junction Connecting into Meadows Road with a Possible Link to Corporation Road 9 3.5 Eastern Junction Connecting into Meadows Road with a Possible Link to Corporation Road and Western Connection to A48 via Duffryn Link Road 9 3.6 Comments on Traffic Assessments 10 3.7 Initial Assessment of the Impact of Tolling the New M4 10 4
    [Show full text]