WONG MAU HANG Leachate Treatment Works SHAN
TUNG FUNG AU
WO KENG SHAN
SEUNG MA Tak Yuet Liu Pok LEI YUE Lau Lo Wu Ta Kwu Ling Farm
MIU KENG KONG NGA PO CHEUNG SHAN
Shun Yee San Tsuen TAI SHEK MO SHAN TONG
Firing Range PAK HOK Tse Koo SHAN Hang Ma Tso Lung CHEUNG PO TAU CHAM SHAN San Tsuen Ngam Pin Junction Design TAI HOM TUK Lo Wu 300m Range
PAI TAU LO PRINCESS HILL Water Treatment Works
Lo Wu CAT HILL WANG LENG Firing Correctional Institution Subject to Refinement Range WA SHAN FUNG KONG SHAN San Wai / Tai Ling Firing Range
Tsung Yuen MA TAU LENG Lok Ma Tit Hang Chau
to Minimise Land Resumption SZE TEI Ho Sheung KO PO SHAN Fung Kong Sewage Treatment SHAN Heung Lookout Works SHEUNG SHUI
Barracks Tung Fong Pun Uk Tsuen Tong Kok SACRED HILL ( TIN PING SHAN )
Lookout
San Uk Tsuen Chau Tau Shek Tsai Dills Corner Leng Pak Shek Au Garden
Kwu Tung TAI LENG PEI
9 Yin Kong QUEEN'S HILL
Europa Garden
Tung Chan
9 Town Hall
Wing Ping LING HILL Tsuen Kam Tsin Casas Domingo
North District Park The Royal Oaks KI LUN SHAN Lookout
Ki Lun Elevated section Tsuen
Luk Mei Tsuen Hang Tau FANLING Tai Po
of Fanling Bypass Pang Loon Tei KI LUN SHAN AU PO LENG AU
FUK TSUEN SHAN Fire Lookout WONG KONG PO LENG SHAN LUNG SHAN WU TIP Sewage Hang Tau Firing SHAN Treatment CHONG TSIN Range 9 Works LENG
Barracks
Siu Hum Tsuen Golf Course Tong Kung Leng KAT TSAI SHAN AU
Cheung Lek Experimental Farm
Lin Tong Mei
Crematorium
Chan Uk Po Lin Tong Mei Tsoi Yuen Tsiu Keng Lo Wai
Water Treatment Works Tsiu Keng Miami Crescent Pang Uk
Tsiu Keng San Wai CLOUDY HILL ( KAU LUNG HANG SHAN )
Ying Pun Lung Yeuk Tau Key Plan
Notes Reprovision of Local and 1. For Legend, please refer to Figure 2.4. Maintenance Roads +4.5 Wing Ning Tsuen +2.0 Wu Nga Lok Yeung Diversion of At-Grade Ma Wat River Roundabout +11.5 With Ventilation System
Lung Yeuk Tau Interchange (Grade Separated with Sha Tau Kok Road)
+11.0 Fanling North NDA
Relocation of Existing Refuge Collection Point & Public Toilet
Shung Him Tong Elevated Section of Fanling Bypass
Luen Wo Hui
DP10
Elevated Section of Job Title Drawing Title Drawn Fanling BypassDate Drawing No. W(g ] Agreement No. CE 61/2007 (CE) LM 04/13 Proposed Road and Checked Approved CIVIL ENGINEERING North East New Territories New Development Areas Figure 2.13 AND DEVELOPMENT Improvement Works - - DEPARTMENT Planning and Engineering Study - Investigation Scale 1:2500 ON A1 Rev Description Date 1:5000 ON A3 -
(Sheet 6 of 7)