Objectifs De Mises En Service Horizon 2017 Aéroport Charles De Gaulle (T4) Mairie De St-Ouen 14 St-Lazare DE GONESSEBARREAU B Aéroport Charles De Gaulle (T2) RER B

Total Page:16

File Type:pdf, Size:1020Kb

Objectifs De Mises En Service Horizon 2017 Aéroport Charles De Gaulle (T4) Mairie De St-Ouen 14 St-Lazare DE GONESSEBARREAU B Aéroport Charles De Gaulle (T2) RER B Le Mesnil-Amelot Objectifs de mises en service Horizon 2017 Aéroport Charles de Gaulle (T4) Mairie de St-Ouen 14 St-Lazare DE GONESSEBARREAU B Aéroport Charles de Gaulle (T2) RER B Vers Cergy Triangle CDG EXPRESS RER A RER C de Gonesse LIGNE 17 Horizon 2020 RER D B Parc des Expositions Noisy- T0 Champs Pont de Sèvres RER B TANGENTIELLE NORD RER E 15 Le Bourget Aulnay TN Aéroport RER A LIGNE 17 Horizon 2023 TANGENTIELLE 13 Sevran-Beaudottes NORD Le Blanc- 16 TN Le Bourget Mesnil Sevran – Livry Saint-Denis TANGENTIELLE Les Agnettes La Courneuve RER LIGNE 16 Pleyel OUEST LIGNES 16 13 “Six Routes” RER B A Les Grésillons Saint- ET 17 Mairie de St-Ouen 14 Colombes Denis T4 Vers Pleyel CDG EXPRESS Mantes- LIGNE 15 Bobigny-Drancy Noisy- la-Jolie Champs Bois-Colombes 7 Olympiades LIGNE 15 Stade 12 Bobigny P. Picasso La Garenne-Colombes Mairie de St-Ouen Fort de France 14 d’Aubervilliers Pont de Bondy T4 Clichy – Montfermeil T0 5 Nanterre Bécon- St-Ouen RER C LIGNE 14 Mairie d’Aubervilliers TRAM- Villejuif les-Bruyères T4 TRAIN T4 CEA IGR RER A E Bondy T4 Saint-Aubin T0 4 TN T4 18 A Rueil Porte de Clichy 1 3 Pont Massy Cardinet Rosny- RER E La Défense LIGNE 11 RER E Bois Perrier Horizon 2025 Nanterre RER C Gare de l’Est Triangle La Boule de Gonesse RER A St-Lazare LIGNE 15 Villemomble E 17 RER E Chelles Rueil / Suresnes Le Bourget RER Neuilly- “Mont-Valérien” LIGNE 11 Saint-Denis Hôpitaux LIGNE 16 3 Nanterre Pleyel 15 LIGNE 15 Neuilly- Châtelet- Val de Fontenay Les Fauvettes 15 Rosny- Les Halles Bois Perrier 11 LIGNE 14 9 Gare de Lyon RER A RER A Saint-Cloud Transilien 11 Noisy-Champs Pont Noisy- TANGENTIELLE 10 1 de Sèvres Champs RER C OUEST Le Perreux- RER B LIGNE 15 Nogent 9 Olympiades Pont de Sèvres Issy RER D RER 12 Maison Blanche Bry Villiers Paris XIIIe Horizon 2027 Champigny Champigny Triangle CDG LIGNE 15 13 de Gonesse Fort d’Issy / Centre (T4) 7 Saint-Maur Créteil Vanves / Clamart Châtillon– 4 RER C 17 Kremlin- RER A RER E RER C Montrouge Bicêtre Hôpital C 15 T0 Bagneux M4 Nanterre LIGNE 15 Arcueil – Cachan Vitry Saint-Denis Satory 7 Centre Créteil l’Échat Pleyel C Villejuif Institut Versailles G. Roussy Le Vert de Maisons LIGNE 18 Chantiers Villejuif Saint-Quentin B L. Aragon Université Variantes Les Ardoines LIGNE 14 Villejuif IGR Chevilly “Trois Communes” 8 18 14 Massy Saint-Quentin Est Aéroport d’Orly M.I.N. – Porte de Thiais VERSAILLES-MASSYTRAM-TRAIN A Horizon 2030 RER C Pont de Rungis CDG (T4) 17 Le Mesnil- Amelot Antonypôle Au-delà de 2030 LIGNE 18 CEA LIGNE 18 Saint-Aubin Massy – Palaiseau Rosny- Massy Aéroport d’Orly RER C Bois Perrier C Opéra 10 Terminus de métro Palaiseau Versailles 15 Gare avec correspondance modes lourds Chantiers TRAM-TRAIN Champigny Orsay Gif MASSY-EVRY Autres gares Centre RER D RER D 2 km 18 CEA B Saint-Aubin RER B © Société du Grand Paris – mars 2013.
Recommended publications
  • Bilan LOTI De L'interconnexion Du RER D Châtelet
    Mars 2006 O L E G N A ’ D s e u q c a J - n a e J Bilan LOTI de l'Interconnexion du RER D Châtelet - Gare de Lyon 2/52 SOM M AIRE Résumé et conclusions......................................................................................................................5 1. Introduction .....................................................................................................................................9 2. Historique et objectifs du projet .........................................................................................1 1 2.1. Historique du Réseau Express Régional (RER) et du projet...................................1 1 2.2. Les objectifs du projet.............................................................................................................1 4 2.3. Les conditions de réalisation de l’opération ...................................................................1 6 3. Consistance, coûts et modalités de financement .....................................................1 8 3.1. Les principales caractéristiques du projet.......................................................................1 9 3.2. Les coûts d’investissement et d’exploitation..................................................................2 0 3.3. Coûts d’exploitation..................................................................................................................2 1 3.4. Le financement de l’investissement ..................................................................................2 3 4. Evolution de la situation
    [Show full text]
  • Cartometro Paris Edition
    Stains la Cerisaie A B C D E (2020-2030) F G H I J Saint-Denis 13 Université Port de Genevilliers Edition 3.6 CDGVAL - LISA Aéroport Roissy Charles de Gaulle Cité de l'air et de l'espace PARIS Décembre 2012 Port de Genevilliers (2014-2020) Basilique de Saint-Denis Terminal 1 1 Hôtel de Ville (2014-2020) 1 Ateliers Asnières - Gennevilliers Parc PX Plan du Métropolitain 13 Terminal 3 Les Courtilles Le Bourget RER Roissypole La Courneuve - 6 Routes Parc PR Saint-Denis Porte de Paris Plan des lignes, voies ,et ateliers ateliers et extensions du réseau Stade de France Satellite S4 Satellite S3 (2020-2030) Légende Terminal 2 Gare (2007-2013) Les Agnettes h Terminal 2E t Voies t La Courneuve - Aubervilliers p : / / Station c a r to Quai orienté (quai ne donnant accès qu'à une .m seule des voies adjacentes) etro.free.fr Section aérienne Trottoir de manœuvre Carrefour Pleyel 7 La Courneuve - 8 mai 1945 La Seine Extension de ligne prévue / planifiée Saint-Ouen Extension au tracé non défini / plusieurs options Les Docks Ateliers de Pleyel Matériel Station fermée / station jamais ouverte / quai inutilisé Station future Gabriel Péri MP59 MP89CC Tunnel(s) / Voie(s) désaffecté(e)s / Supprimé(e)s Mairie d'Aubervilliers Lignes d'exploitation : 4 et 11 Fort d'Aubervilliers 1re mise en circulation : 1963 Ligne d'exploitation : 1 et 4 Mairie de Longueur d'une rame: 1re mise en circulation : 1997 90,39 m / 60 m Saint-Ouen Canal Saint Denis Longueur d'une rame: 90,28 m 2 Composition : 6 / 4 voitures Composition : 6 voitures (M-N-A-AB-N-M / M-N-AB-M) (2017)
    [Show full text]
  • Dossier De Presse Travaux Ete.Pdf
    LES GRANDS TRAVAUX ÉTÉ 2020 DOSSIERDOSSIER DEDE PRESSE PRESSE TRAVAUXTRAVAUX D’ÉTÉD’ÉTÉ 20202021 EN EN ÎLE-DE-FRANCE ÎLE-DE-FRANCE : : LALA MAINTENANCE ET LA MODERNISATIONMODERNISATION DESDES INFRASTRUCTURESINFRASTRUCTURES SURSUR LESLES RÉSEAUXRÉSEAUX RATPRATP ETET SNCF SNCF SE SE POURSUIVENT POURSUIVENT LES GRANDS TRAVAUX ÉTÉ 2020 Édito Pour Île-de-France Mobilités, la RATP et SNCF Réseau, la maintenance et la modernisation des infrastructures ferroviaires de transport sont une priorité. DOSSIER DE PRESSE Dans ce cadre, les deux entreprisesTRAVAUX investissent D’ÉTÉ 2020 ENchaque ÎLE-DE-FRANCE année : massivement avec Île-de-FranceLA MAINTENANCE Mobilités, ET LAla RégionMODERNISATION Île-de-France DES INFRASTRUCTURES et l’État pour entretenir, moderniserSUR et LES développer RÉSEAUX RATP le réseauET SNCF SEferroviaire POURSUIVENT francilien : renouvellement des trains, travaux d’envergure sur les 2 différentes lignes pour garantir sécurité et fiabilité. Cet été, malgré la poursuite de la crise du Covid19, les travaux se poursuivent afin de moderniser le réseau de transport francilien, et le rendre plus fiable et confortable. Point sur les travaux prévus cet été. 02 Juin 2021 LES GRANDS TRAVAUX ÉTÉ 2020 Sommaire ACCOMPAGNER LES VOYAGEURS DURANT TOUTE LA DURÉE DES TRAVAUX . 6 -Une information complète et personnalisée pour faciliter les trajets de chacun -Des agents présents sur le terrain pour répondre à toutes les questions POINT SUR LES TRAVAUX PRÉVUS SUR LE RÉSEAU RER . 10 - Le RER - Les travaux du RER et la ligne • Zoom au sud de la ligne • Zoom au nord de la ligne et ligne DOSSIER DE PRESSE - Le RER - Le RER TRAVAUX D’ÉTÉ 2020 EN ÎLE-DE-FRANCE : - Le RER LA MAINTENANCE ET LA MODERNISATION DES INFRASTRUCTURES LES TRAVAUX SUR LES AUTRES LIGNES DU RÉSEAU SNCF .
    [Show full text]
  • If You Arrive by Plane
    Practical information: How to get to INSEAD? Follow the link below to get directions to the INSEAD Europe campus: http://www.insead.edu/campuses/europe If you arrive by plane You can take both Taxi or Train to go to Fontainebleau Orly airport is nearer than Roissy Charles de Gaulle airport to INSEAD 1. First option : By taxi from the airport to INSEAD Time: 1 hour and a half – 2 hours Price: 100 to 140 euros (can be shared between different participants taking the same taxi) From Orly : more or less 1hour to 1hour and a half – around 100 euros From Roissy Charles de Gaulle 1 hour and a half to 2 hours – around 140 euros From the airport, you can book a taxi in advance from this taxi list http://www.insead.edu/sites/default/files/assets/dept/campus/docs/fbl-taxi-list-2016.pdf Please click here for the estimated fare https://drive.google.com/file/d/0B_5ndt2FPRKBU1RaOTE2OWZmR0E/view?pref=2&pli=1 2. Second option : By Train from the airport From any airport, you can go to Paris and then to Fontainebleau. It should take more or less same time than by taxi and it costs less Time: 1hour and a half – 2 hours Price: around 50 euros Step 1 : from airport to “Gare de Lyon” train station (inside Paris) - From Charles de Gaulle airport to Paris-Gare de Lyon (train station Gare de Lyon): o Take the RER B from “Aeroport Paris-Charles de Gaulle” to “Gare du Nord” o Then RER D from “Gare du Nord” to “Gare de Lyon” 40 minutes – around 22 euros - From Orly airport to Paris-Gare de Lyon (train station Gare de Lyon): o Take the OrlyVal from “Orly Sud” to “Anthony RATP”.
    [Show full text]
  • Accomodations Workshop X Avril2017.Pdf
    21, avenue Carnot 91886 MASSY Phone : (+33)1/69328020 - Fax : (+33)1/69328025 Mail : [email protected] http://www.mercure.com/fr/hotel-1176-hotel-mercure-paris-massy-gare-tgv/index.shtml ACCESS : Located in the heart of Massy business district and 2 minutes from the TGV station and RER B and C stations. 2A Place de l’Union Européenne 91300 Massy Phone : +33 1 691 883 50 - Fax : +33 1 601 074 29 Mail : [email protected] http://www.adagio-city.com/fr/hotel-8696-aparthotel-adagio-access-paris-massy-gare/index.shtml ACCESS : Nearby SNCF Massy RER C station, which is a 2-minute walk from the TGV station and RER station 18-20 Rue Emile Baudot 91120 PALAISEAU Phone (+33)1/64539000 - Fax (+33)1/64471780 Mail : [email protected] http://www.novotel.com/fr/hotel-0386-novotel-massy-palaiseau/index.shtml ACCES : 10 minutes walk from the TGV station and RER B and C stations. 6 rue du Saule Trapu 91300 MASSY Phone : (+33)1/60112030 - Fax : (+33)1/60119553 Mail : [email protected] http://www.ibis.com/fr/hotel-1689-ibis-massy/index.shtml ACCES : Located in the area of activity « Moulin », and 3km from Massy TGV station 6 rue Christophe Colomb - 91300 MASSY Phone : +33 (0)1 60 19 20 20 Mail : [email protected] http://www.sejours-affaires.com/plan-residence-hoteliere-aparthotel-massy-247.html ACCES : 10 minutes walk from the TGV station and RER B and C stations. 2 Rue François Leroux, 91400 ORSAY Phone : 01 64 86 17 47 Booking by Hôtel info : https://www.hotel.info/hotel/detail?hs_hmid=375099&lng=fr&hs_arrival=19.03.2017&hs_departure =20.03.2017&hs_persons=2&hs_step=2&hs_validate=1&hs_persons_total=2&oc=de- DE&hs_rooms=1&dcc=EUR&hotelagentllc=7998699&subagentcode=FR_localuniversal ACCES : Located at 4 minutes walk from Le Guichet station (on RER B line), take RER at Le Guichet station to Massy Palaiseau station At the station, take the TransEssonne 91.06 (B,C) or 91.10 bus DIRECTIONS ACCESS USING PUBLIC TRANSPORT 2 itineraries are possible: from the Massy-Palaiseau station or the Lozère station.
    [Show full text]
  • How Tokyo's Subways Inspired the Paris
    Feature Evolution of Urban Railways How Tokyo’s Subways Inspired the Paris RER (Interconnection with SNCF Suburban Lines) Louis Sato and Philippe Essig Introduction Original Master Plan in 1965 for RER A and Sceaux Line Extended to Châtelet (Les Halles) Station Each time a new idea prevails, the initial Cergy Pontoise Valmondois difficulties are forgotten fairly quickly. In (Second north–south axis) le Bourget Montesson (First north–south axis) town planning and transportation, it is always difficult to design and execute a Saint-Germain RER A project that alters long-established la Defense practices. However, during the last 30 Etoile Auber Châtelet Fontenay years, many metropolises worldwide Bry-sur-Marne Nation RER A Luxembourg Noisy-le-Grand have seen revolutions in the fields of Gare de Lagny Meaux transportation and urban traffic. Lyon This article recalls the situation 30 years Trappes (Second north–south axis) ago when a study of the Tokyo subway guided the design of the central station of Robinson Evry the Paris RER. (First north–south axis) Boissy St-Leger Paris Urban Network (Sceaux Line) in Early 70s In 1970, the Paris urban railway network was based on principles dating back to the 1972 New RER Concept turn of the century when the Paris metro was built. Commuter trains of French Ville Nouvelle National Railways (SNCF) terminated de Cergy Pontoise at the Paris stations of Saint-Lazare, Orry-la-Ville Aeroport Montparnasse, Austerlitz, Lyon, Est and Roissy CDG Nord and there was no line crossing Paris. The same situation applied to the Régie RER D Mitry-Claye Autonome des Transports Parisiens (RATP) Sceaux commuter line serving the southern suburbs, which stopped at Luxembourg RER B Poissy RER A Station.
    [Show full text]
  • Grands Travaux Été 2021 Guide D
    GUIDE D’ACCOMPAGNEMENT GRANDS TRAVAUX ÉTÉ 2021 DU 15 JUILLET AU 21 AOÛT INCLUS PONTOISE St-Ouen L’Aumône St-Ouen L’Aumône Liesse Pierrelaye Montigny Beauchamp Franconville - Le Plessis-Bouchard Cernay Ermont-Eaubonne St-Gratien Épinay-sur-Seine Gennevilliers Les Grésillons Aucun RER C / Gares ouvertes St-Ouen Aucun RER C / Gares fermées Porte de Clichy Départ et terminus des trains Péreire Levallois Neuilly Porte Maillot Avenue Foch Avenue Henri Martin Boulainvilliers Avenue du Président Kennedy Pont deInvalides l’Alma MUSÉE D’ORSAY Saint-Michel-Notre-Dame Champ de Mars PARIS AUSTERLITZ Javel Tour Eiffel Pont du Garigliano Bibliothèque François Mitterrrand VERSAILLES CHÂTEAU Issy Val de Seine Ivry-sur-Seine RIVE GAUCHE Porchefontaine Issy Meudon Vitry-sur-Seine St-Cyr Val Fleury VERSAILLES Viroflay Chaville Rive Gauche Vélizy CHANTIERS Les Ardoines Petit Jouy ST-QUENTIN Les Loges EN-YVELINES Vauboyen Jouy-en-Josas Choisy-le-Roi Rungis PONT DE RUNGIS Chemin La FraternelleAÉROPORTORLY D’ORLY VILLE Bièvres d’Antony Les Saules Massy Verrières Igny Villeneuve-le-Roi Ablon MASSY Longjumeau PALAISEAU Athis Mons Chilly Mazarin Juvisy Gravigny-Balizy Savigny-sur-Orge Petit Vaux + D’INFORMATIONS appli Île-de-France Mobilités SAINT-MARTIN D’ÉTAMPES DOURDAN transilien.com Assistant SNCF maligneC.transilien.com agents SNCF SOMMAIRE LE PROGRAMME DES TRAVAUX D’ÉTÉ LES CONSÉQUENCES SUR VOS DÉPLACEMENTS 5 DES ITINÉRAIRES BIS 6 VOTRE APPLI MA LIGNE C 16 LES DISPOSITIFS D’ACCOMPAGNEMENT LA COMMUNICATION DIGITALE 18 LA COMMUNICATION EN GARE 19 PRENEZ LE BON TRAIN 20 VOS HORAIRES 24 INFORMATIONS UTILES TITRES DE TRANSPORT 35 TRAVAUX SUR LES AUTRES LIGNES 37 NOS CONSEILS POUR VOS ITINÉRAIRES TOURISTIQUES 38 NOS CONSEILS POUR REJOINDRE LES GARES ET AÉROPORTS 42 FOIRE AUX QUESTIONS 46 2 LE PROGRAMME DES TRAVAUX D’ÉTÉ Le confort et la sécurité de nos voyageurs qui empruntent le RER C sont une priorité.
    [Show full text]
  • Schéma De Principe Du RER D Devrait Inter- Venir En Même Temps Lors Du Service Annuel 2014, Et Ce, Tout De Suite Avec 16 Arrêts À Pompadour
    SCHÉMA DE PRINCIPE RER D M a i 2 0 0 9 SCHÉMA DE PRINCIPE RER D >SCHÉMA DIRECTEUR RER D >SCHÉMA DIRECTEUR RER C SOMMAIRE CHAPITRE 1 CONTEXTE .........................p.7 CHAPITRE 2 LA MISE EN ŒUVRE DU SCHÉMA DIRECTEUR ...................... p.55 CHAPITRE 3 PRÉSENTATION DU PROJET ........................p.71 HAPITRE LA SUITE DU SCHÉMA DIRECTEUR : C 4 LES HORIZONS 2015 > 2020 ET AU-DELÀ ........................p.89 CHAPITRE 5 LES PROJETS CONNEXES ........................p.97 HAPITRE LES ENJEUX LIÉS À L’ENVIRONNEMENT C 6 DU PROJET ......................p.113 CHAPITRE 7 INTÉRÊT SOCIO ÉCONOMIQUE DU PROJET ......................p.119 CHAPITRE 8 CALENDRIER PRÉVISIONNEL ......................p.137 5 >SCHÉMA DIRECTEUR RER D CHAPITRE 1 PRÉSENTATION DU SECTEUR 9 CONTEXTE RÉSEAU ET OFFRES DE TRANSPORT 21 ANALYSE DES DÉPLACEMENTS 31 LA LIGNE D 35 LES FRAGILITÉS DE LA LIGNE 42 >SCHÉMA DIRECTEUR RER D I. Contexte I.1- Présentation du secteur Le contexte du RER D a été étudié en 2005 par l’IAURIF (Institut d’Aménagement et d’Urbanisme de la Région Ile de France) dans le cadre de l’établissement du Schéma Directeur RER D. Cette étude avait pour objectif de : présenter les flux de déplacements entre grands secteurs de l’aire d’étude et d’échan- ges avec l’extérieur (143 communes), déterminer les grands enjeux de desserte de la ligne en termes de potentialité de marché sur 67 communes. Les bases de cette étude (recensement de population, enquêtes et analyses statistiques) sont encore d’actualité à ce jour ; l’étude IAURIF reste donc valable. Le prochain recensement est prévu en 2009. L’aire d’étude, correspondant à l’aire d’influence du RER D en Ile de France (c'est-à-dire les communes directement desservies et les communes limitrophes drainées par la ligne), comprend 143 communes.
    [Show full text]
  • Benefits of Punctuality for the Paris Suburban Railway Network
    THE ARTS This PDF document was made available from www.rand.org as a public CHILD POLICY service of the RAND Corporation. CIVIL JUSTICE EDUCATION Jump down to document ENERGY AND ENVIRONMENT 6 HEALTH AND HEALTH CARE INTERNATIONAL AFFAIRS The RAND Corporation is a nonprofit research NATIONAL SECURITY POPULATION AND AGING organization providing objective analysis and effective PUBLIC SAFETY solutions that address the challenges facing the public SCIENCE AND TECHNOLOGY and private sectors around the world. SUBSTANCE ABUSE TERRORISM AND HOMELAND SECURITY TRANSPORTATION AND INFRASTRUCTURE Support RAND WORKFORCE AND WORKPLACE Browse Books & Publications Make a charitable contribution For More Information Visit RAND at www.rand.org Explore RAND Europe View document details Limited Electronic Distribution Rights This document and trademark(s) contained herein are protected by law as indicated in a notice appearing later in this work. This electronic representation of RAND intellectual property is provided for non- commercial use only. Permission is required from RAND to reproduce, or reuse in another form, any of our research documents for commercial use. This product is part of the RAND Corporation technical report series. Reports may include research findings on a specific topic that is limited in scope; present discus- sions of the methodology employed in research; provide literature reviews, survey instruments, modeling exercises, guidelines for practitioners and research profes- sionals, and supporting documentation; or deliver preliminary findings. All RAND reports undergo rigorous peer review to ensure that they meet high standards for re- search quality and objectivity. Benefits of Punctuality Improvements for the Paris Suburban Railway Network Eric Kroes, Hugues Duchateau, Laurence Phillipart, Marco Kouwenhoven Prepared for the Syndicat des Transports d’lle de France The research described in this report was prepared for the Syndicat des Transports d’Ilse de France.
    [Show full text]
  • Forfaits Tickets
    w Forfaits Navigo Forfaits Tickets et tickets POUR TOUS JEUNES TICKET T+ CARTE SCOLAIRE BUS LIGNES Pour un trajet sur la totalité des réseaux rer dans Paris, métro, RÉGULIÈRES tramway, funiculaire, bus et T Zen. Transports en Île-de-France POUR TOUS JEUNES Abonnement annuel pour un aller-retour par jour de classe Ticket t+ entre le domicile et l’établissement scolaire. À l’unité 1,90 € NAVIGO IMAGINE R ÉTUDIANT Carte scolaire bus lignes régulières Tarifs applicables Carnet de 10 14,50 € er Prix variable selon le département au 1 août 2016 Forfait valable toute l’année destiné aux étudiants de moins Sous réserve du respect de certaines conditions SEMAINE • MOIS • ANNUEL Carnet de 10 (tarif réduit) 7,25 € et la distance parcourue Forfaits valables une semaine (du lundi au dimanche) pour de 26 ans. Navigo Semaine, un mois (du premier au dernier jour du mois) IMAGINE R ÉTUDIANT pour Navigo Mois ou un an, par tacite reconduction (payable TICKET D’ACCÈS À BORD TICKET JEUNES WEEK-END Tous les zonages sont concernés par prélèvements mensuels ou au comptant) pour Navigo Annuel. Pour un seul trajet en bus, sans correspondance. Forfait valable une journée de façon illimitée selon les zones 1-2, 1-3, 1-4, 1-5 choisies (samedi, dimanche ou jour férié) pour les jeunes de 333,90 € Ticket d’accès à bord NAVIGO NAVIGO NAVIGO 2-3, 2-4, 2-5 « Toutes zones » moins de 26 ans. SEMAINE MOIS ANNUEL *** Vendu à l’unité uniquement dans les bus 2 € 3-4, 3-5 Zones Les zonages concernés 4-5 1-3 4 € 1-2, 1-3, 1-4, 1-5 22,15 € 73,00 € 803,00 € TICKET « ORIGINE-DESTINATION » Tarif public hors frais de dossier (8 € par an).
    [Show full text]
  • How to Come To
    ROAD ACCESS HBI HEADQUARTER 26 Bis Rue de l’Ermitage, 95160 Montmorency +33 1 39 34 66 00 TAXI From Charles de Gaulles Airport : 40 minutes drive (without traffic jam), ask the taxi driver to take the road by LA CROIX VERTE (see the map). Price estimation: 70 Euros. From Paris Center : 50 minutes drive (without traffic jam). Price estimation: 50-90 Euros. You will find plenty of taxi waiting at the exit of airports and train station. Expect 10 min queue, some- times more. In downtown Paris, taxis rarely stop unless you wait at taxi stations around the main roads. Unfortunately the Parisian Taxis have a bad reputation which is sometimes justified. Make sure they start the clock when you get in the taxi. You might also have to make sure that they accept credit card payment before you get in. If you want to avoid surprises, you can book a taxi in advance, you can contact: • UBER (https://www.uber.com/) • TAXI G7 (+33 1 41 27 66 99) • Taxi Serge on behalf of HBI (+33 6 07 52 99 67). ENTRANCE HBI HEADQUARTER This is what the entrance from rue de L’Ermitage looks like. Please drive down the alley, there is a parking lot where cars can turn around down the road. TRAIN ACCESS HBI HEADQUARTER 26 Bis Rue de l’Ermitage, 95160 Montmorency +33 1 39 34 66 00 HOW TO BUY A TICKET ? Go to a blue automatic ticket machine. Get a ticket Ile-de-France. You have to type your destination station (Enghien-Les-Bains) The ticket is valid for 1 journey from anywhere in Paris to that destination station.
    [Show full text]
  • Railways and Large Urban Development on the Paris Left Bank Alain Boudon
    Feature Redevelopment of Railway Sites Railways and Large Urban Development on the Paris Left Bank Alain Boudon To give more balance to the eastern side the minimum necessary for rail • Service tracks for train formation and of Paris, in 1988, the local government operations, and to permit construction of preparation launched preliminary development plans structures over railway lines, thereby • Main track for the south-eastern section of the city creating a new cityscape not divided by • A maintenance shop for passenger on the left bank of the River Seine. track. In other words, it was decided that rolling stock Due to the importance of railway lands in rail infrastructure can be compatible with • Railway housing and social facilities this part of the city and to protect assets the urban environment as long as the • Service buildings needed by the railway for its operations, railway does not occupy the entire space the city authorities and the French National in high-density areas. SNCF agreed to the long-term transfer of Railways (SNCF) decided to work closely about 20 ha at ground level and 30 ha together from the early planning stages. above ground (over tracks). The first studies explored numerous The Project alternatives dealing with fundamental considerations, such as configuration of The urban planning project extends 2.5 km Project Organization public space, management of railway along the Seine and encompasses 130 ha operations in rail corridors, and the future or 1.2% of the total area of the city. The A partnership was established between the cityscape along the Seine.
    [Show full text]