Evaluation of the Crash Effects of Victoria's Fixed Freeway Speed

Total Page:16

File Type:pdf, Size:1020Kb

Evaluation of the Crash Effects of Victoria's Fixed Freeway Speed EVALUATION OF THE CRASH EFFECTS OF VICTORIA’S FIXED FREEWAY SPEED CAMERAS by Stuart Newstead Kathy Diamantopoulou Max Cameron & Nimmi Candappa May, 2019 (Released February, 2021) Report No. 350 MONASH UNIVERSITY ACCIDENT RESEARCH CENTRE REPORT DOCUMENTATION PAGE Report No. Date Release Date ISBN ISSN Pages 350 May 2019 February 2021 978-1-925413-20-5 1835-4815 (online) 48 Title and sub-title: Evaluation of the crash effects of Victoria’s fixed freeway speed cameras Author(s): Newstead, S., Diamantopoulou, K., Cameron, M. and Candappa, N. Sponsoring Organisation(s): This project was funded through the Centre’s Baseline Research Program for which grants have been received from: Department of Justice and Community Safety, Department of Transport (VicRoads) and Transport Accident Commission Abstract: This aim of study was to evaluate the road safety benefits of fixed speed cameras in operation in Victoria in terms of their impact on crash frequency and severity. Evaluation focused on camera installations on two roads; fixed spot speed cameras at 4 locations on the Geelong Rd (Princes Freeway) and the point to point speed camera system on the Hume Freeway covering the freeway from Epping to Broadford. These road sections were chosen for evaluation based on sufficient before and after installation crash history and being free from other confounding influences at the camera sites. Analysis results showed that the estimated proportional crash reduction effects associated with the cameras at fixed spot camera sites were statistically the same as those estimated for the point to point system. The only difference between spot speed cameras and the point to point system was the geographical area of influence over which associated crash reduction effects were estimated. Evaluation results estimated a 27.7% statistically significant reduction (p=0.016) in all casualty crashes associated with fixed speed camera installations. A corresponding 30.2% reduction in fatal and serious injury crashes was estimated however, this was not statistically significantly different from the estimate for all casualty crashes. Absolute crash savings associated with the Hume Freeway point to point camera system were much greater than those estimated on the Geelong Rd spot speed camera network with annual estimated reductions of 21 and 6.8 casualty crashes respectively associated with the cameras. This reflects the greater crash population covered by the point to point system compared to spot speed cameras. Key Words: Disclaimer Enforcement, Speeding, Fixed Speed Camera, This report is disseminated in the interest of Evaluation, Point-to-Point Speed Camera System, information exchange. The views expressed here are Casualty Crashes those of the authors, and not necessarily those of Monash University Reproduction of this page is authorised. Monash University Accident Research Centre, Building 70, Clayton Campus, Victoria, 3800, Australia. www.monash.edu.au/muarc Telephone: +61 3 9905 4371, Fax: +61 3 9905 4363 ii MONASH UNIVERSITY ACCIDENT RESEARCH CENTRE Preface Project Manager / Team Leader: Associate Professor Stuart Newstead Research Team: Kathy Diamantopoulou Professor Max Cameron Nimmi Candappa Contributor Statement A/Prof Stuart Newstead – project management, research design, data analysis, manuscript preparation Kathy Diamantopoulou – data preparation, manuscript preparation Professor Max Cameron – study design, manuscript preparation Nimmi Candappa – data extraction and preparation Ethics Statement Ethics approval was not required for this project. EVALUATION OF VICTORIA’S FIXED FREEWAY SPEED CAMERAS iii Contents EXECUTIVE SUMMARY .................................................................................................. VI 1. BACKGROUND AND AIMS ....................................................................................... 1 2 REVIEW OF EXISTING EVIDENCE ON FIXED SPEED CAMERAS AND THEIR EFFECTIVENESS ...................................................................................................... 2 2.1 FIXED SPOT SPEED CAMERA SYSTEMS .................................................................. 2 2.1.2 Fixed Spot Speed Cameras in Victoria ................................................................... 2 2.1.2 Fixed Spot Speed Cameras in New South Wales .................................................... 2 2.1.3 Fixed Spot Speed Cameras in Queensland ............................................................. 3 2.1.4 Fixed Spot Speed Cameras in the United Kingdom ................................................ 3 2.1.5 Fixed Spot Speed Cameras in Norway ................................................................... 4 2.1.6 Fixed Spot Speed Cameras in Other Jurisdictions .................................................. 4 2.2 POINT TO POINT SPEED CAMERA SYSTEMS .......................................................... 4 2.2.1 Point to Point Camera Systems in the United Kingdom.......................................... 5 2.2.2 Point to Point Cameras in Victoria ......................................................................... 5 2.2.3 Point-To-Point Camera Systems in Other Jurisdictions .......................................... 7 3. EVALUATION DATA SOURCES ............................................................................... 8 3.1 FIXED SPOT SPEED CAMERA DATA ........................................................................ 8 3.1.1 City Link Domain and Burnley Tunnels ................................................................ 10 3.1.2 East Link and the Mullum Mullum and Melba Tunnels ......................................... 10 3.1.3 Western Ring Road Speed Cameras ...................................................................... 11 3.1.5 Monash Freeway speed cameras ........................................................................... 11 3.1.6 Fixed Speed Cameras on Geelong Road ................................................................ 11 3.2 POINT-TO-POINT CAMERA SYSTEM DATA .......................................................... 12 3.2.1 Point-to-Point cameras on Peninsula Link............................................................ 12 3.2.2 Point-to-Point cameras on Peninsula Link............................................................ 14 3.3 SPEED CAMERA SYSTEMS CONSIDERED FOR EVALUATION ........................... 15 3.4 CRASH DATA............................................................................................................... 15 4. EVALUATION DESIGN AND ANALYSIS METHODS.............................................. 16 4.1 EVALUATION DESIGN ............................................................................................. 16 4.2 SELECTION OF TREATMENT AND CONTROL SITES FOR GEELONG ROAD SPEED CAMERAS ...................................................................................................... 21 4.2.1 Treatment Sites for Fixed Speed Cameras on Geelong Road ................................ 21 4.2.2 Control Sites for Fixed Speed Cameras on Geelong Road .................................... 21 4.3 SELECTION OF TREATMENT AND CONTROL SITES FOR HUME FREEWAY POINT-TO-POINT SPEED CAMERA SYSTEM ......................................................... 24 4.3.1 Treatment Sites for Point-to-Point Speed Camera System on Hume Freeway ....... 24 4.3.2 Control Sites for Point-to-Point Speed Camera System on Hume Freeway ........... 24 4.4 STATISTICAL ANALYSIS METHODOLOGY........................................................... 28 5 ANALYSIS RESULTS .............................................................................................. 33 5.1 FIXED SPEED CAMERAS ON GEELONG ROAD ..................................................... 33 5.2 POINT-TO-POINT CAMERAS ON HUME FREEWAY .............................................. 34 iv MONASH UNIVERSITY ACCIDENT RESEARCH CENTRE 5.3 COMBINED RESULTS FOR GEELONG ROAD SPEED CAMERAS AND HUME FREEWAY POINT-TO-POINT CAMERAS ................................................................ 37 5.4 ABSOLUTE TRAUMA SAVINGS ASSOCIATED WITH THE GEELONG ROAD SPEED CAMERAS AND HUME FREEWAY POINT-TO-POINT CAMERAS ........... 39 6. DISCUSSION............................................................................................................ 41 6.1 FIXED SPEED CAMERAS ON THE GEELONG ROAD ............................................ 41 6.2 POINT-TO-POINT SPEED CAMERAS ON THE HUME FREEWAY ......................... 42 6.3 COMBINED GEELONG ROAD FIXED CAMERAS WITH HUME FREEWAY POINT-TO-POINT CAMERAS .................................................................................... 43 7 CONCLUSIONS ....................................................................................................... 44 8 REFERENCES ......................................................................................................... 45 APPENDIX A: SPEED CAMERA-ON DATES FOR GEELONG ROAD SPEED CAMERAS ................................................................................................................ 47 EVALUATION OF VICTORIA’S FIXED FREEWAY SPEED CAMERAS v EXECUTIVE SUMMARY This aim of this study was to evaluate the road safety benefits of fixed speed cameras in operation in Victoria in terms of their impact on crash frequency and severity. Fixed speed cameras in Victoria are operated on a number of freeways and toll roads across Victoria and encompass two specific types of technology: fixed spot speed cameras which measure the instantaneous speed of vehicles at the camera site and point to
Recommended publications
  • Employment Information Kit Control Systems Engineer
    EMPLOYMENT INFORMATION KIT CONTROL SYSTEMS ENGINEER Control Systems Engineer ABOUT THIS INFORMATION KIT Thank you for your interest in employment with EastLink. This Employment Information Kit provides you with the relevant information you need about this opportunity to help you decide whether to apply for this position. Outlined in this document are details about EastLink, information about the recruitment department and position, the selection process and information on how to prepare your application. You are encouraged to read this information carefully in order to develop an understanding of the requirements. You should assess yourself against the key selection criteria before deciding to apply for the position and prepare an application according to the guidelines outlined in this information kit. RECRUITER CONTACT DETAILS Telephone enquiries for this position can be directed to Narelle Anderson on 9955 1700. Unless otherwise stated, correspondence in relation to this position should be forwarded to:- Human Resources EastLink 2 Hillcrest Avenue (PO Box) 804 Ringwood Victoria 3134 Candidate applications can be submitted via email in Microsoft Word or PDF format to [email protected] Page 2 of 13 © Copyright 2021 ConnectEast Pty Ltd Printed documents are not controlled Control Systems Engineer ABOUT EASTLINK ConnectEast is the owner and operator of EastLink, Melbourne’s second fully-electronic tollway and, since its opening in June 2008, already one of the busiest roads in Victoria. EastLink comprises about 39km of freeway-standard road and connects the Eastern Freeway in Melbourne’s east to the Frankston Freeway in the south. EastLink also includes the Ringwood Bypass and Dandenong Bypass as untolled additions to the state road network.
    [Show full text]
  • Road Management Plan 2018-22
    Greater Dandenong Road Management Plan 2018-22 GREATER DANDENONG ROAD MANAGEMENT PLAN 2018-22 1 Note: Road Management Plan Review 2021 Review of this Road Management Plan was completed by Council on 28 June 2021. The review determined that its standards continue to be appropriate however minor edits that give greater clarity to the Road Management Plan’s effect have been made. This amended RMP came into effect on 30 June 2021. Table of Contents City of Greater Dandenong Road Management Plan ............................................ 2 Glossary of Terms .............................................................................................. 3 1.0 Introduction ................................................................................................... 5 1.1 Background ..................................................................................................... 5 1.2 Purpose ........................................................................................................... 6 1.3 Key stakeholders............................................................................................. 6 1.4 Public Roads Register ..................................................................................... 6 1.5 Obligations of road users ................................................................................ 7 1.6 Delegations ..................................................................................................... 7 2.0 Road Management System .........................................................................
    [Show full text]
  • Eastlink to Open on 29 June - Five Months Early
    12 May 2008 EASTLINK TO OPEN ON 29 JUNE - FIVE MONTHS EARLY ConnectEast, the owner and operator of EastLink, yesterday confirmed to the Victorian Government that it will deliver the $2.5 billion motorway on 29 June 2008 – on-budget and five months ahead of time. To celebrate the completion of this landmark Public Private Partnership project and to encourage motorist familiarisation, ConnectEast announced the first four weeks of operation will be toll-free. ConnectEast also revealed plans to host a community open day on Sunday 15 June to give people a once-in-a-lifetime chance to walk, run or cycle on the road before it opens to traffic. Managing Director, John Gardiner, said the opening of EastLink (and the untolled Ringwood Bypass) well ahead of the 30 November contract date demonstrated the capacity of the private sector to accelerate the delivery of massive projects. “Over the life of this construction ConnectEast has averaged $59 million expenditure per month, including five consecutive months when expenditure exceeded $100 million,” Mr Gardiner said. “This demonstrates the capacity of the private sector, with the support of government, to harness all the necessary resources to make big infrastructure projects a reality in the shortest possible time. “EastLink is already generating an economic and population boom in Melbourne’s outer east and south-east, with businesses and residents re-locating to make the most of the motorway. “EastLink will mean safer driving plus time and fuel savings every day for many thousands of Victorians. The road will revolutionise the lives of people living and working in Melbourne’s eastern and south-eastern suburbs by providing a high- quality uninterrupted north-south transport corridor from Mitcham to Frankston.
    [Show full text]
  • Ordinary Council Meeting 170613
    MINUTES ORDINARY COUNCIL MEETING TUESDAY 13 JUNE 2017 Commencing at 7:00 PM COUNCIL CHAMBERS 225 Lonsdale Street, Dandenong VIC 3175 City of Greater Dandenong ORDINARY COUNCIL MEETING MINUTES TUESDAY 13 JUNE 2017 TABLE OF CONTENTS ITEM SUBJECT PAGE NO 1 MEETING OPENING ........................................................................................ 3867 1.1 ATTENDANCE ............................................................................................................. 3867 1.2 OFFERING OF PRAYER ............................................................................................. 3867 1.3 CONFIRMATION OF MINUTES OF PREVIOUS MEETING ........................................ 3868 1.4 ASSEMBLIES OF COUNCIL ....................................................................................... 3869 1.5 DISCLOSURES OF INTEREST ................................................................................... 3870 2 OFFICERS' REPORTS .................................................................................... 3871 2.1 DOCUMENTS FOR SEALING ..................................................................................... 3871 2.1.1 Documents for Sealing ................................................................................... 3871 2.2 DOCUMENTS FOR TABLING ..................................................................................... 3874 2.2.1 Petitions and Joint Letters .............................................................................. 3874 2.2.2 Documents for Tabling ...................................................................................
    [Show full text]
  • Victoria Class 1 Load Carrying Vehicle and Special Purpose Vehicle Mass and Dimension Exemption Notice 2019 (No
    Commonwealth of Australia Gazette Published by the Commonwealth of Australia GOVERNMENT NOTICES HEAVY VEHICLE NATIONAL LAW Victoria Class 1 Load Carrying Vehicle and Special Purpose Vehicle Mass And Dimension Exemption Notice 2019 (No. 1) PART 1: PRELIMINARY Purpose 1. The purpose of this Notice is to exempt the categories of Class 1 Heavy Vehicles specified in this Notice from— a) the prescribed mass requirements specified in the Notice; and b) the prescribed dimension requirements specified in the Notice. Authorizing provisions 2. This Notice is made under section 117 of the Heavy Vehicle National Law (HVNL) as in force in each state or territory (HVNL). Title 3. This Notice may be cited as the Victoria Class 1 Load Carrying Vehicle and Special Purpose Vehicle Mass And Dimension Exemption Notice 2019 (No. 1). Commencement 4. This Notice comes into operation on 10 February 2019. Expiry 5. This Notice expires on 9 February 2024. Definitions 6. Unless otherwise stated, words and expressions used in this Notice have the same meanings as those defined in the HVNL. 7. In this Notice, “Class 1 OSOM Route Access Lists” means the Victorian Class 1 Oversize and Overmass (OSOM) Route Access Lists referenced in Appendix 1; “Hume Freeway” means the Hume Freeway between Thomastown and the NSW border and includes the Hume Highway at Kalkallo; “main road” means a road described in the Victorian Class 1 OSOM Route Access Lists; Victoria Class 1 Load Carrying Vehicle and Special Purpose Vehicle Mass And Dimension Exemption Notice 2019 (No. 1) Page 1
    [Show full text]
  • See and Do Around Wonderful Morwell
    SEE & DO MORWELL ATTRACTIONS Morwell National Park Signposted from Princes Freeway east of Morwell via Churchill, Junction Road and Jumbuk Road (C456). Parks Victoria 13 19 63. www.parkweb.vic.gov.au A small unique area of remnant forest in the northern foothills of the Strzelecki Ranges with over 40 species of native orchid. Explore nature’s wonderland with cool fern gullies and giant mountain ash forests. Wildlife abounds in the park with wallabies, wombats, possums, kangaroos and koalas frequently sighted. Facilities include picnic areas, toilets, water, gas BBQ and tables. Ask staff for brochure and map. Gippsland Immigration Wall & Walk of Recognition Kernot Lake, Princes Drive www.gippslandimmigrationpark.com.au The Gippsland Immigration Wall and Walk of Recognition are a tribute to immigrants who have lived and worked in Gippsland and contributed to the development of this beautiful region. The monument is set in a parkland beside Kernot Lake. There is a display of the history of immigration into Gippsland using four themes - 'Departing / Arriving, Settling, Working, Achieving’. BBQ, shelters and playground. Waterhole Creek Cultural Trail The Boulevard (behind the Traffic School and underpass) 'Give me your hand my friend' - is the message of the Aboriginal artwork, its translation is 'Gnokan Danna Murra Kor-Ki‘. Local Gunaikurnai artist Ronald Edwards was commissioned to create the artwork stretching 5kms along Waterhole Creek. Points of Interest: 1. The Welcome mural, 2. The Creation story, 3. Bush Tucker Garden, 4. Basket Weaving mural, 5. Meeting Places mural, 6. The Five Clans & Their Shields mural, 7. Snake mural, 8. A Snake in the Rain story Latrobe Regional Gallery 138 Commercial Road Ph: 5128 5700 www.latroberegionalgallery.com Seven gallery spaces and a sculpture courtyard are housed within the complex, showcasing an annual program of state, national and international touring exhibitions.
    [Show full text]
  • Major Projects
    BORAL ASPHALT Build something great™ CASE STUDY Major Projects PENINSULA LINK 2018 EDITION CASE STUDY Major Projects PENINSULA LINK 2018 EDITION Client/Construction Team Client: Abigroup. Contractor: Boral Resources (Vic). Existing Conditions Wet weather can cause costly delays in asphalt works. After experiencing two of the wettest years on record in Australia, a compressed program was implemented which saw approximately 300,000 tonnes of asphalt pavement laid in four months, with our largest Project Impact Statement With construction now completed and the month at 113,000 tonnes. freeway opened, Lend Lease Infrastructure Originally drafted in the 1969 Melbourne Design Services now operates and will maintain Transportation Plan, Peninsula Link is a six-lane To ensure greater comfort and safety for road the freeway for the next 25 years before freeway spanning 27 kilometres, beginning at users, a key factor in the performance of the handing back the asset in an agreed the southern end of Eastlink in Carrum Downs freeway is ride quality, which is a measure of condition to VicRoads. and leading into the Mornington Peninsula the ‘roughness’ of the road surface. After Freeway in Mount Martha. Project Scope construction was completed, a series of measurements showed that the ride comfort Peninsula Link gives drivers the choice of The scope of the works included: along the 27 kilometre span came well within bypassing nine sets of traffic lights and six VicRoads specifications. major roundabouts, allowing road users to • Full depth asphalt in five layers travel from the Mornington Peninsula to including OGA surfacing for the Performance northern 14km Melbourne Airport without encountering a Of the 410,000 tonnes of asphalt produced, single traffic light.
    [Show full text]
  • Height Clearance Under Structures for Permit Vehicles
    SEPTEMBER 2007 Height Clearance Under Structures for Permit Vehicles INFORMATION BULLETIN Height Clearance A vehicle must not travel or attempt to travel: Under Structures for (a) beneath a bridge or overhead Permit Vehicles structure that carries a sign with the words “LOW CLEARANCE” or This information bulletin shows the “CLEARANCE” if the height of the clearance between the road surface and vehicle, including its load, is equal to overhead structures and is intended to or greater than the height shown on assist truck operators and drivers to plan the sign; or their routes. (b) beneath any other overhead It lists the roads with overhead structures structures, cables, wires or trees in alphabetical order for ready reference. unless there is at least 200 millimetres Map references are from Melway Greater clearance to the highest point of the Melbourne Street Directory Edition 34 (2007) vehicle. and Edition 6 of the RACV VicRoads Country Every effort has been made to ensure that Street Directory of Victoria. the information in this bulletin is correct at This bulletin lists the locations and height the time of publication. The height clearance clearance of structures over local roads figures listed in this bulletin, measured in and arterial roads (freeways, highways, and metres, are a result of field measurements or main roads) in metropolitan Melbourne sign posted clearances. Re-sealing of road and arterial roads outside Melbourne. While pavements or other works may reduce the some structures over local roads in rural available clearance under some structures. areas are listed, the relevant municipality Some works including structures over local should be consulted for details of overhead roads are not under the control of VicRoads structures.
    [Show full text]
  • Victorian Class 1 Oversize & Overmass (Osom)
    VICTORIAN CLASS 1 OVERSIZE & OVERMASS (OSOM) ROUTE ACCESS LISTS FEBRUARY 2014 VICTORIAN CLASS 1 OVERSIZE & OVERMASS (OSOM) ROUTE ACCESS LISTS The Victorian Class 1 Oversize & Overmass (OSOM) Route Access Lists detail areas of operation, exempted routes and prohibited routes and structures for all Class 1 OSOM vehicles It is to be read in conjunction with the National Heavy Vehicle Regulator notice Victoria Class 1 Heavy Vehicle Load-carrying Vehicles, Special Purpose Vehicles and Agricultural Vehicles Mass and Dimension Exemption (Notice) 2014 (No. 1). BROAD-ACRE AREA “Broad-Acre Area” means the areas contained within the following cities and shires, not including the boundaries to those areas including: Rural City of Horsham; Rural City of Mildura; Rural City of Swan Hill; Shire of Buloke; Shire of Campaspe; Shire of Gannawarra; Shire of Hindmarsh; Shire of Loddon; Shire of Moira; Shire of Northern Grampians; Shire of West Wimmera; and Shire of Yarriambiack. COLAC-SURF COAST AREA “Colac-Surf Coast Area” means the area contained within the following boundary. It does not include the boundary itself, except between (a) and (b) COLAC-SURF COAST AREA BOUNDARY (a) From the intersection of the Great Ocean Road and Forest Road at Anglesea, in a northerly direction along Forest Road; then: in a westerly direction along Gum Flats Road to Hammonds Road; in a southerly direction along Hammonds Road to the Bambra–Aireys Inlet Road; in a westerly direction along the Bambra–Aireys Inlet Road to the Winchelsea–Deans Marsh Road; in a southerly
    [Show full text]
  • Submission to the Inquiry Into Infrastructure & the Development of Australia's Regional Areas
    SUBMISSION TO THE INQUIRY INTO INFRASTRUCTURE & THE DEVELOPMENT OF AUSTRALIA’S REGIONAL AREAS PARLIAMENT HOUSE CANBERRA PRINCES FREEWAY ACTION COMMITTEE May 1999 l:\infrastructure inq\submissions\electronic subs\sub244-e.doc Submission to The Inquiry into Infrastructure and the Development of Australia’s Regional Areas INTRODUCTION ........................................................................................................1 THE PRINCES FREEWAY ACTION COMMITTEE............................................2 REGIONAL DEVELOPMENT ..................................................................................3 IMPACTS ON SMALL - MEDIUM SIZE BUSINESS ............................................4 AVALON AIRPORT AUSTRALIA PTY LTD ............................................................4 GEELONG CEMENT ....................................................................................................7 GENERAL ECONOMIC IMPACTS OF THE PRINCES FREEWAY.................9 1. OVERVIEW ...............................................................................................................9 2. THE VITAL LINK .....................................................................................................9 3. THE BENEFITS OF AN UPGRADE ......................................................................10 4. HOW TRAFFIC DELAYS COST BUSINESS AND THE COMMUNITY ..........10 5. SAFETY AND THE COST TO THE COMMUNITY ............................................11 ATTACHMENTS .......................................................................................................12
    [Show full text]
  • Victoria Government Gazette by Authority of Victorian Government Printer
    Victoria Government Gazette By Authority of Victorian Government Printer No. G 25 Thursday 19 June 2008 www.gazette.vic.gov.au GENERAL 1318 G 25 19 June 2008 Victoria Government Gazette TABLE OF PROVISIONS Dissolution of Partnership Schroeder Boutique 1320 South East Lawyers 1320 Terang Medical Clinic 1320 Estates of Deceased Persons Aughtersons 1320 Brendan Holland & Michael Cahir 1320 Dwyer Mahon & Robertson 1320 Garden & Green 1321 Gullaci & Gullaci 1321 Hunt & Hunt 1321 Jillian Thomas 1321 Juliano, Furletti & Scott 1322 Mason Sier Turnbull 1322 Mills Oakley Lawyers 1322 Nunan & Bloom 1322 Stidston & Williams Weblaw 1322 Verhoeven & Curtain 1323 Verna A. Cook 1323 Wisewoulds 1323 Wright Smiths 1323 Proclamations 1324 Government and Outer Budget Sector Agencies Notices 1325 Orders in Council 1374 Acts: Health Services; Transport Accident Advertisers Please Note As from 19 June 2008 The last Special Gazette was No. 158 dated 17 June 2008. The last Periodical Gazette was No. 1 dated 12 June 2008. How To Submit Copy l See our webpage www.craftpress.com.au l or contact our office on 9642 5808 between 8.30 am and 5.30 pm Monday to Friday Copies of recent Special Gazettes can now be viewed at the following display cabinet: l 1 Treasury Place, Melbourne (behind the Old Treasury Building) Victoria Government Gazette G 25 19 June 2008 1319 VICTORIA GOVERNMENT GAZETTE Subscribers and Advertisers Our contact details are as follows: Victoria Government Gazette Office Level 1, 520 Bourke Street Melbourne, Victoria 3000 PO Box 1957 Melbourne, Victoria 3001 DX 106 Melbourne Telephone: (03) 9642 5808 Fax: (03) 9600 0478 Mobile (after hours): 0419 327 321 Email: [email protected] Website: www.gazette.vic.gov.au JENNY NOAKES Government Gazette Officer 1320 G 25 19 June 2008 Victoria Government Gazette Private ADVERTISEMENTS DISSOLUTION OF partnership ROBERT NEIL MORISON, late of 7 Oregon Notice is hereby given that Rosemary Lee Drive, Donvale, Victoria, retired, deceased.
    [Show full text]
  • Arterial Roads Tree Strategy Arterial Roads Tree Strategy CONTENTS
    City of Casey Arterial Roads Tree Strategy Arterial Roads Tree Strategy CONTENTS INTRODUCTION 1 DESIGN ZONES 2 LANDSCAPE CONCEPT - ARTERIAL ROADS TREE STRATEGY 3 LANDSCAPE CONCEPT PLAN 4 HILLS ZONE 5 VALLEY ZONE 8 RURAL/COASTAL ZONE 13 DRAINAGE LINE/CREEK VEGETATION 15 ALTERNATE TREE SPECIES 16 GATEWAYS/NODAL POINTS 17 TYPICAL PLANTING SECTIONS 18 POTENTIAL CENTRE MEDIAN PLANTING 21 GATEWAYS 22 IMPLEMENTATION AND FUNDING FOR ARTERIAL ROADS STRATEGY 23 ACKNOWLEDGEMENTS 24 Arterial Roads Tree Strategy GUIDING OBJECTIVES PRINCIPLES FOR DESIGN INTRODUCTION Consultation with members of the Project Team identified a • Establish an overall recognizable character and identity for number of guiding objectives that would infl uence and provide the City; In May 1998, Land Design Partnership Pty Ltd (formerly a rationale for developing the design objectives. A summary Chris Dance Land Design Pty. Ltd) was commissioned by of these are: • Defi ne and enhance areas that have an individual landscape the City of Casey to formulate a Tree Planting Strategy for or vegetation character; the arterial road network. • Utilize the study as a basis for creating a unifi ed landscape character for the City of Casey; • Emphasize ‘gateways’ and entry points into Casey; The Strategy aims to create a recognisable, unifying landscape treatment along the road system, developing a • Develop a cohesive, unifi ed framework of tree planting along • Utilize large road intersections and roundabouts to achieve strong, visual image that is characteristic of the City whilst the road corridor as a common linking element; important traffi c management goals and to defi ne focal points refl ecting the patterns of the surrounding landscape.
    [Show full text]