Central Greece Motorway (E65) Section: Kalambaka – Egnatia
Total Page:16
File Type:pdf, Size:1020Kb
JOINT VENTURE Central Greece Motorway (Ε65) Section: Kalambaka – Egnatia Odos and Aghia Paraskevi Interchange SIX‐MONTHLY PROGRESS TABLE FOR THE IMPLEMENTATION OF THE ENVIRONMENTAL PROVISIONS DURING Section 3: km position 137+550 – km position 175+000 CONSTRUCTION CENTRAL GREECE MOTORWAY JOINT MINISTERIAL DECISION – APPROVAL OF ENVIRONMENTAL MONTH / YEAR: 09/2008 PROVISIONS: Ref. No. 147014/18.11.2005 Env. No. Outline of Provision Progress Prov. 1 2 3 4 Α. Permits / Approvals Α.1 d.4 Permits All the necessary permits and approvals, according to current legislation, the contractual documents, current environmental provisions and environmental designs have been investigated and recorded in the “Report of the Necessary Permits and Approvals, July 2008”. Α.2 d.5 Archaeological matters By way of our letters with ref. numbers CC/C/CO/GE000/PRO0384/JR/ek/15‐09‐2008, CC/C/CO/GE000/PRO0387/JR/ek/15‐09‐2008, CC/C/CO/GE000/PRO0385/JR/ek/15‐09‐2008 and CC/C/CO/GE000/PRO0386/JR/ek/15‐09‐2008, the competent Ephorates of Antiquities (the 19th and 17th Ephorates of Byzantine Antiquities; the 34th and 30th Ephorates of Prehistoric & Classical Antiquities) were notified of the commencement of works in order for these services to take the necessary action. In accordance with the 5765/24‐09‐2008 reply of the 30th Ephorate of Prehistoric & Classical Antiquities, the Department proposes conducting a rescue excavation for two detected archaeological sites along the axis. Moreover, we notified, via said document, 3 more proposals in relation to the construction procedures. Α.3 d.6 Forestry Service With 2376/24‐07‐2008 Decision of the General Secretary of the Region of Thessaly, 51363/13‐6‐2008 Decision of the Grevena Prefecture Forestry Directorate of Approvals for conducting works on forest land the Region of Western Macedonia and 1978/4‐7‐2008 Decision of the General Secretary of the Region of Thessaly, our applications dated 23‐6‐2008, 26‐05‐2008 and 8‐4‐2008 requesting a permit for interventions on forest land for geological‐explanatory works in the zone along which the E‐65 Motorway will pass (Section 4: Kalambaka‐Egnatia Odos) and within the areas of responsibilities of above departments, were approved. Lastly, with our applications with ref. nos. CC/C/CO/GE000/PRO0463/JR/ek/26‐09‐2008 and CC/C/CO/GE000/PRO0467/JR/ek/26‐09‐2008 lodged with the Trikala Forestry Service and the Grevena Prefecture Forestry Directorate we requested a permit to clear forest area and commence works in the zone along which the Motorway will pass. Six‐monthly Progress Report No. 1, October 2008 Page 1 of 9 JOINT VENTURE Central Greece Motorway (Ε65) Section: Kalambaka – Egnatia Odos and Aghia Paraskevi Interchange SIX‐MONTHLY PROGRESS TABLE FOR THE IMPLEMENTATION OF THE ENVIRONMENTAL PROVISIONS DURING Section 3: km position 137+550 – km position 175+000 CONSTRUCTION CENTRAL GREECE MOTORWAY JOINT MINISTERIAL DECISION – APPROVAL OF ENVIRONMENTAL MONTH / YEAR: 09/2008 PROVISIONS: Ref. No. 147014/18.11.2005 Env. No. Outline of Provision Progress Prov. 1 2 3 4 A.4 d.9 Permits for establishing ancillary works With 2376/24‐07‐2008 Decision of the General Secretary of the Region of Thessaly, 51363/13‐6‐2008 Decision of the Grevena Prefecture Forestry Directorate of the Region of Western Macedonia and 1978/4‐7‐2008 Decision of the General Secretary of the Region of Thessaly, our applications dated 23‐6‐2008, 26‐05‐2008 and 8‐4‐2008 requesting a permit for interventions on forest land for geological‐explanatory works in the zone along which the E‐65 Motorway will pass (Section 4: Kalambaka ‐ Egnatia Odos) and within the areas of responsibilities of above departments, were approved. Lastly, with our applications with ref. nos. CC/C/CO/GE000/PRO0463/JR/ek/26‐09‐2008 and CC/C/CO/GE000/PRO0467/JR/ek/26‐09‐2008 lodged with the Trikala Forestry Service and the Grevena Prefecture Forestry Directorate we requested a permit to clear forest area and commence works in the zone along which the Motorway will pass. Α.5 d.11 Environmental approvals All the applications for the environmental permits and approvals which are necessary, according to current legislation, will be submitted to the Special Environmental Service / Ministry for the Environment, Physical Planning and Public Works. To date, no environmental permit or approval is in progress for said sections of E‐65. Α.6 d.12 Permits and approvals for quarries The suitability of the fill obtained during the opening of the roadway is currently being investigated. The results of these investigations are not yet complete. The sites which were preselected for obtaining construction fill are quarries which currently operate legally; inactive quarries; sites which were used in the past, most likely illegally, for obtaining fill and which were not restored and new sites which contain suitable fill. For the preselection of locations at which to establish ancillary works, all the restrictions and obligations contained in current legislation, the project’s contractual documents, current environmental provisions and the project’s environmental designs were recorded (“Report: Proposed Borrow Pit Locations – Environmental Restrictions”) and taken into consideration. Six‐monthly Progress Report No. 1, October 2008 Page 2 of 9 JOINT VENTURE Central Greece Motorway (Ε65) Section: Kalambaka – Egnatia Odos and Aghia Paraskevi Interchange SIX‐MONTHLY PROGRESS TABLE FOR THE IMPLEMENTATION OF THE ENVIRONMENTAL PROVISIONS DURING Section 3: km position 137+550 – km position 175+000 CONSTRUCTION CENTRAL GREECE MOTORWAY JOINT MINISTERIAL DECISION – APPROVAL OF ENVIRONMENTAL MONTH / YEAR: 09/2008 PROVISIONS: Ref. No. 147014/18.11.2005 Env. No. Outline of Provision Progress Prov. 1 2 3 4 Α.8 d.30 Water use This matter will be dealt with in the Special Technical Implementation Plans to be submitted in order to obtain permits and approvals for worksite locations. In addition, the other permits which, according to current legislation, are necessary in order to use water, will be obtained. The procedures for obtaining a permit to use water are outlined in the “Report of the Necessary Permits and Approvals, July 2008”. To date, no water has been used. Β. Designs – Studies Β.1 d.49 Landscaping designs The corresponding landscaping designs will be drafted taking into consideration the Environmental Provision The final project implementation designs are currently being drafted, taking into consideration the Environmental Provision. Any landscaping works will be conducted once the landscaping design has been drafted by specialized engineers, taking into consideration the Environmental Provision. B.2 d.42 Highway designs The final project implementation designs are currently being drafted, taking into consideration the Environmental Provision. Landscaping designs Any landscaping works will be conducted once the landscaping design has been drafted by specialized engineers, taking into consideration the Environmental Provision. B.3 d.43 The final project implementation design are currently being drafted, taking into consideration the Environmental Provision. Any landscaping works will be conducted once the landscaping design has been drafted by specialized engineers, taking into consideration the Environmental Provision. B.4 d.19 Highway designs The final designs for the project are currently being drafted, taking into consideration the Environmental Provision. A memo has been drafted with the obligations outlined in the Environmental Provision, for each designer. B.5 d.53 Highway designs The final designs for the project are currently being drafted, taking into consideration the Environmental Provision. A memo has been drafted with the obligations Road users safety outlined in the Environmental Provision, for each designer. Six‐monthly Progress Report No. 1, October 2008 Page 3 of 9 JOINT VENTURE Central Greece Motorway (Ε65) Section: Kalambaka – Egnatia Odos and Aghia Paraskevi Interchange SIX‐MONTHLY PROGRESS TABLE FOR THE IMPLEMENTATION OF THE ENVIRONMENTAL PROVISIONS DURING Section 3: km position 137+550 – km position 175+000 CONSTRUCTION CENTRAL GREECE MOTORWAY JOINT MINISTERIAL DECISION – APPROVAL OF ENVIRONMENTAL MONTH / YEAR: 09/2008 PROVISIONS: Ref. No. 147014/18.11.2005 Env. No. Outline of Provision Progress Prov. 1 2 3 4 B.6 d.47 Highway designs The final designs for the project are currently being drafted, taking into consideration the Environmental Provision. A memo has been drafted with the obligations Road users safety outlined in the Environmental Provision, for each designer. B.7 d.18 Highway designs The final designs for the project are currently being drafted, taking into consideration the Environmental Provision. A memo has been drafted with the obligations Geological‐technical designs and studies outlined in the Environmental Provision, for each designer. Β.8 d.51 Highway designs The final designs for the project are currently being drafted, taking into consideration the Environmental Provision. A memo has been drafted with the obligations Road users safety outlined in the Environmental Provision, for each designer. Protection of fauna B.9 d.58 Road works designs The final designs for the project are currently being drafted, taking into consideration the Environmental Provision. A memo has been drafted with the obligations Protection of fauna outlined in the Environmental Provision, for each designer. Β.10 d.14 Establishment of concrete and macadam production units For the preselection of locations at which to establish concrete and asphalt mix