Rpmj Ad 2 - 1 Philippines 22 Apr 21

Total Page:16

File Type:pdf, Size:1020Kb

Rpmj Ad 2 - 1 Philippines 22 Apr 21 22 APR 21 AIP RPMJ AD 2 - 1 PHILIPPINES 22 APR 21 AD 2 AERODROMES Note: The following sections in this chapter are intentionally left blank: AD-2.4, AD-2.7, AD-2.9, AD-2.11, AD- 2.14, AD-2.16, AD-2-19, AD-2.21, AD-2.22, AD-2.23, AD-2.24 RPMJ AD 2.1 AERODROME LOCATION INDICATOR AND NAME RPMJ - JOLO PRINCIPAL AIRPORT (Class 2) RPMJ AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 060311N 1210035E. 2 Direction and distance from (city) 2.4KM N. 3 Elevation/Reference temperature 36M AMSL. 4 Geoid undulation at AD ELEV PSN Nil. 5 MAG VAR/Annual Change 0.1ºW (2014) / 2.3’ increasing. 6 AD Operator, address, telephone, telefax, telex, Civil Aviation Authority of the Philippines AFS Jolo Airport, Jolo 7400 Sulu Province 7 Types of traffic permitted (IFR/VFR) VFR. 8 Remarks Nil. RPMJ AD 2.3 OPERATIONAL HOURS 1 AD Operator MON - FRI: 0000 - 0900. 2 Customs and immigration MON - FRI: 0000 - 0900. 3 Health and sanitation Nil. 4 AIS Briefing Office Nil. 5 ATS Reporting Office (ARO) 2200 - 0600. For extension of SER, one (1) day PN is required. 6 MET Briefing Office 2200 - 1000. 7 ATS Nil. 8 Fuelling Nil. 9 Handling Nil. 10 Security H24. 11 De-icing Nil. 12 Remarks Airport Operations: 2200 - 0600. RPMJ AD 2.5 PASSENGER FACILITIES 1 Hotels Near the aerodrome. 2 Restaurants Near the aerodrome. 3 Transportation Car for hire. 4 Medical facilities In the city. 5 Bank and Post Office In the city. 6 Tourist Office Nil. 7 Remarks Nil. RPMJ AD 2.6 RESCUE AND FIRE FIGHTING SERVICES 1 AD category for fire fighting CAT IV. 2 Rescue equipment Two (2) fire trucks [Two (2) SIDES (2400 liters each)]. 3 Capability for removal of disabled aircraft Nil. 4 Remarks Nil. CIVIL AVIATION AUTHORITY AIRAC AIP AMDT 076/21 OF THE PHILIPPINES 22 APR 21 RPMJ AD 2 - 2 AIP 22 APR 21 PHILIPPINES RPMJ AD 2.8 APRONS, TAXIWAYS AND CHECK LOCATIONS/POSITIONS DATA 1 Apron surface and strength Surface: ASPH. Strength: PCN 10. 2 Taxiway width, surface and strength Width: Nil. Surface: Nil. Strength: Nil. 3 Altimeter checkpoint location and elevation Nil. 4 VOR checkpoints Nil. 5 INS checkpoints Nil. 6 Remarks Nil. RPMJ AD 2.10 AERODROME OBSTACLES In approach/TKOF areas In circling area and at AD Remarks 123 RWY/Area Obstacle type Coordinates Obstacle type Coordinates affected Elevation Elevation Markings/LGT Markings/LGT ab c a b 09/APCH zone Trees and Nil Nil Nil Nil antenna Both side of Antenna Nil Nil Nil Nil the RWY 30M RPMJ AD 2.12 RUNWAY PHYSICAL CHARACTERISTICS Designations TRUE BRG Dimensions of Strength THR THR elevation Slope of RWY NR RWY (PCN) coordinates and highest RWY-SWY and surface of RWY end elevation RWY and coordinates of TDZ of SWY THR geoid precision undulation APP RWY 12 3 4 5 6 7 09 088.60º GEO 1800M X 30M PCN 41 Nil Nil 088.70º MAG R/A/W/T CONC 1.89% uphill 27 268.60º GEO 1800M X 30M PCN 41 Nil Nil to the E. 268.70º MAG R/A/W/T CONC SWY CWY Strip RESA Location/ OFZ Remarks dimensions dimensions dimensions dimensions description of arresting system 8 9 10 11 12 13 14 Nil Nil Nil Nil Nil Nil Nil 60M X 30M 60M Nil Nil Nil Nil Nil RPMJ AD 2.13 DECLARED DISTANCES RWY TORA TODA ASDA LDA Remarks Designator 12345 6 09 NU NU NU 1800M Landing only. 27 1800M 1860M 1860M NU Take-off only. AIRAC AIP AMDT 076/21 CIVIL AVIATION AUTHORITY OF THE PHILIPPINES 22 APR 21 AIP RPMJ AD 2 - 3 PHILIPPINES 22 APR 21 RPMJ AD 2.15 OTHER LIGHTING, SECONDARY POWER SUPPLY 1 ABN/IBN location, characteristics and Nil. hours of operation 2 LDI location and LGT Nil. Anemometer location and LGT 3 TWY edge and centre line lighting Nil. 4 Secondary power supply/switch-over Secondary power supply to all lighting at AD. time 5 Remarks Nil. RPMJ AD 2.17 ATS AIRSPACE 1 Designation and lateral limits JOLO AERODROME ADVISORY ZONE (AAZ): A circle radius 5NM centered on 060311N 1210035E (ARP). 2 Vertical limits AAZ: SFC up to but excluding 2000FT. 3 Airspace classification G. 4 ATS unit call sign Jolo Radio. Language(s) English. 5 Transition altitude Nil. 6 Hours of applicability Nil. 7 Remarks Nil. RPMJ AD 2.18 ATS COMMUNICATION FACILITIES Service Designation Call Sign Frequency Hours of operation Remarks 12345 FSS Jolo Radio 122.2MHZ A/G FREQ. 6795KHZ P/P PRI FREQ (Zamboanga Network). 4454KHZ2200 - 0600 P/P SRY FREQ. For extension of SER, one (1) day PN is required. CIVIL AVIATION AUTHORITY AIRAC AIP AMDT 076/21 OF THE PHILIPPINES 22 APR 21 RPMJ AD 2 - 4 AIP 22 APR 21 PHILIPPINES RPMJ AD 2.20 LOCAL AERODROME REGULATIONS 1. Airport regulations 1.1 Non-military aircraft using Sulu airspace should coordinate with ZAM military Admin through CAAP for ID. AIRAC AIP AMDT 076/21 CIVIL AVIATION AUTHORITY OF THE PHILIPPINES.
Recommended publications
  • DOTC Project Pipeline 29 September 2014, Singapore
    Public-Private Partnerships DOTC Project Pipeline 29 September 2014, Singapore Rene K. Limcaoco Undersecretary for Planning and Project Development Department of Transportation and Communications Key Performance Indicators 1. Reduce transport cost by 8.5% – Increase urban mass transport ridership from 1.2M to 2.2M (2016) – Development of intermodal facilities 2. Lessen logistics costs from 23% to 15% – Improve transport linkages and efficiency 3. Airport infra for 10M foreign and 56M domestic tourists – Identify and develop key airport tourism destinations to improve market access and connectivity 4. Reduce transport-related accidents – Impose standards and operating procedures TRANSPORT DEVELOPMENT PLAN Awarded and for Implementation With On-going Studies • Automatic Fare Collection System • North-South Railway • Mactan-Cebu Int’l Airport • Mass Transit System Loop • LRT 1 Cavite Extension • Manila Bay-Pasig River Ferry System • MRT 7 (unsolicited; for implementation) • Integrated Transport System – South • Clark International Airport EO&M Under Procurement • LRT Line 1 Dasmariñas Extension • Integrated Transport System – Southwest • C-5 BRT • Integrated Transport System – South • LRT 2 Operations/Maintenance For Procurement of Transaction Advisors • NAIA Development For Rollout • Manila East Mass Transit System • New Bohol Airport Expansion, O&M • R1-R10 Link Mass Transit System • Laguindingan Airport EO&M • Road Transport IT Infrastructure Project Phase II • Central Spine RoRo For Approval of Relevant Government Bodies • MRT Line 3
    [Show full text]
  • Comprehensive Capacity Development Project for the Bangsamoro Sector Report 2-3: Air Transport
    Comprehensive capacity development project for the Bangsamoro Sector Report 2-3: Air Transport Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2-3: Air Transport Comprehensive capacity development project for the Bangsamoro Sector Report 2-3: Air Transport Comprehensive capacity development project for the Bangsamoro Sector Report 2-3: Air Transport Table of Contents Chapter 1 Introduction ...................................................................................................................... 3-1 1.1 Airports in Mindanao ............................................................................................................ 3-1 1.2 Classification of Airports in the Philippines ......................................................................... 3-1 1.3 Airports in Bangsamoro ........................................................................................................ 3-2 1.4 Overview of Airports in Bangsamoro ................................................................................... 3-2 1.4.1 Cotabato airport ............................................................................................................... 3-2 1.4.2 Jolo airport ....................................................................................................................... 3-3 1.4.3 Sanga-Sanga Airport ........................................................................................................ 3-3 1.4.4 Cagayan De Sulu
    [Show full text]
  • Philippines - National
    Philippines - National Country name: Philippines Official country name: Republic of the Philippines Table of Contents Chapter Name of Assessor Organization Date updated 1 Philippines Country Profile Kevin Howley WFP Nov-19 1.1 Philippines Humanitarian Background Kevin Howley WFP Nov-19 1.2 Philippines Regulatory Departments & Quality Control Kevin Howley WFP Nov-19 1.3 Philippines Customs Information Dragoslav Djuraskovic WFP Dec-12 2 Philippines Logistics Infrastructure Dragoslav Djuraskovic WFP Dec-12 2.1 Philippines Port Assessment Dragoslav Djuraskovic WFP Dec-12 2.1.1 Philippines Port of South Harbour Dragoslav Djuraskovic WFP Dec-12 2.1.3 Philippines Port of Roxas - EMERGENCY RESPONSE TO TYPHOON HAIYAN (YOLANDA) Dragoslav Djuraskovic WFP Dec-12 2.1.4 Philippines Port of Cebu Dragoslav Djuraskovic WFP Dec-12 2.1.6 Philippines Port of Isabel - EMERGENCY RESPONSE TO TYPHOON HAIYAN (YOLANDA) Dragoslav Djuraskovic WFP Dec-12 2.2 Philippines Aviation Dragoslav Djuraskovic WFP Dec-12 2.2.1 Philippines Ninoy Aquino International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.2 Philippines Davao International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.3 Philippines Tambler Airport Dragoslav Djuraskovic WFP Dec-12 2.2.4 Philippines Kalibo Airport Dragoslav Djuraskovic WFP Dec-12 2.2.5 Philippines Laoag International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.6 Philippines Mactan-Cebu International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.7 Philippines Puerto Princesa International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.8 Philippines
    [Show full text]
  • DOTC Roadmap of Airport Projects 23 February 2015, New World Hotel
    Philippines Infrastructure Seminar DOTC Roadmap of Airport Projects 23 February 2015, New World Hotel Jaime Fortunato A. Caringal OIC-Assistant Secretary. Project Development and PPPs [email protected] PHILIPPINE AIRPORTS WITH COMMERCIAL OPERATIONS AIRPORT PROJECTS NATIONWIDE • Manila International (NAIA) PHP 15 B* • Clark International PHP 7.2 B* • Mactan Cebu International PHP 17.52 B • Davao International PHP 5.88 B • Laguindingan International PHP 2.26 B • New Bohol International PHP 11.71 B • Puerto Princesa International PHP 10.27 B • Iloilo International PHP 4.03 B • Bacolod International PHP 3.61 B • Expansion & Improvement of Other Key Tourism Airports PHP 21.35 B • Expansion & Modernization of Other Key Secondary Airports PHP 6.67 B • Other Airport Projects PHP 2 B Total PHP 109.68 B *Estimated; cost of PPP component not included AIRPORT PROJECTS NATIONWIDE AIRPORTS PROJECTS ESTIMATED COST UPGRADED Expansion & PHP 45.6 B Modernization of Key 4 ~ USD 1,013.3 M Gateways Other PPP Airport PHP 31.877 B 5 Projects ~ USD 708.4 B Other Key Tourism PHP 21.351 B 9 Airports ~ USD 474.5 M Other Key Secondary PHP 6.668 B 9 Airports ~ USD 148.2 M PHP 2.0 B Other Airport Projects 22 ~ USD 44.4 M 107.5 B TOTAL 49 ~ USD 2,388.8 M KEY INTERNATIONAL AND PPP AIRPORT PROJECTS AIRPORTS FOR EXPANSION COST COST AND MODERNIZATION (PHP B) (USD M) Manila (Ninoy Aquino) Int’l 15.000* 333.3 Clark Int’l 7.200* 160.0 Clark Int’l Mactan Cebu Int’l 17.520 389.3
    [Show full text]
  • Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2
    The Republic of the Philippines Japan International Cooperation Agency Bangsamoro Transition Commission (BTC) (JICA) Bangsamoro Development Agency (BDA) Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2: Infrastructure April 2016 RECS International Inc. Oriental Consultants Global Co., Ltd. CTI Engineering International Co., Ltd. EI IC Net Limited JR 16-056 The Republic of the Philippines Japan International Cooperation Agency Bangsamoro Transition Commission (BTC) (JICA) Bangsamoro Development Agency (BDA) Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2: Infrastructure Source of GIS map on the cover: JICA Study Team (base map by U.S. National Park Service). April 2016 RECS International Inc. Oriental Consultants Global Co., Ltd. CTI Engineering International Co., Ltd. IC Net Limited Currency Equivalents (average Interbank rates for May–July 2015) US$1.00=PHP 45.583 US$1.00=JPY 124.020 PHP 1=JPY 2.710 Source: OANDA.COM, http://www.oanda.com Comprehensive capacity development project for the Bangsamoro Sector Report 2-1: Road Transport Comprehensive Capacity Development Project for the Bangsamoro Development Plan for the Bangsamoro Final Report Sector Report 2-1: Road Transport Comprehensive capacity development project for the Bangsamoro Sector Report 2-1: Road Transport Comprehensive capacity development project for the Bangsamoro Sector Report 2-1: Road Transport Table of Contents
    [Show full text]
  • Mindanao Spatial Strategy/Development Framework (Mss/Df) 2015-2045
    National Economic and Development Authority MINDANAO SPATIAL STRATEGY/DEVELOPMENT FRAMEWORK (MSS/DF) 2015-2045 NEDA Board - Regional Development Committee Mindanao Area Committee ii MINDANAO SPATIAL STRATEGY/DEVELOPMENT FRAMEWORK (MSS/DF) MESSAGE FROM THE CHAIRPERSON For several decades, Mindanao has faced challenges on persistent and pervasive poverty, as well as chronic threats to peace. Fortunately, it has shown a considerable amount of resiliency. Given this backdrop, an integrative framework has been identified as one strategic intervention for Mindanao to achieve and sustain inclusive growth and peace. It is in this context that the role of the NEDA Board-Regional Development Committee-Mindanao becomes crucial and most relevant in the realization of inclusive growth and peace in Mindanao, that has been elusive in the past. I commend the efforts of the National Economic and Development Authority (NEDA) for initiating the formulation of an Area Spatial Development Framework such as the Mindanao Spatial Strategy/Development Framework (MSS/DF), 2015-2045, that provides the direction that Mindanao shall take, in a more spatially-defined manner, that would accelerate the physical and economic integration and transformation of the island, toward inclusive growth and peace. It does not offer “short-cut solutions” to challenges being faced by Mindanao, but rather, it provides guidance on how Mindanao can strategically harness its potentials and take advantage of opportunities, both internal and external, to sustain its growth. During the formulation and legitimization of this document, the RDCom-Mindanao Area Committee (MAC) did not leave any stone unturned as it made sure that all Mindanao Regions, including the Autonomous Region in Muslim Mindanao (ARMM), have been extensively consulted as evidenced by the endorsements of the respective Regional Development Councils (RDCs)/Regional Economic Development and Planning Board (REDPB) of the ARMM.
    [Show full text]
  • CAAP Year-End Accomplishment Report CY 2020
    Republic of the Philippines CIVIL AVIATION AUTHORITY OF THE PHILIPPINES CAAP ANNUAL ACCOMPLISHMENT REPORT CY 2020 Table of Contents I. Key Policy Issuances…………………………………………………………..1 II. Operational Highlights A. Aircraft, Passenger, and Aircraft Movements……………………….3 B. Night Rated Airports…………………………………………………...5 C. CY 2018-2021 Aviation Sector Project Status……………………...6 D. Airport Projects Inaugurated………………………………………....16 III. Status of Programs/Activities/Projects Implemented…………......……....17 IV. Financial Reports……………………………………………………………...18 V. Other Agency Accomplishments A. Actions/Response to Covid-19………………………………………18 B. Employment Generation Program…………………………………..20 C. Gender and Development……………………………………….......21 D. Local and Foreign Engagements…………………………………...23 I. Key Policy Issuances a. CAAP Quality Policy - Designed to constantly enhance agency performance and in line with the adoption of ISO 9001:2015 Quality Management System, the CAAP Quality Policy aims to improve the quality of services and goods, enhance the attitudes and mindset of personnel, avoid uncertainties in roles and responsibilities, eradicate malicious practices, identify and correct inconsistencies in the implementation of processes, prevent erroneous outputs, apply risk-based thinking to avoid problems, and streamline inefficiencies and ineffectiveness with customer satisfaction in mind. b. Information Technology - CAAP’s Information Technology (IT) policies are designed to ensure the efficient and proper use of the Authority’s IT resources (such as Internet access, corporate e-mail accounts and office-issued equipment) in support of its mandate. In 2020, the Director General approved the following policies: • Authority Order designating Information Technology Officers in Area Centers • Memorandum Circular detailing the Authority’s Information Technology Usage Policy • Memoranda to effect the use of Traze application for contact tracing and installation of endpoint security.
    [Show full text]
  • Xxviii. Autonomous Region in Muslim Mindanao A
    XXVIII. AUTONOMOUS REGION IN MUSLIM MINDANAO A. AUTONOMOUS REGIONAL GOVERNMENT IN MUSLIM MINDANAO For general administration and support, support to operations, and operations, including locally-funded projects, as indicated hereunder.................................................................................................................P 33,056,999,000 ================ New Appropriations, by Program/Projects ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ Current Operating Expenditures ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ Maintenance and Other Personnel Operating Capital Services Expenses Outlays Total ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ PROGRAMS 100000000000000 General Administration and Support P 1,008,501,000 P 175,499,000 P P 1,184,000,000 200000000000000 Support to Operations 21,130,000 15,306,000 36,436,000 300000000000000 Operations 12,510,372,000 2,835,956,000 58,000,000 15,404,328,000 Total, Programs 13,540,003,000 3,026,761,000 58,000,000 16,624,764,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ PROJECT(S) 000000200000000 Locally-Funded Project(s) 1,748,236,000 14,683,999,000 16,432,235,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ Total, Project(s) 1,748,236,000 14,683,999,000 16,432,235,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ TOTAL NEW APPROPRIATIONS P 13,540,003,000 P 4,774,997,000 P 14,741,999,000 P 33,056,999,000 ================ ================ ================ ================ New Appropriations, by Programs/Activities/Projects
    [Show full text]
  • A Muslim Archipelago ISBN 978-1-932946-19-2 ISBN PCN 5160 a Muslim Archipelago: Islam and Politics in Southeast Asia
    Max Archipelago L. Gross A Muslim A Muslim Archipelago Islam and Politics in Southeast Asia Max L. Gross National Defense Intelligence College PCN 5160 ISBN 978-1-932946-19-2 e Research nc e n g ii l ll ee tt nn I I cial policy or position of the fi c c i i g g 2007 March e e Max L. Gross Washington, DC Washington, t NDIC PRESS t a ect the of a fl r r t t S S r o f r e t n e C r o f r e t n e C or any other agency of the U.S. Government National Defense Intelligence College A Muslim Archipelago: Muslim A and do not re The views expressed in this book are those of the author Department of Defense, the Defense Intelligence Agency, Agency, Department of Defense, the Defense Intelligence Islam and Politics in Southeast Asia Islam and Politics in Southeast The National Defense Intelligence College supports and encourages research on intelligence issues that distills lessons and improves Intelligence Community capabilities for policy-level and operational consumers. This book has been many years in the making, as the author explains in his Preface, though he wrote most of the actual text during his year as senior Research Fellow with the Center for Strategic Intelligence Research. The author was for many years Dean of the School of Intelligence Studies at the Joint Military Intelligence College. Even though it may appear that the book could have been written by any good historian or Southeast Asia regional specialist, this work is illuminated by the author’s more than three decades of service within the national Intelligence Community.
    [Show full text]
  • Quarterly Report2009
    GEM USAID’S Growth with Equity in Mindanao (GEM-3) Program GEM 3 Quarterly Report July 1, 2009 to September 30, 2009 Submitted to: United States Agency for International Development/Philippines Prepared by: Office of the Economic Development and Governance Manila, Philippines Charles E. Feibel Noel A. Ruiz Submitted by: Michael G. Langsdorf THE Louis Berger Group, INC. Emma G. Salmani Engineers l Scientists l Economists l Planners Unit 3, 12/F, Export Bank Plaza, Sen. Gil Puyat cor. Pasong Tamo Alejandro Sundermann Makati City 1200 Philippines Tel; (63-02) 812-1647 Renne P. Subido Fax: (63-02) 818-8990 Carlos C. Tan The Growth with Equity in Mindanao (GEM) Program is financed by the U.S. Agency for International Development and implemented in partnership with the Mindanao Economic Development Council October 2009 The General Contractor is The Louis Berger Group, Inc. This publication was made possible through support provided by USAID under the terms of Contract No. AID 492-C-00-08-00001-00 . Opinions expressed do not necessarily reflect the views of USAID rHELouis Berger Group, rNc. Unit3, l2/F hportBonkPlozo, Sen. Gil Puyoicomer Don Chino RocesAvenues, Mokofi City, I 200 Philippines ttr : (632)812.164/ o r -r.4AtL:[email protected] ru: {63?)812-5665. rvlBsrTt: www.bergerphilippilres.ror October9, 2009 Mr.Robert Barnes CognizantTechnical Officer for the GEM 3 Program Officeof theEconomic Develooment and Governance USAIDPhilippines 8/FPNB Financial Center Bldg., PresidentDisodado Macapagal Blvd. PasayCity Subject: USAlDContractNo.4g2-C-00-08-00001-00 Growthwith Equityin Mindanao3 (GEM3) Program QuarterlyPerformance Report (July 1, 2009 - September30, 2009) DearMr.
    [Show full text]
  • Philippine Transport Sector: Developments and Project Pipeline
    Philippine Transport Sector September 2015 Philippine Transport Sector: Developments and Project Pipeline Department of Transportation and Communications September 2015 2 Transport development plan Data Driven Better management and processing of information that makes franchising transparent improving competition Improve the collection of trip data to determine optimal routes and supply information More Lines, More Connections Increase rail transportation network to increase access and mobility New Buses and New Routes INITIATIVES Bus Rapid Transit Projects Seamless Terminal Transfers Provision of new provincial bus routes to correct supply gaps caused by franchise restrictions Bus routes will be introduced on corridors that have no or limited public transportation Better Services Providing a unified ticketing system Creating better interconnections Provide better service levels to the riding public by reducing headway 3 Transport development plan Key Performance Indicators Reduce transport cost by 8.5% Increase urban mass transport ridership from 1.2mn to 2.2mn (2016) Development of intermodal facilities Lessen logistics costs from 23% to 15% Improve transport linkages and efficiency GOALS Airport infrastructure for 10mn foreign and 56mn domestic tourists Identify and develop key airport tourism destinations to improve market access and connectivity Reduce transport-related accidents Impose standards and operating procedures 4 Major accomplishments As of 15 September 2015 Full operationalization of Ninoy Aquino International Airport (NAIA) Terminal 3 Upgrading of NAIA Terminal 1 Civil aviation upgrades Upgrade of Philippine civil aviation to Category 1 by the United States Federal Aviation Administration AVIATION SECTOR NEDA Approval of Clark International Airport – Passenger Terminal Building (PTB) A new passenger terminal building is to be constructed in Clark which will serve 3mn passengers yearly to meet growing demand in Central and North Luzon.
    [Show full text]
  • Philippines Infrastructure.Pdf
    Market Survey /////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// INFRASTRUCTURE IN THE PHILIPPINES Transport, Water sources, Energy, ICT & Telecom //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// FIT Manilla Mrs Mia Santamaria Abela Embassy of Belgium Walloon & Brussels-Capital Export Agency Multinational Bancorporation Centre 6805, Ayala Avenue 9th Floor Salcedo Village 1227 Makati City - Metro Manila – Philippines T: +63 88 43 69 82 [email protected] www.flandersinvestmentandtrade.com //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// 25.11.2019 Infrastructure in the Philippines pagina 2 van 18 SUMMARY 1. Introduction ......................................................................................................................................................................... 4 2. Transport infrastructure .............................................................................................................................................. 4 2.1 Road infrastructure 4 2.2 Railway 4 2.3 Mass transit systems 5 2.4 Air transport 5 2.5 Inter-island water transport 7 2.6 Water resources 7 2.7 Energy 8 2.8 ICT 9 2.9 Telecommunications 10 3. BOI approved investments in the philippines .............................................................................................
    [Show full text]