Key Aspects Form

Total Page:16

File Type:pdf, Size:1020Kb

Key Aspects Form Mechanical Maintenance Technician Vacancy Reference: LNG002 EP Langage Ltd (Part of the EPH Group) EPH is the largest supplier of heat in the Czech Republic, the biggest electricity producer and the second biggest electricity distributor and supplier in Slovakia and ranks as the second biggest lignite producer in Germany. It is also an operator of a robust transmission network in Europe, a key transporter of Russian natural gas to Europe and the biggest gas distributor in Slovakia. In total, it has 22GW of heat and power capacity including coal, lignite and renewables. In September 2017 EPH acquired Langage combined cycle gas turbine (CCGT) power station from Centrica plc. EPH continues to actively pursue other acquisitions and new build opportunities in the UK electricity market. Langage Power Station, near Plymouth, is a combined-cycle power plant that consists of a single 885 MW unit in multi-shaft configuration: 2 x Alstom GT26 gas turbines, exhaust gases heating a single heat recovery steam generator, powering a single STF30C steam turbine. The 885 MW plant cost in excess of £400 million and started generating in early 2010, it was commissioned against an expected 'energy gap' in UK generating capacity, caused by the expected closure of nuclear and older coal-fired stations. Langage is one of the most efficient plants in the UK, with combined cycle efficiency of c57%. It is also highly flexible due to its multi-shaft configuration and is able to run at loads as low as 250MW. Department: Maintenance The Maintenance Team is primarily responsible for delivering excellent plant performance and efficiency through the maintenance strategy, together with ensuring full compliance with agreed safety and environmental performance standards and expectations. The Opportunity An opportunity has arisen for us to recruit a Mechanical Maintenance Technician, within the Mechanical Maintenance Team at EP Langage Ltd. The role of the Technician is to plan and carry out scheduled and reactive maintenance in a safe and efficient manner. Key Responsibilities Reporting to the Maintenance Support Engineer, the key responsibilities and duties will include:- Executing routine and non-routine maintenance activities in accordance with agreed procedures and operational requirements to ensure plant is operating safely, effectively and efficiently Carrying out first line maintenance activities, with response to emergency / unscheduled situations in order to protect plant and personnel, ensuring compliance with safety and environmental policies Investigating complex technical problems relating to critical plant, identifying, diagnosing and reporting defects within the plant and ensuring defects are resolved whilst maintaining station performance, reliability and meeting operational targets by returning plant to normal operating service Preparing work method statements, risk assessment and / or plant operating instructions ensuring the required level of maintenance to asset is achieved and records maintained Preparing work orders, ordering spares, completing risk assessments and identification of resources. This includes the identification of contractors, compilation of work specifications, monitoring of work standards on-site and conducting a review of the quality of work on completion Providing practical, disciplined leadership for all work, carrying out the delegated person responsibility to ensure that all engineering and Health, Safety and Environmental practices are adhered to. Acting as technical specialist for designated ‘Plant Area Responsibilities’ Providing service support functions to the Operations Department, ensuring defects and status of any maintenance activity is effectively communicated to the shift teams Our Ideal Candidate Background Demonstrable experience within the power generation or similar process industry Practical knowledge of process plant and equipment Maintenance management and planning system experience Completed a recognised formal training programme or apprenticeship to achieve technician status (C&G, parts I, II and III) - essential Behaviours Building and influencing relationships through excellent interpersonal skills Works effectively as part of a team to maximise performance Proactively contribute to good health, safety and environmental management Ability to cope with pressurised situations and adhering to deadlines Excellent numeracy, literacy and problem solving skills High motivation and self direction Effective communication and IT skills Qualifications Completed a recognised formal training programme or apprenticeship to achieve technician status (C&G, parts I, II and III) - essential Member of a relevant professional institution (desirable) Remuneration The successful candidate will be appointed at the appropriate grade within the Collective Agreement. The starting salary will be dependent on the successful candidate’s competence, experience and qualifications. Further benefits:- Private medical insurance Pension Bonus opportunity Applications For an informal discussion about the role, please contact the HR Department on 01977 782661. Applications should arrive no later than 4th May 2018. This vacancy is open to EP Langage Ltd permanent and fixed-term employees, contractors, temporary and agency staff as well as members of the public. To apply: Please send your CV and covering lettering to [email protected], writing the Vacancies Ref Number and Job Title. .
Recommended publications
  • Annual Report and Accounts 2006 Annual Report and Accounts 2006
    Centrica plc Annual Report and Accounts 2006 Annual Report and Accounts 2006 report Securing our customers’ energy needs Our vision is to become a leading integrated energy company in selected markets in order to maximise value to shareholders. In 2006 we focused on securing energy to meet our customers’ future needs. Our strategy Our strategy is to create a distinctive business model that delivers sustained profitability through the commodity cycle. We will achieve this by focusing on the following clear priorities: Transform British Gas Sharpen up the organisation and reduce costs Reduce risk by adding new sources of gas and power Build on our multiple growth platforms Our main activities Our upstream business Our downstream business We source energy internationally We supply energy to homes We find and produce gas predominantly in the UK We are Britain’s largest gas and electricity retailer, and have acquired licence blocks in Norway and supplying 49% of the residential gas market and 22% north and west Africa. We trade energy in the UK, of residential electricity. We are a growing North America and Europe and secure contracts force in North America, serving customers in five to bring gas to the UK. Canadian provinces and 15 US states. We generate energy We supply energy to businesses We generate electricity through our gas-fired power In Britain, we are a major supplier of gas and stations in the UK and US and through a growing electricity to the commercial sector. We also have portfolio of wind assets and purchasing agreements. customers in Belgium, the Netherlands and Spain.
    [Show full text]
  • Digest of United Kingdom Energy Statistics 2017
    DIGEST OF UNITED KINGDOM ENERGY STATISTICS 2017 July 2017 This document is available in large print, audio and braille on request. Please email [email protected] with the version you require. Digest of United Kingdom Energy Statistics Enquiries about statistics in this publication should be made to the contact named at the end of the relevant chapter. Brief extracts from this publication may be reproduced provided that the source is fully acknowledged. General enquiries about the publication, and proposals for reproduction of larger extracts, should be addressed to BEIS, at the address given in paragraph XXVIII of the Introduction. The Department for Business, Energy and Industrial Strategy (BEIS) reserves the right to revise or discontinue the text or any table contained in this Digest without prior notice This is a National Statistics publication The United Kingdom Statistics Authority has designated these statistics as National Statistics, in accordance with the Statistics and Registration Service Act 2007 and signifying compliance with the UK Statistics Authority: Code of Practice for Official Statistics. Designation can be broadly interpreted to mean that the statistics: ñ meet identified user needs ONCEñ are well explained and STATISTICSreadily accessible HAVE ñ are produced according to sound methods, and BEENñ are managed impartially DESIGNATEDand objectively in the public interest AS Once statistics have been designated as National Statistics it is a statutory NATIONALrequirement that the Code of Practice S TATISTICSshall continue to be observed IT IS © A Crown copyright 2017 STATUTORY You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence.
    [Show full text]
  • DRAFT FINAL REPORT Cambridge Economic Policy Associates
    SCOPING TOWARDS POTENTIAL HARMONISATION OF ELECTRICITY TRANSMISSION TARIFF STRUCTURES AGENCY FOR COOPERATION OF ENERGY REGULATORS (ACER) JUNE 2015 DRAFT FINAL REPORT Prepared by: Cambridge Economic Policy Associates Ltd CONTENTS 1. Introduction .............................................................................................................. 1 1.1. The European electricity market ............................................................................... 1 1.2. Tariff structure harmonisation .................................................................................. 2 1.3. Scope of study ............................................................................................................ 2 1.4. Study methodology .................................................................................................... 3 1.5. Report structure ......................................................................................................... 4 2. Context of study ....................................................................................................... 6 2.1. The Internal Electricity Market .................................................................................. 6 2.2. Objectives for transmission tariffs ........................................................................... 10 3. Transmission tariff structures in Europe today ......................................................... 12 3.1. What are transmission tariffs? ...............................................................................
    [Show full text]
  • Annual Review and Summary Financial Statements 2010 Shareholder Information Continued
    Centrica plc Registered office: Millstream, Maidenhead Road, Windsor, Berkshire SL4 5GD Company registered in England and Wales No. 3033654 www.centrica.com Annual Review and Summary Financial Statements 2010 Shareholder Information continued SHAREHOLDER SERVICES Centrica shareholder helpline To register for this service, please call the shareholder helpline on 0871 384 2985* to request Centrica’s shareholder register is maintained by Equiniti, a direct dividend payment form or download it from which is responsible for making dividend payments and www.centrica.com/shareholders. 01 10 updating the register. OVERVIEW SUMMARY OF OUR BUSINESS The Centrica FlexiShare service PERFORMANCE If you have any query relating to your Centrica shareholding, 01 Chairman’s Statement please contact our Registrar, Equiniti: FlexiShare is a ‘corporate nominee’, sponsored by Centrica and administered by Equiniti Financial Services Limited. It is 02 Our Performance 10 Operating Review Telephone: 0871 384 2985* a convenient way to manage your Centrica shares without 04 Chief Executive’s Review 22 Corporate Responsibility Review Textphone: 0871 384 2255* the need for a share certificate. Your share account details Write to: Equiniti, Aspect House, Spencer Road, Lancing, will be held on a separate register and you will receive an West Sussex BN99 6DA, United Kingdom annual confirmation statement. Email: [email protected] By transferring your shares into FlexiShare you will benefit from: A range of frequently asked shareholder questions is also available at www.centrica.com/shareholders. • low-cost share-dealing facilities provided by a panel of independent share dealing providers; Direct dividend payments • quicker settlement periods; Make your life easier by having your dividends paid directly into your designated bank or building society account on • no share certificates to lose; and the dividend payment date.
    [Show full text]
  • 2008 Corporate Responsibility Report Centrica Plc Corporate Responsibility Report 2008
    2008 Corporate responsibility report Centrica plc Corporate responsibility report 2008 www.centrica.com/cr08 Contents 3 Chief Executive’s introduction 4 Assurance and scope 5 Excerpt from Corporate Citizenship’s Assurance Statement 6 2008 Highlights 7 Business overview 8 Our approach 14 CR Committee and Governance 17 Business principles 22 Key Performance Indicators 25 Key impact areas 26 Climate change and the environment 44 Customer service 56 Securing future energy supplies 64 Health and safety 72 Employees 83 Supply chain 87 Local impact 92 Our stakeholders 94 Customers 97 Investors 99 Employees 101 Suppliers and business partners 103 Governments and regulators 105 Communities 107 NGOs and consumer organisations 109 Media 110 Trade unions 111 Appendix – Memberships 2 Centrica plc Corporate responsibility report 2008 www.centrica.com/cr08 Chief Executive’s introduction Introduction from Sam Laidlaw 2008 was my first full year as a member of the Corporate Responsibility Committee. Throughout the year, the Committee challenged our current performance and debated areas of future activity across a range of critical business issues. Through this continual process of improvement, I have confidence that we are making good progress in developing the necessary structures and processes, allied to a management commitment that will build a sustainable and environmentally aware business for the future. In this report, you can read about our initiatives and performance over the year, as well as our forward- looking plans for 2009 and beyond. As our CR programmes mature, there is an increasing amount of available information to present to our internal and external audiences. As in previous years, we have chosen to use the online environment to report.
    [Show full text]
  • Carbon Disclosure Project 2011
    CDP 2011 Investor CDP 2011 Information Request Carbon Disclosure Project Centrica Module: Introduction Page: Introduction 0.1 Introduction Please give a general description and introduction to your organization About Centrica Our vision is to be the leading integrated energy company in our chosen markets. We source, generate, process, store, trade, save and supply energy and provide a range of related services. We secure and supply gas and electricity for millions of homes and business and offer a range of home energy solutions and low carbon products and services. We have strong brands and distinctive skills which we use to achieve success in our chosen markets of the UK and North America, and for the benefit of our employees, our customers and our shareholders. In the UK, we source, generate, process and trade gas and electricity through our Centrica Energy business division. We store gas through Centrica Storage and we supply products and services to customers through our retail brand British Gas. In North America, Centrica operates under the name Direct Energy, which now accounts for about a quarter of group turnover. We believe that climate change is one of the single biggest global challenges. Energy generation and energy use are significant contributors to man-made greenhouse gas (GHG) emissions, a driver of climate change. As an integrated energy company, we play a pivotal role in helping to tackle climate change by changing how energy is generated and how consumers use energy. Our corporate responsibility (CR) vision is to be the most trusted energy company leading the move to a low carbon future.
    [Show full text]
  • Renewable Energy Progress Report: South West 2012 Annual Survey 3 Contents Foreword
    1 The south west now generates around 394 GWh of renewable electricity Renewable Energy from wind each year, which accounts for 28 per cent of renewable electricity in the south west, and 1.5 per cent of Progress Report: our electricity demand South West 2012 Annual Survey Renewable Energy Progress Report: South West 2012 Annual Survey 3 Contents Foreword Foreword 3 Last year global investment in renewable Renewable electricity 4 energy reached £165 billion – on par with Renewable heat 8 fossil fuel investment. The low-carbon Low-carbon economy 12 energy revolution is underway. R&D and technology development 14 This report uses the south west of England as a ‘test bed’ to 3. Some of our elected representatives are misreading the Regen SW’s advisory services 16 look in more detail at what is powering this revolution. It sets public mood: local opinion polls, as well as our experience out the excellent renewable energy resources, the progress we at community events, show a strong and consistent majority Case studies 17 are making in harnessing them and the lessons we can draw for supportive of all renewables, based on a common sense the national Renewable Energy Roadmap to increase the speed view that in an uncertain world we should make the most of Anaerobic digestion and sewage gas 18 of deployment and job creation. our local energy resources. The past year in the south west has seen record growth in 4. We need all renewables: small, medium and large: solar PV Biomass 20 renewable electricity from 218 MW to over 520 MW and has dominated this year’s figures in the south west, but consistent growth in renewable heat.
    [Show full text]
  • SOUTH HAMS DISTRICT COUNCIL NAME of COMMITTEE Executive
    AGENDA AGENDA ITEM ITEM SOUTH HAMS DISTRICT COUNCIL 9 9 NAME OF COMMITTEE Executive DATE 6 December 2012 REPORT TITLE Langage Landscape Fund REPORT OF Natural Environment and Recreation Manager Ross Kennerley WARDS AFFECTED Western South Hams Summary of report: The Langage Landscape Fund has been created to support projects that mitigate the visual impact of the Langage Power Station, address climate change and support community projects in areas affected by the power station. This report seeks member’s authorisation to target the funding on community and landscape projects. Financial implications: Expenditure is within the section 106 funds held in the Langage Landscape Fund and is proposed to be spent on projects within the terms of the section 106 agreement. RECOMMENDATIONS: That Executive agrees 1. to release up to £250,000 towards community landscape projects in accordance with the requirements of the Langage s.106 and details as set out in paragraph 2.1 2. to allocate up to £200,000 towards a proposed £3 million Heritage Lottery Fund bid for access, landscape and environmental improvements within the Plym Valley and 3. to note the new management arrangements for the Plymouth Green Infrastructure Partnership subject to existing funding from the Langage Landscape Fund. Officer contact: Ross Kennerley. Natural Environment and Recreation Manager [email protected] 01803 861379 1. BACKGROUND 1.1 At the time of consent it was recognised that the Langage Energy Centre would have a significant visual impact over a wide area. Whilst mass screening of the power station was impractical (and arguably undesirable) it was recognised that targetted landscape schemes would assist in mitigating the impact from key view points and on communities affected by the power station.
    [Show full text]
  • 2010 Corporate Responsibility Report
    2010 Corporate responsibility report Introduction and approach Contents 2 Chief Executive’s introduction 11 Governance 3 Approach and governance Centrica Executive Committee An Integrated business and CR strategy Corporate Responsibility Committee 4 Our CR strategy Performance 2010 Energy for a low carbon world 12 Looking ahead 8 Risk management 13 Assurance and reporting 9 Materiality 14 Scope of report 10 Stakeholder engagement Key stakeholder groups Prioritising stakeholders 2010 Corporate responsibility report: Introduction and approach 1 Chief Executive’s introduction In last year’s corporate responsibility (CR) report I discussed the changing shape of our business and how we responded by developing a new CR strategy. In 2010 we have focused on implementing that strategy and pursuing opportunities that lead the drive to a low carbon world. I am delighted to present our 2010 CR Report, which sets out our progress during the year and addresses some of the challenges that we face. Our new CR strategy has given us a better framework for our through energy efficiency and behaviour change, and on activities, with an emphasis on identifying ways in which providing additional support to our most vulnerable customers. Centrica can reduce carbon emissions. This is a role we are uniquely placed to fulfil through our customer relationships, the What is apparent is that we cannot achieve our low carbon skills of our service engineers and our expertise in sourcing goals in isolation. In September 2010, I set out what I believe energy and generating power. There are significant new market is needed from the industry, government and consumers to opportunities in helping to deliver a low carbon society; building achieve a low carbon economy.
    [Show full text]
  • WP 1702 Capacity Market
    The development of the Capacity Market for electricity in Great Britain Matthew Lockwood EPG Working Paper: 1702 Abstract: A Capacity Market (CM) for electricity was introduced in Great Britain in the early 2010s, with the first auctions being held in 2014. The CM has been controversial in its design and effects. In particular it has been seen as benefitting existing, often high-carbon, capacity and large incumbent generators, rather than new entrants and technologies, such as demand side response. More broadly, it is seen by some as working against, rather than for, the development of a low-carbon flexible future energy system. This paper traces the development of the Capacity Market as a policy process, with a particular focus on the influence of incumbents in that development. It is based on interviews with participants in and close observers of that process, and on a close reading of the policy process documentation, such as consultation submissions. The study of corporate influence in this case is complicated by the confluence of incumbent interests and political incentives facing government actors to keep the lights on. In the main decisions regarding the CM, including the decision to adopt a mechanism in the first place, and in deciding to have a market-wide approach, the incumbent lobby was split. However, in both these cases, the government’s decisions were in line with the wishes of, and used the arguments of the majority of incumbents. There is also evidence that incumbents lobbied effectively against a more supportive design of the CM for demand side response providers.
    [Show full text]
  • Annex D Major Events in the Energy Industry
    Annex D Major events in the Energy Industry 2020 Electricity In July 2020 construction work commenced on what is set to be the world’s longest electricity interconnector, linking the UK’s power system with Denmark. Due for completion in 2023, the 765-kilometre ‘Viking Link’ cable will stretch from Lincolnshire to South Jutland in Denmark. In July 2020 approval was granted for the Vanguard offshore wind farm in Norfolk. The 1.8GW facility consisting of up to 180 turbines will generate enough electricity to power 1.95 million homes. In May 2020 approval was granted for Britain’s largest ever solar farm at Cleve Hill, near Whitstable in Kent. The 350MW facility, comprising of 800.000 solar panels, will begin operation in 2022 and will provide power to around 91,000 homes. Energy Prices In February 2020 the energy price cap was reduced by £17 to £1,162 per year, from 1 April for the six-month “summer” price cap period. 2019 Climate Change The Government laid draft legislation in Parliament in early June 2019 to end the UK’s contribution to climate change, by changing the UK’s legally binding long-term emissions reduction target to net zero greenhouse gas emissions by 2050. The new target is based on advice from the government’s independent advisors, the Committee on Climate Change (CCC). The legislation was signed into law in late June 2019, following approval by the House of Commons and the House of Lords. Energy Policy A joint government-industry Offshore Wind Sector Deal was announced in March 2019, which will lead to clean, green offshore wind providing more than 30% of British electricity by 2030.
    [Show full text]
  • Display PDF in Separate
    environment agency plan TAMAR ANNUAL REVIEW 2000 December 2000 HOLSWORTHY LAUNCESTOI LISKEARD LOOE FOWEY PLYMOUTH FALMOUTH En v ir o n m e n t Ag e n c y Tamar Annual Review 2000 Further copies of this Annual Review can be obtained from: Team Leader, LEAPs Environment Agency Sir John Moore House Victoria Square Bodmin PL31 1EB Environment Agency Copyright Waiver This report is Intended to be used widely and may be quoted, copied or reproduced In any way; provided that the extracts are not quoted out of context and that due acknowledgement Is given to the Environment Agency. Note: This Is not a legally or scientifically binding document. ENVIRONMENT A G EN C Y 109199 Tamar Annual Review 2000 Our Vision Our vision is of this area being managed in a sustainable way, that balances the needs of all users with the needs of the environment. We look forward to a future where a healthy economy leads to: Biodiversity and the physical habitat for wildlife being enhanced People’s enjoyment and appreciation of the environment continuing to grow Pressures from human needs being satisfied sustainably Foreword This is the combined Annual Review of the Tamar Estuary and Freshwater Tamar Action Plans. It describes the progress that has been made since. In addition to our own actions in the plan area we welcome opportunities to work in partnership with other groups. Tamar Annual Review 2000 Contents 1. Introduction 2. Area Overview 3. Protection through Partnership 4. Actions 4.1 Quality of surface waters and groundwaters 4.1.1 Effects of effluent discharges
    [Show full text]