Federal Register / Vol. 67, No. 27 / Friday, February 8, 2002 / Notices 6021

DEPARTMENT OF ENERGY final EIS. Recirculation of the available on the Internet at: document is not necessary under www.efw.bpa.gov Federal Energy Regulatory Section 1506.3(c) of the Council on EIS No. 020050, DRAFT FINAL EIS, Commission Environmental Quality Regulations. FHW, WY, Wyoming Forest Highway [Docket Nos. EC02–5–000, ER02–211–000, EIS No. 020044, DRAFT 23 Project, Louis Lake Road also and EL02–53–000] SUPPLEMENTS, FRC, WA, Condit known as Forest Development Road Hydroelectric (No. 2342) Project, 300, Improvements from Bruce’s Vermont Yankee Nuclear Power Updated Information on Application Parking Lot to Worthen Meadow Corporation, Entergy Nuclear Vermont to Amend the Current License to Road, Funding, NPDES Permits and Yankee, LLC, Vermont Yankee Nuclear Extend the License Term to October 1, COE Section 404 Permit, Shoshone Power Corporation; Notice of Initiation 2006, White Salmon River, Skamania National Forest, Fremont County, WY, of Proceeding and Refund Effective and Klickitat Counties, WA, Comment Wait Period Ends: March 11, 2002, Date Period Ends: March 25, 2002, Contact: Contact: Rick Cushing (303) 716– Nicholas Jayjack (202) 219–2825. This 2138. February 4, 2002. document is available on the Internet Take notice that on February 1, 2002, at: http://www.ferc.gov EIS No. 020051, REVISED DRAFT EIS, the Commission issued an order in the EIS No. 020045, FINAL EIS, FHW, NM, FHW, WA, WA–509 Corridor above-indicated dockets initiating a US 70 Corridor Improvement, Completion/I–5/South Access Road proceeding in Docket No. EL02–53–000 Between Ruidoso Downs to Riverside, Project, Improvements to WA–509 under section 206 of the Federal Power Implementation, Right-of-Way Extension, Enhancement of Southern Act. Acquisition, Lincoln County, NM, Access to and from Sea-Tac The refund effective date in Docket Wait Period Ends: March 11, 2002, International Airport and I–5 No. EL02–53–000 will be 60 days after Contact: Gregory D. Rawlings (505) Improvements between South 210th publication of this notice in the Federal 820–2027. Street and 310th Street, Funding, US Register. EIS No. 20046, DRAFT EIS, FHW, MN, COE Section 404 Permit, NPDES Trunk Highway (TH) 169 Permit, King County, WA, Comment Magalie R. Salas, Improvement Project, Propose Period Ends: March 25, 2002, Contact: Secretary. Improvements to TH–169 from TH–27 Jim Leonard (360) 753–9480. [FR Doc. 02–3066 Filed 2–7–02; 8:45 am] North of the City of Onamia to the EIS No. 020052, DRAFT EIS, TVA, TN, BILLING CODE 6717–01–P Intersection of TH–18 and TH–6 NC, Nolichucky Reservoir Flood Northwest of the City of Garrison, Remediation Project, To Identify and Crow Wing and Mille Lacs Counties, Evaluate Ways to Address Flooding ENVIRONMENTAL PROTECTION MN, Comment Period Ends: March Effects of Nolichucky Dam and the AGENCY 25, 2002, Contact: Cheryl Martin (651) Accumulated Sediment in Nolichucky [ER–FRL–6626–3] 291–6120. Reservoir on Land and Property Not EIS No. 020047, DRAFT SUPPLEMENT, Owned by the Federal Government, Environmental Impact Statements; FRC, WA, Irene Creek Hydroelectric NPDES Permit and US COE 404 Notice of Availability Project, (FERC No. 10100–002) and Permit, Several Counties in TN and Anderson Creek Hydroelectric Project NC, Comment Period Ends: March 29, Responsible Agency: Office of Federal (FERC No. 10416–003), Construction 2002, Contact: Susan Fuhr (423) 587– Activities, General Information (202) and Operation, Issuing of a Amended 5600. 564–7167 or www.epa.gov/oeca/ofa. License Applications, Skagit and EIS No. 020053, FINAL EIS, AFS, UT, Weekly receipt of Environmental Impact Whatcom Counties, WA, Comment Solitude Mountain Resort Master Statements Period Ends: March 25, 2002, Contact: Development Plan Update (MDP), Filed January 28, 2002 Through Alan Mitchnik (202) 219–2826. This Implementation, Special-Use-Permit, February 01, 2002 document is available on the Internet US COE 404 Permit, Wasatch-Cache Pursuant to 40 CFR 1506.9. at: http://rimsweb1.ferc.gov/ EIS No. 020042, DRAFT EIS, FTA, PA, ∼ ∼ ∼ National Forest, Salt Lake County, rims.q rp2 getImagePages 1845215 UT, Wait Period Ends: March 11, Schuylkill Valley Corridor Metro ∼44∼912∼1∼50. Improvements, Reading to the City of EIS No. 020048, DRAFT EIS, FHW, WA, 2002, Contact: Steve Scheid (801) Philadelphia, Funding, Philadelphia, Vancouver Rail Project, Rail 733–2689. Montgomery, Chester and Berks Improvements at the Burlington EIS No. 020054, DRAFT EIS, BIA, CA, Counties, PA, Comment Period Ends: Northern and Santa Fe Rail Yard, Agua Caliente Indian Reservation March 25, 2002, Contact: Keith Lynch Possible Elimination of the West 39th Project, Proposed Section 14 Specific (215) 656–7100. Street At-Grade Crossing, Funding, Plan, Master Development Plan, Agua EIS No. 020043, Final EIS, COE, TN, NPDES Permit, Clark County, WA, Caliente Band of Cahulla Indians, City Adoption—Upper River Comment Period Ends: March 27, of Palm Springs, Riverside County, Navigation Improvement Project, 2002, Contact: Daniel Mathis (306) CA, Comment Period Ends: April 12, Rehabilitation and/or Construction, 753–9413. 2002, Contact: William Allan (916) —Navigation Lock EIS No. 020049, DRAFT EIS, BPA,WA, 978–6043. Structural Improvement Alternative, Schultz-Hanford Transmission Line EIS No. 020055, DRAFT SUPPLEMENT, Funding, NPDES Permit, Coast Guard Project, Construct a New 500 kilovolt COE, TN, Chickamauga Dam Lock Bridge permit and COE Section 404 (kV) Transmission Line in Central Feasibility Study, New and Updated Permits, Tennessee River, Hamilton Washington, north of Hanford Information, Incorporates the 1995 County, TN, Contact: Wayne connecting to Existing Line at the FEIS by Reference, NPDES Permit, Easterling (615) 736–7847. Corps of Schultz Substation, Kittitas, Yakima, U.S. Coast Guard Bridge Permit and Engineers (COE) has adopted the Grant and Benton Counties, WA, Funding, Tennessee River, Hamilton Tennessee Valley Authority’s #960147 Comment Period Ends: March 25, County, TN, Comment Period Ends: filed 03–29–1996. COE was a 2002, Contact: Nancy A. Wittpenn March 25, 2002, Contact: Wayne Cooperating Agency for the above (503) 230–3297. This document is Easterling (615) 736–7847.

VerDate 112000 18:09 Feb 07, 2002 Jkt 197001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\08FEN1.SGM pfrm02 PsN: 08FEN1 6022 Federal Register / Vol. 67, No. 27 / Friday, February 8, 2002 / Notices

Amended Notices Summary: EPA expressed National Forest, Madison Ranger EIS No. 010305, DRAFT SUPPLEMENT, environmental concerns relating to District, Madison County, MT. Summary: EPA’s concerns with this FAA, MN, Flying Cloud Airport, impacts from secondary development/ project were satisfactorily addressed. Substantive Changes to Alternatives induced travel, as well as the cumulative effects on water quality and ERP No. F–AFS–L61224–00 and New Information, Extension of Lemhi Pass National Historic the Runways 9R/27L and 9L/27R, fish species listed as threatened under the Endangered Species Act. EPA Landmark Management Plan, Long-Term Comprehensive Implementation, Beaverhead-Deerlodge Development, In the City of Eden requested that additional information and analysis be included in the final EIS National Forest, Beaverhead County, Prairie, Hennepin County, MN, MT and Salmon-Challis National Forest, Comment Period Ends: March 29, to adequately disclose the potential project impacts and to mitigate those Lemhi County, ID. 2002, Contact: Glen Orcutt (612) 713– Summary: EPA’s review did not 4354. impact where appropriate. ERP No. D–FTA–K59002–AZ Rating identify any potential environmental Revision of FR Notice published on LO, Central Phoenix/East Valley Light impacts requiring substantive changes 09/28/2001: CEQ Review Period Ending Rail Transit Corridor, Construction, to the proposal, therefore EPA has no on 12/14/2001 has been Extended to 03/ Operation and Maintenance, Funding, objection to the action as proposed. 29/2002. Cities of Phoenix, Cities of Tempe and ERP No. F–AFS–L65309–ID Spruce Moose and Moose Lake Right- Dated: February 5, 2002. Mesa, Maricopa County, AZ. of-Way Analysis Area, Implementation, Joseph C. Montgomery, Summary: EPA found that the Timber Harvesting, Road Construction, Director, NEPA Compliance Division, Office document adequately discussed the Reforestation and Watershed of Federal Activities. environmental impacts of the proposed Restoration, Clearwater National Forest, project, therefore EPA has no objections [FR Doc. 02–3125 Filed 2–7–02; 8:45 am] Lochsa Ranger District, Idaho County, BILLING CODE 4140–01–M to the proposed action. ERP No. D–NAS–K12008–CA Rating ID. Summary: No formal comment letter EC2, Programmatic EIS—NASA Ames was sent to the preparing agency. ENVIRONMENTAL PROTECTION Development Plan (NADP) for Ames ERP No. F–AFS–L65354–ID AGENCY Research Center, New Research and Iron Honey Resource Area Project, Development Uses, Implementation, Aquatic, Vegetative and Wildlife Habitat [ER–FRL–6626–4] San Francisco Bay, Santa Clara County, Improvement Activities, CA. Implementation, Coeur d’Alene River Environmental Impact Statements and Summary: EPA expressed Ranger District, Idaho Panhandle Regulations; Availability of EPA environmental concerns associated with National Forests, Kootenai and Comments the project’s impact to air quality and Shoshone Counties, ID. health, and recommended additional air Availability of EPA comments Summary: EPA has no objection to the quality mitigation measures to action as proposed. The final EIS prepared pursuant to the Environmental potentially reduce impacts from Review Process (ERP), under section adequately discloses the impacts and construction activities. satisfactorily responded to most of 309 of the Clean Air Act and section ERP No. DS–NOA–K39068–CA Rating 102(2)(c) of the National Environmental EPA’s previous comments on the draft LO, San Francisco Bay National EIS. In addition, the project overall Policy Act as amended. Requests for Estuarine Research Reserve, Proposed copies of EPA comments can be directed should benefit the landscape. Designation of Three Sites: China, Camp ERP No. F–BLM–K65233–NV to the Office of FEDERAL ACTIVITIES State Park, Brown’s Island Regional Falcon to Gonder 345kV Transmission AT (202) 564–7167. Parks District and Rush Ranch Open Project, Construction, Resource An explanation of the ratings assigned Space Preserve, Additional Information Management Plan Amendments, Right- to draft environmental impact regarding Commercial Navigation and of-Way Grant, Lander, Elko, Eureka and statements (EISs) was published in Socioeconomic Issues, Contra Costa, White Pine Counties, NV. Federal Register dated May 18, 2001 (66 Marin, and Solano Counties, CA. Summary: No formal comment letter FR 27647). Summary: EPA had no additional was sent to the preparing agency. Draft EISs comments on this supplemental ERP No. F–FHW–F40395–WI document. County Highway J/WIS 164 (I–94 to ERP No. D–AFS–C65003–PR Rating ERP No. DS–TVA–A06018–AL Rating County E) Corridor Improvements EC2, Caribbean National Forest, EC2, Browns Ferry Nuclear Plant, Project, Funding, Pewaukee, Villages of Constructing the Rio Sabana Picnic Area Operating License Renewal, Units 2 and Pewaukee and Sussex, Towns of Lisbon, Construction, Rio Sabana Trail 3 and Potentially Unit 1 Operations Richfield and Polk, Waukesha and Reconstruction and Highway PR 191 Extension, Athens, Limestone County, Washington Counties, WI. Reconstruction from Km. 21.3 to Km AL. Summary: EPA continues to express 20.0, Special-Use-Permit, PR. Summary: EPA expressed environmental concerns regarding Summary: EPA expressed environmental concerns regarding the wetland impact mitigation and water environmental concerns with the potential fish impingement and quality impacts. proposed reopening of PR-Highway 191 entrainment effects and the probable ERP No. F–GSA–C81032–NY in the Carribean National Forest and discharge of thermal effluent at higher U.S. Mission to the United Nations requested that additional information be (although still NPDES-compliant) (USUN), Demolition of Current USUN provided in the final EIS to address EPA temperature. and the Construction of a New Facility concerns. ERP No. D–FHW–L40215–OR on the Same Site, Located at 799 United Rating EC2, South Medford Interchange Final EISs Nations Plaza, New York, NY. Project, Interchange Project, Relocation ERP No. F–AFS–J65300–MT Tobacco Summary: EPA’s previous concerns on I–5 south of its current location at Root Vegetation Management Plan, regarding the draft EIS have been Barnett Road, Funding, Jackson County, Restoration and Maintenance of a Mix of resolved, therefore EPA has no objection OR. Vegetation, Beaverhead-Deer Lodge to the proposed action.

VerDate 112000 18:09 Feb 07, 2002 Jkt 197001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\08FEN1.SGM pfrm02 PsN: 08FEN1