Brand New Facility

Total Page:16

File Type:pdf, Size:1020Kb

Brand New Facility opportunity+rare Holroyd Distribution Centre 45 Britton Street, Smithfield Brand new facility Located in an established industrial area on Britton Features: Street in Smithfield, Holroyd Distribution Centre + High clearance warehouse up to 10 metres is one of a few brand new facilities within the area. It is conveniently situated less than one kilometre + ESFR Sprinklers from the Cumberland Highway, providing easy access + A combination of 3 on-grade roller shutters to the M4 and M7 Motorways. The estate falls within and 3 recessed loading docks the boundaries of Holroyd Council and lies within an + Large undercover awning and wide hardstand area zoned 4(a) General Industrial, permitting a wide + Freestanding secure facility range of industrial activities. + Ample car parking Users will benefit from a large office component, ideal for those seeking business headquarters or showroom space. cycle route underground train / tube airport overground train site plan+ 196.5 700m 30km to Cumberland to Sydney CBD Highway 1 1 Unit 1 Unit 2 2 . 1 4,011.4 sqm 10,987.5 sqm 1 5.8km 15.6km 5 0 to M4 Motorway . to M7 Motorway 0 g n i n w Mezzanine A 667.4 sqm Awning Awning Awning Office Awning 1,407.2 sqm 500 sqm (excl) 92 .7 84.6 .2 For lease A 35 Britton Street Option A (Unit 2) Option B (Unit 1 and 2) Area schedule Total (sqm) Area schedule Total (sqm) Warehouse 2 10,9 87.5 Warehouse 1 & 2 14,998.9 Ground floor office 1,407.2 Ground floor office 1,407.2 Mezzanine office 6 67.4 Mezzanine office 6 67.4 Total area 13,062.1 Total area 17,073.5 Peter Dale contact+ 0412 434 738 This document has been prepared by Goodman Property Services (Aust) Pty Ltd ABN 40 088 981 793 for general information purposes only. Whilst every care has been taken in relation to its accuracy, no warranty of accuracy is given or implied. You should obtain your own independent advice before making any decisions about the property referred to in this document. Images contained in this document have been used to enable the customer to visualise the development concepts only, and are not intended to definitively represent the final product. May 2012 www.goodman.com.
Recommended publications
  • Speed Camera Locations
    April 2014 Current Speed Camera Locations Fixed Speed Camera Locations Suburb/Town Road Comment Alstonville Bruxner Highway, between Gap Road and Teven Road Major road works undertaken at site Camera Removed (Alstonville Bypass) Angledale Princes Highway, between Hergenhans Lane and Stony Creek Road safety works proposed. See Camera Removed RMS website for details. Auburn Parramatta Road, between Harbord Street and Duck Street Banora Point Pacific Highway, between Laura Street and Darlington Drive Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Bar Point F3 Freeway, between Jolls Bridge and Mt White Exit Ramp Bardwell Park / Arncliffe M5 Tunnel, between Bexley Road and Marsh Street Ben Lomond New England Highway, between Ross Road and Ben Lomond Road Berkshire Park Richmond Road, between Llandilo Road and Sanctuary Drive Berry Princes Highway, between Kangaroo Valley Road and Victoria Street Bexley North Bexley Road, between Kingsland Road North and Miller Avenue Blandford New England Highway, between Hayles Street and Mills Street Bomaderry Bolong Road, between Beinda Street and Coomea Street Bonnyrigg Elizabeth Drive, between Brown Road and Humphries Road Bonville Pacific Highway, between Bonville Creek and Bonville Station Road Brogo Princes Highway, between Pioneer Close and Brogo River Broughton Princes Highway, between Austral Park Road and Gembrook Road safety works proposed. See Auditor-General Deactivated Lane RMS website for details. Bulli Princes Highway, between Grevillea Park Road and Black Diamond Place Bundagen Pacific Highway, between Pine Creek and Perrys Road Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Burringbar Tweed Valley Way, between Blakeneys Road and Cooradilla Road Burwood Hume Highway, between Willee Street and Emu Street Road safety works proposed.
    [Show full text]
  • CHARTER HALL LONG WALE REIT Annexure A: SUEZ Portfolio Overview December 2016 Charter Hall | 2016 Property Overview
    October 2015 CHARTER HALL LONG WALE REIT Annexure A: SUEZ portfolio overview December 2016 Charter Hall | 2016 Property overview 12 Lanceley Place, Artarmon, NSW The property comprises a purpose built waste transfer station, with the main building built over two levels. Located in a tightly-held industrial precinct in Artarmon, the property benefits from easy access to the Pacific Highway and Gorehill Freeway. The property is situated in a cul-de-sac among well established industrial properties, approximately 7kms north of the Sydney CBD and 3kms north of North Sydney. Property details Ownership interest 100% Purchase price $17.3 million WALE 30.0 years Occupancy 100% GLA 4,309 sqm Site area 8,726 sqm 20 Davis Road, Wetherill Park, NSW The property comprises a purpose built waste transfer station and weighbridge. The property is surrounded by traditional industrial developments of low to high clearance warehouses and other operations. Wetherill Park is located approximately 30kms west of the Sydney CBD and enjoys excellent access to major Sydney arterial road networks including the Prospect Highway, Cumberland Highway, the M4, M5 and M7 Motorways. Property details Ownership interest 100% Purchase price $10.1 million WALE 10.0 years Occupancy 100% GLA 3,975 sqm Site area 20,490 sqm 2 Charter Hall | 2016 Property overview 201 Newton Road, Wetherill Park, NSW The property comprises an office component over two levels adjoining warehouse amenity. The property is situated on the northern side of Newton Road between Coates Place and Hexham Place. Wetherill Park is located approximately 30kms west of the Sydney CBD and enjoys excellent access to major Sydney arterial road networks including the Prospect Highway, Cumberland Highway, the M4, M5 and M7 Motorways.
    [Show full text]
  • Forward Pesticide Application Program North East Sydney Period of Coverage To: 31 May 2016
    Forward Pesticide Application Program North East Sydney Period of coverage to: 31 May 2016 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 1 of 21 Contents General Information 3 Information Line: 1300 776 069 3 Warnings: 3 Round-up Bioactive Herbicide 3 Lynx WG 3 Forward Program 4 MSDS 11 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 2 of 21 General Information Pesticide use is used for weed and vegetation control. The pesticides used is a standard mixture of Lynx WG Round-up Bioactive Herbicide All pesticide spraying is programmed between: Sunday to Thursday 8pm – 5am Works will be rescheduled if rain is forecasted within 24hours or the wind speed is above 15kmph. Information Line: 1300 776 069 Warnings: Round-up Bioactive Herbicide Do not contaminate dams, rivers or streams with the product or used container. When controlling weeds in aquatic situations refer to label directions to minimise the entry of spray into the water. Lynx WG DO NOT use chlorine bleach with ammonia. All traces of liquid fertilizer containing ammonia, ammonium nitrate or ammonium sulphate must be rinsed with water from the mixing and application equipment before adding chlorine bleach solution. Failure to do so will release a gas with a musty chlorine odour which can cause eye, nose, throat and lung irritation. Do not clean equipment in an enclosed area. DO NOT contaminate streams, rivers or waterways with the chemical or used containers. A nil withholding period is applicable for LYNX WG Herbicide. It is recommended, however, not to graze treated areas for 3 days to ensure product efficacy.
    [Show full text]
  • Forward Pesticide Application Program North East Sydney – Period of Coverage Between July 2016 and June 2017
    Forward Pesticide Application Program North East Sydney – Period of coverage between July 2016 and June 2017 Contents 1 General Information 3 For further information, call the information line: 1300 776 069 3 1.1.1 Summary of Warnings 3 Downer EDI Limited ABN 97 003 872 848 www.downergroup.com Page 2 of 3 1 General Information Pesticides are used for weed and vegetation control across north east Sydney. The pesticides used include: Lynx WG; and Round-up Bioactive Herbicide. All pesticide spraying is programmed between the following days and times: Sunday to Thursday between 8pm and 5am. Works will be rescheduled if: Rain is forecast within 24 hours of the proposed weed control activities; and Wind speed is likely to be above 15 km/per hour during proposed weed control activities. For further information, call the information line: 1300 776 069 1.1.1 Summary of Warnings Round-up Bioactive Herbicide Do not contaminate dams, rivers or streams with the product or used containers. When controlling weeds in aquatic environments, refer to product label directions to minimise the impact of spray on aquatic environment. Lynx WG Do not use chlorine bleach with ammonia. The mixing and application equipment must be cleaned of all traces of liquid fertiliser containing ammonia, ammonium nitrate or ammonium sulphate prior to adding chlorine bleach. Failure to do so will release a gas with a musty chlorine odour which can cause eye, nose, throat and lung irritation. Do not clean equipment in an enclosed area. Do not contaminate streams, rivers or waterways with the chemical or used containers.
    [Show full text]
  • M4 Smart Motorway Prospect Highway Eastbound on Ramp
    M4 Smart Motorway Prospect Highway eastbound on ramp Transport for NSW | February 2020 The NSW Government is investing $600 million Ramp closures to build the M4 Smart Motorway. The first of its kind in NSW, this project will introduce intelligent Transport for NSW will continue work at the technology to the M4 Motorway between Pitt Prospect Highway eastbound on ramp at Street, Mays Hill and Mulgoa Road, Penrith. Prospect. When complete, the M4 Smart Motorway is The eastbound on ramp will be closed for two expected to reduce average travel times, provide nights on Sunday 23 February and Monday 24 more reliable journeys and reduce crashes by up February from 9pm to 4am, each night to to 30 per cent. complete drainage and landscaping work. Sections of the M4 Smart Motorway will begin to return to the original speed limit over the next few months. Where construction continues, temporary speed limits will remain in place. Please take note of the signage and drive within the speed limit. From 1 December 2019, Roads and Maritime Services and Transport for NSW joined together to form one organisation – Transport for NSW. The Transport cluster is evolving so we can deliver more integrated transport services and better outcomes for customers and communities across NSW. Our work schedule Contact us We will be on site for two nights on Sunday If you have any questions about the M4 23 February and Monday 24 February from Smart Motorway project, please contact our 9pm to 4am each night, weather permitting. delivery partner Seymour Whyte on: Day work at the site will continue between 1800 989 929 7am and 6pm from Monday to Friday and [email protected] 8am and 1pm Saturdays.
    [Show full text]
  • Parliamentof New South Wales Legislativeassembly 1993 Third
    PARLIAMENT OF NEW SOUTH WALES LEGISLATIVE ASSEMBLY 1993 THIRD SESSION OF THE FIFTIETH PARLIAMENT ___________________ QUESTIONS AND ANSWERS No. 34 TUESDAY 19 OCTOBER 1993 ___________________ [The Questions and Answers Paper published for the first sitting day in each week will contain, by number and title, all unanswered questions, together with questions to which answers have been received on the previous sitting and any new questions. On subsequent days, new questions are printed, as are questions to which answers were received the previous day. Consequently the full text of any question will be printed only twice: when notice is given; and, when answered.] [Pursuant to the Sessional Order adopted by the House on 24 February 1993, Members shall be permitted to lodge 3 questions on notice per sitting day accumulative over one sitting week, provided that the Leader of the Opposition shall be permitted to lodge 4 questions on notice per sitting day. Ministers shall lodge answers to questions on notice within 15 sitting days after the question is first published and such answer shall be published forthwith.] Page 2098 DATE OF PUBLICATION OF QUESTION ANSWER TO BE LODGED BY Q. & A. No. 19 19 October 1993 (Including Question Nos 1225 to 1261) Q. & A. No. 20 20 October 1993 (Including Question Nos 1262 to 1328) Q. & A. No. 21 21 October 1993 (Including Question Nos 1329 to 1345) Q. & A. No. 22 26 October 1993 (Including Question Nos 1346 to 1387) Q. & A. No. 23 27 October 1993 (Including Question Nos 1388 to 1463) Q. & A. No. 24 28 October 1993 (Including Question Nos 1464 to 1524) Q.
    [Show full text]
  • ENG4111 Preliminary Report
    University of Southern Queensland Faculty of Engineering and Surveying Own Identification of contributing factors for the success of toll roads in Australia under Public Private Partnerships A Dissertation submitted by Mr Luke Diffin In fulfilment of the requirements of Bachelor of Engineering (Civil) October 2015 ABSTRACT In Australia, Public Private Partnerships (PPPs) have been established as a common method for governments to deliver major road infrastructure projects. Success of PPPs has varied when measured against Government, Community, Market and Industry interests. Some projects have failed financially while still having a positive impact on the community. Other projects have failed to reach delivery stage as a result of community objections. The holistic success of PPP toll roads is ultimately determined by the needs of major project participants being satisfied in an unbiased equilibrium manner. PPP toll roads delivered in Sydney, Brisbane and Melbourne have had varying degrees of financial success, however there are other vitally important factors to be considered. Tollways directly contribute to travel time savings, vehicle operating cost savings, reduced accidents and vehicle emissions and can make a contribution to the overall economic performance of a city. Therefore these pieces of infrastructure contribute to society as a whole and not just the investors who provide capital for the projects. Even with recent financial failings of PPP toll roads, Governments within Australia are still actively pursuing the PPP model to deliver road infrastructure. Lessons must be learnt from past failures to ensure the successful delivery and operation of future projects. Overall success will be a result of finding a balance between the needs of Government, Private Sector and Society.
    [Show full text]
  • Space For: the Well–Connected
    Space for: the well–connected SILVERWATER DISTRIBUTION CENTRE 4 NEWINGTON ROAD, SILVERWATER, NSW OVERVIEW 2 Opportunity Silverwater Distribution Centre is a premium warehouse facility located only 18 kilometres from the CBD in the sought after industrial hub of Silverwater. Ideal for logistics, distribution and e-retail users, the site boasts fully refurbished warehouse and office spaces, huge undercover loading areas. Close proximity to Silverwater Road provides users with easy access to Sydney’s major road network and beyond. 3 VIEW FROM ABOVE Victoria Road d a o R r e t a w r e v l i S Silverwater Distribution Centre e v i r D y a B h s u b e M4 m M o O H TO RW AY LOCATION 4 Smart move Users benefit from significant logistical advantages with convenient access to major arterial roads including the nearby M4 Motorway and Parramatta Road, while the Hume Highway and Cumberland Highway are located less than 10 kilometres from the site. A number of bus routes also service the area and ferry and train services are located within close proximity providing access in all directions. CENTR ALLY CONNECTED 1.4KM 7KM 18KM to M4 to Parramatta to Sydney 750M Motorway 2.3KM Town Centre 13.2KM CBD to Newington to Parramatta to M5 Motorway Marketplace Road ACCESS Rosehill Silverwater Distribution Centre HAMPSTEAD RD Rawson Street Rawson ADDERLEY ST WEST ST ADDERLEY AUBURN P A HALL STREET HALL R R MACQUARIE RD A M STUBBS ST CARNARVON ST CARNARVON A T Silverwater T A STATION STREET R O A D V ORE STREET SILVERWATER ROAD FARIOLA STREET FARIOLA Parramatta
    [Show full text]
  • Wahroonga Is One of the Most Desirable Suburbs on Sydney's
    3 EMBRACE A NEW STYLE OF LIVING AT THE LYNE APARTMENTS 4 5 Artist’s Impression 6 7 Artist’s Impression The Lyne Apartments, Wahroonga Treat yourself to a relaxing new lifestyle at The Lyne Apartments, an exquisite development on the upper North Shore of Sydney. This stunning new development has been crafted Combining clean modern lines with an inviting colour with an eye for detail. From the spacious living areas palette, The Lyne Apartments has been designed to with leafy views, to the beautifully fitted kitchens and be contemporary yet completely liveable. The outdoor comfortable bedrooms, these apartments have been balcony spaces are perfect for an al fresco meal thoughtfully designed to ensure you can unwind and on a summers evening and the generous windows enjoy an easier way of life. will allow sunlight to brighten your living spaces throughout the year. Artist’s Impression WAHROONGA SYDNEY WAHROONGA KNOX WAHROONGA ABBOTSLEIGH JUNIOR ABBOTSLEIGH PARK CHATSWOOD CBD TRAIN STATION GRAMMAR SHOPPING VILLAGE SCHOOL FOR GIRLS SCHOOL FOR GIRLS 8 9 Wahroonga Train Station 4 mins 1 mins < 500 m Westfield Hornsby 5 mins 11 mins < 2 kms Wahroonga Shopping Village 5 mins 1 mins < 500 m Hornsby Hospital 5 mins 11 mins < 2 kms Abbotsleigh School For Girls 9 mins 3 mins < 500 m Hornsby Train Station 5 mins 11 mins < 2 kms Abbotsleigh Junior School For Girls 12 mins 3 mins < 500 m Chatswood 20 mins 17 mins < 11 kms Knox Grammar 13 mins 3 mins < 1 km Sydney CBD 30 mins 36 mins < 20 kms 10 11 The Lyne Apartments are located in the charming suburb of Wahroonga, a peaceful, leafy green corner of Sydney that is conveniently located near multiple modes of transport.
    [Show full text]
  • APPENDIX 1 APPROVED 4.6 METRE HIGH VEHICLE ROUTES Note: The
    APPENDIX 1 APPROVED 4.6 METRE HIGH VEHICLE ROUTES Note: The following link helps clarify where a road or council area is located: www.rta.nsw.gov.au/heavyvehicles/oversizeovermass/rav_maps.html Sydney Region Access to State roads listed below: Type Road Road Name Starting Point Finishing Point Condition No 4.6m 1 City Road Parramatta Road (HW5), Cleveland Street Chippendale (MR330), Chippendale 4.6m 1 Princes Highway Sydney Park Road Townson Street, (MR528), Newtown Blakehurst 4.6m 1 Princes Highway Townson Street, Ellis Street, Sylvania Northbound Tom Blakehurst Ugly's Bridge: vehicles over 4.3m and no more than 4.6m high must safely move to the middle lane to avoid low clearance obstacles (overhead bridge truss struts). 4.6m 1 Princes Highway Ellis Street, Sylvania Southern Freeway (M1 Princes Motorway), Waterfall 4.6m 2 Hume Highway Parramatta Road (HW5), Nepean River, Menangle Ashfield Park 4.6m 5 Broadway Harris Street (MR170), Wattle Street (MR594), Westbound travel Broadway Broadway only 4.6m 5 Broadway Wattle Street (MR594), City Road (HW1), Broadway Broadway 4.6m 5 Great Western Church Street (HW5), Western Freeway (M4 Highway Parramatta Western Motorway), Emu Plains 4.6m 5 Great Western Russell Street, Emu Lithgow / Blue Highway Plains Mountains Council Boundary 4.6m 5 Parramatta Road City Road (HW1), Old Canterbury Road Chippendale (MR652), Lewisham 4.6m 5 Parramatta Road George Street, James Ruse Drive Homebush (MR309), Granville 4.6m 5 Parramatta Road James Ruse Drive Marsh Street, Granville No Left Turn (MR309), Granville
    [Show full text]
  • Cumberland Highway and Cabramatta Road, Cabramatta Project Update Roads and Maritime Services | February 2018
    Cumberland Highway and Cabramatta Road, Cabramatta Project update Roads and Maritime Services | February 2018 The NSW Government has funded this project as part of its $225 million Pinch Point Program, which Traffic changes aims to reduce traffic delays, manage congestion and improve travel times on Sydney’s major roads. There will be temporary traffic changes during our work hours to ensure the work zone is safe. Roads and Maritime Services has improved the Lane closures will be in place and may affect intersection of the Cumberland Highway and travel times. Please keep to speed limits and Cabramatta Road and in August 2017 opened all follow signs and traffic controllers’ directions. For improvements to traffic. the latest traffic updates, you can call 132 701, visit livetraffic.com or download the Live Traffic We will be returning to the site to remove and NSW App. replace sections of asphalt and repaint line markings on Cumberland Highway, southbound, over Cabramatta Creek about 500 metres south of Cabramatta Road. We have included a map to show the location of the work. Contact us If you have any questions or would like more information on this work, please contact our Our work schedule delivery partner, DM Roads, on: We will be back on site for another four night 1800 332 660 shifts between Monday 26 February and Friday 16 March, weather permitting. Our work hours will [email protected] be between 8pm and 5am from Sunday to Friday. http://www.rms.nsw.gov.au/ How will the work affect you? If you need help understanding this information, please contact Our work may be noisy at times but we will the Translating and Interpreting continue to do everything we can to minimise its Service on 131 450 and ask them impact, including completing the noisier tasks by to call us on 1800 332 660.
    [Show full text]
  • Integrated Access and Movement Study City of Canterbury Bankstown Final Report
    Integrated Access and Movement Study City of Canterbury Bankstown Final Report Prepared by: GTA Consultants (NSW) Pty Ltd for City of Canterbury Bankstown Council on 18/09/19 Reference: N168090 Issue #: A Integrated Access and Movement Study City of Canterbury Bankstown Final Report Client: City of Canterbury Bankstown Council on 18/09/19 Reference: N168090 Issue #: A Quality Record Issue Date Description Prepared By Checked By Approved By Signed A-Dr 21/04/19 Draft Zara Abbasi, Sarah Dewberry Volker Buhl Nick Buchanan A-Dr 2 6/09/2019 Draft Zara Abbasi Volker Buhl Volker Buhl A 18/09/19 Final Zara Abbasi Volker Buhl Nick Buchanan © GTA Consultants (GTA Consultants (NSW) Pty Ltd) 2018 The information contained in this document is confidential and intended solely for the use of the client for the purpose for which it has been prepared and no representation is made or is to be implied as being made to any third party. Use or copying of this document in ) ( whole or in part without the written permission of GTA Consultants constitutes an infringement of copyright. The intellectual property Melbourne | Sydney | Brisbane contained in this document remains the property of GTA Consultants. GTA Report Canberra | Adelaide | Perth Executive Summary N168090 // 18/09/19 Final Report // Issue: A Integrated Access and Movement Study, City of Canterbury Bankstown i EXECUTIVE SUMMARY Scope and Background Recent amendments to the Environmental Planning and Assessment Act 1979 (the Act) require the CCB to review its current Local Environmental Plan and prepare a comprehensive Canterbury Bankstown Local Environmental Plan (LEP) as soon as practicable, to address the requirements in the South District Plan.
    [Show full text]