CLEVER GROUND CABLING CONTENTS IMPRINT © Copyright by: TRACTO-TECHNIK GmbH & Co. KG MARCH 2018 57368 Lennestadt ·

Editorial team: Burkhard Rarbach, Thorsten Gödde, Anne Knour, Manuel Pohl, Phillipp Schumacher, Thorsten Schulte Layout: Alexa Wirth 26 Circulation: 4.500 Subject to change. No liability for misprints! 8

FOR YOU IN ACTION 22 HDD SPECIAL APPLICATION ABOUT US GOOD TO KNOW Trenchless drainage for dewatering landslide 4 FIBRE OPTICS FTTX terraces in Mössingen / Germany 44 REPRESENTED WORLDWIDE 57 PRODUCTS Fast Internet installation through protected Asian sales partners’ meeting in Singapore Reduced bending radii for selected biotope with GRUNDODRILL18ACS 26 SEWAGE CONSTRUCTION GRUNDODRILL models Sewer service connections created using the STAFF auger boring method with GRUNDOBORE400 8 GAS DISTRIBUTION NETWORKS 46 New Application Specialist and 58 TRAININGS Sales Managers for TRACTO-TECHNIK UK Gas supplier Comgás relies on Fast trenchless gas service lines with 30 SEWER CONSTRUCTION GRUNDOMAT: Contractor AGI Construction Keyhole technology reaches high levels of productivity Steel pipe ramming ND 2000 under 47 Additional staffing at TRACTO-TECHNIK Zurich's Laubegg tramway terminal loop 59 TRADE FAIRS 48 Managing Director of Australian sister 12 WATER PIPELINE CONSTRUCTION 34 PIPE RENEWAL SEWAGE company Tom Hughes has retired INTERMAT Sheltered waters - Speedy installion of a cast Pipe renewal in a dairy 50 INFORMATION iron drinking water line ND 300 using HDD 60 TRAININGS 38 Third "TRACTO-TECHNIK Group MD Meeting" SYSTEMATIC RECYCLING Tailor-made trainings for customers 15 DISTRICT HEATING Directional drilling over 440 m through rocky and partners New installation of a property service ground using the GRUNDODRILL18ACS 52 TRACTO-TECHNIK UK and SGN win connection for district heating using auger UKSTT Innovation Award for iCore system boring 62 TRADE FAIRS 53 MACHINE HAND-OVER 28Nplus 18 Handover of a GRUNDODRILL to GROUND CABLING / POWER Klever Boor- en Perstechniek BV Paasch connects new Elbe tide gauges underground using GRUNDODRILL15XP 54 CLOSER THE CUSTOMER New sales and aftersales service structure

2 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 3 FOR YOU IN ACTION FIBRE OPTICS FTTX

AT HIGHSPEED INTO THE FUTURE Fast Internet connection through protected biotope

The community of Hohenstein is situated in the cess to the Internet should be less urgent than The path area for the fibre optics highway is made Trenchless line installation in rocky grounds with the centre of the scarcely populated plateau of the in densely populated areas and strong business visible with stakes marked red. GRUNDODRILL18ACS. Central Swabian Alb, at an altitude of 730 - 770 m centres. But the high-perched "backwater" of in the middle of a very nature-orientated lands- Reutlingen is also a high-tech region and boasts PATH ROUTES AND BIOTOPE PROTECTION underground. Thanks to former job-sites, the cape with a rough climate (the "rough Alb"). Ho- medium-sized market leaders who depend upon The number of sections for HDD operations was company Maier Bau was familiar with the hard- henstein in the district of Reutlingen (Germany) rapid Internet access to keep up with the compe- much greater than originally planned. Many years ness of the compact calcareous stones in and geographically belongs to the Swabian Alb and titors. before, the nature conservation authorities of on top of the tableland of the Alb and along the lies within the range of the so-called "knoll alb" the district of Reutlingen had designated forest Alb ridge. For the 1.0 to 1.6 m deep installation which is characterised by shelf formations (large SOLUTIONS FOR INTERNET DEVELOPMENT verges, juniper heaths, chalky rough pastures of the ductwork pipes (for accommodating the former siliceous sponge shelves from the Juras- As a means of creating efficient Internet con- and many region which serve as habitats for fibre optics bundles later on), any rig other than sic), laid bare by weathering. The shelf formations nections, the community Hohenstein became rare plants and animals as biotope protection the GRUNDODRILL18ACS was out of the question; consist of very hard compact limestone of bioge- a member of the broadband supply association areas. In the course of site inspection, some of after all, the trenchless line installation through nic origin, mainly in layers rather close to the soil which is already active in the neighbouring dis- this terrain, natural hedges and forest borders hard rock formations with a compressive surface. Hohenstein therefore lies high up on the trict of Sigmaringen, where important broad- in most parts, created an impression of "waste strength of up to 230 MPa had to be performed central tableland of the Swabian Alb and is very band routes have formerly been built. The link land" and hardly utilisable strips of vegetation. safely and within a short period of time. As men- rocky, due to the compact limestone reef rock. road comes from the south in this case and en- But of all the places, these were just the regi- tioned before, the compact limestone seaming compasses long stretches of way through com- ons harbouring many meanwhile rare animals ridge and tableland of the Swabian Alb stems INTERNET FOR A HUGE TABLELAND? munal territory, especially since all sub-munici- and plants. On no account was it permitted to from former reefs in the upper Jurassic sea. In a region with only 60 inhabitants per square ki- palities are to receive a FTTC upgrade, too. The disturb these biotope spaces by open cut me- These biogenic reef limestones were covered lometre, with a great number of natural spaces company STARK Energies GmbH was assigned thods, therefore only trenchless line installation up by other subsequently following geological and many recreational areas away from the large with the upgrading project of the route network. by means of HDD was in the running. Long bio- successions, pressed together and compacted transport axes - in such surroundings, rapid ac- This company, specialised in long line installa- tope zones exist between the sub-municipalities in process, thus taking on the shape of their me- tion jobs, possesses high-performance Oberstetten and Ödenwaldstetten and in other anwhile characteristic massive formation. Due cable ploughs and conventional sections; they allow fibre optics installations by to the high roof pressure of younger formations, underground engineering ma- means of HDD only. the layers of which have been stripped again by chinery. Overall planning and weathering influences, these reef limestones project control of the measu- PENETRATING COMPACT LIMESTONE received their enormous compressive strength. The path for the fibre optics bundles is often concealed re was carried out by the Aß- WITH ROCK BORING TECHNOLOGY Reef limestone formations are made up by milli- beneath the verge between the country road and the falg Gaspard Partner Engi- The company Maier Bau from Dettighofen was ards of sponges and other former riff creatures woodland edge. neering Company. All those commissioned with the HDD sections totalling from the ocean; they have merged into hard to fields of work which cannot almost 1 km in length through these valuable very hard, rarely recognisable sludge petrifica- be performed with the cable areas of unspoiled nature. Thanks to tiny trial tion. Reefs show an inhomogeneous structure plough or the usual machi- pits along the protected landscape fringes, the down to the present day, therefore this is also nery were sourced out to the massive rock was determined at only very the case in petrified reefs. Compact limestone is specialised companies. The few decimetres in depth. In part, they consis- inhomogeneous in terms and has an internally HDD technology was catego- ted of square-edged rocky boulders and slabs, irregular structure. When boring through this rically planned for complicated rather close to the weathered surface, someti- kind of formation, you cannot expect an evenly route sections. mes small rocky horns even rose right out of the structured solid rock; you have to face rock with

4 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 5 FOR YOU IN ACTION FIBRE OPTICS FTTX

Picture left: Typical drilling section running parallel with the country lane. A size 90 ductwork pipe for the reception of the fibreglass bundle is already installed inside the rock at the front section. Picture left: Locating the bore head along an organically valuable verge of Picture top, right: Section for section, the line is the woods installed without trenches in the rocky underground Picture top: The excavation of the launch pit for a HDD operation section of an area of outstanding natural beauty. unearths the typical compact limestone formation. Picture bottom, right: The fibre optics line Picture right: The bore head chosen for drilling through the compact development has already arrived at several parts of limestone was a Stratacut drill bit with PCD tipping. Hohenstein.

internal boundary layers and gross structural for steering and protecting the bore) was able to walled and very regular bore holes. In this way, tiple service connections for private households discontinuity instead. This hard rock demands a come up to the desired daily output in a calculab- the final diameter was almost achieved with will be installed in the coming months. drill rig with the highest capacity and a bore head le way. Twin tube rod drill rigs have an enormous the pilot bore alone. The following expansion fully up to the job of cutting through if you want advantage over conventional rigs in all soil con- course in opposite direction of the bore hole had POSITIVE EFFECT FOR THE RESIDENTS AND to achieve a good daily output. Drilling section ditions, even in the most extreme; they are ap- the same diameter, allowing the product pipe, a THE NATURAL HERITAGE lengths of 140 m were defined as the daily target. plicable with a variety of different drill rods and protection pipe for subsequent accommodation The residents of the central tableland of the Swa- bore head assemblies. They can drill through of the capillary fibre optics tubes, to be attached bian Alb enjoy the abundance of nature in their CONVINCING PERFORMANCE WITH THE hard rock formations without needing great dril- directly behind the expander head and pulled in surroundings and are well aware of its impact on ACS DRILLING TECHNOLOGY ling fluid amounts. Additionally, the position of at the same time. Pulling in the pipe was perfor- their quality of life. The former great locational All in all, four bore sections, each 140 m in the locating transmitter right at the front of the med in less time than the pilot bore had taken. disadvantage will soon be compensated when the length, 2 sections at 120 m each, one 70 m long bore head lends high locating precision. The time saved in process was used to transfer rapid Internet connection becomes available to section and one further section at so far not pre- and reposition the drill rig, ready for the work them; after all, they will soon be linked with the cisely defined length were to be bored through In order to master the hard limestone, a Stra- phase on the following day. The daily output rest of the world at record speed. The occupants the compact limestone between Oberstetten and tacut full section drill bit with PCD tipping was was achieved according to plan and without any of the region observed attentively and with utter Ödenwaldstetten. The calculation of the company chosen for the rock-breaker bore head instead problems. The complete rock boring stretch of contentment, how the boundary layers of the bio- comprised one pilot bore per work day and one of a roller bit. The polycrystalline diamond pla- almost 1000 m in length was managed in a little tope zones and the regions in the state of lands- expanding run including pipe pulling in half a day tes (PCD) of the drill bit are very expensive, but more than a fortnight. cape protection had been treated very gently and or a whole work day at the utmost. In order to they also exhibit an extremely strong cutting even contact-free wherever possible, simply by comply with this time allocation in the descri- performance and longevity, as long as the ma- The cross-country routes to be worked with the the application of underground line installation bed hard and inhomogeneous compact limes- chine is operated skilfully. Within the inhomoge- cable plough were also installed at a good pace with the directional horizontal drilling technique. tone, a very powerful drill rig had to be put into neous compact limestone, a very good and uni- while the fibre optics bundles for the sub-mu- The people living in the region of Hohenstein and action, and a very capable rock boring head to form decomposition of the rock formation was nicipalities of Hohenstein were built in beneath its surroundings are rather aware of the rocky go with it. As a high-performance HDD rig, the achieved; fissures and karstic formation as well the pavements at the same time. The completion underground beneath their homes, therefore they GRUNDODRILL18ACS was the last resort for all as dolomitic sections of rock were overcome of the whole fibre optics measure is intended for were full of praise for the building contractor in people concerned. Only such an All Condition very well. The pilot bore with the Stratacut drill autumn 2017. In previous parallel operations, general and the performing drilling company with BACK TO System (ACS) drill rig with its twin tube rods (in- bit achieved a bore hole diameter of 165 mm. The the property service connections for industrial its applied trenchless and totally eco-friendly CONTENTS ternal rods for the drill bit drive and outer rods choice of this cutter bit type resulted in smooth- buildings had already been carried out; the mul- equipment technology in particular. ◊

6 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 7 FOR YOU IN ACTION GAS DISTRIBUTION NETWORKS

GRUNDOMAT STEPS AGI Construction crews are using 75 and 85 mm diameter GRUNDOMAT moles for a significant gas service line ON THE GAS! replacement programme in Rhode Island.

Fast trenchless gas service lines with GRUNDOMAT: Contractor AGI Construction reaches high levels of productivity

Contractor AGI Construction, Smithfield from rience and oversees all field operations for the and crews that just do tie-ins. Basical- Rhode Island is one of the premier underground company. Minnis began his career in the indus- ly it’s a moving assembly line. We see utility contractors in the northeastern United try as a second-generation pipeline welder and major efficiencies with that approach.” States. For over 25 years the construction com- originally started as a welder for AGI. That was pany has provided a comprehensive range of almost 20 years ago. Today, Minnis manages a With a wide range of challenging soil contracting services for natural gas, telecom- work force of 25 crews and 195 employees. As conditions to contend with, along with munications, and electric underground utility in- part of AGI’s leadership group, he has been a established, older neighborhoods, stallations. With almost 200 skilled employees, major contributor to the significant innovations Minnis said his crews are utilizing soil the Rhode Island-based company’s service area that the company has developed, including the displacement hammers to facilitate a includes all of New England. proprietary approach the company takes toward significant service line replacement pipeline installation. programme for a local gas utility pro- AGI Vice President of Operations, Brian Minnis vider. has over 35 years of natural gas pipeline expe- Minnis said, “The approach to project work in pipe- line installation operations has improved efficiency Minnis explained, “We’re currently re- and productivity in the field. We have moved to placing a large number of old cast iron a very specialized approach. For exam- mains and bare steel gas service lines. ple, we have crews that specialize Residents are very particular on how in main installation. Then we you take care of their property. The soil have crews that focus so- displacement hammers allow us to li- lely on services mit the amount of disruption for the homeowner. We use them as much as possible. I’d an impressive service line replacement pro- say ninety percent of our service line work is done gramme at AGI. It’s really a model of efficiency. with ‘moles’.” They get a lot of productivity from their crews as well as the soil displacement hammers.” While soil displacement hammers range in size from 45 mm diameter up to 180 mm in diameter, Using a staple of trenchless technology com- AGI uses primarily 75 and 85 mm diameter tools. bined with the company’s production-based pro- Throughout Rhode Island, crews are using GRUN- ject approach has helped in the establishment of DOMATs from TT Technologies, Aurora, IL., for ser- a successful gas service line replacement pro- vice line installations. gramme.

TT Technologies soil displacement hammer spe- VERSATILE SOIL DISPLACEMENT HAMMERS cialist Ric Micelotta said, “Brian has developed Soil displacement hammers are known for

8 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 9 FOR YOU IN ACTION GAS DISTRIBUTION NETWORKS

Picture on the left: After completing the bore, crews install the new HDPE by attaching versatility. According to Micelotta, several tech- conditions. Micelotta said, “The chisel-head as- it to the front of the soil dispalcement hammer and reversing the tool through the niques can be used with soil dispalcement ham- sembly is the key to accuracy. The assembly is borehole, pulling in the new service simultaneously. mers to install services. He said, “Soil displace- spring-loaded and pushes forward from the ca- ment hammers offer many options for installing sing creating a pilot bore for the tool to follow. Picture on the right: AGI Construction is replacing approximately 3,000 gas service the actual product pipe. That’s one of the reasons The reciprocating action and stepped-cone de- lines annually, with 90 percent of the service line installation work being completed with they are so effective in service line installation si- sign of the tool head allows it to overcome diffi- soil displacement hammers. tuations. For pulling PVC or ridged plastic pipe directly behind the hammer, a spe- cially designed pipe-pulling tailpiece is available. Sever- al other tailpieces are also available for pulling PE and with soil displacement steel pipe. hammers. Launch and exit pits average in size 1,5 m “In certain situations, after long, 1,2 m wide and 1,2 m the bore is complete, the deep. Crews launch the soil tool is removed from the pit. dispalcement hammers by Then the pipe is attached hand with a smart sighting to the air hose and pulled mast. into place when the hose is pulled out. Because of the Near side service installa- poor, dry soil conditions in tions range between 10 and the area they are working 15 m in length while long in now, AGI crews are atta- side installations are typi- ching the new service line cally around 20 m. Minnis and a tracer wire to the estimates that boring rates front of the tool, and ba- average approximately 30 cking the tool out through cm per minute depending the bore hole, pulling in the on soil conditions. Once new service simultaneously crews have completed the in severse mode. That me- installation, the new ser- thod can be accomplished vice is tied into the main in several ways including using mechanical or elec- a pulling eye adapter that tro-fusion fittings. slips over the tip of the tool head and is secured by roll pins.” cult soils and obstructions without being pushed ding on service requirements. Our crews are Micelotta said, “With all the people they have off course.” typically able to replace three services per day. performing service line installations, they’re ON THE JOB And home-owners are only taken off for a short running Grundomats all day long. Basic tool In Rhode Island, AGI is getting significant pro- Minnis has 12 four-person crews working on time, usually put back in service within 2 or 3 up-keep and maintenance is performed at ductivity from its GRUNDOMAT crews, replacing service line replacement throughout the state, hours.” their shop, but crews also service them when approximately 3,000 gas service lines annually. dividing tasks between pit preparations, in- needed in the field. The tools are very easy to Soil conditions vary from sandy in one part of the stalling the service and tie in. He said, “Most Often, the service line replacements are taking maintain. The programme that Brian has es- state to rocky gravel soils in the other. of the installations we’re doing are for replace- place in well-established neighbourhoods, in tablished at AGI for gas service installations is ment as opposed to new service. We’re instal- tight working conditions, with landscaping, really something. Their crews are well trained BACK TO The design of the GRUNDOMAT has a lot to do ling 12,5 mm, 25 mm and 50 mm High Density driveways and sidewalks to avoid. The setting and extremely efficient. They really know what CONTENTS with its accuracy and overcoming difficult soil Poly-ethylene (HDPE) gas service lines, depen- is well suited for trenchless horizontal boring they’re doing. Definitely top quality.” ◊

10 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 11 FOR YOU IN ACTION WATER PIPELINE CONSTRUCTION

BRING ON THE WATER! Sheltered waters - Speedy installation of a cast iron drinking water pipe ND 300 using HDD

The town of Barth lies in the north-east of Ger- Ultimately, it was the growing fear that the pipe The initial apprehension proved to be justified damaged section using the HDD method. The many and attracts many holidaymakers from might burst which forced the water and sewa- and a serious problem was found after the loca- suggestion was accepted as the optimal solution all over Germany and Europe. Barth lies on the ge authority, Boddenland GmbH, to act. Howe- tion of damage. The pumps that had already been to the problem. southern shore of the "Barther Bodden" (Barth ver, conventional means of repair proved to be installed on site to lower the groundwater level Lagoon). With its numerous tourist attractions problematic from both technological and envi- were by no means powerful enough to produce Immediately after being commissioned, TIAS and its close proximity to the Baltic resort of ronmental aspects, since near-surface ground- the force required to down it sufficiently. Repai- Tiesler contacted its long-term business part- Zingst, it has become an important area for the water levels and the swamp-like soil conditions ring the damaged area under these circumstan- ner, Beermann Bohrtechnik GmbH. Both com- federal state of Mecklenburg-Western Pome- in some places would have made the building ces was out of the question. This confronted the panies have worked together for many years in rania. project very difficult – especially because the responsible decision-makers with enormous an atmosphere of mutual trust. They can look existing drinking water pipe line in an unspoilt problems because the drinking water pipe line back on a successful collaboration covering Shortly before the beginning of the summer Flora-Fauna-Habitat showed signs of damage. was also the main water supply line for the Baltic more than 20 kilometres of drilled supply pipe season in 2017, the grey cast iron trans- resort of Zingst. But a reliable water supply was lines, mainly made of cast iron, using the HDD port pipe line built in 1932 was damaged yet Knowing about their outstanding experience in vital, especially on account of the expected influx method. This company is reputed to be a speci- again. Damage to this pipe line was a fre- this field of work, the utility company turned to of visitors in the holiday season. alist in handling difficult projects with the HDD quent occurrence as environmental influen- the TIAS Tiesler GmbH for help. The regionally method and was therefore asked to develop a ces, corrosion and age-related wear could operating construction company was asked to In accord with the assessment of the situation bore concept for carrying out the job. not be kept at bay any longer. It was posing use its experience in handling projects under by TIAS Tiesler, the following solution to the an increasing hazard for losing supply reli- difficult general conditions to find and subse- problem was put forward to the utility compa- The affected stretch which required new pipe ability. quently implement a solution. ny: complete new pipe installation for the entire installation was split into two sections (270 and

12 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 13 FOR YOU IN ACTION REMOTE HEATING PIPELINE CONSTRUCTION

PLEASANT HEAT IN THE HOUSE THANKS TO GRUNDOBORE

New installation of a property service connection for district heating using auger boring

Last year in May, the people of Switzerland voted to an estimated 40 % until the year 2050. Remote on the revised energy bill via popular vote; the ob- heat is generated in the process of manufacture jective of the bill is to promote renewable energy, as a by-product, therefore its use makes sense reduce energy consumption and raise energy ef- not only from a commercial, but also from an eco-

340 metres). An existing paved forest track was Based on these jointly formulated general con- the starting point for the two sections in need of ditions, planning started immediately with the new pipe work. aim of ensuring a quick and continuous connec- tion of the drinking water pipe line. Since the new pipes were installed in the pro- There was no more time to lose, so drilling be- tective strip close to the existing pipeline, it was gan as soon as the job was allocated. even possible to provide water within the imme- diate area surrounding the launch pit with the Both sections of the size 300 ductile cast iron help of a tapping clamp. Therefore the impact drinking water pipe line were completed using Picture about: Looking into the prepared launch pit. on the environment was reduced considerably the HDD method in only eleven working days Picture right: Lowering the drill rig GRUNDOBORE400 into the launch pit. in a sustainable manner. and without delay. The customer was fully satisfied with both the In parallel, the customer carried out a sur- completion of the work, well ahead of the sche- vey of the ground conditions, since it was dule, and the quality of the services. ficiency. One focal point is the district heat supply logical point of view. Against this background, a necessary to determine the local geology which only accounts for a small share of approx. growing number of house owners are deciding on BACK TO and draw conclusions relating to the drilling This goes to show that good cooperation bet- 4 % of the complete heat provision in Switzerland connecting their property with an already existing CONTENTS work and the composition of the drilling fluid ween all the project participants always pays at present. According to the White Paper District district heat grid. Such a property service con- thereof. off, especially in such cases. ◊ Heating, however, this share could be extended nection to the district heat grid was carried out

14 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 15 FOR YOU IN ACTION REMOTE HEATING PIPELINE CONSTRUCTION

by the company Fa. Menegola AG, Amriswil (CH), NON-DIRECTIONAL PILOT BORE all there was left to do was to align the rock bo- pipe and the pipe pulling connection was moun- employing the auger drill rig GRUNDOBORE400 by The company Menegola AG called for expert help ring head mounted to the first retrievable pipe ted to the pipe drive. With the help of a chain TRACTO-TECHNIK to do the job in Zihlschlacht- from TRACTO-TECHNIK to carry out the bore. so it could penetrate the lean concrete at the hoist, the casing pipe was now braced with the Sitterdorf, belonging to the Canton of Thurgau in Therefore, the complete first bore served to brief right point as to achieve the planned bore path pipe pulling adapter in the basement. These Switzerland. Here, two casing pipes ND 200, each the Swiss drilling crew on the method and hand- course. This was done by fastening the first were all the necessary preparations for the next 4 m in length, were installed. The auger boring me- ling of the drill rig GRUNDOBORE400 by an emplo- retrievable pipe in its vertical position with the step in which the casing pipe was successfully thod was chosen for two reasons: first of all, the yee of TRACTO-TECHNIK. help of a tensioning strop. With this action, the pulled out of the basement in the direction of planned bore path running beneath a wall into the important preparatory jobs were completed and the launch pit. With gradual pulling in, one ret- building would have made an installation using the Planning had shown that a steered pilot bore the actual drilling operation could commence. rievable pipe after the other was disassembled open-trench method impossible and second, even was superfluous, it was possible to thrust the again in the launch pit. The final examination a steered HDD drill would have been very hard to retrievable pipes forward directly. The course of REACHING THE TARGET IN ONLY TWO HOURS with an electronic hose pipe level confirmed the perform, due to the confined space conditions. The the bore path with an inclination of 1 percent ran The bore moved forward, one pipe after the planned inclination. auger boring rig GRUNDOBORE400 offered the ideal from the launch pit underneath a small wall and other. A drilling auger inside the retrievable solution here, due to its compact design and the then from under the staircase into the basement pipes conveyed the loose soil, broken away by SUCCESSFUL COMPLETION positional accuracy of the method. of the residential building. The position for the the bore head, into the launch pit at the same For the bore of the second casing pipe, the rig opening was planned directly above the bottom time. In a manner of speaking, the pipe string, had to be shifted in the launch pit and aligned ESTABLISHING THE LAUNCH PIT plate. several retrievable pipes screwed together, once again. After successful briefing and sup- Starting point for the bore was a launch pit situated serves as a placeholder for the casing pipe to port for aligning and spot-drilling of the lean in the sidewalk, with a depth of approx. 1.50 m and PRECISION WORK IS DEMANDED be inserted later on when this drilling method concrete by an employee from TRACTO-TECH- further dimensions of 2 x 1.5 m, which had been In order to reach this target, the bore rig was is applied. Only two hours and nine retrievable NIK, the second bore was carried out by the Me- prepared by the company Menegola beforehand. lowered into the launch pit where the cradle pipes later, the first bore arrived at the targeted negola bore crew independently, up to the point The loamy ground did not necessitate a support parts were aligned precisely to the demanded point in the basement. Here, the bore head was of pulling-in the casing pipe with well-targeted

Picture left: The rock boring head as it breaks through at the intended point in the basement. Picture below left: The casing pipe, braced to the pipe pulling adapter with a chain hoist in the process of pulling in. Pcute below right: Break-through of the second bore (right) on the side of the already installed casing pipe.

Picture left: Fastening the first retrievable pipe in a vertical position with the help of a tensioning strop. Picture about: Screwing on the next retrievable pipe with internal auger.

system of the launch pit. Only the faces of the pit inclination with the help of an electronic water disassembled and replaced by the pipe pulling precision. It took only two day to carry out both were fortified with lean concrete because they had spirit level. Additionally, the rig was tightly clam- adapter. boring operations, including the new installati- to serve as abutments for the bore rig. To provide a ped between the two abutments to make sure At the same time the bore rig was prepared on of the two casing pipes. Now nothing could BACK TO CONTENTS level footprint for the drill rig, the bottom of the pit that no undesirable change of position could for pulling in the casing pipe: the pulling slee- stand in the way for connecting the property ser- was laid out with formwork panels. take place, even in the course of boring. Then ve was screwed onto the pressed-in retrievable vice line with the Swiss district heating grid. ◊

16 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 17 FOR YOU IN ACTION HDD-SONDERANWENDUNGGROUND CABLING / POWER

HAPPY STRANDING Paasch connects new Elbe tide gauges using HDD

The bore for connecting the Elbe tide gauge in "Grauenort" is completed.

The island of Krautsand lies on the river banks of pe. From its source in the Giant Mountains in the Waterways and Shipping Office (WSA) - which is two cable protection pipes OD 110 x 10 each from the Lower Elbe between and Cuxhaven, Czech Republic to its mouth flowing into the North responsible for this stretch of the River Elbe - ar- the beach to the foundations of the tide gauges at merely connected to the mainland by two bridges. Sea in Cuxhaven, the Elbe covers a total distance ranged for new measuring stations containing the bottom of the riverbed under water - at Grauer- Krautsand is a popular holiday destination and of 1,094 km – tributaries not included. It is there- state-of-the-art technology to be installed right ort over 234 m and at Krautsand over 180 m length. swimming resort, thanks to its idyllic location fore one of the main transport routes for inland alongside the existing reference levels. Since the What sounded more like a routine horizontal dril- in the green Kehding region, with quaint houses shipping in Europe. However, the Elbe is difficult responsible authorities knew for certain that the ling operation posed a challenge in logistics and flaunting the typical thatched roofs in the North to navigate in some places, for example in the area land connection could not be made using the planning, even for the professionals from Paasch German tradition, fruit orchards, meadows and of the Lower Elbe in the intertidal zone close to open-trench construction method in this sensi- because all works at the tide gauges had to be a wonderful sandy beach connected to long tidal the estuary. So-called reference levels are ins- tive and partially protected area, the WSA issued carried out under water. The tide set the rhythm flats. In this sensitive and partially protected en- talled there approx. every ten km along the ship- a tender for the project, expressly demanding the for all jobs involved and only one week was planned vironment, two new tide gauges had to be linked ping passage in sighting distance from the river application of a trenchless installation method. for each task. The transport ship carrying the lar- with the data network off the coast of Krautsand bank. The tides can be predicted precisely, thanks The Damendorf-based company Paasch Rohrlei- ge pipe bundles, drum carrier and other materials and the nearby Grauerort Fortress. A seemingly to frequent water level measurements. tungsbau was awarded the contract for the hori- could therefore only dock at the port in Krautsand difficult task - but not for the experienced specia- zontal directional drilling (HDD) project, including when the tide was high. The work boat, bearing ma- lists from the company Paasch Rohrleitungsbau One of these tide gauges is located near Kraut- all underwater connection jobs, because they have terials and equipment, also depended on a high and their GRUNDODRILL15N. sand while another is ten km away at the Grauer- the required experience and practice in planning watermark. The 28-metre-long MS HEROS 1 is ort Fortress. Up to 80,000 ship movements every and implementing these complex projects. part of the fleet of Heros GmbH, a company spe- THE WATERWAY OF THE GREAT ELBE RIVER year can be observed from the beach. Because cialising in underwater construction. The crew With a catchment area of 148,300 square km, the the existing reference levels have aged immensely WORKING IN THE RHYTHM OF THE TIDE consisted of three professional industrial divers Elbe is the fourth largest river in Central Euro- in technical and structural terms, the Hamburg The actual task for Paasch was the installation of whose task it was to change the drilling tools un-

18 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 19 FOR YOU IN ACTION GROUND CABLING / POWER

der water and carry out other jobs required for Using a Medium Drill Head, this was carried out oned beneath the trees slightly above the beach move through the navigation channel on that day the pipe-work. without further delay. A diver took hold of the so the swimmers and guests at the beach snack and causing distinctly great waves, even greater drill head under water and fastened it to the cra- bar remained undisturbed. The truck containing caution was necessary for navigating the Heros 1 Following weeks of planning project and logistics, ne cable of the ship to prevent it from drifting off the mixing system was parked at the car park on while working under water and on the confined top work started at the Grauerort tide gauge under course due to the tidal current. Next morning, a di- the other side, facing the road to the beach, so that deck. However, both the experienced crew from the supervision of the WSA in mid-July. Grauerort ver went down again to replace the drill head with a only the hose running to the drill rig gave a hint of Paasch and the divers kept their cool. The two pro- is named after its fortress which was used as an backreamer and hang on the pipe bundle prepared the drilling operation. tective PE pipes OD 110 were also installed within ammunition depot for sea mines until after the on the ship beforehand. In order to move the pipe one day. However, since the Hamburg Waterways end of the Second World War and was then con- coils in the right pulling-in direction and keep them When the pilot bore started the next day, the holi- and Shipping Office was worried that the new pro- verted into a cultural centre. Because the sur- there, the work boat had to change position several daymakers did not even notice. Only a few visitors tective pipes might be damaged by ship anchors, rounding area is possibly still contaminated by times. The captain of Heros I navigated with extre- came to see what was going on when the work the project manager of Paasch suggested the in- mines from the era of military use, a bomb dispo- me care to prevent injury of the crew above and be- boat was fastened to the mole. Here, the pilot bore stallation of still smaller OD 50 ductwork into the sal team first had to march up to explore the site neath the water and make sure that the pipe string itself also caused no problems at all. Just like in previously laid OD 100 pipe the following day. The around the bore path through the dike and beach did not tear off. This also proved successful, thanks Grauerort, locating was carried out from a rubber data cables were subsequently pulled into these before work could start. When it was clear that to the active assistance of the drilling team. Finally, dinghy which was also used to transport people pipes with the aid of the divers. All this took place there was no threat of an explosion by forgotten the still empty and therefore lightweight protective and material to the work boat. The 180 m to the without disturbing the holidaymakers or interfe- mines, the drilling team arrived to prepare the pipes were weighed down with concrete half shells tide gauge were finished in just one day and the ring with the protected dike landscape. site and establish the head access holes. as a protection against the stream current. Thanks drill head was attached to the ship like before. to these measures, drilling over of a distance of 234 In Krautsand the actual challenge was also to SUCCESSFUL LANDING PLUNGED m for the first tide gauge was completed within the complete the work under water and in accord with Both tide gauges are now connected to the power The work boat with the diver crew moved in the stipulated period of time. the schedule set by the tide. Thus the team went grid and data network ashore and reliably transmit next day and the pilot bore for installing the two straight back to the port to load the stored pipe the water level values in Grauerort and Krautsand. protective HDPE pipes OD 110 could start. Dril- DRILLING WHERE OTHER PEOPLE GO material into the work boat once the pilot bore had Once again the specialists from Paasch have pro- ling through the sandy soil went well until the bore SWIMMING been completed. ven their competence in planning and implemen- head came across an unknown obstacle halfway. Since work on the tide gauge in Krautsand was ting the most complex HDD projects, illustrating Obviously these were the remains of an old buil- due to start the following Monday, the team from WAVE MOVEMENT that even such logistically elaborate undertakings ding structure which did not show up on any map. Paasch used the weekend to set up the site. Un- Pipe pulling could then be prepared the next mor- can be realised in an efficient and profitable way by Because the brickwork was impenetrable, there like the almost deserted area in Grauerort, many ning. The divers were deployed again for tool chan- means of the HDD technology. The responsible au- was no alternative but to bypass the obstacle by lively holidaymakers were populating the beach ging and connecting of the long pipes. Due to the thorities of the Hamburg Waterways and Shipping redirecting the bore path and drilling underneath. at Krautsand. The GRUNDODRILL15N was positi- multitude of large cargo ships which were on the Office were delighted. ◊

BACK TO CONTENTS

The bore head is received and fixed by a diver. View from the bore rig in Krautsand. The backreamer is lowered. Arrival of the pipe bundle.

20 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 21 FOR YOU IN ACTION HDD SPECIAL APPLICATION

down and came to rest almost 885 m, while the inner city of taking effect in direction of the 1000 m in a hollow between the Mössingen is situated about 410 valley caused underground de- Hirschkopf and the neighbou- m below. The relief of the extre- formation which damaged many ring Farrenberg. mely rugged and cleaved escar- buildings to a greater or lesser pment alternates strongly here, extent. LANDSLIDE HAZARD More than nine million tons of but in fact, landslides would rock from the escarpment had rather have been expected in The residential area had to be gained momentum and formed the south-western neighbour- evacuated, supply lines were CLEVERLY AVERTED great rotational slipping slabs hood, the Hohenzollern area, cut off, the slope was barrica- bedded on a stony desert of de- because the steep tracks there ded on a large scale, measure- trital rocky waste masses. Huge have frequently been damaged ment and aerial surveys were sections of the woodlands were by slope failure in the past. carried out immediately. Ten residential buildings clearly showed shear cracks and con- tinuous measurement proved that the creeping motion at the foot of the slope was still go- ing on for a while. Extensive actions were started at short notice to stop the hillside mo- vement quickly. Some of these measures were the immediate elimination of the surface water The slope above the residential area of Mössingen after the landslide in 2013. Schematic illustration of the course of a drainage bore through the Auchtert collecting in the slope depressi- slope. ons by installing and renewing fluting profiles, building drai- Trenchless drainage for dewatering landslide terraces destroyed or pushed together, After rain for days on end, star- nage galleries with the help of in Mössingen / Germany piling up the underground to ting at the end of May and going gravel piles reaching far down form slanted slabs. The steep on until the 2nd of June in 2013, for large-surface drainage of Mössingen is a small town with clined like a lectern and shows and numerous full accounts, face of the Hirschkopf, reaching five further landslides from the the mountain slope and finally approximately 20,000 residents only scarce relief variations in the dimensions of the landsli- an altitude of 820 m, was peeled escarpment within the city area establishing geodesic and geo- in the district of Tübingen in the direction facing Upper Swa- des and their risk potential for off up to the flank ledge of the of Mössingen occurred. Espe- technical measuring systems. Germany belonging to the fore- bia. residential areas in the vicinity hill at 720 m in height. Since the cially beneath the Rossberg on After the installation of the land in the medium range of the have been discussed. landslide area affected "only" a surface of 9 ha, approximately large-area drainage and fol- Swabian Jura. Due to landslide Mössingen lies directly ahead woodland, rehabilitation mea- half a million cubic metres of lowing the evidence that further recurrence, the region appears of the bluff of the Swabian Jura MOUNTAIN SLIDE IN 1983 sures were not carried out. The soil and cut rock careered into movement of the slope was held in the media quite frequently. which is also called "Albtrauf" On the 12th of April 1983, one complete landslide area was agitation above a settlement. up, the evacuation was lifted. The Swabian Jura is a tabular (escarpment). For centuries the of the greatest landslides in turned into a nature conserva- Above this residential area in low mountain range in south- escarpment region has provi- Germany for the past 100 years tion area (geological site and the district of Öschingen, the During the years from 2014 to western Germany with a length ded the scene for landslides, occurred at the "Hirschkopf", a biotope) instead. In the years so-called "Landhaussiedlung" 2016, the buildings in the re- of 220 km and altitudes bet- many landslide incidents have woodland of the escarpment, following this phenomenon, on- (cottage house settlement), sidential area affected by the ween 640 m and 1015 m. This made their appearance bet- directly in the south-east of lookers could admire nature's central slope areas along a landslide were also recons- mesa intimidates the onlooker ween Geislingen an der Steige the inner city of Mössingen. Af- wonderful regrowth of the ro- stretch of 260 m started slip- tructed by the installation of by a bluff with differences in and the municipality Klettgau. ter some very heavy rain falls, cky wasteland. ping. Fortunately, the greatest bend-proof floor slabs or base- altitude of up to 400 m at its However, no other place lying more than four million cubic part of this landslip stopped ment floors and maintainab- northern and north-western ahead of the escarpment has metres of rock sloughed away MOUNTAIN SLIDES IN 2013 before it could reach the sett- le drainage; some of the buil- side while the plateau of the witnessed so many and so mas- with a loud roar along the pre- The steep edge of the Swabi- lement, but the pressure distri- dings were even pulled down table in southern and south- sive landslides as Mössingen. cipice of the Hirschkopf at a an Jura in the south of Mös- bution coming from the moving and built up completely again. eastern direction is slightly in- In several television reports stretch of 600 m; they slithered singen reaches an altitude of soil and rock masses above and Even while the drainages were

22 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 23 FOR YOU IN ACTION HDD SPECIAL APPLICATION

being established, a long-term as in the districts of Mössingen. district in Öschingen, therefo- with gradient rates of 39.4 % situ would also have to be pe- throughout, complying perfect- concept for all landslide prone Besides the hillside situations re the precautionary drainage (the lower slope stretch) and netrated. ly with the time schedule. locations on the slope in Mös- above Talheim, the district of was considered extremely ur- more than 45 % (the higher singen was developed. Espe- Öschingen beneath the "Schön- gent for good reasons. slope stretch, partially with In an attempt to carry out op- INLET STRUCTURES AND cially in the close vicinity of the berger Kapf" (up to 801 m high) inclination sections up to 90 timal bores in this challenging FURTHER POSSIBILITIES landslide above the residential in the open-field system "Auch- TRENCHLESS INSTALLATION %!) were going to drain two geology, the company Maier As soon as the steep rock area, slight signs of movement tert" is particularly in need of OF SLOPE DRAINAGE ABOVE A long cross-bracket type slope Bau from Dettighofen-Bal- bores were completed, nu- and locomotion trails were de- drainage, especially since older RESIDENTIAL DISTRICT troughs above the eastern sett- tersweil employed a HDD rig merous peripheral crushed termined along the slopes; this landslide massifs can form slo- The first drainage line instal- lement on the slope of Öschin- type GRUNDODRILL18ACS with rock drains, inlet channels, discovery initiated the plans for pe depressions here which fill lation to ward off rain water gen. PE 100-RC material was twin-tube rods (manufactured intake pipes and connection li- a circumspect dewatering con- up with water after every pre- accumulation was planned for chosen deliberately because by TRACTO-TECHNIK GmbH & nes were installed in the Auch- cept. cipitation event. Just to make 2016, even though winter was the slope setting is built up Co. KG). This steerable drill rig, tert slope. In the early spring- sure that this water cannot already near. Additionally, the mainly of slope rubble masses particularly suitable for instal- time of 2017, the surrounding DRAINAGE MEASURES AS A unnecessarily wet the slope drainage installation had to which, for the greater share, lation in geologically deman- measures were accomplished LONG-TERM CONCEPT through in the retaining depres- be carried out with minor in- consist of splintery limestone ding, rapidly alternating soils and the concrete-cast inlet The geodetic and enginee- sions, drainages were planned terference in reference to the pieces. Although rocks from and even rock formations, has structures rounded out. For ring geology monitoring of the to dewater the deepest regions sensitive slope area; therefore the Lower and Middle White Ju- served the company well for longer periods of rainfall, the escarpment situation round of the troughs through closed a minimal invasive trenchless rassic (malm rock) are in situ at several impressing trenchless region now has better draina- and about Mössingen lead to drain pipes leading directly into method was chosen for the the Auchtert hillside, the Auch- pipe installation projects. ge prospects than ever before, the development of a long-term still deeper regions which are project. The experienced con- tert slope itself is covered with although there is still a high catalogue of measures by the already equipped with well di- struction and drilling company splintery slope rubble masses The bore was carried out by a potential for optimisation left Federal Institute for Geo-Sci- mensioned drainage pipe lines. Maier Bau from Dettighofen of crushed White Jurassic lime very experienced drill master in over. Not all slope depressions ences and Natural Resources The banked up depressions of (district of Waldshut) was com- rock. Only in several tens of a relatively short period of time; have been furnished with drai- of Baden-Württemberg, Divisi- the slope are situated in the missioned with the task. This metres in depth, natural White he worked with a rock boring nages so far, having given pri- on Engineering Geology, and a midst of wildly overgrown wood company has already carried Jurassic rock formations (marl bit for the pilot bore and a hole- ority to the largest first. Slope private engineering office spe- regions. The tapered depres- out very ambitious building zones and "well-layered" alter- opener for the gradual expan- dewatering can definitely be cialised in the subject matter of sions in lengths of some 10 to projects in the field of landslide nating limestone) can be found. sion and completed the job in replenished with further tren- landslides. One important item 100 metres have trees growing rehabilitation in the district of The bore paths, running verti- mid-December, to the utter sa- chless drainages. Utilising the in this catalogue of measures to criss-crossed in the cleavage. Tübingen. cally along the slope inclinati- tisfaction of all parties involved. GRUNDODRILL 18ACS has de- be taken are provisions for de- These slope depressions with on, were planned to lead more With the steerable drilling sys- monstrated convincingly that 18ACS BACK TO watering in the slopes exposed their cross-bracket structure Two closed drainage lines with than 30 m deep into the slope, tem GRUNDODRILL , work this can be performed econo- CONTENTS to movement and locomotion are situated above an expansive an outer diameter of 280 mm, meaning that natural rock ho- in these trying slope regions mically while treating the envi- trails above the residential are- and very high grade residential one 65 m, the other 160 m long, rizons of the White Jurassic in was uncomplicated and reliable ronment with care. ◊

The HDD rig GRUNDODRILL18ACS complete with service truck while drilling a Locating the bore head and course of the HDD operation Exit point of the lower slope drainage line close to a housing complex. The new inlet building at the top end of the bore hole for the future drain of the Auchtert slope through the Auchtert slope. upper slope drainage in a slope trough.

24 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 25 FOR YOU IN ACTION SEWER LINE INSTALLATION

needed to carry out the job."

D & Z became aware of the au- ger boring machine GRUNDO- BORE400, which allows pipes to be installed at an extremely high positioning accuracy du- ring the visit to a trade fair. The GRUNDOBORE400 works with exreme efficiency at a maxi- mum feed rate of 2.8 m/min and a thrust of up to 400 kN or maximum pullback of 315 kN. The auger boring machi- ne is suitable for the installati- on of sewage and waste water service connections right up to collectors for protective and NEW PIPES IN product pipes up to OD 404. The an area of almost 130 ha; this also had to be repeated en rou- managers of D & Z were quickly is where the river Vtlava must te to the launch pit. Neverthel- convinced of the benefits of the formerly have had its bed. The ess, the work progressed con- auger boring method. The in- HISTORIC GROUND workers came across its lega- siderably faster than with the stallation of the new sewage cies in the form of up to 15 cm other methods usually applied pipelines in the historic centre Sewer service connections created using the auger large rocks in the otherwise by D & Z. of Prague became necessary as 400 sandy ground during the non- the dimensions of the old ser- boring method with GRUNDOBORE directional auger bore. "The AUGER BORING INSTEAD OF vice connection pipes were no geological conditions we found TUNNEL CONSTRUCTION longer sufficient. The service were difficult. The sand, which Until they started using the au- connection pipes lead into an Imagine one of the busiest struction for establishing four used for the gravity line on the had hardly any stability, was ger boring method, D & Z ap- existing walk-in brick collector streets in the centre of Prague sewer service connections and outskirts of the historic city ravaged with larger rocks", re- plied other tunneling methods with an oval profile of 2100 x had to be fully or partly closed chose to make use of the au- centre of Prague. Not only the members Daniel Grunert from which were very time-consu- 1300 mm. off for an extended period of ger boring technique for instal- special structural conditions on TRACTO-TECHNIK, who trained ming, making an avarage pro- time for car and tram traffic. ling new vitrified clay pipes ND site and the necessity to adhe- the workers of D & Z on site in gress of 20 to 25 cm a day, with INTENSIVE PLANNING, The local residents and busi- 200 instead. The spatial con- re closely to the course of the the technology and handling peaks of 50 cm at best. "The THOROUGH PERFORMANCE ness people would be exposed ditions locally were too close slope made heavy demands on of the GRUNDOBORE400. The original method would have The starting point for the work to construction noise and dirt and the negative impact on the the construction company D & rocks would have wedged in been too time-consuming and in the city centre of Prague was for months. This would be al- surroundings of the site envi- Z spol s.r.o, but another chal- the auger drill time and again. tedious", explains Martin Vesely an approx. 7.7 m deep and 1.3 m most unthinkable on Prague's ronment would have been too lenge awaited the employees of To eliminate this problem, the from INTERGLOBAL, the long- x 2.1 m wide launch pit, which high street 'Narodni Trida' great, particularly in the case of the Prague-based construction conveyor auger had to be rota- term Czech sales partner of took almost three weeks to ex- ('Avenue of the Nation'), built in an open construction for which company 7 m beneath the sur- ted alternately in one direction TRACTO-TECHNIK. "Many cu- cavate. The assembly and setup 1781, with its historic buildings a 7 m deep pit would have to face. and then the other, until the bic metres of earth would have of the auger boring machine worthy of protecting. If for no be dug. The GRUNDOBORE400 wedged rock came loose and had to be moved and an ext- took another day, meaning the other reason, this is why the auger boring unit from TRAC- DIFFICULT GROUND could then be transported back remely complex construction drilling work could finally start authorities of the city of Prague TO-TECHNIK was used for in- CONDITIONS to the launch pit. Under certain technlogy with many additional on the 19th of May 2017. This decided against an open con- stalling the vitrified clay pipes The city centre is spread over circumstances, the process employees would have been was preceded by an intensive

26 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 27 FOR YOU IN ACTION SEWER CONSTRUCTION

bore path collector axis

The course of the collector axis and the bore path is delineated.

Protective steel pipes and bore head upon Picture above: the auger frequently encounters arrival in the existing larger rocks in the otherwise sandy ground. walkable brick coll- ector. Picture left: following the successful installation of the vitrified clay pipe, the oval profile was let in flush with the surrounding brickwork.

planning phase taking appro- ended clamping device as part breaks down the soil without it was possible to press the way. After these preparations, because the damaged surface ximately six months, during of the pressure bridge of the displacement. At the same time casing pipes in directly, a pilot an auger boring operation of the road has to be restored which the client, construction GRUNDOBORE400 was the most the loosened soil is transported bore for determining the di- with steel casing or retrievable completely when the work is company, machine manufac- importent asset for particularly back to the launch pit in the in- rection was not required. This pipes, guided by the accurately done, an individual operation turer and salesperson worked straight pressing in of the pipes, side of the pipe with a conveyor procedurally less complex and installed pilot bore string, can which is omitted if the auger together intensely. thus providing high directional auger, thus paving the way for also more cost-efficient me- be carried out. boring method is applied. So it stability. the steel pipe. thod was possible because of comes as little surprise that all The OD 273 protective pipe the sufficiently great inclination MINOR INTERFERENCES parties involved in the project which was welded together NON-DIRECTIONAL AUGER While the product pipe, in this and the adequate dimensions The actual boring and installati- reached a favourable conclusi- from 1 m long sections was BORING case an ND 200 pipe made of of the collector, positioned at a on of the vitrified clay pipes was on. Martin Vesely: "Despite all driven from the launch pit at In the case of Narodni Trida, vitrified clay, was being pressed distance of no more than 9 m. In completed successfully with the challenges, we managed an inclination of 8 to 10% in the one bore took a day, this being in, the steel pipes were pushed contrast to the non-directional one pipe per day; in total this to accurately realise the bores direction of the collector, no due to the challenging geology from the product pipes into the method chosen in Prague, for a step took three working days with the required inclination further than 9 m away. Owing to on site For the auger boring in collector, where the one metre directional pilot bore, i.e. in the per bore, without any undue and in a comparatively short the problematic ground condi- Prague, protective steel pipes long pieces, which had former- case of a precisely defined line- negative impact on traffic and time. The solution proved to be tions the bore could only be per- were initially driven through ly been welded together in the ar route, initially a pilot rod with pedestrians. An excessive bur- economical, effective and gent- formed at a relatively slow pace the ground. For this purpose a launch pit, were flame-cut and pilot bore head is driven pre- den on local residents with noi- le at the same time." A good and with extreme care to main- bore head is attached to top of retrieved in sections. Because cisely and with positional accu- se and dirt was also avoided. In reason for D & Z to stick to the BACK TO CONTENTS tain the demanded inclination. the inner bore auger at the open a linear course of the bore path racy from the pit, displacing the addition, an open-cut installati- GRUNDOBORE400 for other ins- For this purpose, the double- end of the protective pipe, which was not specified beforehand, soil into the surroundings on its on method causes higher costs tallation projects in the future. ◊

28 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 29 FOR YOU IN ACTION WASTEWATER PIPE CONSTRUCTION

DEAD ON TARGET STROKE BY STROKE Steel pipe ramming ND 2000 under Zurich's Laubegg tramway terminal loop

The city of Zurich with its 403,000 inhabitants covers an area of 92 km² and is by far the lar- gest city in Switzerland. If you include the hea- vily populated immediate surrounding areas from which numerous commuters stream into the city each day, this conurbation is home to 1.3 million people. The city on the river Lim- mat and Lake Zurich is the country's most important economic and financial metropolis, its university and Institute of Technology have achieved international renown, and in terms of art and culture, the city is an important hub for Switzerland. Internationally, Zurich has been awarded city with the highest quality of life on several occasions, not least because of its well- preserved medieval district, its excellent geo- graphical position and incredible flair.

EFFICIENT AND EFFECTIVE You cannot have a high quality of life without a good and intact infrastructure - and not just OVER AND UNDER overground. This is why the city of Zurich has The redevelopment and the construction of a local companies, which are subordinate to the new stretch of sewer in the Uetlibergstraße by city administration, look after utilities such as the Laubegg tramway terminal loop presented its power supply (produces 5,295 GWh per year) unique challenges to the Zurich civil enginee- and water catchment (1,224 wells), water treat- ring department's construction management ment (four waterworks) and distribution (1,550 team and the coordination of the various buil- km drinking water pipe network) and sewage ding projects as well. First, the four-lane road disposal (1,000 km long sewer network). This had to be closed to tram traffic for five weeks makes it possible for the city to combine around and the tracks had to be cut off. Beside the 90% of all municipal civil engineering works open-trench installation of sewer pipes (kite- with other construction projects (for example, shaped profile ND 1,400, concrete) for which simultaneous building projects for gas, water, respective trenches needed to be dug in the wastewater and road infrastructure as well as middle of the four-lane road and under the tram lines) in order to minimise the number of tram lines, achieving the following, which would roadworks across the city. enable the simultaneous new construction and

30 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 31 FOR YOU IN ACTION SEWER CONSTRUCTION

connection of a 18 m long stretch of sewer, was as protective and/or utility pipes with diame- process under way: For positioning the rammer could now be inserted into the protective pipes of vital importance: ters of 390 – 2000 mm and lengths up to 80 m right on target - due to the fixed sewer heights, and connected to the newly constructed parallel through soil grades 1–5 beneath roads, tracks, ramming needed to be carried out with high running sewer pipe line without any problems. • crossing beneath a 150 kV and a medium buildings, etc. without needing abutments. This dimensional accuracy - a starting cradle was The void between the utility and the protective voltage power station was exactly the right choice for meeting the used and ramming beneath the above menti- pipes was filled. At no point in time throughout • crossing beneath several Swisscom challenges posed by the Uetlibergstraße/Lau- oned gas and sewer pipe lines as well as the the entire ramming operation did the external power stations begg tramway terminal loop, which demanded Swisscom and other power stations could now line need to be closed. To allow the tram to re- • crossing of an existing sewer line and high pinpoint accuracy as well as dimensional begin. One after another, the GRUNDORAMGoli- sume its service according to plan at the termi- • crossing of a gas pipe line accuracy and absolute reliability. This targeted ath drove the ND 2000 steel pipes 2–2.5 m into nal loop after an intermission of five weeks, the precision is achieved with the ram because the the heavy clay soil over a distance of 18 m. The track bed and rail tracks were reconstructed RELIABLE AND ACCURATE dynamic impact punctures through the varying fact that ramming does not destroy the sur- immediately after the pipe ramming was com- Steel pipe ramming was the only viable option. soil formations in the diameter of the pipe wi- rounding soil structures also ensured that the pleted. It was not possible to put an abutment in place thout having to displace obstacles en bloc and pipe would be well embedded in the soil. Ram- for pipe jacking as just behind the launch pit the pushing them along. The soil that is collected in ming went according to plan, apart from when Zurich's approx. 1,000 km long sewer network, Vonplon Strassenbau AG was simultaneously the hollow steel pipe whilst ramming is usually progress was hindered by three old rootstocks, which is maintained, serviced and improved re- working with open trenches for installing the emptied into the reception pit with the help of which had to be dug out and removed using a gularly, now features a further section which pipes for the subsequent stretch of sewer. water and/or compressed air. chainsaw. Because of the large pipe diameter, has been overhauled completely. On their web- the soil collected inside was easily loosened by site, Zehnder Spezialbau AG write: "The deed is The experienced and competent company, READY, STEADY, GO! an 800 kg crawler excavator, transported to the done. Zurich, Uetlibergstrasse: pipe ramming Zehnder Spezialbau AG, based 35 km away in Zehnder began setting up the roadworks in two- launch pit by a 1,200 kg crawler-type loader and operation, ND 2000, at a length of 18 m", and in Bennau, was commissioned with the steel pipe shift operation under tremendous time pressu- withdrawn from above. The ramming progress one of the accompanying photos you can see a ramming project by the civil engineering depart- re: After the pipe trench established for open- reached a speed of 2 m/h so it took only 9 hours rather happy team smiling into the camera from ment and Zehnder chose to use the GRUNDO- cut installation beforehand was widened and to drive in the 18 m long pipeline. out of the thrust pipe which had just "arrived". RAMGoliath for this task. Using this pipe ram- deepened, it was used as a launch pit while the Goliath has overcome them all - the pipes to be mer, which provides up to 11,600 Nm of impact existing pipe trench served well as a reception ALL PERSONS INVOLVED ARE CONTENT crossed as well as the Swisscom and other po- energy, it is possible to ram steel pipes serving pit. Then it was time to get the actual ramming The new concrete pipe (kite-shaped ND 1400) wer stations. ◊

BACK TO CONTENTS

32 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 33 FOR YOU IN ACTION PIPE RENEWAL SEWAGE

NO NEED TO CRY OVER scharged again after use. The last item is our keyword: the waste water discharge system. SPILT MILK Discharge takes place through lines made of vitrified clay pipes ND 200 which are installed directly beneath the tiled floor at a depth bet- Pipe renewal in a dairy ween 1.50 and 2.00 m. At times, the waste water has temperatures of 80 °C (flushing water) and contains chemicals such as nitric acid, caustic soda and phosphoric acid (in very low concen- tration of 1 to 2 %, however) as well as Javelle water and alkaline foam cleaners. These che- micals, which are applied in all sectors of food production, accrue with the frequent cleaning and disinfection of the milk production facilities and machinery as well as within the area of sup- ply and discharge pipes. Also, a 20 percent bri- ne solution which is required for making certain products is discharged through the waste water system. Further waste waters flow into the line via installed floor inlets in the hall; these stem © DMK Group from occasional spillovers from a variety of dif- ferent process phases.

The "DMK Deutsches Milchkontor GmbH" with its about 590 employees contribute to the supply of their jobs, wide and narrow pipes of supply and Sections of the existing vitrified clay pipe were 26 locations in ten German federal states and ap- the international markets with milk products discharge systems course through, pumps, severely damaged in several places, due to proximately 7,500 employees is Germany's grea- "Made in Germany". The corporate facilities of containers, tanks, cooling units and others are many long years in service; their technical fai- test dairy company; the primary product milk is this DMK location with its grand silos, numerous scattered everywhere - most of them made of lure demanded renewal of the line. Affected was delivered by more than 8,300 active producers. elongated production halls and outhouses form high-quality stainless steel. Everything stands a mains, 55 m in length, and a 25 m long mains The co-operatively organised enterprise with its a square block of formidable circumference - on a wall-to-wall tiled floor in hygienic and well- which approaches the first mains at a right ang- headquarters in the town of in Lower Saxo- surrounded by pastures green in the middle of tended surroundings; of course, industrial hygi- le. These two sections showed the typical dama- ny processes approximately 6.7 billion kilograms the countryside. Beneath the roofs of these pro- ene and diligence are the alpha and omega in a ge symptoms: lengthwise and transverse frac- of milk annually. Making internationally accre- duction halls, high-tech state-of-the-art plants milk processing business. tures were spread along these two; some spots dited quality products, it belongs to the leading process thousands of litres of fresh milk, making featured shard formation and even structural pan-European companies for dairy produce. butter, cheese, powdered whey and the like. When looking at this extensive equipment, one collapse. Swift and reflected action was asked thing is certain: for the production processes, for in view of the sensitive location and the as- One of the 26 DMK locations is the Saxon com- In one of these large halls in Edewecht, short huge amounts of fresh water are required and sociated acuteness of a renewal. The following munity of Edewecht near Oldenburg. Here, round and long conveyor belts and roads perform similar amounts of waste water have to be di- points had to be considered:

34 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 35 FOR YOU IN ACTION PIPE RENEWAL SEWAGE

transported without additional machinery • rapid installation and a quick new start-up of the plant hardly interfered with the day-to- day production business • rapid work cycles and high performance made sure of = minimal work restrictions of the production process = high daily output with rapid installation progress (cost-saving) • the long service life of the new pipes is economically attractive • the PP-HM thrust pipes are resistant to cleaning agents and disinfectants • the PP-HM thrust pipes are equipped with smooth spigot and socket joints inside and out, with two fixedly inserted lip seals.

The starting signal for the pipe renewal works was cued by extending two existing, normally tightly sealed floor openings by means of a dia- mond cutter and two further hand excavations for positioning the GRUNDOBURST400G. The uti- lised 54 mm QuickLock bursting rods with gui- ding mandrel were easily pushed through the © DMK Group two mains with lengths of 55 m and 25 m. When • intrusion into a (running) food producing the roller blades where pulled back, the old pipes business made of vitrified clay and the shards, which were • compliance with/requirements of the hygiene the only remainders of the defective pipe in some regulations parts, were broken up by the bursting head and • confinement of the working space due to the the broken pieces displaced into the surround- production plant ing soil (sand) just as easily, while the new MV • skirting the erected scaffolding for the thrust pipes made of PP-HM were pulled in at current job of repairing the ceiling the same time. It became obvious that the tensi- • the course of the waste water line directly le load, monitored by a GRUNDOLOG measuring beneath the floor of the hall instrument, never came close to exceeding the • the demands on the pipe material to permissible threshold value of 150 kN. be selected. The actual pipe renewal works were polished The situation quickly became clear and the profes- off quickly and smoothly with erecting, setting sionals on site made their decision: for the renewal up and conversion of the equipment in two short of the badly damaged mains, static pipe bursting HM for their new pipes (ND/OD 225, installation allow large machine application) days, to the utter satisfaction of all. In the me- was the solution; it offers the trenchless renewal length 1.00 m), which are approved by DIBT (Ger- • the existing openings in the floor were easily antime, the dairy continued to produce all the in the same bore path, replacing the old pipe by a man institute for building technology). enlarged for manholes/pits to accommodate many goods made of luscious milk, unham- new pipe with the same diameter or even larger. the pipe bursting rig pered and without hindrance. The GRUNDOBURST400G produced by TRACTO- With these, all requirements could be satisfied and • the compact dimensions of the pipe bursting rig TECHNIK was definitely the optimal choice for this adequate solutions were found for all constraints: made an unrestricted application in the confined Further 80 m of the damaged old pipe at the venture with its very specific demands. Following working spaces possible - it also helped to DMK GmbH location Edewecht are still waiting BACK TO CONTENTS the expertise of the manufacturer, the responsible • only small hand excavations were needed by-pass the working scaffolds in the hall for repair, this job will also be managed in no party chose Concept-HL thrust pipes made of PP- (the sensitive hygiene regulations would not • the light-weight pipe burster was easily time at all. ◊

36 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 37 FOR YOU IN ACTION SYSTEMATIC RECYCLING

pipeline needed to be installed around 12 m un- and an AMC recycling system for the drilling fluid der the river Agger and, for the greater part, up was used in Lohmar. "The requirements impo- a steep hill through loose gravel and different sed on the machines used were extremely high," types of rock classified as soil class 4. And that explains Dipl.-Ing. Wilhelm Rubbert, Managing was not all: the site was in a nature reserve with Director of Bieske and Partner GmbH, the en- an unspoilt river flood plain belonging to the Ag- gineering firm responsible based in Lohmar. Yet gerbogen landscaped garden. This meant that, construction manager Schürmann has worked right from the start, trenchless iinstallation was with TRACTO-TECHNIK machines for 20 years the only option. Open-trench installation would and does not hide the fact that he is convinced have had too great an impact on the environment of their reliability and ability: "In my opinion, the and would have required a considerable detour GRUNDODRILL18ACS is especially robust and ver- along a winding road. satile." According to the site manager of REVOR, fluid-assisted horizontal drilling through rock is DRILLING RIG FOR GEOLOGICALLY meanwhile the rule within his business branch DIFFICULT SOIL and the most frequently applied method in the "Technology has simply advanced," is region by far. Schürmann's answer as to why the parties in- TOP PERFORMANCE volved "dared" to embark on such an ambi- EXPLORATORY BOREHOLE FILLED tious project. With "technology" he means the COMPLETELY GRUNDODRILL18ACS, an extremely powerful dril- This was the case in Lohmar too:here, setting ling rig for HDD bores in geologically difficult soil, up the site on the 17th of July marked the start THROUGH A and hard rock in particular. "For this purpose, the of the building project. The following day, an 80 rock drilling machine is equipped with twin-tube m long exploratory borehole was drilled through rods, where the inner tube is supported within gravel under the river Agger, which was flushed NATURE RESERVE the outer tube at certain bearing points, thus and then filled completely with Drillmix (Bento- avoiding wear-causing contact with the outer nite mixed with a cement-based special binding tube when drilling," explains Manuel Pohl, HDD agent) again. After the drilling fluid had been al- Castle Auel, a hotel with an adjacent golf course, lies in an idyllic setting not far from the landscaped gardens and nature Product Manager at TRACTO-TECHNIK. A new lowed to harden for three days, the complete pilot reserve in which the building project was carried out. type of plug-in rod connection ensures that the bore covering the entire 440 m bore length was inner tube can be connected quickly, saving carried out in 15 working days. Here, the bore considerable time when drilling - an important head, attached to the drill rod string in a shear- Directional drilling over 440 m through rocky ground advantage, seeing as the complete rod system resisting tight connection, was pushed vertically used in Lohmar weighed around 13 tonnes. through the ground by the HDD rig (which has a 18ACS using the GRUNDODRILL Whereas the inner tube actuates the drill bit, the thrust and pullback force of 5 – 6 tons and 3000 - outer tube guides the rock bore head by turning 4000 Nm of torque) in order to reach the required the bore head, which is positioned at an angle. depth for rapidly passing beneath an eight met- Carrying out a fluid assisted HDD bore over more & Co. KG, the drilling contractor carried out di- Manuel Pohl: "The innovative technology ensu- res wide section of the river Ager. than 440 m through rocky ground in a river flood rectional drilling in the town of Lohmar in North res that, despite the high drilling capacity, only plain placed under environmental protection Rhine-Westphalia in the summer of 2017. Here, relatively small amounts of Bentonite drilling 90% OF DRILLING FLUID RECYCLED ON SITE is not something you get to do every day, even in close proximity to the Castle Auel Hotel, an fluid are needed for flushing and stabilising the Due to the drill rods having a smaller diameter for an experienced construction manager like old grey cast iron water pipe (ND 125) that had bore hole, which can help keep the cost of ac- than the bore head, and because of the way dril- Helmut Schürmann. Quite the contrary: "Ne- been installed in the early 60s had to be replaced quiring, preparing and disposing of Bentonite to ling works, an annulus remains into which the ver before have we drilled over such a distance by an insulated steel pipe (ND 219) for capacity a minimum." Bentonite drilling fluid was pumped through the and under such difficult soil conditions." And reasons. rods with an average flow of 150 l/min, flushing Helmut Schürmann knows what he is talking ADVANCES IN TECHNOLOGY MAKE out the annulus with the bore cuttings. All in all, about; after all, he has 22 years of civil enginee- Replacing the pipeline was the last section of CHALLENGING BORES POSSIBLE only around 80 m3 of Bentonite were used as 90 % ring experience under his belt working for RE- a building project to provide a supply of water The HDD system comprising of a drilling rig for of the drilling fluid was be recycled on-site. Not VOR Reuschenbach-Vorwerk GmbH in Germany. between the villages of Schönenberg and Schei- horizontal directional drilling, a Bentonite mixing only does the fluid, consisting of Bentonite and Commissioned by Stadtwerke Lohmar GmbH derhöhe. The real challenge was that the new unit, a drive station for operating the mixing unit water, help to loosen and remove soil, it also acts

38 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 39 FOR YOU IN ACTION SYSTEMATIC RECYCLING

Picture, left: The pilot bore.

Picture, top, centre: Helmut Schürmann (right) – together with Network Master Andreas Witt from the Stadtwerke Lohmar here – regularly checking the consis- tency of the drilling fluid coming back from recycling and having it cleaned again, if necessary.

Picture, below, centre: Locating the bore head.

Picture, right: Metre by metre, the bore head of the GRUNDODRILL rig, operated by Michael Foltin, works its way through the soil towards the reception pit.

as a lubricant and cooling agent for the bore head scheid. Throughout the whole process and at INSERTING THE NEW PIPE AFTER the Network Supply Department at Stadtwerke and, most importantly, stabilises the entire bore regular intervals, construction manager Schür- UPSIZING THE BORE ONCE MORE Lohmar (municipal utilities of the city of Loh- hole. For this purpose, the Bentonite contains mann checked the position – accurate to within Once the bore head had reached the reception mar). A press release describing the innovative natural, strongly dilative clay minerals (swelling a centimetre – of the manoeuvrable bore head, pit, it was replaced by a reamer with a larger fluid-assisted drilling method performed with properties of at least 480 %), which lend thixi- which was fitted with a transmitter that sent diameter. It helped upsizing the pilot bore from the GRUNDODRILL had aroused his interest. otropic characteristics to the fluid. This means signals to the 19 kHz Digitrak F5 receiver. With 8.5 to 12 inches using 3 – 4 tones of thrust and He recognised the advantages immediately: that the fluid has supportive and load-bearing the help of a 3D tracking antenna, the construc- pullback force and 3000 – 4000 Nm of torque with the application of the latest technology, properties when at rest, yet can flow and trans- tion manager was able to pinpoint the transmis- when being pulled back. The new pipe was si- nature was treated with great care while a rapid port material when in motion without losing its sion signal from any direction. Whenever there multaneously pulled into the bore hole, which and efficient installation progress was guaran- supportive force. was a risk of deviating from its course, Schür- took approximately seven hours. For this pur- teed, not to forget the cost-saving effect in com- mann contacted the machine operator, Michael pose, the 12 m long pipe sections, each weig- parison with open-cut methods. GUIDING THE BORE HEAD – Foltin, in the cab of the GRUNDODRILL, who hing 280 kg, had been welded together to form ACCURATE TO A CENTIMETRE then adjusted the bore head's direction, incline a complete pipeline. A change of machinery SAVING COSTS BY RECYCLING From its starting point – the launch pit at the 484 and angle immediately. "We were even working was needed i for pulling in the new pipe, so the The recycling system used in Lohmar – the (federal road in Germany) – the bore runs down- in a depth of 22 m at the border of the hill and GRUNDODRILL25N was used. "This made it pos- AMC Trailer SRU2017 – also helped to redu- wards at a steep angle until it reaches a depth of had to describe an extreme arc from its seam sible to install the new pipe successfully despite ce the impact on the environment, save costs around 12 m, where it passes under the Agger to the reception pit in order to achieve a suitab- the difficult soil conditions and without the pro- and therefore make the project profitable. in a slight curve and then goes up a steep hill le angle for inserting the new pipe there," says ject having too great an impact on the environ- AMC stands for Australian Mud Company, and to the reception pit, located not far from Wahl- Dipl.-Ing. Wilhelm Rubbert. ment," says Dipl.-Ing. Andreas Söffler, Head of in Germany it is represented by AMC Europe,

40 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 41 FOR YOU IN ACTION

Picture about: The 440 m long pipe string – welded together using 12 m long pipe sections – is ready to be pulled in. YOU TRULY FIT THE BILL! Picture, right: Helmut Schürmann, Construction Manager for REVOR YOUR INPUT IS IN GREAT DEMAND... Reuschenbach-Vorwerk GmbH, Jürgen Rüthing, Master Craftman for networks and owner of the pipe-laying company of the same name, Dipl.-Ing. Andreas Söffler, Head of the Network Supply Department at Stadt- werke (municipal utilities) Lohmar and Dipl.- Ing. Wilhelm Rubbert, Managing Director of .... AND WE WILL REPORT IN FULL! Bieske and Partner GmbH, the engineering company in charge, watch from the reception pit while the new pipe is being pulled in. Have you carried out any interesting construction project recently and would like to publish their progress?

which is based in Rastede. AMC is one of the lea- fluid to be reused. This subsequently reduces the ding manufacturers in drilling fluid and recycling amount of waste matter requiring disposal at a Are you interested in a professional report to be published in our customer technology. TRACTO-TECHNIK joined forces with charge. In light of costs between 700 - 900 Euros magazine "Tractuell", the relevant trade publications and / or on the Internet? AMC in order to be able to offer its customers per ton for high-quality Bentonite and the incre- A report which can additionally be used for your own press relations? functioning, tried-and-tested recycling techno- ased costs for proper disposal of the fluid after logy for performance categories up to 300 kN. final use, this has a positive effect on the building Using screens and with a cleaning performance project's profitability. If this is the case, then simply contact us! All you have to do is to deliver the of 160 – 170 l/min, the AMC Trailer SRU2017 pictures and information on your project and we’ll do the rest! separated the basic components from the used Thus, the interaction of powerful directional dril- Contact: Anne Knour, Tel.: +49 27 23 / 80 81 77, drilling fluid first. Then in the following finer se- ling and state-of-the-art recycling technology E-Mail: [email protected] paration stage, centrifuges separated the fine helped to keep a lock on the costs and reduce grit, enabling a degree of purity (separating cut) adverse environmental effects during the pro- of smaller than 6 µm to be achieved in Lohmar. gression of the building project in Lohmar. The cleaned drilling fluid was then fed back into We are looking forward to your job sites! the drilling system using a transfer pump. The newly installed drinking water pipeline with its increased capacity also ensures a long-term BACK TO The professional recycling of the HDD drilling flu- reliable supply to the communities of Schönen- CONTENTS id, that is separation of the solid material, takes berg and Scheiderhöhe, which are now connec- place in a closed circuit and allows the drilling ted by the new line. ◊ TRACTO-TECHNIK GmbH & Co. KG · Paul-Schmidt-Straße 2 · D-57368 Lennestadt · Germany · www.TRACTO-TECHNIK.de

42 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 43 ABOUT US REPRENSENTED WORLDWIDE

LONG-RANGELONG-RANGE STRATEGYSTRATEGY FORFOR TRACTO-TECHNIKTRACTO-TECHNIK AUSTRALIAAUSTRALIA The Asian sales partners’ meeting attendees: (left to right): Fordsen Djuraiman (Trans Electric, Indonesia) Tamer Kayan (Distribution Development Manager TRACTO-TECHNIK Germany), Jeff Rose (TRACTO- TECHNIK Australia) Wu Ying (McAllen, China), Cesar Araneta (Wise Industrial Systems, Philippines) Chew Chow Cher (Trenchless Technology, Singapore) Stefan Schmitz (Regional Marketing Manager, TRACTO- TECHNIK Germany) Bosco Ku (Kingdom Eagle, Hong Kong) Sebastian Schwarzer (Regional Sales Manager, TRACTO-TECHNIK Germany) and Daniel Lu (Grand Superior, Taiwan).

Asian sales partners’ meeting in Singapore

In line with the appointment of Jeff Rose, who suc- in Singapore in November 2017 for the first time in Essential parts of these supportive measures are a panies and says: “Having spent most of my working ceeded retiree Tom Hughes as Managing Director of 10 years to catch up on the latest developments in new training concept for increasing the distributors’ life in the construction equipment industry, I’m our Australian sister in Brisbane late last year, the the national markets and the sales partners’ com- competence in sales, marketing and service of our aware of the huge potential for trenchless techno- company has changed its name from TT ASIA-PACI- panies. Nodig technologies as well as a specific marketing logies in Australia, New Zealand and the Asia, thus I FIC Pty Ltd to TRACTO-TECHNIK Australia Pty Ltd. and branding packages. am looking forward to working with the team in this Upon invitation by Jeff Rose and the sales and the new challenge”. With the name change the company wants to em- marketing managers in charge from Germany, the After two days of constructive talks and extensive phasize its affiliation with TRACTO-TECHNIK group sales partners’ representatives from China, Hong exchange on the specific national markets and re- THE TRACTO-TECHNIK AUSTRALIA SALES of companies and thus benefit even more from the Kong, Taiwan the Philippines, Indonesia, Thailand quirements all participants agreed to meet annually TEAM: brand’s excellent reputation on the international and Singapore/Malaysia met to discuss the future from now on, continuing in September 2018. JEFF ROSE, MANAGING DIRECTOR markets. perspectives and strategies. Accordingly, topics on Mobile phone: +61 (427)995755 the agenda were analysis of the respective national TRACTO-TECHNIK Australia will continue to sup- Email: [email protected] Just as TT Asia Pacific did since 1998, markets and concepts for targeted sales and mar- port for their customers and sales partners in the TRACTO-TECHNIK Australia will provide our Nodig keting. Asian Pacific region to the full extent with compre- JOHN WALSH, NATIONAL SALES MANAGER solutions and services in Australia, New Zealand hensive project consulting and an excellent pre- and Mobile phone: +61 (408) 771148 and Asia as well. Particularly the Asian markets Another focus during the meeting was on the after sales services for all of our NODIG solutions Email: [email protected] have lots of potential for trenchless technologies structural improvements the parent company being a number one priority. that will be specifically exploited according to the TRACTO-TECHNIK in Germany has been imple- DANIEL TOMS, SOUTH AREA SALES MANAGER BACK TO national requirements under Jeff's management. menting in order to even better accommodate the Jeff himself is happy to have such an exciting oppor- Mobile phone: +61 (408) 699 085 CONTENTS As a first step to so, all Asian sales partners met demands of partners and customers worldwide. tunity within the TRACTO-TECHNIK group of com- Email: [email protected]

44 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 45 ABOUT US STAFF

COMPETENCY THE TEAM IS THE DEVELOPMENT STAR! Additional staff at TRACTO-TECHNIK New Application Specialist and Sales Managers for TRACTO-TECHNIK UK

new innovations to the Utility industry based on a TT Nord vast product knowledge of butt/electro fusion, flow TT Nord-Ost of partners and customers all stopping, new connections, pipe-cutting and tren- over the world. chless technologies. He is looking forward to wor- TT Nord-West king with the TRACTO-TECHNIK HDD equipment Mr. Berthold Einhaus was en- and contractors, and will be helping to increase TT West gaged to optimize our service their market share with HDD products in the UK. TT Ost Roy’s home is in Mansfield in Nottinghamshire. He is married with one daughter and his main interests in life are sport related, in particular field hockey.

TT Sd-West In January 2018 James Montague joined TRACTO- TECHNIK UK. James previously worked in the plant manufacturing industry for 20 years at JCB. His TT Sd Roy Greasby James Montague background was both sales and service, covering local and international markets including Europe, As previously reported, our Bedford-based sister Eastern Europe and Africa. For the last two years TT Sd-Ost company TRACTO-TECHNIK UK are re-focusing on there, James spent time researching the utility in- their core competencies in trenchless technologies dustry with a view to developing products suited to to be able to grow. Part of this growth strategy is the utility market. James works at TRACTO-TECH- Giovanni Diana, Manager Used Berthold Einhaus, HDD Service also to recruit further personnel. The latest addi- NIK UK as an Area Sales Manager for all NODIG Equipment Technician tions to the workforce are Roy Greasby as Product products, but also will be assisting other sales col- Application Specialist and James Montague as Area leagues in further developing the HDD market in the In order to make a compa- Diana has been responsible for for HDD technology. As an ex- Sales Manager. UK. ny fit for the future, the right the marketing of used machi- perienced service technician, James lives in Doveridge in Derbyshire, is married strategy is crucial. In order to nes and accessories of TRAC- Mr. Einhaus joined the mobile Roy Greasby joined TRACTO-TECHNIK UK in Octo- with three daughters and when he gets the time, implement it successfully in TO-TECHNIK as the new Used team of our Customer Center ber 2017 after working for the UK based manufac- enjoys cycling and sailing. the long term, the right team Machines Manager. Due to his North in Bakum on December turer and supplier of specialist pipeline equipment, is also needed. For this rea- many years of experience in 1st last year. Hyram Engineering, for over 25 years. Roy spent 13 On behalf of the whole TRACTO-TECHNIK UK staff, son, TRACTO-TECHNIK has this field in the construction years working there as the hire manager looking af- managing director Roger Wahl says: “We’re glad to strengthened its sales and ser- machinery industry, Mr. Dia- These new obligations will ter the national hire fleet of equipment with a nati- have been able to appoint Roy and James to support vice staff in recent months with na has all the prerequisites to further improve TRACTO- BACK TO onwide network of depots. Then for the last 7 years our sales team. Their personal skills and professio- the addition of competent new market used machines and TECHNIK's range of services. BACK TO CONTENTS CONTENTS he moved to the role of external sales manager. Roy nal competence are a valuable addition, helping us employees. accessories from TRACTO- We wish all gentlemen much whilst at Hyram, had been successful in delivering to best tap the British and Irish markets.” ◊ Since 01.01.2018 Mr. Giovanni TECHNIK profitably on behalf joy and success in their tasks! ◊

46 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 47 ABOUT US STAFF

FAREWELL TOM!

Managing Director of Australian sister company Tom Hughes has retired

Tom Hughes has been suc- lia, New Zealand and Asia. Lo- Australia and New Zealand alo- ter sales service for the com- by not only the customers and ket potentials unlocked by Tom cessfully leading our Australi- cated at that time on the Gold ne are huge territories and the plete range of “moling” tech- partners, but transport requi- and his team even further. an sister company since April Coast in Queensland Austra- TT AP Asian sales area includes nology throughout the country. rements as well. This has pro- 1999. After almost two decades lia, they were “down under” Singapore, Indonesia, Thailand, Further reliable sales partner- ved a wise move and TTAP has Retiring also at TT Asia Paci- fic at the end of last year was Administration Manager Pam Kitchen. Starting at the same time as Tom in 1999, Pam has been an integral part of TT ASIA PACIFIC’s management team. As Tom’s right hand wo- man, her input and experience has proved invaluable to both him and the business. All at TRACTO-TECHNIK in Australia and Germany wish both Pam and Tom the very best for their retirement. Tom Hughes Jeffrey Rose suceeds Tom Hughes Open day at the TT Asia Pacific premises in Brisbane. Tom Hughes attending TRACTO-TECHNIK's 50th anniversary gala together as managing director. with sales partner Tony Wu from China and Francis Rameil, TRACTO-TECHNIK. Uwe Prinz, TRACTO-TECHNIK CMO says on behalf of the com- of relentless dedication in the to TRACTO-TECHNIK and the Vietnam, Hong Kong, Philip- ships have been established forged ahead and is reaching plete German management. development of the Nodig mar- majority of sister companies. pines, Taiwan, and of course all over the TT ASIA PACIFIC more clients than ever since “I’d like to thank Tom Hughes kets "Down under" Tom has Tom was appointed as Mana- China. Recognizing the poten- sales territory, e. g. with Licon that time. for his brilliant achievements retired as Managing Director ging Director of TT ASIA PACI- tial for trenchless technologies Prestige and GATO Sales & and efforts in the development of TT ASIA PACIFIC Pty Ltd at FIC in 1999, becoming a corpo- in China early on, Tom primed Repairs in Australia, Blick In- In late 2017, in line with the of the markets "down under" the end of October 2017. Being rate member of the Australian business there together with dustrial in New Zealand, Tren- appointment of Jeff Rose, who this refers to the personal and a general senior manager, Society for Trenchless Techno- long-term sales partner Wu chless Technology Pte Ltd. In succeeded Tom Hughes as professional level.” Being high- who always based business on logies ASTT in the same year. Ying (Tony) of McAllen (Tianjin) Singapore to name but a few Managing Director, TT ASIA ly appreciated for his conside- strong personal relationships, Under his management TT International Trading Compa- (see also report on page 52). PACIFIC Pty Ltd has changed rate and affirmative manner, he has been most popular with ASIA PACIFIC have expanded ny. With the support and help its name to TRACTO-TECHNIK Tom will be missed by partners partners, customers and colle- their markets in both Aust- from TRACTO-TECHNIK and In 2005, TT ASIA PACIFIC de- Australia Pty Ltd. This name and colleagues equally. As a agues alike. ralia, New Zealand and Asia, especially from Tom, McAllen cided to forego the pleasures change emphasizing the affi- retiree he will enjoy life and an extensive network of dis- was able to set up four offices of the office on the sunny Gold liation of our Australian sister leisure at his home in Bris- TT ASIA PACIFIC was estab- tributors being essential to in China located in Beijing, Ti- Coast and move to Brisbane, in with the worldwide TRACTO- bane spending more time with BACK TO lished in 1998 to service the cover the area that is TT ASIA anjin, Shanghai and Shenyang, order to be more centrally lo- TECHNIK group of companies, his family, especially his four CONTENTS trenchless markets in Austra- PACIFIC’s jurisdiction. providing sales and pre and af- cated to enable easier access was made to exploit the mar- grandchildren. ◊

48 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 49 ABOUT US CLOSER TO THE CUSTOMER

international construction equipment industry brand’s good reputation worldwide on the in- HITTING THE MARK and has held various managerial positions in ternational markets. sales and product management. Uwe Prinz, Managing Director of Sales & Marketing of Taking stock of the third Group meeting, all par- TRACTO-TECHNIK, commented: "With Jeffrey ticipants showed their approval. In the name of TOGETHER! Rose, we are very pleased to have found a sui- the other attendants, Wolfgang Schmidt, owner table successor for Tom, not only on a professi- and Managing Director of TRACTO-TECHNIK, Third "TRACTO-TECHNIK Group MD Meeting" onal but also on a personal level. The markets stated: "Thanks to the frequent exchange of down under still carry great potential for our information we are better able to control the trenchless technologies and we are tighly fo- sustainable growth of the company and spot cussed on developing this under the guidance situations which require readjustment. It of Jeffrey." is tremendously pleasing to see how we can achieve the common objectives for securing Parallel to the change at the top, the Australian the company's long-term success together, sister company will also change its name from taking one step after the other." The intensive TT Asia Pacific Pty Ltd to TRACTO-TECHNIK exchange will be continued at the next ma- Australia Pty Ltd. With this name change the nagement meeting which will take place in May BACK TO company wants to illustrate its affiliation with 2018 at the headquarters of the English sister CONTENTS the group and thus benefit even more from the company TRACTO-TECHNIK UK in Bedford. ◊

KLICK HERE As part of the third "MD Group Meeting" of TRACTO-TECHNIK, the German management thanks the outgoing Mana- PLAIN TEXT FOR THE QUESTIONNAIRE ging Director of the Australian sister company TT Asia PACIFIC Tom Hughes and welcomes his successor Jeffrey Rose. Bottom row f.l.t.r.: CEO Timotheus Hofmeister, owner and Managing Director Wolfgang Schmidt, Tom Hughes, Jeffrey Questionnaire on TRACTUELL Rose, CMO Uwe Prinz and CTO Meinolf Rameil.

The management of the global TRACTO-TECHNIK The "Group MD Meeting" was also an oppor- With "tractuell" we would like to keep you upda- the "tractuell" we Group met on the 10th and 11th of October for the tunity to officially implement a change in the ted on everything worth knowing about our NODIG want you to always third "Group MD Meeting" at the company head- top management of TRACTO-TECHNIK's Aus- systems and our company in an entertaining way. get the informati- quarters in Lennestadt/Germany. The managing tralian sister company TT Asia Pacific in Bris- In order to achieve this, we are constantly working on and inspiration directors of the sister companies in England, bane, as the current long-standing Managing on improving structure and content. The faithful that is important France, Morocco, Australia and the USA came to- Director Tom Hughes will be taking his well- readers of "tractuell" have certainly not escaped to you. It's not gether with the German management in order to deserved retirement in the near future. the changes in design and content over the years. called "Maga- exchange in-depth information on the status and zine for cu- prospects of the global measures for the strategic As part of a gala dinner, the management of To find out whether we are on the right track with stomers and alignment and further development of the group. TRACTO-TECHNIK acknowledged the accom- our concept, we need your support. This is why we friends" for plishments of Tom Hughes during his almost have included a questionnaire in this edition as a nothing. The second management meeting of the TRAC- twenty years at TT Asia Pacific and thanked him means to find out how you assess our customer TO-TECHNIK Group this year mainly focussed for his relentless dedication and efforts in the magazine in terms of design, topics and scope. We would like to thank you on the digitalisation of processes, products and development of the markets "down under". in advance for your evaluation and for services, as well as the steps in sales, marketing Please take the time to fill in the questionnaire returning the questionnaire by 30.04.2018. This and after-sales for the enhanced development of Tom Hughes' successor is the Australian-born and give us your opinion - openly and honest- can be done comfortably by fax or email. We will the international markets for trenchless techno- Jeffrey Rose. The 55-year-old mechanical en- ly. That way, you help us to make changes and raffle 10 high quality power banks among all ent- logies. gineer has many years of experience in the improvements in the right places. Because with rants. ◊

50 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 51 ABOUT US INFORMATION / MACHINE HAND-OVER

AWARD-WINNING BEDANKT! Handover of a GRUNDODRILL28Nplus to INNOVATION Klever Boor- en Perstechniek BV TRACTO-TECHNIK UK and SGN win UKSTT Innovation Award for iCore system

sgn.co.uk/icore

Frank Meerman (right) hands over the GRUNDODRILL28Nplus to the technician Ruud Zuidema from Klever. And the winner is….. Billie Turner of TRACTO-TECHNIK Principle sketch of the iCore solution for mobile mains UK Ltd. and Angus McIntosh from SGN Ltd, Edinburgh and service replacement through a keyhole. The Klever Boor- en Perstechniek BV from the the flower market Royal Flora in Aalsmeer to esta- proudly present award trophy and certificate. Dutch town of Benschop specialises in horizontal blish a Telecom connection of more than 232 m in drilling since 1994, relying on the horizontal dril- length, which happened in only one day. TRACTO-TECHNIK UK and SGN were the proud win- portation of equipment, to carry out mains and ser- ling technology from TRACTO-TECHNIK, among ners of the prestigious UKSTT Award for “Innovative vice replacement activities safely and efficiently with others. As a means of augmenting their HDD pool, Since specialising in the horizontal drilling techno- Product” at the UKSTT Awards Dinner in September minimal disruption to customers. the civil engineering company recently purchased logy, Klever has been continuously growing. There- 2017 in Leeds. This award recognises non-project a GRUNDODRILL28Nplus from our sales partner fore, the company has moved to a new, larger site specific developments that support the trenchless The submission from Billie Turner of TRACTO- in the Netherlands, Meerman Jr b.v. The owner in Benschop a short while ago, gaining sufficient technology industry and are new to the UK market. TECHNIK UK and Angus McIntosh from SGN was and manager Frank Meerman himself turned space and good chances for future expansion. In The “Innovative Product” is one of the most com- based on the development of the iCore system which up at the GRUNDODRILL works in Lennestadt- order to satisfy the steadily growing demands, the petitive categories which are independently judged utilises keyhole technology, including a coring sys- Langenei to hand the machine over to Klever. GRUNDODRILL28Nplus was purchased. Frank Meer- each year. TRACTO-TECHNIK UK and SGN received tem, vacuum excavation, the GRUNDOPIT KHD di- man is pleased with the success of his long-term it for the development of a mobile mains and ser- rectional drilling unit and specially developed Long The customers of Klever Boor- en Perstechniek, customer and hopes that Klever will be able to per- vice replacement solution through a keyhole named Handled Tooling to safely excavate, lay and connect founded in 1994, are energy providers, local autho- form many profitable HDD operations in future. ◊ “iCore”. Having been short listed for awards three a service pipe to a main from a 650mm excavation rities and infrastructure companies. Commissions times before this was the first award TRACTO- with no man entry. for the drill crew are on the increase all over the TECHNIK’s UK sister had won since the start of the The jury choose the iCore solution because “SGN’s country. Right from the start, after the civil engi- Society in 1993. new versatile keyhole technology iCore will improve neering company with approximately 50 employees Operating a 74,000km network of gas mains and mains replacement efficiency, safety, cost savings, had decided to specialise in the horizontal drilling services across Scotland and the south of England, and benefit our customers, the public, the gas and technique, Meerman Jr has provided the trench- delivering gas to 5.9 million private and commercial wider utilities industries”. less drilling equipment - at first GRUNDOMAT soil customers, SGN are the second biggest gas provi- The Awards Dinner followed on from a very success- displacement hammers and GRUNDORAM steel der in the UK. The private company places special ful No Dig Roadshow with exhibitors and two tracks pipe ramming machines. Besides some large drill emphasis on highest safety standards, excellent of presentations, including an overview on Pipe rigs from Prime Drilling, Klever already owns a BACK TO customer services and minimal impact on the en- Bursting from TRACTO-TECHNIK UK’s Matthew Iz- GRUNDODRILL25N. This drill rig is also constantly BACK TO CONTENTS CONTENTS vironment. For the iCore project, the task was to zard who also presided over the Dinner as the new in action; like recently, when an ND 160 mm host The design of GRUNDODRILL28Nplus was adapted to the develop a self-contained vehicle for the easy trans- Chairman of the UKSTT. ◊ pipe had to be installed under the auction halls of yellow Klever fleet.

52 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 53 ABOUT US CLOSER TO THE CUSTOMER

sation of the sectors telephone service, Customer Centre, ser- GOOD PROSPECTS vice training, accessories, loca- ting technology, truck assembly New sales and after-sales structure and complaints management to the after-sales department. This means that all areas re- K. BERNHARDT: That's right, a quired for effective service are lot has actually changed. After RegionsRegionen joined together under one roof. all, we have recognized in our TRACTUELL: How did you pro- Verkaufs- in-depth analysis of the existing ceed with the practical imple- Salesgebie areate structures that we need to re- mentation, what are the focal position ourselves strategically From left to right: Kai Bernhardt, André Gwosdek and Anne Knour points? in order to be able to react as (editorial team). A. GWOSDEK: Of the large quickly and comprehensively to number of specific steps that the needs of our customers as we have developed on the ba- GRUNDOMAT we demand of ourselves. With GRUNDORAM sis of this service structure, the this knowledge, we have then GRUNDOCRACK first to be implemented were GRUNDOBURST taken decisive steps in sales GRUNDOBORE those from which customers and service. benefit immediately. One of the The decisive factor for both are- first was the introduction of new as is the bundling of expertise used machine and follow-up within the scope of "directio- warranties under the heading GRUNDOPIT nal and non-directional drilling "GRUNDOplus". Another im- GRUNDODRILL technology". On this basis, we portant step was the engage- As reported in previous editions, entire product range. In recent have established sales product ment of Manuel Reichling as a TRACTO-TECHNIK is structu- months, numerous strategic management in order to be able Service Trainer. As a result, we rally and organisationally re- measures have already been to react more quickly to market K. BERNHARDT: Of course, all Sales department, for which are now in a position to syste- aligning itself under the motto implemented there to guaran- developments and to take cus- this has an influence on the André Gwosdek is responsible. matically train our own service Sales "Fit for Future" with regard to tee effective, fast and sustaina- tomer requirements into ac- staffing. On theV eonertr iehand,b we TRACTUELL: Mr. Gwosdek, how technicians as well as those of the needs of customers and ble national and international count as far as possible in the have increased our staff and did you proceed to set up af- our sister companies and sales markets by means of a large service before, during and after development and optimisation hired an experienced Used Ma- ter sales service optimally and partners in directional and non- number of measures. For this the purchase of a machine. of products and accessories. chine Manager to achieve theCustomers Kwhatund emeasuresn did you take? directional drilling technology. reason, for example, NODIG's Since the beginning of the year, best possible ServiceStrade-inervice price What will be new or better for For our customers, this means production facilities in Lenne- We talked to our National Sa- we also possess a digital quota- for our customers. In addition, the machine user? faster trouble check and repair. stadt will be merged to create les Manager Kai Bernhardt tion configurator which allows we have already arranged for A. GWOSDEK: First, we also As the next important step, we a modern line assembly facility, and after-sales manager And- our sales staff to compile ma- medium-term succession pl- analysed precisely to find the have set up a central service linked to a state-of-the-art logi- ré Gwosdek about the purpose chines and equipment accor- anning in the field of sales force weak points and make out what hotline to forward all enqui- stics centre. and content of the individual ding to customer requirements. to achieve smooth periods of can be done to ensure an even ries to the right contact person measures and how they inter- And in order to offer our custo- transition and allow the custo- more effective service from a at once. In order to be able to Simultaneously with these act. mers even better local services, mers to get to know their new single source for our customers provide on-site help even more changes in physical structure, TRACTUELL: Mr. Bernhardt, a we are upgrading our nationwi- contacts in good time. And last all over the world, especially af- quickly in the event of warranty the structures and responsibi- lot has happened in the NODIG de branches so they can serve but not least, we have restruc- ter a machine sale. Keywords or damage, the teams for war- lities of the various organisati- sales department, both struc- as Customer Centres. tured the German sales sectors here are "spare parts supply" ranty settlement and decentra- onal units were adapted accor- turally and in terms of person- TRACTUELL: What are the ef- and bundled and boosted our and of course the "maintenance lised service have been increa- dingly. Because the customer is nel. Please tell us more about it fects of these structural chan- competencies in the interest of and repair service" at our loca- sed. always the centre of attention, and how exactly our customers ges on the staffing level, have faster regional availability. tions and the customer's site. This lays the foundation for an the most extensive changes will benefit from these changes there been any alterations or In parallel, a new service struc- We have set the strategic course ideal service but, as was menti- affect sales and service for the in the future. are they to be expected? ture was anchored in the After for this by assigning the organi- oned before, these are only the

54 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 55 ABOUT US CLOSER TO THE CUSTOMER / PRODUCTS

maintenance, repair and supply of spare parts and accessories. LESS IS MORE In order to better coordinate our RegionsRegionen own capacities and activities, RegionsRegionen we have divided Germany into Reduced bending radii for selected two service districts - northeast Verkaufs- GRUNDODRILL design models Sales area and southwest. The Customer Vergkeabuiefste- Centres therefore belong to one Sales area district, which bundles and allo- gebiete cates all inquiries. This speeds up our internal processes enor- mously and also the reaction first steps. so we can react without delay. time for our customers. TRACTUELL: Particularly inte- As already mentioned, we dif- TRACTUELL: You have really GRUNDOMAT resting for established and po- GRferentiateUNDOR betweenAM directional invested a lot of time and effort tential customers in Germany GRandUN Dnon-directionalOCRACK drilling in setting up both fields of busi- is the new structure ofG theR CusUN-DGORtechnology,MUNADTOBU soRS Tthat there are ness activity in the best possi- tomer Centres and salesGR regiUN-DGORtwoRUN AdistributionDMOBORE channels. The ble way for the future. Hence ons. How is this structureGR goingUND OsalesCR AstaffsCK of both channels the final inquiries to both of you, to be represented in theG RfutureUND OareB UfamiliarRST with the complete do you have a message for the Drill rods for the horizontal drilling technique With regard to the bending radii, this interaction and why in this way? product range and can advise customers? have to be highly flexible and robust at the same of forces has been analysed again and recalcula- K. BERNHARDT: GRUNDOBORE K. BERNHARDT: As a Custo- on any article, but the customer We know that time. On the one hand, they shall resist the ted. The calculations resulted© in TRACTO-TECHNIK reduced bending GmbH & Co. KG mer Centre, our branches will has only one contact person - not everything is running per- thrust and pulling forces and the torque during radii for the following GRUNDODRILL models be the central competent con- GRdependingUNDOP IonT his own focus on fectly yet and that there is still drilling; on the other hand they must be flexible and the applied TwinDrive drill rods respectively. tact for all customers in the GRdrillingUND Otechnology.DRILL In this way, a lot to be done until we can enough to bore non-linear bore paths. One thing region with their demands and our employees have more time meet all demands. Therefore I is for sure: the smaller the bending radius, the GRUNDODRILL11XP with rods TD61 = questions, but also for the ser- for the customer's concerns just want to say "thank you" to greater the variance with which the bore path min. bending radius 33 m vice of the entire product range. and can support them in an our customers and ask them can be planned. In order to increase this flexibi- GRUNDODRILL15XPT with rods TD73 = GRUNDOPIT In the course of upgrading regi- even more targeted manner. to continue placing their confi- lity for the GRUNDODRILL bore technique, redu- min. bending radius 45 m onal competencies, it GwasR UonlyND OTRACTUELL:DRILL To what extent dence in us. ced bending radii were now defined for selected GRUNDODRILL18N/18ACS with rods TD82 = BACK TO CONTENTS logical to reorganize the sales does this reorganisation also A. GWOSDEK: Even though we models. min. bending radius 60 m districtVSales eGermanyrtrieb accordingly. affect the after sales and ser- have already achieved a great The outcome of this was four vice for the users of our NODIG deal, we are aware that there is The minimal bending radius to be driven with a The users of these GRUNDODRILL models can sales regions with ten systems? still a lot of untapped potential particular kind of drill rod is not simply a question now drive even more flexible bore path courses sales districts which A. GWOSDEK: As Kai Bernhardt for an optimal and modern af- of material and design, but depends, above all, with their HDD rigs, thanks to the reduced ben- move us closerCustomers Kto unhasde alreadyn said, the Customer ter-sales service, like including on the forces affecting the rods. For calculating ding radii. This means that the application scope our customers Centres will offer the comple- digital services in our range of the bending radius, the torque is relevant in the for horizontal drilling is expanded and profitabili- VSalesertrieb ServiceService te service for directional and offers. We hope to be able to first instance alongside pulling and thrust forces. ty further increased. ◊ non-directional drilling present concrete products at technologies in the the Bauma 2019. medium term. This is TRACTUELL: Mr Bernhardt, Mr particularly advanta- Gwosdek, thank you for the in- CustomersKunden geous for our cus- terview. tomers in the fast- ServiceService growing field of HDD technology, which we can provide for with EDITORS’ NOTE: We will keep BACK TO CONTENTS greater speed and more you up to date on all develop- comprehensively with regard to ments here. ◊

56 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 57 GOOD TO KNOW TRAININGS / TRADE FAIRS

INNOVATION STANDS UP INTERMAT Gas supplier Comgás relies on Keyhole technology 23. APRIL - 28. APRIL, 2018 STAND E5 F 025, PARIS-NORD VILLEPINTE, FRANCE Comgás is Brazil's largest gas supplier with loped tools called "Long Handled Toolings (LHT)". around 1.6 million private, commercial and in- On the one hand, Comgás' managers were convin- dustrial customers who receive their gas via a ced by the technology itself and on the other hand, pipeline network of around 14,000 km. TRACTO- references such as serial use by the Scottish gas TECHNIK’s Brazilian sales partner, the Sao Paulo- supplier SGN (iCore) were the crucial factor in de- based company Sondeq, drew the attention of the ciding to apply this gentle and sustainable method gas supplier’s management to minimally invasive themselves. keyhole technology and the GRUNDOPITK. The ini- tial public interest, resulted in Comgás deciding to Since the application of such a complex techno- logy requires thorough instruction, project mana- ger Ingred Ely Lenzi and project engineers Marcos Yoshito Ueno, Luciano Rodrigues de Oliveira and Everton Gomes Oliveira came to Lennestadt in No- vember 2017 for a two-week training course. The Smart NODIG solutions from TRACTO-TECHNIK entire keyhole technique in theory and practice was on the agenda. The courses included units at INTERMAT 2018 covering structure, handling and operation of the complete equipment: from the core drill units for excavating the asphalt core to the GRUNDOPPITK CO-LOCATED WITH drilling rig and the LHT tools. In order to be able to offer Comgás an optimal service on site in Brazil, Focusing on "Smart NODIG solutions for your EXHIBITION the owners of Sondeq, Paulo and Jorge Dequech, applications" TRACTO-TECHNIK is taking part MAP 2018 also took part in the intensive training course. in the INTERMAT trade fair for the 10th time. On Machines & equipment for earthmoving and civil engineering Machines & equipment for demolition, environment & recycling an outdoor area of more than 500 m2 we will be Accessories, components, parts for earthmoving and demolition The Comgás engineers and their trainers at TRACTO-TECHNIK. The Comgás trainers were the project engineers presenting the complete range of trendsetting New technologies for earthmoving & demolition Elmar Koch, Tobias Klein and Andreas Hanses of products and services for the trenchless installa- DEMOLITION & RECYCLING VILLAGE use the minimally invasive keyhole technology for TRACTO-TECHNIK, in the practical part they were tion and renewal of supply and disposal pipes at the sustainable maintenance of its gas network. supported by Gunter Lehmann and Jonas Hachen INTERMAT 2018 in Paris. of the STS. Paulo and Jorge Dequech from Sondeq Visit our outdoor stand E5 F 025 at INTERMAT P With the innovative GRUNDOPITK, house connec- were additionally coached by Björn Freimuth as Especially with regards to cost reduction for pri- from April 23 -28, 2018 in Paris-Nord, Villepinte VISITOR tions for gas and water from OD 25 to 63 can be the responsible Regional Sales Manager. During vate utilities and the public sector when maintai- to learn more. Our experts will be on site withACCESS P Equipment & materials for road infrastructure /maintenance installed underground directly into the building two weeks of intensive training, the participants ning and developing the complex underground comprehensive answers to all your questions. Machines and equipment for minerals industries through a tension-free circular borehole (key- have learned everything they need to know to be infrastructure, the innovative products and sys- New technologies, engineering for roads, minerals industry, foundations hole) with a diameter of approx. 600 mm. When able to apply the keyhole technology in practice. tems by TRACTO-TECHNIK offer sustainable and We are looking forward to seeing you! VISITOR Drilling, boring, special foundations, trenching machines using circular excavations the surface tension is The guests from Brazil were not only enthusiastic economical solutions for a variety of applications Yours TRACTO-TECHNIK-Team ACCESS Accessories & components for roads, minerals and foundations minimal, with the asphalt cover being sustainably about the technology, but also about the compre- such as water supply, fibre optics (TFFX), gas dis- SMART ROAD VILLAGE BACK TO reinstated and any follow up costs being omitted. hensive support and felt very comfortable despite tribution networks, buried power cabling, e-mo- INTERMAT 2018 BACK TO EXT. 5 CONTENTS URBANCONTENTS The connection to the main line is done from the the winter temperatures in the Sauerland region bility, wind farms, pipeline construction, district 23. - 28. April, 2018 , Paris-Nord, Villepinte WORKSITE OUTDOOR surface through the keyhole using specially deve- in central Germany. heating and sewage. Stand E5 F 025, outdoor area ◊ ZONE ◊ GROUP AREAS ACCESS 58 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 59 HALL 5b Materials handling and lifting equipment and machinery Vehicles & equipment for materials transportation Vehicles for passenger transportation (LCV) Accessories, components, parts for lifting & transportation

EXT. 6 New technologies for lifting, handling & transportation

HALL 5a CONCRETE START-UPS VILLAGE BY EUROVIA

HALL 4 DEMOS DEMOLITION & RECYCLING ZONE

BUILDINGS

HALL 6 & CONCRETE SECTOR CONCRETE SECTOR BUILDINGS Concrete industry, other Accessories, components VISITOR equipment and machinery and parts for building work ACCESS Facilities and machinery Formwork, scaffolding for concrete production and shoring Facilities and machinery Site equipment and tooling RER B for pre-cast concrete Materials for buildings Materials for concrete and construction Paris-CDG Equipment and machinery for New technology for buildings special and decorative concrete Topography, new technologies, Equipment, delivery and laying engineering, automatic systems of ready-mixed concrete New technology, services and engineering for concrete

Outdoor stands Indoor stands Outdoor demonstration zones Car parks P BUILDING SMART VILLAGE GOOD TO KNOW TRAININGS

by making sure of frequent maintenance ning concept. In these user training courses KNOWLEDGE FOR and professional overhauling. Owing to the for directional and non-directional NODID great demand, we will also offer service systems, the participants get to know how the trainings for the GRUNDOMAT, GRUNDORAM machines work and how to set up the machine and GRUNDOBURST technology for service system very well; a hands-on tutorial teaches EVERYONE technicians of the global TRACTO-TECHNIK the safe operation on site and the proper organisation as well as for their distributors maintenance of the equipment. The "mother" Tailor-made trainings for customers and partners and partners in addition to the exisiting HDD of all training is still the GRUNDOMAT user trainings. training course, which we carry out at all lo-

As recently reported, TRACTO-TECHNIK has ners started last year in autumn. These courses New in the program are so-called "Basic HDD cations of TRACTO-TECHNIK and at the Bau completely revised and extended the training impart the required knowledge for providing Trainings" aimed at newcomers and career ABC Rostrup in Bad Zwischenahn, Germany. concept to improve the service for customers customers with the best possible advice when changers in horizontal directional drilling tech- Within the scope of complex HDD technolo- and partners. In view of providing the best pos- purchasing the complex trenchless technology. nology. The contents of these trainings are ba- gy, we offer not only training courses for the sible consultation and support before, during The next courses in German and English lan- sic functionality as well as the procedures and GRUNDODRILL machine technology but also and after sales, we offer training courses for guage will be held in Lennestadt this summer. possibilities of fluid-assisted HDD rig applica- for special topics such as locating technology the sales and service of NODIG technology in For employees in the sales departments of the tion. In addition, basic knowledge of job site or rock boring. addition to the classical user training courses sister companies and distribution partners planning, project planning and documentation since last year. In order to allow as many users around the world, sales training can also be of HDD projects is imparted. These basic HDD Details on the contents, target dates of the and sales partners as possible to take part in held individually on site. trainings are designed for users, machine ope- available training courses and how to apply these trainings, all courses take place at va- rators and drilling crews in the civil enginee- online can be found on our homepage under rying dates and alternating locations during The new trainings or service and mainte- ring and road construction business as well as "Service" -> "Trainings". the 2017/2108 training season. nance of the GRUNDODRILL and GRUNDOPIT professionals and managers of sales, product horizontal drilling technology greatly appeal management and marketing departments. If you, as our customer or partner, are in- The newly launched GRUNDODRILL to the service partners. In the practice-orien- terested in a specific on-site training, please BACK TO CONTENTS and GRUNDOMAT sales trainings for ted courses, participants learn how to ensu- Of course the users of trenchless drilling tech- contact us at [email protected] for an TRACTO-TECHNIK sales staff and trade part- re the operational readiness of the machines nologies are also in the focus of the new trai- individual offer. ◊

60 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 61 GOOD TO KNOW TRADE FAIRS

TRADE FAIRS 2018 TRAID FAIR IMPRESSIONS We look forward to seeing you!

06. - 07.03.18 ÖGL Symposium Grabenlos Loipersdorf / Austria www.grabenlos.at

06. - 08.03.18 Middle East Electricity Dubai / United Arab Emirates Energetab Nordbau Poland September 2017 www.middleeastelectricity.com Poland Germany September 2017

05. - 06.04.18 33. Christian Veder Kolloquium Graz / Austria http://www.cvk.tugraz.at

09. - 14.04.18 HANDS ON DAYS Lennestadt / Germany www.tracto-technik.de

13. - 15.04.18 Diesel, Dirt & Turf Expo Penrith / Australia https://www.dieseldirtandturf.com.au Africa IFAT Africa September 2017 23. - 28.04.18 INTERMAT Paris / France NO-DIG Medellin www.paris-en.intermatconstruction.com ColombiaColombia September 2017

24. - 26.04.18 RENEXPO Water & Energy Belgrad / Serbia http://www.renexpo-belgrade.com

02. - 06.05.18 Vei og Anlegg Hellerudsletta / Norway www.veioganlegg2018.no FinlandMAXPO 07. - 08.05.18 Trenchless Asia Kuala Lumpur / Malaysia September 2017 www.trenchlessasia.com

14. - 18.05.18 IFAT Munich / Germany www.ifat.de

22. - 23.05.18 Utility Week Live Birmingham / England www.utilityweeklive.co.uk AustraliaNo-Dig Down Under UnitedUnited ArabArabWETEX 31.05. - 02.06.18 Maskin Massan Stockholm / AustraliaSeptember 2017 October 2017 https://maskinmassan.se EmiratesEmirates

13.06.18 Trenchless Romania Bukarest / Romania www.trenchless-romania.com

18. - 20.09.18 NO-DIG Live Peterborough / Great Britain BACK TO CONTENTS www.nodiglive.co.uk

Smart-City World- BACK TO NetherlandsNetherlandsNO-DIG Spain AustriaFiberday CONTENTS October 2017 Congress November 2017 November 2017

62 TRACTUELL 53 E | 18 TRACTUELL 53 E | 18 63 TRACTO-TECHNIK worldwide

Germany TRACTO-TECHNIK GmbH & Co. KG TT Headquarters Paul-Schmidt-Straße 2 57368 Lennestadt Tel: +49 2723 808-0 · Fax: -180 [email protected] www.TRACTO-TECHNIK.com

Switzerland United Kingdom France TRACTO-TECHNIK TRACTO-TECHNIK UK Ltd TRACTO-TECHNIK France S.a.r.l. Presented by your TT partner: Schweiz AG 10 Windsor Road 1/3 Rue de la Prairie Ratihard 3 Bedford MK 42 9SU F-77700 Bailly Romainvilliers 8253 Diessenhofen Tel: +44 1234 342566 Tél: +33 1 60 42 49 40 Tel: +41 79 820 38 97 Fax: +44 1234 352184 Fax: +33 1 60 42 49 43 [email protected] [email protected] [email protected] www.TRACTO-TECHNIK.ch www.TRACTO-TECHNIK.co.uk www.TRACTO-TECHNIK.fr

USA Australia Morocco TT TECHNOLOGIES Inc. TRACTO-TECHNIK Australia Pty Ltd. TRACTO-TECHNIK Afrique S.a.r.l. 2020 East New York Street 6 Devlan Street Route de Tamesna 4022 Aurora, IL. 60502 Mansfield, Qld 4122 Poste 2044, 12220 Tamesna Tel: +1 630 851 8200 Tel: +61 7 3420 5455 Tel.: +212 5 37 40 13 63 / 64 Fax: +1 630 851 8299 Fax: +61 7 3420 5855 Fax: +212 5 37 40 13 65 [email protected] [email protected] [email protected] www.TTTECHNOLOGIES.com www.TRACTO-TECHNIK.com.au www.TRACTO-TECHNIK.ma

INSPIRING TRENCHLESS TECHNOLOGIES No. 362001T06 Subject to change No. 362001T06 Subject to