Feasibility Study Report
National Instrument Technical Report for the Eva Copper Project Feasibility Study Report Effective Date: October 1, 2018 Report Date: November 14, 2018 Copper Mountain Mining Corporation NI 43-101 Technical Report for the Eva Copper Project Feasibility Study DATE AND SIGNATURE PAGE This report titled “National Instrument 43-101 Technical Report for the Copper Mountain Mine” and dated November 14, 2018 was prepared and signed by the following authors: Original Signed and Sealed Gerry Schwab, P.Eng. Dated at Vancouver, BC Senior Project Manager, Hatch Original Signed and Sealed Peter Holbek, M.Sc., P.Geo. Dated at Vancouver, BC Vice President Exploration, CMMC Original Signed and Sealed Stuart E. Collins, P.Eng. Dated at Denver, CO Principal Mining Engineer, CMMC Original Signed and Sealed Marinus Andre (Andre) de Ruijter, M.Sc.(Eng), P.Eng. Dated at Vancouver, BC Principal Metallurgical Engineer, Hatch Original Signed and Sealed Alistair Kent, M.E., P.Eng. Senior Project Manager, Dated at Vancouver, BC Merit Consultants International Inc. Original Signed and Sealed David John Toomey Morgan, B.Sc, M.Sc, AusIMM, MIEAust, CPEng. Dated at Perth, WA Managing Director, Knight Piesold Pty. Ltd. Date and Signature Page H355246-00000-200-230-0001-SE02, Rev. D, © Hatch 2018 All rights reserved, including all rights relating to the use of this document or its contents. Copper Mountain Mining Corporation NI 43-101 Technical Report for the Eva Copper Project Feasibility Study Original Signed and Sealed Dated at Perth, WA Roland Bartsch, Msc, Bsc. Hons, MAUSIMM, MAIG General Manager Exploration, CMMPL Original Signed and Sealed Dated at Vancouver, BC (Edward) Richard Klue, NHD Ext.
[Show full text]