Auxiliary Interstate Highway • 1-10 to I-19

Total Page:16

File Type:pdf, Size:1020Kb

Auxiliary Interstate Highway • 1-10 to I-19 Casa Auxiliary Interstate Highway • 1-10Grande to I-19 An economic catalyst poised for growth in the Sonoran Desert Pinal County Many potential economic centers wait for the right elements to fall into 11 10 place to begin development. The Sonoran Corridor area is an already UPRR Marana vibrant economic region. This link will accelerate its future as a national Oro Valley economic powerhouse. 10 Saguaro Ironwood National The assets already in place: Forest Park National Monument Tucson Mountain Tucson • Rail lines east and west Park Tohono O’odham Nation BOR Wildlife 11 Mitigation Corridor • Rail service south to and from Mexico 19 UPRR 10 86 • National and international air service at Tucson International Airport 11A San Xavier District 10 • Raytheon Missile Systems Tohono O’odham Nation • University of Arizona Science and Tech Park with almost 2,000,000 11 Sahuarita square feet of high-tech office, R&D and laboratory facilities Pima County 19 Green Valley • The Port of Tucson, Arizona’s largest intermodal center SONORAN UPRR • Interstate highway access west, east and south to Mexico (less than 60 CORRIDOR miles away) Bridges U.P.R.R Bioscience • Land identified, planned and zoned for commercial and industrial 19 Tubac development (without residential impact), including the future Aerospace/Defense Research and Business park Santa Cruz County AJO WAY Rio Rico The remaining link... 19 is this Auxiliary Interstate Highway, a high-speed, limited-access corridor Nogales 130612 ARC G2 V000-PCC that connects this area with19 I-19 to the west and I-10 to the east. The project has already received local support with over $17 million of funds The Auxiliary Highway is a critical transportation link and economic catalyst spent and committed from Pima County and its regional partners. for southern Arizona’s growth in the coming decades. Port of Tucson VALENCIA ROAD ALVERNON WAY ALVERNON Tucson Intl. Airport ROAD SWAN RAIL AIR U.P.R.R VALENCIA ROAD U.P.R.R Tech Parks KOLB ROAD Arizona Raytheon SURFACE Raytheon Buffer Expansion Future Aerospace / 510 Defense Research 10 and Business Park 16 Miles AUXILIARY INTERSTATE I-10 / I-19 I-10 INTERSTATE AUXILIARY U.P.R.R 19 ROAD WILMOT Auxiliary Interstate Highway I-10 to I-19 In addition to attracting new development, the economic benefits include easy access to suppliers and logistics centers to the more NOGALES HIGHWAY PIMA MINE ROAD than 220 existing defense and aerospace companies already in the region. 293 - Auxiliary Interstate Highway I10 - I19.indd 11 19 SAHUARITA ROAD SAHUARITA ROAD 11 11 19 The project takes advantage of the labor force and other economic assets • Access to existing residential communities with affordable housing and strong infrastructures in place • Existing Foreign Trade Zone • The University of Arizona, one of the top ranked research universities in the United States Tucson International has 3 active runways, the longest of which is In addition to attracting new development, consider the economic over 11,000 feet. It has full 24-hour port of entry facilities for both benefits of easy access to suppliers and logistics centers to the more cargo and passengers, including customs and immigration services. than 220 existing defense and aerospace companies already located in the region. Transportation benefits An additional benefit accrues immediately on project completion. It will relieve the current overburdened I-10 / I-19 transition which is projected to overwhelm the current infrastructure by 2020. Commercial trucks traveling between I-19 and I-10 will save 10.8 miles per vehicle per trip and with projected volumes of 1600 daily trips, total fuel savings alone are estimated at approximately $20,000 per day and Arizona’s largest port of entry, Mariposa, is less than 60 miles to growing. the south. The I-19 / I-10 route already handles high volumes of imported and exported goods. Trade projections show a rapidly Request increasing volume in the next decades. With significant local resources already committed, we’re asking for a designation as an Auxiliary Highway from I-10 to I-19, which will enable Federal and State assistance for implementation. The Traffic Case Projected traffic volumes through the current interchange system will rapidly become unmanageable without this projected Auxiliary Interstate Highway. The Port of Tucson is the largest intermodal center in the state and highlights the area’s flexibility in transportation. Rail, air, or truck TANGERINETANGERINE RD. RD. TANGERINEservicesTANGERINE RD. are RD. available in a conveniently concentrated area. S S SI SI IL IL LV LV 2011 V V 2030 E E ER ER RB RB B B E E E 10E 10 L 10L 10 L L L L INA RD.INA RD. L L INA RD.INA RD. R R R R D D D D . ORANGEORANGE GROVE GROVERD. RD. ORANGEORANGE GROVE GROVERD. RD. EL CMO.EL DEL CMO. CERRO DEL CERRO EL CMO.EL DEL CMO. CERRO DEL CERRO CONGRESSCONGRESS CONGRESSCONGRESS TO 22NDTO 22ND ST ST TO 22NDTO 22ND ST ST IRONWOODIRONWOOD HILLS HILLSGRANT GRANTRD. RD.175,000175,000 IRONWOODIRONWOOD HILLS HILLS GRANT GRANTRD. 290,000RD. 290,000 SPEEDWAYSPEEDWAY BLVD. BLVD. INTERSTATEINTERSTATE 10 10 INTERSTATEINTERSTATE 10 10 SPEEDWAYSPEEDWAY BLVD. BLVD. TO TOAJO AJO WAY WAY 22ND. ST.22ND. ST. VALENCIAVALENCIA TO TO TO TOAJO AJO WAY WAY 22ND. ST.22ND. ST. VALENCIAVALENCIA TO TO CRAYCROFTCRAYCROFT CRAYCROFTCRAYCROFT 90,00090,000 52,00052,000 254,000254,000 ALVERNON WAY ALVERNON WAY 225,000225,000 ALVERNON WAY ALVERNON WAY VALENCIAVALENCIA RD. RD. VALENCIAVALENCIA RD. RD. KOLB RD. KOLB RD. KOLB RD. KOLB RD. AJO WAY.AJO WAY. T.I.A. T.I.A. AJO WAY.AJO WAY. T.I.A. T.I.A. MISSION RD. MISSION RD. MISSION RD. MISSION RD. WILMOT RD. WILMOT RD. WILMOT RD. WILMOT RD. CRAYCROFT RD. CRAYCROFT RD. CRAYCROFT RD. CRAYCROFT RD. 19 19 10 10 19 19 10 10 HOUGHTON RD. HOUGHTON RD. HOUGHTON RD. HOUGHTON RD. SAHUARITASAHUARITA RD. RD. SAHUARITASAHUARITA RD. RD. 293 - Auxiliary Interstate Highway I10 - I19.indd 0 0 5 5 10 10 SCALE SCALEIN MILES IN MILES.
Recommended publications
  • Transportation/4
    TRANSPORTATION/4 4.1/OVERVIEW Like the rest of the City, Biloxi’s transportation system was The City of Biloxi is in a rebuilding mode, both to replace aging profoundly impacted by Hurricane Katrina. Prior to Hurricane infrastructure and to repair and improve the roadways and fa- Katrina, the City was experiencing intensive development of cilities that were damaged by Katrina and subsequent storms. coastal properties adjacent to Highway 90, including condo- - minium, casino, and retail projects. Katrina devastated High- lowing reconstruction of U.S. Highway 90, the Biloxi Bridge, way 90 and other key transportation facilities, highlighting andPre-Katrina casinos. traffic Many volumes transportation and congestion projects haveare in returned progress fol or Biloxi’s dependence on a constrained network of roadways under consideration, providing an opportunity for coordinat- and bridges connecting to inland areas. ed, long-range planning for a system that supports the future The City of Biloxi operated in a State of Emergency for over land use and development pattern of Biloxi. In that context, two years following Hurricane Katrina’s landfall on August 29, the Transportation Element of the Comprehensive Plan lays 2005. Roadway access to the Biloxi Peninsula is provided by out a strategy to develop a multi-modal system that improves Highway 90 and Pass Road from the west and by three key mobility and safety and increases the choices available to resi- bridges from the east and north: Highway 90 via the Biloxi dents and visitors to move about the City. Bay Bridge from Oceans Springs and I-110 and Popp’s Ferry Road over Back Bay.
    [Show full text]
  • Florida Traveler's Guide
    Florida’s Major Highway Construction Projects: April - June 2018 Interstate 4 24. Charlotte County – Adding lanes and resurfacing from south of N. Jones 46. Martin County – Installing Truck Parking Availability System for the south- 1. I-4 and I-75 interchange -- Hillsborough County – Modifying the eastbound Loop Road to north of US 17 (4.5 miles) bound Rest Area at mile marker 107, three miles south of Martin Highway / and westbound I-4 (Exit 9) ramps onto northbound I-75 into a single entrance 25. Charlotte County – Installing Truck Parking Availability System for the SR 714 (Exit 110), near Palm City; the northbound Rest Area at mile marker point with a long auxiliary lane. (2 miles) northbound and southbound Weigh Stations at mile marker 158 106, four miles south of Martin Highway /SR 714 (Exit 110) near Palm City; the southbound Weigh-in-Motion Station at mile marker 113, one mile south of 2. Polk County -- Reconstructing the State Road 559 (Ex 44) interchange 26. Lee County -- Replacing 13 Dynamic Message Signs from mile marker 117 to mile marker 145 Becker Road (Exit 114), near Palm City; and the northbound Weigh-in-Motion 3. Polk County -- Installing Truck Parking Availability System for the eastbound Station at mile marker 92, four miles south of Bridge Road (Exit 96), near 27. Lee County – Installing Truck Parking Availability System for the northbound and westbound Rest Areas at mile marker 46. Hobe Sound and southbound Rest Areas at mile marker 131 4. Polk County -- Installing a new Fog/Low Visibility Detection System on 47.
    [Show full text]
  • Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
    Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate.
    [Show full text]
  • The Interstate Highway System Turns 60
    The Interstate Highway System turns 60: Challenges to Its Ability to Continue to Save Lives, Time and Money JUNE 27, 2016 202-466-6706 tripnet.org Founded in 1971, TRIP ® of Washington, DC, is a nonprofit organization that researches, evaluates and distributes economic and technical data on surface transportation issues. TRIP is sponsored by insurance companies, equipment manufacturers, distributors and suppliers; businesses involved in highway and transit engineering and construction; labor unions; and organizations concerned with efficient and safe surface transportation. Executive Summary Sixty years ago the nation embarked on its greatest public works project, the construction of the Interstate Highway System. President Dwight D. Eisenhower provided strong support for the building of an Interstate Highway System that would improve traffic safety, reduce travel times and improve the nation’s economic productivity. Serving as the most critical transportation link in the nation’s economy, the Interstate Highway System has significantly improved the lives of U.S. residents and visitors. Throughout the nation, the Interstate system allows for high levels of mobility by greatly reducing travel times and providing a significantly higher level of traffic safety than other routes. But 60 years after President Eisenhower articulated a vision for the nation’s transportation system, the U. S. again faces a challenge in modernizing its aging and increasingly congested Interstate highway system. If Americans are to continue to enjoy their current level of personal and commercial mobility on Interstate highways and bridges, the nation will need to make a commitment to identifying a long-term funding source to support a well-maintained Interstate Highway System able to meet the nation’s need for additional mobility.
    [Show full text]
  • Interstate 10 Western Connected Freight Corridor, Volume 2: Planning Framework
    SPR-752 MAY 2019 Interstate 10 Western Connected Freight Corridor, Volume 2: Planning Framework Arizona Department of Transportation Research Center Interstate 10 Western Connected Freight Corridor, Volume 2: Planning Framework FHWA Transportation Pooled Fund 5-348 SPR-752 May 2019 Prepared by: Allan Rutter, Ed Seymour, and Roberto Macias Texas A&M Transportation Institute 3135 TAMU, College Station, Texas 77845 Mark Jensen and Daniel Stock Cambridge Systematics 2715 Southview Avenue Arroyo Grande, California 93420 Published by: Arizona Department of Transportation 206 South 17th Avenue Phoenix, Arizona 85007 In cooperation with U.S. Department of Transportation Federal Highway Administration This report was funded in part from the Federal Highway Administration, US Department of Transportation. The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the data, and for the use or adaptation of previously published material, presented herein. The contents do not necessarily reflect the official views or policies of the Arizona, California, New Mexico, and Texas Departments of Transportation or the Federal Highway Administration, US Department of Transportation. This report does not constitute a standard, specification, or regulation. Trade or manufacturers’ names that may appear herein are cited only because they are considered essential to the objectives of the report. The US government and the States of Arizona, California, New Mexico, and Texas do not endorse products or manufacturers.
    [Show full text]
  • Segment Four Final.Pdf
    AtAscosA BexAr Frio GuAdAlupe lA sAlle MedinA WeBB Wilson ZApAtA i-35 CORRIDOR cotullA lAredo peArsAll sAn Antonio seGuin st HedWiG seGMENT 4 recoMMENDATIONS sAn Antonio/ BexAr county Mpo Laredo urban trAnsportAtion study GreAter sAn Antonio cHAMBer oF coMMerce seGuin cHAMBer oF coMMerce soutH sAn INTERSTATE Antonio cHAMBer oF 35 coMMerce texAs FArM BureAu INTRODUCTION In 2007, the Texas Department of Transportation (TxDOT) recognized the need for the regular and systematic input of citizen planners to help determine the future of the I-35 corridor. In response, the I-35 Corridor Advisory Committee was created by the Texas Transportation Commission, bringing together a group of independent Texas citizens interested in the future of the corridor. These indi- viduals, representing their regions, provide TxDOT with a citizen’s view of how the corridor should be developed. After a period of intense collaboration, the I-35 Corridor Advisory Commit- tee issued the Citizens’ Report on the Current and Future Needs of the I-35 Corridor in November 2008. Their report concluded that the existing capacity on I-35 was insufficient to meet future mobility demands, that additional capacity would be needed within the corridor, and that more community involvement was needed in planning the I-35 corridor. The Texas Transportation Commission agreed it was time for even more public input into the planning process, and called for a citizen- directed effort starting at the local level. OKLAHOMA In March 2009, the Texas Transportation Commission es- tablished four I-35 Corridor Segment Committees to assist 1 ¨¦§30 Ft Worth Dallas the Corridor Advisory Committee.
    [Show full text]
  • Analysis of the Interstate 10 Twin Bridge's Collapse During
    Analysis of the Interstate 10 Twin Bridge’s Collapse During Hurricane Katrina By Genda Chen, Emitt C. Witt III, David Hoffman, Ronaldo Luna, and Adam Sevi The Interstate 10 Twin Span Bridge over Lake Pontchartrain north of New Orleans, La., was rendered completely unusable by Hurricane Katrina. The cause of the collapse of the bridges generated great interest among hydrologists and structural engineers as well as among the general public. What made this case study even more important was the fact that two nearby the failure bridges sustained the effects of the same of the Interstate 10 (I-10) storm surge and suffered only light Twin Span Bridge over Lake damage. Lessons learned from this Pontchartrain. Figure 1 shows investigation are invaluable to the I-10 twin bridges and the maintaining the safety of many relationship of the approach’s of the Nation’s coastal and low causeways on both sides river-crossing bridges. of the navigation channel’s high main span. It was determined that air Introduction trapped beneath the deck of the I-10 On October bridges was a major 7, 2005, the contributing factor U.S. Geological to the bridges’ Survey’s (USGS) collapse. This Mid-Continent finding was well Geographic Science supported by Center partnered evidence observed with the University in nearby bridges of Missouri-Rolla that suffered little or (UMR) Natural Hazards no damage. Mitigation Institute to send A similar issue was a reconnaissance team to the noted by engineers during areas around New Orleans, La., the 1993 flooding of the that were damaged by Hurricane Mississippi River.
    [Show full text]
  • Texas DPS COVID-19 Tracker 05.25.21
    Texas DPS COVID-19 Tracker 05.25.21 Distance to Alternate EC Enrollment Center Status Nearest EC Address HOO of Alternate Location Column1 Abilene, TX-N 10th St Open Allen, TX-Central Expy S Open Alpine, TX-W Sul Ross Ave Open Amarillo, TX-SW 7th Ave Open Amarillo, TX-W Interstate 40 Open Arlington, TX-Avenue H E Open Arlington, TX-E Lamar Blvd Open Austin, TX-E Highway 290 Open Austin, TX-E Huntland Dr Open Austin, TX-W Highway 71 Open Baytown, TX-East Fwy Open Beaumont, TX-Eastex Fwy Open Beeville, TX-E Houston St Open Big Spring, TX-Scurry St Open Brady, TX-W 11th St Open Brownfield, TX-1201 Tahoka Rd Open Brownfield, TX-212 Tahoka Rd Open Brownsville, TX-Padre Island Hwy Open Brownwood, TX-Highway 377 S Open Carthage, TX-SE Loop Open Childress, TX-Ave B NE Open College Station, TX-Texas Ave S Open Converse, TX-Amendment Way Open Copperas Cove, TX-E Business 190 Open Corpus Christi, TX-1620 S Padre Island Dr Open Corpus Christi, TX-McArdle Rd Open Corsicana, TX-W 6th Ave Open Crockett, TX-E Loop 304 Open Crowley, TX-E Main St Open Dallas, TX-12801 N Central Expy Open Dallas, TX-DFW Open Dallas, TX-E R L Thornton Fwy Open Dallas, TX-Empire Central Dr Open Dallas, TX-LBJ Service Rd Open Deer Park, TX-Center St Open Del Rio, TX-FM 2523 Open Denton, TX-S Interstate 35 E Open Dilley, TX-W FM 117 Open Eagle Pass, TX-Del Rio Blvd Open El Paso, TX-Viscount Blvd Open Flower Mound, TX-Churchill Dr Open Fort Stockton, TX-Interstate 10 W Open Fort Worth, TX-Shotts St Open Graham, TX-Elm St Open Greenville, TX-Stonewall St Open Gregory, TX-4th
    [Show full text]
  • US 70, Safford to New Mexico State Line | Interstate Detour Needs Study
    U.S. 70, Safford to New Mexico State Line Interstate Detour Needs Study Final Report December 2019 ADOT Contract # 17-171965 Task # MPD 00018-19 Prepared for: Prepared by: U.S. 70 Final Report TABLE OF CONTENTS 1.0 STUDY PURPOSE AND NEED ............................................................................................... 1 1.1 Introduction ........................................................................................................................ 1 1.2 Corridor Overview ............................................................................................................... 5 Location............................................................................................................................... 5 History: “The Old West Highway” ....................................................................................... 5 U.S. 70 Segment Description .............................................................................................. 5 1.3 I-10 Detour and Regional Impact ........................................................................................ 8 1.4 Detour Alternatives ............................................................................................................. 9 2.0 OVERVIEW OF APPROACH AND FINDINGS ............................................................................ 12 2.1 Data Sources ..................................................................................................................... 12 Summary of Previous Studies ..........................................................................................
    [Show full text]
  • Arizona Transportation History
    Arizona Transportation History Final Report 660 December 2011 Arizona Department of Transportation Research Center DISCLAIMER The contents of this report reflect the views of the authors who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Arizona Department of Transportation or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Trade or manufacturers' names which may appear herein are cited only because they are considered essential to the objectives of the report. The U.S. Government and the State of Arizona do not endorse products or manufacturers. Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA-AZ-11-660 4. Title and Subtitle 5. Report Date December 2011 ARIZONA TRANSPORTATION HISTORY 6. Performing Organization Code 7. Author 8. Performing Organization Report No. Mark E. Pry, Ph.D. and Fred Andersen 9. Performing Organization Name and Address 10. Work Unit No. History Plus 315 E. Balboa Dr. 11. Contract or Grant No. Tempe, AZ 85282 SPR-PL-1(173)-655 12. Sponsoring Agency Name and Address 13.Type of Report & Period Covered ARIZONA DEPARTMENT OF TRANSPORTATION 206 S. 17TH AVENUE PHOENIX, ARIZONA 85007 14. Sponsoring Agency Code Project Manager: Steven Rost, Ph.D. 15. Supplementary Notes Prepared in cooperation with the U.S. Department of Transportation, Federal Highway Administration 16. Abstract The Arizona transportation history project was conceived in anticipation of Arizona’s centennial, which will be celebrated in 2012. Following approval of the Arizona Centennial Plan in 2007, the Arizona Department of Transportation (ADOT) recognized that the centennial celebration would present an opportunity to inform Arizonans of the crucial role that transportation has played in the growth and development of the state.
    [Show full text]
  • State of Louisiana Evacuation Plan and Contraflow
    State of Louisiana Evacuation Plan / Contraflow Hurricane Evacuation Strategy The overall strategy of all Southeast Louisiana Parishes for dealing with a potential catastrophic hurricane is to evacuate as much of the risk population as possible from the path of the storm. Evacuees would then relocate to a place of relative safety outside the projected high water mark of the storm surge flooding and hurricane force winds. The New Orleans metropolitan area represents a difficult evacuation problem due to the large population and a road system for evacuation that is limited and susceptible to flooding. It has been estimated that it could take approximately 72 hours to evacuate most of this area. The public is encouraged to act in their best interest and voluntarily evacuate the high-risk areas before a recommended evacuation. If you plan to evacuate, leave as early as possible before hurricane gale force winds and storm surge cause road closings. Leaving early may also help you to avoid massive traffic jams encountered late in an evacuation effort. Listen to the radio and television for storm reports. An evacuation notice will be issued when a hurricane is forecasted to present a danger to the City. The timing of this notice will depend on the probability of landfall and the severity and forward speed of the storm. Louisiana Evacuation Plan The State of Louisiana Evacuation Plan goes into effect when any slow moving Category 3 and all Category 4 & 5 hurricanes pose a threat to our area. The goal of the State of Louisiana Evacuation Plan is to move everyone south of Interstate 10 to areas with higher elevation.
    [Show full text]
  • Interstate 80 Freight Corridor Analysis
    FINAL REPORT FHWA-WY- 09/09F Interstate 80 Freight Corridor Analysis Current Freight Traffic, Trends and Projections for WYDOT Policy-makers, Planning, Engineering, Highway Safety and Enforcement R Prepared by: & R&S Consulting S Consulting PO Box 302 Masonville, CO 80541 U.S. Department of Transportation Federal Highway Administration State of Wyoming Department of Transportation December 2008 Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document. The contents of this report reflect the views of the author(s) who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Wyoming Department of Transportation or the Federal Highway Administration. This report does not constitute a standard, specification or regulation. The United States Government and the State of Wyoming do not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report only because they are considered essential to the objectives of the document. Quality Assurance Statement The Federal Highway Administration (FHWA) provides high-quality information to serve government, industry, and the public in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement. ii Report No. FHWA – WY-09/09F Government Accession No. Recipients Catalog No.
    [Show full text]