Neerabup Preliminary Decommisioning Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Ancillary Service Costs: Spinning Reserve, Load Rejection Reserve and System Restart Costs (Margin Values and Cost LR) for 2021/22 Determination
Ancillary service costs: Spinning reserve, load rejection reserve and system restart costs (Margin values and Cost_LR) for 2021/22 Determination 31 March 2021 D227225 Economic Regulation Authority Economic Regulation Authority Level 4, Albert Facey House 469 Wellington Street, Perth WA 6000 Telephone 08 6557 7900 Email [email protected] Website www.erawa.com.au This document can also be made available in alternative formats on request. National Relay Service TTY: 13 36 77 © 2021 Economic Regulation Authority. All rights reserved. This material may be reproduced in whole or in part provided the source is acknowledged Ancillary service costs: Spinning reserve, load rejection reserve and system restart costs (Margin values and Cost_LR) for 2021/22 – Determination Economic Regulation Authority Contents Executive summary ............................................................................................................. 2 1. Introduction ............................................................................................................... 6 1.1 Requirements for the ERA’s determination ......................................................... 7 2. What are ancillary services? ....................................................................................... 9 2.1 Spinning reserve service.................................................................................. 9 2.1.1 How the cost of spinning reserve is recovered from the market .............................. 9 2.2 Load rejection reserve service ....................................................................... -
Environmental Protection Authority ENVIRONMENTAL PROTECTION AUTHORITY
Environmental Protection Authority ENVIRONMENTAL PROTECTION AUTHORITY ANNUAL REPORT 2002 • 2003 Contents: TRANSMITTAL TO THE MINISTER ..........................................................................I CHAIRMAN’S OVERVIEW .......................................................................................... 1 MEMBERS........................................................................................................................ 4 MAJOR ENVIRONMENTAL ISSUES.......................................................................... 8 Sustainability................................................................................................................... 8 Natural Resource Management....................................................................................... 9 State of the Environment Reporting ............................................................................. 11 Broadscale Clearing of Native Vegetation for Agriculture .......................................... 11 Forest Management....................................................................................................... 12 Perth’s Water Resources............................................................................................... 12 Peel-Harvey................................................................................................................... 13 National Water Quality Management Strategy: Australian and New Zealand Guidelines for Fresh and Marine Water Quality (Guideline No 4) and Australian Guidelines for -
ERM Power's Neerabup
PROSPECTUS for the offer of 57,142,858 Shares at $1.75 per Share in ERM Power For personal use only Global Co-ordinator Joint Lead Managers ERMERR M POWERPOWEPOWP OWE R PROSPECTUSPROSPEOSP CTUCTUSTU 1 Important Information Offer Information. Proportionate consolidation is not consistent with Australian The Offer contained in this Prospectus is an invitation to acquire fully Accounting Standards as set out in Sections 1.2 and 8.2. paid ordinary shares in ERM Power Limited (‘ERM Power’ or the All fi nancial amounts contained in this Prospectus are expressed in ‘Company’) (‘Shares’). Australian currency unless otherwise stated. Any discrepancies between Lodgement and listing totals and sums and components in tables and fi gures contained in this This Prospectus is dated 17 November 2010 and a copy was lodged with Prospectus are due to rounding. ASIC on that date. No Shares will be issued on the basis of this Prospectus Disclaimer after the date that is 13 months after 17 November 2010. No person is authorised to give any information or to make any ERM Power will, within seven days after the date of this Prospectus, apply representation in connection with the Offer which is not contained in this to ASX for admission to the offi cial list of ASX and quotation of Shares on Prospectus. Any information not so contained may not be relied upon ASX. Neither ASIC nor ASX takes any responsibility for the contents of this as having been authorised by ERM Power, the Joint Lead Managers or Prospectus or the merits of the investment to which this Prospectus relates. -
2014-11-25 QWON Power Stations
LEGISLATIVE COUNCIL C1379 QUESTION WITHOUT NOTICE (Of which some notice has been given) Tuesday, 25 November 2014 Hon Robin Chapple to the Leader ofthe House representing the Minister for Energy. Please provide a summary of all active power stations in Western Australia, including: age; capacity profile; fuel and/or mine type; number of employees; whether it is on or off the grid; and the closure schedule. I thankthe Hon. Member for some notice of this question. I table the attached document. The Public Utilities Office has relied on the Independent Market Operator for data concerning generators on the SWIS and has reported the maximum sent out capacity offered by these facilities into the Balancing Market, as of 25 November 2014. These figures may differ slightly from the number of capacity credits awarded and from facility nameplate capacity owing to factors including parasitic load and ambient temperature. For NWIS and NIS facilities, various sources have been used as there is no single definitive list of facilities. The nature of mining operations has not been investigated. The Public Utilities Office does not have access to data on the number of employees or on the closure schedule of power stations. The expected plant life of power stations is variable, a function of maintenance regimes and commercial considerations. ATTACHMENT TO QWN C1379 . 'I . " ~ -1J&1t~-n i ~,'l;(, : 'C' 4\", lTt ~A','~:'l';"(~.i~ffil!. " l]f,:,gl '~. l) , '. lifP'\1 ~, , •. 'fg~~t:t.: :' (~~.~:~n.', . ~ j - llll' ~!l!i:jliiW~tlilit~r~QJ\l1~~t~ii~Sys:t~m;(~~),~'•. -
Appendix E. Energy Price Limits Based on Aero-Derivative Gas Turbines Using Alternative Gas Price Forecast Appendix F
2015 Review of the Energy Price Limits for the Wholesale Electricity Market IMO Final Report 18 May 2015 Contents 1. Background .................................................................................................................. 3 2. Summary of the draft report ........................................................................................ 3 2.1 Overview ......................................................................................................... 3 2.2 Methods for estimating gas price distributions ............................................... 3 2.3 IMO’s preliminary view .................................................................................... 4 2.4 Results in the draft report ............................................................................... 4 3. Public consultation process ....................................................................................... 5 4. Changes from the draft report .................................................................................... 5 5. Conclusions .................................................................................................................. 6 Document details Report Title: 2015 Review of the Energy Price Limits for the Wholesale Electricity Market – IMO Final Report Release Status: Public Confidentiality Status: Public domain Independent Market Operator Level 17, 197 St Georges Terrace, Perth WA 6000 PO Box 7096, Cloisters Square, Perth WA 6850 Tel. (08) 9254 4300 Fax. (08) 9254 4399 Email: [email protected] -
Answers to Questions Prior to Hearing
Hon Mike Nahan MLA Treasurer; Minister for Energy; Citizenship and Multicultural Interests Ourref: 48-13528; 48-13527 Hon Ken Travers MLC Chairman Estimates and Financial Operations Committee Parliament House PERTH WA 6000 Attn: Mr Mark Warner Committee Clerk Dear Mr Travers QUESTIONS PRIOR TO 2014-15 ANNUAL REPORT HEARINGS - SYNERGY AND HORIZON POWER In response to the Committee's letter of 20 October 2015, please find attached responses to the questions prior to hearing, in respect of Synergy and Horizon Power's 2014-15 annual report. Yours sincerely DR MIKE NAHAN MLA TREASURER Att. CC: Hon Peter Collier MLC Minister representing the Minister for Energy in the Legislative Council 1 9 NOV 2015 Level 13, Dumas House, 2 Havelock Street, West Perth, Western Australia 6005 Telephone: +61 8 6552 5700 Facsimile: +61 8 6552 5701 Email: [email protected] ESTIMATES AND FINANCIAL OPERATIONS COMMITTEE 2014/15 ANNUAL REPORT HEARINGS QUESTIONS PRIOR TO HEARING Synergy Annual Report 2014/15 Hon Robin Chappie asked: 1) Page 5 under "Our Business," I ask: a) How many people are employed at each of your nine power stations? Answer: Employees (2014-15) Cockbum Power Station 19 Kalgoorlie Gas Turbine Mungarra Gas Turbine 5 Pinjar Power Station Kwinana Power Station (includes Kwinana Gas Turbines) 11 Geraldton Gas Turbine 0 Worsley (South West Co-Generation Joint Venture) 0 (operated by Worsley Alumina) Muja Power Station 337 Collie Power Station 1 FTE + contractors as required. How many people are employed at each of your nine wind farms? Answer: Employees (2014-15) Albany Wind Farm Bremer Bay Wind-Diesel System 4 Esperance Wind Farms Hopetoun Wind-Diesel System Coral Bay Wind-Diesel System 2 Denham Wind-Diesel System 2 Kalbarri Wind Farm 1 Mumbida Wind Farm 6 How many people are employed at your one solar farm? Answer: Employees (2014-15) Greenough River Solar Farm 1.5 2) Page 21 under "Delivering energy" you describe two station transformers failing and a partial cooling tower collapse at Muja Power Station, I ask: a) Have these issues been rectified? Answer: Yes. -
Annual Planning Report 2020
Annual Planning Report 2020 Table of contents Section 1 Introduction 3 Section 2 Planning considerations 7 Section 3 Demand forecasts and scenario planning 13 Section 4 Emerging technology 17 Section 5 Key completed projects 23 Section 6 Transmission network issues and developments 27 Section 7 Distribution network issues and developments 49 Section 8 Conclusion 57 Appendix A Estimated maximum short circuit levels for 2019/20 59 Western Power Annual Planning Report 2020 1 2 Western Power Annual Planning Report 2020 1 Introduction Western Power Annual Planning Report 2020 3 Who we are For more than 70 years, We’re already harnessing new technology and are excited about further opportunities to Western Power has evolve with the changing energy needs of our provided Western customers to keep them connected every step of the way. Australians with safe, We build, operate and maintain the reliable and efficient transmission and distribution networks which cover a service area of over 255,000km². electricity. The transmission network is shown in the diagram on page 6. Our vast transmission and distribution network seamlessly connects our homes, businesses The network is inherently dynamic and and essential community infrastructure to an complex. Customers’ needs change and we increasingly renewable energy mix, to build our regularly receive new connection applications. State and meet the changing energy needs You should use the information in this report of Western Australians. We’re powered by only as a guide and we recommend that you community trust and the passion of our people. get in touch with us as early as possible when planning your project. -
Proposed Revisions DBNGP Access Arrangement
Proposed Revisions DBNGP Access Arrangement 2016 – 2020 Access Arrangement Period Forecast capital expenditure Supporting Submission: 9 PUBLIC Date Submitted: 31/12/2014 Proposed Revisions DBNGP Access Arrangement CONFIDENTIALITY 1.1 This submission is provided to the ERA to assist it in its assessment of the proposed revisions to the DBNGP Access Arrangement. 1.2 Some information contained in the submission is confidential and commercially sensitive. The reasons for DBP's claim of confidentiality are outlined in Appendix B: to this submission. 1.3 A public version of this submission will be provided separately. 1.4 Accordingly, this version of the submission is provided to the ERA on the following conditions: (a) it is to be used by the ERA solely for the purposes of assessing the proposed revisions to the DBNGP Access Arrangement; (b) it is not to be disclosed to any person other than the following without DBP’s prior written approval: (i) those staff of the ERA who are involved in assisting the ERA in its assessment process; and (ii) those of the ERA’s consultants who are involved in assisting the ERA in its assessment process and who have appropriate confidentiality undertakings in place. DBP Transmission (DBP) is the owner and operator of the Dampier to Bunbury Natural Gas Pipeline (DBNGP), Western Australia’s most important piece of energy infrastructure. The DBNGP is WA’s key gas transmission pipeline stretching almost 1600 kilometres and linking the gas fields located in the Carnarvon Basin off the Pilbara coast with population centres and industry in the south-west of the State Trent Leach Nick Wills-Johnson Manager Regulatory & Government Policy Manager Economic Regulation P: (08) 9223 4357 P: (08) 9223 4902 M: 0429 045 320 M: 0477 374 246 DBNGP (WA) Transmission Pty Limited ABN 69 081 609 190 Level 6 12-14 The Esplanade PERTH WA 6000 P: +61 8 9223 4300 F: +61 8 9223 4301 Sub 9 forecast capex [PUBLIC]_Final.docx Page i Proposed Revisions DBNGP Access Arrangement Table of Contents 1. -
For Personal Use Only Use Personal for but Now Offer Our Industry Leading Services to Small Businesses
27 September 2013 The Manager Company Announcements Office Australian Securities Exchange Via Electronic Lodgement Attached are the following documents: 1. The Annual Report including Financial Statements and Directors’ Report for the year ended June 2013. 2. Notice of annual general meeting and shareholder proxy form. 3. The ERM Power Update. These documents are being sent to shareholders in accordance with their election as to the receipt of printed reports. Peter Jans Group General Counsel & Company Secretary ERM Power Limited For further information Garry West Corporate Communications Manager Phone: +61 7 3020 5165 Mobile: +61 457 140 650 Email: [email protected] About ERM Power ERM Power is a dynamic Australian energy company with interests in electricity sales and generation, and gas production and exploration. Trading as ERM Business Energy and founded in 1980, we have grown to become the 4th largest electricity retailer in the National Electricity Market with operations in every state. We initially focused on larger businesses For personal use only but now offer our industry leading services to small businesses. We have equity interests in 442 megawatts of low emission, gas fired peaking power stations in Western Australia and Queensland, sell conventional gas and condensate from onshore discoveries in Western Australia, and have gas exploration operations in Western Australia and New South Wales. www.ermpower.com.au ERM POWER LIMITED ERM POWER ANNUAL REPORT | ANNUAL REPORT 2013 REPORT | ANNUAL For personal use only ERM POWER ERM Power (ASX code: EPW) is a dynamic Australian energy company with interests in electricity sales and generation, and gas production and exploration. -
Carbon Emissions Inventory Major Resource Projects – AGEIS 2012
FACILITIES CURRENTLY OPERATING Name/Location; Facility name, Operator Scope 1 (Direct) Source of data General activity GHG emissions Point source CO2e TPA emissions total, where stationary energy is accounted for elsewhere (eg Power derived from SWIS) Alkimos Wastewater Treatment Water Corporation Plant Sourced from SWIS 16,000 EPA Bulletins 1238, 1239 Argyle, diamonds Rio Tinto Argyle Diamonds sustainable development 49,000 report 2009 and 2010 Armadale Brick Austral Bricks Data provided by Company giving their (Brickworks Ltd) 42,968 state total emissions Cardup Brick Austral Bricks (Brickworks Ltd) see Armadale Brick Caversham Tile Bristile (Brickworks Ltd) see Armadale Brick Malaga Brick Austral Bricks (Brickworks Ltd) see Armadale Brick Australind; titanium Cristal Global Sourced from SWIS 34,000 Company report (June 2009) Boddington; Mt Saddleback, BHP Billiton - Worsley bauxite Alumina Pty Ltd 243,000 AAC Sustainability report 2009 Bonaparte Basin; Blacktip gas ENI Australia project not known Bonaparte Basin; Puffin, oil AED Oil Ltd (in administration) not known Brockman Syncline 4 Iron Ore Rio Tinto (form. Project Hamersley Iron Pty Limited) 111,800 EPA Bulletin 1214 WA GREENHOUSE GAS EMISSIONS Page 2 Bronzewing - Mt McClure, gold Navigator Resources Ltd not known Burrup; Ammonia Plant, Burrup Burrup Fertilisers Pty NGER Greenhouse and Energy Information Peninsula Ltd 1,484,877 2010-11 Canning Basin; Blina, Lloyd, Buru Energy Ltd Sundown & West Terrace, oil 244 Data provided by Company Cape Preston; Central Block, Sino Iron (CITIC) -
Council Agenda Management Software
Council Agenda ORDINARY COUNCIL MEETING 7.00pm, 27 July, 2010 Civic Centre, Dundebar Road, Wanneroo Public Question & Statement Time Council allows a minimum of 15 minutes for public questions and statements at each Council Meeting. If there are not sufficient questions to fill the allocated time, the person presiding will move on to the next item. If there are more questions than can be dealt with in the 15 minutes allotted, the person presiding will determine whether to extend question time. Protocols During the meeting, no member of the public may interrupt the meeting’s proceedings or enter into conversation. Each person seeking to ask questions during public question time may address the Council for a maximum of 3 minutes each. A register of person’s wishing to ask a question/s at the Council Meeting is located at the main reception desk outside of the Chamber on the night. However, members of the public wishing to submit written questions are requested to lodge them with the Chief Executive Officer at least 30 hours prior to the start of the meeting i.e. noon on the previous day. The person presiding will control public question time and ensure that each person wishing to ask a question is given a fair and equal opportunity to do so. A person wishing to ask a question should state his or her name and address before asking the question. If the question relates to an item on the agenda, the item number should also be stated. The following general rules apply to question and statement time: Questions should only relate to the business of the council and should not be a statement or personal opinion. -
Robert Ceic BACHELOR of ENGINEERING (MECHANICAL) Australian Service Line Leader Power & Renewables
Robert Ceic BACHELOR OF ENGINEERING (MECHANICAL) Australian Service Line Leader Power & Renewables Location Experience Perth, WA, Australia 23 years Qualifications/Accreditations – Bachelor of Engineering, 2005 – ME (Management), 2011 Key technical skills Memberships – Gas, coal, diesel fuel combustion – CPEng / MIEAust – Institute Engineers Australia – Fired and Unfired boilers, HRSG’s, Gas Turbines, (NER registered); and Steam Turbines Reciprocating Engines – FAIE – Australian Institute Energy – Utility Solar PV – Power Plant “EPC” Construction – Lenders Engineer – Project Management & Team Management – Client Relationship Management – Market Strategy, business development and opportunity pursuit, thermal and renewable energy Relevant experience summary Robert is Technical Director and Australian Service Line Leader for Power Generation & Renewable Energy at GHD and responsible for developing, maintaining and profiling GHD’s technical capability and capacity. He has over 23 years of experience in the power industry as a contractor and consultant ranging from project development and design through to construction and operation of various types of power generation facilities in Australia, UK, United States and Indonesia. Robert is a Chartered Mechanical Engineer with postgraduate qualifications in Management and a Fellow of the Australian Institute of Energy. Project experience • Project Manager Battery Compliance Study; • Project Director Collie Pumped Hydro Energy Various Storage pre-FEED Study; Role: Engineering Services Panel Client Relationship • Project Director Coral Bay Hybrid Power Station and Programme Manager Protection Study and implementation; Client: Synergy • Project Director various Asset integrity studies and Location: Perth, WA, Australia inspections on operating assets; and Co-ordinating manager for services panel providing • Executive Advisor WEMMR readiness projects. multi-disciplined asset integrity engineering works and sub-contractor management at all coal, gas turbine, wind and solar power stations.