Wo Che – Tsing Lung Tau)

Total Page:16

File Type:pdf, Size:1020Kb

Wo Che – Tsing Lung Tau) Traffic Advice Introduction of KMB Route No. 48P (Wo Che – Tsing Lung Tau) Members of the public are advised that with effect from 24 April 2017, KMB will operate a new bus route numbered as 48P (Wo Che – Tsing Lung Tau). The operational details are as follows: A. Routeing WO CHE to TSING LUNG TAU : via Fung Shun Street, Wo Che Street, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Po Road, Sha Tin Central Bus Terminus, Sha Tin Centre Street, Wang Pok Street, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Po Road, Shing Mun Tunnel Road, Shing Mun Tunnels, Cheung Pei Shan Road, Tsuen Kam Interchange, Tai Ho Road North, Tai Ho Road, Tsuen Wan (Nina Tower) Bus Terminus, Tai Ho Road, Sha Tsui Road, Tai Chung Road, Castle Peak Road – Tsuen Wan, Hoi Hing Road, Hoi On Road, Castle Peak Road – Ting Kau, Castle Peak Road – New Ting Kau, Castle Peak Road – Ting Kau, Castle Peak Road – Sham Tseng and Castle Peak Road – Tsing Lung Tau. TSING LUNG TAU to WO CHE : via Castle Peak Road – Tsing Lung Tau, Castle Peak Road – Sham Tseng, Castle Peak Road – Ting Kau, Castle Peak Road – New Ting Kau, Castle Peak Road – Ting Kau, Hoi On Road, Lai Shun Road, Castle Peak Road – Tsuen Wan, Hoi Hing Road, Tai Chung Road, Sha Tsui Road, Tai Ho Road, Tai Ho Road North, Tsuen Kam Interchange, Cheung Pei Shan Road, Shing Mun Tunnels, Shing Mun Tunnel Road, Tai Po Road, Sha Tin Rural Committee Road, Tai Po Road, Sha Tin Central Bus Terminus, Sha Tin Centre Street, Wang Pok Street, Yuen Wo Road, Wo Che Street and Fung Shun Street. B. Fare Wo Che $13.20 After Shing Mun Tunnels Bus Interchange $13.20 $5.80 Tsing Lung Tau Boardings at Shing Mun Tunnels Bus Interchange to Tsing Lung Tau: $5.10 Tsing Lung Tau $13.20 Castle Peak Road (Belvedere Garden) $13.20 $9.10 After Shing Mun Tunnels Bus Interchange $13.20 $9.10 $4.50 Wo Che No charge for boardings at Shing Mun Tunnels Bus Interchange to Wo Che. 1 C. Timetable Mondays to Fridays (except public holidays) from Who Che: 7.45 a.m. and 6.15 p.m. Mondays to Fridays (except public holidays) from Tsing Lung Tau: 7.45 a.m. and 6.15 p.m. D. Bus Stop Arrangements Who Che to Tsing Lung Tau 0. Wo Che Bus Terminus 1. Fung Shun Street Outside Fung Wo House 2. Yuen Wo Road Opposite Lek Yuen Estate 3. Sha Tin Central Bus Terminus 4. Shing Mun Tunnels Bus Interchange 5. Tai Ho Road North Tai Ho Road Bridge 6. Tsuen Wan (Nina Tower) Bus Terminus 7. Tai Chung Road House No.22-28 Hale Weal Industrial Building 8. Castle Peak Road Outside House No. 491-501 Hi-Tech Industrial Centre 9. Castle Peak Road Near Chai Wan Kok Street 10. Hoi On Road Opposite Belvedere Garden Phase 3 11. Hoi On Road Near Lai Shun Road 12. Hoi On Road Near Road Junction With Castle Peak Road 13. Castle Peak Road Near Yau Kam Tau 14. Castle Peak Road Near Approach Beach 15. Castle Peak Road Outside South Mountain Swimming Association 16. Castle Peak Road Ting Kau 17. Castle Peak Road Lido Beach L/P W3826-0 18. Castle Peak Road Hoi Mei Beach 19. Castle Peak Road Outside Garden Balery 20. Castle Peak Road Outside House No. 17-29 21. Castle Peak Road Outside Lido Garden 22. Castle Peak Road Near Ma Wan Pier Near L/P Fb3130 23. Castle Peak Road Opposite Sea Crest Villa Phase 3 24. Castle Peak Road Opposite Sea Crest Villa Phase 4 Near L/P Fb3426 25. Castle Peak Road Opposite Tsing Lung Tau Tsuen 26. Castle Peak Road Tsing Lung Tau Pier, Opposite Hong Kong Garden Near L/P Bc0946 2 Tsing Lung Tau to Who Che 0. Castle Peak Road Hong Kong Garden Near L/P Bc0938 1. Castle Peak Road Near Tsing Lung Tau Tsuen 2. Castle Peak Road Outside Sea Crest Villa Phase 4 3. Castle Peak Road Outside Sea Crest Villa Phase 3 4. Castle Peak Road Opposite Ma Wan Pier 5. Castle Peak Road Outside Sham Tseng Village 6. Castle Peak Road Outside Rhine Garden 7. Castle Peak Road Near Rhine Terrace 8. Castle Peak Road Hoi Mei Beaches 9. Castle Peak Road Outside Villa Mar near Lido Beach 10. Castle Peak Road Ting Kau Beaches 11. Castle Peak Road Opposite South Mountain Swimming Association 12. Castle Peak Road Near Golden Villa 13. Castle Peak Road Yau Kom Tau 14. Castle Peak Road Outside Greenview Terrace 15. Hoi On Road Outside Bayview Garden 16. Castle Peak Road Opposite Belvedere Garden Phase 3 17. Castle Peak Road Outside The Panorama 18. Tai Chung Road Near Chai Wan Kok Street 19. Sha Tsui Road Outside No. 163 Fuk Loi Estate Fuk Chi Lau 20. Tai Ho Road Outside Princess Alexandra Community Centre 21. Tai Ho Road North Tai Ho Road Bridge 22. Shing Mun Tunnels Bus Interchange 23. New Town Plaza B1 24. Wo Che Street, Outside Sau Chuen House, Lek Yuen Estate 25. Fung Shun Street Outside Fung Wo Estate Wo Yue House 26. Wo Che Bus Terminus Notices will be displayed by the bus company to inform passengers of the above arrangements. 3 .
Recommended publications
  • 332 Controlling Officer's Reply
    Examination of Estimates of Expenditure 2019-20 Reply Serial No. FHB(FE)332 CONTROLLING OFFICER’S REPLY (Question Serial No. 5578) Head: (49) Food and Environmental Hygiene Department Subhead (No. & title): (-) Not specified Programme: (2) Environmental Hygiene and Related Services Controlling Officer: Director of Food and Environmental Hygiene (Miss Vivian LAU) Director of Bureau: Secretary for Food and Health Question: How many unisex toilets are there in the territory? Please provide their addresses with a breakdown by the 18 districts. Does the Food and Environmental Hygiene Department have any plan to continuously increase the number of unisex toilets? If yes, please provide the details. Asked by: Hon CHAN Chi-chuen (LegCo internal reference no.: 409) Reply: The Food and Environmental Hygiene Department (the Department) has 379 public toilets with accessible unisex toilets (AUTs) provision. A list of these toilets is provided at Annex. If circumstances permit, the Department will, based on “The Design Manual on Barrier Free Access 2008”, provide AUTs at new public toilets or during reprovisioning or refurbishment of existing ones. Access to AUTs does not necessitate traversing an area reserved for one sex only. - End - Session 13 FHB(FE) - Page 901 Annex (Page 1 of 20) List of Public Toilets with Accessible Unisex Toilets Serial District Name of Public Toilet Address No. 1 Central/Western Belcher's Street Public Behind No.2-12 Belcher's Street, Sai Toilet Wan 2 Central/Western Centre Street Public Toilet Near Centre Street Market,
    [Show full text]
  • Head 95 — LEISURE and CULTURAL SERVICES DEPARTMENT
    Head 95 — LEISURE AND CULTURAL SERVICES DEPARTMENT Controlling officer: the Director of Leisure and Cultural Services will account for expenditure under this Head. Estimate 2013–14 .................................................................................................................................... $000.0m$6,538.0 m Establishment ceiling 2013–14 (notional annual mid-point salary value) representing an estimated 8 769 non-directorate posts as at 31 March 2013 rising by 253 posts to 9 022 posts as at 31 March 2014 ......................................................................................................................................... $2,381.8m In addition, there will be an estimated 12 directorate posts as at 31 March 2013 and as at 31 March 2014. Commitment balance ............................................................................................................................. $94.5m Controlling Officer’s Report Programmes Programme (1) Recreation and Sports These programmes contribute to Policy Area 18: Recreation, Programme (2) Horticulture and Amenities Culture, Amenities and Entertainment Licensing (Secretary for Home Affairs). Programme (3) Heritage and Museums This programme contributes to Policy Area 18: Recreation, Culture, Amenities and Entertainment Licensing (Secretary for Home Affairs) and Policy Area 22: Buildings, Lands, Planning, Heritage Conservation, Greening and Landscape (Secretary for Development). Programme (4) Performing Arts These programmes contribute to Policy Area 18:
    [Show full text]
  • G.N. 3973 NOTICE of AWARD of CONTRACT the Following Contracts Awarded During the Month of May 2001 Are Published for General Information
    G.N. 3973 NOTICE OF AWARD OF CONTRACT The following contracts awarded during the month of May 2001 are published for general information. LEISURE AND CULTURAL SERVICES DEPARTMENT 1–3 Pai Tau Street, Sha Tin, New Territories, Hong Kong. Tender Tendering Item/ Reference Procedure Particulars Contractor(s) and Address(es) Quantity Amount LCQ OpenProvision of management Kai Shing Management — HK$33,318,672.00 3026/2000 services for indoor games hall Services Ltd., (G.N. 8256) of Leisure and Cultural Room 2301, Sun Hung Kei Services Department in Urban Centre, 30 Harbour Road, Areas (Cheung Sha Wan Wan Chai, Hong Kong. Indoor Games Hall, Chuk Yuen Indoor Games Hall and Quarry Bay Complex Indoor Games Hall) Provision of management Colliers Jardine Management — HK$9,385,224.00 services for indoor games hall Ltd., of Leisure and Cultural 23/F., Devon House, Taikoo Services Department in Urban Place, 979 King’s Road, Areas (Chun Wah Road Quarry Bay, Hong Kong. Indoor Games Hall) RKQ (LD) Open The grant of a licence to LSG Catering Hong Kong — HK$4,680,000.00 STADIA provide refreshment kiosk, Ltd., 01/2001 catering and reception services Unit 1704–1706 Island Place at the Hong Kong Coliseum Tower, 510 King’s Road, and Queen Elizabeth Stadium North Point, Hong Kong. (1.6.2001–31.5.2004) LRQ OpenOperation of the general POON Woon — HK$1,836,000.00 LCSD restaurant at Kowloon Tsai Flat B, 15/F, 17 Village Road, LS(KC) Swimming Pool, the light Happy Valley, Hong Kong. 90/308 refreshment kiosk at Kowloon Tsai Park and the mobile kiosk at Kowloon Tsai Sportsground (1.5.2001–30.4.2004) LRQ-LCSD Open Operation of the pro-shop at Prasidha (HK) Ltd., — HK$363,600.00 LS(SSP) Cornwall Street Park (Squash Flat A, 5/F, North Point 90/22 and Table Tennis Centre) Industrial Building, 499 King’s IV(PS) (1.6.2001–31.5.2004) Road, North Point, Hong Kong.
    [Show full text]
  • Legislative Council
    立法會 Legislative Council LC Paper No. CB(1)58/02-03 Ref : CB1/PL/TP Panel on Transport Background brief on Route 10 Purpose This paper provides background information on the Route 10 - North Lantau to Yuen Long Highway project. It also gives an account of past discussions on the subject matter held by Legislative Council Members. Background of Route 10 2. Route 10, a proposed dual 3-lane highway of about 12.8-kilometre (km) long, will connect Lam Tei in North West New Territories (NWNT) to Northeast Lantau via So Kwun Wat and Tsing Lung Tau. 3. According to the Administration, Route 10 will perform the following functions – (a) to provide an alternative external road link for Lantau and the airport; (b) to meet anticipated population and employment growth in NWNT; and (c) to meet forecast traffic demand generated by cross boundary activities. 4. The route comprises the following sections – (a) Southern Section (8.3 km) – from North Lantau to So Kwun Wat; and (b) Northern Section (4.5 km) – from So Kwun Wat to Yuen Long Highway. - 2 - Route 10 Southern Section 5. The Southern Section of Route 10 between North Lantau and So Kwun Wat was gazetted under the Roads (Works, Use and Compensation) Ordinance (Cap. 370) in July 2000. Two link roads to connect with Tuen Mun Road were included in the scheme – (a) a dual 2-lane So Kwun Wat Link Road which connected Route 10 to Tuen Mun Road at So Kwun Wat, for vehicles to enter or leave the Southern Section; and (b) a dual 2-lane Siu Lam Link Road which connected Route 10 to Tuen Mun Road at Siu Lam, for vehicles to enter or leave the Northern Section.
    [Show full text]
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • Traffic and Transport Arrangements for the Commissioning of Shenzhen Bay Port and Northwest New Territories Traffic and Infrastructure Review
    LC Paper No. CB(1)2023/06-07(05) For Discussion on 9 July 2007 Legislative Council Panel on Transport Traffic and Transport Arrangements for the commissioning of Shenzhen Bay Port and Northwest New Territories Traffic and Infrastructure Review PURPOSE This paper - (i) updates Members on the traffic and transport arrangements upon the commissioning of Shenzhen Bay Port (SBP); and (ii) informs Members of the latest progress of the Northwest New Territories (NWNT) Traffic and Infrastructure Review (the Review). TRAFFIC AND TRANSPORT ARRANGEMENTS UPON THE COMMISSIONING OF SBP Quota arrangements and public transport services 2. The SBP will be open to traffic from 6 pm on 1 July 2007. As we informed Members earlier, we have reached agreement with the relevant Guangdong authorities on the number of quotas to be issued for cross-boundary private cars and coaches. For private cars, we will initially issue 1 500 new SBP quotas. In addition, to ease congestion at the existing control points, we will encourage existing holders of quotas for other crossings to switch to SBP. In this regard, we will allow a 3-month trial period upon the commissioning of SBP, during which existing quota-holders can try to use SBP. They may then apply for a SBP quota by surrendering their quotas for other existing crossings. The Guangdong authorities have started accepting applications for private car quotas. The Transport Department (TD) earlier sent letters to existing quota holders to invite them to switch to use SBP and to inform them of the arrangements for the trial period. 3. Regarding cross-boundary coaches, TD has completed the exercise to allocate 300 quotas to the operators.
    [Show full text]
  • An Evaluation of 48 Leisure and Cultural Sites Along Victoria Harbour: Suggestions for a Vibrant Hong Kong Harbour-Front
    An Evaluation of 48 Leisure and Cultural Sites along Victoria Harbour: Suggestions for a Vibrant Hong Kong Harbour-front An Interactive Qualifying Project Report submitted to the Faculty of the Worcester Polytechnic Institute in partial fulfillment of the requirements for the Degree of Bachelor of Science in cooperation with Designing Hong Kong, Ltd., Hong Kong on February 20, 2009 Submitted By: Submitted To: Nathaniel Jannetti Paul Zimmerman, Sponsor Liaison Aubrey Scarborough Project Advisors: Paul Smith Professor Jeanine Skorinko Elizabeth Tuite Professor Stanley Selkow Abstract Even though Hong Kong is well known for its waterfront views, Victoria Harbour uses little of its waterfront to the fullest potential. From past research, we identified four main qualities essential to a beneficial harbour-front: accessibility, connectivity, quality and design/maintenance. After observing forty-eight sites around Hong Kong’s Victoria Harbour, we indicated both positive and negative qualities that added or detracted from the site’s vibrancy. We found that a mix of facilities, amenities and activities at water's edge can make Victoria Harbour a more popular destination for both residents and tourists. Our report presents findings and suggestions for the improvement of Hong Kong. ii Acknowledgements We would like to express the deepest appreciation to the Leisure and Cultural Services Department, Harbour-front Enhancement Committee, Hong Kong University, Harbour Business Forum and Designing Hong Kong, LTD. To Paul Cheung, Paul Zimmerman, Roger Nissim, Elanna Tam, David Chaiong, Brenda Fung, Terry Ma, Mee Kam Ng, Andrew Thompson, Maggie Brooke, Stanley Selkow and Jeanine Skorinko, we thank you for your enthusiasm and support. All of you have made the course of this project and our personal time here the experience of a lifetime.
    [Show full text]
  • Minutes of 667Th Meeting of the Metro Planning Committee Held at 9:00 A.M
    TOWN PLANNING BOARD Minutes of 667th Meeting of the Metro Planning Committee held at 9:00 a.m. on 12.3.2021 Present Director of Planning Chairman Mr Ivan M. K. Chung Mr Wilson Y.W. Fung Vice-chairman Dr Frankie W.C. Yeung Dr Lawrence W.C. Poon Mr Thomas O.S. Ho Mr Alex T.H. Lai Professor T.S. Liu Mr Franklin Yu Mr Stanley T.S. Choi Mr Daniel K.S. Lau Ms Lilian S.K. Law Professor John C.Y. Ng Professor Jonathan W.C. Wong - 2 - Dr Roger C.K. Chan Mr C.H. Tse Assistant Commissioner for Transport (Urban), Transport Department Mr Patrick K.H. Ho Chief Engineer (Works), Home Affairs Department Mr Gavin C.T. Tse Principal Environmental Protection Officer (Metro Assessment), Environmental Protection Department Dr Sunny C.W. Cheung Assistant Director (Regional 1), Lands Department Mr Albert K.L. Cheung Deputy Director of Planning/District Secretary Miss Fiona S.Y. Lung Absent with Apologies Ms Sandy H.Y. Wong In Attendance Assistant Director of Planning/Board Ms Lily Y.M. Yam Chief Town Planner/Town Planning Board Ms Caroline T.Y. Tang Town Planner/Town Planning Board Mr Ryan C.K. Ho - 3 - Opening Remarks 1. The Chairman said that the meeting would be conducted with video conferencing arrangement. Agenda Item 1 Confirmation of the Draft Minutes of the 666th MPC Meeting held on 26.2.2021 [Open Meeting] 2. The draft minutes of the 666th MPC meeting held on 26.2.2021 were confirmed without amendments. Agenda Item 2 Matter Arising [Open Meeting] 3.
    [Show full text]
  • Directors and Parties Involved in the [Redacted]
    THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS AND PARTIES INVOLVED IN THE [REDACTED] DIRECTORS Name Residential Address Nationality Executive Directors Mr. Poon Ken Ching Flat A, 12/F, Avalon, 17-19 Tai Hang Road, Chinese Keung (潘正強) Hong Kong Mr. Poon Ching Tong Flat A, 12/F, Avalon, 17-19 Tai Hang Road, Chinese Tommy (潘正棠) Hong Kong Mr.NgKwokWai Room 1154, 11/F, Lok Sin Lau, Chinese (吳國威) Lok Man Sun Chuen, Kowloon, Hong Kong Non-executive Director Ms. Poon Kam Yee Flat A, 10/F, Block 5, Pacific Palisades, Chinese Odilia (潘錦儀) 1 Braemar Hill Road, North Point, Hong Kong Independent non-executive Directors Dr. Wong Kam Din Flat D, 22/F, Block 16, Hong Kong Garden, British (王金殿) Tsing Lung Tau, New Territories, Hong Kong Mr. Yung Chung Hing Flat LC, 65/F, TWR 11, Meadowland, Chinese (翁宗興) La Splendeur, Tseung Kwan O, New Territories, Hong Kong Mr. Lam Chung Wai Flat C, 29/F, Tower 8, Bellagio, Chinese (林仲煒) 33 Castle Peak Road, Sham Tseng, New Territories, Hong Kong Further information on the profile and background of our Directors has been disclosed in the section headed “Directors and senior management” in this document. –54– THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS AND PARTIES INVOLVED IN THE [REDACTED] PARTIES INVOLVED IN THE [REDACTED] Party Name
    [Show full text]
  • Overview of Potential Capital Works Items to Be Submitted to PWSC in the 2006-07 Legislative Session
    LC Paper No. FC48/06-07(02) Overview of potential capital works items to be submitted to PWSC in the 2006-07 Legislative Session Target Date of Project No. Project Title Contract Start submission to Code Date PWSC 1 ―― Provision for CWRF block -- 19.12.06 allocations in 2007-08 2 6718TH Improvement to Tung Chung Road -- 24.1.07 between Lung Tseng Tau and Cheung Sha 3 3323EP A 24-classroom primary school at 2006-Q4 25.10.06 the junction of Texaco Road and Castle Peak Road, Tsuen Wan 4 4112CD Drainage improvement in Northern 2006-Q4 First submission New Territories - package A on 25.10.06 and withdrawn Second submission on 22.11.06 and endorsed 5 3338EP A 24-classroom primary school in 2007-Q1 25.10.06 Site 10, West Kowloon Reclamation, Sham Shui Po 6 3247RS Improvement to Victoria Park Tennis 2007-Q1 19.12.06 Centre 7 4052DS Ting Kau sewerage, stage 2 2007-Q1 22.11.06 8 4126DS Sham Tseng sewerage, stage 3 2007-Q1 22.11.06 9 4338DS Improvement and upgrading of the 2007-Q1 25.10.06 sewerage systems in Sha Tin/Ma On Shan New Town 10 5035CG Greening master plan for Kowloon 2007-Q1 25.10.06 West - studies and works 11 5036CG Greening master plan for Hong 2007-Q1 25.10.06 Kong Island - studies and works 12 6143TB Improvement to pedestrian subway 2007-Q1 19.12.06 system at Kwai Fuk Road roundabout - 2 - Target Date of Project No. Project Title Contract Start submission to Code Date PWSC 13 6582TH Central Kowloon Route - 2007-Q1 First submission consultants' design fees and site on 19.12.06 and investigations negatived Second submission on 7.2.07 and endorsed 14 7711CL Kai Tak development – advance 2007-Q1 22.11.06 infrastructure works for developments at the southern part of the former runway 15 7719CL Kai Tak development - engineering 2007-Q1 22.11.06 review 16 8028EA Reprovisioning of St.
    [Show full text]
  • Mon Tue Wed Thu Fri Sat Sun 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
    WWF - DDC Location Plan May-2018 Mon Tue Wed Thu Fri Sat Sun 1 2 3 4 5 6 Team A Day-Off Tsuen Wan Plaza Diamond Hill MTR Exit A2 Lau Sin Street, Tin Hau King Man Street, Sai Kung (Near Sai Kung Library) Day-Off Hang Seng Bank Head Office, Central New Jade Shopping Centre, Chai Wan New Jade Shopping Centre, Chai Wan Team B Shatin Plaza Shatin Plaza Shatin Plaza (Near Footbridge) (Near Footbridge) (Near Footbridge) Hang Seng Bank Head Office, Central New Jade Shopping Centre, Chai Wan Team C Canal Road East Bridge, Causeway Bay Hong Kong MTR Station Yuen Long MTR Station Yuen Long MTR Station (Near Footbridge) (Near Footbridge) Hang Seng Bank Head Office, Central Team D Wu Kai Sha MTR Station Exit B Canal Road East Bridge, Causeway Bay Yuen Long MTR Station Tsuen Wan Plaza (Near Footbridge) Tsuen Wan Plaza (Near Footbridge) (Near Footbridge) World Wide House, Central World Wide House, Central Team E Tuen Mun MTR Station Wu Kai Sha MTR Station Exit B Canal Road East Bridge, Causeway Bay Tsuen Wan Plaza (Near Footbridge) (Near Footbridge) (Near Footbridge) World Wide House, Central Team F Causeway Bay Plaza 1 (Near Footbridge) Tuen Mun MTR Station Wu Kai Sha MTR Station Exit B Chai Wan MTR Station Chai Wan MTR Station (Near Footbridge) Team G Admiralty MTR Station Exit A Causeway Bay Plaza 1 (Near Footbridge) Tuen Mun MTR Station Chai Wan MTR Station Austin MTR Station Exit B (Near Footbridge) Austin MTR Station Exit B (Near Footbridge) Team H Tai Wai MTR Station Exit D Admiralty MTR Station Exit A Causeway Bay Plaza 1 (Near Footbridge) Austin
    [Show full text]
  • (I) Villages with Public Sewerage Installed
    Annex Details of villages where public sewerage works installed / under construction / under planning (i) Villages with public sewerage installed District Village name No. of (Number of Houses villages) (About) Islands (19) Yung Shue Wan Main Street, Yung Shue Wan Back 1 530 Street (Part 1), Po Wah Yuen (Part 1), Sha Po Old Village (Part 1), Sha Po New Village (Part 1), Tai Yuen New Village, Kam Shan Terrace, Ko Long (Part 1), Chung Mei, Sok Kwu Wan, Ngong Ping Village, Central Cheung Chau Old Town, Peng Chau (Part), Chung Hau, Tung Wan Tau, Tai O town centre, Ma Wan New Village, Tei Po New Village, Chek Lap Kok New Village North (33) Kan Lung Tsuen, San Wai, San Uk Tsuen, Ma Mei 2 800 Ha, Ma Mei Ha Leng Tsui, Tung Kok Wai, Lo Wai, Tsz Tong Tsuen, Wing Ning Tsuen, Wing Ning Wai, Ma Wat Wai, Tai Tau Leng, Tsung Pak Long, Yin Kong, Fan Leng Lau, Kai Leng, Ng Uk Tsuen, Heung Yuen Wai, Ha Hueng Yuen, Tsung Yuen Ha, Chuk Yuen (North), Chuk Yuen (South), Kaw Liu, Ta Kwu Ling, Kan Tau Wai, Tong Fong, Ping Yeung, Tai Po Tin, Ping Che, Pak Hok Shan, Tai Tong Wu, Leng Tsai, Hung Leng (Part) Sai Kung Tan Cheung, Po Lo Che, Tui Min Hoi, Fui Yiu Ha, 1 440 (20) Sai Kung Old Town, Tai Wan, Sha Ha, Silverstrand, Wo Tong Kong (Mang Kung Uk), Yu Uk Village (Part), Hung Uk, Wai Sum Village, O Mun Village, O Pui Village (Part), Heng Mei Deng Tsuen, Chan Uk Tsuen, Mau Ping New Village (Part), Wong Chuk Shan San Tsuen (Part), Pak Kong Au (Part), Sha Kok Mei (Part) Annex District Village name No.
    [Show full text]