Royal Asiatic Society Hong Kong | 2019

Total Page:16

File Type:pdf, Size:1020Kb

Royal Asiatic Society Hong Kong | 2019 ROYAL ASIATIC SOCIETY NEWSLETTER HONG KONG E-mail: [email protected] Tel: + (852) 2234 5011 Fax: + (852) 2234 5039 GPO Box 3864, Hong Kong www.royalasiaticsociety.org.hk http://www.facebook.com/RoyalAsiaticSocietyHongKong Twitter: RASHK 1959 July 2019 Photo by and courtesy of Helen Tinsley Group Visit to Dragon Garden, Lumina College, 18 May 2019 二零一九年五月十八日參觀龍圃花園(恩光書院郊區校園)所攝之團體照 Royal Asiatic Society Hong Kong | 2019 Contents MESSAGE FROM YOUR VICE PRESIDENT 3 FUTURE ACTIVITIES Sat, 10 Aug 2019 Local Visit A History of the World in 100 Objects from the British Museum 4 Tue, 24 Sep 2019 Lecture Portraits of Trees of Hong Kong & Southern China 6 Wed, 9 Oct 2019 Lecture Empire of the Winds: The Global Role of Asia’s Great Archipelago 6 RECENT ACTIVITIES Fri, 3 May 2019 How South Asians Helped to Make Hong Kong 7 Sat, 18 May 2019 Visit to Dragon Garden & Nearby Sham Tseng 8 Wed, 22 May 2019 Chinese Shipwrecks, Treasure Hunters & the History of Underwater 9 Cultural Heritage Regimes Sat, 1 Jun 2019 Photographs of Old Hong Kong & the Tales They Tell 10 Sat, 22 Jun 2019 Nose in the Books: The Making of a Library of the Humanities in the 11 City Thu, 27 Jun 2019 The Silver Way: China, Spanish America and the Birth of 12 Globalisation, 1565-1815 OF GENERAL INTEREST Now till Wed, 9 Aug 2019 A Disappearing Art: Bookplates and Hong Kong, at Hong Kong 13 Baptist University Library Now till Sun, 18 Aug 2019 Strokes of Wonder: Figure Painting by Ren Bonian from the National 13 Art Museum of China St. John’s Cathedral Shop 14 2019 Membership Renewal 15 PUBLICATIONS 15 CONTACT DETAILS 17 Cover Photo: Group photo of RASHK members and guests taken on Saturday, 18th May 2019, during the visit to the Dragon Garden, Lumina College, Tsing Lung Tau, N.T. 2 Royal Asiatic Society Hong Kong | 2019 Message from your Vice President Welcome to the RAS July 2019 Newsletter and thanks to Roy Delbyck, our Council member, for taking on the role of Editor for this edition. It contains information on recent activities as well as news about some of our future planned events which we hope you will enjoy. The picture above documents our well attended and enjoyable tour of Dragon Garden for members, which was followed by a visit to a Chiu Chow temple where veneration of ancestors was the theme and then a delicious goose lunch at Sham Tseng. We continue to provide you with written records of our visit events, but over the past 2 - 3 years for talks- and with our speakers' consent- we are now arranging audio recordings, which are catalogued and held in our Library collection. Our Honorary Librarian, Vivian So, can provide you with details if you are interested to follow up. Your ideas and suggestions to members of our Activities Committee for future talks and visits, both local and across the border and further afield, are most welcome. Hong Kong is an energetic and vibrant community and there are many aspects of its life and history which provide great opportunities for documentation and exploration. Our AGM was held in April 2019 at the Hong Kong Club. We had the opportunity to thank Dr Gillian Bickley for her many years of service to RAS as member and regular contributor to RAS events, as she stepped down from her role as Council Member and latterly Vice President. We also welcomed Dr CM Kwong and Roy Delbyck as new Council Members. The post of President remains vacant, but the work of the Society continues with the Vice President and the capable support of Council members. Over the summer we will be upgrading the IT support for our member database to a more user-friendly set up, so that our Administrator can provide you, hopefully, with a more efficient service. Preparation for the RAS Journal 59 is well advanced. Next year will be the 60th Anniversary Jubilee Year for the Journal and planning for this celebration edition by Honorary Editor, Stephen Davies and colleagues, is already under way. Many of you will be travelling over the summer months, but whether you are here in Hong Kong or overseas, we look forward to your feedback and seeing you at future events. Your contributions in various capacities and different ways to the work of the RAS are well appreciated. Helen Tinsley RASHK Vice President and Activities Coordinator 3 Royal Asiatic Society Hong Kong | 2019 Future Activities LOCAL VISIT The Hong Kong Jockey Club Series: A History of the World in 100 Objects from the British Museum Sat • 10 Aug 2019 This exhibition originated from a popular BBC radio programme hosted by Neil MacGregor, the director of the British Museum at the time, telling the story of human civilisation using 100 objects selected from the museum’s encyclopedic collections. Unlike traditional narratives that focus on selected periods or cultural zones, this exhibition reviews human development from a new perspective. Tracing human activity from 2 million years ago to the present, the stories behind the objects reveal the similarities across different geographical locations and cultures in terms of power, belief, art, trading and technology. Through this broadened vision, visitors may gain new insights about the world in which we live. Exhibits are selected from various geographical areas, showing man-made objects, not only exquisite art pieces, but also, and in a larger proportion, everyday utensils and implements, as well as currency, scientific instruments and ritual items. Highlights include the first human stone tool from Africa, the Standard of Ur (an artifact from one of the world’s most ancient cities, in Iraq), fifty Manillas (a currency involved in the slave trade), the ship’s chronometer used on Charles Darwin’s voyage on the HMS Beagle , Japanese artist Hokusai's famous woodblock print “The Great Wave off Kanagawa” from the series "Thirty-Six Views of Mount Fuji", and a print of David Hockney, a famous contemporary artist, which explores the issue of LGBT rights. Each object tells a story that invites you to travel in time and geography to thought-provoking corners of the world. The Docent English-speaking docent from the Hong Kong Heritage Museum. 4 Royal Asiatic Society Hong Kong | 2019 Future Activities Programme Docent: English-speaking docent, Hong Kong Heritage Museum Date: Sat, 10 Aug 2019 Time: RAS group gathers at 10:00 a.m. at box office at the lobby, guided tour starts 10:15 a.m. Venue: Hong Kong Heritage Museum, 1 Man Lam Road, Sha Tin, Hong Kong Admission: RAS members and guests free of charge. Booking: Please email <[email protected]> in advance to reserve your place N.B.: No. of participants capped at 25 pax. ****** 5 Royal Asiatic Society Hong Kong | 2019 Future Activities LECTURE Portraits of Trees of Hong Kong & Southern China Tue • 24 Sep 2019 Details to be confirmed. Programme Speaker: Sally Grace Bunker Date: Tue, 24 Sep 2019 Time: Reception desk opens at 6:30 p.m.; talk starts 7:00 p.m. Venue: TBC Admission: TBC Booking: Please email <[email protected]> in advance to reserve your place. ****** LECTURE Empire of the Winds: The Global Role of Asia’s Great Archipelago Wed • 9 Oct 2019 More details in our next Newsletter. Programme Speaker: Philip Bowring Date: Wed, 9 Oct 2019 Time: Reception desk opens at 6:30 p.m.; talk starts 7:00 p.m. Venue: LT4, Centre for Visual Arts, 7A Kennedy Road, Mid- Levels Admission: RAS Members $100; Non-Members / Guests $150 Booking: Please email <[email protected]> in advance to reserve your place and pay at the door. ****** 6 Royal Asiatic Society Hong Kong | 2019 Recent Activities How South Asians Helped to Make Hong Kong Written by Helen Tinsley Speakers: Mark O’Neill (Author) and Kevin Lee (Photographer) Date: Fri, 3 May 2019 Venue: Café 8 at Pier 8, Hong Kong Maritime Museum, Central Almost all RAS talks and lectures are now, with speakers’ consent, audio recorded and saved for later loan, rather than written up for our RAS Newsletter as in the past. However, we did not manage a recording at this well-attended talk, so it is important for the Newsletter to recognise a splendid joint presentation by Mark O’Neill and his colleague Kevin Lee, based on their book of the same title. Mark took the opportunity to remind us of some of the known and not so well known contributions made by the South Asian communities to Hong Kong’s rich history in the colonial period and beyond – in donations that helped found some of our important institutions, businesses and the professions, government and disciplinary services, native cuisines and religious practices. Kevin then shared with us a few of his wonderful photographs which illustrated these narratives so well. Who can forget his 2018 picture of a sea of mainly women Muslim worshippers in Victoria Park celebrating Eid al-Fitr at the end of Ramadan’s month of fasting? RAS members and guests who attended enjoyed the convivial Café 8 setting and for those who wished to study the topic further, Mark and Kevin’s book was available for purchase. Photos by and Courtesy of Ivy Ho 7 Royal Asiatic Society Hong Kong | 2019 Recent Activities Visit to Dragon Garden & Nearby Sham Tseng Written by Kate Budge Docent: English-speaking docent from Lumina College Date: Sat, 18 May 2019 Venue: Dragon Garden, 32-42 Castle Peak Road, Tsing Lung Tau, N.T. and nearby Sham Tseng On a warm May morning, RAS members boarded 962B Citibus in Central and, after magnificent views of Stonecutters Island, Hong Kong Harbour, and Ma Wan Island, entered the grand red gates of Dragon Garden, the largest private garden in Hong Kong and a Grade II listed Historic Building.
Recommended publications
  • 332 Controlling Officer's Reply
    Examination of Estimates of Expenditure 2019-20 Reply Serial No. FHB(FE)332 CONTROLLING OFFICER’S REPLY (Question Serial No. 5578) Head: (49) Food and Environmental Hygiene Department Subhead (No. & title): (-) Not specified Programme: (2) Environmental Hygiene and Related Services Controlling Officer: Director of Food and Environmental Hygiene (Miss Vivian LAU) Director of Bureau: Secretary for Food and Health Question: How many unisex toilets are there in the territory? Please provide their addresses with a breakdown by the 18 districts. Does the Food and Environmental Hygiene Department have any plan to continuously increase the number of unisex toilets? If yes, please provide the details. Asked by: Hon CHAN Chi-chuen (LegCo internal reference no.: 409) Reply: The Food and Environmental Hygiene Department (the Department) has 379 public toilets with accessible unisex toilets (AUTs) provision. A list of these toilets is provided at Annex. If circumstances permit, the Department will, based on “The Design Manual on Barrier Free Access 2008”, provide AUTs at new public toilets or during reprovisioning or refurbishment of existing ones. Access to AUTs does not necessitate traversing an area reserved for one sex only. - End - Session 13 FHB(FE) - Page 901 Annex (Page 1 of 20) List of Public Toilets with Accessible Unisex Toilets Serial District Name of Public Toilet Address No. 1 Central/Western Belcher's Street Public Behind No.2-12 Belcher's Street, Sai Toilet Wan 2 Central/Western Centre Street Public Toilet Near Centre Street Market,
    [Show full text]
  • Legislative Council
    立法會 Legislative Council LC Paper No. CB(1)58/02-03 Ref : CB1/PL/TP Panel on Transport Background brief on Route 10 Purpose This paper provides background information on the Route 10 - North Lantau to Yuen Long Highway project. It also gives an account of past discussions on the subject matter held by Legislative Council Members. Background of Route 10 2. Route 10, a proposed dual 3-lane highway of about 12.8-kilometre (km) long, will connect Lam Tei in North West New Territories (NWNT) to Northeast Lantau via So Kwun Wat and Tsing Lung Tau. 3. According to the Administration, Route 10 will perform the following functions – (a) to provide an alternative external road link for Lantau and the airport; (b) to meet anticipated population and employment growth in NWNT; and (c) to meet forecast traffic demand generated by cross boundary activities. 4. The route comprises the following sections – (a) Southern Section (8.3 km) – from North Lantau to So Kwun Wat; and (b) Northern Section (4.5 km) – from So Kwun Wat to Yuen Long Highway. - 2 - Route 10 Southern Section 5. The Southern Section of Route 10 between North Lantau and So Kwun Wat was gazetted under the Roads (Works, Use and Compensation) Ordinance (Cap. 370) in July 2000. Two link roads to connect with Tuen Mun Road were included in the scheme – (a) a dual 2-lane So Kwun Wat Link Road which connected Route 10 to Tuen Mun Road at So Kwun Wat, for vehicles to enter or leave the Southern Section; and (b) a dual 2-lane Siu Lam Link Road which connected Route 10 to Tuen Mun Road at Siu Lam, for vehicles to enter or leave the Northern Section.
    [Show full text]
  • Traffic and Transport Arrangements for the Commissioning of Shenzhen Bay Port and Northwest New Territories Traffic and Infrastructure Review
    LC Paper No. CB(1)2023/06-07(05) For Discussion on 9 July 2007 Legislative Council Panel on Transport Traffic and Transport Arrangements for the commissioning of Shenzhen Bay Port and Northwest New Territories Traffic and Infrastructure Review PURPOSE This paper - (i) updates Members on the traffic and transport arrangements upon the commissioning of Shenzhen Bay Port (SBP); and (ii) informs Members of the latest progress of the Northwest New Territories (NWNT) Traffic and Infrastructure Review (the Review). TRAFFIC AND TRANSPORT ARRANGEMENTS UPON THE COMMISSIONING OF SBP Quota arrangements and public transport services 2. The SBP will be open to traffic from 6 pm on 1 July 2007. As we informed Members earlier, we have reached agreement with the relevant Guangdong authorities on the number of quotas to be issued for cross-boundary private cars and coaches. For private cars, we will initially issue 1 500 new SBP quotas. In addition, to ease congestion at the existing control points, we will encourage existing holders of quotas for other crossings to switch to SBP. In this regard, we will allow a 3-month trial period upon the commissioning of SBP, during which existing quota-holders can try to use SBP. They may then apply for a SBP quota by surrendering their quotas for other existing crossings. The Guangdong authorities have started accepting applications for private car quotas. The Transport Department (TD) earlier sent letters to existing quota holders to invite them to switch to use SBP and to inform them of the arrangements for the trial period. 3. Regarding cross-boundary coaches, TD has completed the exercise to allocate 300 quotas to the operators.
    [Show full text]
  • Minutes of 667Th Meeting of the Metro Planning Committee Held at 9:00 A.M
    TOWN PLANNING BOARD Minutes of 667th Meeting of the Metro Planning Committee held at 9:00 a.m. on 12.3.2021 Present Director of Planning Chairman Mr Ivan M. K. Chung Mr Wilson Y.W. Fung Vice-chairman Dr Frankie W.C. Yeung Dr Lawrence W.C. Poon Mr Thomas O.S. Ho Mr Alex T.H. Lai Professor T.S. Liu Mr Franklin Yu Mr Stanley T.S. Choi Mr Daniel K.S. Lau Ms Lilian S.K. Law Professor John C.Y. Ng Professor Jonathan W.C. Wong - 2 - Dr Roger C.K. Chan Mr C.H. Tse Assistant Commissioner for Transport (Urban), Transport Department Mr Patrick K.H. Ho Chief Engineer (Works), Home Affairs Department Mr Gavin C.T. Tse Principal Environmental Protection Officer (Metro Assessment), Environmental Protection Department Dr Sunny C.W. Cheung Assistant Director (Regional 1), Lands Department Mr Albert K.L. Cheung Deputy Director of Planning/District Secretary Miss Fiona S.Y. Lung Absent with Apologies Ms Sandy H.Y. Wong In Attendance Assistant Director of Planning/Board Ms Lily Y.M. Yam Chief Town Planner/Town Planning Board Ms Caroline T.Y. Tang Town Planner/Town Planning Board Mr Ryan C.K. Ho - 3 - Opening Remarks 1. The Chairman said that the meeting would be conducted with video conferencing arrangement. Agenda Item 1 Confirmation of the Draft Minutes of the 666th MPC Meeting held on 26.2.2021 [Open Meeting] 2. The draft minutes of the 666th MPC meeting held on 26.2.2021 were confirmed without amendments. Agenda Item 2 Matter Arising [Open Meeting] 3.
    [Show full text]
  • Overview of Potential Capital Works Items to Be Submitted to PWSC in the 2006-07 Legislative Session
    LC Paper No. FC48/06-07(02) Overview of potential capital works items to be submitted to PWSC in the 2006-07 Legislative Session Target Date of Project No. Project Title Contract Start submission to Code Date PWSC 1 ―― Provision for CWRF block -- 19.12.06 allocations in 2007-08 2 6718TH Improvement to Tung Chung Road -- 24.1.07 between Lung Tseng Tau and Cheung Sha 3 3323EP A 24-classroom primary school at 2006-Q4 25.10.06 the junction of Texaco Road and Castle Peak Road, Tsuen Wan 4 4112CD Drainage improvement in Northern 2006-Q4 First submission New Territories - package A on 25.10.06 and withdrawn Second submission on 22.11.06 and endorsed 5 3338EP A 24-classroom primary school in 2007-Q1 25.10.06 Site 10, West Kowloon Reclamation, Sham Shui Po 6 3247RS Improvement to Victoria Park Tennis 2007-Q1 19.12.06 Centre 7 4052DS Ting Kau sewerage, stage 2 2007-Q1 22.11.06 8 4126DS Sham Tseng sewerage, stage 3 2007-Q1 22.11.06 9 4338DS Improvement and upgrading of the 2007-Q1 25.10.06 sewerage systems in Sha Tin/Ma On Shan New Town 10 5035CG Greening master plan for Kowloon 2007-Q1 25.10.06 West - studies and works 11 5036CG Greening master plan for Hong 2007-Q1 25.10.06 Kong Island - studies and works 12 6143TB Improvement to pedestrian subway 2007-Q1 19.12.06 system at Kwai Fuk Road roundabout - 2 - Target Date of Project No. Project Title Contract Start submission to Code Date PWSC 13 6582TH Central Kowloon Route - 2007-Q1 First submission consultants' design fees and site on 19.12.06 and investigations negatived Second submission on 7.2.07 and endorsed 14 7711CL Kai Tak development – advance 2007-Q1 22.11.06 infrastructure works for developments at the southern part of the former runway 15 7719CL Kai Tak development - engineering 2007-Q1 22.11.06 review 16 8028EA Reprovisioning of St.
    [Show full text]
  • Mon Tue Wed Thu Fri Sat Sun 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
    WWF - DDC Location Plan May-2018 Mon Tue Wed Thu Fri Sat Sun 1 2 3 4 5 6 Team A Day-Off Tsuen Wan Plaza Diamond Hill MTR Exit A2 Lau Sin Street, Tin Hau King Man Street, Sai Kung (Near Sai Kung Library) Day-Off Hang Seng Bank Head Office, Central New Jade Shopping Centre, Chai Wan New Jade Shopping Centre, Chai Wan Team B Shatin Plaza Shatin Plaza Shatin Plaza (Near Footbridge) (Near Footbridge) (Near Footbridge) Hang Seng Bank Head Office, Central New Jade Shopping Centre, Chai Wan Team C Canal Road East Bridge, Causeway Bay Hong Kong MTR Station Yuen Long MTR Station Yuen Long MTR Station (Near Footbridge) (Near Footbridge) Hang Seng Bank Head Office, Central Team D Wu Kai Sha MTR Station Exit B Canal Road East Bridge, Causeway Bay Yuen Long MTR Station Tsuen Wan Plaza (Near Footbridge) Tsuen Wan Plaza (Near Footbridge) (Near Footbridge) World Wide House, Central World Wide House, Central Team E Tuen Mun MTR Station Wu Kai Sha MTR Station Exit B Canal Road East Bridge, Causeway Bay Tsuen Wan Plaza (Near Footbridge) (Near Footbridge) (Near Footbridge) World Wide House, Central Team F Causeway Bay Plaza 1 (Near Footbridge) Tuen Mun MTR Station Wu Kai Sha MTR Station Exit B Chai Wan MTR Station Chai Wan MTR Station (Near Footbridge) Team G Admiralty MTR Station Exit A Causeway Bay Plaza 1 (Near Footbridge) Tuen Mun MTR Station Chai Wan MTR Station Austin MTR Station Exit B (Near Footbridge) Austin MTR Station Exit B (Near Footbridge) Team H Tai Wai MTR Station Exit D Admiralty MTR Station Exit A Causeway Bay Plaza 1 (Near Footbridge) Austin
    [Show full text]
  • Head 43 — CIVIL ENGINEERING DEPARTMENT
    Head 43 — CIVIL ENGINEERING DEPARTMENT Controlling officer: the Director of Civil Engineering will account for expenditure under this Head. Estimate 2002–03................................................................................................................................... $915.2m Establishment ceiling 2002–03 (notional annual mid-point salary value) representing an estimated 1 497 non-directorate posts at 31 March 2002 reducing by eight posts to 1 489 posts at 31 March 2003......................................................................................................................................... $499.0m In addition there will be an estimated 35 directorate posts at 31 March 2002 and at 31 March 2003. Capital Account commitment balance................................................................................................. $24.0m Controlling Officer’s Report Programmes Programme (1) Tourism and Recreational This programme contributes to Policy Area 5: Travel and Development Tourism (Secretary for Economic Services). Programme (2) Port and Marine Facilities This programme contributes to Policy Area 3: Air and Sea Communications (Secretary for Economic Services). Programme (3) Site Formation and This programme contributes to Policy Area 22: Buildings, Reclamation† Lands and Planning (Secretary for Planning and Lands) and Policy Area 23: Environmental Protection and Conservation (Secretary for the Environment and Food). Programme (4) Slope Safety and These programmes contribute to Policy Area 27: Intra-
    [Show full text]
  • Paper on Railway Development Strategy Prepared by the Legislative Council Secretariat
    立法會 Legislative Council LC Paper No. CB(1)2012/13-14(02) Ref. : CB1/PS/1/12 Panel on Transport Subcommittee on Matters Relating to Railways Special meeting on 29 September 2014 Background brief on railway development strategy Purpose 1. This paper recaps the activities of the Stage 1 and Stage 2 public engagement exercises of the Review and Update of the Railway Development Strategy 2000 conducted by the Administration from April 2012 to May 2013. It also summarizes the major views and concerns expressed by Members during previous discussions relevant to this subject. Background Railway Development Strategy 2000 2. According to the information provided by the Administration1, Railway Development Strategy 2000 ("RDS 2000") was announced in May 2000. It maps out the railway network expansion plan for Hong Kong up to the year 2016, so as to tie in with the overall development in Hong Kong, to meet the daily traffic need of the public, as well as to reinforce the sustainable transport policy of making railways as the backbone of the passenger transport system, providing Hong Kong citizens with convenient and safe public transport services at reasonable prices. 3. RDS 2000 recommended six priority railway schemes. Out of these projects, the Kowloon Southern Link was commissioned in 2009. The other five railway projects recommended by RDS 2000, i.e. the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Hong Kong 1 Source: The Administration's paper on "Review and Update of the Railway Development Strategy 2000" in November 2010 [LC Paper No. CB(1)256/10-11(03)] - 2 - Section), West Island line, South Island line (East), Kwun Tong Line Extension and Shatin to Central Link, are being implemented in full swing.
    [Show full text]
  • List of Projects Used in HKIA/ARB Professional Assessment 2007 - 2013
    List of projects used in HKIA/ARB Professional Assessment 2007 - 2013 Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 1 2007 Aedas Ltd Satellite Earth Station Dai Hei Street at Tai Po Industrial Estate Section G Tai Po Town Lot BD 2/9141/01 (P) Jan 04 IL7076, IL7077, IL971, IL970 Proposed Hotel Development at 31E - 39 Wyndham 31E, 31F, 33-39 Wyndham Street, 2 2007 AGC Design Ltd SARP, IL970RP, BD3/2058/94 PT IV Jul 04 Street, Central Central, Hong Kong IL970SBSS1 RP Extension to the Church of Jesus Christ of Latter Day Tseung Kwan O Lot 45, Area II, Po Lam 3 2007 Aedas Ltd Tseung Kwan O Lot 45 BD 9106/04 31 Oct 2006 Saints at Tseung Kwan O Lane 4 2007 P & T Architects & Engineers Ltd Residential Development At 2 Lok Kwai Path Shatin, 2 Lok Kwai Path, Shatin, N.T. STTL 526 BD 9067/02 Jan 06 / May 06 5 2007 Leung King Partners Ltd Villa Rosa Residents 82 Peak Road, Hong Kong RBL 742 BD 2014/98 Aug 00 6 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tuen Mun Area 4C, TMTL 384 King Fung Path, Tuen Mun, N.T. Lot No. 384, Area 4C BD 6/9260/97H (P) Aug 02 Service Apartment Building at Nos. 116-122, Yeung Uk 116-122 Yeung Uk Road, Tsuen Wan, 7 2007 MLA Architects (HK) Ltd TWTL 407 9325/93 28 Aug 06 Road (H-Cube) N.T.
    [Show full text]
  • Information Note Strategic Cavern Area No. 09 – Ting
    - 1 - CAVERN MASTER PLAN – INFORMATION NOTE STRATEGIC CAVERN AREA NO. 09 – TING KAU This Information Note describes the characteristics, key development opportunities and constraints of Strategic Cavern Area No. 09 - Ting Kau (the SCVA). It indicates the potential land uses suitable for cavern development within the area, but would not pre-empt other possible land uses put forward by the project proponents with justifications. It also denotes the extent of potential portal locations. The spatial context of the SCVA is illustrated in the Reference Drawing appended to this Information Note. Reference should be made to the Explanatory Statement of the Cavern Master Plan for its background and purposes, as well as the definition and delineation criteria of SCVAs. 1. Location Plan Information Note (SCVA09 – Ting Kau) - 2 - 2. Strategic Cavern Area Details Outline Zoning Plans (OZPs): Approved Tsuen Wan West OZP No. S/TWW/19 Approved Tsuen Wan OZP No. S/TW/33 Area: 82.2 ha Maximum elevation in the SCVA: +418 mPD Minimum elevation in the SCVA: +11 mPD 3. District Context Location The SCVA is located at Ting Kau in the western part of the New Territories. Yau Kom Tau is to the east of the SCVA, Sham Tseng is to the west, Tai Lam Country Park is to the north and Tsing Yi across Rambler Channel is to the south. The SCVA is generally hilly with a maximum elevation of about +418 mPD. The majority of the SCVA, including its northern and central portions, encroaches onto Tai Lam Country Park. Surrounding the SCVA, Ting Kau is a residential area with low-rise residential developments, including Royal Dragon Villa (about 50 m to the south of the SCVA) and a local village namely Ting Kau Village (about 150 m to the southwest of the SCVA).
    [Show full text]
  • M / SP / 14 / 172 San Tsuen ¥S SHEK LUNG KUNG –‰ Ú¥Oª SEE PLAN REF
    200 451 è¦K Catchwater 400 303 fih 100 The Cairnhill 100 ROUTE 314 TWISK 80 200 Ser Res 80 100 Catchwater Ser Res TAI LAM CHUNG RESERVOIR ú¥OªÐ 474 flA Kwong Pan Tin flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 172 San Tsuen ¥s SHEK LUNG KUNG –‰ ú¥Oª SEE PLAN REF. No. M / SP / 14 / 172 Tso Kung Tam Kwong Pan Tin Tsuen “T FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES Fu Yung Shan fl” U¤á 315 80 j¤VÆ 300 Ha Fa Shan ¥—¥ flW˘ fl´« Pak Tin Pa TSUEN KING CIRCUIT San Tsuen 400 Allway Gardens 100 100 Tsuen Wan Centre fl”· 200 Tsuen King Garden ¤{ Ma Sim Pei Tsuen “T» ¥—¥ Pak Tin Pa fl Tsuen ·wƒ TSUEN KING CIRCUIT Adventist Hospital flw… A A ⁄· Tsuen Tak Garden Kam Fung r´º´s ½ Muk Min Ha Tsuen 200 259 Garden 200 Discovery Park ROUTE TWISK 300 A» 200 Summit C«s⁄‰⁄‚ CASTLE Terrace ã®W PEAK ROAD - TSUEN WAN CHAI WAN KOK _ b¥s D e NORTH Pun Shan Tsuen j ROAD HO ã®WÆ TAI C«fi Catchwater TSUEN WAN F¨L fi WAN ” fl CHAI WAN KOK STREET Fuk Loi Estate ñº¨· Tsuen Wan LineLuk Yeung 226 Catchwater HOI PA STREET Sun Chuen 3.3.5 TAI CHUNG ROAD TUEN MUN ROAD ¡º 200 SHA TSUI ROAD j¤ 300 oªa¬ Yau Kom Tau HOI SHING ROAD ½ CASTLE PEAK ROAD - TSUEN j¤e Village R˜« 8 HOI HING ROAD j¤VÆk¤ Ser Res ù Belvedere Garden flW Tai Lam Centre SAI LAU KOK j¤VÆg Ser Res for Women 100 flW˘ C Tai Lam Correctional 344 3.3.4 j¤F Institution M†§ s TAI HO ROAD ½ Tsing Fai Tong o“a‹Y New Village 1 fi‡ SHAM TSENG Yau Kom Tau ROAD flW˘ t¤s TSUEN WAN ê¶ `² w SETTLEMENT Treatment Works fl fi– Tsuen Wan HOI ON ROAD Yuen Tun Catchwater BASIN SHAM TSENG RÄ£³ A» Plaza W ³²w w… Lindo Green Greenview Court TSUEN WAN è¬w¼L MARKET
    [Show full text]
  • Wo Che – Tsing Lung Tau)
    Traffic Advice Introduction of KMB Route No. 48P (Wo Che – Tsing Lung Tau) Members of the public are advised that with effect from 24 April 2017, KMB will operate a new bus route numbered as 48P (Wo Che – Tsing Lung Tau). The operational details are as follows: A. Routeing WO CHE to TSING LUNG TAU : via Fung Shun Street, Wo Che Street, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Po Road, Sha Tin Central Bus Terminus, Sha Tin Centre Street, Wang Pok Street, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Po Road, Shing Mun Tunnel Road, Shing Mun Tunnels, Cheung Pei Shan Road, Tsuen Kam Interchange, Tai Ho Road North, Tai Ho Road, Tsuen Wan (Nina Tower) Bus Terminus, Tai Ho Road, Sha Tsui Road, Tai Chung Road, Castle Peak Road – Tsuen Wan, Hoi Hing Road, Hoi On Road, Castle Peak Road – Ting Kau, Castle Peak Road – New Ting Kau, Castle Peak Road – Ting Kau, Castle Peak Road – Sham Tseng and Castle Peak Road – Tsing Lung Tau. TSING LUNG TAU to WO CHE : via Castle Peak Road – Tsing Lung Tau, Castle Peak Road – Sham Tseng, Castle Peak Road – Ting Kau, Castle Peak Road – New Ting Kau, Castle Peak Road – Ting Kau, Hoi On Road, Lai Shun Road, Castle Peak Road – Tsuen Wan, Hoi Hing Road, Tai Chung Road, Sha Tsui Road, Tai Ho Road, Tai Ho Road North, Tsuen Kam Interchange, Cheung Pei Shan Road, Shing Mun Tunnels, Shing Mun Tunnel Road, Tai Po Road, Sha Tin Rural Committee Road, Tai Po Road, Sha Tin Central Bus Terminus, Sha Tin Centre Street, Wang Pok Street, Yuen Wo Road, Wo Che Street and Fung Shun Street.
    [Show full text]