9/23/2016 MTA - Eye on the Future

Welcome to the latest MTA "Eye on the Future," in which we present currently funded capital projects that are planned to be advertised from September 2016 through August 2017.

The "Eye" is hosted along with other information and resources about the MTA Capital Program in one convenient location. It is another part of how we are improving the way we do business and we hope that you find it to be useful.

The MTA Capital Program is not only very important for the safety and reliability of the MTA transportation system; it is also vital to the regional economy. As described in this issue of the "Eye," the MTA is preparing to undertake 159 projects valued at approximately $4.3 billion in capital work that spans many areas, including civil, structural, and electrical, as well as new technologies. These projects are vital to the reliability, growth and resiliency of the system and contribute to the regional economy. This amount of investment is projected to generate approximately $7.6 billion in economic activity for the New York region.

Contractors and suppliers have a critical stake in the success of the Capital Program. We appreciate your interest in and support of the projects included in this issue of the "Eye," and we look forward to your participation.

Yours truly,

Thomas F. Prendergast Chairman and Chief Executive Officer

Click here for Eye on the Future

Download a Printable PDF File

http://wp1.mtahq.org/mta/capital/eotf.htm 1/1 9/23/2016 MTA - Eye on the Future

Information About Contracts that Will Be Advertised for Professional Services, Construction, and Equipment Procurement

SEPTEMBER 2016 – AUGUST 2017

Letter from the Chairman Information About Contracts Overview Contacts Selected Contract Provisions Forecast of Contracts and Proposals Brief Descriptions of Work to be Advertised MTA Transit MTA Long Island Rail Road MTA Metro-North Railroad MTA Bridges & Tunnels MTA Capital Construction MTA Bus Company

Overview

This edition of An Eye on the Future contains information for prospective contractors, engineers, architects and vendors about contracts that are expected to be advertised for bids between SEPTEMBER 2016 – AUGUST 2017 by the Metropolitan Transportation Authority's operating agencies.

MTA New York City Transit (NYC Transit) MTA Staten Island Railway (SIRTOA) MTA Long Island Rail Road (LIRR) MTA Metro-North Railroad (MNR) MTA Bridges and Tunnels (B&T) MTA Capital Construction (MTACC) MTA Bus Company (MTA Bus)

In 1993 the MTA board approved a new service identity program for the MTA family of agencies. The identity program provides for the use of the above popular names to make clear to our customers that the various MTA affiliates and subsidiaries constitute an integrated regional transportation network. However, for all procurement documents and official transactions, the agencies retain their legal names: New York City Transit Authority, Staten Island Rapid Transit Operating Authority, the Long Island Rail Road Company, Metro-North Commuter Railroad Company, and Tunnel Authority, Capital Construction and Bus Company.

With respect to the contract descriptions and other data included in this volume, readers should note that they are for general information only and are not to be construed as final. The exact description of the work and other pertinent information concerning an individual contract will be found in the contract specifications and drawings or solicitation documents which may be obtained by prospective bidders when solicitation begins. Most contracts for construction, procurement of capital equipment and professional services are awarded after a competitive process, including sealed bids for construction and procurements and competitive requests for proposals for professional services.

Some aspects of contracting are common to all the MTA agencies.

1. MTA agencies are not subject to the Wicks Law for their construction projects. 2. MTA agencies seek the best contractors, suppliers, and professional services firms in the business, including firms owned by women and minorities for which special efforts are made to ensure appropriate participation. We pledge to do our part to make all projects successful for the agencies and contractors alike.

http://wp1.mtahq.org/mta/capital/eotf_intro.htm 1/3 9/23/2016 MTA - Eye on the Future 3. Projects already funded by Federal grants are noted in the solicitation schedule with an asterisk. Some of the other projects may become eligible for Federal funding in future grant applications.

Public notices of solicitations are normally published in advance of the availability of contract documents or requests for proposals in the New York State Contract Reporter and in one or more of the following publications.

New York Post El Diario The Daily Challenge Amsterdam News Minority Commerce Weekly Engineering News Record

Contacts

Further information about contracts adverstised here can be obtained by contacting respective agency representatives:

MTA NEW YORK CITY TRANSIT / MTA STATEN ISLAND RAILWAY / MTA BUS COMPANY

Security & Consulting Service for NEW YORK CITY For all other contracts TRANSIT ONLY Mr. Robert Eskenazi Mr. Joseph Paldino Senior Director Materiel Division Assistant Chief Procurement Officer MTA New York City Transit Materiel Division 2 Broadway MTA New York City Transit New York, NY 10004 2 Broadway Telephone: (646) 252-6258 New York, NY 10004 Fax: (646) 252-6144 Telephone: (646) 252-6330 Email: [email protected] Fax:(646) 252-6099 Email: [email protected]

MTA METRO-NORTH RAILROAD

Mr. Charles F. Hansen Deputy Director - Capital Procurement MTA Metro-North Railroad 347 Madison Avenue 14th Floor New York, New York 10017-3706 Telephone: (212) 340-3262 Fax: (212) 340-4034 E-mail: [email protected]

MTA LONG ISLAND RAIL ROAD

Nelda Jarvis Jenkins Contract Research Clerk Planning & Construction MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone: (718) 725-2643 Fax: (718) 725-2676 [email protected]

MTA BRIDGES & TUNNELS

Ms. Victoria Warren Procurement and Materials MTA Bridges and Tunnels 2 Broadway 24th Floor New York, New York 10004 Telephone: (646) 252-7092 Fax: (646) 252-7077 E-mail: [email protected]

MTA CAPITAL CONSTRUCTION

Mr. David K. Cannon Senior Director and Chief Procurement Officer Procurement and Law Department MTA Capital Construction 2 Broadway - A8.99 New York, New York 10004 http://wp1.mtahq.org/mta/capital/eotf_intro.htm 2/3 9/23/2016 MTA - Eye on the Future Telephone (646) 252-2321 E-mail: [email protected]

Selected Provisions of Capital Program Contracts

This is a summary of several provisions which are generally applicable to MTA agency projects. Complete requirements for a given contract can only be obtained from the documents for that contract. Naturally, all construction is performed under the laws and regulations of New York State. This is not intended to be a full summary of General Provisions.

1. MTA New York City Transit, the two commuter railroads, and MTA Capital Construction base progress payments on the contractor's monthly submissions of cost-loaded schedules. The use of CPM network diagrams is required for complex projects while simpler bar charts are required for less complex projects. 2. All the agencies' contract documents contain a value engineering change proposal clause. Contractors are encouraged to submit cost saving proposals during construction, and upon acceptance of the proposal, would be able to share in the actual cost savings. 3. Another effort to improve the management of capital projects is the use of contractor evaluation files that are kept on all ongoing work. All the MTA agencies use identical criteria to evaluate contractors and share the information with the other MTA agencies. 4. The period between advertisement for bids and bid opening will vary from approximately four to eight weeks, depending on size of the contract. 5. Unless specifically noted in the bid document, the transit facilities will be in continuous operation during the performance of the work for the majority of contracts. The contracting agency will provide the necessary maintainers, flagmen, diversions of service and work trains. 6. Bidders will be required to submit, prior to the award of the contract, a program of affirmative action to provide for equal employment opportunity. Submittals will be described in the contract documents. Goals for the participation of minority-owned and women-owned firms may be specified for each contract. Minority business enterprises and women business enterprises will be afforded full opportunity to submit bids and/or proposals and will not be subjected to discrimination on the basis of race, religion, color, sex, or national origin in consideration for awarding contracts. 7. A bid bond or a certified check in the amount of five to ten percent is normally required at the time of delivery of the bid. The contractor must furnish a performance bond and payment bond in amounts equal to 100 percent of the contract price. 8. In addition to other requirements specifically provided in the contract, each bidder must be prepared to prove to the satisfaction of the contracting agency that he has the qualifications, including but not limited to skill and experience, and the necessary facilities and financial resources to complete the work in a satisfactory manner within the time specified. 9. Contracts generally require a guarantee of all apparatuses, devices, workmanship and materials for at least one year. A security in the form of a bond in the sum of a predetermined percentage of the amount of the contract may be required prior to the final payment. Contracts may have additional requirements which must be reviewed. 10. The contractor shall also maintain, at a minimum, Workers Compensation, Commercial General Liability and Commercial Automobile Insurance. Additional coverage may be required and will be indicated in the contract. The MTA and the contracting agency shall be named as an additional insured on the policy. In general, coverage requirements range from $1,000,000 to $5,000,000 combined single limit for injuries to persons (including death) and for damage to property. The limits of liability will vary depending on the size and type of projects. In addition, the contractor will be required to hold the governmental agencies and contracting agency harmless. Evidence of the required insurance shall be delivered to the contracting agency on an MTA approved Certificate of Insurance prior to execution of the contract. Each insurance policy, or Certificate of Insurance, shall contain an agreement by the insurance company issuing the policy that the policy will not be canceled, terminated or modified without 30 days prior notice to the contracting agency. At least two weeks prior to the expiration of each policy, the contractor shall endeavor to provide an updated Certificate of Insurance evidencing renewal coverage to the contract agency. The MTA has in place Owner Controlled Insurance Programs (OCIP) for the East Side Access (ESA) project, the Second Avenue Subway and selected projects in the Capital Plan. Under traditional OCIPs, the MTA covers the construction phase of work and provides general liability, excess liability, workers' compensation, railroad protective, and builder's risk coverage to all participating contractors. The ESA OCIP adds environmental liability coverage for related engineering and environmental work.

http://wp1.mtahq.org/mta/capital/eotf_intro.htm 3/3 9/23/2016 MTA - Eye on the Future

Forecast of Contracts to be Advertised and Proposals to be Solicited

Letter from the Chairman Information About Contracts Forecast of Contracts and Proposals Brief Descriptions of Work to be Advertised MTA New York City Transit MTA Long Island Rail Road MTA Metro-North Railroad MTA Bridges & Tunnels MTA Capital Construction MTA Bus Company

SEPTEMBER 2016 – AUGUST 2017

Type of Solic Month Reference Number Contract Description Agency Range Contract

Bridges and Tunnels

Constr SEP 2016 HH-13A/HH-88B Reconstruction of Toll Plazas and B&T OVER $50M Southbound Approach at , and Replacement of Facility Lighting System

Constr SEP 2016 RK-07 Design-Build Mechanical/Electrical B&T $10M - $50M Rehabilitation of Lift Span

Special SEP 2016 RK-19/RK-70/RK-70 Paint Conceptual Design for Seismic & Wind B&T $5M - $10M Services Retrofit of the Suspended Span and Miscellaneous Structural Rehabilitation and Painting of Suspended Span of RFK Bridge

Special SEP 2016 RK-20 Design for Main Cable Inspection and B&T $1M - $5M Services Rehabilitation

Special SEP 2016 TN-55 Scoping for Replacement of Bronx and B&T $5M - $10M Services Queens Approach Viaducts and Lower Garage at the

Special NOV 2016 HC-80/QM-36 Design for Rehab of HLCT and QMT B&T $5M - $10M Services Ventilation Buildings

Constr JAN 2017 VN-34 Design-Build: Main Cable Inspection and B&T $10M - $50M Suspender Rope Testing at VNB Bridge

Special MAR 2017 RK-58 Design for Rehabilitation of Robert Moses B&T $1M - $5M Services Building and Service Buildings of RFK Facility

Special MAR 2017 VN-86 Design for widening of Belt Parkway B&T $1M - $5M Services

http://wp1.mtahq.org/mta/capital/eotf-allagency_new.htm 1/7 9/23/2016 MTA - Eye on the Future

Type of Solic Month Reference Number Contract Description Agency Range Contract

Constr MAR 2017 VN-89/VN-30 Design-Build Rehabilitation of Tower B&T $10M - $50M Bases, Mooring Platforms and Elevators at VNB Bridge

Constr APR 2017 RK-22 Interim Repairs to the FDR Ramp at RFK B&T $10M - $50M Bridge

Constr MAY 2017 HC-30/QM-91 Design-Build Install Smoke B&T $5M - $10M Detection/Smoke Alarm Systems at QMT/HCLT Ventilation Buildings and Service Buildings Constr MAY 2017 HC-64 Design-Build Hugh L. Carey Tunnel B&T $1M - $5M Service Building Electrical Rehabilitation

Constr Mgmt AUG 2017 TN-49 Construction Management Services for B&T $10M - $50M TN-49 Construction Contract (Replacement of Suspended Span Deck at Throgs Neck Bridge)

Long Island Rail Road

Constr SEP 2016 TBD Springfield and Union Tpke Bridges LIRR $5M - $10M Repairs**

Constr OCT 2016 L10972* Rehabilitation of Nostrand Ave** LIRR $10M - $50M

Constr OCT 2016 L10987* Buckram Rd Bridge Replacement** LIRR $10M - $50M

Constr NOV 2016 L09411 New Mid-Suffolk Electric Yard LIRR OVER $50M

Constr DEC 2016 E01930 & E02605 (Sandy)* Long Island City Yard Restoration / LIRR $10M - $50M Resiliency

Constr DEC 2016 L10175 Richmond Hill Substation Replacement LIRR $5M - $10M

New York City Transit

Construction SEP 2016 A36984 Platform Components: 4 Locations / 4th NYCT $5M - $10M Avenue

Construction SEP 2016 A37122 ADA: Court Square / Crosstown (Stairs NYCT $1M - $5M Phase)

Construction SEP 2016 A37659 (Sandy)* Sandy Mitigation: 9 Stations (9 Stns NYCT $10M - $50M BK/Q Initiative)

Construction SEP 2016 A37660 (Sandy)* Sandy Mitigation: Street Level Openings NYCT $10M - $50M and Internal Station Hardening (7 Stations + 1 Fan Plant)

Construction SEP 2016 B40495 Replacement of Oil-Water Separators at 4 NYCT $5M - $10M Locations

Construction SEP 2016 B62027 Storage Tank Component Replacement: NYCT $5M - $10M Jackie Gleason and Castleton Depots

Construction SEP 2016 C34839/P36449/ C31622 (Sandy)* Sandy Mitigation: Long-Term Perimeter NYCT OVER $50M Protection, Power Cable Replacement and Yard Portal - 148 St Yard

Construction SEP 2016 C34923 Overcoat: Broadway - End Of Line / NYCT $10M - $50M Myrtle

Construction SEP 2016 C36693 Rehabilitation of Substation Roof & NYCT $1M - $5M Enclosure: Jerome/E 162 St

Construction SEP 2016 C40254 Replace Roof at East New York Bus NYCT $5M - $10M Depot

Construction SEP 2016 C43752 Rapid Transit Operations Facilities: NYCT $5M - $10M Chambers St / Nassau Loop

http://wp1.mtahq.org/mta/capital/eotf-allagency_new.htm 2/7 9/23/2016 MTA - Eye on the Future

Type of Solic Month Reference Number Contract Description Agency Range Contract

Construction SEP 2016 C48506 (Sandy)* Sandy Mitigation: Near-Term Flood NYCT $1M - $5M Protection Stillwell Terminal Facilities

Construction SEP 2016 C48701 Elevated Structural Rehab and Overcoat NYCT $10M - $50M Painting: White Plains Road Line

Construction SEP 2016 E42262 Replace Yard Lighting: 207th Street NYCT $10M - $50M

Construction SEP 2016 P36471* Repair Two Circuit Breaker Houses - NYCT $5M - $10M Canarsie Line

Purchase SEP 2016 V33700 Purchase 202 Non-Revenue Vehicles NYCT $10M - $50M 2015

Construction OCT 2016 A36164 ADA: 68 St-Hunter College / Lexington NYCT $10M - $50M

Construction OCT 2016 A36921 Station Component Repairs: 3 Locations / NYCT $1M - $5M Crosstown

Construction OCT 2016 A36956 Station Component Repair: 4 Locations / NYCT $10M - $50M 8th Avenue

Construction OCT 2016 A46017/A46019/A46020/A46021/A46022 Station Renewal: 5 Stations - Astoria Line NYCT $10M - $50M

Purchase OCT 2016 B40662 Purchase 628 Standard Diesel Buses NYCT OVER $50M

Construction OCT 2016 C33835 Priority Structural Repairs: 4th Avenue NYCT OVER $50M

Construction OCT 2016 C34836 (Sandy)* Sandy Mitigation: Long-Term Perimeter NYCT OVER $50M Protection, Portal Protection and Power Cable Replacement-Coney Island Yard Construction OCT 2016 MW50-6593 Structural Rehabilitation Phase 1: South NYCT $10M - $50M of 36th Street to Station - 4th Avenue Line

Construction OCT 2016 P80682 New Power Substation: Tottenville NYCT $10M - $50M

Purchase OCT 2016 R34252 Purchase 54 Flat Cars NYCT $10M - $50M

Purchase OCT 2016 R34254 Purchase 27 Refuse Flat Cars NYCT $10M - $50M

Purchase NOV 2016 C32515 Track Intrusion Detection: Pilot Phase 2 NYCT $1M - $5M

Construction NOV 2016 C33242* Overcoat: 72 Street - 103 Street / NYCT $10M - $50M Flushing

Construction NOV 2016 RC03-6761 Refurbish Keene Vacuum Systems NYCT

Construction DEC 2016 A37109* ADA: Gun Hill Rd / Dyre NYCT $10M - $50M

Construction DEC 2016 B40499 Portable Bus Lift Replacement NYCT $5M - $10M

Construction DEC 2016 C34850 Structural Remediation: E 180 St NYCT $1M - $5M Maintenance Shop & Retaining Wall

Construction DEC 2016 C34919* Overcoat: 17 Bridges and East 180 Street NYCT $10M - $50M Flyover / Dyre Av

Construction DEC 2016 P36472* Repair CBH # 210 - (239th Street / WPR) NYCT $10M - $50M

Construction DEC 2016 P80683 Staten Island Railway: New Power NYCT $10M - $50M Substations at New Dorp and Clifton

Construction DEC 2016 W32385 Upgrade Asynchronous Fiber Optic NYCT $10M - $50M Network to SONET - Rings A,C

Purchase JAN 2017 B62003 Bus Rapid Transit: Purchase 240 NYCT $5M - $10M MetroCard Fare Machines

Construction JAN 2017 EN01-7355 Boring Services: Bk/Q/SI NYCT $1M - $5M

Construction JAN 2017 EN01-7356 Boring Services & Bronx NYCT $1M - $5M

Construction JAN 2017 P36698 New Substation: Maspeth Avenue- NYCT $10M - $50M Humboldt Street / CNR

Design/Build JAN 2017 P36699 New Substation: Harrison Pl / Canarsie NYCT $10M - $50M Ln

Purchase JAN 2017 R34194 Heavy Shop Equipment Purchase & NYCT $5M - $10M Replacement 2015-19

Construction JAN 2017 S32396 AC Line Relay Upgrade (Crosstown) - (96 NYCT $10M - $50M Signal)

Purchase JAN 2017 SF01-2767 Depot Bus Location System NYCT $1M - $5M

Construction FEB 2017 A36961 Station Component Repairs: 3 Locations / NYCT $1M - $5M Fulton

http://wp1.mtahq.org/mta/capital/eotf-allagency_new.htm 3/7 9/23/2016 MTA - Eye on the Future

Type of Solic Month Reference Number Contract Description Agency Range Contract

Construction FEB 2017 A36988 Platform Components: 4 Locations / NYCT $1M - $5M Jerome

Construction FEB 2017 A37110* ADA: Bedford Park Boulevard / NYCT $10M - $50M Concourse

Construction FEB 2017 C34838/P36450/ C31623 (Sandy)* Sandy Mitigation: Long-Term Perimeter NYCT OVER $50M Protection, Portal Protection & Power Cable Replacement - 207 St Yard

Construction FEB 2017 C34847* Fire Alarm System Replacement at 3 Bus NYCT $10M - $50M Depots

Construction FEB 2017 C40250 Replace Equipment at Jackie Gleason NYCT $1M - $5M Depot Compressed Natural Gas Facility

Construction FEB 2017 E31707* Fan Plant Motor Control System NYCT $5M - $10M Replacement - 9 Locations

Construction FEB 2017 ST01-0862* Access Improvements: Grand Central: NYCT $10M - $50M Phase 2

Construction MAR 2017 A36150* ADA: Phase 2: 57 Street - 7 Avenue / NYCT $10M - $50M Broadway

Construction MAR 2017 A37673 Station Entrance: 8 Avenue / Sea Beach NYCT $5M - $10M

Construction MAR 2017 A46024 Station Renewal and Water Remediation: NYCT $10M - $50M Borough Hall / Lexington

Purchase MAR 2017 B40664 Purchase 190 Articulated Buses NYCT OVER $50M

Construction MAR 2017 C40257 East New York Depot Component Repair: NYCT $5M - $10M Windows and Façade

Construction APR 2017 A37119* ADA: Canarsie-Rockaway Pkwy / NYCT $5M - $10M Canarsie

Construction APR 2017 A46025 Station Renewal: Mets-Willets Point / NYCT $10M - $50M Flushing

Construction APR 2017 E31682 (Sandy)* Sandy Mitigation: Fan Plant 7207, South NYCT $1M - $5M Ferry, Manhattan

Construction APR 2017 EN01-7357 Test Pit Services NYCT $5M - $10M

Purchase APR 2017 SF01-2423 Automatic Passenger Counting (APC) - NYCT $1M - $5M Pilot & Phase 1 Rollout

Construction APR 2017 W32389 Antenna Cable Upgrade/Replacement NYCT $5M - $10M Phase 1

Construction MAY 2017 A37117* ADA: 86 Street / 4th Avenue NYCT $10M - $50M

Construction MAY 2017 A37628 (Sandy)* Sandy Mitigation: Upgrade Emergency NYCT $10M - $50M Booth Comm System (EBCS)

Construction MAY 2017 B62032 (Sandy)* Sandy Mitigation: Four Depots NYCT $10M - $50M

Construction MAY 2017 C34924 (Sandy)* Sandy Mitigation: Steinway Portal NYCT $5M - $10M

Construction MAY 2017 C43844 Livingston Plaza Electrical and NYCT $10M - $50M Mechanical System Improvements

Construction MAY 2017 SF01-7260 Jamaica Bus Terminal Reconfiguration NYCT $1M - $5M

Construction JUN 2017 A36995 Platform Components: Kingston-Throop NYCT $1M - $5M Avenues / Fulton

Construction JUN 2017 A37202 Platform Components: 2 Locations / NYCT $1M - $5M Lenox

Construction JUN 2017 A37205 Platform Components: 2 Locations / NYCT $5M - $10M Crosstown

Construction JUN 2017 A46018; A37106; A37589* Astoria Boulevard Station Rehabilitation, NYCT $10M - $50M ADA and Canopy Repair

Construction JUN 2017 C40235* Department of Buses - Gun Hill Depot NYCT $10M - $50M Component Repair : Roof

Construction JUN 2017 E30300* Replacement of Two Escalators: Grand NYCT $5M - $10M Central-42 Street / Lexington

Construction JUN 2017 P36696 Retrofit Existing 25 Hz Frequency NYCT $10M - $50M Converters at 10 Substations

Construction JUN 2017 PW03-1297 (Sandy)* Sandy Mitigation: Montague-Furman NYCT $1M - $5M Substation / BWY

http://wp1.mtahq.org/mta/capital/eotf-allagency_new.htm 4/7 9/23/2016 MTA - Eye on the Future

Type of Solic Month Reference Number Contract Description Agency Range Contract

Construction JUL 2017 A37200 Platform Components: 3 Locations / NYCT $1M - $5M Eastern Parkway, Clark

Construction JUL 2017 C34845* Department of Car Equipment Shop NYCT $10M - $50M Components Phase 1: East 180th Street , Coney Island, Pelham, and Pelham Diesel

Construction JUL 2017 C34857 (Sandy)* Sandy Repairs: Rockaway Line Wrap-Up NYCT $10M - $50M

Construction JUL 2017 C40241 Elevator Upgrade: 7 Elevators at 5 NYCT $10M - $50M Depots

Construction JUL 2017 E34026* Replace 11 Hydraulic Elevators / Various NYCT $10M - $50M

Construction JUL 2017 E34027* Replace 12 Traction Elevators / NYCT $10M - $50M Broadway-7th Avenue

Construction JUL 2017 FC01-4830 (Sandy)* Sandy Mitigation: Consolidated Revenue NYCT $10M - $50M Facility

Construction JUL 2017 P36420 Duct Reconstruction: Stanton Street NYCT $5M - $10M Substation / 6th Avenue

Construction JUL 2017 PD02-4832 (Sandy)* Sandy Mitigation: Tiffany Central NYCT $10M - $50M Warehouse

Construction JUL 2017 SF01-4831 (Sandy)* Sandy Mitigation: Zerega Central NYCT OVER $50M Maintenance Facility

Construction JUL 2017 ST01-4327 (Sandy)* Sandy Mitigation: Internal Station NYCT $10M - $50M Hardening

Purchase JUL 2017 V31998 49 Non-Revenue Vehicles 2016 NYCT $5M - $10M

Construction AUG 2017 A36949 Station Component Repairs: Aqueduct- NYCT $1M - $5M North Conduit Av/Rockaway Line

Construction AUG 2017 A36993 Platform Components: 3 Locations / NYCT $1M - $5M Nostrand

Construction AUG 2017 A36998 Platform Components: 2 Locations / NYCT $1M - $5M Pelham

Construction AUG 2017 A37120* ADA: Eastern Parkway-Brooklyn Museum NYCT $10M - $50M / Eastern Parkway Line

Construction AUG 2017 B62028 Storage Tank Component Replacement: NYCT $5M - $10M East New York and Gun Hill Depots

Construction AUG 2017 C31620 Yard CCTV - Phase 2 NYCT $5M - $10M

Construction AUG 2017 C33600* Overcoat: East New York Yard & Shop NYCT $10M - $50M Leads And Loops

Construction AUG 2017 C40245* Zerega Central Maintenance Facility NYCT $1M - $5M Component Rehab: Office Space

Construction AUG 2017 C40900 Signal Room Fire Suppression, Phase 2 NYCT $5M - $10M

Construction AUG 2017 C48706* Elevated Structural Rehab: Livonia Yard NYCT $5M - $10M Overpass & Retaining Wall

Construction AUG 2017 E32627* Replace Supervisory Vent Controls - NYCT $10M - $50M Various Locations

Construction AUG 2017 E34028* Replace 8 Traction Elevators / Various NYCT $10M - $50M

Construction AUG 2017 P36339 Replacement of Control & Battery Cable: NYCT $10M - $50M 4 Substation Control Zones (2/3/5/8) Construction AUG 2017 ST21-2511 Platform Components: 2 Locations / NYCT $1M - $5M Flushing

Construction AUG 2017 W32799 Public Address/Customer Information NYCT $1M - $5M Screen Replacement - Canarsie Line

Metro-North Railroad

Design/Build SEP 2016 M10399 Design, Furnish, Install and Integrate MNR $5M - $10M Metro-North’s Public Address and Visual Information System http://wp1.mtahq.org/mta/capital/eotf-allagency_new.htm 5/7 9/23/2016 MTA - Eye on the Future

Type of Solic Month Reference Number Contract Description Agency Range Contract

Design/Build SEP 2016 M10691 Design-Build for New Cable Plant to MNR $10M - $50M Support Audio-Visual and Facility Enhancements in

Design/Build SEP 2016 M10764 Design & Construction Services for a MNR $10M - $50M Visual Display System Utilizing LED Video Wall Architecture - GCT

Design/Build SEP 2016 M10812 Design-Build:Prospect Hill Road Bridge - MNR $5M - $10M Southeast, NY

Design/Build SEP 2016 M702-02-07 Outlying Stations - Audio and Visual MNR $10M - $50M Information System Replacements

Purchase OCT 2016 M10349* Purchase CNC Milling Machine MNR $100K - $250K

Purchase OCT 2016 M10350* Purchase one (1) Dynamic Track MNR $1M - $5M Stablizer

Purchase OCT 2016 M10351* Purchase eight (8) Junior Tamper MNR $1M - $5M

Purchase OCT 2016 M10352* Purchase eight (8) Tie Crane MNR $1M - $5M

Purchase OCT 2016 M10353* Purchase eight (8) Backhoe w/Trailer MNR $1M - $5M

Purchase OCT 2016 M10354* Purchase Asphalt Paver w/Trailer MNR $100K - $250K

Purchase OCT 2016 M10355* Purchase two (2) Industrial Fork Trucks MNR $50K - &100K

Purchase OCT 2016 M10356* Purchase Compact Crawler Lift w/Trailer MNR $100K - $250K

Purchase OCT 2016 M10357* Purchase Hi-Rail Track Excavator MNR $100K - $250K w/Trailer

Purchase OCT 2016 M10358* Purchase Hi-Track Loader w/Trailer MNR $100K - $250K

Purchase OCT 2016 M10359* Purchase Asphalt Roller w/Trailer MNR $50K - &100K

Purchase OCT 2016 M10364* Purchase two (2) Mini Loader Backhoe MNR $50K - &100K w/Snow Blower

Purchase OCT 2016 M10365* Purchase three (3) Rough Terrain Scissor MNR $100K - $250K Lift w/ five Ton Trailer

Purchase OCT 2016 M703-01-09_1* Purchase one (1) Production Tamper MNR $1M - $5M

Constr DEC 2016 E04175* Replace Power Cables - Harlem River Lift MNR $1M - $5M Bridge

Constr MAR 2017 M705-01-01_1 Construction-Mott Haven - Motor MNR $5M - $10M Alternators

Constr AUG 2017 M09217 Radio/Communication Installation MNR $10M - $50M

Constr AUG 2017 M10310 Rock Slope Remediation- Hudson Line MNR $5M - $10M

Constr AUG 2017 M10323* Rock Slope Remediation - Port Jervis MNR $5M - $10M Line

MTA Bus

Constr SEP 2016 B62022* Security Improvements - JFK & Spring MTA BUS $9M-$10M Creek Depots

Constr FEB 2017 C40246* CNG Upgrade - College Point Depot MTA BUS $5M - $6M

Constr AUG 2017 C-40260* HVAC- College Point Depot MTA BUS $8M - $9M

Constr AUG 2017 C-40261* HVAC- Spring Creek Depot MTA BUS $3 - $4M

Capital Construction

Constr SEP 2016 CQ033 Mid-Day Storage Yard Facility for the MTACC Over $100M East Side Access Project**

http://wp1.mtahq.org/mta/capital/eotf-allagency_new.htm 6/7 9/23/2016 MTA - Eye on the Future

Type of Solic Month Reference Number Contract Description Agency Range Contract

Special SEP 2016 PS862* Independent Compliance Monitor MTACC $1M - $5M Services

Program SEP 2016 PS863 Program Management Services for the MTACC $10M - $50M Management Penn Station Access Project**

Constr DEC 2016 CM015 48th St. Entrance for the East Side MTACC $10M - $50M Access Project**

Constr DEC 2016 CS086* Tunnel Systems Package 2, Signal MTACC $10M - $50M Installation for the East Side Access Project**

Design FEB 2017 PS864* Engineering and Environmental MTACC $50M - $100M Consultant for the Penn Station Access Project**

* Partially Funded by Federal grant(s)

http://wp1.mtahq.org/mta/capital/eotf-allagency_new.htm 7/7 9/23/2016 MTA - Eye on the Future

Brief Descriptions of Work to be Advertised

Letter from the Chairman Information About Contracts Forecast of Contracts and Proposals Brief Descriptions of Work to be Advertised MTA New York City Transit MTA Long Island Rail Road MTA Metro-North Railroad MTA Bridges & Tunnels MTA Capital Construction MTA Bus Company

* Partially Funded by Federal grant(s)

Bridges and Tunnels Brief Description of Work SEP 2016

HH-13A/HH-88B RECONSTRUCTION OF TOLL PLAZAS AND SOUTHBOUND APPROACH AT HENRY HUDSON BRIDGE, AND REPLACEMENT OF FACILITY LIGHTING SYSTEM OVER $50M

Under this construction contract, the contractor will reconstruct the upper and lower level of toll plaza areas including full replacement of the south approach structure. Project also includes replacement of facility lighting system and other miscellaneous construction work. Scope of Work includes but is not Limited to:

Complete replacement of the bridge deck, superstructure, and substructure elements of the Upper and Lower Level Toll Plazas. Full replacement of the south approach structure including the maintenance garage. Reframing lower level plaza to eliminate the columns that currently support the upper level plaza deck and structure. Replacement of retaining walls at and around the toll plazas. Construction of new utility services for the Lower Level Maintenance Garage, including heating, cooling, plumbing, water services, and bay doors. Replacement of all existing guiderail, aluminum light poles with wooden light poles and LED fixtures on the Henry Hudson Parkway (northbound and southbound).

Duration of Contract 45 Months

RK-07 DESIGN-BUILD MECHANICAL/ELECTRICAL REHABILITATION OF HARLEM RIVER LIFT SPAN $10M - $50M

This Design-Build contract will include repair/replacement of certain mechanical components of the PLC system. In addition, electrical components of the lift span will be replaced, to include the 5kV switch gear, the droop cable, and installation of a dehumidification system in both machinery rooms. Scope of Work includes but is not limited to:

Verify the existing mechanical and electrical conditions at the Harlem River Lift Span and the available documentation as described in the RFP. Design and install all new electrical and mechanical upgrades and replacements with additional capability to accommodate future use. Design and install the upgrading and repair of electrical and mechanical equipment including: new generator & ATS switch located on land, including provisions for access road, and miscellaneous structural components such as; adjustment of live load bearing lift span balancing, pier navigation, tower service lights, aviation and navigation lights, droop cable replacement. Comply with all design criteria, phasing approach, environmental permits and approvals, schedule, fire and security requirements. Conduct mechanical and electrical systems testing, as well as, train the Authority personnel on such systems. http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 1/26 9/23/2016 MTA - Eye on the Future Duration of Contract 36 Months

RK-19/RK-70/RK-70 Paint CONCEPTUAL DESIGN FOR SEISMIC & WIND RETROFIT OF THE SUSPENDED SPAN AND MISCELLANEOUS STRUCTURAL REHABILITATION AND PAINTING OF SUSPENDED SPAN OF RFK BRIDGE $5M - $10M

Under this contract, the consultant will perform a feasibility study on the following: Installation of a traveler system on the suspended spans; Widening the suspended span sidewalk; and Reducing transverse roadway joints on the suspended span orthotropic deck. Based on the results of this feasibility study, as well as the results of the original RK 19 study, the Consultant shall prepare a conceptual design. The Scope of work for the Conceptual Design includes but is not limited to: All seismic and wind retrofits necessary on the suspended span including widening of the sidewalk; Replacement of the median and side barriers including any necessary additional wind testing the barrier crash testing; Retrofits on the stringer to floor beam connections of the suspended spans; Retrofits to the joint system; Miscellaneous structural repairs to address biennial flags for all three legs of RFK Bridge, and Spot cleaning and painting of the suspended span steel. Upon acceptance of the Conceptual Design, additional design phases may be awarded.

Duration of Contract 27 Months

RK-20 DESIGN FOR MAIN CABLE INSPECTION AND REHABILITATION $1M - $5M

Under this contract the consultant will prepare design for the East River Suspension Spans of RFK Bridge main cable inspection and required restoration work. Consultant shall also perform the inspection of the cable panels that are un-wrapped, as well as model the remaining cable strength based upon wire testing data. Scope of Work includes but is not limited to:

Review available documentation and inspection reports related to the project scope. Prepare inspection protocol and staging plan for suspension span main cable. Provide design for cable un-wrapping, wedging, sampling, and re- wrapping. Perform inspection of the unwrapped cable panels and perform cable strength modeling based on wire testing data.

Duration of Contract 72 Months

TN-55 SCOPING FOR REPLACEMENT OF BRONX AND QUEENS APPROACH VIADUCTS AND LOWER GARAGE AT THE THROGS NECK BRIDGE $5M - $10M

Under this contract the consultant will perform an engineering study to address current and anticipated deterioration as well as service-related issues, including increased traffic demand and existing non-conforming and obsolete elements. Additionally, alternatives for rehabilitation or replacement of the approaches to bring them up to current seismic loading, and geometric criteria will be investigated. Partial and full replacement alternatives shall address the following: constructability, service life, ease of maintenance, utilities (including new utilities, continuation of service during construction, and access to utilities during and after construction), and environmental and other permitting. Scope of Work includes but is not limited to:

Investigation and evaluation of superstructure elements, substructure elements, and seismic vulnerability with consideration of rehabilitation measures to be performed under Project TN-53. Geotechnical investigation, to include approximately 30 borings. Hazardous materials assessment. Evaluation of three (3) alternatives for partial or full approach viaduct replacement in the Design Brief (10% Completion).

Duration of Contract 24 Months

Bridges and Tunnels Brief Description of Work NOV 2016

HC-80/QM-36 DESIGN FOR REHAB OF HLCT AND QMT VENTILATION BUILDINGS $5M - $10M

Under this contract, the consultant will prepare a design for the rehabilitation of the Ventilation Buildings at both the Hugh Lincoln Carey Tunnel and the Queens Midtown Tunnel to address all deficiencies including architectural, structural, safety, and mechanical issues.

Duration of Contract 18 Months

Bridges and Tunnels Brief Description of Work JAN 2017

VN-34 DESIGN-BUILD: MAIN CABLE INSPECTION AND SUSPENDER ROPE TESTING AT VNB BRIDGE $10M - $50M

http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 2/26 9/23/2016 MTA - Eye on the Future The purpose of this Design-Build Contract is to remove suspender ropes for testing and open several main cable panels for inspection and testing. The Scope of work for this Contract includes but is not limited to:

Prepare design for unwrapping, wedging, wire sampling, compaction and re-wrapping of main cables at selected panel locations including traffic maintenance and protection, access platform design in accordance with design build criteria set forth in RFP. Perform main cable unwrapping, wire sampling as directed by the cable modeling consultant, cable compaction and re-wrapping on all four cables at selected locations. Prepare design for removal, replacement and designated testing of suspender ropes including traffic maintenance and protection, access platform design, temporary supports and jacking requirements. Perform suspender rope removal and replacement at selected locations. Perform testing of suspender rope samples and main cable wires.

Duration of Contract 39 Months

Bridges and Tunnels Brief Description of Work MAR 2017

RK-58 DESIGN FOR REHABILITATION OF ROBERT MOSES BUILDING AND SERVICE BUILDINGS OF RFK FACILITY $1M - $5M

Under this contract, the consultant shall prepare design for the renovation of three buildings on the Randall’s Island campus of the RFK Bridge. These buildings include the Robert Moses Building, the Manhattan Service Building and Service Building. Design work will include rehabilitation of interior spaces, including finishes and MEP systems, as well as the exterior envelope.

Duration of Contract 18 Months

VN-86 DESIGN FOR WIDENING OF BELT PARKWAY $1M - $5M

Under this contract, the consultant will prepare design for the construction of an additional eastbound lane on the Belt Parkway from the VNB to Bay Parkway. This design shall include necessary roadway grading, alignment, construction details, drainage, MPT, and electrical work. Consultant shall assist B&T with permitting and inter-agency coordination.

Duration of Contract 36 Months

VN-89/VN-30 DESIGN-BUILD REHABILITATION OF TOWER BASES, MOORING PLATFORMS AND ELEVATORS AT VNB BRIDGE $10M - $50M

Under this Design-Build contract, the contractor will prepare the design for and perform rehabilitation of the tower pedestals including resetting the granite cladding and repairs to the concrete base, replacement/relocation of tower dry standpipe mooring platform in Staten Island, and rehabilitation of the tower elevators.

Duration of Contract 24 Months

Bridges and Tunnels Brief Description of Work APR 2017

RK-22 INTERIM REPAIRS TO THE FDR RAMP AT RFK BRIDGE $10M - $50M

Under this contract, the contractor will perform interim repairs to the FDR Ramp. The Scope of Work includes but is not limited to: rehabilitation of expansion joints and drainage systems, concrete repairs, curtain wall removal and tie plate.

Duration of Contract 24 Months

Bridges and Tunnels Brief Description of Work MAY 2017

HC-30/QM-91 DESIGN-BUILD INSTALL SMOKE DETECTION/SMOKE ALARM SYSTEMS AT QMT/HCLT VENTILATION BUILDINGS AND SERVICE BUILDINGS $5M - $10M http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 3/26 9/23/2016 MTA - Eye on the Future Under this Design-Build contract, the contractor will prepare design for and perform construction installation of smoke detection/alarm systems in the tunnel ventilation buildings and service buildings.

Duration of Contract 30 Months

HC-64 DESIGN-BUILD HUGH L. CAREY TUNNEL SERVICE BUILDING ELECTRICAL REHABILITATION $1M - $5M

This Design-Build contract will replace/relocate outdated main electrical distribution equipment in the service building.

Design and install replacement of outdated electrical distribution equipment in service building. Comply with all design criteria, phasing approach, environmental permits and approvals, schedule, fire and security requirements. Conduct electrical systems testing, as well as, train the Authority personnel on such systems.

Duration of Contract 18 Months

Bridges and Tunnels Brief Description of Work AUG 2017

TN-49 CONSTRUCTION MANAGEMENT SERVICES FOR TN-49 CONSTRUCTION CONTRACT (REPLACEMENT OF SUSPENDED SPAN DECK AT THROGS NECK BRIDGE) $10M - $50M

Under this construction management contract, the consultant will provide construction administration work for TN-49 construction contract (replacement of the suspended span deck at the Throgs Neck Bridge). Suspended span deck will be replaced with an orthotropic deck. Work includes replacement of the median barrier and parapets, replacement of drainage system and roadway lighting. Work also includes painting of the towers and suspended span steel.

Duration of Contract 56 Months

Long Island Rail Road Brief Description of Work SEP 2016

TBD SPRINGFIELD AND UNION TPKE BRIDGES REPAIRS** $5M - $10M

Springfield Boulevard Bridge (LIRR Bridge No. 09-O-133) is located on the Main Line Branch. The project is for the replacement of the girder top plates, abutment wall repair, underdeck repairs, and partial platform replacement. Union Turnpike Bridge (LIRR Bridge No. 29-O-064) is located on the Montauk Branch. The single span, two track bridge carries only freight traffic. The bearings on the bridge are frozen and not functioning as designed. This project will rehabilitate the Union Turnpike railroad bridge for bearing replacements and bridge seats.

Springfield Boulevard Bridge - Repairs on Girder 1 and 5 top flange plates on all 3 spans. Springfield Boulevard Bridge - Repair platform support steel brackets and platform stubs Springfield Boulevard Bridge- Removal and replacement of existing concrete passenger platforms Union Turnpike - Replace bearings Union Turnpike - Remove and rebuild partial bridge seat and pedestals Union Turnpike - Repair back wall as necessary

Duration of Contract 12 Months

Long Island Rail Road Brief Description of Work OCT 2016

L10972* REHABILITATION OF NOSTRAND AVE** $10M - $50M

The purpose of this project is to rehabilitate the existing Nostrand Avenue Station and provide ADA-compliant accessibility to the station platforms. This station is located in Kings County on the Atlantic Branch (Milepost 1.6), and consists of two elevated side platforms, with an unmanned ticket booth (now used for LIRR utilities/storage) on the south platform. This Scope of Work provides for replacement of the station platforms and platform substructure, railings, stairs, canopy system, station lighting, electrical and communications system, and signage, along with the installation of two new elevators and general improvements to site accessibility.

Replace station platforms and platform substructure, railings, stairs, canopy system, station lighting, electrical and communications system. Replacement of signage. Install two new elevators. http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 4/26 9/23/2016 MTA - Eye on the Future General improvements to site accessibility

Duration of Contract 30 Months

L10987* BUCKRAM RD BRIDGE REPLACEMENT** $10M - $50M

Buckram Road Bridge (LIRR Bridge no. 67-O-300) located in Locust Valley on the Oyster Bay Line was built in 1889, carries one non-electrified track, and has three spans with a bridge length of 134 feet. The bridge is open deck and consists of one through plate girder span and two deck plate girder spans. With the current vertical clearance posted at 10’-1”, bridge strikes by vehicles have been a common occurrence. The purpose of this project is to replace the Buckram Road Bridge with single span bridge, increase vertical clearance under the bridge to reduce vehicular strikes, improve vehicle line of sight angles, and increase the load rating to the current Cooper’s E50 requirements.

Utility relocation Remove hazardous materials (abatement) Install concrete lagging retaining wall Repair existing abutments Remove track, signal, etc. Remove existing bridge and install new bridge Install track, signal, etc.

Duration of Contract 19 Months

Long Island Rail Road Brief Description of Work NOV 2016

L09411 NEW MID-SUFFOLK ELECTRIC YARD OVER $50M

Construction of a new electric train storage yard south of and adjacent to existing train storage yard in Ronkonkoma. The new yard will include up to 11 tracks that can each hold 12-car electric trains. The yard will be constructed to include accommodations for light interior car cleaning, toilet servicing, inspection, and light repairs. The work also includes a new electric service substation, employee facility and material storage facility.

Construct Lead track with interlocked signals, switches, and crossovers. Install up to 11 electrified lay-up tracks for 12-car consists and provide under-car inspection pits. Provide car cleaner utility sheds [11] with hot & cold water and other utilities for cleaning and maintenance. Provide new electric service substation to supply traction power, and wayside power for yard lighting and yard activities, and for lay-up of diesel consists. Toilet servicing facilities and gated access for emergency toilet servicing truck. High security perimeter fencing and access gates, parking, walkways, and lighting. Employee welfare facilities.

Duration of Contract 30 Months

Long Island Rail Road Brief Description of Work DEC 2016

E01930 & E02605(Sandy)* LONG ISLAND CITY YARD RESTORATION / RESILIENCY $10M - $50M

Reconstruction of Tracks 9 through 12 including restoration of third rail systems; switch replacements; perimeter flood protection walls and gates; construction of car cleaning platforms; underground utilities; storm water detention and management system including flap valves, sumps, pumps, and chambers; raised track profiles [to raise elevation]; traction and wayside power systems; noise mitigation strategies; and excavation/removal of excess soil. In addition, to properly stage work and minimize impact to operations, early construction to support restoration and mitigation will include installation of third rail systems on Tracks 7 and 8 [also enhances system resiliency] with a fueling safety interlock.

New east end fueling [with spill collection pans] Underground duct banks with upgrades for future wayside power & for future third rail power. Fuel safety interlock between third rail facilities and diesel fueling to prevent simultaneous energizing of third rail and diesel on newly electrified tracks 7 & 8. New cleaning service platforms between Tracks 9 & 10 and Tracks 11 & 12, including service platform No. 6 modifications [architectural and structural], and service pits. Remove excess soil. Asphalt roadways and walkways. Flood prevention measures including combination of yard perimeter protective barrier permanent and removable flood walls, storm drainage system modifications, and sump pits & pumps.

Duration of Contract 30 Months

http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 5/26 9/23/2016 MTA - Eye on the Future L10175 RICHMOND HILL SUBSTATION REPLACEMENT $5M - $10M

Construction of new prefabricated modular substation at Richmond Hill that will house new pre-installed AC switchgear, rectifiers, DC switchgear, control cabinets, and associated equipment.

Manufacture, deliver, and install prefabricated substation building with necessary power components. Provide 2 - 3 MW Transformer-Rectifier units. Provide DC Switchgear with 8 DC Breakers. Provide AC Switchgear with 5 - 26.4kV AC Breakers. Provide PLC / SCADA System. Provide Auxiliary Equipment.

Duration of Contract 20 Months

Metro-North Railroad Brief Description of Work SEP 2016

M10399 DESIGN, FURNISH, INSTALL AND INTEGRATE METRO-NORTH’S PUBLIC ADDRESS AND VISUAL INFORMATION SYSTEM $5M - $10M

The purpose of this project is to install a new Public Address and Visual Information System (PA/VIS) head-end equipment consisting of a new PA/VIS primary server within Grand Central Terminal. A second alternate server shall be installed at Metro-North Railroad's office building at 525 North Broadway in White Plains, New York. The project also includes PA/VIS consoles, software, network equipment, new station control units (SCU) and Digital Signal Processors (DSP) to be furnished, installed and integrated at all passenger stations. Additionally, a Real Time Train Data system shall be designed and implemented to enhance the reporting accuracy of the train arrival information in the new PA/VIS.

- Design, furnish, and install primary and alternate servers - Design, furnish and integrate station controller units at all passenger stations - Design, furnish and integrate digital signal processors at all passenger stations - Design, furnish and integrate ambient microphones and amplifiers at all passenger stations - Design real-time passenger information system (software) and integrate/implement into the new system

Duration of Contract 62 Months

M10691 DESIGN-BUILD FOR NEW CABLE PLANT TO SUPPORT AUDIO-VISUAL AND FACILITY ENHANCEMENTS IN GRAND CENTRAL TERMINAL $10M - $50M

The purpose of this project is to build a new cable plant and perform work to support Metro-North Railroad's communications infrastructure in Grand Central Terminal. Within Grand Central Terminal, Metro-North Railroad is implementing a Customer Service Initiative Project to update and expand the capacity of communications between the railroad and its customers. This project will improve communications, increase reliability, and provide for future growth for new types of information to be displayed. Implementation of this project will address existing system components that are at the end of their useful lives and modernize the overall system.

- Build new cable plant- install conduits, cables (copper, fiber optic) - Renovate Room 7C within Grand Central Terminal with new ceiling, flooring, HVAC, plumbing, fire suppression and some electrical work to prepare it for a new PA/VIS Head End System (By others) within the renovated room - Furnish and install new amplifiers for the Grand Central Terminal Public address system - Perform sheet metal work associated with passenger display frames - Furnish and install various new HVAC, plumbing, electrical, UPS and for suppression in Track 117 room (GCT PA Room) and the north end PA room - Furnish and install various displays within Grand Central Terminal

Duration of Contract 24 Months

M10764 DESIGN & CONSTRUCTION SERVICES FOR A VISUAL DISPLAY SYSTEM UTILIZING LED VIDEO WALL ARCHITECTURE - GCT $10M - $50M

The purpose of this project is to replace the main train information display boards (Big Boards) located above the information booths in Grand Central Terminal (GCT) and replace the existing Gate Boards located throughout the Terminal. The new boards shall be designed, fabricated and installed using LED video wall architecture. The installation of LED video wall shall form fit and function in existing housings in existing spaces on the main concourse for the Big Board displays and throughout GCT for the gate indicators. The new Big Board and Gate Board equipment consists of tiled LED displays of the same size and shape as the existing Big Boards and the Gate Boards. This contract also icludes power supplies for each board, control units to receive digital video inputs from a new PA/VIS head end, interface points for receiving signals via fiber optic cable, mounting hardware for each board, protective glass screens for the gate boards and demolition of the existing Big Board and Gate Boards. Complete cutover of each board shall occur overnight without loss of train departure information to Metro-North Railroad (MNR) Customers during normal business hours.

- Design, furnish and install new video walls to replace the Big Boards and Gate boards - Build custom frames to support the new boards and fit within the current housings - Assemble a mock-up within GCT of a Big Board prior to installation for testing and acceptance - Demolish and salvage the existing information display Big Board and install one new Information Big Board at a time - Demolish and salvage one Gate Board at a time and replace it with the new Gate Board during off-hours according to the restrictions of working in GCT http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 6/26 9/23/2016 MTA - Eye on the Future - Coordinate with other contractors and equipment in order to test and install the new boards

Duration of Contract 27 Months

M10812 DESIGN-BUILD:PROSPECT HILL ROAD BRIDGE - SOUTHEAST, NY $5M - $10M

This contract is for the Replacement of the Prospect Hill Road Bridge located in the Town of Southeast, Putnam County, New York. The bridge is currently closed for vehicular traffic. The existing 4-span bridge carries Prospect Hill Road over Metro-North Railrod's (MNR) Brewster Yard and is located approximately 0.16 mile south of MNR’s Southeast Train Station. Spans 1 and 4 are each 30’ long, supported by two built- p steel girders. Spans 2 and 3 are each 105’-6” long and are each carried by two through steel Warren trusses and transverse steel floor beams. The existing bridge will be demolished and the new bridge will be located in the same alignment as the existing bridge. Retaining walls will be constructed at the approaches. The new bridge is currently under 30% design and is being prepared for Design-Build advertisement.

- Finalization of design for new bridge and submittal process - Mobilization, relocation of utilities, set-up maintenance and protection of traffic, and relocation of employee parking - Construction of temporary supports and demolition of existing superstructure and substructures (piers) - Excavation and construction of new center pier, abutment(s), and retaining walls for the approaches - Construction of new bridge superstructure and approaches

Duration of Contract 21 Months

M702-02-07 OUTLYING STATIONS - AUDIO AND VISUAL INFORMATION SYSTEM REPLACEMENTS $10M - $50M

The purpose of this project is to create new station public address systems that will provide audio and visual display of scheduled trains on station platforms on the Hudson and lower Harlem and New Haven Lines. The new system shall provide train arrival in real-time along with additional information for passengers. The system backbone shall support the addition of security cameras, access control and elevator and escalator monitoring at East of Hudson stations. This technology improvement will enhance communications with customers with accurate real time information.

- Construct and install cable; copper and fiber circuits to support passenger signs and video surveillance - Install three-door equipment cabinet with HVAC - Construct and install mounts for passenger displays at outlying stations - Construct and install video surveillance mounting equipment - Install cameras and signs at outlying stations

Duration of Contract 60 Months

Metro-North Railroad Brief Description of Work OCT 2016

M10349* PURCHASE CNC MILLING MACHINE $100K - $250K

This contract will provide for the purchase of one (1) computer numerical control (CNC) milling machine for Metro-North Railroad's (MNR) Maintenance of Way machine shop. Specifications to include extra tooling to accommodate MNR work scope (e.g. parts manufacturing).

- Fabrication of one (1) computer numerical control (CNC) milling machine - Procurement of additional tooling to meet specific MNR work scope (e.g. parts manufacturing)

Duration of Contract 11 Months

M10350* PURCHASE ONE (1) DYNAMIC TRACK STABLIZER $1M - $5M

This contract will provide for the purchase of one (1) dynamic track stabilizer for Metro-North Railroad's Maintenance of Way Track and Structures Department. Specifications include special lighting and ergonomic requests, control features, maintenance equipment, extra fluid filtering and accommodations for track clearance needs.

- Fabrication of one (1) dynamic track stabilizer - Procurement of additional work lighting and specific travel lighting - Procurement of control features, maintenance equipment, extra fluid filtering for various systems - Procurement of modifications to accommodate MNR track clearance needs

Duration of Contract 11 Months

M10351* PURCHASE EIGHT (8) JUNIOR TAMPER $1M - $5M http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 7/26 9/23/2016 MTA - Eye on the Future This contract will provide for the purchase of eight (8) junior type spot tampers for Metro-North Railroad’s Maintenance of Way Track and Structures Department. Required modifications to include specific lighting and ergonomic requests, control features, maintenance equipment, extra fluid filtering and accommodations for track clearance needs.

- Fabrication of eight (8) junior type spot tampers - Procurement of additional work lighting and specific travel lighting - Procurement of control features, maintenance equipment, extra fluid filtering for various systems - Procurement of track clearance needs

Duration of Contract 11 Months

M10352* PURCHASE EIGHT (8) TIE CRANE $1M - $5M

This contract will provide for the purchase of eight (8) tie cranes for Metro-North Railroad’s Maintenance of Way Track and Structures Department. Required modifications to include specific lighting and ergonomic requests, control features, maintenance equipment, extra fluid filtering and accommodations for track clearance needs. In addition, interchangeable work implements such as basket and finger grapples, brush mower and magnet are also required.

- Fabrication of eight (8) tie cranes - Procurement of additional work lighting and specific travel lighting - Procurement of control features, maintenance equipment, extra fluid filtering for various systems - Procurement of track clearance needs - Procurement of interchangeable work implements such as basket and finger grapples, brush mower and magnet

Duration of Contract 11 Months

M10353* PURCHASE EIGHT (8) BACKHOE W/TRAILER $1M - $5M

This contract will provide for the purchase of eight (8) backhoes with trailers for Metro-North Railroad’s Maintenance of Way Track and Structures Department. Required modifications to include snow plow, various sized buckets, hi-rail equipment and other work implements.

- Fabrication of eight (8) backhoes - Procurement of eight (8) trailers - Procurement of snow plow - Procurement of various sized buckets - Procurement of hi-rail equipment - Procurement of other work implements (tamp ties, tie grapple, high flow tool circuits, ballast boom attachment)

Duration of Contract 11 Months

M10354* PURCHASE ASPHALT PAVER W/TRAILER $100K - $250K

This contract will provide for the purchase of one (1) asphalt paver with trailer for Metro-North Railroad’s Maintenance of Way Track and Structures Department.

- Fabrication of one (1) asphalt paver - Procurement of one (1) trailer

Duration of Contract 11 Months

M10355* PURCHASE TWO (2) INDUSTRIAL FORK TRUCKS $50K - &100K

This contract will provide for the purchase of two (2) industrial fork trucks for Metro-North Railroad’s Maintenance of Way Track and Structures Department. Specifications include enclosed cab with HVAC controls, lighting and various sized forks.

- Fabrication of two (2) industrial fork trucks - Procurement of enclosed cab with HVAC controls, lighting and various sized forks - -

Duration of Contract 11 Months

M10356* PURCHASE COMPACT CRAWLER LIFT W/TRAILER $100K - $250K

This contact will provide for the purchase of one (1) compact crawler lift with Trailer for Metro-North Railroad’s Maintenance of Way Track and Structures Department. Unit must be electrically powered due to use within facilities (no engine emissions). http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 8/26 9/23/2016 MTA - Eye on the Future - Fabrication of one (1) compact crawler lift - Procurement of one (1) trailer - Procurement of electric power option due to use within facilities (no engine emissions)

Duration of Contract 11 Months

M10357* PURCHASE HI-RAIL TRACK EXCAVATOR W/TRAILER $100K - $250K

This contract will provide for the purchase one (1) hi-rail track excavator with trailer for Metro-North Railroad’s (MNR) Maintenance of Way Track and Structures Department. Specifications include hi-rail equipment, lighting, HVAC equipment, maintenace related items such as added filtration, buckets of various sizes and dimensions needed to meet MNR clearance requirements.

- Fabrication of one (1) hi-rail track excavator - Procurement of one (1) trailer - Procurement of hi-rail equipment - Procurement of lighting, HVAC equipment and maintenance related items such as added filtration - Procurement of different sized buckets - Ensurance that unit meets MNR clearance requirements

Duration of Contract 11 Months

M10358* PURCHASE HI-TRACK LOADER W/TRAILER $100K - $250K

This contract will provide for the purchase of one (1) hi-track loader with trailer for Metro-North Railroad’s Maintenance of Way Track and Structures Department. Specifications included hi-rail, enclosed cab and buckets of various sizes.

- Fabrication of one (1) hi-track loader with trailer - Procurement of one (1) trailer - Procurement of hi-rail equipment - Procurement of enclosed cab and buckets of various sizes

Duration of Contract 11 Months

M10359* PURCHASE ASPHALT ROLLER W/TRAILER $50K - &100K

This contract will provide for the purchase of one (1) asphalt roller with trailer for Metro-North Railroad’s Maintenance of Way Track and Structures Department.

- Fabrication of one (1) asphalt roller - Procurement of one (1) trailer

Duration of Contract 11 Months

M10364* PURCHASE TWO (2) MINI LOADER BACKHOE W/SNOW BLOWER $50K - &100K

This contact will provide for the purchase of two (2) Mini Loader Backhoes for Metro-North Railroad’s Maintenance of Way Track and Structures Department. Specifications include snow blower.

- Fabrication of two (2) mini loader backhoes - Procurement of two (2) snow blowers

Duration of Contract 11 Months

M10365* PURCHASE THREE (3) ROUGH TERRAIN SCISSOR LIFT W/ FIVE TON TRAILER $100K - $250K

This contact will provide for the purchase of three (3) Rough Terrain Scissor Lifts with five Ton Trailers for Metro-North Railroad’s Maintenance of Way Track and Structures Department.

- Fabrication of three (3) rough terrain scissor lifts - Procurement of three (3) five ton trailers

Duration of Contract 11 Months

M703-01-09_1* PURCHASE ONE (1) PRODUCTION TAMPER http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 9/26 9/23/2016 MTA - Eye on the Future $1M - $5M

This contract will provide for the purchase of one (1) production tamper for Metro-North Railroad's Maintenance of Way Track and Structures Department. Specifications include special needs with regard to clearances for third rail, overhead wire, platforms and the tunnel at the entrance to Grand Central Terminal. In addition, special clamp frames, lateral movement limits on our work heads and physical clearance dimensions of certain lining / lifting system components can cause certain unique build characteristics. Modified production rates to what is stock can create modifications to hydraulic and control system features as well as rated engine horsepower.

- Fabrication of one (1) Production Tamper - Procurement of modifications to accommodate MNR third rail, overhead wire, platforms and track clearance needs

Duration of Contract 11 Months

Metro-North Railroad Brief Description of Work DEC 2016

E04175* REPLACE POWER CABLES - HARLEM RIVER LIFT BRIDGE $1M - $5M

This contract is to run new high voltage submarine power cables in existing micro tunnel between the Bronx and Manhattan sides of the Harlem River Lift Bridge. These cables will be used to provide backup power. Two step up transformers will be installed, one on either side of bridge so that the stepped up voltage will reduce the voltage drop and hence the cable size. The end result of this will be to transfer power from one side to another in case of power failure.

- Equipment Procurement - Run new high voltage cables thru existing micro tunnel, install transformers, disconnect switches and make final terminations on transformer primary/ secondary - Implement interlock scheme - Perform testing and commissioning

Duration of Contract 9 Months

Metro-North Railroad Brief Description of Work MAR 2017

M705-01-01_1 CONSTRUCTION-MOTT HAVEN - MOTOR ALTERNATORS $5M - $10M

This contract provides for the construction of the replacement of two motor alternator sets along with their low, medium and high voltage equipment which are located in Mott Haven Yard. The signal substation motor alternator sets convert high voltage 60 HZ AC power to medium voltage 100 HZ AC power to serve as a primary feed for Metro-North Railroad's Signal systems. Mott Haven Yard is one of (6) locations serving the electrified territory of the Harlem and Hudson lines. During construction a temporary mobile motor alternator will continue to provide signal power.

- Switchgear and controls to be replaced - Replace motor alternators with new motor alternators - Installation of new 600V Switchgear - Installation of new 5kv, 100 Hz switchgear - Installation of new 15kv, 60Hz switchgear - Installation of 5 kv,15kv power and 600v control cables

Duration of Contract 24 Months

Metro-North Railroad Brief Description of Work AUG 2017

M09217 RADIO/COMMUNICATION INSTALLATION $10M - $50M

Congress passed the Rail Safety Improvement Act of 2008 which requires that all commuter railroads implement a Positive Train Control System (PTC) on it's mainline tracks by December 31, 2018. PTC is a system designed to prevent train-to-train collisions, over speed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position. This contract provides for the procurement and installation of radio/communication equipment and includes the following tasks:

- Installation of wood poles, antenna system and coaxial cable from pole to the radio equipment case - Installation of platforms and foundations for radio equipment case - Installation of both power and fiber cables with varying installations including conduit and cable tray from radio case to the signal equipment locations http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 10/26 9/23/2016 MTA - Eye on the Future Duration of Contract 24 Months

M10310 ROCK SLOPE REMEDIATION- HUDSON LINE $5M - $10M

The scope of work for this contract consists of the stabilization of approximately eight rock slopes along Metro-North Railroad's right of way along the Hudson line.

- Tree Removal - Rock Face Scaling - Installation of Rock Bolts - Installation of Cable Mesh. - Installation of Rock Fences - Construction of Concrete Buttresses

Duration of Contract 24 Months

M10323* ROCK SLOPE REMEDIATION - PORT JERVIS LINE $5M - $10M

The scope of work for this contract consists of the stabilization of approximately seven rock slopes along Metro-North Railroad's right of way along the Port Jervis Line.

- Tree Removal - Rock Face Scaling - Installation of Rock Bolts - Installation of Cable Mesh - Construction of Concrete Buttresses

Duration of Contract 24 Months

New York City Transit Brief Description of Work SEP 2016

A36984 PLATFORM COMPONENTS: 4 LOCATIONS / 4TH AVENUE $5M - $10M

Repair of station components at 25th Street, 45th Street Stations on the 4th Avenue Line in Brooklyn, including platform components and track walls.

Duration of Contract 12 Months

A37122 ADA: COURT SQUARE / CROSSTOWN (STAIRS PHASE) $1M - $5M

This project is the first of two phases to provide full ADA (Americans with Disabilities Act) accessibility at the Court Square Station on the Crosstown Line in Queens. This phase will include enhancement of platform stair capacity, including the addition of two new platform stairs, widening of two existing platform stairs, shifting an existing platform staircase, and removal of temporary refuse room at platform level. Phase two will include elevator installation at same location.

Duration of Contract 13 Months

A37659(Sandy)* SANDY MITIGATION: 9 STATIONS (9 STNS BK/Q INITIATIVE) $10M - $50M

Implementation of long-term flood protection measures at nine stations to prevent damage from future storm surge events, including adjacent tunnels and one fan plant. Work involves fabrication and installation of both permanent and deployable methods of protection, which may include, but is not limited to, water tight doors and lids, mechanical closure devices, removable sidewalk vent covers, flex gates.

Duration of Contract 36 Months

A37660(Sandy)* SANDY MITIGATION: STREET LEVEL OPENINGS AND INTERNAL STATION HARDENING (7 STATIONS + 1 FAN PLANT) $10M - $50M

Construction of long-term flood protection at seven stations, adjacent tunnels and one fan plant in Manhattan, Queens and the Bronx. Scope includes, but is not limited to, flood mitigation of station entrances, ventilation gratings, hatches, manholes, and critical rooms. Locations include stations on the http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 11/26 9/23/2016 MTA - Eye on the Future Broadway-7th Ave, Lexington, Concourse, Jerome and East 63rd St Lines, as well as, a fan plant on the East 63rd St. Line.

Duration of Contract 48 Months

B40495 REPLACEMENT OF OIL-WATER SEPARATORS AT 4 LOCATIONS $5M - $10M

Replace existing oil/water separators at four (4) bus depots to fulfill code and permit compliance and to avoid possible soil and groundwater contamination. Work may also include remediation of existing contamination in the vicinity of these oil/water separators.

Duration of Contract 18 Months

B62027 STORAGE TANK COMPONENT REPLACEMENT: JACKIE GLEASON AND CASTLETON DEPOTS $5M - $10M

Replacement of storage tanks at the Jackie Gleason and Castleton Depots, in order to comply with current regulation and to reduce risk of leaks, spills, or unplanned service interruptions.

Duration of Contract 27 Months

C34839/P36449/ C31622(Sandy)* SANDY MITIGATION: LONG-TERM PERIMETER PROTECTION, POWER CABLE REPLACEMENT AND YARD PORTAL - 148 ST YARD OVER $50M

This project will provide perimeter protection to prevent flooding due to storm surges, as well as the replacement of power cables at the 148th Street Yard.

Construction of a seawall adjacent to the existing bulkhead wall Construction of a floodwall at the north and south end of the site Installation of watertight driveway gates Installation of steel stop logs at the tunnel portal Replacement of power cables

Duration of Contract 42 Months

C34923 OVERCOAT: BROADWAY - END OF LINE / MYRTLE $10M - $50M

Overcoat painting and select structural steel repair along 2.6 miles of elevated structure on the Myrtle Avenue Line in Brooklyn and Queens.

Duration of Contract 32 Months

C36693 REHABILITATION OF SUBSTATION ROOF & ENCLOSURE: JEROME/E 162 ST $1M - $5M

Repair of substation enclosure and related components at Jerome/East 162nd Street on the Jerome Avenue Line.

Duration of Contract 14 Months

C40254 REPLACE ROOF AT EAST NEW YORK BUS DEPOT $5M - $10M

Replacement of roof components at East New York Bus Depot, including replacement of drains scupper, fence, doors, lintel and rehabilitation masonry.

Duration of Contract 16 Months

C43752 RAPID TRANSIT OPERATIONS FACILITIES: CHAMBERS ST / NASSAU LOOP $5M - $10M

Reconstruction and rehabilitation of Rapid Transit Operations Construction Flagging facility at Chambers Street Station on the Nassau Loop in Manhattan. Work will include construction of new rooms and communication systems, heating, ventilation, electrical, lighting, plumping, flooring, painting.

Duration of Contract 12 Months

C48506(Sandy)* SANDY MITIGATION: NEAR-TERM FLOOD PROTECTION STILLWELL TERMINAL FACILITIES http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 12/26 9/23/2016 MTA - Eye on the Future $1M - $5M

Fabrication and installation of both permanent and deployable methods of flood protection, which may include:

Perimeter protection using deployable barriers at pedestrian openings, two condensers placed 1-foot outside building envelope, and an in-line check valve in pipe from manhole to Utility Building Interior improvement throughout building, including sealing conduits entering Utility Building's normal electrical distribution room and photovoltaic inverter rooms Improvements to duct banks, including manhole inserts, and sealing conduits

Duration of Contract 11 Months

C48701 ELEVATED STRUCTURAL REHAB AND OVERCOAT PAINTING: WHITE PLAINS ROAD LINE $10M - $50M

Rehabilitation of steel elevated structure of White Plains Road Line between Boston Road and East 180th Street Abutment, inclusive of abutment repairs and overcoat painting.

Duration of Contract 24 Months

E42262 REPLACE YARD LIGHTING: 207TH STREET $10M - $50M

Rehabilitation and upgrade of lighting at 207th St Yard in Manhattan to comply with current standards. Work will include removal and replacement of concrete foundations, fixtures, conduits, wires, appurtenances and ancillary components.

Duration of Contract 29 Months

P36471* REPAIR TWO CIRCUIT BREAKER HOUSES - CANARSIE LINE $5M - $10M

Replacement of circuit breaker houses and associated components at Myrtle Avenue and Wilson Avenue Stations on the Canarsie Line, including, but not limited to:

Repair or replacement of leaking roofs, broken windows Installation of new breakers, feeder cables, new lights, vandal proof doors, new telephone, CO2 fire extinguisher, and access intrusion system Installation of new Supervisory Control and Data Acquisition System (SCADA) and battery wiring

Duration of Contract 24 Months

V33700 PURCHASE 202 NON-REVENUE VEHICLES 2015 $10M - $50M

Purchase and replace 202 non-revenue rubber tire support vehicles to be used for essential services such as emergency response, material transportation, track repair and elevated structure repair.

Duration of Contract 12 Months

New York City Transit Brief Description of Work OCT 2016

A36164 ADA: 68 ST-HUNTER COLLEGE / LEXINGTON $10M - $50M

This project will provide full ADA (Americans with Disabilities Act) accessibility at the 68th Street-Hunter College Station on the IRT Lexington Avenue Line located in the borough of Manhattan. The station was identified as an ADA Key station in 1992.

Duration of Contract 48 Months

A36921 STATION COMPONENT REPAIRS: 3 LOCATIONS / CROSSTOWN $1M - $5M

Repair of platform components at Broadway, Myrtle-Willoughby Avenues, and Clinton-Washington Avenues Stations, including:

Platform edge replacement Retrofit of existing platforms to include ADA boarding zones http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 13/26 9/23/2016 MTA - Eye on the Future Targeted column and beam repair at Broadway Station

Duration of Contract 11 Months

A36956 STATION COMPONENT REPAIR: 4 LOCATIONS / 8TH AVENUE $10M - $50M

This project will eliminate deficient conditions at stations on the 8th Avenue Line in the borough of Manhattan. Component repair work may include, but is not limited to, the repair of street stairs, mezzanine stairs, platform stairs, ceiling beams, platform edges, platform floors, platform columns and girders, and platform walls.

Duration of Contract 20 Months

A46017/A46019/A46020/A46021/A46022 STATION RENEWAL: 5 STATIONS - ASTORIA LINE $10M - $50M

Renewal of 5 stations on the Astoria Line in Queens. Work will involve repair of three or more components at Astoria-Ditmars Boulevard, 30th Avenue, Broadway, 36th Avenue, and 39th Avenue Stations. Components to be determined based on Station Condition Survey.

Duration of Contract 27 Months

B40662 PURCHASE 628 STANDARD DIESEL BUSES OVER $50M

Duration of Contract 36 Months

C33835 PRIORITY STRUCTURAL REPAIRS: 4TH AVENUE OVER $50M

Water remediation and repair of concrete and structural steel along about 1.1 miles of tunnel between 36th Street and 59th Street Stations on the 4th Avenue Line in Queens.

Duration of Contract 34 Months

C34836(Sandy)* SANDY MITIGATION: LONG-TERM PERIMETER PROTECTION, PORTAL PROTECTION AND POWER CABLE REPLACEMENT-CONEY ISLAND YARD OVER $50M

This contract involves long-term measures to mitigate Coney Island Yard from damage by future storm surge, including the following:

Construction of flood walls along the perimeter of the yard installation of watertight gates at vehicular and pedestrian gates Ensuring sufficient pumping capacity based around on-site storage and off-site pumping improving yard drainage as needed including outfall and runoff management measures

Duration of Contract 65 Months

MW50-6593 STRUCTURAL REHABILITATION PHASE 1: SOUTH OF 36TH STREET TO 59TH STREET STATION - 4TH AVENUE LINE $10M - $50M

Water remediation and select structural repairs along 1.1 miles of the tunnel between 36th Street Station and 59th Street Station on the 4th Avenue Line in Brooklyn.

Duration of Contract 35 Months

P80682 NEW POWER SUBSTATION: TOTTENVILLE $10M - $50M

Fabrication and installation of new substation in Staten Island at Tottenville Station to support 2x3000kW rectifiers.

Duration of Contract 25 Months

http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 14/26 9/23/2016 MTA - Eye on the Future R34252 PURCHASE 54 FLAT CARS $10M - $50M

Duration of Contract 28 Months

R34254 PURCHASE 27 REFUSE FLAT CARS $10M - $50M

Duration of Contract 39 Months

New York City Transit Brief Description of Work NOV 2016

C32515 TRACK INTRUSION DETECTION: PILOT PHASE 2 $1M - $5M

Fabrication of track intrusion detection system that detect people or objects on active tracks and alerts train operators, station personnel and Rail Control Center/Rapid Transit Operations Supervision. This system will be installed at 50th Street Station on the 8th Avenue Line in Manhattan and, when installed, the system configuration should include the following:

CCTV at Rail Control Center Local visual indications for station personnel, train operators and first responders Capability for both secure local and remote reset.

Duration of Contract 10 Months

C33242* OVERCOAT: 72 STREET - 103 STREET / FLUSHING $10M - $50M

Overcoat painting and select structural repairs on the Flushing Line from 72nd Street to 103rd Street in Queens.

Duration of Contract 24 Months

RC03-6761 REFURBISH KEENE VACUUM SYSTEMS

This project will involve the purchase and replacement of the coin sorting unit and associated hardware for Keene vacuum system, an electromechanical device utilized to remove, process and store coin revenue from bus fareboxes. Each NYCT depot currently has, at minimum, two Keene vacuum units.

Duration of Contract TBD Months

New York City Transit Brief Description of Work DEC 2016

A37109* ADA: GUN HILL RD / DYRE $10M - $50M

Installation of two hydraulic elevators and associated components, as well as, modification of ancillary areas to provide station accessibility in compliance with ADA standards.

Duration of Contract 27 Months

B40499 PORTABLE BUS LIFT REPLACEMENT $5M - $10M

Fabrication and installation of approximately 900 portable bus lifts for installation at bus depots across the system. Work will include:

Removal and disposal of existing bus lifts Delivery of new bus lifts to Bus Depots across the system to be networked together in groups of 4 for standard buses or in groups of 6 for articulated buses

Duration of Contract 59 Months http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 15/26 9/23/2016 MTA - Eye on the Future

C34850 STRUCTURAL REMEDIATION: E 180 ST MAINTENANCE SHOP & RETAINING WALL $1M - $5M

Repair of structural elements at East 180th Street Car Maintenance Facility, as well as, adjacent retaining wall and walkway. Work includes the following:

Stabilization of column adjacent to building corner Reconstruction of portion of retaining wall Reconstruction of exterior walking and metal railing

Duration of Contract 12 Months

C34919* OVERCOAT: 17 BRIDGES AND EAST 180 STREET FLYOVER / DYRE AV $10M - $50M

Overcoat painting and select structural repairs across 17 bridges and flyover at East 180th Street Yard on the Dyre Avenue Line in the Bronx.

Duration of Contract 20 Months

P36472* REPAIR CBH # 210 - (239TH STREET / WPR) $10M - $50M

Replacement of circuit breaker house and associated components in the vicinity of 238th Street Station on the White Plains Road Line in the Bronx.

Duration of Contract 24 Months

P80683 STATEN ISLAND RAILWAY: NEW POWER SUBSTATIONS AT NEW DORP AND CLIFTON $10M - $50M

Fabrication and installation of two new substations in Staten Island at New Dorp and Clifton Stations to support 2x3000kW rectifiers.

Duration of Contract 42 Months

W32385 UPGRADE ASYNCHRONOUS FIBER OPTIC NETWORK TO SONET - RINGS A,C $10M - $50M

Upgrade Asynchronous Fiber Optic Network node equipment to Synchronous Optic Network (SONET) on fiber optic rings A and C systemwide. Contract to include the following:

Replacement of existing equipment Cutover of individual applications

Duration of Contract 31 Months

New York City Transit Brief Description of Work JAN 2017

B62003 BUS RAPID TRANSIT: PURCHASE 240 METROCARD FARE MACHINES $5M - $10M

Purchase of 240 MetroCard fare machines for use at Select Bus Service stops systemwide.

Duration of Contract 4 Months

EN01-7355 BORING SERVICES: BK/Q/SI $1M - $5M

Contract for test boring services within the boroughs of Brooklyn, Queens and Staten Island to determine sub-surface soil conditions for capital projects in the 15-19 Program.

Duration of Contract 36 Months

http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 16/26 9/23/2016 MTA - Eye on the Future EN01-7356 BORING SERVICES MANHATTAN & BRONX $1M - $5M

Contract for test boring services within the boroughs of Manhattan and the Bronx to determine sub-surface soil conditions for capital projects in the 15-19 Program.

Duration of Contract 36 Months

P36698 NEW SUBSTATION: MASPETH AVENUE-HUMBOLDT STREET / CNR $10M - $50M

Construction of new underground substation in the vicinity of Maspeth Avenue-Humboldt Street Station on the Canarsie Line in Brooklyn to support Communication Based Train Control (CBTC) operations.

Duration of Contract 42 Months

P36699 NEW SUBSTATION: HARRISON PL / CANARSIE LN $10M - $50M

Construction of new underground substation in the vicinity of Harrison Place on the Canarsie Line in Brooklyn to support Communication Based Train Control (CBTC) operations.

Duration of Contract 49 Months

R34194 HEAVY SHOP EQUIPMENT PURCHASE & REPLACEMENT 2015-19 $5M - $10M

Fabrication of nineteen (19) heavy shop equipment, one (1) truck washer, one (1) bridge crane, and two (2) part wash and rinse tanks for use at maintenance facilities system-wide.

Duration of Contract 35 Months

S32396 AC LINE RELAY UPGRADE (CROSSTOWN) - (96 SIGNAL) $10M - $50M

Upgrade of line control relays at 96 automatic signal locations on the Crosstown Line between the interlockings at Court Square, Nassau Avenue and Bergen Street in Brooklyn and Queens. Work will include the following:

Replacement of AC line control relays with DC line control relays Installation of DC power feeds, new unit cases with DC ground detector equipment, and centralized and remote DC rectifiers Modification of tower model boards with DC ground detector indications Design, installation, wiring and testing of required modifications

Duration of Contract 52 Months

SF01-2767 DEPOT BUS LOCATION SYSTEM $1M - $5M

Development and fabrication of depot bus location system for real-time tracking of bus location within the depot, as well as, bus departure and bus arrival times. System will be implemented at depots system-wide.

Duration of Contract 24 Months

New York City Transit Brief Description of Work FEB 2017

A36961 STATION COMPONENT REPAIRS: 3 LOCATIONS / FULTON $1M - $5M

Replacement of platform components at Kingston-Throop Avenue, Ralph Avenue, and Liberty Avenue on the Fulton Line in Brooklyn, including:

platform edges rubbing board tactile warning strip http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 17/26 9/23/2016 MTA - Eye on the Future concrete boarding zone retrofit of existing platform to include ADA boarding zone

Duration of Contract 24 Months

A36988 PLATFORM COMPONENTS: 4 LOCATIONS / JEROME $1M - $5M

Repair of platform components at Kingsbridge Road, 183 Street, Mount Eden Avenue, and 167th Street Stations on the Jerome Line in the Bronx, including:

Platform edge repairs at all locations Platform floor repairs at Mount Eden Avenue and 167th Street Stations

Duration of Contract TBD Months

A37110* ADA: BEDFORD PARK BOULEVARD / CONCOURSE $10M - $50M

Installation of three hydraulic elevators and associated equipment, as well as, modification of ancillary areas to provide ADA compliant accessibility at Bedford Park Boulevard Station on the Concourse Line in the Bronx.

Duration of Contract 28 Months

C34838/P36450/ C31623(Sandy)* SANDY MITIGATION: LONG-TERM PERIMETER PROTECTION, PORTAL PROTECTION & POWER CABLE REPLACEMENT - 207 ST YARD OVER $50M

This project will provide perimeter protection at the 207th Street Yard to prevent flooding due to storm surges from a Category 2 hurricane plus 1-ft for wave run-up, 1-ft for freeboard, and 1-ft for sea level rise. This will also include flood gates or other sealing features at the tunnel portals in the yard.

Duration of Contract 68 Months

C34847* FIRE ALARM SYSTEM REPLACEMENT AT 3 BUS DEPOTS $10M - $50M

Fabrication and installation of fire alarm systems at three bus depots: Jackie Gleason (Brooklyn), Manhattanville (Manhattan), and Gun Hill (Bronx).

Duration of Contract 46 Months

C40250 REPLACE EQUIPMENT AT JACKIE GLEASON DEPOT COMPRESSED NATURAL GAS FACILITY $1M - $5M

Replacement of existing Skid Equipment in Compressed Natural Gas Facility at Jackie Gleason Bus Depot in Brooklyn.

Duration of Contract 10 Months

E31707* FAN PLANT MOTOR CONTROL SYSTEM REPLACEMENT - 9 LOCATIONS $5M - $10M

Fabrication and installation of Motor Control Cabinet and associated wires and conduits at 9 fan plants in Brooklyn and Manhattan.

Duration of Contract 28 Months

ST01-0862* ACCESS IMPROVEMENTS: GRAND CENTRAL: PHASE 2 $10M - $50M

Phase 2 of Access Improvements at Grand Central. Retrofit and reconfiguration of existing facilities, including upgrades to the mezzanine serving Lexington Avenue Line. Other potential improvements will be finalized during design phase.

Duration of Contract 42 Months

New York City Transit Brief Description of Work MAR 2017 http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 18/26 9/23/2016 MTA - Eye on the Future

A36150* ADA: PHASE 2: 57 STREET - 7 AVENUE / BROADWAY $10M - $50M

Duration of Contract 41 Months

A37673 STATION ENTRANCE: 8 AVENUE / SEA BEACH $5M - $10M

Duration of Contract 12 Months

A46024 STATION RENEWAL AND WATER REMEDIATION: BOROUGH HALL / LEXINGTON $10M - $50M

Duration of Contract 31 Months

B40664 PURCHASE 190 ARTICULATED BUSES OVER $50M

Duration of Contract 36 Months

C40257 EAST NEW YORK DEPOT COMPONENT REPAIR: WINDOWS AND FAÇADE $5M - $10M

Duration of Contract 17 Months

New York City Transit Brief Description of Work APR 2017

A37119* ADA: CANARSIE-ROCKAWAY PKWY / CANARSIE $5M - $10M

Installation of ramps and modification of platforms and ancillary areas to provide ADA accessibility at Rockaway Parkway Station on the Canarsie Line in Brooklyn.

Duration of Contract 12 Months

A46025 STATION RENEWAL: METS-WILLETS POINT / FLUSHING $10M - $50M

Duration of Contract TBD Months

E31682(Sandy)* SANDY MITIGATION: FAN PLANT 7207, SOUTH FERRY, MANHATTAN $1M - $5M

Duration of Contract 12 Months

EN01-7357 TEST PIT SERVICES $5M - $10M

Duration of Contract 30 Months

SF01-2423 AUTOMATIC PASSENGER COUNTING (APC) - PILOT & PHASE 1 ROLLOUT $1M - $5M http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 19/26 9/23/2016 MTA - Eye on the Future Duration of Contract 24 Months

W32389 ANTENNA CABLE UPGRADE/REPLACEMENT PHASE 1 $5M - $10M

Duration of Contract 24 Months

New York City Transit Brief Description of Work MAY 2017

A37117* ADA: 86 STREET / 4TH AVENUE $10M - $50M

Duration of Contract 26 Months

A37628(Sandy)* SANDY MITIGATION: UPGRADE EMERGENCY BOOTH COMM SYSTEM (EBCS) $10M - $50M

Duration of Contract 54 Months

B62032(Sandy)* SANDY MITIGATION: FOUR DEPOTS $10M - $50M

Duration of Contract 24 Months

C34924(Sandy)* SANDY MITIGATION: STEINWAY PORTAL $5M - $10M

Duration of Contract 12 Months

C43844 LIVINGSTON PLAZA ELECTRICAL AND MECHANICAL SYSTEM IMPROVEMENTS $10M - $50M

Duration of Contract 38 Months

SF01-7260 JAMAICA BUS TERMINAL RECONFIGURATION $1M - $5M

Duration of Contract TBD Months

New York City Transit Brief Description of Work JUN 2017

A36995 PLATFORM COMPONENTS: KINGSTON-THROOP AVENUES / FULTON $1M - $5M

Duration of Contract 10 Months

A37202 PLATFORM COMPONENTS: 2 LOCATIONS / LENOX $1M - $5M

Duration of Contract 24 Months http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 20/26 9/23/2016 MTA - Eye on the Future

A37205 PLATFORM COMPONENTS: 2 LOCATIONS / CROSSTOWN $5M - $10M

Duration of Contract TBD Months

A46018; A37106; A37589* ASTORIA BOULEVARD STATION REHABILITATION, ADA AND CANOPY REPAIR $10M - $50M

Duration of Contract TBD Months

C40235* DEPARTMENT OF BUSES - GUN HILL DEPOT COMPONENT REPAIR : ROOF $10M - $50M

Duration of Contract 17 Months

E30300* REPLACEMENT OF TWO ESCALATORS: GRAND CENTRAL-42 STREET / LEXINGTON $5M - $10M

Duration of Contract 27 Months

P36696 RETROFIT EXISTING 25 HZ FREQUENCY CONVERTERS AT 10 SUBSTATIONS $10M - $50M

Duration of Contract 25 Months

PW03-1297(Sandy)* SANDY MITIGATION: MONTAGUE-FURMAN SUBSTATION / BWY $1M - $5M

Duration of Contract 16 Months

New York City Transit Brief Description of Work JUL 2017

A37200 PLATFORM COMPONENTS: 3 LOCATIONS / EASTERN PARKWAY, CLARK $1M - $5M

Duration of Contract 14 Months

C34845* DEPARTMENT OF CAR EQUIPMENT SHOP COMPONENTS PHASE 1: EAST 180TH STREET , CONEY ISLAND, PELHAM, AND PELHAM DIESEL $10M - $50M

Duration of Contract 28 Months

C34857(Sandy)* SANDY REPAIRS: ROCKAWAY LINE WRAP-UP $10M - $50M

Duration of Contract 38 Months

C40241 ELEVATOR UPGRADE: 7 ELEVATORS AT 5 DEPOTS $10M - $50M

Duration of Contract 31 Months http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 21/26 9/23/2016 MTA - Eye on the Future

E34026* REPLACE 11 HYDRAULIC ELEVATORS / VARIOUS $10M - $50M

Duration of Contract 30 Months

E34027* REPLACE 12 TRACTION ELEVATORS / BROADWAY-7TH AVENUE $10M - $50M

Duration of Contract 41 Months

FC01-4830(Sandy)* SANDY MITIGATION: CONSOLIDATED REVENUE FACILITY $10M - $50M

Duration of Contract TBD Months

P36420 DUCT RECONSTRUCTION: STANTON STREET SUBSTATION / 6TH AVENUE $5M - $10M

Duration of Contract 18 Months

PD02-4832(Sandy)* SANDY MITIGATION: TIFFANY CENTRAL WAREHOUSE $10M - $50M

Duration of Contract TBD Months

SF01-4831(Sandy)* SANDY MITIGATION: ZEREGA CENTRAL MAINTENANCE FACILITY OVER $50M

Duration of Contract TBD Months

ST01-4327(Sandy)* SANDY MITIGATION: INTERNAL STATION HARDENING $10M - $50M

Duration of Contract TBD Months

V31998 49 NON-REVENUE VEHICLES 2016 $5M - $10M

Duration of Contract 12 Months

New York City Transit Brief Description of Work AUG 2017

A36949 STATION COMPONENT REPAIRS: AQUEDUCT-NORTH CONDUIT AV/ROCKAWAY LINE $1M - $5M

Duration of Contract 10 Months

A36993 PLATFORM COMPONENTS: 3 LOCATIONS / NOSTRAND $1M - $5M

Duration of Contract 11 Months http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 22/26 9/23/2016 MTA - Eye on the Future

A36998 PLATFORM COMPONENTS: 2 LOCATIONS / PELHAM $1M - $5M

Duration of Contract 14 Months

A37120* ADA: EASTERN PARKWAY-BROOKLYN MUSEUM / EASTERN PARKWAY LINE $10M - $50M

Duration of Contract 26 Months

B62028 STORAGE TANK COMPONENT REPLACEMENT: EAST NEW YORK AND GUN HILL DEPOTS $5M - $10M

Duration of Contract TBD Months

C31620 YARD CCTV - PHASE 2 $5M - $10M

Duration of Contract 24 Months

C33600* OVERCOAT: EAST NEW YORK YARD & SHOP LEADS AND LOOPS $10M - $50M

Duration of Contract 21 Months

C40245* ZEREGA CENTRAL MAINTENANCE FACILITY COMPONENT REHAB: OFFICE SPACE $1M - $5M

Duration of Contract 17 Months

C40900 SIGNAL ROOM FIRE SUPPRESSION, PHASE 2 $5M - $10M

Duration of Contract 27 Months

C48706* ELEVATED STRUCTURAL REHAB: LIVONIA YARD OVERPASS & RETAINING WALL $5M - $10M

Duration of Contract 24 Months

E32627* REPLACE SUPERVISORY VENT CONTROLS - VARIOUS LOCATIONS $10M - $50M

Duration of Contract 48 Months

E34028* REPLACE 8 TRACTION ELEVATORS / VARIOUS $10M - $50M

Duration of Contract 34 Months

P36339 REPLACEMENT OF CONTROL & BATTERY CABLE: 4 SUBSTATION CONTROL ZONES (2/3/5/8) $10M - $50M http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 23/26 9/23/2016 MTA - Eye on the Future Duration of Contract 50 Months

ST21-2511 PLATFORM COMPONENTS: 2 LOCATIONS / FLUSHING $1M - $5M

Duration of Contract TBD Months

W32799 PUBLIC ADDRESS/CUSTOMER INFORMATION SCREEN REPLACEMENT - CANARSIE LINE $1M - $5M

Duration of Contract 15 Months

MTA Bus Brief Description of Work SEP 2016

B62022* SECURITY IMPROVEMENTS - JFK & SPRING CREEK DEPOTS $9M-$10M

This project will consist of security improvements to protect critical MTA infrastructures to ensure the secure continuation of MTA operations at the Spring Creek and JFK Depots. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 21 Months Months

MTA Bus Brief Description of Work FEB 2017

C40246* CNG UPGRADE - COLLEGE POINT DEPOT $5M - $6M

This project is for facility renovation and will consist of upgrading the existing CNG system at the College Point Depot. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 17 Months Months

MTA Bus Brief Description of Work AUG 2017

C-40260* HVAC- COLLEGE POINT DEPOT $8M - $9M

This project will replace the HV and A/C units and associated equipment at the College Point Depot. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 24 Months Months

C-40261* HVAC- SPRING CREEK DEPOT $3 - $4M

This project will replace the HV and A/C units and associated equipment at the Spring Creek Depot. This project is FTA funded. Procurement will be done on behalf of MTA Bus by MTA New York City Transit.

Duration of Contract 18 months Months

Capital Construction Brief Description of Work SEP 2016 http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 24/26 9/23/2016 MTA - Eye on the Future

CQ033 MID-DAY STORAGE YARD FACILITY FOR THE EAST SIDE ACCESS PROJECT** Over $100M

This contract is for the construction of a storage yard facility for railcars. The scope of work under this contract shall include but is not limited to:

Demolition of existing buildings Perform environmental remediation Installation of sub-ballast, ballast, switches, ties, track, third rail, drainage, conduit and duct banks Removal of existing and installation of new utilities Install, test and commission yard track, signal systems, traction power, mechanical and electrical systems Construct foot bridge, walkways, and roadways.

Duration of Contract 40 Months

PS862* INDEPENDENT COMPLIANCE MONITOR $1M - $5M

This contract is for the services of an Independent Compliance Monitor (Monitor) to monitor the various third party contractor activities concerning site security and assess, Disadvantage/Minority/Woman owned Business Enterprise (“DMBE”) requirements, timely payments to subcontractors and suppliers, payment of prevailing wages to workers and other areas relating to business integrity.

Duration of Contract 36 Months

PS863 PROGRAM MANAGEMENT SERVICES FOR THE PENN STATION ACCESS PROJECT** $10M - $50M

The Penn Station Access Project will provide an alternate route and terminal in Manhattan for Metro-North customers at Penn Station. This Contract is for Program Management consulting services to assist in the advancement of the Project. The scope of work for this Contract includes but is not limited to:

General services to support conceptual planning, pre-engineering and engineering design phases Technical writing, including preparation of the scope of work for the full engineering services RFP, Project Management Plan, and, interagency and other agreements Cost estimating to refine preliminary estimates prepared in the conceptual planning phase and updates Preparation of a Master Program Schedule,establishment of program milestones and interface points Design reviews and constructability assessments

Duration of Contract 40 Months

Capital Construction Brief Description of Work DEC 2016

CM015 48TH ST. ENTRANCE FOR THE EAST SIDE ACCESS PROJECT** $10M - $50M

This contract is for the construction of an entrance into Grand Central Terminal (“GCT”). The work includes, heavy civil, mechanical, electrical and plumbing. The scope of work under this contract shall include but is not limited to:

Underpinning building columns, install reframing and reconfigure utility services Construction of CMU and storefront partitions, ceilings, chases, ventilation shafts, stairs, doors and floor finishes Fit out of the new GCT surface entrance structure under 48th St. Installation of smoke exhaust shaft, HVBAC, plumbing and fire protection Installation of power, lighting, grounding and empty systems conduit and accessories

Duration of Contract 24 Months

CS086* TUNNEL SYSTEMS PACKAGE 2, SIGNAL INSTALLATION FOR THE EAST SIDE ACCESS PROJECT** $10M - $50M

This contract is for the installation of Federal Railroad Administration compliant signal equipment procured under a separate Contract (VS086). The installation work shall take place in the East Side Access (“ESA”) Tunnels. The scope of work under this Contract includes but is not limited to:

Installation of wayside railroad signal system equipment including track circuits, impedance bonds, home and automatic signals, cables and cases Installation interfaces with ESA Control Systems Install microprocessor-based Central Instrument Rooms Test and Commission the complete signaling system in the ESA tunnels Install tunnel and signal signage http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 25/26 9/23/2016 MTA - Eye on the Future Duration of Contract 41 Months

Capital Construction Brief Description of Work FEB 2017

PS864* ENGINEERING AND ENVIRONMENTAL CONSULTANT FOR THE PENN STATION ACCESS PROJECT** $50M - $100M

Duration of Contract 27 Months

* Partially Funded by Federal grant(s)

http://wp1.mtahq.org/mta/capital/eotf-descrip.htm 26/26