Environmental Status

Total Page:16

File Type:pdf, Size:1020Kb

Environmental Status Mega Leather Park at village Senpurabpara near Ramaipur in Kanpur Nagar, U.P. by Uttar Pradesh State Industrial Development Corporation Limited. FORM 1 (I) Basic Information Sl.No. Item Details 1. Name of the project/s Mega Leather Park 2. S.No. in the schedule 7(c), Category “A” 3. Proposed capacity Total area of land: 1821085 sqm (182.109 ha) /area/length/tonnage to be Proposed production capacity: 669 TPD (Raw handled/command area/lease hides/skins to finished leather, all industries area/number of wells to be drilled. established will be covered under 4(f) category) & 75 ancillary industries for finished leather products. 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. - 6. Category of Project i.e. ‘A’ or ‘B’ A (as the area lies outside the notified industrial area) 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If Yes yes, please specify. 9. Location Plot/Survey/Khasra No. Village Village SenpurabPara near Ramaipur, Tehsil Kanpur District Kanpur Nagar District, State Uttar Pradesh 10. Nearest railway station/airport along Nearest Railway station with distance in kms. • Sidhi Etara Railway station 7.50 Km E • Kathara Railway station 8.30 Km E Nearest Airport • Chakeri Airport Kanpur 12 Km NE 11. Nearest Town, city, district Nearest Town- Ramaipur Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipality of Ramaipur Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Uttar Pradesh State Industrial Development Prepared By: M/s Perfact Enviro Solutions Pvt. Ltd. 2 Mega Leather Park at village Senpurabpara near Ramaipur in Kanpur Nagar, U.P. by Uttar Pradesh State Industrial Development Corporation Limited. 15. Address for correspondence: Name Sh Ranvir Prasad Designation (Owner/Partner /CEO) Managing Director, UPSIDC Address UPSIDC Complex, A-1/4 Lakhanpur, Kanpur Pin code 208024 E-mail [email protected] Telephone No. 0512-2582851 Fax No. +917379151151 16. Details of Alternative Sites examined, if None any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects None 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Not Applicable Act, 1980? ii. The Wildlife (Protection) Act, Not Applicable 1972? Not Applicable iii. The C.R.Z. Notification, 1991? 22. Whether there is any Government No Order/Policy relevant /relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending None against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity Prepared By: M/s Perfact Enviro Solutions Pvt. Ltd. 3 Mega Leather Park at village Senpurabpara near Ramaipur in Kanpur Nagar, U.P. by Uttar Pradesh State Industrial Development Corporation Limited. 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Information/Checklist quantities /rates, wherever possible) S.No confirmation Yes/No with source of information data 1.1 Permanent or temporary change Yes UPSIDC is in the process of acquisition of in land use, land cover or land admeasuring 1821085 sqm (450 topography including increase in acres) out of which 300 acres will be intensity of land use (with respect developed as leather industry (raw to local land use plan) hides/skins to finished leather) as Phase I and rest 150 acres will be developed into ancillary industries as phase II for making finished leather products. Once acquisition is completed the land shall be transferred to the SPV and UPSIDC will promote the SPV and invite industry for shareholding. Thus, the land use will be changed to developed leather park. 1.2 Clearance of existing land, Yes The site is a vacant land with few bushes. vegetation and buildings? So, no clearance is required as the land is devoid of vegetation. 1.3 Creation of new land uses? Yes Once acquisition is completed the land shall be transferred to the SPV and UPSIDC will promote the SPV and invite industry for shareholding. Thus, the land use will be changed to developed leather park. 1.4 Pre-construction investigations e.g. Yes Soil Investigation report shall be bore houses, soil testing? submitted. 1.5 Construction works? Yes Common facilities including Infrastructure essential for production units like common facility center, Trade/Convention Center, HRD/Training Center, Product design Center, Testing Laboratory, Research & Quality Bench Marking Center will be constructed over the ground for Leather Park. 1.6 Demolition works? No No site clearance is required. 1.7 Temporary sites used for No 300 no. of Local labours will be engaged construction works or housing of from nearby areas. Hence no need of Prepared By: M/s Perfact Enviro Solutions Pvt. Ltd. 4 Mega Leather Park at village Senpurabpara near Ramaipur in Kanpur Nagar, U.P. by Uttar Pradesh State Industrial Development Corporation Limited. construction workers? housing of construction workers. 1.8 Above ground buildings, structures Yes Common facility center, or earthworks including linear Trade/Convention Center, HRD/Training structures, cut and fill or Center, Product design Center, Testing excavations Laboratory, Research, Quality Bench Marking Center and office buildings shall be constructed above ground. Surplus earth generated during excavation will be used for leveling and landscaping work within the premises. 1.9 Underground works including No Not applicable mining or tunneling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? Yes Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing Yes 1. Raw to Wet Blue –Water less Chrome processes? tanning 2. Wet Blue to Dye Crust. 3. Dye Crust to Finished leather 4. Finished leather to leather products The detailed process is given in pre- feasibility report. 1.14 Facilities for storage of goods or Yes Raw materials storage yard will be made. materials? 1.15 Facilities for treatment or disposal Yes During Installation: of solid waste or liquid effluents? Solid waste of 45 kg/day shall be generated from construction labour which shall be then disposed to MSW site. 11 KLD of Waste water from labour shall be discharged to septic tank followed by soak pit. During Operation: Liquid Waste Total waste water of 19243 KLD shall be generated, out of which total Process waste water generated from the proposed Leather Park will be approx. Prepared By: M/s Perfact Enviro Solutions Pvt. Ltd. 5 Mega Leather Park at village Senpurabpara near Ramaipur in Kanpur Nagar, U.P. by Uttar Pradesh State Industrial Development Corporation Limited. 18665 KLD, Domestic waste water will be 300 KLD and other waste from DG cooling and misc. use will be 278, KLD. As chilled hides/skins will be used, hence TDS will be reduced in waste water. Water Less Chrome Tanning approved by CLRI shall be adopted. Hence, no waste water will be generated from chrome tanning. Domestic waste water of 300 KLD will be treated in Common STP of capacity 360 KLD & rest effluent of 18943 KLD will be treated In CETP of capacity 20 MLD. Municipal Solid Waste: 1350 kg/day Municipal Solid Waste will be generated out of which 945 kg/day biodegradable waste will be sent to Vermi-composting site within the project site & 338 Kg/day recyclable waste will be given to authorized recycler & 67 Kg/day of plastic waste shall be given to authorized recycler. Process Waste Process waste generated will include 47.8 TPD of fleshing which will be sold to glue manufacturers & dog chew, 23.9 TPD of shaving which will be sold to leather board manufacturer, 23.9 TPD of trimmings or splitting which will be sold to lower quality of leather goods manufacturers etc. Other process waste such as lumps of isocyanate and polyol will be generated from ancillary units which will be collected in leak proof containers at isolated place and then it will be disposed to TSDF site and the scraps will be sold to secondary uses. Detail of solid waste and liquid effluent is Prepared By: M/s Perfact Enviro Solutions Pvt. Ltd. 6 Mega Leather Park at village Senpurabpara near Ramaipur in Kanpur Nagar, U.P. by Uttar Pradesh State Industrial Development Corporation Limited. given in Pre-feasibility report. 1.16 Facilities for long term housing of No Approx. 300 no. of local labor will be operational workers? engaged from nearby area during construction/installation phase and approx. 8000 staff will be engaged during operation phase which will work in shifts. Hence no long-term housing or staff quarters will be provided. 1.17 New road, rail or sea traffic during No Not anticipated construction or operation? 1.18 New road, rail, air waterborne or No Not anticipated other transport infrastructure including new or altered routes and stations, ports, airports etc. 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not applicable or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No None 1.23 Abstraction or transfers of water Yes Water source will be Public water supply form ground or surface waters? system provided within the Industrial Estate or ground water after getting permission from CGWB.
Recommended publications
  • Section-VIII : Laboratory Services
    Section‐VIII Laboratory Services 8. Laboratory Services 8.1 Haemoglobin Test ‐ State level As can be seen from the graph, hemoglobin test is being carried out at almost every FRU studied However, 10 percent medical colleges do not provide the basic Hb test. Division wise‐ As the graph shows, 96 percent of the FRUs on an average are offering this service, with as many as 13 divisions having 100 percent FRUs contacted providing basic Hb test. Hemoglobin test is not available at District Women Hospital (Mau), District Women Hospital (Budaun), CHC Partawal (Maharajganj), CHC Kasia (Kushinagar), CHC Ghatampur (Kanpur Nagar) and CHC Dewa (Barabanki). 132 8.2 CBC Test ‐ State level Complete Blood Count (CBC) test is being offered at very few FRUs. While none of the sub‐divisional hospitals are having this facility, only 25 percent of the BMCs, 42 percent of the CHCs and less than half of the DWHs contacted are offering this facility. Division wise‐ As per the graph above, only 46 percent of the 206 FRUs studied across the state are offering CBC (Complete Blood Count) test service. None of the FRUs in Jhansi division is having this service. While 29 percent of the health facilities in Moradabad division are offering this service, most others are only a shade better. Mirzapur (83%) followed by Gorakhpur (73%) are having maximum FRUs with this facility. CBC test is not available at Veerangna Jhalkaribai Mahila Hosp Lucknow (Lucknow), Sub Divisional Hospital Sikandrabad, Bullandshahar, M.K.R. HOSPITAL (Kanpur Nagar), LBS Combined Hosp (Varanasi),
    [Show full text]
  • Page 1 of 100 ALL INDIA ORIENTAL CONFERENCE LIFE MEMBERSHIP LIST
    ALL INDIA ORIENTAL CONFERENCE LIFE MEMBERSHIP LIST PATRON: BENEFACTOR: 8. Atul Kumar 1. Arshad Jamal C7 Shiv Vihar Lal Mandir 1. Vimal Devi Rai 4, Mohalla - Prema Rai Colony Jwalapur, City : Head & Reader in Sanskrit. Maunath Bhanjan, Dist. Jwalapur, Taluka : Jwalapur Department. Hindu P. G. Maunathbhanjan, Uttar , District: Haridwar , College, Zamania, Dt. Pradesh 275101 Uttaranchal , Pin : 249407 Ghazipur 232 331 Patron -2070 Patron – 2238 Benefactor. - 497. 2. Shivala 9. Gauranga Das 2. S. Kalyanaraman Via Bhitauli Bazar Sri Sri Radha Gopinath 5/3 Temple Avenue, Luxmipur Shivala, Temple, 7 K.m. Munshi Srinagar Colony, Tal : Ghughli , Dist. Marg, Opposite Bhartiya Saidapet, Chennai 600 015 Maharajganj Uttar Pradesh , Vidyabhavan, Mumbai, Benefactor Pin : 273302 Mumbai, Maharashtra Patron-2075 400007 3. Shrama Sushma, Patron – 2410 H. No. 225 Bashirat Ganj, 3. Kapil Dev Lucknow 226004 U.P. P G. Department Of Sanskrit 10. Anand Suresh Kumar Benefactor – 1318 University Of Jammu , City : C/o Suddhanand Ashram Jammu, Taluka : Jammu Self knowledge, Village Giri 4. Kavita Jaiswal And Kashmir , District : Valam Adi Annamalai Road, B 5/11 , City : Awadhgarvi Jammu , Jammu And Tiruvannamalai, Sonarpura, Kashmir , Pin : 180006 Tamil Nadu 606604 Taluka : Varanasi , District : Patron-2087 Patron -1171 Varanasi , Uttar Pradesh , Pin : 221001 4. Shailendra Tiwari 11. Arora Mohini Benefactor -2125 D-36/25 B Godwoliya Gurudevi Vidyalaya Agastya Kund Near Sharda Ram Nagar Morar, 5. Dr Sathian M Bhawan , Varanasi, Uttar Gwalior M.P. 474006 Harinandanam,house,kairali Pradesh, 221001 Patron – 1302 Street,pattambi, City : Patron – 2114 Pattambi, Taluka : Pattambi , 12. Basu Ratna District : Palakkad , Kerala , 5. Pankaj Kumar Panday 183 Jodhpur Park, Pin : 679306 Vill- Nayagaw Tulasiyan Backside Bldg.
    [Show full text]
  • Covid-19 Vaccination Microplan Date - (06-08-2021) District : Kanpur Nagar Name of Covid Capacity MOIC of Cold Name of Cold Chain Supervisor/MO Vaccination No
    Covid-19 Vaccination Microplan Date - (06-08-2021) District : Kanpur Nagar Name of Covid Capacity MOIC of Cold Name of Cold Chain Supervisor/MO Vaccination No. of Chain Point/ AEFI Vaccine Dose Online Walking Name of ANM Mobile No. Point/AEFI Center Duty Center/Session Site Total Team Center CVC No.CVC (CVC) Capacity 1st 2nd 1st 2nd CVC UPHC Kalyanpur CV Covishield 1st & 2nd 200 75 25 75 25 1 Moni Devi 7985632779 18+ KLY WP Pri Sch Baikunthpur 1st Covishield 1st & 2nd 150 0 0 140 10 1 Padma 8787075969 DR AVINASH YADAV CV 18+ 1 Kalyanpur 9721788887 KLY WP Pri Sch Baikunthpur Covishield 1st & 2nd 150 0 0 140 10 1 Hema 6387422915 2nd CV 18+ KLY WP Pri Sch Bharatpur CV Covishield 1st & 2nd 150 0 0 140 10 1 Premlata 9118718875 18+ CVC CHC Sarsaul CV Covishield 1st & 2nd 150 0 0 100 50 1 Neetu Singh 9621960962 18+ SARS WP Purwameer CV 18+ Covishield 1st & 2nd 150 0 0 140 10 1 Meena Singh 9889539889 Dr RAMESH KUMAR 2 Sarsaul 9410497490 SARS WP Naugawan Gautam Covishield 1st & 2nd 150 0 0 140 10 1 Mithlesh 9936577749 CV 18+ Shashikiran SARS WP Shikathiya CV 18+ Covishield 1st & 2nd 150 0 0 140 10 1 7080199608 Sachan CVC PHC Kathara CV Covishield 1st & 2nd 150 0 0 100 50 1 Asha Verma 7839722214 18+ BIDH WP Aanganwadi Covishield 1st & 2nd 150 0 0 140 10 1 Laxmi Devi 6386094073 DR S. P. YADAV Katheruaa CV 18+ 3 Bidhnu 9453229491 BIDH WP Pri Sch Katheruaa CV Covishield 1st & 2nd 150 0 0 140 10 1 Beena Singh 8429463299 18+ BIDH WP Pri Sch Hadhaha CV Covishield 1st & 2nd 150 0 0 140 10 1 Mala Singh 9935619510 18+ CVC CHC Bilhaur CV Covishield 1st &
    [Show full text]
  • Final Attendance Sheet Statelevel
    HMIS/MCTS State Level Training cum Review of Divison ‐ Allahabad, Chitrakootdham and Varanasi Training Dates : 18‐20 Dec. 2014 Participants List Sl. No. Division District Designation Name of Participant Moile NO. Email ID 1 Varanasi Varanasi Divisional PM Mr. Brijesh Mishra 8005192941 [email protected] 2 Varanasi Varanasi Div. Accounts Manager Mr. Sanjay Srivastava 8005193326 [email protected] 3 Varanasi Varanasi District Immunization Officer (DIO) Dr. B.N. Singh 9918902105 [email protected] 4 Varanasi Varanasi District Program Manager (DPM) Mr. Ripunjay Srivastava 8005193093 [email protected] 5 Varanasi Varanasi District Data Manager (DDM) Mr. Ritesh Kr. Srivastava 9307771956 [email protected] 6 Varanasi Varanasi District Asst. Research Office (ARO) Hari Bandhan Maurya [email protected] 7 Varanasi Varanasi HMIS Operator Pankaj Rai 9696898645 8 Varanasi Chandauli District Immunization Officer (DIO) Dr. H.R. Maurya 9648009462 [email protected] 9 Varanasi Chandauli District Program Manager (DPM) Dr. R.B. Yadav 8005193040 [email protected] 10 Varanasi Chandauli District Asst. Research Office (ARO) Vidyuta Prakash Singh 8005193255 [email protected] 11 Varanasi Chandauli HMIS Operator Nilratan 9889138764 [email protected] 12 Varanasi Ghazipur District Immunization Officer (DIO) Dr. S.K. Rai 9415624032 [email protected] 13 Varanasi Ghazipur District Program Manager (DPM) Mr. Satya Prakash 8005193051 [email protected] 14 Varanasi Ghazipur District Data Manager (DDM) Mohd. Azhar Khan 9451601062 [email protected] 15 Varanasi Ghazipur District Asst. Research Office (ARO) Dr. S.N. Chauhan 9415972968 [email protected] 16 Varanasi Ghazipur HMIS Operator Mr. Shiv Kumar Yadav 8808619132 [email protected] 17 Varanasi Jaunpur District Immunization Officer (DIO) Dr.
    [Show full text]
  • Kanpur Nagar 2017.Pdf
    NATIONAL HEALTH MISS ION MONITORING OF IMPORT ANT COMPONENTS OF NH M PROGRAMME IMPLEMENTATION PLAN IN KANPUR NAGAR DISTRICT , UTTAR PRADESH SUBMITTED TO MINISTRY OF HEALTH A ND FAMILY WELFARE GOVERNMENT OF INDIA DR. SURESH SHARMA ADITI SINGH DEVANSHI KULSRESHTHA POPULATION RESEARCH CENTRE INSTITUTE OF ECONOMIC GROWTH, DELHI UNIVERSITY, DE LHI-110007 NOVEMBER 2017 NHM UTTAR PRADESH PIP 2017: KANPUR NAGAR DISTRICT PRC-IEG, DELHI TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................................. 1 LIST OF TABLES ..................................................................................................................................................... 3 LIST OF FIGURES ................................................................................................................................................... 4 ACKNOWLEDGEMENT ........................................................................................................................................... 5 ACRONYMS AND ABBREVIATIONS ......................................................................................................................... 6 EXECUTIVE SUMMARY .......................................................................................................................................... 7 Strengths ...................................................................................................................................................................
    [Show full text]
  • Lower Ganga Canal Command Area and Haidergarh Branch Environmental Setting & Environmental Baseline 118
    Draft Final Report of Lower Ganga Canal System and Public Disclosure Authorized Haidergarh Branch Public Disclosure Authorized REVISED Public Disclosure Authorized Submitted to: Project Activity Core Team (PACT) WALMI Bhawan, Utrethia, Telibagh, Lucknow – 226026 Submitted by: IRG Systems South Asia Pvt. Ltd. Lower Ground Floor, AADI Building, 2-Balbir Saxena Marg, Hauz Khas, Public Disclosure Authorized New Delhi – 110 016, INDIA Tel: +91-11-4597 4500 / 4597 Fax: +91-11-4175 9514 www.irgssa.com In association with Page | 1 Tetra Tech India Ltd. IRG Systems South Asia Pvt. Ltd. Table of Contents CHAPTER 1: INTRODUCTION 16 1.0 Introduction & Background 16 1.1 Water Resource Development in Uttar Pradesh 16 1.2 Study Area & Project Activities 20 1.3 Need for the Social & Environmental Framework 24 1.4 Objectives 24 1.5 Scope of Work (SoW) 25 1.6 Approach & Methodology 25 1.7 Work Plan 28 1.8 Structure of the Report 29 CHAPTER 2: REGULATORY REVIEW AND GAP ANALYSIS 31 2.0 Introduction 31 2.1 Policy and regulatory framework to deal with water management, social and environmental safeguards 31 2.1.2 Regulatory framework to deal with water, environment and social Safeguards 31 2.1.3 Legislative Framework to Deal with Social Safeguards 32 2.2 Applicable Policy, Rules & Regulation to project interventions / activities 33 2.2.1 EIA Notification 33 2.3 Institutional Framework to deal with water, social and environmental safeguards 37 2.4 Institutional Gaps 39 CHAPTER 3: SOCIO-ECONOMIC BASELINE STATUS 40 3.0 Introduction 40 3.1 Socio-Economic Baseline
    [Show full text]
  • Impact of Urban Activity on Ganges Water Quality and Ecology: Case Study Kanpur
    INTERUNIVERSITY PROGRAMME ADVANCED MASTER OF SCIENCE IN ‘TECHNOLOGY FOR INTEGRATED WATER MANAGEMENT’ Impact of urban activity on Ganges water quality and ecology: case study Kanpur Matthias Troch Stamnummer: 01205240 Promotor: Prof. dr. Ludo Diels Promotor: Prof. dr. Colin Janssen Master's dissertation submitted in partial fulfilment of the requirements for the degree of Master of Science in ‘Technology for Integrated Water Management’ Academic Year: 2017 - 2018 Acknowledgements Before reading my master dissertation, I would like to seize the opportunity to thank some people who helped and supported me during this study. First of all, I would like to thank my promotor, Prof. Dr. Ludo Diels. You gave me the opportunity to study the astonishing Ganges river. I greatly appreciate your support and readiness to answer my questions. I am very thankful for all your advice and the constructive discussions we had. For this, I am very grateful for having you as a promotor. I would also like to thank Prof. Dr. Vinod Tare, head of the Civil Engineering Department of IIT Kanpur. I greatly appreciate your hospitality and support during the preparation of the Ganges survey. I would like to express my gratitude to Steven Joosen. I am grateful for your help during the preparation of the Ganges survey and for providing the necessary lab equipment. I would like to thank the entire staff of the Civil Engineering Department of IIT Kanpur, especially Arvind Ashish and Rakesh Mishra. Without them, the practical realisation of the Ganges survey would be impossible. They put a lot of effort and time in helping me organising the presented field study.
    [Show full text]
  • Kanpur Dehat District, U.P
    DISTRICT GROUND WATER BROCHURE KANPUR DEHAT DISTRICT, U.P. (AAP: 2012-13) By P.K. Tripathi Scientist 'C' CONTENTS Chapter Title Page No. KANPUR DEHAT DISTRICT AT A GLANCE ..................3 1.0 INTRODUCTION ..................6 2.0 RAINFALL & CLIMATE ..................7 3.0 GEOMORPHOLOGY & SOIL TYPE ..................7 4.0 GROUND WATER SCENARIO ..................8 4.1 Hydrogeology 4.2 Ground Water Resource 4.3 Ground Water Quality 4.4 Status of Ground Water Development 5.0 GROUND WATER MANAGEMENT STRATEGY ..................14 5.1 Ground Water Development 5.2 Water Conservation Structure & Artificial Recharge 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS ..................15 7.0 RECOMMENDATIONS ..................16 PLATES: I. INDEX MAP OF KANPUR DEHAT DISTRICT, U.P. II. HYDROGEOMORPHOLOGICAL MAP OF KANPUR DEHAT DISTRICT, U.P. III. CANAL'S MAP OF KANPUR DEHAT, U.P. IV. FENCE DIAGRAM KANPUR DEHAT, U.P. V. DEPTH TO WATER LEVEL PREMONSOON 2012, KANPUR DEHAT DISTRICT, U.P. VI. DEPTH TO WATER LEVEL POSTMONSOON 2012, KANPUR DEHAT DISTRICT, U.P. VII. CATEGORIZATION OF BLOCKS (GROUND WATER RESOURCES /DRAFT), KANPUR DEHAT DISTRICT, U.P. VIII. ISOCON MAP AND POINT VALUES OF ARSENIC (PHREATIC AQUIFER), KANPUR DEHAT DISTRICT, U.P. APPENDIX: I. DETAILS OF EXPLORATORY TUBEWELLS IN KANPUR DEHAT DISTRICT, U.P. 2 KANPUR DEHAT DISTRICT AT GLANCE 1. GENERAL INFORMATION i. Geographical Area (Sq km.) : 3021 ii. Administrative Divisions : Number of Tehsil/Block 5/10 Number of Panchayat/Villages 102/1032 iii. Population (as on 2001 census) : 15,63,336 iv. Average Annual Rainfall (mm) : 782.8 2. GEOMORPHOLOGY Major Physiographic Units : Older Alluvium plain, older flood plain & active flood plain Major Drainages : Yamuna, Pandu, Rind, Sengar 3.
    [Show full text]
  • WEEKLY DISPOSAL REPORT FSL,LUCKNOW Week Starting From-07.09.15 to 11.09.15 BALLESTIC DIVISION S.No
    WEEKLY DISPOSAL REPORT FSL,LUCKNOW Week Starting From-07.09.15 To 11.09.15 BALLESTIC DIVISION S.No. District Name Police Station Crime No. Date Of Date Of Remark Name Receipt Disposal 1. CHITRAKOOT KARVI 30/14 11.02.14 08.09.15 2. JAUNPUR MUGRABAD 280/14 08.08.14 08.09.15 SHAHPUR 3. LUCKNOW HUSAINGANJ 144/15 10.08.15 10.09.15 4. LUCKNOW HUSAINGANJ 144/15 31.07.15 10.09.15 5. BULANDSHAHAR DIBAI 87/15 30.03.15 11.09.15 6. SHAHJHANPUR KOTWALI 75/14 28.05.14 11.09.15 7. SHAHJHANPUR KOTWALI 75/14,127/14 28.05.14 11.09.15 8 SHAHJHANPUR KOTWALI 75/14,227/14 28.05.14 11.09.15 9 SHAHJHANPUR KOTWALI 75/14,126/14 28.05.14 11.09.15 10 SHAHJHANPUR KOTWALI 75/14,226/14 28.05.14 11.09.15 11 FATEHGARH MOHAMMADABAD 288/13 14.08.15 10.09.15 12 LAKHIMPUR KHIRI FOOL BAHED 484/14 11.09.14 11.09.15 WEEKLY DISPOSAL REPORT FSL,LUCKNOW Week Starting From-07.09.15 To 11.09.15 TOXICOLOGY DIVISION S.No. District Name Police Station Crime No. Date Of Date Of Remark Name Receipt Disposal 1. BARABANKI HAIDARGARH PM.N.55/15 08.04.15 07.09.15 2. CHANDAULI CHANDAULI 45/15 09.04.15 07.09.15 3. AZAMGARH RAUNAPAR 119/14 08.04.15 07.09.15 4. LAKHIMPUR KHIRI KOTAWALI C-4931/13 09.04.15 07.09.15 SADAR 5. RAIBARAILY SARAINI PM.N 220/15 09.04.15 07.09.15 6.
    [Show full text]
  • INDIA Public Disclosure Authorized
    E-339 VOL. 1 INDIA Public Disclosure Authorized THIRD NATIONAL HIGHWAY WORLD BANK PROJECT Public Disclosure Authorized CONSOLIDATED EIA REPORT (CONSTRUCTION PACKAGES 11- V) Public Disclosure Authorized NATIONAL HIGHWAYS AUTHORITY OF INDIA NEW DELHI (Ministry of Surface Transport) March, 2000 Public Disclosure Authorized 4 4 =fmmm~E-339 VOL. 1 INDIA THIRD NATIONAL HIGHWAY WORLD BANK PROJECT CONSOLIDATED EIA REPORT (CONSTRUCTION PACKAGES II - V) NATIONAL HIGHWAYS AUTHORITY OF INDIA NEW DELHI (Ministry of Surface Transport) March, 2000 TABLE OF CONTENTS THE REPORT I The Project............................................................... 1-1 1.1 The Project Description ............................................................... ]-II 1.2 Overall Scope of Project Works ............................................................ 1-3 1.3 Proposed Improvement of the Project Highway ................... ................ 1-3 1.4 Scope of Environmental Impact Assessment ................. ........................... 1-6 1.5 Structure of The Consolidated EIA Report ........................................... 1-7 2 Policy, Legal And Administrative Framework ................... ........................... 2-1 2.1 Institutional Setting for the Project .. 2-1 2.1.1 The National Highways Authority of India (NHAI) 2-1 2.1.2 Project Implementation Units (PIU) .................................................. 2-1 2.1.3 State Public Works Departments (PWDs) .2-2 2.2 Institutional Setting in the Environmental Context .................... 2-2 2.2.1 Ministry
    [Show full text]
  • Project Report Template
    Final Report Environmental and Social Assessment with Management Plan for laying of Branch Sewers and Allied Works in Sewerage District-I of Kanpur City, Uttar Pradesh Prepared for NATIONAL GANGA RIVER BASIN AUTHORITY (NGRBA) (Ministry of Environment and Forests, Government of India) Environmental and Social Assessment with Management Plan (Sewerage District-I, Kanpur) © The Energy and Resources Institute 2014 Suggested format for citation T E R I. 2013 Environmental and Social Assessment with Management Plan for laying of Branch Sewers and Allied Works in Sewerage District-I of Kanpur City, Uttar Pradesh New Delhi: The Energy and Resources Institute. [Project Report No. 2010WM13] For more information Sonia Grover Research Associate – Water Resources Division T E R I Tel. 2468 2100 or 2468 2111 Darbari Seth Block E-mail [email protected] IHC Complex, Lodhi Road Fax 2468 2144 or 2468 2145 New Delhi – 110 003 Web www.teriin.org India India +91 • Delhi (0)11 ii Environmental and Social Assessment with Management Plan (Sewerage District-I, Kanpur) Table of Contents EXECUTIVE SUMMARY ................................................................................................................... 2 Introduction ............................................................................................................................. 2 Project Description ................................................................................................................. 2 Status of sewage generation in District I Kanpur .......................................................
    [Show full text]
  • Kanpur Nagar
    Brief Industrial Profile of District Kanpur Nagar U.P. Prepared by MSME-DEVELOPMENT INSTITUTE (Ministry of MSME, Govt.of India) 107, Industrial Estate, Kalpi Road, Fazalganj, Kanpur-208012 Phone: 0512-2295070-73, Fax: 0512-2240143 E-mail : [email protected] Web- msmedikanpur.gov.in FOREWORD District Industrial Potential Survey Report of District Kanpur Nagar is a key report which not only contains current industrial scenario of the district but also other useful information about the district. This report provides valuable inputs which may be useful for existing & prospective entrepreneurs of the District. It is the only readily available source which provides the latest data on infrastructure, banking and industry of the district. It also provides information on potentials areas in manufacturing and service sector of the district. I sincerely hope that District Industrial Potential Survey Report of District Kanpur Nagar will facilitate easier dissemination of information about the district to policy makers and also to the professionals working in the MSME sector. I appreciate the efforts made by Dr. Priyanka Singh Bhadouria, Asstt. Director (EI) in preparing the District Industrial Potential Survey Report of Kanpur Nagar District. October, 2019 ( L.B.S. Yadav) Kanpur Director Incharge CONTENTS S.No. Topic Page No. 1. General Characteristics of the District 1 1.1 Location & Geographical Area 1 1.2 Topog raphy 2 1.3 Availability of Minerals. 2 1.4 Forest 2 1.5 Administrative Set Up 2 2. District at a Glance 3 - 5 2.1 Existing Status of Industri al Area in the District Kanpur Nagar 6 3. Industrial Scenario of Kanpur Nagar 6 3.1 Year Wise T rend of Units Registered 6 3.2 Details of Existing Manufacturing Enterprises with 2 Digit National 7 Industry Classification Code 3.3 Details of Existing Service Enterprises with 2 Digit National Industry 8 Classification Code 3.
    [Show full text]