MOZAMBIQUE Sofala Province

Total Page:16

File Type:pdf, Size:1020Kb

MOZAMBIQUE Sofala Province MOZAMBIQUE AÆ Flood Sofala Province Imagery analysis: 29 Jan 2017 | Published 31 January 2017 | Version 1.0 FL20170118MOZ ¥¦¬ 34°5'0"E 34°12'0"E 34°19'0"E 34°26'0"E 34°33'0"E 34°40'0"E 34°47'0"E 34°54'0"E Savane Tica Galinha ZIMBABWE Map location 19°25'0"S 19°25'0"S MOZAMBIQUE Pretoria Maputo ¥¦¬ Mbabane¥¦¬ Tica ¥¦¬ Mafambisse Reino SOUTH AFRICA Pungwe River Satellite Detected Surface Waters Nhamatanda Extent and Evolution along the 19°32'0"S Mafambisse Dondo Pungwe River in Sofala Province, 19°32'0"S Mozambique Magação This map illustrates satellite-detected flood waters over Pungwe River in Sofala Province, Mozambique as observed from the Sentinel-1 images acquired on 05 and 29 January 2017. An increase of surface water Dondo extent was observed in the 29 January 2017 image compared to the 05 January 2017 image including the zones along the Pungwe river and several areas along this river were inundated. It is likely that flood waters 19°39'0"S 19°39'0"S have been systematically underestimated along highly vegetated areas along main river banks and within Sofala built-up urban areas because of the special Inhamizua characteristics of the satellite data used. This is a preliminary analysis and has not yet been validated in the field. Please send ground feedback to UNITAR - UNOSAT. Cidade Da Beira 19°46'0"S Legend 19°46'0"S Village Buzi City/Town Beira Primary road River/waterway MOZAMBIQUE CHANNEL Municipality boundary Goonda Buzi Province boundary 19°53'0"S Reference waters 19°53'0"S Satellite detected waters : 05 January 2017 Satellite detected waters : 29 January 2017 Map Scale for A3: 1:300,000 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Estaquinha Community Km I! 0 1.5 3 6 9 12 34°5'0"E 34°12'0"E 34°19'0"E 34°26'0"E 34°33'0"E 34°40'0"E 34°47'0"E 34°54'0"E Analysis conducted with ArcGIS v10.4.1 Satellite Data (1): Sentinel-1 Satellite Data (2): Sentinel-1 Baseline Data : HDX, OSM, OCHA & WFP The depiction and use of boundaries, geographic names and related data shown here are not warranted to be error-free nor do they imply Imagery Dates: 29 January 2017 Imagery Date: 05 January 2017 Analysis : UNITAR - UNOSAT official endorsement or acceptance by the United Nations. UNOSAT is a program of the United Nations Institute for Training and Research Coordinate System: WGS 1984 UTM Zone 36S Resolution: 10 m Resolution: 10 m Production: UNITAR - UNOSAT (UNITAR), providing satellite imagery and related geographic information, research and analysis to UN humanitarian & development Projection: Transverse Mercator Copyright: Copernicus 2017 / ESA Copyright: Copernicus 2017 / ESA agencies & their implementing partners. This work by UNITAR-UNOSAT is licensed under a CC BY-NC 3.0. Datum: WGS 1984 Source: ESA Source: ESA Units: Meter UNITAR - UNOSAT - Palais des Nations CH-1211 Geneva 10, Switzerland - T: +41 22 767 4020 (UNOSAT Operations) - Hotline 24/7: +41 75 411 4998 - [email protected] - www.unitar.org/unosat.
Recommended publications
  • Zimbabwe News, Vol. 18, No. 9
    Zimbabwe News, Vol. 18, No. 9 http://www.aluka.org/action/showMetadata?doi=10.5555/AL.SFF.DOCUMENT.nuzn198709 Use of the Aluka digital library is subject to Aluka’s Terms and Conditions, available at http://www.aluka.org/page/about/termsConditions.jsp. By using Aluka, you agree that you have read and will abide by the Terms and Conditions. Among other things, the Terms and Conditions provide that the content in the Aluka digital library is only for personal, non-commercial use by authorized users of Aluka in connection with research, scholarship, and education. The content in the Aluka digital library is subject to copyright, with the exception of certain governmental works and very old materials that may be in the public domain under applicable law. Permission must be sought from Aluka and/or the applicable copyright holder in connection with any duplication or distribution of these materials where required by applicable law. Aluka is a not-for-profit initiative dedicated to creating and preserving a digital archive of materials about and from the developing world. For more information about Aluka, please see http://www.aluka.org Zimbabwe News, Vol. 18, No. 9 Alternative title Zimbabwe News Author/Creator Zimbabwe African National Union Publisher Zimbabwe African National Union (Harare, Zimbabwe) Date 1987-09-00 Resource type Magazines (Periodicals) Language English Subject Coverage (spatial) Zimbabwe, Mozambique, South Africa, Southern Africa (region) Coverage (temporal) 1987 Source Northwestern University Libraries, L968.91005 Z711 v.18 Rights By kind permission of ZANU, the Zimbabwe African National Union Patriotic Front. Description Editorial. Address to the Central Committee by the President and First Secretary of ZANU (PF) Comrade R.G.
    [Show full text]
  • Salt Intrusion in the Pungue Estuary, Mozambique
    Ivar Abas and Hugo Hagedooren Salt intrusion in the Pungue estuary, Mozambique A case study on modelling the salinity distribution in the Pungue estuary Delft, March 2017 2 Salt intrusion in the Pungue estuary, Mozambique A case study on modelling the salinity distribution in the Pungue estuary By Ivar Abas and Hugo Hagedooren In fulfilment of the requirements of an Additional Master Thesis Master Civil Engineering Track Water Management at the Delft University of Technology, Supervisors: Prof. Dr. Ir. H.H.G. Savenije, Dr. Ir. S.G.J. Heijman, Ir. W.M.J. Luxemburg An electronic version of this thesis is available at http://repository.tudelft.nl/ 3 Notation 푎 Cross-sectional convergence length [m] 퐴 Tidal average cross-sectional area [m2] 2 퐴0 Cross-sectional area at the estuary mouth [m ] 2 퐴푟 Cross-sectional area of the river [m ] 푏 Width convergence length [m] 퐵 Tidal average estuary width [m] 퐵0 Width at the estuary mouth [m] 퐵푟 Width of the river [m] 퐶 Chézy coefficient [m0.5/s] 퐷 Tidal average longitudinal dispersion [m2/s] 2 퐷0 Dispersion coefficient at the estuary mouth [m /s] 2 퐷 Dispersion coefficient during HWS, TA or LWS [m /s] 퐷(푥) Dispersion coefficient as a function of 푥 [m2/s] 퐸 Tidal excursion [m] 퐸0 Tidal excursion at the estuary mouth [m] Gravitational acceleration [m/s2] ℎ̅ Tidal average depth [m] ℎ0 Depth at the estuary mouth [m] 퐻 Tidal range [m] 퐾 Van der Burgh’s coefficient [-] 퐿 Salt intrusion length [m] 푃 Wetted perimeter [m] 푃 Tidal prism [m3] 푃푛 Net rainfall in an estuary [m/s] 푞 Coefficient of the advective
    [Show full text]
  • Pdf | 218.74 Kb
    SOUTHERN AFRICA Flash Update No.11 – Tropical Cyclone Eloise As of 28 January 2021 HIGHLIGHTS • More than 270,000 people have been affected by Eloise across Southern Africa, including 267,289 in Mozambique, more than 1,000 in Zimbabwe and more than 1,000 in Eswatini. • The death toll from Eloise has risen to 21, including 11 in Mozambique, 3 in Zimbabwe, 4 in Eswatini, 2 in South Africa and 1 in Madagascar. • With flood waters present in multiple locations, the risk of water-borne diseases, including cholera, is high. • Tens of thousands of hectares of crops have been flooded due to the Eloise weather system, which could have consequences for the next harvest and food security in the period ahead. SITUATION OVERVIEW The Eloise weather system has left at least 21 people dead -11 in Mozambique, 3 in Zimbabwe, 4 in Eswatini, 2 in South Africa and 1 in Madagascar- and affected more than 270,000 people across Southern Africa, according to preliminary information which continues to be updated as new data becomes available. Although the damage wrought by Eloise to date has been less widespread than Tropical Cyclone Idai in 2019, homes, crops and infrastructure in Mozambique, Zimbabwe, Eswatini and South Africa have been damaged or destroyed. In Mozambique, the number of people affected by Tropical Storm Eloise has risen to 267,289, as assessment teams have reached areas impacted by the storm and further information is becoming available. At least 20,167 people are sheltering in 32 temporary accommodation centres after being displaced by flooding, where urgent needs include clean water and sanitation to prevent disease outbreaks.
    [Show full text]
  • Shared Watercourses Support Project for Buzi, Save and Ruvuma River Basins
    AFRICAN DEVELOPMENT FUND Language: English Original: English MULTINATIONAL SADC SHARED WATERCOURSES SUPPORT PROJECT FOR BUZI, SAVE AND RUVUMA RIVER BASINS APPRAISAL REPORT INFRASTRUCTURE DEPARTMENT NORTH, EAST, AND SOUTH REGION SEPTEMBER 2005 TABLE OF CONTENTS Page BASIC PROJECT DATA/ EQUIVALENTS AND ABBREVIATIONS /LIST OF ANNEXES/TABLES/ BASIC DATA, MATRIX EXECUTIVE SUMMARY i-xiii 1. HISTORY AND ORIGIN OF THE PROJECT 1 2. THE SADC WATER SECTOR 2 2.1 Sector Organisation 2 2.2 Sector Policy and Strategy 3 2.3 Water Resources 4 2.4 Sector Constraints 4 2.5 Donor Interventions 5 2.6 Poverty, Gender HIV AND AIDS, Malaria and Water Resources 6 3. TRANSBOUNDARY WATER RESOURCES MANAGEMENT 7 4. THE PROJECT 10 4.1 Project Concept and Rationale 10 4.2 Project Area and Beneficiaries 11 4.3 Strategic Context 13 4.4 Project Objective 14 4.5 Project Description 14 4.6 Production, Market, and Prices 18 4.7 Environmental Impact 18 4.8 Social Impact 19 4.9 Project Costs 19 4.10 Sources of Finance 20 5. PROJECT IMPLEMENTATION 21 5.1 Executing Agency 21 5.2 Implementation Schedule and Supervision 23 5.3 Procurement Arrangements 23 5.4 Disbursement Arrangement 25 5.5 Monitoring and Evaluation 26 5.6 Financial Reporting and Auditing 27 5.7 Donor Coordination 27 6. PROJECT SUSTAINABILITY 27 6.1 Recurrent Costs 27 6.2 Project Sustainability 28 6.3 Critical Risks and Mitigation Measures 28 7. PROJECT BENEFITS 7.1 Economic Benefits 29 7.2 Social Impacts 29 i 8. CONCLUSIONS AND RECOMMENDATIONS 8.1 Conclusions 30 8.2 Recommendations 31 ___________________________________________________________________________ This report was prepared following an Appraisal Mission to SADC by Messrs Egbert H.J.
    [Show full text]
  • Environmental Impact Assessment Report for Pungwe B Hydroelectric 2013 Electric Power Scheme
    Environmental Impact Assessment Report for Pungwe B Hydroelectric 2013 Electric Power Scheme Proponent Nyangani Renewable Energy Date January 2013 Document Title ENVIRONMENTAL IMPACT ASSESSMENT Report for the Pungwe B hydroelectric power scheme on the Pungwe River in the Honde Valley, north eastern Zimbabwe Black Crystal Consulting Private Limited EMA Reg. No. 00004/2011 1 Fairbairn Drive Mt Pleasant Harare Box 9111 Harare Phone: (04) 33 43 61 / 2912645 Black Crystal Consulting Private Limited EMA Reg. No. 0000071/2013 1 Fairbairn Drive Mt Pleasant Harare Box 9111 Harare Phone: (04) 334 361/ 307 458/ 2912645 Fax : (04) 307466 Mobile : +263 779 394 179 E-mail: [email protected] www.blackcrystal.co.zw Environmental Impact Assessment Report for Pungwe B Hydroelectric 2013 Electric Power Scheme Copyright © 2013 by Black Crystal Consulting (Private) Limited This report is the sole property of Nyangani Renewable Energy and Black Crystal Consulting. All rights reserved. No part of this report may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, without the prior written permission of the proponent and the consultants, nor be otherwise circulated in any form of binding or cover other than that in which it is produced here. Final Report Page ii Environmental Impact Assessment Report for Pungwe B Hydroelectric 2013 Electric Power Scheme CONSULTANT DETAILS: Black Crystal Consulting Private Limited EMA Reg. No. 000071/2012 Harare Office: No. 1 Fairbairn Drive Mount Pleasant HARARE. P O Box 9111, Harare. E-mail: [email protected] www.blackcrystal.co.zw Phone: (04) 334 361/ 307 458/ 2912645 Fax : (04) 307466 Mobile : +263 779 394 179 Bulawayo Office: P O Box FM 493, Famona Bulawayo Mobile +263 772 126 963 Final Report Page iii Environmental Impact Assessment Report for Pungwe B Hydroelectric 2013 Electric Power Scheme CONSULTANT TEAM MEMBERS: ECOLOGIST: Ms S.L.
    [Show full text]
  • Water Resources Strategies to Increase Food Production in the Semi-Arid Tropics with Particular Emphasis on the Potential of Alluvial Groundwater
    Water resources strategies to increase Food Production in the semi-arid troPics With Particular emPhasis on the Potential oF alluvial groundWater david love WATER RESOURCES STRATEGIES TO INCREASE FOOD PRODUCTION IN THE SEMI-ARID TROPICS WITH PARTICULAR EMPHASIS ON THE POTENTIAL OF ALLUVIAL GROUNDWATER WATER RESOURCES STRATEGIES TO INCREASE FOOD PRODUCTION IN THE SEMI-ARID TROPICS WITH PARTICULAR EMPHASIS ON THE POTENTIAL OF ALLUVIAL GROUNDWATER DISSERTATION Submitted in fulfillment of the requirements of the Board for Doctorates of Delft University of Technology and of the Academic Board of the UNESCO-IHE Institute for Water Education for the Degree of DOCTOR to be defended in public on Thursday, 12 September 2013, at 12.30 hrs in Delft, the Netherlands by David LOVE Bachelor of Science, University of Zimbabwe Bachelor of Science Honours and Masters of Science, University of Stellenbosch, South Africa born in Lusaka, Zambia. This dissertation has been approved by the supervisors: Prof. dr. S. Uhlenbrook Prof. dr. ir. P. van der Zaag Composition of Doctoral Committee: Chairman Rector Magnificus TU Delft Vice-Chairman Rector UNESCO-IHE Prof. dr. S. Uhlenbrook UNESCO-IHE / Delft University of Technology Prof. dr. ir. P. van der Zaag UNESCO-IHE / Delft University of Technology Prof. dr. ir. H.H.G Savenije Delft University of Technology Prof.dr.ir. N.C van de Giesen Delft University of Technology Prof dr. C. de Fraiture UNESCO-IHE / Wageningen University Prof. dr. D. Mazvimavi University of the Western Cape, South Africa Dr. ir.T.N. Olsthoorn Delft University of Technology, reserve member CRC Press/Balkema is an imprint of the Taylor & Francis Group, an informa business © 2013, David Love All rights reserved.
    [Show full text]
  • Southern Africa • Floods Regional Update # 1 10 March 2010 This Report Was Issued by the Regional Office for Southern and Eastern Africa (ROSEA)
    Southern Africa • Floods Regional Update # 1 10 March 2010 This report was issued by the Regional Office for Southern and Eastern Africa (ROSEA). It covers the period from 01 February to 9 March 2010. The next report will be issued within the next two weeks I. HIGHLIGHTS/KEY PRIORITIES • Normal to above normal rains in northern Zambia and northern Mozambique are causing river levels to rise, forcing authorities to discharge water from Kariba dam in Zimbabwe and Cahora Bassa dam in Mozambique. This, in addition to the ongoing rainfall is causing localized flooding in some areas. • The Government of Mozambique issued a Red Alert on 9 March, in response to the localized flooding in parts of the country. To date, 13,000 displaced people have been relocated to safe areas. • In Zambia, an estimated 800 families have been affected by flooding of which 150 have been relocated to temporary shelter setup by the Government. • An estimated 910 cholera cases and 19 cholera related deaths have been reported in Zambia. II. Regional Situation Overview Consistent with the SADC Outlook for the first quarter of the year, there has been normal to above normal rainfall across the northern half of southern Africa. Northern Zambia and northern Mozambique have particularly received above normal rains. In turn, the Kariba dam, in Zimbabwe, is 73% full. This prompted the opening of one flood gate on the 9th of March 2010. Eastern and Northern Zimbabwe received heavy rains in the past two weeks leading to flash floods in some areas and to the rise, above alert levels, of the Pungwe River downstream in Mozambique.
    [Show full text]
  • Four Key Episodes in the Policy Articulation of IWRM in Downstream Mozambique
    www.water-alternatives.org Volume 9 | Issue 3 Alba, R. and Bolding, A. 2016. IWRM avant la lettre? Four key episodes in the policy articulation of IWRM in downstream Mozambique. Water Alternatives 9(3): 549-568 IWRM Avant la Lettre? Four Key Episodes in the Policy Articulation of IWRM in Downstream Mozambique Rossella Alba Governance and Sustainability Lab, Trier University, Trier, Germany; [email protected] Alex Bolding Water Resources Management group, Wageningen University, Wageningen, The Netherlands; [email protected] ABSTRACT: The first substantive piece of water legislation ever adopted in Mozambique, the Lei de Águas of 1991, was crafted before IWRM was endorsed as the newly emerging global consensus on water governance. Yet, the Lei de Águas already incorporated the river basin concept and its decentralised water management, making Mozambique a case of IWRM 'avant la lettre'. In this paper, we reconstruct the drivers behind four key policy episodes that shaped the travel of IWRM to Mozambique, viz. the Lei de Águas 1991, the SADC Water Protocol, the National Water Policy 1995, and the 2007 national reforms and regulations, drawing from the experiences of two Mozambican river basins, the Limpopo and the Pungwe. In terms of process, we observe that domestic concerns, a small Mozambican water policy elite nurtured by international donors, and the agenda of financial institutions highly shaped the articulation of IWRM. In terms of outcomes, several contradictions emerge: i.e. centralised State management seems to have become further entrenched, stakeholders have virtually no say in water matters and the most powerful and wealthy stakeholders use payments to secure water cheaply at the expense of unregistered smallholder users who depend for their livelihoods on primary water.
    [Show full text]
  • Working with Stakeholders Linking Environmental Flows To
    Working with Stakeholders Linking Environmental Flows to Transboundary Governance in the Pungwe, Buzi & Save River basins By Dominic Mazvimavi Institute for Water Studies University of the Western Cape Mozambique-Zimbabwe Objectives Constraints Demand for stakeholder Compliance with SADC Regional Protocol, Low levels of awareness of driven and participatory Bilateral Agreements, and National Water ecosystems services from capacity building on e- Laws. river flows. flow assessment and Transparent and sustainable transboundary Inadequate capacity for e- management. water resources management flow assessment and Enhancing peaceful bilateral cooperation management. Outputs Process IUCN & Waternet Transparent stakeholder owned Transboundary and bi- Capacity Building transboundary implementation of e-flow nationally driven e-flow Intervention recommendations. assessments and Awareness development. Sustainable water allocations and provision formulation of Demonstration in pilot of river related ecosystem services. commensurate river basin Revue River Basin. Upscaling of b-nationally driven e-flow management measures. Learning by doing e-flow assessments from pilot sub-basins to all 3 assessment. shared basins. Outcomes Compliance with regional and bilateral agreements, and national legislation. Increased and sustainable provision of river flow-related ecosystem services. Improved human-wellbeing and peaceful harmonious bilateral management of water resources and natural resources in general. Legal Framework • SADC Protocol on Shared Watercourse
    [Show full text]
  • 1 Technical Note: Hydrology of the Lake Urema Wetland, Mozambique
    Technical Note: Hydrology of the Lake Urema wetland, Mozambique Matthew McCartney and Richard Owen October 2007 Description Lake Urema is a shallow lake located on the floor of the Rift Valley, just to the south of the Zambezi River in Gorongosa National Park in Mozambique. Located at 18o52’ S and 34o39’E at an altitude of approximately 20 masl, the lake is part of the Lower Zambezi-Gorongoza-Buzi- Pungwe floodplain system (Breen et al., 1997). The floodplains surrounding the lake are highly productive and crucial to the ecological well being of the National Park. The periodic inundation of the floodplains creates a dynamic ecotone supporting a range of diverse temporal habitats with the capacity to support large numbers of herbivores and associated predators (Tinley, 1977). The lake itself supports large numbers of hippopotamus, crocodiles and water birds and is an important source of fish for several communities living close to it. Several rivers drain onto the Rift valley floor from the both the east and west. The primary inflowing river is the River Nhanduge which rises to the north-west of the lake on the Barue platform which forms the highlands on the western side of the Rift Valley (Figure 1). The river source is close to the city of Macosse and not far from the border with Zimbabwe. Other rivers originate on the flanks of Mount Gorongosa. Mount Gorongosa is a younger intrusive granite massif (30km (N-S) by 20 km (E-W)) rising 1,400m above the Barue platform immediately to the north-west of the lake (Figure 1).
    [Show full text]
  • MOZAMBIQUE Tropical Cyclone IDAI Briefing Note – 15 March 2019
    MOZAMBIQUE Tropical Cyclone IDAI Briefing note – 15 March 2019 Tropical Cyclone Idai that developed from a tropical depression beginning on 9 March made landfall on the evening of 14 March through Beira city, Sofala province, central Mozambique. 600,000 people are estimated to be affected. Heavy rains and flooding over recent days have already affected 141,000 people, displaced 17,100 and killed 66 people. Stronger winds, storm surge and heavy rains are expected to affect the provinces of Zambezia, Sofala, Tete, Manica and Niassa until 17 March. 15 transit centres have been set up in Zambezia and Tete to assist the displaced population. Map by OCHA (12/03/2019) Anticipated scope and scale Key priorities Humanitarian constraints Significant flooding is still expected as the tropical cyclone Idai 600’000 Beira and other districts in Sofala are without moves inland towards Manica province. 160,000 people are at communication lines as of 15 March. Beira is people affected by the cyclone (estimate) risk due to the expected rise in water levels in the Zambezi, also without electricity. Up to 1,583 kilometers Licungo, Pungoe and Buzi river basins. Most districts in of roads in five regions have been damaged. Zambezia, Sofala, Manica, Tete and Inhabane will be affected +17’000 11 bridges have also been destroyed. by strong winds (150 km/h) and heavy rains (up to 150 mm in displaced (9-14 March) 24 hours). Rains, thunderstorms and strong winds will also Limitations impact district in Niassa, Cabo Delgado and North of Tete. A +12’000 Due to the rapid changes in the natural development of the cyclone the storm surge of 4 metres is expected to hit the city of Beira, with homes and classrooms damaged impact on the population and infrastructure is hard to assess until the a much higher tide at the mouth of the Pungwe River likely to cyclone has passed.
    [Show full text]
  • Socio-Economy
    Government of the Republic of Mozambique Government of the Republic of Zimbabwe Swedish International Development Cooperation Agency (Sida) DEVELOPMENT OF THE PUNGWE RIVER BASIN JOINT INTEGRATED WATER RESOURCES MANAGEMENT STRATEGY MONOGRAPH REPORT ANNEX XII SECTOR STUDY ON: SOCIO-ECONOMY FINAL REPORT APRIL 2004 SWECO & Associates Client: Government of the Republic of Mozambique Government of the Republic of Zimbabwe Swedish International Development Cooperation Agency (Sida) Project: DEVELOPMENT OF THE PUNGWE RIVER BASIN JOINT INTEGRATED WATER RESOURCES MANAGEMENT STRATEGY Title: Monograph Report Sub title: Annex XII, Sector Study on: Socio-economy Status of report: Final SWECO Project No: 1150447 Date: April 2004 Project team: SWECO International AB, Sweden (lead) ICWS, The Netherlands OPTO International AB, Sweden SMHI, Sweden NCG AB, Sweden CONSULTEC Lda, Mozambique IMPACTO Lda, Mozambique Catholic University of Mozambique Interconsult Zimbabwe (Pvt) Ltd, Zimbabwe Approved by: Lennart Lundberg, Project Director SWECO INTERNATIONAL AB P:/1113/1116/1150447000 Pungue IWRM Strategy - Sida/Original/Monograph Report/Annex XII/English/Annex XII Socio-Economy.doc DEVELOPMENT OF THE PUNGWE RIVER BASIN JOINT IWRM STRATEGY Monograph Report Annex XII: Socio-Economy The Pungwe Project The Pungwe River Basin Joint Integrated Water Resources Management Strategy (IWRMS), the Pungwe Project in short, is a co-operative effort by the Governments of Zimbabwe and Mozambique to create a framework for the sustainable and equitable management, development and conservation of the water resources of the Pungwe River basin, with the objective of increasing the derived social and economic benefits for the people living in the basin. A key element in the development of this strategy by the Project lies in building capacity for its implementation and upgrading, to facilitate effective participatory management by both the authorities and stakeholders.
    [Show full text]