Ms Nina Wilson Nottinghamshire County Council County Hall West Bridgford NG2 7QP
6 September 2017
Dear Ms Wilson,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Neil McBride Lincolnshire County Council County Offices Newland LN1 1YL
6 September 2017
Dear Mr McBride,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Ms Fiona Dunning Bassetlaw District Council Queen's Buildings Potter Street S80 2AH
6 September 2017
Dear Ms Dunning,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Ian Elliot West Lindsey District Council Guildhall Marshall's Yard Lincolnshire DN21 2NA
6 September 2017
Dear Mr Elliot,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Ms Kirsty Cole Newark and Sherwood District Council Kelham Hall Newark NG23 5QX
6 September 2017
Dear Ms Cole,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Ms Hayley Barsby Mansfield District Council Civic Centre Chesterfield Road South Nottinghamshire NG19 7BH
6 September 2017
Dear Ms Barsby,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Matt Gregory Nottingham City Council Loxley House Station Street NG2 3GN
6 September 2017
Dear Mr Gregory,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr John Wright Leicester County Council County Hall Glenfield LE3 8RA
6 September 2017
Dear Mr Wright,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Steve Buffery Derbyshire County Council Shand House Dale Road South Derbyshire DE4 3RY
6 September 2017
Dear Mr Buffery,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Craig Jiggins The Civil Aviation Authority 45-59 Kingsway London WC2B 6TE
6 September 2017
Dear Mr Jiggins,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Dave Adams The Health and Safety Executive 2.2 Redgrave Court Merton Road Merseyside L20 7HS
6 September 2017
Dear Mr Adams,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
MS Laura Calvert Marine Management Organisation Lancaster House Newcastle Newcastle Upon Tyne NE4 7YH
6 September 2017
Dear MS Calvert,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir Alan Massey KCB CBE The Maritime & Coastguard Agency Spring Place 105 Commercial Road SO15 1EG
6 September 2017
Dear Sir Massey KCB CBE,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Rt Hon Sir Michael Fallon The Secretary of State for Defence Whitehall London SW1A 2HB
6 September 2017
Dear Rt Hon Sir Fallon,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir Andrew Dollan National Institute for Health and Care Excellence Midcity Place 71 High Holborn WC1V 6NA
6 September 2017
Dear Sir Dollan,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Ms Sarndrah Horsfall National Patient Safety Agency 4-8 Maple Street London W1T 5HD
6 September 2017
Dear Ms Horsfall,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Ms Becky Cassidy NHS Foundation Trust Nottinghamshire Healthcare Duncan Macmillan House Porchester Road NG3 6AA
6 September 2017
Dear Ms Cassidy,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam NHS Foundation Trust Doncaster and Bassetlaw Hospitals NHS Trust Bassetlaw Hospital Blyth Road Nottinghamshire S81 0BD
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam NHS England PO Box 16738 Redditch B97 9PT
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam NHS East Midlands Interchange 25 Business Park Nottingham NG10 5QG
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam NHS Digital 1 Trevelyan Square Boar Lane West Yorkshire LS1 6AE
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr David Wilson Public Health England Chilton Didcot OX11 0RQ
6 September 2017
Dear Mr Wilson,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Ms Roslyn Deeming Natural England Hornbeam House Crewe Business Park Crewe CW1 6GJ
6 September 2017
Dear Ms Deeming,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Nick Hopkins Nottinghamshire Fire and Rescue Services Bestwood Lodge Drive Arnold NG5 8PG
6 September 2017
Dear Mr Hopkins,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Nottinghamshire Police Authority County Hall Loughborough Road NG2 7QP
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Joe Drewry The Environment Agency Trent Side North West Bridgford NG2 5FA
6 September 2017
Dear Mr Drewry,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Martin Seldon Highways England The Cube 199 Wharfside B1 1RN
6 September 2017
Dear Mr Seldon,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam The Coal Authority 200 Lichfield Lane Mansfield NG18 4RG
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam The Office of Rail Regulation One Kemble Street London WC2B 4AN
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Tim Allen Historic England Windsor House Cliftonville NN1 5BE
6 September 2017
Dear Mr Allen,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Mat Everett Trent Valley Internal Drainage Board Trent Valley 31 Castlegate Nottinghamshire NG24 1BB
6 September 2017
Dear Mr Everett,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam The Forestry Commission (East and West Midlands Area) Central District Office Kings Clipstone Notts NG21 9JL
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Rt Hon Chris Grayling Department for Transport Horseferry Road London SW1P 4DR
6 September 2017
Dear Rt Hon Grayling,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam BT Group plc BT Centre 81 Newgate Street EC1A 7AJ
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam BT Openreach BT Centre 81 Newgate Street EC1A 7AJ
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam British Sky Broadcasting Limited Sky Place Grant Way TW7 5QD
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Western Power Distribution Avonbank Feeder Road BS2 0TB
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Northern Power Grid Manor House Station Road DH4 7LA
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Severn Trent Water Limited Severn Trent Centre PO Box 5309 CV3 9FH
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Anglian Water Lancaster House Lancaster Way Huntingdon PE29 6XU
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam The Joint Nature Conservation Committee Monkstone House City Road PE1 1JY
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Vodafone Limited Vodafone House The Connection Berkshire RG14 2FN
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam CTIL Arlington Business Park Building 1330 Reading RG7 4SA
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Orange Personal Communications Services Ltd Trident Place Mosquito Way Hertfordshire AL10 9BW
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam EE Limited Trident Place Mosquito Way Hertfordshire AL10 9BW
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam Three Star House 20 Grenfell Road SL6 1EH
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam T-Mobile Trident Place Mosquito Way Hertfordshire AL10 9BW
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Liam Frank Southern Gas Networks Walton Park Walton Road PO6 1UJ
6 September 2017
Dear Mr Frank,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Sir/Madam O2 (Telefonica UK) 260 Bath Road Slough SL1 4DX
6 September 2017
Dear Sir/Madam ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
Mr Steve Vanstone Trinity House Tower Hill London EC3N 4DH
6 September 2017
Dear Mr Vanstone,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm); • West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
6 September 2017
Dear ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
6 September 2017
Dear ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
6 September 2017
Dear ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
6 September 2017
Dear ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
6 September 2017
Dear ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN
Company Reg. No. 4267569 edfenergy.com
6 September 2017
Dear ,
West Burton C Power Station Development- Formal Consultation: 7 September to 16 October 2017 Section 42 Planning Act 2008
EDF Energy (West Burton Power) Limited (referred to in this letter as EDF Energy) is intending to make an application to the Secretary of State for a Development Consent Order for a new gas-fired peaking plant power station of up to 299 megawatts (MW) at the existing West Burton Power Station Site, to be known as West Burton C. As part of this process leading up to the application under the Planning Act 2008, EDF Energy is carrying out pre-application consultation on its proposals.
Informal consultation took place from 5 July to 2 August 2017. Since the close of the informal consultation, EDF Energy has had regard to consultation feedback and has refined its proposals. It is now launching its formal consultation stage from 7 September to 16 October 2017.
The newsletter (enclosed) provides an overview of the key details of the proposed Project and development site, the likely significant environmental impacts and approach to mitigation, and the consenting process.
Copies of the consultation documents, which comprise the Preliminary Environmental Information (PEI) Report, Non-Technical Summary, Statement of Community Consultation, Newsletter (enclosed) and Proof of the Public Notice (enclosed), can be accessed via our webpage (www.westburtonc.co.uk) or in hard copy at the following deposit locations during this consultation stage:
• Gainsborough Library - Cobden Street, Gainsborough, Lincolnshire, DN21 2NG (Monday to Friday 9am-5pm and Saturday 9am-1pm); • Retford Library - Churchgate, Retford, Nottinghamshire, DN22 6PE (Monday to Friday 9.30am – 6pm and Saturday 9.30am – 4pm); • Bassetlaw District Council Worksop office – Queen’s Buildings, Potter Street, Worksop, Nottinghamshire, S80 2AH (Monday to Friday 9am – 5pm); • Bassetlaw District Council Retford office - 17B The Square, Retford, Nottinghamshire, DN22 6DB (Monday to Friday 9am – 5pm);
EDF Energy (West Burton Power) Limited 40 Grosvenor Place, Victoria, London SW1X 7EN Company Reg. No. 4267569 edfenergy.com
• West Lindsey District Council’s office – Guildhall, Marshall's Yard, Gainsborough, DN21 2NA (Monday to Tuesday and Thursday to Friday 9am-5pm and Wednesday 10am-5pm).
If you wish to provide EDF Energy with initial views at this stage, these would be welcome in writing (either by post or email) by Monday 16 October 2017 to either:
Post: FREEPOST WBC CONSULTATION; or Email: [email protected]
Alternatively, call us on 0800 520 2524, or visit our website at www.westburtonc.co.uk
If you wish to meet to discuss the Project, please do not hesitate to contact us using the details above.
Yours sincerely,
Carly Vince Chief Planning Officer [email protected]
Encl. West Burton C Formal Consultation Newsletter and Proof of West Burton C Public Notice