JANUARY 2020 Traffic on Wells Road MORDIALLOC FREEWAY Managing traffic and transport impacts

We’re building the Mordialloc The project will take 13,000 trucks These plans will consider existing Freeway to connect the off local roads, giving local roads back road conditions to decide the best to local residents. way to manage temporary changes Freeway to traffic flow. to the Dingley Bypass. Keeping you moving To reduce the impacts we'll schedule We’ll prepare Traffic Management Plans The Mordialloc Freeway will slash works impacting traffic outside of peak to maintain the safety of the public and travel times and ease congestion times. While we're building the new our workers and reduce the impact to in ’s south east, providing Freeway we'll also regularly monitor traffic during construction. a safer, more reliable journey. traffic conditions in the area.

roadprojects.vic.gov.au

Authorised by the Victorian Government, 1 Treasury Place, Melbourne 5

Wellington Rd Monash Fwy

2 3 Princes Hwy

Dingley Byp

Clayton Rd

Westall Rd

Warrigal Rd

Lightwood Rd Stud Rd 1 Springvale Rd Heatherton Rd

Junction Rd Eastlink

Centre Rd Old Dandenong Rd Heatherton Rd

Lower Dandenong Rd

Beach Rd Woodlands Dr

Corrigan Rd

M Mills Rd Power Rd o

r

d

i a

l

l

i o Dandenong Byp c Princes Hwy

F

w

y

Boundary Road Wells Rd

Abbotts Rd

Hammond Rd

S. Gippsland Hwy

Eastlink 1 Truck route from Heatherton Managing truck Using traffic management movements We'll use traffic management

Western Port Hwy 4 2 Truck route from Lysterfield Thompson Rd measures to keep you and workers There will be a large number of safe during works. These include: trucks travelling to and from our 3 Truck route from Lysterfield work site. installing safety barriers to We’ll also need to close some 4 Truck route from Hampton Park We’ve developed a strategy to manage truck movements and safely separate drivers from roads overnight in future when we minimise disruption to road users and our construction works lift the beams for the new Freeway 5 Truck route from Scoresby Hall Rd the local community. This includes: bridges into place, including: Sladen St installing signs to guide • Old Dandenong Road • planning truck routes to 6 Truck route from Sommerville motorists, pedestrians and • Centre Dandenong Road Ballarto Rd minimise the distance cyclists through changed they’ll travel on local roads • Lower Dandenong Road traffic conditions

Nepean Hwy Frankston Fwy

Please note: Quarry Rd • planning truck movements • Governor Road These routes are subject to change. Skye Rd to minimise the impact on closing some lanes • Bowen Parkway any one road • Springvale Road. Browns Rd • sourcing the material from Cranbourne Rd multiple quarry locations Traffic conditions will across Melbourne temporary traffic signals progressively change, and we • making changes to roads crossing ask you to be alert, patient and North Rd pay close attention to road signs, Western Port Hwy our worksite to allow trucks to Pearcedale Rd safety enter and exit the work site traffic controller’s instructions and reduced speed limits. • ensuring our truck drivers are traffic controllers informed about speed limits Mcclelland Dr • monitoring traffic volumes and adjusting truck routes as required reducing speed limits. Baxter Tooradin Rd • once at the work site, we’ll use a temporary haul road to take trucks off local roads.

Grant Rd

Nepean Hwy

Peninsula Link Image above: Traffic on Wells Road

6 Maintaining access Communicating Being accountable to private property traffic changes for what we do We’ll make every effort to ensure We’ll provide you with advanced notice We’ve developed an Environmental there is little or no disruption to about any traffic changes, including: Management Framework properties during our works. We’ll let (EMF) which includes approved you know in advance if access to your • signs placed on roads alerting road Environmental Performance property will be temporarily affected. users to traffic conditions Requirements (EPRs) to minimise • letters to nearby properties impacts to the community. These describe the traffic and transport • our social media channels outcomes we’re required to achieve • advertising in local newspapers during the design, construction and • our website roadprojects.vic.gov.au operation of the Freeway. and bigbuild.vic.gov.au Information on our EPRs can • email updates. be found in our Environmental Management Framework and Image above: Traffic on Wells Road viewed at roadprojects.vic.gov.au/ projects/mordialloc-freeway

CONTACT US Follow us on social media [email protected] Please contact us if you would like this

1800 105 105 @roadprojectsvic information in an accessible format. Major Road Projects For languages other than English, If you need assistance because of a hearing or

GPO Box 4509, Melbourne VIC 3001 please call 9209 0147. speech impairment, please visit relayservice.gov.au 0870