Robert Ceic BACHELOR of ENGINEERING (MECHANICAL) Australian Service Line Leader Power & Renewables

Total Page:16

File Type:pdf, Size:1020Kb

Robert Ceic BACHELOR of ENGINEERING (MECHANICAL) Australian Service Line Leader Power & Renewables Robert Ceic BACHELOR OF ENGINEERING (MECHANICAL) Australian Service Line Leader Power & Renewables Location Experience Perth, WA, Australia 23 years Qualifications/Accreditations – Bachelor of Engineering, 2005 – ME (Management), 2011 Key technical skills Memberships – Gas, coal, diesel fuel combustion – CPEng / MIEAust – Institute Engineers Australia – Fired and Unfired boilers, HRSG’s, Gas Turbines, (NER registered); and Steam Turbines Reciprocating Engines – FAIE – Australian Institute Energy – Utility Solar PV – Power Plant “EPC” Construction – Lenders Engineer – Project Management & Team Management – Client Relationship Management – Market Strategy, business development and opportunity pursuit, thermal and renewable energy Relevant experience summary Robert is Technical Director and Australian Service Line Leader for Power Generation & Renewable Energy at GHD and responsible for developing, maintaining and profiling GHD’s technical capability and capacity. He has over 23 years of experience in the power industry as a contractor and consultant ranging from project development and design through to construction and operation of various types of power generation facilities in Australia, UK, United States and Indonesia. Robert is a Chartered Mechanical Engineer with postgraduate qualifications in Management and a Fellow of the Australian Institute of Energy. Project experience • Project Manager Battery Compliance Study; • Project Director Collie Pumped Hydro Energy Various Storage pre-FEED Study; Role: Engineering Services Panel Client Relationship • Project Director Coral Bay Hybrid Power Station and Programme Manager Protection Study and implementation; Client: Synergy • Project Director various Asset integrity studies and Location: Perth, WA, Australia inspections on operating assets; and Co-ordinating manager for services panel providing • Executive Advisor WEMMR readiness projects. multi-disciplined asset integrity engineering works and sub-contractor management at all coal, gas turbine, wind and solar power stations. 183 MW Warradarge Wind Farm • Project Director Closure Planning Muja and Role: Project Director Kwinana Power Station Study; Client: Bright Energy Investments Location: Perth, WA, Australia • Project Manager Renewable Energy Hosting Capacity Studies; Proposal Manager and subsequent Project Director for Owners Engineer services. • Project Director Renewables project readiness assessments and risk reviews; • Project Manager Collie Renewable Energy Transformation Feasibility Study; E [email protected] www.ghd.com Robert Ceic | Australian Service Line Leader Power & Renewables 30 MW Greenough Solar Farm Stage 2 Cogeneration Feasibility Study (CBH) Role: Project Director Feasibility assessment and cost estimate of 3MW Client: Bright Energy Investments biomass cogeneration plant for grain processing Location: Perth, WA, Australia facility. Manager and subsequent Project Director for Owners Engineer services. Geraldton Energy Project (Confidential) 60 MW Solar PV farm in SWIS Technical advisor for 20 MW Waste to Energy development project. Responsible for liaison with Role: Project Developer Western Power & OEM’s. Client: Confidential Location: Perth, WA, Australia Generator License Compliance Auditing Technical Advisor for 60 MW solar PV farm in SWIS. (Alinta Energy, Worsley Alumina, Verve Energy) Southdown Joint Venture Power Supply Development Concurrent license audits of cogeneration and gas turbine plant for various assets owners in SWIS in Role: Project Director accordance with ERA regulatory framework. Client: Grange Resources Location: Perth, WA, Australia Pilbara Power Project (Horizon Power) Project Director and executive advisor for 120 MW power plant development for magnetite mine in SW Lead technical advisor and GHD team lead for power- WA. island and balance of plant RFT development and tender response review for 150 MW gas fired power DeGrussa Solar Project project based on LM6000 gas turbines and IHI HRSG’s. Role: Construction Superintendent Client: Neoen Onslow Power Station Concept Development Location: Perth, WA, Australia (Chevron Corp) Construction superintendency of 16 MW solar hybrid battery plant at Degrussa Copper mine. Technical and commercial development of the Onslow gas fired plant, gas pipeline and HV infrastructure East Kimberly System Strategy Blueprint including representation on Chevrons behalf during discussions with WA state utilities and OEM’s. Project Role: Project Manager (on Secondment) will support a desalination plant and a large-scale Client: Horizon Power industrial precinct near Onslow as part of the Location: Perth, WA, Australia Wheatstone LNG project. Business case development and options study for enhancing reliability of the East Kimberly Regional QAL Cogeneration Plant Technical Review System grid transmission and generation capability which includes the Ord River 30 MW Hydroelectric (Rio Tinto Alcan) Power Scheme. Independent review of EPCM’s technical specification for HRSG, balance of plant and the EPC contract as Public Utilities and Mining Projects part of RTA risk mitigation strategy. Role: Various including Technical Advisor, Project Study Manager and Project Director Cadia Gold Mine Energy Storage and Hybrid Client: Various Generation Study (Newcrest Mining) Location: Perth, WA, Australia Project Study Manager for investigation into proposed renewable energy generation and battery energy Carnarvon Augmentation Project (Horizon storage business case and technology options. Power) Closure planning of redundant power station and Ulverstone 8 MW Cogeneration Plant programme of enhancement and improvement works Commissioning (Simplot Australia) at newly commissioned diesel and gas power station. Acting as project director for site and desktop review LRMC Cost Modelling (Public Utilities Office) activities supporting the Owners commissioning team. Desktop cost model and public report for new entrant Climate Change Adaption Study (CLP thermal and renewable technologies in SWIS. Holdings) Review of technical solutions for coal fired and gas fired power plant(s) in client portfolio to manage effects E [email protected] www.ghd.com Robert Ceic | Australian Service Line Leader Power & Renewables of climate change and de risk power station • Power Plant Expansion Whyalla Steelworks operations. (Onesteel) • Biomass Concept Design (Delta Electricity) ESKOM Build Programme Independent Review (DPE South Africa) • Appin & Tower Mine Waste Gas Feasibility Study (Energy Developments Limited) Supporting the construction review and project • Western Sydney Gas Peaking Plant (Snowy performance benchmarking in conjunction with Hydro) Johannesburg Office of 4800 MW Medupi and Kusile coal fired projects and Ingula pumped storage scheme • Project Engineer / Mechanical Design Engineer / for National Government department. Engineering Cadetship • Alstom Power | Jan 2000 – Dec 2006 Gas Turbine Development Portfolio (Origin Energy) Career history Client contact and interface responsible for managing 2013 - present GHD, Australian Service Line engineering resources, budget and services contract Leader Power & Renewables for development, definition and technical appraisal of Quarantine 2 OCGT, Kerrawary 1000MW OCGT and Jan 2012 – Mar AECOM, Manager Power Darling Downs 2 OCGT expansion projects. 2013 Generation/Principal Engineer 2007 - 2011 Parsons Brinckerhoff, Project Kerrawary 1,000 MW OCGT Concept Manager Validation (Origin Energy) 1996 - 2006 Alstom Power, Project Assessment of proposed site layout, utility Engineer/Mechanical Design connections, logistics suitability water supply, noise Engineer/Engineering and development approval requirements. Cadetship/Design Technician NSW CCGT Feasibility Study (Santos Ltd) Study of proposed green-field sites for 500–1500 MW block CCGT plants in NSW and VIC. Co-ordination of multi-disciplined engineering team; all consultation with NSW Department of Planning, gas and HV utilities; managing relationships with equipment suppliers, constructors and industrial landowners; fieldwork investigations; directing emissions modelling, thermal performance modelling and plant layout and technical input into business case. Ravensthorpe Nickel Mine Power Plant WA (FQM Ltd) FIFO Project Manager responsible for validation engineering, team safety and site commissioning of mothballed 54 MW diesel boiler and steam turbine plant for FQM Nickel Australia. Key activities included cold and hot commissioning, piping design and balance of plant equipment verification to ensure reliable return to service of plant. Additional Project Experience: • NSW Power Privatisation 2010 (TRUenergy) • Redbank Power Station NSW (Confidential Bank) • Munmorah Power Station NSW (Norske Hydro) • Cawse Nickel Mine Power Plant (Alinta) • Worsley Multi Fuel Cogeneration Plant (Various) • Uranquinty Power Station (BOS) • Neerabup Power Station (NAB) • SCP Project Port Kembla Steelworks (Bluescope Steel) E [email protected] www.ghd.com .
Recommended publications
  • View Annual Report
    2010 Annual Report We expect to triple our production base by 2015. A SOLID BASE A POSITION OF STRENGTH GroA ROBUST PROJwECT PIPELINE th A nickel A copper A copper-gold A nickel project under deposit in the One of the The 8th largest operation in a operation with construction in new Copperbelt world’s major copper mine in growing mining over 30 years mining-friendly located in undeveloped the world jurisdiction of mine life Finland NW Zambia copper deposits Kansanshi Guelb Moghrein Ravensthorpe Kevitsa Sentinel Haquira First Quantum Minerals Ltd. is a growing mining and metals First Quantum currently The Company’s current company engaged in mineral produces LME grade “A” copper approved copper projects are exploration, development cathode, copper in concentrate, expected to increase annual and mining. The Company’s gold and sulphuric acid and is production by at least 45% objective is to become a on track to become a significant by 2015. In addition, later-stage globally diversified nickel producer by 2012. The exploration projects have mining company. Company's current operations the potential to add a further are the Kansanshi copper-gold 500,000 tonnes of annual mine in Zambia and the Guelb copper production. Moghrein copper-gold mine in Mauritania. In 2010, First Quantum produced 323,017 tonnes of copper, 191,395 ounces of gold and generated $2.4 billion of revenues. Unless otherwise noted, all amounts in this report are expressed in United States dollars. 2010 Annual Report In 2010, our operations continued to provide a solid base to support our growth strategy.
    [Show full text]
  • ERM Power's Neerabup
    PROSPECTUS for the offer of 57,142,858 Shares at $1.75 per Share in ERM Power For personal use only Global Co-ordinator Joint Lead Managers ERMERR M POWERPOWEPOWP OWE R PROSPECTUSPROSPEOSP CTUCTUSTU 1 Important Information Offer Information. Proportionate consolidation is not consistent with Australian The Offer contained in this Prospectus is an invitation to acquire fully Accounting Standards as set out in Sections 1.2 and 8.2. paid ordinary shares in ERM Power Limited (‘ERM Power’ or the All fi nancial amounts contained in this Prospectus are expressed in ‘Company’) (‘Shares’). Australian currency unless otherwise stated. Any discrepancies between Lodgement and listing totals and sums and components in tables and fi gures contained in this This Prospectus is dated 17 November 2010 and a copy was lodged with Prospectus are due to rounding. ASIC on that date. No Shares will be issued on the basis of this Prospectus Disclaimer after the date that is 13 months after 17 November 2010. No person is authorised to give any information or to make any ERM Power will, within seven days after the date of this Prospectus, apply representation in connection with the Offer which is not contained in this to ASX for admission to the offi cial list of ASX and quotation of Shares on Prospectus. Any information not so contained may not be relied upon ASX. Neither ASIC nor ASX takes any responsibility for the contents of this as having been authorised by ERM Power, the Joint Lead Managers or Prospectus or the merits of the investment to which this Prospectus relates.
    [Show full text]
  • 49422 DO PROSPECT SEPT.Indd
    WESTERN AUSTRALIA’S INTERNATIONAL RESOURCES DEVELOPMENT MAGAZINE September–November 2004 $3 (inc GST) Nickel Kambalda reborn Discoveries: The search takes off Kwinana’s golden anniversary DEPARTMENT OF INDUSTRY AND RESOURCES Investment Services 168 St Georges Terrace PERTH Western Australia 6000 Postal address: Box 7606 • Cloisters Square Perth Western Australia 6850 FROM THE MINISTER Tel: +61 8 9327 5555 • Fax: +61 8 9222 3862 Email: [email protected] www.doir.wa.gov.au New hi-tech airborne geological survey INTERNATIONAL OFFICES Europe European Offi ce • 5th fl oor, Australia Centre he Western Australian Government’s However, while Corner of Strand and Melbourne Place A$12million hi-tech airborne our resources sector LONDON WC2B 4LG • UNITED KINGDOM geological survey program will is vital to our State’s Tel: +44 20 7240 2881 • Fax: +44 20 7240 6637 T Email: [email protected] potentially unlock billions of dollars in economy, nothing is Clive Brown, MLA Minister for State India — Mumbai natural resources and create new jobs more important than Development Western Australian Trade Offi ce and opportunities for current and future ensuring workers return 93 Jolly Maker Chambers No 2 9th fl oor, Nariman Point • MUMBAI 400 021 INDIA generations of Western Australians. home safely. Tel: +91 22 5630 3979/74/78 • Fax: +91 22 5630 3977 The new four-year program is designed Western Australia’s resources sector has Email: [email protected] to double the area of the State covered by a strong and enviable record in protecting India — Chennai Western Australian Trade Offi ce - Advisory Offi ce base-line airborne geophysical data that the health and safety of its workers and the 1 Doshi Regency • 876 Poonamallee High Road provides an image of the rocks beneath number one priority of the industry is to Kilpauk • Chennai 600 084 • INDIA soil and sand cover.
    [Show full text]
  • 2014-11-25 QWON Power Stations
    LEGISLATIVE COUNCIL C1379 QUESTION WITHOUT NOTICE (Of which some notice has been given) Tuesday, 25 November 2014 Hon Robin Chapple to the Leader ofthe House representing the Minister for Energy. Please provide a summary of all active power stations in Western Australia, including: age; capacity profile; fuel and/or mine type; number of employees; whether it is on or off the grid; and the closure schedule. I thankthe Hon. Member for some notice of this question. I table the attached document. The Public Utilities Office has relied on the Independent Market Operator for data concerning generators on the SWIS and has reported the maximum sent out capacity offered by these facilities into the Balancing Market, as of 25 November 2014. These figures may differ slightly from the number of capacity credits awarded and from facility nameplate capacity owing to factors including parasitic load and ambient temperature. For NWIS and NIS facilities, various sources have been used as there is no single definitive list of facilities. The nature of mining operations has not been investigated. The Public Utilities Office does not have access to data on the number of employees or on the closure schedule of power stations. The expected plant life of power stations is variable, a function of maintenance regimes and commercial considerations. ATTACHMENT TO QWN C1379 . 'I . " ~ -1J&1t~-n i ~,'l;(, : 'C' 4\", lTt ~A','~:'l';"(~.i~ffil!. " l]f,:,gl '~. l) , '. lifP'\1 ~, , •. 'fg~~t:t.: :' (~~.~:~n.', . ~ j - llll' ~!l!i:jliiW~tlilit~r~QJ\l1~~t~ii~Sys:t~m;(~~),~'•.
    [Show full text]
  • Uranquinty Emergency Response Plan
    Plan GEN-HSE-ERP-UPS Uranquinty Emergency Response Plan Version: 8.0 Released: 05 February 2016 Document Owner: UPS Plant Manager Review Date: 05 February 2018 *Please see Document control section for more information Public Exhibition Document Privacy Information Removed For internal Origin use and distribution only. Subject to employee confidentiality obligations. Once printed, this is an uncontrolled document unless issued and stamped Controlled Copy. Security: [Review whether the document is available for viewing by all interested Origin users, or whether restrictions should apply.] Uranquinty Emergency Response Plan Introduction The Site Emergency Response Plan (ERP) is designed to provide direction and guidance for the Site Emergency Response Team Leader (Site ERT Leader) and site Emergency Response Team (ERT) to respond effectively to site level emergencies and to return site to normal operations. Further support is provided to the Operational Sites through the Emergency Response Framework (see Figure 1), specifically, the Generation Group Emergency Management Plan (GEMP) and Origin Energy’s Crisis Management Plan (CMP). ERP Activation & Escalation Upon the initial notification of a site level emergency, the Site ERT Leader will activate this ERP and escalate where appropriate to internal and external parties (see Table 1). A toolkit is provided to assist site in activating and appropriately escalating the site level emergency to return the site to normal operations safely. Table 1: Activation & Escalation Do Check Activate the
    [Show full text]
  • Public Affairs Parliament House PERTH WA 6000 \
    12 November 2009 Hon Brian Ellis MLC BY EMAIL: [email protected] Chairman Standing Committee on Environment and Public Affairs Parliament House PERTH WA 6000 \ Dear Mr Ellis RE: Submission-Petition No. 45 Esperance Anglican Community School, kirrars 11 and 1 10/ I thank you for the opportunity to make a submission on the petition relating Derance Anglica -•• unity School. The petition is in response to the decision by the Minister for Education not to a . 6 tile 'm of the condition on the registration of the Esperance Anglican Community School (EACS) for Year 11/12 in 201.1, ason given by the Minister was that such an action would have a detrimental effect on the upper secondary (Year 11 and 12) educational program of Esperance Senior High School (ESHS). The petitioners who represent families of Esperance and the surrounding regions serviced by the Esperance Anglican Community School believe that the Minister has erred in her decision and I support the view of the petitioners. The Minister, in making her decision, discussed four main reasons for her conclusion which I will address as follows: 1. Source of Year 11 Cohort for EACS The Minister has concluded that the major source of enrolment for the year 11 cohort would be from ESHS and this would have a detrimental impact on current programmes. However, in spite of the closure of the Ravensthorpe Nickel Mine, enrolments at Esperance Senior High School are significantly up, particularly in Year 11 and 12 in 2009 in comparison to the previous year. Year 11 has 236 students in 2009 compared to 200 in 2008 and Year 12 has 162 in Year 12 compared to 130 in 2008.
    [Show full text]
  • View Annual Report
    CREATING TOMORROW TODAY BHP BILLITON LIMITED ANNUAL REPORT 2004 BHP Billiton is the world's largest diversified resources group, operating a unique mix of high-quality assets across the globe. We structure our portfolio of assets into seven customer-oriented groupings called Customer Sector Groups. These are Petroleum, Aluminium, Base Metals, Carbon Steel Materials, Diamonds and Specialty Products, Energy Coal and Stainless Steel Materials. As you will see on the following pages, our commodities are used in a vast range of products, from playful plastics to powerful PCs to super-fast trains. We're proud of the contribution our operations are making to 'creating tomorrow today' while delivering value and sustainable returns for our shareholders. WE CREATE VALUE THROUGH THE DISCOVERY, DEVELOPMENT, CONVERSION AND MARKETING OF NATURAL RESOURCES ANNUAL GENERAL MEETING The Annual General Meeting of BHP Billiton Limited will be held at the Harbourside Auditorium, Sydney Convention and Exhibition Centre, Darling Harbour, Sydney on Friday 22 October 2004 commencing at 11.00 am. ABOUT THIS REPORT BHP Billiton is a Dual Listed Company comprising BHP Billiton Limited and BHP Billiton Plc. The two entities continue to exist BHP Billiton Limited. as separate companies but operate as a combined group known as BHP Billiton. ABN 49 004 028 077. Registered in Australia. The headquarters of BHP Billiton Limited and the global headquarters of the combined BHP Billiton Group are located in Registered Office: Melbourne, Australia. BHP Billiton Plc is located in London, UK. Both companies have identical Boards of Directors and are 180 Lonsdale Street, run by a unified management team.
    [Show full text]
  • Ravensthorpe Nickel BHP Billiton Project Opens on South Coast Resources Education Partnerships Formed for Industry's Future
    WESTERN AUSTRALIA’S INTERNATIONAL RESOURCES DEVELOPMENT MAGAZINE June - August 2008 $3 (inc GST) Ravensthorpe Nickel BHP Billiton project opens on south coast Print post approved PP 665002/00062 approved Print post Resources education Partnerships formed for industry’s future DEPARTMENT OF INDUSTRY AND RESOURCES Investment Services 1 Adelaide Terrace East Perth, Western Australia 6004 Tel: +61 8 9222 3333 • Fax: +61 8 9222 3862 Email: [email protected] www.doir.wa.gov.au INTERNATIONAL OFFICES Europe European Office • 5th floor, Australia Centre Corner of Strand and Melbourne Place London WC2B 4LG • UNITED KINGDOM Tel: +44 20 7240 2881 • Fax: +44 20 7240 6637 Email: [email protected] India — Mumbai Western Australian Trade Office 93 Jolly Maker Chambers No 2 9th floor, Nariman Point • Mumbai 400 021 • INDIA Tel: +91 22 6630 3973 • Fax: +91 22 6630 3977 Email: [email protected] India — Chennai Western Australian Trade Office - Advisory Office 1 Doshi Regency • 876 Poonamallee High Road Kilpauk • Chennai 600 084 • INDIA Tel: +91 44 2640 0407 • Fax: +91 44 2643 0064 Email: [email protected] Indonesia — Jakarta Facing up to the challenges Western Australia Trade Office Wisma Budi Building Floor 5 Suite 504 JI H R Rasuna Said Kav C-6 Kuningan, Jakarta 12940 • INDONESIA Tel: +62 21 5290 2860 • Fax: +62 21 5296 2722 It seems strange to talk of the challenges facing the Western Australian Email: [email protected] resources industry when the sales value of minerals and petroleum from the Japan — Tokyo Government of Western Australia, Tokyo Office State jumped 7 per cent last year to A$53.1 billion, and spending on exploration 13th floor, Fukoku Seimei Building for new resources was a record at more than A$3 billion.
    [Show full text]
  • Neerabup Preliminary Decommisioning Plan
    PRELIMINARY DECOMMISSIONING PLAN NEWGEN POWER STATION NEERABUP December 2010 330 MW Gas‐Fired Power Station Neerabup Index PRELIMINARY DECOMMISSIONING PLAN ........................................................................ 1 NEWGEN POWER STATION ............................................................................................ 1 NEERABUP 1 1 Introduction ............................................................................................................ 1 2 Company Information ............................................................................................. 1 3 Need for the Project ................................................................................................ 1 4 Project Information ................................................................................................. 2 4.1 Plant Information .............................................................................................. 2 4.3 Land Description ................................................................................................ 3 4.4 Environmental Approvals .................................................................................. 4 5 Purpose of the Document ........................................................................................ 4 5.1 Rationale for Site Selection ............................................................................... 4 5.1.1 Power Station ................................................................................................ 4 5.1.2 Gas Pipeline
    [Show full text]
  • For Personal Use Only Use Personal for but Now Offer Our Industry Leading Services to Small Businesses
    27 September 2013 The Manager Company Announcements Office Australian Securities Exchange Via Electronic Lodgement Attached are the following documents: 1. The Annual Report including Financial Statements and Directors’ Report for the year ended June 2013. 2. Notice of annual general meeting and shareholder proxy form. 3. The ERM Power Update. These documents are being sent to shareholders in accordance with their election as to the receipt of printed reports. Peter Jans Group General Counsel & Company Secretary ERM Power Limited For further information Garry West Corporate Communications Manager Phone: +61 7 3020 5165 Mobile: +61 457 140 650 Email: [email protected] About ERM Power ERM Power is a dynamic Australian energy company with interests in electricity sales and generation, and gas production and exploration. Trading as ERM Business Energy and founded in 1980, we have grown to become the 4th largest electricity retailer in the National Electricity Market with operations in every state. We initially focused on larger businesses For personal use only but now offer our industry leading services to small businesses. We have equity interests in 442 megawatts of low emission, gas fired peaking power stations in Western Australia and Queensland, sell conventional gas and condensate from onshore discoveries in Western Australia, and have gas exploration operations in Western Australia and New South Wales. www.ermpower.com.au ERM POWER LIMITED ERM POWER ANNUAL REPORT | ANNUAL REPORT 2013 REPORT | ANNUAL For personal use only ERM POWER ERM Power (ASX code: EPW) is a dynamic Australian energy company with interests in electricity sales and generation, and gas production and exploration.
    [Show full text]
  • Council Agenda Management Software
    Council Agenda ORDINARY COUNCIL MEETING 7.00pm, 27 July, 2010 Civic Centre, Dundebar Road, Wanneroo Public Question & Statement Time Council allows a minimum of 15 minutes for public questions and statements at each Council Meeting. If there are not sufficient questions to fill the allocated time, the person presiding will move on to the next item. If there are more questions than can be dealt with in the 15 minutes allotted, the person presiding will determine whether to extend question time. Protocols During the meeting, no member of the public may interrupt the meeting’s proceedings or enter into conversation. Each person seeking to ask questions during public question time may address the Council for a maximum of 3 minutes each. A register of person’s wishing to ask a question/s at the Council Meeting is located at the main reception desk outside of the Chamber on the night. However, members of the public wishing to submit written questions are requested to lodge them with the Chief Executive Officer at least 30 hours prior to the start of the meeting i.e. noon on the previous day. The person presiding will control public question time and ensure that each person wishing to ask a question is given a fair and equal opportunity to do so. A person wishing to ask a question should state his or her name and address before asking the question. If the question relates to an item on the agenda, the item number should also be stated. The following general rules apply to question and statement time: Questions should only relate to the business of the council and should not be a statement or personal opinion.
    [Show full text]
  • Chapter 11 Version 58 Savings and Transitional Rules
    NATIONAL ELECTRICITY RULES AS IN FORCE IN THE NORTHERN TERRITORY CHAPTER 11 VERSION 58 SAVINGS AND TRANSITIONAL RULES SAVINGS AND TRANSITIONAL RULES CHAPTER 11 Page 927 NATIONAL ELECTRICITY RULES AS IN FORCE IN THE NORTHERN TERRITORY CHAPTER 11 VERSION 58 SAVINGS AND TRANSITIONAL RULES 11. Savings and Transitional Rules Parts A to ZZI, ZZK, ZZL, ZZN (except for clause 11.86.8), ZZO to ZZT, ZZV and ZZX have no effect in this jurisdiction (see regulation 5A of the National Electricity (Northern Territory) (National Uniform Legislation) (Modification) Regulations). The application of those Parts may be revisited as part of the phased implementation of the Rules in this jurisdiction. Part ZZJDemand management incentive scheme 11.82 Rules consequential on making of the National Electricity Amendment (Demand management incentive scheme) Rule 2015 11.82.1 Definitions (a) In this rule 11.82: Amending Rule means the National Electricity Amendment (Demand Management Incentive Scheme) Rule 2015. commencement date means the date Schedules 1, 2 and 3 of the Amending Rule commence. new clauses 6.6.3 and 6.6.3A means clauses 6.6.3 and 6.6.3A of the Rules as in force after the commencement date. (b) Italicised terms used in this rule have the same meaning as under Schedule 3 of the Amending Rule. 11.82.2 AER to develop and publish the demand management incentive scheme and demand management innovation allowance mechanism (a) By 1 December 2016, the AER must develop and publish the first: (i) demand management incentive scheme under new clause 6.6.3; and (ii) demand management innovation allowance mechanism under new clause 6.6.3A.
    [Show full text]