World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Document of The World Bank FI COP FOR OFFICIAL USE ONLY Public Disclosure Authorized ReportNo. P-3061-MOR REPORTAND RECOMMENDATION OF THE PRESIDENTOF THE Public Disclosure Authorized INTERNATIONALBANK FOR RECONSTRUCTIONAND DEVELOPMENT TO THE EXECUTIVEDIRECTORS ON A PROPOSEDLOAN TO THE KINGDOM OF MOROCCO Public Disclosure Authorized FOR A THIRD WATER SUPPLY PROJECT May 6, 1981 Public Disclosure Authorized This documenthas a restricteddistribution and may be used by recipientsonly in the performanceof their official duties. Its contentsmay not otherwisebe disclosedwithout World Bank authorization. KINGDOM OF MOROCCO THIRD WATER SUPPLY PROJECT FISCAL YEAR January 1 - December 31 CURRENCYEQUIVALENTS Currency Unit Dirbam (DH) DH 1 US$0.24 US$1 DH 4.20 WEIGHTS AND MEASURES Metric System British/US System 1 meter (m) 3.28 feet (ft) 1 kilometer 0.62 miles (mi) 1 bectare 2.47 acres GLOSSARY OF ABBREVIATIONS ONEP Office National de l'Eau Potable FEC Fonds d'Ecuipement Communal (Communal Infrastructure Fund) FOR OFFICIAL USE ONLY KINGDOM OF MOROCCO THIRD WATER SUPPLY PROJECT LOAN AND PROJECT SUMMARY Borrower: Kingdom of Morocco Beneficiaries: The Office National de l'Eau Potable (ONEP); the water supply agencies (Regies) in the cities of Casablanca, Fes, Marrakech, Meknes, Tetouan, Safi, Oujda, Tanger, Rabat-Sal6, Taza and Kenitra, as well as other Regies which may be agreed upon during project implementation; the Hydraulics Department of the Ministry of Equipment; and a government agency to be designated sbortly. Amount: The equivalent of US$87 million. Terms: Seventeen years including four years, of grace, at an interest rate of 9.6 percent per annum. On-Lending Arrangements: The Government will onlend the proceeds of the loan allocated to ONEP (about $45.8 million) and the Regies (about $38.1 million) on terms identical to the loan's, as in the financing plan below. The Government would use the remaining $3.1 million for the water resource development component and for the rural water systems study. Project Description: The primary objective of the project is to improve access to safe water supply of the low income population of at least 11 major towns and 80 smaller centers, and to bring water or improved water supply to the population around Karia Ba Mohamed and in'the Ziz valley from Errachidia to Erfoud, as well as on the Tafilalet plain around Rissani. The project consists of: (i) revolving funds to finance credit granted to low income households for house connections in at least 11 major cities and about 80 other population centers; (ii) a line of credit to ONEP, referred to later as the sector loan component, for subprojects consisting of improvements and expansion of water supply facilities in about 32 small centers; (iii) construction of two regional water supply systems, in the areas of Karia Ba Mohamed (about 7,300 | This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. - ii - inhabitants), and Errachidia - Erfoud - Rissani (170,000 inhabitants); (iv) the development of water resources in some 24 centers; (v) the acquisition of laboratory equipment, water meters, leak detection equipment and materials, and eauipment for maintenance and surveys; and (vi) technical assistance, training and studies. The beneficiaries of the project would consist of (i) approximately 1.6 million low income inhabitants of the cities and other centers referred to above, constituting about 275,000 households who would finance their house connections through the revolving funds financed under the loan; and (ii) some 600,000 people living in the small centers served by the two regional systems or in the centers to benefit from the sector loan component. The implementation of the project does not pose any special risks. Estimated Cost: The total project cost is estimated at US$169 _ million apportioned as follows: Local Foreign Total % of Item -------US$ Million--------- Total A. Sector loan component 15.6 10.0 25.6 15 B. Regional Water Supply Systems 16.5 9.5 26.0 15 C. Equipment and Materials 1.6 1.8 3.4 2 D. Water Resources Development 2.9 2.3 5.2 3 E. Consulting Services, Technical Assistance and Studies 4.5 3.4 7.9 5 Base Cost 41.1 27.0 68.1 40 Physical Contingencies 3.5 2.2 5.7 4 Price Contingencies 9.5 6.0 15.5 9 F. Fund for House Connections 27.9 51.8 79.7 47 Total Project Cost 82.0 1/ 87.0 169.0 100 I/ Includes $7.2 million in duties and taxes. - iii - Financing Plan ONEP Govt. FEC Bank Total --------------US$ Million--------------- ---------Local…------- Foreign - House Connections Regies: - Casablanca - - 5.6 10.4 16.0 - Fes - - 2.6 4.9 7.5 - Marrakech - 1.9 3.5 5.4 - Meknes - - 1.0 1.7 2.7 - Tetouan - - 1.2 2.2 3.4 - Safi - - 1.0 1.8 2.8 - Oujda - - 1.0 1.8 2.8 - Tanger - - .9 1.6 2.5 - Rabat-Sa16 - - .6 1.2 1.8 - Taza - - .3 0.5 .8 - Kenitra - - .2 0.4 .6 ONEP 7.4 - - 13.7 21.1 Unallocated - - 4.2 8.1 12.3 Sub-Total 7.4 - 20.5 51.8 79.7 - ONEP Components (excluding house connections) 3.5 46.8 - 32.1 82.4 - Water Resource Development - 3.6 - 2.8 6.4 (Ministry of Equipment) - Rural Water Systems Study - 0.2 - 0.3 0.5 (to be designated) TOTAL 10.9 50.6 20.5 87.0 169.0 % of Total 6 30 12 52 100 Estimated Disbursements: Bank FY 1982 1983 1984 1985 1986 … -------- …USs Million---------…-- Annual 6.4 21.2 26.2 25.5 7.7 Cumulative 6.4 27.6 53.8 79.3 87.0 Rate of Return: Not quantifiable Appraisal Report: Report No.3339a-MOR of April 24, 1981. - 111 - Financing Plan ONEP Govt. FEC Bank Total --------------US$ Million--------------- ---------Local-------- Foreign - House Connections Regies: - Casablanca - - 5.6 10.4 16.0 - Fes - - 2.6 4.9 7.5 - Marrakech - - 1.9 3.5 5.4 - Meknes - - 1.0 1.7 2.7 - Tetouan - - 1.2 2.2 3.4 - Safi - - 1.0 1.8 2.8 - Oujda - - 1.0 1.8 2.8 - Tanger - - .9 1.6 2.5 - Rabat-Sale - - .6 1.2 1.8 - Taza - - .3 0.5 .8 - Kenitra - - .2 0.4 .6 ONEP 7.4 - - 13.7 21.1 Unallocated - - 4.2 8.1 12.3 Sub-Total 7.4 - 20.5 51.8 79.7 - ONEP Components (excluding house connections) 3.5 46.8 - 32.1 82.4 - Water Resource Development - 3.6 - 2.8 6.4 (Ministry of Equipment) - Rural Water Systems Study - 0.2 - 0.3 0.5 (to be designated) TOTAL 10.9 50.6 20.5 87.0 169.0 % of Total 6 30 12 52 100 Estimated Disbursements: Bank FY 1982 1983 1984 1985 1986 ------------US$ Million------------ Annual 6.4 21.2 26.2 25.5 7.7 Cumulative 6.4 27.6 53.8 79.3 87.0 Rate of Return: Not quantifiable Appraisal Report: Report No.3339a-MOR of April 24, 1981. REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE IBRD TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE KINGDOM OF MOROCCO FOR A THIRD WATER SUPPLY PROJECT 1. I submit the following report and recommendation on a proposed loan to the Kingdom of Morocco for the equivalent of US$87 million to help finance a third water supply project. The loan would have a term of 17 years, including 4 years of grace, with interest at 9.6 percent per annum. The Government would onlend on the same terms about US$45.8 million to the Office National de l'Eau Potable (ONEP) and about US$38.1 million to the water distributing Regies of Casablanca, Fez, Marrakech, Meknes, Tetouan, Safi, Oujda, Tanger, Rabat-Sale, Taza and Kenitra, and possibly to other Regies to be agreed upon, to finance mainly water supply systems and house connections for low-income customers. PART I - THE ECONOMY 2. A basic economic mission visited Morocco in November 1978, and updating missions in September and December 1979 and in May 1980. A report entitled "Morocco: Basic Economic Report" (3289-MOR) was distributed to the Executive Directors in December 1980. Country and Economic Data Sheets are attached as Annex I. Introduction 3. Compared with many developing countries, Morocco is well endowed with natural resources. It has a considerable agricultural potential both in irrigated and rainfed areas. The Atlantic and the Mediterranean coastlines offer considerable fish resources. Morocco also has the world's largest and most easily recoverable phosphate reserves, which makes the phosphate sector a key export sector. Other minerals such as iron ore, manganese, lead and zinc are also exported, but in much smaller amounts. Coal and hydropower plants satisfy only a small part of the country's energy requirements, which are essentially met with imported oil. Morocco has however uranium and oil shale resources which it plans to exploit. In addition, Morocco's proximity to Europe has favored trade, tourism and labor migration with the EEC countries. 4. During the first 15 years after independence (1956), a conservative approach to economic policy predominated in Morocco. GDP increased at an average rate of 4% a year in the 1960s. Growth accelerated somewhat under the 1968-72 development plan as the economy derived substantial momentum from exports. However, a relatively weak savings effort and a small externally financed resource gap resulted in only a slow rise in the share of resources allocated to investment.
Recommended publications
  • Greening the Agriculture System: Morocco's Political Failure In
    Greening the Agriculture System: Morocco’s Political Failure in Building a Sustainable Model for Development By Jihane Benamar Mentored by Dr. Harry Verhoeven A Thesis Submitted in Partial Fulfilment of the Requirements for the Award of Honors in International Politics, Edmund A. Walsh School of Foreign Service, Georgetown University, Spring 2018. CHAPTER 1: INTRODUCTION ............................................................................................................ 2 • THE MOROCCAN PUZZLE .................................................................................................... 5 • WHY IS AGRICULTURAL DEVELOPMENT IMPORTANT FOR MOROCCO? .............................. 7 • WHY THE PLAN MAROC VERT? .......................................................................................... 8 METHODOLOGY ................................................................................................................... 11 CHAPTER 2: LITERATURE REVIEW ................................................................................................ 13 • A CONCEPTUAL FRAMEWORK FOR “DEVELOPMENT”....................................................... 14 • ROSTOW, STRUCTURAL ADJUSTMENT PROGRAMS (SAPS) & THE OLD DEVELOPMENT DISCOURSE ......................................................................................................................... 19 • THE ROLE OF AGRICULTURE IN DEVELOPMENT .............................................................. 24 • SUSTAINABILITY AND THE DISCOURSE ON DEVELOPMENT & AGRICULTURE ................
    [Show full text]
  • Cadastre Des Autorisations TPV Page 1 De
    Cadastre des autorisations TPV N° N° DATE DE ORIGINE BENEFICIAIRE AUTORISATIO CATEGORIE SERIE ITINERAIRE POINT DEPART POINT DESTINATION DOSSIER SEANCE CT D'AGREMENT N Casablanca - Beni Mellal et retour par Ben Ahmed - Kouribga - Oued Les Héritiers de feu FATHI Mohamed et FATHI Casablanca Beni Mellal 1 V 161 27/04/2006 Transaction 2 A Zem - Boujad Kasbah Tadla Rabia Boujad Casablanca Lundi : Boujaad - Casablanca 1- Oujda - Ahfir - Berkane - Saf Saf - Mellilia Mellilia 2- Oujda - Les Mines de Sidi Sidi Boubker 13 V Les Héritiers de feu MOUMEN Hadj Hmida 902 18/09/2003 Succession 2 A Oujda Boubker Saidia 3- Oujda La plage de Saidia Nador 4- Oujda - Nador 19 V MM. EL IDRISSI Omar et Driss 868 06/07/2005 Transaction 2 et 3 B Casablanca - Souks Casablanca 23 V M. EL HADAD Brahim Ben Mohamed 517 03/07/1974 Succession 2 et 3 A Safi - Souks Safi Mme. Khaddouj Bent Salah 2/24, SALEK Mina 26 V 8/24, et SALEK Jamal Eddine 2/24, EL 55 08/06/1983 Transaction 2 A Casablanca - Settat Casablanca Settat MOUTTAKI Bouchaib et Mustapha 12/24 29 V MM. Les Héritiers de feu EL KAICH Abdelkrim 173 16/02/1988 Succession 3 A Casablanca - Souks Casablanca Fès - Meknès Meknès - Mernissa Meknès - Ghafsai Aouicha Bent Mohamed - LAMBRABET née Fès 30 V 219 27/07/1995 Attribution 2 A Meknès - Sefrou Meknès LABBACI Fatiha et LABBACI Yamina Meknès Meknès - Taza Meknès - Tétouan Meknès - Oujda 31 V M. EL HILALI Abdelahak Ben Mohamed 136 19/09/1972 Attribution A Casablanca - Souks Casablanca 31 V M.
    [Show full text]
  • Chapitre VI La Ville Et Ses Équipements Collectifs
    Chapitre VI La ville et ses équipements collectifs Introduction L'intérêt accordé à la connaissance du milieu urbain et de ses équipements collectifs suscite un intérêt croissant, en raison de l’urbanisation accélérée que connaît le pays, et de son effet sur les équipements et les dysfonctionnements liés à la répartition des infrastructures. Pour résorber ce déséquilibre et assurer la satisfaction des besoins, le développement d'un réseau d'équipements collectifs appropriés s'impose. Tant que ce déséquilibre persiste, le problème de la marginalisation sociale, qui s’intensifie avec le chômage et la pauvreté va continuer à se poser La politique des équipements collectifs doit donc occuper une place centrale dans la stratégie de développement, particulièrement dans le cadre de l’aménagement du territoire. La distribution spatiale de la population et par conséquent des activités économiques, est certes liée aux conditions naturelles, difficiles à modifier. Néanmoins, l'aménagement de l'espace par le biais d'une politique active peut constituer un outil efficace pour mettre en place des conditions favorables à la réduction des disparités. Cette politique requiert des informations fiables à un niveau fin sur l'espace à aménager. La présente étude se réfère à la Base de données communales en milieu urbain (BA.DO.C) de 1997, élaborée par la Direction de la Statistique et concerne le niveau géographique le plus fin à savoir les communes urbaines, qui constituent l'élément de base de la décentralisation et le cadre d'application de la démocratie locale. Au recensement de 1982, était considéré comme espace urbain toute agglomération ayant un minimum de 1 500 habitants et qui présentait au moins quatre des sept conditions énumérées en infra1.
    [Show full text]
  • Direction Regionale Du Centre Nord
    ROYAUME DU MAROC Office National de l’Électricité et de l’Eau Potable Branche Eau DIRECTION REGIONALE DU CENTRE NORD ________________________________ Projet de renforcement de la production et d’amélioration de la performance technique et commerciale de l’eau potable (PRPTC) Composante : Programme d’amélioration des performances techniques des centres de la Direction Régionale du Centre Nord PLAN D’ACQUISITION DES TERRAINS ET D’INDEMNISATION DES PERSONNES AFFECTEES PAR LE PROJET (PATI-PAP) FINANCEMENT BAD 15 Août 2021 RESUME EXECUTIF DU PATI-PAP 1. INTRODUCTION 1.1. CONTEXTE ET JUSTIFICATION DU PROJET 1.2. OBJECTIFS DU PATI-PAP 1.3. METHODOLOGIE D’ELABORATION DU PATI-PAP 2. DESCRIPTION DU PROJET ET DE LA ZONE CONCERNEE 2.1. Description du projet 2.2. Consistance du projet 2.2.1 Consistance des lots 2.2.2. Besoins en foncier 2.3. Présentation de la zone du projet 2.3.1 Présentation géographique 2.3.2. POPULATION ET DEMOGRAPHIE 2.3.3 Urbanisation 2.3.4 Armature urbaine 2.3.5. INFRASTRUCTURES DE BASE 2.3.6. SECTEURS PRODUCTIFS 2.3.7 CAPITAL IMMATERIEL 3. IMPACTS POTENTIELS DU PROJET 3.1. Impacts potentiels positifs 3.2. Impacts potentiels négatifs 3.3. Impacts cumulatifs et résiduels 4. RESPONSABLITES ORGANISATIONNELLES 4.1. Cadre organisationnel nationale 4.2. Responsabilités de la mise en œuvre du présent PATI-PAP 5. PARTICIPATION ET CONSULTATIONS PUBLIQUES 5.1. Participation communautaire/Consultations publiques déjà réalisées 5.2. Consultation des PAPs 5.3. Enquêtes administratives 6. INTEGRATION DES COMMUNAUTES D’ACCUEIL 7. ETUDES SOCIO –ECONOMIQUES : Recensement des personnes affectées par le projet 7.1.
    [Show full text]
  • Morocco and United States Combined Government Procurement Annexes
    Draft Subject to Legal Review for Accuracy, Clarity, and Consistency March 31, 2004 MOROCCO AND UNITED STATES COMBINED GOVERNMENT PROCUREMENT ANNEXES ANNEX 9-A-1 CENTRAL LEVEL GOVERNMENT ENTITIES This Chapter applies to procurement by the Central Level Government Entities listed in this Annex where the value of procurement is estimated, in accordance with Article 1:4 - Valuation, to equal or exceed the following relevant threshold. Unless otherwise specified within this Annex, all agencies subordinate to those listed are covered by this Chapter. Thresholds: (To be adjusted according to the formula in Annex 9-E) For procurement of goods and services: $175,000 [Dirham SDR conversion] For procurement of construction services: $ 6,725,000 [Dirham SDR conversion] Schedule of Morocco 1. PRIME MINISTER (1) 2. NATIONAL DEFENSE ADMINISTRATION (2) 3. GENERAL SECRETARIAT OF THE GOVERNMENT 4. MINISTRY OF JUSTICE 5. MINISTRY OF FOREIGN AFFAIRS AND COOPERATION 6. MINISTRY OF THE INTERIOR (3) 7. MINISTRY OF COMMUNICATION 8. MINISTRY OF HIGHER EDUCATION, EXECUTIVE TRAINING AND SCIENTIFIC RESEARCH 9. MINISTRY OF NATIONAL EDUCATION AND YOUTH 10. MINISTRYOF HEALTH 11. MINISTRY OF FINANCE AND PRIVATIZATION 12. MINISTRY OF TOURISM 13. MINISTRY OF MARITIME FISHERIES 14. MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION 15. MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT (4) 16. MINISTRY OF SPORT 17. MINISTRY REPORTING TO THE PRIME MINISTER AND CHARGED WITH ECONOMIC AND GENERAL AFFAIRS AND WITH RAISING THE STATUS 1 Draft Subject to Legal Review for Accuracy, Clarity, and Consistency March 31, 2004 OF THE ECONOMY 18. MINISTRY OF HANDICRAFTS AND SOCIAL ECONOMY 19. MINISTRY OF ENERGY AND MINING (5) 20.
    [Show full text]
  • MPLS VPN Service
    MPLS VPN Service PCCW Global’s MPLS VPN Service provides reliable and secure access to your network from anywhere in the world. This technology-independent solution enables you to handle a multitude of tasks ranging from mission-critical Enterprise Resource Planning (ERP), Customer Relationship Management (CRM), quality videoconferencing and Voice-over-IP (VoIP) to convenient email and web-based applications while addressing traditional network problems relating to speed, scalability, Quality of Service (QoS) management and traffic engineering. MPLS VPN enables routers to tag and forward incoming packets based on their class of service specification and allows you to run voice communications, video, and IT applications separately via a single connection and create faster and smoother pathways by simplifying traffic flow. Independent of other VPNs, your network enjoys a level of security equivalent to that provided by frame relay and ATM. Network diagram Database Customer Portal 24/7 online customer portal CE Router Voice Voice Regional LAN Headquarters Headquarters Data LAN Data LAN Country A LAN Country B PE CE Customer Router Service Portal PE Router Router • Router report IPSec • Traffic report Backup • QoS report PCCW Global • Application report MPLS Core Network Internet IPSec MPLS Gateway Partner Network PE Router CE Remote Router Site Access PE Router Voice CE Voice LAN Router Branch Office CE Data Branch Router Office LAN Country D Data LAN Country C Key benefits to your business n A fully-scalable solution requiring minimal investment
    [Show full text]
  • وزارة اﻟﺘﺠﻬﻴﺰ واﻟﻨﻘﻞ واﻟﻠﻮﺟﺴﺘﻴﻚ Bulletin De Viabilite Routiere Du 21/01/2017
    اﳌﻤﻠﻜﺔ اﳌﻐﺮﺑﻴﺔ ROYAUME DU MAROC وزارة اﻟﺘﺠﻬﻴﺰ ,MINISTERE DE L’EQUIPEMENT واﻟﻨﻘﻞ واﻟﻠﻮﺟﺴﺘﻴﻚ DU TRANSPORT ET DE LA LOGISTIQUE BULLETIN DE VIABILITE ROUTIERE DU 21/01/2017 A 9 HEURES CHUTES DE NEIGE Synthèse des routes coupées et rétablies Routes coupées Routes rétablies Total Routes Nationales 1 6 7 Routes Régionales 4 14 18 Routes Provinciales 19 18 37 Total 24 38 62 SECTION DE ROUTES COUPEES Point Province Route Liaison Observations Kilométrique Meknes‐Ifrane RN 13 Hajeb ‐ Azrou 255 ‐290 Coupée, forte tempête, difficultés de déneiger Coupée, forte tempête, difficultés de déneiger Ifrane RN13 Azrou ‐ Timehdit 290 ‐ 324 Uniquement pour les véhicules légers : La RR503 en passant par Sefrou, Boulemane et Zaida Coupée, forte tempête, difficultés de déneiger Midelt RN13 Timehdit ‐ Midelt 324 ‐ 363 Uniquement pour les véhicules légers : La RR503 en passant par Sefrou, Boulemane et Zaida Khénifra ‐ RR503 Khénifra ‐ zaida Coupée, forte tempête, difficultés de déneiger Midelt Ifrane‐ RR707 Ifrane ‐ Boulemane 32 ‐ 62 Coupée boulemane Maghraoua ‐ Taza RR507 54 ‐ 105 Coupée Bouyablane Taza‐sefrou RR504 Ribat El Kheir‐ bouiblane 99 ‐105 Coupée Ifrane RP7231 Habri ‐Michlifen 0‐19 Coupée Ifrane RP7216 RN 13 ‐ Bekrit Coupée Takka Ichaan‐Source Khénifra P7304 10‐26 Coupée Oum Rbiaa Aghbalou‐Sidi yahya Khénifra RP7315 10‐17 Coupée ouhaqi Midelt RP7102 RN1 3‐ Zaouit didi hamza Coupée Midelt RP7102 RR70 6‐ Ait yahya Coupée Midelt RP7317 Boumia ‐ Tanordi Coupée Midelt RP7319 Itzer ‐ anefgou ‐ imilchil 80 Coupée Direction des Routes ﺣﻲ اﻟﺮﻳﺎض ,اﻟﺮﺑﺎط ﻣﻌﺎهﺪ
    [Show full text]
  • Application of Electrical Tomography for the Hydrogeological Study of the Fez-Taza Corridor, Case of Bir Tam-Tam(Morocco)
    E3S Web of Conferences 298, 05003 (2021) https://doi.org/10.1051/e3sconf/202129805003 ICCR 2020 Application of electrical Tomography for the hydrogeological study of the Fez-Taza corridor, Case of Bir Tam-Tam(Morocco) Hassnae Faiz1,*, Anasse Benslimane1, Mohamed Chibout1, 3, Mohamed El Mokhtar2, 3, Fatima Zahra Faqihi1, and Youssef Chahid1 1Laboratory Geosciences, Environment and Associated Resources, Faculty of Sciences Dhar El Mahraz, University Sidi Mohamed Ben Abdellah, Fez, Morocco. 2Laboratory of Geosciences, Faculty of Science, University Ibn Tofail, Kenitra, Morocco. 3Society AFRICA GEO-SERVICES, Fez, Morocco. Abstract. The present work contributes to the multidisciplinary geological, hydrogeological, and geophysical exploration of groundwater in the Bir Tam-Tam region of the Fez-Taza corridor. Our main objective is to release water resources in our study area to supply drinking water in the region and irrigation of agricultural areas. Potential zones are located at the Lias fracturing zones. This study is interested in understanding the hydrogeological context of the study area through geophysical methods such as Electrical Tomography. The comparison of geological data, Drilling data, and the interpretation of the results of electrical Tomography have made it possible to highlight the geoelectric levels likely to constitute a potential aquifer and to locate possible structural accidents (faults) affecting the dolomitic limestone formations of Lias that could drain groundwater. 1 Introduction as the crow flies, about 40 km ESE of the city of Fez, 30 km NE of the city of Sefrou, 57 km SW of the city of The need for water in the world is increasing more and Taza and 11 km S of the dam of Idriss Premier.
    [Show full text]
  • Résultats Élections
    REGION PREFECTURE CONSEIL COMMUNE NOM PRESIDENT ADRESSE OUED‐ED‐DAHAB‐ AOUSSERD commune LAGOUIRA brahim LAKHLIGUI CU. Lagouira, Hay Al MasjiD n° 41, Dakhla ‐ LAGOUIRA urbaine AousserD OUED‐ED‐DAHAB‐ OUED ED‐DAHAB ‐ commune DAKHLA (M) SiDi SLOH EL JAMANI CU. Dakhla ‐ OueD ED Dahab LAGOUIRA LAGOUIRA urbaine LAAYOUNE‐BOUJDOUR‐ LAAYOUNE commune EL MARSA (M) Hassan DERHEM CU. El Marsa, B.P. 36 ‐ Laâyoune SAKIA‐EL‐HAMRA urbaine LAAYOUNE‐BOUJDOUR‐ LAAYOUNE commune LAAYOUNE (M) HamDi OULED RACHID CU. Laâyoune, B.P. 495 ‐ Laâyoune SAKIA‐EL‐HAMRA urbaine LAAYOUNE‐BOUJDOUR‐ LAAYOUNE commune TARFAYA (M) AhmeD AZARQI CU. Tarfaya, B.P. 43 Tarfaya ‐ Laâyoune SAKIA‐EL‐HAMRA urbaine LAAYOUNE‐BOUJDOUR‐ BOUJDOUR commune BOUJDOUR (M) AbDelaziz ABBA CU. BoujDour, BD Hassan II ‐ BoujDour SAKIA‐EL‐HAMRA urbaine GUELMIM‐ES‐SEMARA TATA commune FAM EL HISN (M) MohameD OUDOR CU. Fam El Hisn – Tata urbaine GUELMIM‐ES‐SEMARA TATA commune TIZAGHTE Fatima BOUJNAH CR. Tizaghte, caïDat Issafen ‐ Tata rurale GUELMIM‐ES‐SEMARA TATA commune FOUM ZGUID (M) AbDerrahmane SAIDI CU. Foum ZguiD – Tata urbaine GUELMIM‐ES‐SEMARA TATA commune AKKA (M) RachiD MOULAY CHARIF CU. Akka – Tata urbaine GUELMIM‐ES‐SEMARA TAN TAN commune TAN TAN (M) Ali EL MAZLIOJ CU. Tan‐Tan – Tan‐Tan urbaine GUELMIM‐ES‐SEMARA ES SEMARA commune ES‐SEMARA (M) SiDi MohameD EL CU. Es‐Semara, Hôtel De ville, avenue urbaine JOUMANI MohameD V ‐ Es‐Semara GUELMIM‐ES‐SEMARA ASSA ZAG commune ZAG (M) Atman AILLA CU. Zag – Assa‐Zag urbaine GUELMIM‐ES‐SEMARA ASSA ZAG commune ASSA (M) HamDi OUAISSI CU. Assa – Assa‐Zag REGION PREFECTURE CONSEIL COMMUNE NOM PRESIDENT ADRESSE urbaine GUELMIM‐ES‐SEMARA GUELMIM commune GUELMIM (M) AbDlouhab BELFKIH CU.
    [Show full text]
  • International Conference on Applied Mathematics Taza, October 19-20
    Summary Conference Program All participants who wish to contribute to this Confer- The University Sidi Mohamed Ben Abdallah, Polydisciplinary Faculty of Taza (FPT), and the ence by an oral presentation or a poster, are invited to Laboratory of Engineering Sciences (LSI) at FP submit an abstract’s article written in English. After Taza, Morocco will organize in October 19-20, 2017 the International Conference on Applied acceptance of their contribution, the participant must Mathematics (ICAM’2017) . This Conference complete the online registration form. aims to provide a meeting place for researchers, professionals and practitioners to exchange ideas The Conference will be organized in two sections: and recent developments in both theoretical and EDPs section applied mathematics. Also, this meeting will enable new doctoral researchers to exchange their Cryptography section ideas with scientific specialists in their corresponding fields of study and seeks to discover And the program will include : new techniques of mathematics as a tool in various Five plenary lectures, 40 minutes disciplines. On the other side, participants are encouraged to establish collaborations and join Presentation of accepted contributions, 20 minutes their efforts in order to advance the theory and practice in their own fields of study. This Posters conference is broad-based that covers all branches Important dates International Conference on of engineering sciences, mathematics and interdisciplinary researches. Applied Mathematics The proceeding book will
    [Show full text]
  • Field Movements Between Fes and Taza Risk of Landslides of an Embedded Passage of Highway Vehicles PV113 of the Oued Amlil -Taza Section
    International Journal of Scientific & Engineering Research Volume 11, Issue 5, May-2020 1611 ISSN 2229-5518 Field Movements between Fes and Taza Risk of Landslides of an Embedded Passage of Highway Vehicles PV113 of the Oued Amlil -Taza section. Morocco Expertise and Stabilization Methodology Alaoui Mustapha1, Mehdi Khalid2, Bendahhou Zourarah2 Hamou Mansouri3 Abdellah Bouhou3 1Sultan Moulay Slimane University, Sciences and Technologies Faculty Béni Mellal (FST) 2Chouaib Doukkali University, Faculty of Sciences El Jadida (FSJ).Morocco 3Public Laboratory for Studies and Tests. Soil Study Center (CES)-LPEE. Morocco Abstract Northern Morocco, landslides play a role in the evolution of slopes. The geological and geotechnical studies of the ground are most often motivated by the search for solutions to a movement said. Thus, the objective of this work is to study the stability of the embankment with the passage of the vehicle PV113 section of the A2 highway between Oued Amlil and Taza. Stability calculations have concluded that the break is sliding rotational type, and a circular type failure, the surface would be at 10m depth. Action of water in the embankment and into the substrate altered favored pore pressure exceeds the shear strength, leading to the development of the driving forces sufficient to move. Materials marly slope physical characteristics favorableIJSER to landslides. The development, the excavation and backfill weight unloading areas hampered by a general slope of the precarious balance. Ground the first is the sliding of Oued Amlil and the second is that of Taza. The purpose of this scientific approach is to establish, based on a specific slip case study, a methodology that can be used and transposed to geology for sites that can slide and have a similar material or lithology, the same predisposing factors and the same geomorphological and geological context, which above all makes it possible to identify the direct and indirect causes of this risk in a context of climate change.
    [Show full text]
  • Demobilization in Morocco: the Case of the February 20 Movement by © 2018 Sammy Zeyad Badran
    Demobilization in Morocco: The Case of The February 20 Movement By © 2018 Sammy Zeyad Badran Submitted to the graduate degree program in Political Science and the Graduate Faculty of the University of Kansas in partial fulfillment of the requirements for the degree of Doctor of Philosophy. Chairperson: Dr. Hannah E. Britton Co-Chairperson: Dr. Gail Buttorff Dr. Gary M. Reich Dr. Nazli Avdan Dr. Alesha E. Doan Date Defended: 31 May 2018 ii The dissertation committee for Sammy Zeyad Badran certifies that this is the approved version of the following dissertation: Demobilization in Morocco: The Case of The February 20 Movement Chairperson: Dr. Hannah E. Britton Co-Chairperson: Dr. Gail Buttorff Date Approved: 31 May 2018 iii Abstract This dissertation aims to understand why protests lessen when they do by investigating how and why social movements demobilize. I do this by questioning the causal link between consistent state polices (concessions or repression) and social movement demobilization. My interviews with the February 20 Movement, the main organizer of mass protests in Morocco during the Arab Spring, reveals how ideological differences between leftist and Islamist participants led to the group’s eventual halt of protests. During my fieldwork, I conducted 46 semi-structured elite interviews with civil society activists, political party leaders, MPs, and independent activists throughout Morocco. My interviews demonstrate that the February 20 Movement was initially united, but that this incrementally changed following the King’s mixed-policy of concessions and repression. The King’s concessionary policies convinced society that demands were being met and therefore led to the perception that the February 20 Movement was no longer needed, while repression highlighted internal divides.
    [Show full text]