Figure 2.13 Proposed Road and Improvement Works
Total Page:16
File Type:pdf, Size:1020Kb
WONG MAU HANG Leachate Treatment Works SHAN TUNG FUNG AU WO KENG SHAN SEUNG MA Tak Yuet Liu Pok LEI YUE Lau Lo Wu Ta Kwu Ling Farm MIU KENG KONG NGA PO CHEUNG SHAN Shun Yee San Tsuen TAI SHEK MO SHAN TONG Firing Range PAK HOK Tse Koo SHAN Hang Ma Tso Lung CHEUNG PO TAU CHAM SHAN San Tsuen Ngam Pin Junction Design TAI HOM TUK Lo Wu 300m Range PAI TAU LO PRINCESS HILL Water Treatment Works Lo Wu CAT HILL WANG LENG Firing Correctional Institution Subject to Refinement Range WA SHAN FUNG KONG SHAN San Wai / Tai Ling Firing Range Tsung Yuen MA TAU LENG Lok Ma Tit Hang to Minimise Land Resumption Chau SZE TEI Ho Sheung KO PO SHAN Fung Kong Sewage Treatment SHAN Heung Lookout Works SHEUNG SHUI Barracks Tung Fong Pun Uk Tsuen Tong Kok SACRED HILL ( TIN PING SHAN ) San Uk Tsuen Lookout Chau Tau Shek Tsai Dills Corner Leng Pak Shek Au Garden Kwu Tung TAI LENG PEI 9 Yin Kong QUEEN'S HILL Europa Garden Tung Chan 9 Town Hall Wing Ping LING HILL Tsuen Kam Tsin Casas Domingo North District Park The Royal Oaks KI LUN SHAN Lookout Ki Lun Elevated section Tsuen Luk Mei Tsuen Hang Tau FANLING of Fanling Bypass Tai Po Pang Loon Tei KI LUN SHAN AU PO LENG AU FUK TSUEN SHAN Fire Lookout WONG KONG PO LENG SHAN LUNG SHAN WU TIP Sewage Hang Tau SHAN Treatment CHONG TSIN Firing Range 9 Works LENG Barracks Siu Hum Tsuen Golf Course Tong Kung Leng KAT TSAI SHAN AU Cheung Lek Experimental Farm Lin Tong Mei Crematorium Chan Uk Po Lin Tong Mei Tsoi Yuen Tsiu Keng Lo Wai Water Treatment Works Tsiu Keng Miami Crescent Pang Uk Tsiu Keng San Wai CLOUDY HILL ( KAU LUNG HANG SHAN ) Ying Pun Lung Yeuk Tau Key Plan Notes Reprovision of Local and 1. For Legend, please refer to Figure 2.4. Maintenance Roads +4.5 Wing Ning Tsuen +2.0 Wu Nga Lok Yeung Diversion of At-Grade Ma Wat River Roundabout +11.5 With Ventilation System Lung Yeuk Tau Interchange (Grade Separated with Sha Tau Kok Road) +11.0 Fanling North NDA Relocation of Existing Refuge Collection Point & Public Toilet Shung Him Tong Elevated Section of Fanling Bypass Luen Wo Hui DP10 Elevated Section of Job Title Drawing Title Drawn FanlingDate Bypass Drawing No. W(g] Agreement No. CE 61/2007 (CE) LM 04/13 Proposed Road and Checked Approved CIVIL ENGINEERING North East New Territories New Development Areas Figure 2.13 AND DEVELOPMENT Improvement Works - - DEPARTMENT Planning and Engineering Study - Investigation Scale 1:2500 ON A1 - Rev Description Date 1:5000 ON A3 (Sheet 6 of 7).