CALL for BIDS 00120-1 CALL for BIDS Sealed Bids Will Be Received by the Spokane Airport Board (Owner) at the Spokane Internation

Total Page:16

File Type:pdf, Size:1020Kb

CALL for BIDS 00120-1 CALL for BIDS Sealed Bids Will Be Received by the Spokane Airport Board (Owner) at the Spokane Internation CALL FOR BIDS Sealed bids will be received by the Spokane Airport Board (Owner) at the Spokane International Airport, W. 9000 Airport Drive, Suite 204, Spokane, Washington 99224, until 10:00 a.m., Friday May 29, 2015 for: FELTS FIELD AIRPORT, SPOKANE, WASHINGTON SIA PROJECT #14-07 REHABILITATE TAXIWAYS B, D & E AND TAXILANES AIP 3-53-0073-029/030 It shall be the duty of each Bidder to submit his/her bid on or before the hour and date specified. Any bids received after the time for opening will not be considered. Bids will be publicly opened and read aloud at the designated location and time. A MANDATORY Pre-Bid Conference will be held in the Felts Field Maintenance Building at 11:00 a.m., Friday, May 15, 2015. Enter at Security Gate #1, located on the East 6800 block of Rutter Avenue and follow the signs to the Maintenance Building. Major subcontractors are encouraged to attend; however, it is mandatory for Prime Contractors only. Any bid submitted by a firm, which did not attend this pre-bid conference, will be rejected. The work generally consists of rehabilitation of the full length of Taxiway B, a portion of Taxiway D, Taxiway E and twelve Taxilanes on the airport. Rehabilitation of Taxiway B will include construction of a new holding bay and connecting Taxiway E between Taxiway B and the Runway 4R Threshold. Work items associated with the project include removal of existing asphalt, excavation/embankment, installation of subsurface edge drains, subbase course, base course, asphalt, gravel shoulders, pavement markings, guidance signs, edge lights, stormwater structures, domestic water and sewer, drainage swales, topsoil and seeding. Contract Documents are available at http://siaplanroom.com/public.php. Documents can be viewed and/or purchased online. The Planholders List is also available at this website. All addenda will be issued through email. Bidders must order online to be placed on the Planholders List and to receive automatic e-mail notification of addenda. Abadan Reprographics & Imaging, 603 East Second Avenue, Spokane, WA 99202 (Phone: 509-747- 2964) should be contacted with website and plan ordering questions. Additional project information, bid results (after bid opening), as well as information about other Airport projects are available from the Planning and Engineering Office of Spokane Airports Monday through Friday between 8:00 am and 4:30 pm or by calling Lisa L. Corcoran, Project Manager at (509) 455- 6406 or email at [email protected]. A contract according to the General Conditions, Supplementary Conditions and Addendums (if applicable) shall be signed prior to work commencing. Each bid must be accompanied by a cashier’s check or surety bid bond, in an amount of not less than five percent (5%) of the total bid for all bid schedules (including sales tax). A performance bond, payment bond, and liability insurance in accordance with the contract documents will be required for the Contract. The Spokane Airport Board reserves the right to reject any and all bids, to waive any informality, to accept any alternate bids, and to make such award that it deems to be in the best interest of the Airport pursuant to the terms of the Instructions to Bidders and General Conditions. The Contract will be awarded to the lowest responsive and responsible bidder as stated in the Bid CALL FOR BIDS 00120-1 H:\2014 PROJECTS\14-07 FF TAXIWAYS & TAXILANES REHAB\C. CONSTRUCTION\C.1 PRE CONSTRUCTION\C.1.C ADVERTISEMENT & PLAN HOLDERS\REBID\00120 CALL FOR BIDS (REBID).DOCX Proposal. All bidders are cautioned to be aware of the requirement to have their bids considered responsive. Spokane International Airport is an Equal Opportunity Employer and encourages Women, Minority, Disadvantage Business Enterprises and small businesses to participate in the competitive bidding process. Spokane International Airport/Felts Field Airport, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Prospective Contractors are notified that the work under this Contract is funded in part by a grant from the Federal Aviation Administration and as such this solicitation and any resulting contract are subject to the requirements of Buy America Preference; Foreign Trade Restriction; Davis Bacon Act; Affirmative Action; Debarment and Suspension; and Drug Free Workplace Act of 1988. Published in Spokesman Review from Friday, May 8, 2015 through Friday, May 15, 2015. Posted on-line on the Spokane International Airport Website at http://business.spokaneairports.net/bids/ CALL FOR BIDS 00120-2 H:\2014 PROJECTS\14-07 FF TAXIWAYS & TAXILANES REHAB\C. CONSTRUCTION\C.1 PRE CONSTRUCTION\C.1.C ADVERTISEMENT & PLAN HOLDERS\REBID\00120 CALL FOR BIDS (REBID).DOCX .
Recommended publications
  • Airport Diagram Airport Diagram
    12096 EVERETT/ SNOHOMISH COUNTY (PAINE FIELD) (PAE) AIRPORT DIAGRAM AL-142 (FAA) EVERETT, WASHINGTON ATIS 128.65 BOEING PAINE TOWER PLANT 120.2 256.7 (East of RWY 16L-34R) 132.95 256.7 (West of RWY 16R-34L) GND CON 121.8 339.8 200 X CLNC DEL 220 126.75 AA ELEV 16R 563 A1 K1 162.0^ ILS ILS HOLD HOLD A 47^55'N BOEING 9010 X 150 A2 RAMP RWY 11-29 S-30 RWY 16L-34R S-12.5 A3 RWY 16R-34L NW-1, 18 OCT 2012 to 15 NOV S-100, D-200, 2S-175 TWR CUSTOMS 2D-350, 2D/2D2-830 11 A4 787 B .A OUTER ELEV RAMP VAR 17.1^ E 561 NORTH 117.0^ C RAMP INNER C1 JANUARY 2010 D1 RAMP TERMINAL ELEV A5 16L D-3 ANNUAL RATE OF CHANGE D-3 4514 X 75 C 597 0.2^ W X G1 F1 A6 X D2 CENTRAL X G2 F2 HS 1 RAMP X D3 162.5^ X H D 3000 X 75 A X X X D40.9% UP G3 EAST WEST X X RAMP RAMP W3 X NW-1, 18 OCT 2012 to 15 NOV FIRE F X STATION 297.0^ D5 FIELD K7 A7 E G4 ELEV F4 ELEV A8 SOUTH 29 600 606 RAMP G 342.5^ 47^54'N 342.0^ G5 A G6 HS 2 F6 A9 A 34R ELEV ELEV 578 596 A10 34L 400 X 220 HS 3 CAUTION: BE ALERT TO RUNWAY CROSSING CLEARANCES. READBACK OF ALL RUNWAY HOLDING INSTRUCTIONS IS REQUIRED.
    [Show full text]
  • 1956-1958 Adjutant General's Report
    . HEADQUA.;.i:t'IERS MILITARY DEPARTMENT STATE OF WASHINGTON Office of The Adjutant General ·Camp Murray, Tacoma 33, Washington December 20, 1958 -· The Honorable Albert D. Rosellini Governor of the State of Washington Executive Department Olympia, Washington Dear Governor Rosellini: In conformity with the provisions of Title 3S, Chap­ ter 38.12, Section 38,12.020, Revised Code of Washington, the biennial report of The Adjutant General of Washington is submitted herewith for the period November 1, 1956, to October 31, 1958, inclusive. · The attached report is made up of individual reports prepared by each section of The Adjutant General's Office and the U. s. Property and Fiscal Officer, and presents a comprehensive coverage of the operations and condition of the Military Department and the Washington National Guard during the reporting period. Respectfully submitted, ~\;)f i-Y\ ,Q~~\_) GEOR~ M. HASKETT Major General, Wash ARNG The Adjutant General .-~ TABLE OF CON'IBNTS PAGES THE NATIONAL GUARD: Federal and State Missions • • • • • • • • • • • • • • • • • 1 Commander-in-Chief, Washington National Guard • • • • • • • l The Adjutant General • • • • • • • • • • • • • • • • • • • • 2 FULL-TIME PERSONNEL • • • • • • • • • • • • • • • • • • • • • •• 2 FEDERA.L ADVISORS • • • • • • • • • • • • • • • • • • • • • • • • 3 REPORT OF OPERATIONS AND TRAINING SECTION: Organizational Changes • • • • • • • • • • • • • • • • • • • 4 An.~ual Field Training • • • • • • • • • • • • • • • • • • • 4-5 Resident Instruction • • • • • • • • • • • • • • • • •
    [Show full text]
  • Pierce County Public Works and Utilities Brian J
    Pierce County Public Works and Utilities Brian J. Ziegler, P.E. 2702 South 42nd Street, Suite 201 Director Tacoma, Washington 98409-7322 [email protected] piercecountywa.org/pwu TO: Dan Roach, Chair Pierce County Council FROM: Deb Wallace, Airport and Ferry Administrator DATE: October 28, 2014 SUBJECT: Airport Security The purpose of this briefing paper is to provide an update to Council on the status of security upgrades at Pierce County's airports. Current Situation: The Pierce County Airport and Ferry division is in the process of upgrading gate access, fencing, and security lighting at both airports. In 2015 the division will implement an Airport Watch program to increase the safety and security at each facility. The improvements are being made due to incidents which have occurred at the airports over the last several years and at the request of airport tenants. Currently both airports are fenced with restricted access gates to enhance security, although there are gaps in the fencing allowing unauthorized pedestrian entry. These gaps will be addressed in early 2015. An electronic gate is being added to the north gate at Tacoma Narrows Airport (TIW) and the south gate is being outfitted with a mechanism to allow its use by those who are hearing impaired. Once that improvement is completed, 24 hour security will be implemented at TIW. Thun Field currently operates with 24 hour gate security. Prior to implementation, the airport commissions at each airport discussed airport security measures during the preceding year and staff coordinated the implementation of the security measures with airport tenants.
    [Show full text]
  • National Transportation Safety Board Aviation Accident Final Report
    National Transportation Safety Board Aviation Accident Final Report Location: Spokane, WA Accident Number: SEA04FA023 Date & Time: 11/29/2003, 0801 PST Registration: N439AF Aircraft: Fairchild Swearingen SA227-AT Aircraft Damage: Destroyed Defining Event: Injuries: 1 Fatal Flight Conducted Under: Part 135: Air Taxi & Commuter - Non-scheduled Analysis The pilot, who had more than 3,340 hours of pilot-in-command time in the make/model of the accident aircraft, and was very familiar with the destination airport and its ILS approach procedure, departed on a cargo flight in the SA227 turboprop aircraft. The aircraft was dispatched with the primary (NAV 1) ILS receiver having been deferred (out of service) due to unreliable performance the evening before the accident, thus leaving the aircraft with the secondary (NAV 2) ILS receiver for ILS use. The pilot arrived in the destination terminal area and was given vectors to intercept the ILS localizer, and radar data showed the aircraft intercepting and tracking the localizer accurately throughout the approach. Mode C altitude readouts showed the aircraft approaching from below the glideslope at the required intercept altitude of 4,100 feet, passing through and above the glideslope and then initiating a relatively constant descent, the angle of which exceeded the glideslope angle of -3.5 degrees. Weather at the destination airport was 400 foot overcast and the decision height for the ILS/DME runway 21R approach was 270 feet. The aircraft passed through the tops of trees in level flight about 530 feet above the airport elevation and slightly under 3 nautical miles from the runway threshold.
    [Show full text]
  • Washington National Guard Pamphlet
    WASH ARNG PAM 870-1-7 WASH ANG PAM 210-1-7 WASHINGTON NATIONAL GUARD PAMPHLET THE OFFICIAL HISTORY OF THE WASHINGTON NATIONAL GUARD VOLUME 7 WASHINGTON NATIONAL GUARD IN POST WORLD WAR II HEADQUARTERS MILITARY DEPARTMENT STATE OF WASHINGTON OFFICE OF THE ADJUTANT GENERAL CAMP MURRAY, TACOMA, WASHINGTON 98430 - i - THIS VOLUME IS A TRUE COPY THE ORIGINAL DOCUMENT ROSTERS HEREIN HAVE BEEN REVISED BUT ONLY TO PUT EACH UNIT, IF POSSIBLE, WHOLLY ON A SINGLE PAGE AND TO ALPHABETIZE THE PERSONNEL THEREIN DIGITIZED VERSION CREATED BY WASHINGTON NATIONAL GUARD STATE HISTORICAL SOCIETY - ii - INTRODUCTION TO VOLUME 7, HISTORY OF THE WASHINGTON NATIONAL GUARD BY MAJOR GENERAL HOWARD SAMUEL McGEE, THE ADJUTANT GENERAL Volume 7 of the History of the Washington National Guard covers the Washington National Guard in the Post World War II period, which includes the conflict in Korea. This conflict has been categorized as a "police action", not a war, therefore little has been published by the Chief of Military History, Department of the Army or by individuals. However, the material available to our historian is believed to be of such importance as to justify its publication in this volume of our official history. While Washington National Guard units did not actually serve in Korea during this "police action", our Air National Guard and certain artillery units were inducted into service to replace like regular air and army units withdrawn for service in Korea. However, many Washington men participated in the action as did the 2nd and 3rd Infantry Divisions, both of which had been stationed at Fort Lewis and other Washington military installations.
    [Show full text]
  • Spokane Airports
    SPOKANE AIRPORT BOARD Spokane, Washington ii i ii i COMPREHENSIVE ANNUAL FINANCIAL STATEMENTS FOR THE YEARS ENDING DECEMBER 31, 2015 & 2014 Prepared By Dave Armstrong, CPA, Finance Director Charlie Pflieger, CPA, Accounting Manager Sherrie Rydbom, Accounting Analyst With the assistance of the Finance Department Spokane, Washington ii TABLE OF CONTENTS INTRODUCTORY SECTION Transmittal Letter ................................................................................................................................. 1-11 GFOA Certificate of Achievement ........................................................................................................... 12 Spokane Airport Board ............................................................................................................................ 13 Organizational Chart ............................................................................................................................... 14 FINANCIAL SECTION Independent Auditor’s Report .................................................................................................................. 15-17 Management Discussion and Analysis ................................................................................................... 18-27 Statement of Net Position .................................................................................................................... 28-29 Statement of Revenues, Expenses, and Changes in Net Position ..................................................... 30-31 Statements
    [Show full text]
  • KSFF Felts Field Spokane Airport
    KSFF Felts Field Spokane Airport USER GUIDE SEPTEMBER 2016 Contents Thank you! .................................................................................................................................................... 3 Product requirements ................................................................................................................................ 4 What will you miss out on if you don’t have Orbx FTX Northern Rockies installed? .................. 4 Quick Installation Guide ............................................................................................................................. 5 Scenery Coverage Area ............................................................................................................................... 6 Airport Information and Charts ................................................................................................................. 7 Additional Scenery Features .................................................................................................................... 10 The KSFF Control Panel............................................................................................................................. 11 Quick Reference Simulator Settings ....................................................................................................... 11 Product Technical Support ....................................................................................................................... 12 Please do NOT email support requests
    [Show full text]
  • Spokane Army Air Depot
    History History >> Visiting our storied path Due to the economic depression imity to McChord Field and the though. Most noticeably opposed The Women Army Air Corps (WAAC) arrived at the Depot May 14, 1943. gripping the nation and Spokane in Boeing Plant, which would make were the farmers who lived and the 1930s, the Spokane Chamber of repairs and supplies for military made their livelihood on White Commerce felt they needed to find airplanes more accessible, Spokane Bluff Prairie, the land that was the a way to boost the local economy, was attractive because it was inland, proposed site for the depot. Eight which radiated with despair. They which made it less susceptible to air families took legal action to stop figured one of the best ways to attacks. Northern Pacific Railroad the sale of their land, but “opposing pump enthusiasm and dollars into stepped in, providing an extra ben- the government during wartime was Spokane Army the local economy was to attract a efit that made Spokane more desir- not looked upon favorably,” noted military installation to the area. able. They worked with Spokane city the authors of Sentinel of the Pacific A congressional party set out officials to create priority-shipping Northwest. Air Depot to tour Washington in 1935, in schedules and guaranteed equipment In the end, their legal action was an effort to find a location in the and line construction, ensuring the no match for the voices of the city Pacific Northwest in which to estab- depot would be able to quickly and leadership and of Congressman lish an Army Air Corps supply and efficiently move supplies to service Leavy.
    [Show full text]
  • Yakima Airport Beta Test Site – News Release
    City of Yakima News Release Subject: Yakima Airport Selected as Test Site Contact: Yakima Airport Director Rob Peterson – 575-6149 Communications & Public Affairs Director Randy Beehler – 901-1142 Release Date: Thursday, December 3rd , 2020 Yakima Airport Selected as Electric Aircraft Test Site Yakima Air Terminal-McAllister Field (YKM) is one of six airports selected to be an electric aircraft beta test site. The selection was announced last month in a feasibility study published by the Washington State Department of Transportation (WSDOT) Aviation Division. The state legislature tasked the WSDOT Aviation Division with forming the Electric Aircraft Working Group in 2018 to explore electric aircraft service across the state. “Yakima’s selection as one of the first electric aircraft test locations is a pivotal moment in aviation history,” said YKM Director Rob Peterson. “Our low energy rates and the amount of sunshine we receive are vital, as these aircraft will require a battery-powered system. Our location can take advantage of solar power to charge them.” The potential implementation and growth of commercial electric aircraft could be a boon for Yakima’s economy, Peterson said. “If airline and cargo operations can lower operating costs with electric aviation it could open YKM to service markets in various areas of the Pacific Northwest,” Peterson said. “Ultimately, if airlines or carrier operators do begin electric aircraft passenger service we’ll be five steps ahead.” Additionally, the potential for expanded air service could have a positive impact on employment. More workers would be needed in the aerospace sector, as well as an increase in jobs needed to support electric aircraft, Peterson said.
    [Show full text]
  • Airport Classes 2018.Xlsx
    Assoc City Airport Name WAMA Category ID Anacortes Anacortes Community CS 74S Anacortes Skyline SPB General Use 21H Anatone Rogersburg State General Use D69 Arlington Arlington Municipal Regional AWO Auburn Auburn Municipal Community S50 Bandera Bandera State General Use 4W0 Battle Ground Cedars North Airpark General Use W58 Battle Ground Goheen Field General Use W52 Bellingham Bellingham International Major 3 BLI Bellingham Floathaven SPB General Use 0W7 Bremerton Bremerton National Regional PWT Brewster Anderson Field Community S97 Burlington Skagit Regional Regional BVS Camas Grove Field Community 1W1 Cashmere Cashmere Dryden Community 8S2 Chehalis Chehalis‐Centralia Regional CLS Chelan Lake Chelan Community S10 Chewelah Sand Canyon Local 1S9 Clayton Cross Winds General Use C72 Cle Elum DeVere Field Local 2W1 Cle Elum Cle Elum Municipal Local S93 Colfax Port of Whitman Business Air Center Community S94 Colfax Lower Granite State General Use 00W College Place Martin Field Community S95 Colville Colville Municipal Community 63S Concrete Mears Field Community 3W5 Copalis Beach Copalis Beach State General Use S16 Dalles, OR Columbia Gorge Regional/The Dalles Municip Community DLS Darrington Darrington Municipal Local 1S2 Davenport Davenport Municipal Community 68S Deer Park Deer Park Municipal Regional DEW East Wenatchee Pangborn Memorial Major 5 EAT Easton Easton State General Use ESW Eastsound Orcas Island Community CS ORS Eatonville Swanson Field Local 2W3 Electric City Grand Coulee Dam Local 3W7 Ellensburg Bowers Field Regional ELN
    [Show full text]
  • Easton State Airport Airport Layout Plan Report
    EASTON STATE AIRPORT AIRPORT LAYOUT PLAN REPORT FINAL REPORT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AVIATION DIVISION WSDOT AVIATION | EASTON ALP Easton State Airport Airport Layout Plan Report Prepared for Washington State Department of Transportation Aviation Division Roger Millar, AICP K. Metcalf Marshall Elizer Secretary Deputy Secretary Assistant Secretary for Multi-Modal Development and Delivery (M2D2) Community Development & Economic Development David Fleckenstein Director of Aviation G. Paul Wolf State Airports Manager Final Print May 2018 (re-issued 2015 Report) Prepared by Century West Engineering 421 North Pearl Street, Suite 206 Ellensburg, Washington 98926 (509) 933-2477 www.centurywest.com MAY 2018 i WSDOT AVIATION | EASTON ALP Washington State Department of Transportation Aviation Division Motto Innovative leadership in state aeronautics Mission Statement WSDOT Aviation fosters the development of aeronautics and the state’s aviation system to support sustainable communities and statewide economic vitality. Vision To consistently provide innovative leadership in state aeronautics. Americans with Disabilities Act (ADA) Information Materials can be provided in alternative formats by calling the ADA Compliance Manager at 360-705-7097. Persons who are deaf or hard of hearing may contact that number via the Washington Relay Service at 7-1-1. Title VI Notice to the Public It is Washington State Department of Transportation (WSDOT) policy to ensure no person shall, on the grounds of race, color, national origin, or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities.
    [Show full text]
  • SPOKANE AIRPORT BOARD, ) ) Petitioner, ) ) V
    Case: 13-71133 04/04/2013 ID: 8576697 DktEntry: 9-1 Page: 1 of 8 (1 of 42) UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT ____________________________________ ) SPOKANE AIRPORT BOARD, ) ) Petitioner, ) ) v. ) ) MICHAEL P. HUERTA, ) No. 13-71172 ADMINISTRATOR, ) (consolidated with Nos. ) 13-71133, 13-71177, 13-71178, AND ) 13-71179, 13-71181) ) FEDERAL AVIATION ) ADMINISTRATION, ) ) Respondents. ) ____________________________________) MOTION FOR LEAVE TO INTERVENE OF THE CITY OF BATTLE CREEK Pursuant to Rule 15(d) of the Federal Rules of Appellate Procedure, the City of Battle Creek, Michigan (“Battle Creek”) respectfully requests leave to intervene in the above-captioned Petition for Review of the decision of Respondent Federal Aviation Administration’s (“FAA”) to close air traffic control towers currently funded by the federal contract tower program. Petitioner Spokane Airport Board (“Spokane”) filed the Petition for Review in this case in the United States Court of Appeals for the District of Columbia Cir- 1 Case: 13-71133 04/04/2013 ID: 8576697 DktEntry: 9-1 Page: 2 of 8 (2 of 42) cuit on March 25, 2013. By an order of the United States Judicial Panel on Multi- district Litigation, the Petition for Review was transferred to this Court on April 3, 2013, and consolidated with five other petitions challenging the same agency ac- tion. Like Spokane’s Felts Field, Battle Creek’s W.K. Kellogg Airport is also on the list of towers slated for closure, and Battle Creek respectfully seeks leave to in- tervene in support of Petitioner to advance its own interests in overturning the FAA’s unlawful decision.
    [Show full text]