Eastlink: Strategies for Success

Total Page:16

File Type:pdf, Size:1020Kb

Eastlink: Strategies for Success Presentation to IPWEA 2013 Victorian Conference Wednesday 20 March 2013 www.seita.com.au Overview • Linking Melbourne Authority • PPP road projects in Melbourne • Why PPPs • Peninsula Link – current status • East West Link – Business Case www.seita.com.au Linking Melbourne Authority • 1995 – Melbourne CityLink Authority • Public Private Partnerships (PPP) specialists - Road engineering - Project financing / commercial / legal documentation - Planning / environmental approval expertise • 2003 - Southern & Eastern Integrated Transport Authority • 2010 - Linking Melbourne Authority www.seita.com.au Reporting Lines Minister for Roads Linking Melbourne Authority Board Chief Executive Officer Chief Operating Officer Executive Director Commercial & Legal Directors Director Directors Director Peninsula Link Corporate Commercial & Communications & Planning Services Legal www.seita.com.au Legislation • Melbourne City Link Act 1996 • Southern & Eastern Integrated Transport Authority Act 2004 • Transport Integration Act 2010 • Major Transport Projects Facilitation Act 2010 www.seita.com.au CITYLINK LEGEND EAST WEST LINK Ringwood Bypass STATE ROADS/ HIGHWAYS CITYLINK EASTLINK EASTLINK PENINSULA LINK (under construction) EAST WEST LINK (business case) Dandenong Bypass PENINSULA LINK Melbourne’s PPP Road Projects www.seita.com.au Why Public Private Partnerships? • Access to finance • Improved risk sharing • Benefits of innovation • Completion driven by revenue • Whole of life approach • Private sector: - management skills - decision making www.seita.com.au www.seita.com.au CityLink • VicRoads / Melbourne City Link Authority • Linked 3 radial freeways • Melbourne’s key east-west connection • PPP toll-road • One of first free-flow toll roads in the world www.seita.com.au CityLink • Concessionaire – Transurban – 22km freeway – 1.6km and 3.6km three lane tunnels – 5km viaduct and Bolte bridge • Fully electronic tolling system • Construction cost $1.5 billion (1995) • 38 year concession - started March 1996 • Opened as toll road in January 2000 www.seita.com.au www.seita.com.au www.seita.com.au www.seita.com.au EastLink • SEITA Add text • Linked Eastern and Frankston Freeways • PPP toll road • Concession period: 39 years • Construction cost: $2.5 billion (2004) • KPIs for operation and maintenance www.seita.com.au EastLink – PPP Toll Road • Concessionaire – ConnectEast – 39km freeway – 1.6km twin three lane tunnels – 17 interchanges • Fully electronic interoperable tolling system • 39 year concession - started November 2004 • Opened in June 2008 (5 months early) www.seita.com.au www.seita.com.au www.seita.com.au www.seita.com.au www.seita.com.au Peninsula Link – an Availability PPP • Links EastLink and Mornington Peninsula Freeway • 27km freeway • 9 interchanges with local roads • Quarterly service payments by State – 25 years • Project company - Southern Way • Design and construction - Abigroup www.seita.com.au Peninsula Link – Current Status • Commenced - January 2010 • Completed - 14 January 2013 • Defects completion - 14 July 2013 • Minor works / environmental obligations • Community issues being addressed • Future handover to VicRoads www.seita.com.au www.seita.com.au www.seita.com.au www.seita.com.au www.seita.com.au PPP Availability Model • Payment stream drives early completion • Achieves PPP risk transfer – D&C – Operations and maintenance • Minimises revenue risk to private sector • Allows innovation • Whole of life approach in D&C www.seita.com.au East West Link – Proposed Scheme • 18 km link Eastern Freeway, CityLink, Western Ring Road • Business case finalised - whole project - focus on eastern section • Government decision • Initial planning study Western section completed A city shaping project www.seita.com.au East West Link Business Case activities • Alignment, scope review • Geotechnical investigations • Estimate refinement • Traffic modelling / revenue analysis • Peer reviews • Market engagement - Government announcement of Business Case - Individual meetings www.seita.com.au East West Link - Challenges Ahead • Coming up with an affordable project • Finding a funding solution ($10-12 billion) • Planning / environmental approval process • Stakeholder / community engagement • Delivery in an urban environment • Minimising impacts • Determining risk allocation www.seita.com.au Questions www.seita.com.au .
Recommended publications
  • Employment Information Kit Control Systems Engineer
    EMPLOYMENT INFORMATION KIT CONTROL SYSTEMS ENGINEER Control Systems Engineer ABOUT THIS INFORMATION KIT Thank you for your interest in employment with EastLink. This Employment Information Kit provides you with the relevant information you need about this opportunity to help you decide whether to apply for this position. Outlined in this document are details about EastLink, information about the recruitment department and position, the selection process and information on how to prepare your application. You are encouraged to read this information carefully in order to develop an understanding of the requirements. You should assess yourself against the key selection criteria before deciding to apply for the position and prepare an application according to the guidelines outlined in this information kit. RECRUITER CONTACT DETAILS Telephone enquiries for this position can be directed to Narelle Anderson on 9955 1700. Unless otherwise stated, correspondence in relation to this position should be forwarded to:- Human Resources EastLink 2 Hillcrest Avenue (PO Box) 804 Ringwood Victoria 3134 Candidate applications can be submitted via email in Microsoft Word or PDF format to [email protected] Page 2 of 13 © Copyright 2021 ConnectEast Pty Ltd Printed documents are not controlled Control Systems Engineer ABOUT EASTLINK ConnectEast is the owner and operator of EastLink, Melbourne’s second fully-electronic tollway and, since its opening in June 2008, already one of the busiest roads in Victoria. EastLink comprises about 39km of freeway-standard road and connects the Eastern Freeway in Melbourne’s east to the Frankston Freeway in the south. EastLink also includes the Ringwood Bypass and Dandenong Bypass as untolled additions to the state road network.
    [Show full text]
  • Submission Cover Sheets
    Submission Cover Sheet North East Link Project EES IAC 402 Request to be heard?: No, but please email me th Full Name: Phil Turner Organisation: Maroondah City Council Affected property: Attachment 1: Maroondah_Coun Attachment 2: Maroondah_Coun Attachment 3: Comments: To the North East Link Inquiry & Advisory Committee (IAC) Maroondah Council provides the following submission to the IAC, in relation to the EES for the North East Link project. While Council formally supports the objectives of the NEL project, I advise that the support of Maroondah Council has been conditional on appropriate traffic considerations being made with regard to the impact of the project on the Eastlink tunnels, the Ringwood Bypass and by extension the Ringwood Metropolitan Activity Centre. Council previously commissioned a review by O’Brien Traffic that considered the project in the context of the tunnels and impacts on Ringwood, and it was determined that without ancillary works to take traffic pressure off the Eastlink tunnels and the Ringwood Bypass, the project would potentially fail and have a major detrimental impact on the viability of the Ringwood Metropolitan Activity Centre. The O’Brien Traffic report attached to this submission details the basis for those concerns. Council’s concerns were previously forwarded to NELA and Council officers have met with NELA officers on these matters, however, to date Council has not received an appropriate response that addresses these concerns, including within the ESS. In support of this submission, the following documents have also been uploaded: o A submission letter signed by Council’s Mayor Rob Steane documenting the history of Council’s dealings regarding NEL, and outlining Council’s concerns current with the project; o Council Report September 2018; o O’Brien Traffic Review dated 12 September 2017; o Council letter to NELA (26 February 2018) and NELA response (14 March 2018); o Correspondence from Council on Bypass concerns (including technical reports); and o Minutes from MCC / NELA meetings 6 April 2018 and 30 April 2018.
    [Show full text]
  • Road Management Plan 2018-22
    Greater Dandenong Road Management Plan 2018-22 GREATER DANDENONG ROAD MANAGEMENT PLAN 2018-22 1 Note: Road Management Plan Review 2021 Review of this Road Management Plan was completed by Council on 28 June 2021. The review determined that its standards continue to be appropriate however minor edits that give greater clarity to the Road Management Plan’s effect have been made. This amended RMP came into effect on 30 June 2021. Table of Contents City of Greater Dandenong Road Management Plan ............................................ 2 Glossary of Terms .............................................................................................. 3 1.0 Introduction ................................................................................................... 5 1.1 Background ..................................................................................................... 5 1.2 Purpose ........................................................................................................... 6 1.3 Key stakeholders............................................................................................. 6 1.4 Public Roads Register ..................................................................................... 6 1.5 Obligations of road users ................................................................................ 7 1.6 Delegations ..................................................................................................... 7 2.0 Road Management System .........................................................................
    [Show full text]
  • 1 /(I,,. 052 Vicrqads 1994-1995 the Honourable WR Baxter, MLC Minister for Roads and Ports 5Th Floor 60 Denmark Street Kew Vic 3101
    1 /(I,,. 052 VicRQads 1994-1995 The Honourable WR Baxter, MLC Minister for Roads and Ports 5th Floor 60 Denmark Street Kew Vic 3101 Dear Minister VicRoads' Annual Report 1994-1995 I have pleasure in submitting to you, for presentation to Parliament, the Annual Report of the Roads Corporation (VicRoads) for the period 1Jul y 1994 to 30June1995. Yours sincerely COLIN JORDAN CHIEF EXECUTIVE 052 VicRoads l 994-1995 Annual report :VicR.oads Location: BK Barcode: 31010000638256 • Report from Chief Executive 4 • Improving Front-line Services 22 Corporate 6 Vehicle Registration 22 Mission Staterrent 6 Licensing 22 Advisory Board Members 6 Driver and Vehicle Information 23 Corporate Management Group 7 Other Initiatives 23 Senior Organisation Structure 7 Enhancing the Environment 24 • Managing Victoria's Road System 8 Environment Strategy 24 Major Metropolitan Road Improvements 8 Traffic Noise 24 Major Rural Road Improvements 9 Air Quality 25 The Better Roads Victoria Program 10 Enhancing theLandscape 25 • Managing Victoria's road system. Strategic Planning 11 Bicycles 25 Page 12 Federal Funding 11 • Managing for Results 26 Maintaining Roads and Bridges 12 People 26 • Improving Traffic Flow and Mobility 14 Qual ity Management 27 Traffic Management Initiatives 14 Improving Business Prcre;ses 27 Reforming Regulation 14 Benchmarking 28 Supporting Government Initiatives 17 Research and Development 28 • Enhancing Road Safety 18 Private Sector Partnership 29 Safer Roads 18 Partnership with Local Government 29 Safer Road Use 19 • Financial Management 30 Saler Vehicles 19 • Financial Statements 34 Strategy and Co-ordination 20 • Appendices 46 Legislation 46 Enhancing the environment. Page24 · Workforce Data 46 • VicRoads 1994-95 highlights.
    [Show full text]
  • Eastlink to Open on 29 June - Five Months Early
    12 May 2008 EASTLINK TO OPEN ON 29 JUNE - FIVE MONTHS EARLY ConnectEast, the owner and operator of EastLink, yesterday confirmed to the Victorian Government that it will deliver the $2.5 billion motorway on 29 June 2008 – on-budget and five months ahead of time. To celebrate the completion of this landmark Public Private Partnership project and to encourage motorist familiarisation, ConnectEast announced the first four weeks of operation will be toll-free. ConnectEast also revealed plans to host a community open day on Sunday 15 June to give people a once-in-a-lifetime chance to walk, run or cycle on the road before it opens to traffic. Managing Director, John Gardiner, said the opening of EastLink (and the untolled Ringwood Bypass) well ahead of the 30 November contract date demonstrated the capacity of the private sector to accelerate the delivery of massive projects. “Over the life of this construction ConnectEast has averaged $59 million expenditure per month, including five consecutive months when expenditure exceeded $100 million,” Mr Gardiner said. “This demonstrates the capacity of the private sector, with the support of government, to harness all the necessary resources to make big infrastructure projects a reality in the shortest possible time. “EastLink is already generating an economic and population boom in Melbourne’s outer east and south-east, with businesses and residents re-locating to make the most of the motorway. “EastLink will mean safer driving plus time and fuel savings every day for many thousands of Victorians. The road will revolutionise the lives of people living and working in Melbourne’s eastern and south-eastern suburbs by providing a high- quality uninterrupted north-south transport corridor from Mitcham to Frankston.
    [Show full text]
  • Ordinary Council Meeting 170613
    MINUTES ORDINARY COUNCIL MEETING TUESDAY 13 JUNE 2017 Commencing at 7:00 PM COUNCIL CHAMBERS 225 Lonsdale Street, Dandenong VIC 3175 City of Greater Dandenong ORDINARY COUNCIL MEETING MINUTES TUESDAY 13 JUNE 2017 TABLE OF CONTENTS ITEM SUBJECT PAGE NO 1 MEETING OPENING ........................................................................................ 3867 1.1 ATTENDANCE ............................................................................................................. 3867 1.2 OFFERING OF PRAYER ............................................................................................. 3867 1.3 CONFIRMATION OF MINUTES OF PREVIOUS MEETING ........................................ 3868 1.4 ASSEMBLIES OF COUNCIL ....................................................................................... 3869 1.5 DISCLOSURES OF INTEREST ................................................................................... 3870 2 OFFICERS' REPORTS .................................................................................... 3871 2.1 DOCUMENTS FOR SEALING ..................................................................................... 3871 2.1.1 Documents for Sealing ................................................................................... 3871 2.2 DOCUMENTS FOR TABLING ..................................................................................... 3874 2.2.1 Petitions and Joint Letters .............................................................................. 3874 2.2.2 Documents for Tabling ...................................................................................
    [Show full text]
  • North Melbourne Station Melbourne
    2 North Melbourne Station Melbourne e c T r e t s n u M t S Victoria St h g t t r t S S t S u S n l d b V l ic to r a ria i S n e y t o f r h o w t s s t a r D o t o L e S b d b n A A Silk P L l a Miller St u r e n s Spe S nce t r S Miller St R t a i t lw S a l y l P e l w a Dy d t non R S 2 NORTH MELBOURNE t S h g r u b y r D Ire lan d S t Pl s t k S ic d r D o f s t o b b T A a i t L a ne e A n dd a er L ley it S a t T t S e k w a H e n a L n e d d a M R a i lw t a S y n e P d l o R 0 50 100 200 300 Mtetres Image © Data source: DEDJTR, Aerial Imagery, 2015. Vicmap DELWP, Data, 2015 S Fo ey ot nl North Melbournesc Station opened in 1859 and is a ta ray S 0 50 Rd100 200 300 major interchange station servicing the Craigieburn,Metres Flemington Racecourse, Sunbury, Upfield, Werribee Document Path: G:\31\33036\GIS\Maps\Working\31-33036_001_OtherStationSiteFootprints300mAerial_20cm.mxd and Williamstown lines.
    [Show full text]
  • Victoria Harbour Docklands Conservation Management
    VICTORIA HARBOUR DOCKLANDS CONSERVATION MANAGEMENT PLAN VICTORIA HARBOUR DOCKLANDS Conservation Management Plan Prepared for Places Victoria & City of Melbourne June 2012 TABLE OF CONTENTS LIST OF FIGURES v ACKNOWLEDGEMENTS xi PROJECT TEAM xii 1.0 INTRODUCTION 1 1.1 Background and brief 1 1.2 Melbourne Docklands 1 1.3 Master planning & development 2 1.4 Heritage status 2 1.5 Location 2 1.6 Methodology 2 1.7 Report content 4 1.7.1 Management and development 4 1.7.2 Background and contextual history 4 1.7.3 Physical survey and analysis 4 1.7.4 Heritage significance 4 1.7.5 Conservation policy and strategy 5 1.8 Sources 5 1.9 Historic images and documents 5 2.0 MANAGEMENT 7 2.1 Introduction 7 2.2 Management responsibilities 7 2.2.1 Management history 7 2.2.2 Current management arrangements 7 2.3 Heritage controls 10 2.3.1 Victorian Heritage Register 10 2.3.2 Victorian Heritage Inventory 10 2.3.3 Melbourne Planning Scheme 12 2.3.4 National Trust of Australia (Victoria) 12 2.4 Heritage approvals & statutory obligations 12 2.4.1 Where permits are required 12 2.4.2 Permit exemptions and minor works 12 2.4.3 Heritage Victoria permit process and requirements 13 2.4.4 Heritage impacts 14 2.4.5 Project planning and timing 14 2.4.6 Appeals 15 LOVELL CHEN i 3.0 HISTORY 17 3.1 Introduction 17 3.2 Pre-contact history 17 3.3 Early European occupation 17 3.4 Early Melbourne shipping and port activity 18 3.5 Railways development and expansion 20 3.6 Victoria Dock 21 3.6.1 Planning the dock 21 3.6.2 Constructing the dock 22 3.6.3 West Melbourne Dock opens
    [Show full text]
  • East-West Road Travel 32 L Investing in Transport - Overview
    31 l east-west road travel 32 l investing in transport - overview Travel patterns in Melbourne are changing. More and more The EWLNA has found that: people are travelling to and from the central city during peak • There is substantial demand for cross city travel, with periods; more people are moving around the city outside these particularly strong growth in travel from the west to the east periods; and more people are making trips across the city. and south-east. The combined impact of these trips is higher traffi c volumes and greater congestion on roads in the city’s inner and middle • Transport options for travel across the city are seriously suburbs, as well as signifi cant bottlenecks on both the road and congested. rail networks. • While the Monash-CityLink-West Gate freeway upgrade will The EWLNA has found a strong and growing demand for relieve pressure along this corridor, the extra capacity being east-west road travel in Melbourne – a demand that existing provided on the route will be fully taken up during peak infrastructure will be unable to meet without a very substantial periods within a relatively short time. increase in congestion. • With the exception of the Monash-CityLink-West Gate Modelling undertaken for the EWLNA confi rms what every freeway, the east-west roads within the EWLNA Study Area person travelling across Melbourne knows: that the increasing are disconnected and poorly suited to effi ciently moving high demand for travel, the escalating urban freight task and the volumes of traffi c across the city. growing number of cars on Melbourne’s roads are generating • Congestion on key east-west routes – and the accompanying greater levels of congestion on major cross city routes.
    [Show full text]
  • Major Projects
    BORAL ASPHALT Build something great™ CASE STUDY Major Projects PENINSULA LINK 2018 EDITION CASE STUDY Major Projects PENINSULA LINK 2018 EDITION Client/Construction Team Client: Abigroup. Contractor: Boral Resources (Vic). Existing Conditions Wet weather can cause costly delays in asphalt works. After experiencing two of the wettest years on record in Australia, a compressed program was implemented which saw approximately 300,000 tonnes of asphalt pavement laid in four months, with our largest Project Impact Statement With construction now completed and the month at 113,000 tonnes. freeway opened, Lend Lease Infrastructure Originally drafted in the 1969 Melbourne Design Services now operates and will maintain Transportation Plan, Peninsula Link is a six-lane To ensure greater comfort and safety for road the freeway for the next 25 years before freeway spanning 27 kilometres, beginning at users, a key factor in the performance of the handing back the asset in an agreed the southern end of Eastlink in Carrum Downs freeway is ride quality, which is a measure of condition to VicRoads. and leading into the Mornington Peninsula the ‘roughness’ of the road surface. After Freeway in Mount Martha. Project Scope construction was completed, a series of measurements showed that the ride comfort Peninsula Link gives drivers the choice of The scope of the works included: along the 27 kilometre span came well within bypassing nine sets of traffic lights and six VicRoads specifications. major roundabouts, allowing road users to • Full depth asphalt in five layers travel from the Mornington Peninsula to including OGA surfacing for the Performance northern 14km Melbourne Airport without encountering a Of the 410,000 tonnes of asphalt produced, single traffic light.
    [Show full text]
  • Toll Roads - National Cover Australian Toll Roads
    Toll Roads - National Cover Australian Toll Roads Roam Express offers a visitor e-pass which is valid for up Please be aware that toll fees apply on some roads in to 30 days on all Australian toll roads. Australia. A visitor E-Pass can be set up before or within 48 hours of You will likely encounter toll roads if you are driving through your first trip to cover travel on all Australian toll roads. Metropolitan New South Wales, Queensland and Victoria. When driving a thl rental vehicle in Australia you are responsible for paying toll fees, so it is important to be aware of these roads before you travel. As most toll roads in Australia Roam Contact Details are electronically tolled, you will not be able to stop and pay Ph: 13 76 26 cash. www.roamexpress.com.au Please refer to this brochure which provides an overview of all International Callers: +61 2 9086 6400 Australian toll roads as well as information on how to pay for toll travel. Bitte beachten Sie, dass einige Strassen Zahlungspflichtig 17 16 15 Castle Hill 14 sind in Australien. 13 Die Mautstrassen befinden sich in New South Wales, Queensland 18 10 12 M2 und Victoria. 11 9 Manly Wenn Sie ein Wohnmobil von thl gemietet haben in Australien 19 sind Sie verantwortlich die Gebuehren zu zahlen, deshalb ist es 44 20 Paramatta 8 wichtig dass Sie sich ueber diese Strassen informieren. Die moisten 21 7 Mautstrassen sind elektronisch und Sie koennen nicht Bar bezahlen 22 Harbour 6 oder anhalten. Eastern Bridge 5 Sydney 4 Bitte beachten Sie die Broschure die Sie in Ihren Unterlagen Creek M7 CBD 2 3 bekommen wo diese Strassen sind und wie Sie bezahlen koennen.
    [Show full text]
  • Height Clearance Under Structures for Permit Vehicles
    SEPTEMBER 2007 Height Clearance Under Structures for Permit Vehicles INFORMATION BULLETIN Height Clearance A vehicle must not travel or attempt to travel: Under Structures for (a) beneath a bridge or overhead Permit Vehicles structure that carries a sign with the words “LOW CLEARANCE” or This information bulletin shows the “CLEARANCE” if the height of the clearance between the road surface and vehicle, including its load, is equal to overhead structures and is intended to or greater than the height shown on assist truck operators and drivers to plan the sign; or their routes. (b) beneath any other overhead It lists the roads with overhead structures structures, cables, wires or trees in alphabetical order for ready reference. unless there is at least 200 millimetres Map references are from Melway Greater clearance to the highest point of the Melbourne Street Directory Edition 34 (2007) vehicle. and Edition 6 of the RACV VicRoads Country Every effort has been made to ensure that Street Directory of Victoria. the information in this bulletin is correct at This bulletin lists the locations and height the time of publication. The height clearance clearance of structures over local roads figures listed in this bulletin, measured in and arterial roads (freeways, highways, and metres, are a result of field measurements or main roads) in metropolitan Melbourne sign posted clearances. Re-sealing of road and arterial roads outside Melbourne. While pavements or other works may reduce the some structures over local roads in rural available clearance under some structures. areas are listed, the relevant municipality Some works including structures over local should be consulted for details of overhead roads are not under the control of VicRoads structures.
    [Show full text]