Accelerating Infrastructure Development

Total Page:16

File Type:pdf, Size:1020Kb

Accelerating Infrastructure Development Accelerating Infrastructure Development REPUBLIC OF THE PHILIPPINES NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY HIGH, SUSTAINABLE and INCLUSIVE GROWTH ECONOMIC GROWTH HUMAN DEVELOPMENT and Infrastructure is an enabler of SOCIAL PROTECTION growth in the country’s Infrastructure is a critical support economic sectors: Tourism, to the provision of basic goods Agriculture, and Industry, among and services and to ensuring a others. safer society Infrastructure Development 2 Progress made in the last 2 and ½ years in addressing infrastructure bottlenecks Legal • Revised IRR of RA 7718 or the BOT Law Framework • Proposed Amendments of the Joint for PPP Venture (JV) Guidelines Investment • 61 NEDA Board confirmed/ICC approved projects under President Aquino’s term, 70 Programs/ percent of which are infrastructure projects Projects amounting to PhP425 billion • Master Plan for Flood Management in Infrastructure Metro Manila (MM) and Surrounding Areas Master Plans • High Standard Highway Master Plan for MM and 200 km radius Challenges 3 STRATEGIC ACTION: Accelerate Infrastructure Development as Catalyst for Inclusive and Sustainable Economic Growth Fast Track Implementation Increase Strengthen of Other Crucial infrastructure Infrastructure Spending Coordination in Planning and . Increase Implementation . Develop new power sources, infrastructure uprate existing power plants spending . Adopt a coherent from 2.6% to and efficient . Develop and rehabilitate at least 5% intermodal transport irrigation systems of GDP in roadmap 2016 . Provide flood control measures . Pursue institutional reform, policy . Provide infrastructure to development and enhance access to basic implementation services 4 Increase Infrastructure Spending: Increase infrastructure spending from 2.6% to at least 5% of GDP by 2016 Public Infrastructure Spending as Percentage of GDP 6.0% PhP599B PhP638B PhP680B 5.0% 5.0% 5.0% 5.0% PhP450B 4.0% 4.0% 3.0% PhP250B PhP249B* 2.6% 2.0% 2.4% 1.0% 0.0% 2011 2012 2013 2014 2015 2016 *as of November 2012 5 Strengthen Coordination in Planning and Implementation: Implement a more efficient intermodal transport system based on a coherent roadmap to connect major centers . Develop additional commuter rail lines . Provide Integrated Transport System (ITS) north and south terminals . Accelerate the implementation of approved expressways . Develop Bus Rapid Transit (BRT) lines . Improve and extend the PNR line from North to South . Develop the Roll-on Roll-off (RORO) Spine Project . Fast-track the implementation of road projects under the DPWH- DOT Convergence Program and approved airport projects . Pursue construction, rehabilitation of roads connecting key cities and production areas 6 Strengthen Coordination in Planning and Implementation: Pursue institutional reform, policy development and implementation Recommended Actions Agency . Accelerate the approval and adoption of the National INFRACOM- Transport Policy (NTP) and the Transport Roadmap to member improve the efficiency and effectiveness of the transport agencies sector . Transform the National Water Resources Board (NWRB) OP, NWRB, into a National Water Resources Management Office DBM (NWRMO) . Formulate and adopt the National Informal Settlements NHA, HUDCC Upgrading Strategy (NISUS) and National Resettlement Framework . Address issues to full realization of objectives of the Power DOE Sector Reform Agenda . Provide a coherent roadmap towards operationalizing DOST-ICTO effective e-Governance 7 Fast Track Implementation of Other Crucial Infrastructure: • Develop renewable energy sources in various Develop locations in the country, and the natural gas industry new power sources and • Uprate, rehabilitate existing power plants to uprate increase generating capacity existing plants • Pursue private-initiated projects to prepare for critical periods Develop and • Pursue multipurpose/major irrigation facilities rehabilitate • Prioritize quick-gestating activities such as the irrigation rehabilitation and improvement of existing irrigation systems systems • Implement the NEDA Board approved “Master Plan for Provide Flood Management in Metro Manila and Surrounding Areas” flood control measures • Implement the Flood Risk Management Project along Selected Principal Rivers (FRIMP) 8 Fast Track Implementation of Other Crucial Infrastructure (cont’n): • Provide adequate water supply infrastructure and capacity development support to 455 SALINTUBIG waterless areas • Electrify remaining 33,878 sitios • Install 102.75 MW additional power capacity in Provide off-grid areas infrastructure • Install transmission lines and upgrade substations to enhance to improve supply reliability in off-grid areas access to • Complete 35,500 classrooms (by 2013) basic services • Upgrade 704 BHS, 2,349 RHUs and 566 government hospitals • Provide direct housing units to a million households • Complete 69 SLFs with an estimated capacity of 8,600 MT/day of solid waste 9 Thank you. REPUBLIC OF THE PHILIPPINES NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY Supplementary Slides Implement a more efficient intermodal transport system based on a coherent roadmap to connect major centers Spatial Programs/Projects IA Coverage Develop additional commuter rail lines LRT Line South Extension Project (formerly LRT DOTC NCR Line 1 Cavite Extension, including JICA TA for Region IV-A FS) LRT Line 2 East Extension Project (formerly LRT DOTC NCR Line 2 East Extension, including JICA TA for FS) MRT 7 DOTC/ NCR, Region III ULC Develop Bus Rapid Transit (BRT) lines Cebu Bus Rapid Transit (BRT) Section 1 DOTC Region VII (Bulacao-Ayala section) 12 Implement a more efficient intermodal transport system based on a coherent roadmap to connect major centers Spatial Programs/Projects IA Coverage Accelerate the implementation of approved expressways Daang Hari SLEX Link Road Project DPWH Region IV-A North Luzon Expressway (NLEX) - South DPWH NCR Luzon Expressway (SLEX) Connector Road Cavite-Laguna Expressway Project DPWH Region IV-A Ninoy Aquino International Airport (NAIA) DPWH NCR Expressway (Phase 2), 4.9km Central Luzon Link Expressway (CLLEX) DPWH Region III Phase I 13 Implement a more efficient intermodal transport system based on a coherent roadmap to connect major centers Develop the Roll-on Roll-off (RORO) Spine Project . Luzon Island-Panay-Negros-Cebu-Bohol-Mindanao route 14 Implement a more efficient intermodal transport system based on a coherent roadmap to connect major centers Tourism Roads under the DOT-DPWH Convergence Program: . Road along Ambangeg Jct. National Road to Mt. Pulag, Benguet; . Penablanca-Callao Cave Road, Cagayan; . Taal Lake Circumferential Road (Laurel-Agoncillo), Batangas; . Puerto Princesa North Road (Taytay-El Nido Section), Palawan; . Donsol-Sta.Cruz Road leading to Tourist Attraction (Butanding), Donsol, Sorsogon; . Panglao Island Circumferential Road, Bohol; . Boracay Circumferential Road, Malay, Aklan; . Service Road to Binangawan Falls Sagay, Camiguin; . Island Garden City of Samal Circumferential Road (East Side), Davao del Norte; and . Jct. Osmena-Pilar Road, Siargao Island, Surigao del Norte 15 Implement a more efficient intermodal transport system based on a coherent roadmap to connect major centers Spatial Programs/Projects IA Coverage Fast track implementation of approved airport projects Puerto Princesa Airport Development Project DOTC- Region IV-B (PPADP) CAAP Bicol International Airport formerly DOTC- Region V Development of New Legaspi (Daraga) Airport CAAP New Bohol Airport Project DOTC- Region VII CAAP Mactan Cebu International Airport DOTC- Region VII Construction of New Passenger Terminal MCIAA Tacloban Airport Re-Development Project DOTC- Region VIII CAAP Laguindingan Airport Air-Navigation System DOTC- Region X and Support Facilities Supply Project CAAP 16 Implement a more efficient intermodal transport system based on a coherent roadmap to connect major centers Spatial Programs/Projects IA Coverage Pursue construction, rehabilitation of roads connecting key cities and production areas Road Improvement and Institutional Development Project DPWH (RIIDP) Bukidnon-Cotabato Road Region XII Iloilo-Capiz Road Region VI Palo-Carigara-Ormoc Road Region VIII Famy-Infanta-Dalahican Port Road Region IV-A Palico-Balayan-Batangas Road Region IV-A Caticlan-Malay-Nabas Road Region VI Sindanga-Liloy Road Region IX Mindanao East-West Lateral Road, Sta. Filomena-Tacalaan Region X Road Guimaras Circumferential Road Region VI Toledo-Tabuelan-San Remigio Road Region VII Bacolod-Murcia-Benedicto-San Carlos Road Region VI Mindoro West Coast Road Region IV-B Surigao (Lipata)-Davao Road Region XI Region XIII 17 Develop new power sources and uprate existing plants Spatial Programs/Projects IA Coverage Uprate, Rehabilitate Power Plants Uprating of Agus 6 Units 1 &2 NPC Region X Rehabilitation, Operation and Maintenance of the Angat Hydro Electric Power Plant (AHEPP) Auxiliary MWSS NCR Turbines 4 & 5 through PPP Project 18 Pursue private-initiated projects to prepare for critical periods LUZON VISAYAS MINDANAO Demand Scenario Low High Low High Low High (AAGR = (AAGR = (AAGR = (AAGR = (AAGR = (AAGR = 4.13%) 8.48%) 4.52%) 8.48%) 4.75%) 8.48%) Projected 1298 MW 3442 MW 328 MW 657 MW 337 MW 562 MW cumulative increase in demand and reserve (2013-2016) Excess capacity over peak demand 1162 MW 206 MW -47 MW and reserve (2012) Critical periods 2016 2015 2015 2014 2012 2012 (assuming no additional capacity starting 2012) Minimum required 136 MW 2280 MW 122 450 MW 384 MW 609 MW capacity addition MW (2013 - 2016) Committed
Recommended publications
  • Securities and Exchange Commission
    1111111111111111111111111111111111111111111111111111111111111111111111111111111111111 101092015001068 SECURITIES AND EXCHANGE COMMISSION SECBuild ing, EDSA, Greenhills,MandaluyongCity, Metro Manila, Philippines Tel:(632) 726-0931 to 39 Fax:(632) 725-5293 Email: [email protected] Barcode Page The following document has been received: Receiving Officer/Encoder : Joselito 0 . Alfaro Receiving Branch : SEC Head Office Receipt Date and Time : January 09, 2015 02:33:58 PM Received From : Head Office Company Representative Doc Source Company Information SEC Registration No. 0000167 423 Company Name MEGAWORLD CORP. Industry Classification Company Type Stock Corporation Document Information Document ID 101092015001068 Document Type 17-C (FORM 11-C:CURRENT DISCL/RPT) Document Code 17-C Period Covered January 08, 2015 No. of Days Late 0 Department CFD Remarks C00072-2015 SECURITIES AND EXCHANGE COMMISSION SEC FORM 17-C CURRENT REPORT UNDER SECTION 17 OF THE SECURITIES REGULATION CODE AND SRC RULE 17.2(c) THEREUNDER 1. Date of Report (Date of earliest event reported) Jan 8, 2015 2. SEC Identification Number 167423 3. BIR Tax Identification No. 000-477-103 4. Exact name of issuer as specified in its charter MEGAWORLD CORPORATION 5. Province, country or other jurisdiction of incorporation Metro Manila 6. Industry Classification Code(SEC Use Only) 7. Address of principal office 28th Floor, The World Centre, 330 Sen. Gil Puyat Avenue, Makati City, Philippines Postal Code 1227 8. Issuer's telephone number, including area code (632) 8678826 to 40 9. Former name or former address, if changed since last report N/A 10. Securities registered pursuant to Sections 8 and 12 of the SRC or Sections 4 and 8 of the RSA Title of Each Class Number of Shares of Common Stock Outstanding and Amount of Debt Outstanding Common 32,231,457,948 Preferred 6,000,000,000 11.
    [Show full text]
  • Las Pinas City, Philippines
    Las Pinas City, Republic of the Philippines Population Size: 532,330 (2007) Las Piñas was one of the early settlements south of Old Manila during the Spanish colonial times. It was a salt-center where 1,200 inhabitants live. It was a sleepy fishing and agricultural community located at the mouth of the Zapote and Las Piñas Rivers as their waters flow out to Manila Bay. Today Las Piñas is a highly urbanized city and has grown by leaps and bounds. Its rich history and culture and the gains obtained for it by its past leaders are steppingstones that has moved the quality of life forward. It is not just known now for its world famous bamboo organ but a lot of other accomplishments and recognitions it has obtained. Yet it has kept its quiet charm and small town feel where the values of family and kinship, sense of community and civic spirit remain. Where every resident have a deep sense of belonging to a place they proudly call their home. Las Piñas urbanization was spearheaded by the suburban dream of the low-to medium density residential subdivisions available for middle income employees from the major business districts of other Metro Manila towns. It boost of a more than 99% literacy rate of it’s more than half a million population. Its education and health and nutrition programs are recipient of local and regional awards. The city’s environmental accomplishments for its River Rehabilitation and Clean and Green Programs are honored by national and international award giving bodies. The Las Piñas Historical Corridor Project is a 3.4-kilometer stretch of the city’s old district was developed showcasing and bringing back the picturesque aspects of the City’s Spanish colonial heritage.
    [Show full text]
  • 11844024 43.Pdf
    92 716 REGIONAL DEVELOPMENT COUNCIL 93 717 94 719 MEMORANDUM OF UNDERSTANDING ( D R A F T ) This Memorandum of Understanding is entered into by and between Department of Public Works and Highways (DPWH), with office address on Bonfacio Drive, Manila, as the government agency responsible for the planning and development of the Cavite-Laguna Arterial Roads described herein; - and – One Asia Development Corporation, with office address at Suite 2302, The Orient Square, Emerald Avenue, Ortigas Center, Pasig, and the acknowledged developer of one of the properties to be affected by the planned arterial roads in Cavite;. 1. THE PLANNED ARTERIAL ROADS Following the JICA-assisted feasibility study on the CALA East-West National Road Project which was conducted from February 2005 to September 2006, the Philippine government through the Department of Public Works and Highways has decided to build the following arterial roads: a) North-South Expressway, hereinafter referred to as “NS-Way”, extending from Bacoor-Cavite in the north to Sta.Rosa-Laguna in the south and broken down into the following segments: a. NS1 – a grade separation interchange to connect the existing R-1 Expressway to an upgraded Molino Boulevard, approximately 1.9 kms; b. NS2 – a 6-lane expressway, approximately 4.6 km., on Molino Boulevard from NS1; c. NS3 – a 6-lane expressway, approximately 6.3 km, from NS2 to Daang Hari, through the One Asia Property; d. NS4 – extends about 6.8 km. South from Daang Hari extension up to Aguinaldo Highway towards Palapala in Dasmariñas, and almost parallel to Aguinaldo Highway;. e. NS5 – runs on the west-side of Aguinaldo Highway about 2 km before Governor’s Drive and terminates at the Silang area, with a length of about 7.6 km.
    [Show full text]
  • OTH: Philippines
    Increase in Budget of CDTA Strengthening Public-Private Partnerships in the Philippines (PHI 45515) PERFORMANCE OVERVIEW 1. TA implementation has progressed much better that expected. With its focus on improving PPP governance framework, the TA has become the anchor of the Government’s PPP program. This role of the TA was further re-enforced through PPP becoming a major component of the program cluster Increasing Competiveness for Inclusive Growth. The progress of implementation of the TA’s capacity building and Project Development and Monitoring Facility (PDMF) components is summarized below. 2. Capacity building component is progressing well. a. GHD Pty Ltd (Australia), the international firm on PPP policy, institutional, legal, information management strengthening and capacity building has (i) advanced in developing a comprehensive manual on PPPs for national government agencies (NGAs), (ii) substantially updated the PPP manual for local government units (LGUs) developed with support of the World Bank, (iii) submitted the first draft review of the government’s institutional set-up for PPPs, and (iv) submitted first two policy papers on selected PPP topics to inform the process of amending the BOT Law.1 The two manuals, which will cover the whole PPP project cycle, will be adopted by the Infrastructure Committee of the NEDA Board by end June 2012. GHD’s training of PPP Center staff, government oversight agencies, and selected line-departments on priority PPP topics will be completed by June 2012. b. Twelve national2 and two international consultants3 have been provided to the PPP Center. These have been critically supporting the PPP Center in coping with the increased demand for its services and contributed an enhanced quality of PPP Center’s performance.
    [Show full text]
  • Malolos-Clark Railway Project – Tranche 1 Volume I
    Environmental Monitoring Report Semi-annual Environmental Monitoring Report No. 1 March 2020 PHI: Malolos-Clark Railway Project – Tranche 1 Volume I September 2019 – March 2020 Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 March 2020) Currency unit – Philippine Peso (PHP) PHP1.00 = $0.02 $1.00 = PHP50.96 ABBREVIATIONS ADB – Asian Development Bank BMB – Biodiversity Management Bureau Brgy – Barangay CCA – Climate Change Adaptation CCC – Climate Change Commission CDC – Clark Development Corporation CEMP – Contractor’s Environmental Management Plan CENRO – City/Community Environment and Natural Resources Office CIA – Clark International Airport CIAC – Clark International Airport Corporation CLLEx – Central Luzon Link Expressway CLUP – Comprehensive Land Use Plan CMR – Compliance Monitoring Report CMVR – Compliance Monitoring and Validation Report CNO – Certificate of No Objection CPDO – City Planning and Development Office DAO – DENR Administrative Order DD / DED – Detailed Design Stage / Detailed Engineering Design Stage DENR – Department of Environment and Natural Resources DepEd – Department of Education DIA – Direct Impact Area DILG – Department of Interior and Local Government DOH – Department of Health DOST – Department of Science and Technology DOTr – Department of Transportation DPWH – Department of Public Works and Highways DSWD – Department of Social Welfare and Development
    [Show full text]
  • No. Area Municipality Address
    NO. AREA MUNICIPALITY ADDRESS 1 MNM BULACAN KM 23 NLEX, MARILAO BULACAN 2 MNM BULACAN NORTH LUZON TOLLWAYS, SOUTHBOUND BOCAUE, BULACAN 3 MNM BULACAN BGY MALAMIG BUSTOS, BULACAN 4 MNM BULACAN 48 NORTHERN HILLS, MALHACAN, MEYCAUAYAN, BULACAN 5 MNM BULACAN KM 42 NLEX, NORTHBOUND LANE, PLARID BULACAN 6 MNM BULACAN MAHARLIKA HIGHWAY, GALA-MAASIM, SAN BULACAN 7 MNM BULACAN PUROK 1 MABINI STREET, SANTISSIMA T MALOLOS, BULACAN 8 MNM BULACAN KM 37 BGY CUTCUT, BULIHAN PLARIDEL, BULACAN 9 MNM BULACAN MAHARLIKA HIGHWAY BRGY. SAMPALOC SAN RAFAEL, BULACAN 10 MNM BULACAN VILLARAMA ST., POBLACION NORZAGARAY, BULACAN 11 MNM BULACAN BRGY. TAAL DRT HIGHWAY PULILAN BULACAN 12 MNM BULACAN GROTTO, SAN JOSE DEL MONTE BULACAN 13 MNM BULACAN 595 McARTHUR HIGHWAY, BO. TUKTUKAN GUIGUINTO, BULACAN 14 MNM BULACAN BO. TURO, BOCAUE BULACAN 15 MNM BULACAN DIVERSION ROAD (BY PASS), STA. CLAR STA. MARIA, BULACAN 16 MNM BULACAN DULONG BAYAN, STA. MARIA BULACAN 17 MNM BULACAN 101 MCARTHUR HIGHWAY BULACAN 18 NCR CALOOCAN C-3 ROAD, DAGAT-DAGATAN CALOOCAN CITY 19 NCR CALOOCAN B. SERRANO ST. COR 11TH AVE CALOOCAN CITY 20 NCR CALOOCAN GEN. LUIS CORNER P. DELA CRUZ STS. KALOOKAN CITY 21 NCR CALOOCAN ZABARTE ROAD, BRGY. CAMARIN, NORTH CALOOCAN, KALOOKAN CITY 22 NCR CALOOCAN TULLAHAN ROAD, ST. QUITERIA CALOOCAN CITY 23 NCR CALOOCAN 486 EDSA CORNER A DE JESUS ST., CALOOCAN 24 NCR LAS PINAS LOT 2A DAANG HARI CORNER DAANG REYN LAS PINAS 25 NCR LAS PINAS C5 EXT. COR. S. MARQUEZ ST. MANUYO TALON, LAS PINAS 26 NCR LAS PINAS 269 REAL ST. PAMPLONA LAS PINAS 27 NCR LAS PINAS C5 EXT.
    [Show full text]
  • MEMO EXPRESS.Pdf
    MERCHANT BRANCHES MEMO EXPRESS SM SOUTHMALL ALABANG ZAPOTE RD ALMANZA UNO LAS PINAS CITY 1740 MEMO EXPRESS CYBERZONE SM CITY FAIRVIEW REGALADO AVE. GREATER LAGRO QUEZON CITY 1100 MEMO EXPRESS UNIT CZ24 SM CITY BF D.A.S.A COR PRES AVE BRGY BF HOMES PARANAQUE CITY 1700 MEMO EXPRESS 345 ALABANG ZAPOTE RD ROBINSON PLACE LAS PINAS BRGY TALON LAS PINAS CITY 1740 MEMO EXPRESS UNIT 303 2F ARCADIA BLDG SANTA ROSA TAGAYTAY ROAD DON JOSE STA. ROSA CITY LAGUNA 4026 MEMO EXPRESS CZ234 SM CITY BACOLOD RECLAMATION ARE BACOLOD CITY 6100 MEMO EXPRESS SM CENTER ANGONO MANILA EAST ROAD SAN ISIDRO ANGONO RIZAL 1930 MEMO EXPRESS SM MEGA CENTER MELENCIO SAN ROQUE CABANATUAN CITY NUEVA ECIJA 3100 MEMO EXPRESS CY 20 SM CITY GENSAN CORNER SANTIAGO BLVD SAN MIGUEL ST. LAGAO GEN SANTOS CITY 9500 MEMO EXPRESS SPACE 3-052 3F NEW GLORIETTA 2 AYALA CENTER SAN LORENZO MAKATI CITY 1224 MEMO EXPRESS L3-341 ROBINSONS NORTH ABUCAY BRGY 91 TACLOBAN CITY 6500 MEMO EXPRESS L2 2019 ROBINSON PLACE ORMOC CHRYSANTHEMUM SUBD. COGON ORMOC CITY 6541 MEMO EXPRESS CZ 3008 17 SM CITY LEGAZPI TAHAO ROAD LEGAZPI CITY ALBAY 4500 MEMO EXPRESS RM 814 PACIFIC LAND CTR BLDG QUITIN PAREDES ST. BRGY 289 ZONE 027 DIST 111 BINONDO MANILA 1006 MEMO EXPRESS SPACE 3111 ABREEZA MALL JP LAUREL AVE DAVAO CITY 8000 MEMO EXPRESS THE DISTRICT MALL AGUINALDO HIWAY COR. DAANG HARI ROAD ANABU II D CITY OF IMUS CAVITE 4103 MEMO EXPRESS L3 ROBINSON PLACE SANTIAGO MABINI SANTIAGO CITY 3311 MEMO EXPRESS 239 SM CITY CAUAYAN MAHARLIKA HIGHWAY DISTRICT 2 CAUAYAN CITY ISABELA 3305 MEMO EXPRESS CENTRIO MALL CM RECTO AVENUE BRGY 24 CAGAYAN DE ORO CITY 9000 MEMO EXPRESS L3-338 ROBINSON PLACE MALOLOS SUMAPANG MATANDA CITY MALOLOS BULACAN 3300 MEMO EXPRESS 3RD LEVEL SPACE 3029A FAIRVIEW TERRACES QUIRINO HIGHWAY PASONG PUTIK QUEZON CITY 1012 MEMO EXPRESS SPACE 2 02448 ROBINSON PLACE PUEBLO DE PANAY LAWAAN ROXAS CITY 5800 MEMO EXPRESS CZ 015 25 SM CITY SAN JOSE DEL MONTE BRGY TUNGKONG MANGGA CITY OF SAN JOSE DEL MONTE BULACAN 3023 MEMO EXPRESS UNIT 326 3RD FLR AYALA MALLS LEGAZPI RIZAL ST.
    [Show full text]
  • The Daang Hari Road
    The Feasibility Study and Implementation Support on the CALA East-West National Road Project Final Report Chapter 7 7.7.2 Daang Hari Road (DH) The Daang Hari Road (DH) will start from the border between Muntinlupa City (National Capital Region) and the municipality of Imus, Cavite, where it will be connected with the existing Daang Hari Road which is at present under construction. The DH Road will end at the Coastal Road in the Municipality of Tanza. Total length of DH-3 and DH-4 is 21.0 km. Since the proposed alignment is located at lowland between EL.10 m to EL.30 m and crosses over many rivers flowing down from south to north into Manila Bay, due consideration will be required to decide the design flood levels appropriately. The DH Road can be divided mainly into two parts, namely east and west sections of Aguinaldo Highway. Within the eastern part, DH Road will cross seven rivers, which are moderately small creeks with 15 m to 25 m of width. It will cross with the proposed NS Road at Sta.8+230. At Sta.8+800, a new bridge is under construction along the proposed alignment. The western part which stretches from Aguinaldo Highway to the end point at the Coastal Road, a total of five rivers will be crossed by the alignment. Paddy and pasture land is the predominant land use in this area, contrary to those in the eastern part. It is noted that future urbanization and land use changes shall be taken into account to estimate flood discharge at crossings where the catchments varies between 50 to 100 km2 approximately.
    [Show full text]
  • An Integrated and Optimal Scheduling of Public Transport Operations Along EDSA (Pubfix) the DLSU Team Faculty: • Dr
    An Integrated and Optimal Scheduling of Public Transport Operations along EDSA (PUBFix) The DLSU Team Faculty: • Dr. Alexis Fillone (Project Leader) • Dr. Elmer Dadios • Engr. Edwin Sybingco • Engr. Robert Kerwin Billones • Dr. Maria Cecilia Paringit • Dr. Marlon Era • Dr. Laurence Gan Lim • Dr. Argel Bandala • Graduate Students and Research Staff Funded by: Department of Science and Technology – Philippine Council for Industry, Energy, and Emerging Technologies for Research and Development Intelligent Transport Systems (ITS) Forum 2017, February 17, 2017, 8AM-5PM, 5th Flr., HSSH, DLSU, Manila Summary of Presentation 1. Objectives Attainment 2. Status of the project (as of today, Feb. 17, 2017) 3. Expected Outputs vs. Actual accomplishments 4. 6Ps under the project a. Publications – In recognized scientific journals b. Products or Process – Commercial value of outputs c. Patents (include those filed and for filing) – Tangible measure of innovation d. People Services/capability building (identify if there are MS/PhDs) – Increase in the scientific workforce e. Places/partnerships forged – Facilities that enable increased above 4ps output f. Policy (DO, JAO, LGU resolution, etc) – Adopted science-based guidelines 5. Specific data generated and target users 6. Next Steps Intelligent Transport Systems (ITS) Forum 2017, February 17, 2017, 8AM-5PM, 5th Flr., HSSH, DLSU, Manila Project Accomplishments as of Feb. 17, 2017 Intelligent Transport Systems (ITS) Forum 2017, February 17, 2017, 8AM-5PM, 5th Flr., HSSH, DLSU, Manila 6Ps UNDER THE PROJECT Intelligent Transport Systems (ITS) Forum 2017, February 17, 2017, 8AM-5PM, 5th Flr., HSSH, DLSU, Manila 1P. PUBLICATIONS Intelligent Transport Systems (ITS) Forum 2017, February 17, 2017, 8AM-5PM, 5th Flr., HSSH, DLSU, Manila 2P.
    [Show full text]
  • Appendix 7 Information and Data of Existing Outfall
    Appendix 7 Information and Data of Existing Outfall Data Collection Survey for Sewerage Systems in West Metro Manila Outfall Location A Date Surveyed: 13 & 17 May 2016 City/Town: Las Pinas Weather: Fair - Cloudy - Rainy p p Notes: e n N1 - Water Depth (Full / PartlyFull) N6 - Water Color (Clear) N11 - with floating trash/garbage LPR - Las Pinas River Outfall Identification d N2 - Water Depth (Half) N7 - Water Color (Brown) U/S - upstream IC - Ilet Creek LP-OF000 i x N3 - Water Depth (Low / Below Half) N8 - Water Color (Dark/Murky) D/S - downstream 7 N4 - Water Flow (Stagnant) N9 - Water Odor (None) OF - outfall outfall N5 - Water Flow (Flowing) N10 - Water Odor (Foul) LP - Las Pinas number E City/Municipality x i s OUTFALL INFORMATION t i Coordinates Findings/Observations n Tributary g Main River UTM N (Latitude) E (Longitude) Other Remarks Photo Reference No. River/Waterway ID N1 N2 N3 N4 N6N5N7 N8 N9 N10 N11 N E Deg. Min. Sec. Deg. Min. Sec. O u 4.00m wide box culvert crossing t f Diego Cera Avenue, catchment area a Zapote River LP-OF1 1600478.96 281172.44 14 28 5.59 120 58 11.43 X X XXX - residential & commercial, on-going 4088, 4089 l l construction of sluiceway and bridge D/S of box culvert LP-OF2/LSP- 0.30m dia pipe culvert, no water Las Piñas River 1601179.76 282053.89 14 28 28.64 120 58 40.65 4091 OF003 flowing, catchment area - residential App7-1 LP-OF3/LSP- 0.30m dia pipe culvert, no water Las Piñas River 1601180.74 282046.71 14 28 28.67 120 58 40.41 4091 OF004 flowing, catchment area - residential 0.50m wide concrete box conduit located U/S of Pulang Lupa bridge, LP-OF4/LSP- Las Piñas River 1601159.
    [Show full text]
  • 1St PPP Project Bidding: Successful
    INFRASTRUCTURE 49 1st PPP project bidding: Successful After a delayed start, the banner program of the Aquino administration, the public-private partnership (PPP) infrastructure program, has been fi nally launched with the successful bidding of the 4-kilometer Daang Hari-South Luzon Expressway road link project. he 1.956-billion Daang Hari (King’s Road) – South Luzon Expressway (SLEX) road link project has been Tawarded to Ayala Corporation after it submitted the highest bid of P902 million for the 30-year contract to build, operate and maintain the 4-kilometer road project. There were only 2 bidders competing for the road project – the Ayala Corporation partnered with the Spanish engineering fi rm, Getinsa; and the South Expressway Link consortium consisting of San Miguel Corp’s Optimal Infrastructure Development, Inc, Star Infrastructure Development Corp. and Citra Group’s CLGP Philippine Holdings, Inc. The joint venture group of D.M. Consunji Inc. and C.M. Pancho Construction Inc., the only other pre-qualifi ed participant, withdrew from submitting a fi nal bid. There were initially 20 individual fi rms and groups that submitted expressions of interest for the project. Ayala Corporation’s bid of P902 million was superior to acquisition will be completed 6 months after the signing of the P608- million bid submitted by the South Expressway the concession agreement and that commercial operations Link consortium. The government had earlier set a P371- will happen earlier than the expected timeline of August 2013. million fl oor price for the project. The Daang Hari-SLEX The project will complement the Cavite-Laguna East-West road link is the fi rst project to be successfully awarded Highway (CALA Expressway), which is also included in the to the private sector under the Aquino administration’s priority infrastructure PPP program of the national government.
    [Show full text]
  • Republic of the Philippines)
    14 April 2014 Philippine Stock Exchange Disclosure Department Listings & Disclosure Group 3/F, The Philippine Stock Exchange, Inc. Tower One and Exchange Plaza, Ayala Ave., Makati City Subject: Report on the Top 100 Shareholders Gentlemen: This is in connection with your Revised Disclosure Rules requiring Integrated Micro-Electronics, Inc. to submit a report on the list of top 100 shareholders of the Company. In compliance therewith, we are submitting herewith the list of top 100 shareholders on the Company’s common shares for the quarter-ending 31 March 2014. Thank you. Very truly yours, SOLOMON M. HERMOSURA Corporate Secretary BPI STOCK TRANSFER OFFICE INTEGRATED MICROELECTRONICS, INC TOP 100 STOCKHOLDERS AS OF MARCH 31, 2014 RANK STOCKHOLDER NUMBER STOCKHOLDER NAME NATIONALITY CERTIFICATE CLASS OUTSTANDING SHARES PERCENTAGE TOTAL 1 0100000004 AYC HOLDINGS, LTD. NOF U 945,537,373 57.8636% 945,537,373 33/F TOWER ONE, AYALA TRIANGLE,AYALA AVENUE, MAKATI CITY 2 1600000008 PCD NOMINEE CORPORATION (FILIPINO) FIL U 307,789,362 18.8356% 307,789,362 37F TOWER ONE, THE ENTERPRISE CENTER, 6766 AYALA AVENUE COR. PASEO DE ROXAS, MAKATI CITY 3 0500000022 EPIQ NV BEL U 200,000,000 12.2393% 200,000,000 C/O IMI- NORTH SCIENCE AVE., SPECIAL EXPORT PROCESSING ZONE LAGUNA TECHNOPARK, BIÑAN, LAGUNA 4024 4 1600000002 POMS INVESTMENT PTE LTD. SGN U 57,339,671 3.5089% 57,339,671 10 ANSON ROAD, #34-18 INTERNATIONAL PLAZA, SINGAPORE 079903 5 0500000008 2007 ESOWN SUBSCRIPTION FIL U 44,988,446 2.7531% 44,988,446 C/O ESOWN ADMINISTRATOR, NENENG CARVAJAL 6 0500000018 2009 ESOWN SUBSCRIPTION FIL U 30,022,153 1.8372% 30,022,153 C/O ESOWN ADMINISTRATOR, NENENG CARVAJAL 7 1600000009 PCD NOMINEE CORPORATION (NON-FIL.) NOF U 11,667,844 0.7140% 11,667,844 37/F TOWER ONE, THE ENTERPRISE CENTER, 6766 AYALA AVENUE COR.
    [Show full text]