Prikaz Plana Rekonstrukcije I Dogradnje Hidroelektrane “Zvornik“ D. KRSTIĆ i dr. PRIKAZ PLANA REKONSTRUKCIJE I DOGRADNJE HIDROELEKTRANE... Prikaz plana rekonstrukcije i dogradnje Hidroelektrane “Zvornik“ DUŠAN B. KRSTIĆ, “Energoprojekt – Hidroinženjering“ a.d, Beograd Stručni rad SLOBODAN M. ZLATKOVIĆ, Ministarstvo poljoprivrede UDC: 621.311.21(497.11) i zaštite životne sredine, Tehnička komisija za ocenu studija o DOI: 10.5937/tehnika1603372K proceni uticaja projekata i aktivnosti na vodenu životnu sredinu, Beograd MILKA Đ. DOMAZET, Javno preduzeće “Elektroprivreda Srbije“, Beograd DEJAN M. VUKSANOVIĆ, Javno preduzeće “Elektroprivreda Srbije“, Beograd Osnovnim projektom energetskog iskorišćenja srednjeg dela reke Drine (od Višegrada do Zvornika) bila je predviđena izgradnja pet velikih hidroelektrana. Hidroelektrana kod Zvornika je imala najveće prednosti i ona je prva izgrađena. Hidroelektrana “Zvornik“ pregrađuje reku Drinu na oko 1 km uzvodno od Malog Zvornika u Srbiji i Zvornika u Bosni i Hercegovini. U cilju produženja radnog veka, Urbanističkim projektom je planirana modernizacija proizvodnih agregata i pripadajuće opreme, dogradnja aneksa iznad sifona agregata A1 i A2, kao i dogradnja aneksa mašinske zgrade na desnoj obali reke u funkciji smeštaja elektroopreme. Zamenom vitalnih delova turbine sa povećanjem prečnika uz povećanje stepena korisnosti, protoka i snage, kao i zamenom generatora novim generatorom veće snage sa pobudom i svim potrebnim pomoćnim uređajima, obezbediće se pouzdan rad hidroelektrane i produžiće se radni vek za narednih 40 godina, uz stvaranje mogućnosti za naknadnu ugradnju dodatnog petog agregata. Ključne reči: Hidroelektrana “Zvornik“, nivo vode, rekonstrukcija, prokopavanje, brana 1. UVOD Podrinju, na obroncima planine Boranje. Geografski Osnovnim projektom energetskog iskorišćenja položaj gradskog naselja je +44°23'43’’ severne geo- srednjeg dela reke Drine (od Višegrada do Zvornika) grafske širine i +19°06'57’’ istočne geografske dužine. bila je predviđena izgradnja pet velikih hidroelektrana. Grad je formiran u uskom pojasu na desnoj obali reke Hidroelektrana kod Zvornika je imala najveće pred- Drine, na području između 140 i 250 m nadmorske nosti i ona je prva izgrađena. Pripremni radovi za po- visine, a kroz njega protiču Đukanovića potok, Buče- četak gradnje Hidroelektrane “Zvornik“ otpočeli su vski potok i Moštanica. Sa susednim Zvornikom u krajem 1947. godine, a punim obimom su krenuli Bosni i Hercegovini povezan je sa dva mosta na Drini 1950. godine. Hidroelektrana ima 4 agregata nazivne [1]. snage po 30 MVA, koji su puštani u pogon od 1955. Hidroelektrana se nalazi na reci Drini, 93 km od do 1958. godine [1]. njenog ušća u reku Savu, u zapadnom delu Republike Srbije. Hidroelektrana pregrađuje reku Drinu na oko 1 2. OPIS LOKACIJE NA KOJOJ SE IZVODI km uzvodno od Malog Zvornika u Srbiji i Zvornika u PROJEKAT Bosni i Hercegovini (slika 1). Opština Mali Zvornik je nastala 1955. godine, ka- da je puštena u rad Hidroelektrana “Zvornik“. Sa po- vršinom od 184 km2, to je najmanja opština u Mačva- nskom okrugu, i jedna je od najmanjih u Republici Srbiji. Najviša kota opštine je Crni vrh sa 856 metara nadmorske visine. Mali Zvornik je smešten u srednjem Adresa autora: Dušan Krstić, “Energoprojekt – Hidroinženjering” ad, Beograd, Bul. Mihajla Pupina 12 Rad primljen: 31.05.2015. Rad prihvaćen: 17.03.2016. Slika 1 - Hidroelektrana “Zvornik“ 372 TEHNIKA – NAŠE GRAĐEVINARSTVO 70 (2016) 3 D. KRSTIĆ i dr. PRIKAZ PLANA REKONSTRUKCIJE I DOGRADNJE HIDROELEKTRANE... Ukupna površina parcele na kojoj se nalaze objekti revitalizacija i modernizacija glavne opreme nije hidroelektrane iznosi 2 ha, 71 ar i 14 m2, a od toga je urađena. 2 pod objektima 1 ha, 44 ara i 26 m . Zemljište na kome Komisija Javnog preduzeća “Elektroprivreda Sr- 2 je reka Drina zauzima 14 ari i 88 m , a ostalo veštački bije“ za revitalizaciju i modernizaciju hidroelektrana stvoreno neplodno zemljište zauzima 1 ha i 12 ari. izvršila je 1996. godine procenu stanja objekata i opreme hidroelektrane “Zvornik“ na osnovu krite- 3. PRETHODNI RADOVI NA IZVOĐENJU rijuma iz Uputstva za modernizaciju hidroelektrana PROJEKTA koje je urađeno 1989. godine od strane “Electric Power Hidroelektrana “Zvornik“ je u pogonu više od 50 Research Institute“ iz Kalifornije. Došlo se do godina, i uz redovno održavanje i korišćenje ona je u zaključka da je akcija na revitalizaciji i modernizaciji ovom periodu dala odgovarajući doprinos elektro-ene- neophodna u određenom momentu [1]. rgetskom sistemu Srbije. Međutim, specifična društve- Ocenom stanja opreme i objekata hidroelektrane, na i ekonomska situacija u vreme građenja i nabavke koju je 1997. godine uradila Stručna grupa EPS-a, a opreme, kao i kasnija izgradnja većih i značajnijih zatim Studijom o mogućnosti povećanja snage i pro- objekata, a verovatno i nedostatak sredstava za izgra- izvodnje hidroelektrane, koju je 2002. godine uradio dnju ostalih planiranih objekata u tom delu reke Drine, “Energoprojekt Hidroinženjering“ a.d., pokazano je da rezultirali su time da na hidroelektrani nisu maksi- je potrebno i ekonomski isplativo u narednom periodu malno iskorišćene pogodnosti pregradnog profila. Uo- obaviti produženje radnog veka opreme, da bi se ona čeni su sledeći značajni problemi koji su pratili rad hi- osposobila za siguran i pouzdan rad u narednom eks- droelektrane tokom celog dosadašnjeg perioda ploatacionom periodu od 30 godina. Da bi se sagledale eksploatacije: mogućnosti hidroelektrane, 2002. godine je urađena planirano prokopavanje korita reke Drine nizvo- Studija modernizacije i mogućnosti povećanja snage i dno od elektrane i uređenje obala nije sprovedeno proizvodnje, koja je razmotrila efekte koji se mogu do kraja; dobiti snižavanjem nivoa reke Drine nizvodno od bra- u poslednjih nekoliko godina vršeni su dodatni ne prokopavanjem korita, povećanjem kote vode u otkupi zemljišta tako da je ostvareno podizanje ko- akumulaciji sa sadašnjih 157,50 m na 158,00 m i te normalnog uspora sa projektovanih 157,3 m na 160,00 m, revitalizacijom turbina sa novim radnim sadašnjih 157,5 m; međutim, otkupi zemljišta i kolom istog prečnika kao kod postojećih ili nešto ve- objekata nisu sprovedeni do kraja, a u periodu na- ćeg prečnika i revitalizacijom ili zamenom generatora kon izgradnje hidroelektrane nije vođeno ni računa novim. U Studiji je urađena analiza stabilnosti brane i o izgradnji objekata u zoni akumulacije, tako da data su moguća tehnička rešenja [1]. nije došlo do podizanja sadašnje kote normalnog Stručni savet EPS-a je na sednici održanoj 2002. uspora sa 157,50 m na kotu 158,00 m; godine razmotrio pomenutu Studiju i zaključio da se instalisani proticaj elektrane od Q=600 m3/s se po- pri izradi Idejnog projekta i Studije opravdanosti uvaže kazao kao nedovoljan pa je dolazilo do češćeg pre- sledeće konstatacije: livanja vode preko brane. prokopavanje korita i snižavanje kote donje vode reke Drine nizvodno od brane nije sporno i ne Prokopavanje koje je na inicijativu osoblja ele- treba da čeka revitalizaciju opreme; ktrane rađeno u poslednjih nekoliko godina dalo je određene rezultate, ali se ne može reći da su oni realno je za kotu gornje vode u akumulaciji Zvo- adekvatni mogućnostima. 2004. godine “Energopro- rnik usvojiti kotu 158,00 m; jekt Hidroinženjering“ je uradio Idejni projekat proko- da se varijanta revitalizacije i modernizacije tur- pavanja korita reke Drine u kome su iskazani efekti bina i generatora, koja će se razraditi u Idejnom koji se ostvaruju izvršenjem ovih radova [1]. projektu, odredi posle ispitivanja stanja generato- ra; Da bi se situacija popravila, 1981. godine urađeni su Idejni projekti dodatnog agregata na desnoj obali, a Krajem 2002. godine formirana je Stručna grupa 2004. Glavni (Idejni) projekat prokopavanja korita re- EPS-a za ocenu stanja generatora i određivanja vari- ke Drine nizvodno od brane, koji nisu do sada jante njihove revitalizacije i modernizacije. Stručna realizovani [1]. grupa je zaključila da je optimalna varijanta revita- lizacije i modernizacije agregata ona kod koje bi tur- Sa starenjem opreme pojavljuju se problemi u bina imala novo radno kolo, istog ili nešto većeg njenom radu, pa je pre 10-15 godina započeto raz- prečnika od postojećeg, čime se omogućuje povećanje matranje njene revitalizacije i modernizacije. Manji snage i bolji stepen korisnosti turbine, kao i novi ge- obim ovih aktivnosti obavilo je osoblje hidroelektrane neratori koji će omogućiti potpuno iskorišćenje ras- sa sredstvima kojim je elektrana raspolagala, ali položive snage turbine [1]. TEHNIKA – NAŠE GRAĐEVINARSTVO 70 (2016) 3 373 D. KRSTIĆ i dr. PRIKAZ PLANA REKONSTRUKCIJE I DOGRADNJE HIDROELEKTRANE... Uvažavajući konstatacije Stručnog saveta EPS-a i 2007. godine urađena je Studija opravdanosti rekon- zaključke Stručne grupe za ocenu stanja generatora, strukcije sa dogradnjom u cilju produženja radnog napravljen je Projektni zadatak koji je obuhvatio sve veka hidroelektrane. Opravdanost realizacije usvojene navedene činjenice. Pri tome su uvažene i sledeće nove alternative rekonstrukcije sa dogradnjom potvrđena je okolnosti: i u okviru finansijske analize. U toku 2007. godine izrađen je Plan opšteg uređenja za seosko naselje da nivo gornje vode u akumulaciji treba da ostane Sakar. Naknadno je odlučeno da se granica Plana 157,30 m; opšteg uređenja proširi tako da obuhvati i objekte da se za kotu donje vode usvoje rezultati iz Gla- hidroelektrane, što je u konačnom dokumentu uvaženo vnog (Idejnog) projekta prokopavanja korita iz uz obavezu izrade Situacionog plana kompleksa hidro- 2004. godine; elektrane i Urbanističkog projekta
Recommended publications
  • The World Bank
    Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES15150 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SERBIA ROAD REHABILITATION AND SAFETY PROJECT LOAN IBRD-82550 APRIL 26, 2013 TO THE REPUBLIC OF SERBIA – December 23, 2014 Transport and ICT Global Practice Europe and Central Asia This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. ABBREVIATIONS AND ACRONYMS DLI Disbursement Linked Indicator DLP Defects Liability Period EBRD European Bank for Reconstruction and Development EIB European Investment Bank EIRR Economic Internal Rate of Return EMP Environmental Management Plan FY Fiscal Year GoS Government of Serbia PAD Project Appraisal Document PDO Project Development Objective PERS Public Enterprise Roads of Serbia PBMC Performance Based Maintenance Contract WB World Bank Regional Vice President: Laura Tuck Country Director: Ellen A. Goldstein Senior Global Practice Director Pierre Guslain Practice Manager: Juan Gaviria Task Team Leader: Moustafa Baher El-Hefnawy 2 SERBIA Road Rehabilitation and Safety Project CONTENTS DATASHEET Page 4 ANNEX 1: RESULTS FRAMEWORK AND MONITORING Page 9 ANNEX 2: REVISED IMPLEMENTATION PROGRAM Page 12 ANNEX 3a: ORIGINAL DLI TARGETS Page 18 ANNEX 3b: REVISED DLI TARGETS Page 20 ANNEX 4: SYSTEMATIC OPERATIONAL RISK RATING TOOL Page 22 3 DATA SHEET Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) EUROPE AND CENTRAL ASIA ECCU4 Report No: RES15150 Basic Information Project ID: P127876 Lending Instrument: Specific Investment Loan Regional Vice President: Laura Tuck Original EA Category: Partial Assessment (B) Country Director: Ellen A.
    [Show full text]
  • ENVIRONMENTAL MANAGEMENT PLAN for Urgent Maintenance and Remedy of Damages on State Road IB Class, No
    Beograd, Bulevar kralja Aleksandra 282 tel: +381 11 30 40 700 fax: +381 11 30 40 699 ENVIRONMENTAL MANAGEMENT PLAN for Urgent maintenance and remedy of damages on State Road IB Class, No. 26 Beograd - Sabac - Mali Zvornik section: Banja Koviljaca - Mali Zvornik km 0 + 000 to km 14 + 150 L = 14.150 km - Environmental Category B - BELGRADE, August 2015, Draft Document 1 State Road of the IB Class, No. 26, Section: B. Koviljaca - M. Zvornik, 20150826 Environmental Management Plan - EMP, DRAFT TABLE OF CONTENTS INTRODUCTION EXECUTIVE SUMMARY 1. PROJECT DESCRIPTION 2. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 3. BASELINE CONDITIONS ASSESSED DURING ROUTE SURVEY 4. SUMMARY OF ENVIRONMENTAL IMPACTS 5. ENVIRONMENTAL MANAGEMENT PLAN. A. MITIGATION PLAN B. MONITORING PLAN C. INSTITUTIONAL IMPLEMENTATION AND REPORTING ARRANGEMENTS 6. STAKEHOLDER ENGAGEMENT - INFORMATION DISCLOSURE, CONSULTATIONS AND PARTICIPATION 7. REFERENCE APPENDICES I EMP - MITIGATION PLAN II EMP - MONITORING PLAN III RELEVANT SERBIAN LEGISLATION IV STAKEHOLDER ENGAGEMENT AND PUBLIC CONSULTATION V CONDITION AND APPROVALS AND THE NECESSARY DOCUMENTATIONS FROM THE RELEVANT PUBLIC INSTITUTIONS 2 State Road of the IB Class, No. 26, Section: B. Koviljaca - M. Zvornik, 20150826 Environmental Management Plan - EMP, DRAFT ABBREVIATIONS AND ACRONYMS AADT Annual Average Daily Traffic CEP Contractor’s Environmental Plan EBRD European Bank for Reconstruction and Development EIA Environmental Impact Assessment EIB European Investment Bank EMP Environmental Management Plan HSE Health, Safety and Environment IFIs International Financing Institutions INP Institute for Nature Protection of the Republic of Serbia IPCM Institute for Protection of Cultural Monuments of the Republic of Serbia MoAEP Ministry of Agriculture and Environmental Protection MoT Ministry of Transport (fmr.
    [Show full text]
  • Konačni Birački Spisak Članova Regionalnog Centra Valjevo MS G
    Konačni birački spisak članova Regionalnog centra Valjevo_MS_G Godina Regionalni Matična RB Ime (roditelj) Prezime Licenca, odnosno licence člana Komore Prebivalište mesto i opština rođenja centar sekcija 1 Aleksandar (Dragoslav) Pošarac 1984 310N52114, 410I69314 Valjevo, Valjevo Valjevo G 2 Aleksandar (Milisav) Lazarević 1960 310482203 Valjevo, Valjevo Valjevo G 3 Aleksandar (Milomir) Nikolić 1986 410I97114, 310N82715 Valjevo, Valjevo Valjevo G 4 Aleksandar (Miroslav) Katanić 1984 414I69814, 314O92216 Loznica, Loznica Valjevo G 5 Aleksandar (Momčilo) Kuzmanović 1962 314372503, 414355303 Zabari, Valjevo Valjevo G 6 Aleksandar (Slobodan) Čavić 1988 410J53015, 310O46715 Šabac, Šabac Valjevo G 7 Aleksandar (Svetozar, Miljana) Selaković 1959 410338003, 310865004 Valjevo, Valjevo Valjevo G 8 Aleksandar (Tomislav) Mitrović 1959 310368403, 410352403 Valjevo, Valjevo Valjevo G 9 Aleksandra (Dragan) Milinković 1988 414K77218, 314P73318 Šabac, Šabac Valjevo G 10 Aleksandra (Jovica) Tojčić 1972 314D42806 Valjevo, Valjevo ValjevoG 11 Ana (Milan) Veselinović 1984 410I62514, 310N44914 Šabac, Šabac Valjevo G 12 Anđelka (Slobodan) Leontijević 1979 812171713, 800171513 Ub, Ub Valjevo G 13 Biljana (Radoje) Leontijević 1983 800176013, 812176113 Ub, Ub Valjevo G 14 Biserka (Milan i Ana) Stanimirović 1956 414270103, 314424003, 415G33211 Zavlaka, Krupanj Valjevo G 15 Bogdan (Slobodan) Polić 1950 414B06407, 314I71710 Šabac, Šabac Valjevo G 16 Bojan (Miroljub) Tomašević 1984 415J37815 Valjevo, Valjevo ValjevoG 17 Boris (Aleksandar) Vesić 1973 410F32910, 311J62910,
    [Show full text]
  • The Role of Islam in the War in Bosnia and Herzegovina, Is Discussed in the Next Section
    MUSLIM IDENTITY, ‘NEO-ISLAM’ AND THE 1992-95 WAR IN BOSNIA AND HERZEGOVINA S. OSMANOVIC Ph.D. 2015 ABSTRACT Following the fall of the Berlin Wall, Yugoslavia was entangled in a fratricidal break-up. In none of the other former Yugoslav republics did the conflict turn as violent as in Bosnia and Herzegovina, which suffered genocide, the greatest number of victims and the highest percentage of infrastructural destruction. Although its three ethnic communities – Muslims, Serbs and Croats – were previously well integrated, the break-up of Yugoslavia exposed Bosnia’s unique Islamic component, which both Serbs and Croats perceived to be the major impediment to the continuation of a pluralistic society. Islam, however, only turned into a divisive and decisive factor in the conflict when combined with ethnic nationalism. Previous research into the causes of the 1992-95 war in Bosnia and Herzegovina and the break-up of Yugoslavia has identified Bosnia’s long Islamic heritage and large Muslim population on the doorstep of Europe as specific features influencing both its rationale and resolution. Yet there has been no analysis of the role and impact of ‘neo-Islam’ (a term I explained below) in the conflict – an omission this thesis seeks to redress. The thesis uses historical analysis to demonstrate that Bosnia and Herzegovina was frequently subject to international intervention during the nineteenth and twentieth centuries, it explores whether the unique Islamic component was the reason behind this phenomenon, and seeks to comprehend why Bosnia and Herzegovina has always appeared to pose a problem for the international community, from the papal persecutions of the medieval Bogumils through to the present day.
    [Show full text]
  • Postal Code Post Office Name Post Office Address 11000
    POSTAL POST OFFICE POST OFFICE POSTAL POST OFFICE POST OFFICE CODE NAME ADDRESS CODE NAME ADDRESS 11000 BEOGRAD 6 SAVSKA 2 11161 BEOGRAD 16 MIJE KOVACEVICA 7B (STUD.DOM) 11010 BEOGRAD 48 KUMODRASKA 153 11162 BEOGRAD 18 VISNJICKA 110V 11011 BEOGRAD 145 ZAPLANJSKA 32 (STADION SHOPING CENTAR) 11163 BEOGRAD 107 BACVANSKA 21 11050 BEOGRAD 22 USTANICKA 182 11164 BEOGRAD 106 SALVADORA ALJENDEA 18 11051 BEOGRAD 130 VELJKA DUGOSEVICA 19 11166 BEOGRAD 112 KRALJA MILANA 14 11052 BEOGRAD 141 BULEVAR KRALJA ALEKSANDRA 516/Z 11167 BEOGRAD 113 NJEGOSEVA 7 11060 BEOGRAD 38 PATRISA LUMUMBE 50 11168 BEOGRAD 114 KNEZA MILOSA 24 11061 BEOGRAD 139 TAKOVSKA 2 11169 BEOGRAD 115 KNEZA MILOSA 81 11101 BEOGRAD 1 TAKOVSKA 2 11210 BEOGRAD 26 ZRENJANINSKI PUT BB (KRNJACA) 11102 BEOGRAD 3 ZMAJ JOVINA 17 11211 BORCA VALJEVSKOG ODREDA 15 11103 BEOGRAD 4 NUSICEVA 16 11212 OVCA MIHAJA EMINESKUA 80 11104 BEOGRAD 5 BEOGRADSKA 8 11213 PADINSKA SKELA PADINSKA SKELA BB 11106 BEOGRAD 10 CARA DUSANA 14-16 11214 BORCA RATKA MILJICA 81 11107 BEOGRAD 11 USTANICKA 79 11215 SLANCI MARSALA TITA 50 11108 BEOGRAD 12 BULEVAR DESPOTA STEFANA 68/A 11224 VRCIN SAVE KOVACEVICA 2 11109 BEOGRAD 14 BULEVAR KRALJA ALEKSANDRA 121 11306 GROCKA BULEVAR OSLOBODJENJA 24 11110 BEOGRAD 15 MAKSIMA GORKOG 2 11307 BOLEC SMEDEREVSKI PUT BB 11111 BEOGRAD 17 BULEVAR KRALJA ALEKSANDRA 84 11308 BEGALJICA BORISA KIDRICA 211 11112 BEOGRAD 19 LOMINA 7 11309 LESTANE MARSALA TITA 60 11113 BEOGRAD 20 SAVSKA 17/A 11350 BEOGRAD 120 KATICEVA 14-18 11114 BEOGRAD 21 UCITELJSKA 60 11351 VINCA PROFESORA VASICA 172 11115 BEOGRAD 23 BULEVAR OSLOBODJENJA 51 11430 UMCARI TRG REPUBLIKE 1 11116 BEOGRAD 28 RUZVELTOVA 21 11030 BEOGRAD 8 SUMADIJSKI TRG 2/A 11117 BEOGRAD 29 GOSPODAR JEVREMOVA 17 11031 BEOGRAD 131 BULEVAR VOJVODE MISICA 12 (EUROSALON) 11118 BEOGRAD 32 MAKSIMA GORKOG 89 11040 BEOGRAD 33 NEZNANOG JUNAKA 2/A 11119 BEOGRAD 34 MILESEVSKA 66 11090 BEOGRAD 75 PILOTA MIHAJLA PETROVICA 8-12 11120 BEOGRAD 35 KRALJICE MARIJE 5 11091 BEOGRAD 109 17.
    [Show full text]
  • Support to Water Resources Management in the Drina River Basin Project Id No
    Consulting Services for SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN PROJECT ID NO. 1099991 SERBIA – IWRM STUDY AND PLAN – BACKGROUND PAPER - VOLUME 2 – ANNEXES July 2016 Consulting Services for SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN PROJECT ID NO. 1099991 SERBIA – IWRM STUDY AND PLAN – BACKGROUND PAPER - VOLUME 2 – ANNEXES July 2016 PROJECT NO. A038803 DOCUMENT NO. 1 VERSION B DATE OF ISSUE July 2016 PREPARED DAH and others CHECKED RSS APPROVED RSS Consulting Services for SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN PROJECT ID NO. 1099991 This document has been produced with the financial assistance of the European Western Balkans Joint Fund under the Western Balkans Investment Framework. The views expressed herein are those of authors and can therefore in no way be taken to reflect the official opinion of the Contributors to the European Western Balkans Joint Fund or the EBRD and the EIB, as co‐managers of the European Western Balkans Joint Fund. World Bank Serbia - IWRM Study and Plan – Background Paper - Annexes Support to Water Resources Management in the Drina River Basin i Table of Contents Page No ................................................................................................................................................ Acronyms and Abbreviations x 1 Annex 1 ‐ Supporting Introduction ......................................................................................................... 1‐1 1.1 Annex 1‐1: Consolidated Summary of Stakeholder Comments
    [Show full text]
  • Sl List 09 2019
    Republika Srbija OP[TINA MALI ZVORNIK SLU@BENI LIST BROJ 09/19 Mali Zvornik, 19.08.2019. godine Besplatan primerak Na osnovu ~lana 40. Statuta op{tine Mali KONCESIONI AKT ZA POVERAVAWE Zvornik ("Slu`beni list op{tine Mali Zvornik OBAVQAWA KOMUNALNE DELATNOSTI 21/18), 29. stav 2. Zakona o javno-privatnom LINIJSKOG PREVOZA PUTNIKA NA partnerstvu i koncesijama ("Slu`beni glasnik TERITORIJI OP[TINE MALI ZVORNIK RS", br. 88/1, 15/16 i 104/16) i Mi{qewa Komisije za javno-privatno partnerstvo broj 29/2019 od 31. jula 2019. godine, Skup{tina op{tine Mali Zvornik na sednici odr`anoj 16.08.2019. godine, Jul, 2019. godine donosi 1. POJAM KONCESIJE ODLUKU O USVAJAWU KONCESIONOG AKTA ZA POVERAVAWE OBAVQAWA ^lanom 10.stav 1 Zakona o javno-privatnom KOMUNALENE DELATNOSTI LINIJSKOG partnerstvu i koncesijama ("Slu`beni glasnik PREVOZA PUTNIKA NA TERITORIJI RS", br. 88/2011,15/2016 i 104/16) je definisano da OP[TINE MALI ZVORNIK je koncesija, u smislu ovog zakona, ugovorno ili institucionalno JPP sa elementima koncesije u kome je javnim ugovorom ure|eno komercijalno I kori{}ewe prirodnog bogatstva, dobra u op{toj upotrebi koja su u javnoj svojini, odnosno dobra u Usvaja se Koncesioni akt za poveravawe svojini javnog tela ili obavqawe delatnosti od obavqawa komunalne delatnosti linijskog prevoza op{teg interesa, koje javni partner ustupa putnika na teritoriji op{tine Mali Zvornik u privatnom partneru, na odre|eno vreme, pod obliku javno-privatnog partnerstva sa elementima posebno propisanim uslovima, uz pla}awe koncesije u skladu sa Zakonom, a na koji je koncesione naknade od strane privatnog, odnosno Komisija za javno - privatno partnerstvo dala javnog partnera, pri ~emu privatni partner snosi Mi{qewe broj 29/2019 od 31.
    [Show full text]
  • Gender Disaggregated Data - Western Balkans
    GENDER DISAGGREGATED DATA - WESTERN BALKANS STATISTICAL REPORTS 2005 - 2013 TABLE OF CONTENTS & REVISION HISTORY 1 CONTENTS 1. REVISION HISTORY ______________________________________________________________ 5 2. PROJECT OVERVIEW _____________________________________________________________ 1 2.1. The project objective _________________________________________________________ 1 2.2. Target areas ________________________________________________________________ 1 2.3. Data source ________________________________________________________________ 1 2.4. Data quality issues ___________________________________________________________ 1 2.5. Detailed data analysis ________________________________________________________ 2 3. APPROACH USED _______________________________________________________________ 3 4. RECOMMENDATIONS ___________________________________________________________ 12 4.1. Federation of Bosnia and Herzegovina __________________________________________ 12 4.2. Republika Srpska ___________________________________________________________ 12 4.3. Republic of Kosovo __________________________________________________________ 13 4.4. Albania ___________________________________________________________________ 13 4.5. Serbia ____________________________________________________________________ 13 4.6. FYR Macedonia ____________________________________________________________ 14 4.7. Montenegro _______________________________________________________________ 14 5. FEDERATION OF BOSNIA AND HERZEGOVINA ________________________________________
    [Show full text]
  • Security Council Distr
    UNITED NATIONS S Security Council Distr. GENERAL S/1995/645 3 August 1995 ORIGINAL: ENGLISH LETTER DATED 3 AUGUST 1995 FROM THE SECRETARY-GENERAL ADDRESSED TO THE PRESIDENT OF THE SECURITY COUNCIL I have the honour to transmit the attached report, which was addressed to me on 2 August 1995 by the Co-Chairmen of the Steering Committee of the International Conference on the Former Yugoslavia, concerning the operations of the International Conference’s Mission to the Federal Republic of Yugoslavia (Serbia and Montenegro). This report by the Co-Chairmen contains the certification referred to in Security Council resolution 1003 (1995). I should be grateful if you would bring this information to the attention of the members of the Security Council. (Signed) Boutros BOUTROS-GHALI 95-23065 (E) 030895 /... S/1995/645 English Page 2 Annex Operations of the International Conference on the Former Yugoslavia (ICFY) Mission to the Federal Republic of Yugoslavia (Serbia and Montenegro) I. INTRODUCTION 1. The present report is submitted pursuant to paragraph 13 of Security Council resolutions 988 (1995) of 21 April 1995 and 1003 (1995) of 5 July 1995. In resolution 988 (1995), the Security Council requested that the Secretary- General submit every 30 days, for its review, a report from the Co-Chairmen of the Steering Committee of the International Conference on the Former Yugoslavia on the border closure measures taken by the authorities of the Federal Republic of Yugoslavia (Serbia and Montenegro). 2. It will be recalled that, on 4 August 1994, the following
    [Show full text]
  • SOLID WASTE MANAGEMENT in Cross-Border Rural and Coastal Areas of South Eastern Europe CONTENT
    SOLID WASTE MANAGEMENT In cross-border rural and coastal areas of South Eastern Europe CONTENT ASSESSMENT METHOD FOR CROSS-BORDER ADVERSE ENVIRONMENTAL AND ECONOMIC IMPACT 03-26 ASSESSMENT REPORT ON THE CROSS BOARDER ADVERSE ENVIRONMENTAL AND ECONOMIC IMPACT IN TARA-DRINA-SAVA REGION 27-86 ASSESSMENT REPORT ON THE CROSS-BORDER ADVERSE ENVIRONMENTAL AND ECONOMIC IMPACT IN SHARRA REGION 87-133 INTEGRATED SOLID WASTE MANAGEMENT MODEL IN TARA-DRINA-SAVA REGION 134-192 INTEGRATED SOLID WASTE MANAGEMENT MODEL IN SHARRA REGION 193-246 ASSESSMENT REPORT ON THE CROSS-BORDER ADVERSE ENVIRONMENTAL AND ECONOMIC IMPACT IN ADRIATIC COAST 247-289 INTEGRATED SOLID WASTE MANAGEMENT MODEL IN ADRIATIC COAST REGION 290-343 ASSESSMENT METHOD for cross-border adverse environmental and economic impact Contents Executive Summary ................................................................................................................................. 3 1. Background ....................................................................................................................................... 5 2. Goals and Objectives ...................................................................................................................... 5 3. The Pilot Regions ............................................................................................................................. 6 4. The Approach .................................................................................................................................. 11 4.1 Introducing
    [Show full text]
  • From Ottawa to Sarajevo
    FROM OTTAWA TO SARAJEVO FROM OTTAWA TO SARAJEVO CANADIAN PEACEKEEPERS IN THE BALKANS Dawn M. Hewitt Centre for International Relations, Queen’s University Kingston, Ontario, Canada 1998 Canadian Cataloguing in Publication Data Hewitt, Dawn M. From Ottawa to Sarajevo : Canadian peacekeepers in the Balkans (Martello papers ; 18) ISBN 0-88911-788-8 1. United Nations – Armed Forces. 2. United Nations – Canada. 3. Canada – Armed Forces – Bosnia and Hercegovina. 4. Canada – Armed Forces – Croatia. 5. Canada – Armed Forces – Yugoslavia. I. Queen’s University (Kingston, Ont.). Centre for International Relations. II. Title. III. Series. JX1981.P7H49 1997 355.3’57’0971 C97-932224-3 © Copyright 1998 Dedication To my parents, Msgt (ret) Norman E. Hewitt and Mrs Ruth Kane Hewitt The way of arms and arts as the way of the warrior is a constant precept that needs no detailing. Keep arts at your left side, arms by your right, the two must complement each other, without one the other can not be. Hojo Code The Martello Papers This is the eighteenth in a series of security studies published over the past several years by the Queen’s University Centre for International Relations (QCIR), under the general title of the Martello Papers. “From Ottawa to Sarajevo” is a detailed, empirical examination of Canadian participation in UN peacekeeping efforts in the former Yugoslavia between 1992 and 1995, written by a US Air Force officer, Major Dawn Hewitt, who served as Visiting Defence Fellow at the Centre during the 1996-97 academic year. Peacekeeping, by all accounts, has become increasingly complex since the end- ing of the Cold War, and as Major Hewitt’s monograph reveals, nowhere have those complexities and frustrations been more apparent than in the former Yugo- slavia.
    [Show full text]
  • Mali Zvornik
    CORE Metadata, citation and similar papers at core.ac.uk Provided by OpenEdition Balkanologie Revue d'études pluridisciplinaires Vol. VI, n° 1-2 | 2002 Volume VI Numéro 1-2 Mali Zvornik Bernard Lory Édition électronique URL : http://journals.openedition.org/balkanologie/436 ISSN : 1965-0582 Éditeur Association française d'études sur les Balkans (Afebalk) Édition imprimée Date de publication : 1 décembre 2002 Pagination : 15-18 ISSN : 1279-7952 Référence électronique Bernard Lory, « Mali Zvornik », Balkanologie [En ligne], Vol. VI, n° 1-2 | décembre 2002, mis en ligne le 03 février 2009, consulté le 20 avril 2019. URL : http://journals.openedition.org/balkanologie/436 © Tous droits réservés BalkanologieVI (1-2), décembre 2002, p. 15-18 \ 15 MALI ZVORNIK Bernard Lory* Les débuts de l'autonomie d e la Serbie baignent dans un grand flou juri­ dique. Un terme fut mi s à la Seconde Insurrection serbe en 181 5 par un simpl e accord verba l entr e l e beylerbey d e Rouméli e Maraşl ı Al i pach a e t Milo š Obrenovic. Ce dernier s e voyait reconnu comme oberknez, c'est à dire comme interlocuteur privilégi é d u pouvoir ottoman e t porte­parole d e la populatio n chrétienne serbe. Une relative autonomie interne était accordée à celle­ci dans le cadre du pachalik de Belgrade. Il fallut beaucou p d e doigté, de ruse et souven t d e mauvaise fo i à Milo š Obrenović pour consolider ses fragiles positions. Dès 1820, pourtant, il souleva la question de l'étendue territoriale de sa juridiction.
    [Show full text]