Robe River Robe Is the Fourth Largest Seaborne Trader in Iron Ore Western Australia Processing Between 27 and 32 Million Tonnes Per Year

Total Page:16

File Type:pdf, Size:1020Kb

Robe River Robe Is the Fourth Largest Seaborne Trader in Iron Ore Western Australia Processing Between 27 and 32 Million Tonnes Per Year ROBE RIVER ROBE IS THE FOURTH LARGEST SEABORNE TRADER IN IRON ORE WESTERN AUSTRALIA PROCESSING BETWEEN 27 AND 32 MILLION TONNES PER YEAR. Robe River Iron Associates is a dynamic Australian joint venture In 1996 Robe purchased an MMD 1500 Series Twin Shaft Sizer fit- which is widely regarded as the worlds most cost effective, consis- ted with 4 Tooth heavy duty rotors. The sizer is powered by two 500 tent and reliable supplier of Iron Ore. It's major deposits, current- hp electric motors, each driving though a fluid coupling and MMD ly estimated at 3 to 4 billion tonnes, are found in Mesas stretching Heavy Duty Gearbox. This machine was designed to achieve the for 100 kilometres along specification demanded by Robe, which was to reduce the ROM ore the ancient Robe River from sizes up to 2.0 x 2.0 x 1.5 metres down to a nominal -300 mm, Valley in Western at an initial 6,000 tph but with a guaranteed output of 10,000 tph to Australia's Pilbara facilitate future expansion plans. The haul trucks which operate 24 Region. The mine is hours per day, 7 days a week, all year round, dump into the sizer sta- located 1,400 kilome- tion's 1200 tonne capacity hopper, then the apron feeder discharges tres north by road from Tipping ore into a 1200 tonne directly into the the state capital, Perth. dump hopper. MMD Sizer at a A 200 kilometre railroad controlled rate. A conveyor, running at 4 m/s, then transports connects the mine to the the nominal -300 mm product to the train loadout hoppers. Mesa A in 1973 port facilities at Cape The following are some of the benefits which have resulted Lambert. The ore is loaded into large capacity haul trucks by excava- due to Robes decision to install the MMD Sizer System:- tors, electric rope shovels and front end loaders at the face and trans- Less down time due to hold ups in the loadout system; Faster ported to the loadout station. Average haul distances are less than 2 loadout times with more even loading of rail cars giving a 5- kilometres, significantly lower than most large scale operations. To P&H 2100 Electric Rope shov- 10% gain in car capacity; Elimination of damage to the cars achieve greater ore handling efficiency by reducing the Run of Mine el loads a 190 tonne truck due to the impact of large lumps; Increased production cou- rock to a nominal minus 300 mm before being loaded on to the train, pled with a reduction in both maintenance and production the decision was taken in 1995 to install a Mineral Sizer at Mesa J. costs. These benefits indicate very significant overall cost Loading 100 tonne rail cars savings that fully justify the capital invested in the Sizer Problem and Solution Station by Robe. By the elimination of massive oversize lumps :- 1) Rail car capacity increased by 5-10% 2) Damage and hang ups at loadout eliminated 3) Damaged rail cars eliminated 4) Damage at port handling facilities eliminated 5) Primary crushing at port eliminated Maintenance costs slashed Why not contact MMD A 200 car, 20,000 tonne payload on its way to Robes port facilities at Cape Lambert, crosses the Fortescue River bridge spanning 360 metres. World Leaders in Mineral Sizers Sizing Minerals Around the World Loading System Short haul Truck and Shovel. Dump Hopper Capacity, 1,200 tonnes ROM ore. Conveyor Conveys ore from sizer to train loadout hopper. Apron Feeder Capacity 9.8 metres long 6,000 tph. 2.4 metres wide. Belt width Capacity 1.6 metres 10,000 tph. future 1.8m Mineral Sizer 10,000 tph. Sizes ROM ore to Mesa J nominal -300mm. Loadout MMD 1500 Series Hopper Twin Shaft Sizer capacity 4 tooth rotors 5,000 tonnes. double drive. Twin Feeder Guaranteed capacity capacity 7,000 tph. 10,000 tph. MMD Sizer MMD Sizer 1500 Series (see inset) 4 tooth rotors 10,000 tph Dump Hopper capacity 1,200 tonnes RAIL LOADOUT SIZER Conveyor STATION current capacity 6,000 tph future capacity 10,000 tph Loadout Hopper capacity 5,000 tonnes (c) 1999 The MMD Group of Companies All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, transmitted by any means, electronic, mechanical, photocopying, or otherwise, without the prior permission of the publisher. Mine Sizing Facilities MMD Group Head office, Cotes Park Lane, Cotes Park Industrial Estate, Somercotes, Derbyshire. DE55 4NJ Tel +44 (0)1773 835533 Fax +44 (0)1773 837818 e-mail [email protected] Canada USA United Kingdom India Australia Tel +1 403 799 4600 Tel +1 423 977 6600 Tel +44 1773 835533 Tel +91 44 828 0778 Tel +61 242 718011 Fax +1 403 791 5178 Fax +1 423 977 4306 Fax +44 1773 837818 Fax +91 44 828 0725 Fax +61 242 718314 [email protected] [email protected] [email protected] [email protected] [email protected] China Europe South Africa South East Asia South America Tel +86 106 762 1056 Tel +44 1773 835533 Tel +27 11 826 2491 Tel +66 2636 1976 Tel +55 021 262 5115 Fax +86 106 762 0926 Fax +44 1773 837818 Fax +27 11 826 6487 Fax +66 2636 1980 Fax +55 021 220 5479 [email protected] [email protected] [email protected] [email protected] [email protected].
Recommended publications
  • Ministerial Decisions at at 12 October 2018
    MINISTERIAL DECISIONS AS AT OCTOBER 2020 Recently received Awaiting decision pursuant to section 45(7) of Pending submission to Pending decision by Ministerial decision the Environmental Protection Act 1986 Minister for Aboriginal Affairs Minister for Aboriginal Affairs APPLICANT / MINISTERIAL LAND PURPOSE LANDOWNER DECISION September 2020 Lot 140 on DP 39512, CT 2227/905, 140 South Western Highway, Land Act No. 11238201, Lot 141 on DP 39512, CT 2227/906, 141 South Western Highway, Land Act No. 11238202, 202 Vittoria Road, Land Act No. 11891696, Glen Iris. Pending Intersection Vittoria Road Lot 201 on DP 57769, CT 2686/979, 201 submission to Main Roads South Western Highway South Western Highway, Land Act No. Minister for Western Australia upgrade and Bridge 0430 11733330, Lot 202 on DP 56668, CT Aboriginal Affairs replacement, Picton. 2754/978, Picton. Road Reserve, Land Act No.s 1575861, 11397280, 11397277, 1347375, and 1292274. Unallocated Crown Land, South Western Highway, Land Act No.s 11580413, 1319074 and 1292275, Picton. Pending Fortifying Mining Pty Ltd – Tenements M25/369, P25/2618, submission to Fortify Mining Pty Majestic North Project. To P25/2619, P25/2620, and P25/2621, Minister for Ltd undertake exploration and Goldfields. Aboriginal Affairs resource delineation drilling Reserve 34565, Lot 11835 on Plan Pending 240379, CT 3141/191, Coode Street, Landscape enhancement submission to City of South South Perth, Land Act No. 1081341 and and river restoration. To Minister for Perth Reserve 48325, Lot 301 on Plan 47451, construct the Waterbird Aboriginal Affairs CT 3151/548, 171 Riverside Drive, Land Refuge Act No. 11714773, Perth Pending Able Planning and Lot 501 on Plan 23800, CT 2219/673, submission to Lot 501 Yalyalup Urban Project 113 Vasse Highway, Yalyalup, Land Act Minister for Subdivision.
    [Show full text]
  • Port Related Structures on the Coast of Western Australia
    Port Related Structures on the Coast of Western Australia By: D.A. Cumming, D. Garratt, M. McCarthy, A. WoICe With <.:unlribuliuns from Albany Seniur High Schoul. M. Anderson. R. Howard. C.A. Miller and P. Worsley Octobel' 1995 @WAUUSEUM Report: Department of Matitime Archaeology, Westem Australian Maritime Museum. No, 98. Cover pholograph: A view of Halllelin Bay in iL~ heyday as a limber porl. (W A Marilime Museum) This study is dedicated to the memory of Denis Arthur Cuml11ing 1923-1995 This project was funded under the National Estate Program, a Commonwealth-financed grants scheme administered by the Australian HeriL:'lge Commission (Federal Government) and the Heritage Council of Western Australia. (State Govenlluent). ACKNOWLEDGEMENTS The Heritage Council of Western Australia Mr lan Baxter (Director) Mr Geny MacGill Ms Jenni Williams Ms Sharon McKerrow Dr Lenore Layman The Institution of Engineers, Australia Mr Max Anderson Mr Richard Hartley Mr Bmce James Mr Tony Moulds Mrs Dorothy Austen-Smith The State Archive of Westem Australia Mr David Whitford The Esperance Bay HistOIical Society Mrs Olive Tamlin Mr Merv Andre Mr Peter Anderson of Esperance Mr Peter Hudson of Esperance The Augusta HistOIical Society Mr Steve Mm'shall of Augusta The Busselton HistOlical Societv Mrs Elizabeth Nelson Mr Alfred Reynolds of Dunsborough Mr Philip Overton of Busselton Mr Rupert Genitsen The Bunbury Timber Jetty Preservation Society inc. Mrs B. Manea The Bunbury HistOlical Society The Rockingham Historical Society The Geraldton Historical Society Mrs J Trautman Mrs D Benzie Mrs Glenis Thomas Mr Peter W orsley of Gerald ton The Onslow Goods Shed Museum Mr lan Blair Mr Les Butcher Ms Gaye Nay ton The Roebourne Historical Society.
    [Show full text]
  • The Role of Managed Aquifer Recharge in Developing Northern Australian Agriculture CASE STUDIES to DETERMINE the ECONOMIC FEASIBILITY
    Managed Aquifer Recharge ISSN 2206-1991 Volume 2 No 3 2017 https://doi.org/10.21139/wej.2017.029 THE ROLE OF MANAGED AQUIFER RECHARGE IN DEVELOPING NORTHERN AUSTRALIAN AGRICULTURE CASE STUDIES TO DETERMINE THE ECONOMIC FEASIBILITY R Evans, L Lennon, G Hoxley, R Krake, D Yin Foo, C Schelfhout, J Simons ABSTRACT more economically attractive for horticulture production. Managed aquifer recharge (MAR) is a commonly used technique in many countries to artificially increase the INTRODUCTION This paper describes a study to consider the role recharge rate over the wet season and hence increase of MAR in developing irrigated agriculture in the the groundwater storage available during the dry season. Northern Territory (Daly catchment and Central Considering northern Australia’s long dry season and Australia) and the Pilbara in Western Australia. The relatively short wet season, MAR has the potential to play fundamental advantages of MAR based developments a major role in water resource development. over conventional water sources (typically large dams) Shallow weirs, infiltration trenches and injection bores are the cost of transporting water, lack of evaporative were considered as the main MAR methods. Five losses, seasonal variability and the scalability of sites were assessed in the Pilbara and seven across MAR projects. Conversely, impediments are believed the Northern Territory. After consideration of a range to be primarily the economic feasibility rather than of factors such as the available source water, local the technical feasibility. When compared to other hydrogeology, soil suitability and potential irrigation water supply options, MAR can be attractive both demand, most sites were considered technically feasible.
    [Show full text]
  • Groundwater Resource Assessment and Conceptualization in the Pilbara Region, Western Australia
    Earth Systems and Environment https://doi.org/10.1007/s41748-018-0051-0 ORIGINAL ARTICLE Groundwater Resource Assessment and Conceptualization in the Pilbara Region, Western Australia Rodrigo Rojas1 · Philip Commander2 · Don McFarlane3,4 · Riasat Ali5 · Warrick Dawes3 · Olga Barron3 · Geof Hodgson3 · Steve Charles3 Received: 25 January 2018 / Accepted: 8 May 2018 © Springer International Publishing AG, part of Springer Nature 2018 Abstract The Pilbara region is one of the most important mining hubs in Australia. It is also a region characterised by an extreme climate, featuring environmental assets of national signifcance, and considered a valued land by indigenous people. Given the arid conditions, surface water is scarce, shows large variability, and is an unreliable source of water for drinking and industrial/mining purposes. In such conditions, groundwater has become a strategic resource in the Pilbara region. To date, however, an integrated regional characterization and conceptualization of the occurrence of groundwater resources in this region were missing. This article addresses this gap by integrating disperse knowledge, collating available data on aquifer properties, by reviewing groundwater systems (aquifer types) present in the region and identifying their potential, and propos- ing conceptualizations for the occurrence and functioning of the groundwater systems identifed. Results show that aquifers across the Pilbara Region vary substantially and can be classifed in seven main types: coastal alluvial systems, concealed channel
    [Show full text]
  • Australia-Wide Assessment of River Health: Western Australian Bioassessment Report
    National River Health Program healthy rivers living rivers rivers for life MONITORING RIVER HEALTH INITIATIVE TECHNICAL REPORT REPORT NUMBER 7 Australia-Wide Assessment of River Health: Western Australian Bioassessment Report Authors: S. A. Halse M. D. Scanlon J. S. Cocking Published By: Environment Australia GPO Box 787 CANBERRA ACT 2601 Authors: S.A Halse, M.D. Scanlon and J.S. Cocking Department of Conservation and Land Management PO Box 51 Wanneroo WA 6946 Copyright: Department of Conservation and Land Management and Commonwealth of Australia This work is copyright. Information contained in this publication may be copied or reproduced for study, research, information, or educational purposes, subject to inclusion of an acknowledgment of the source. Requests and inquiries concerning reproduction and rights should be addressed to the above authors and: Assistant Secretary Water Branch Environment Australia GPO Box 787 Canberra ACT 2601 Disclaimer: The views and opinions expressed in this publication are those of the authors and do not necessarily reflect those of the Commonwealth Government or the Minister for the Environment and Heritage. While reasonable efforts have been made to ensure that the contents of this publication are factually correct, the Commonwealth does not accept responsibility for the accuracy or completeness of the contents, and shall not be liable for any loss or damage that may be occasioned directly or indirectly through the use of, or reliance on, the contents of this publication. The information contained in this work has been published by Environment Australia to help develop community, industry and management expertise in sustainable water resources management and raise awareness of river health issues and the needs of our rivers.
    [Show full text]
  • Western Australia
    APRIL 2021 – Part 1 of 4 CAMPING IN WESTERN AUSTRALIA PART 1 CAMPSITES, REST AREAS, CARAVAN PARKS, DAY USE SITES AND CAMP GROUNDS PART 1 of 4 : PERTH to PORT HERDLAND BRAND HIGHWAY – ROUTE 1 IS THERE SOMETHING HERE THAT NEEDS UPDATING? IF SO, PLEASE LET US KNOW AT : [email protected] THIS GUIDE IS ONLY AS GOOD AS THE INFORMATION WE GET BACK FROM YOU This guide is USED to be FREE OF CHARGE but we can’t go on giving it away forever if we never get any donations. It does cost us money to create and maintain it. Parts 1 -3 are still free but this main section now costs $5.00 Au. We know this guide is easy to copy and pass around so if you are using a ‘free’ copy, how about donating a couple of bucks via our website? Like us on Facebook : https://www.facebook.com/campinginWA Please note: The phone numbers in this guide have not been updated for some time and some will be out of date. HEMA Map references are being gradually replaced by GPS coordinates. 1 www.wanowandthen.com APRIL 2021 – Part 1 of 4 KEY TO ICONS Fees apply Water skiing. Toilets.(may be drop toilets). Scenic attraction. Disabled access, or reasonably suitable. Cycling. Shelter and/or tables and/or picnic facilities. Walking trails Fireplace or BBQ (BBQ may be wood, gas Public phone nearby. or electric). No fires Caretaker on site or visits daily. Water. (May not be suitable for drinking or DANGER No Swimming. limited). Authorised overnight camping.
    [Show full text]
  • Mineral Resources of Western
    MINERAL RESOURCES OF WESTERN AUSTRALIA DEPARTMENT OF MINES PERTH, WESTERN AUSTRALIA 1980 Issued under the authority of the Hon. P. V. Jones, M.L.A. Minister for Mines 89686-1 Since the publication of the last issue of this booklet in 1966 a major expansion of mineral production in Western Australia has been achieved. Deposits of iron, nickel, natural gas, bauxite, heavy mineral sands, uranium and diamond are now being worked or are known to be commercial. Over the period 1966 to 1971, following the initial discovery of nickel sulphide at Kambalda, a speculative boom in base metal exploration developed that could only be likened to the gold rush days around the turn of the century. Although not all of the exploration activity in this period was well directed, many new discoveries were made as a result of the ready availability of risk capital. In the wake of the boom it is mainly the true prospectors that remain-the individual, to whom the still sparsely populated areas of the State hold an irresistible appeal and the chance of rich bonanza, and the established and dedicated mining companies for whom exploration is a necessary and vital part of the minerals industry. 1 am confident that the persistence of these prospectors will be rewarded with yet further discoveries of economic mineral deposits. Western Australia, with an area of over 2.5 million square kilometres, has a wide diversity of rocks representing all geological periods, and vast areas have been incompletely prospected. This booklet presents an up to date account of the minerals that are, or have been, economically exploited in Western Australia.
    [Show full text]
  • Preliminary Agency Statement of Natural Resource Management Priorities in Western Australia
    Preliminary Agency Statement of Natural Resource Management Priorities in Western Australia Department of Agriculture Department of Conservation and Land Management Department of Environment Department of Fisheries November 2003 “Results contained within this report do not represent a final priority listing of assets for investment, but provide a starting point or guide for further discussion and investigations that will contribute to a final investment decision.” Acknowledgments Contribution Personnel Title Organisation Team Leader Verity Klemm Restoration and Management Department of Environment Section Manager Report Preparation Eve Bunbury Manager, Marine Planning Department of Fisheries Report Preparation Keith Claymore Senior Policy Advisor Department of Conservation and Land Management Report Preparation Verity Klemm Restoration and Management Department of Environment Section Manager Report Preparation Damien McAlinden Natural Resource Management Department of Environment Officer Report Preparation Brendan Nicholas Research Officer, Esperance Department of Agriculture Office Report Preparation Noel Schoknecht Unit Manager for Natural Department of Agriculture Resources Report Preparation Rob Tregonning Senior Policy Officer, Department of Fisheries Environmental Assessment Report Preparation Ian Watson Advisor, Land Management Department of Agriculture Report Preparation Gordon Wyre Acting Director, Nature Department of Conservation and Conservation Land Management For more information contact: Verity Klemm Catchment Management
    [Show full text]
  • Water and Environment
    Water and Environment STRATEGIC REVIEW OF THE SURFACE WATER MONITORING NETWORK REPORT Prepared for Department of Water Date of Issue 3 August 2009 Our Reference 1045/B1/005e STRATEGIC REVIEW OF THE SURFACE WATER MONITORING NETWORK REPORT Prepared for Department of Water Date of Issue 3 August 2009 Our Reference 1045/B1/005e STRATEGIC REVIEW OF THE SURFACE WATER MONITORING NETWORK REPORT Date Revision Description Revision A 28 April 2009 Draft Report for client review Revision B 05 June 2009 Amendments following client review Revision C 19 June 2009 Further amendments following client review Revision D 30 July 2009 Final inclusion of figures and formatting Revision E 3 August 2009 Final for release to client Name Position Signature Date Originator Glen Terlick Senior Hydrographer, 30/07/09 Department of Water Emma Neale Environmental 30/07/09 Consultant Reviewer Vince Piper Principal Civil/ Water 30/07/09 Resources Engineer Leith Bowyer Senior Hydrologist, 30/07/09 Department of Water Location Address Issuing Office Perth Suite 4, 125 Melville Parade, Como WA 6152 Tel: 08 9368 4044 Fax: 08 9368 4055 Our Reference 1045/B1/005e STRATEGIC REVIEW OF THE SURFACE WATER MONITORING NETWORK REPORT CONTENTS CONTENTS 1 INTRODUCTION ...................................................................................................1 1.1 Background ...................................................................................................1 1.2 State Water Strategy......................................................................................1
    [Show full text]
  • Bulletin 144 Plate 1A: Geology of the Fortescue Group: West Pilbara Craton
    GEOLOGICAL SURVEY OF WESTERN AUSTRALIA BULLETIN 144 PLATE 1A 116°30À 117°00À 117°30À 116°00À 118°00À 118°30À è75 ê00ôôôÜE ê25 è00ôôôÜE è25 è50 ê50 ê75 ì00ôôôÜE ì25 ì50 20°00À 20°00À gas pipeline îî75 îî75 I N D I A N O C E A N Cape Thouin Cape Legendre îî50 îî50 Ôm Ôx Ls LEGENDRE I Ls Ôx Boodarie TURNER GIDLEY I Ls DELAMBRE I RIVER HAUY I PILBARA ñyG DS SANDY HILL ROSEMARY I N COSSIGNY HILL ISLA ñFd ANGEL I ñyG Cape Cossigny 30 km Port Hedland 22 ñgf 20°30À A R C H I P E L A G O ñyGo MINERAL RIVER E 20°30À ñFa MALUS I L YU Sloping Point RONSARD I Mundabullangana MERMAID SOUND D A M P I E R MT BURRUP WEST LEWIS I ñyGo EAST I FIELD îî25 îî25 ñyG BURRUP PENINSULA IER ILLINCOTHERRA HILL ST 45 m ENDERBY I Cape Lambert RE ñFa d d FO ñyG d d EAST LEWIS I DIXON I 35 Fonyanna Outcamp 10 Fortescue Bay ñf MARBLE BAR ñFr Point Samson DEPUCH I KING BAY Hearson Cove ñci ñb MERMAID STRAIT ño ño ñyG ñgf Cleaverville ñyGo Ls ñFh ñci DISTRICT EAGLEHAWK I Dampier d NICKOL BAY Balla Balla Harbour d ñFr Wickham ñgp SHARP PEAK Cossack Ôa Ôx d d PEEWAH 120 m d 40 ñb ñgf Sherlock Bay STATION HILL ñyGo Ôm ñb Ôm ñu ñs 71 m ñyG SALT Dampier KARRATHA R 128 ñs MT WANGEE DEEP WELL HILL EVAPORATION Na Ôx ñb ñc 63 m ñgf Balla Balla Ôa POND Ôx R 129 Salt Creek V,Ti HIGHWAY Ôm 40 Ôx ñf NICKOL RIVERNICKOL 97 m ñao R 123 Roebourne Zn,Cu, ñb Poverty R 124 ñs NORTH EAST REGNARD I Ôa Weerianna Ag V,Ti R 125 MT BERGHAUS Cu,Ag MT HALL Don Well MT SPINIFEX 30 REGNARD BAY ñyGo ñs MT NEGRI 86 m Wodgina Homestead 58 km ñyGo H 186 m V,Ti 94 m ñb ARD V,Ti 176 m îî00ôôôÜN ñc 60 îî00ôôôÜN
    [Show full text]
  • Fortescue River Gas Pipeline
    Fortescue River Gas Pipeline EP Act Referral Supporting Document Prepared for DBP Development Group December 2013 Fortescue River Gas Pipeline – EP Act Referral Supporting Document DOCUMENT TRACKING Item Detail Project Name Fortescue River Gas Pipeline – Approvals Management Project Number 13PERPLA-0024 Nicki Thompson (08) 9 227 1070 Project Manager Suites 1&2, 49 Ord St West Perth 6005 Prepared by Nicki Thompson Reviewed by Benjamin Smith, Warren McGrath Approved by Warren McGrath Status FINAL Version Number 2 Last saved on 20 December 2013 This report should be cited as ‘Eco Logical Australia 2013. Fortescue River Gas Pipeline - EP Act Referral Supporting Document. Prepared for DBP Development Group.’ ACKNOWLEDGEMENTS This document has been prepared by Eco Logical Australia Pty Ltd with support from DBP Development Group and contributions from Mattiske Consulting Pty Ltd and Ninox Wildlife Consulting. Disclaimer This document may only be used for the purpose for which it was commissioned and in accordance with the contract between Eco Logical Australia Pty Ltd and DBP Development Group. The scope of services was defined in consultation with DBP Development Group, by time and budgetary constraints imposed by the client, and the availability of reports and other data on the subject area. Changes to available information, legislation and schedules are made on an ongoing basis and readers should obtain up to date information. Eco Logical Australia Pty Ltd accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report and its supporting material by any third party. Information provided is not intended to be a substitute for site specific assessment or legal advice in relation to any matter.
    [Show full text]
  • Iron Country: Unlocking the Pilbara
    Iron country: Unlocking the Pilbara DAVID LEE A PUBLIC POLICY ANALYSIS PRODUCED FOR 09 THE MINERALS COUNCIL OF AUSTRALIA JUNE 2015 Iron country: Unlocking the Pilbara DAVID LEE MINERALS COUNCIL OF AUSTRALIA June 2015 Dr David Lee is the Director of the Historical Publications and Research Unit, Department of Foreign Affairs and Trade. He is the author of Australia and the World in the Twentieth Century, Melbourne, 2005 and Stanley Melbourne Bruce: Australian Internationalist, London and New York, 2010. He is currently researching Australia’s post-1960 mining booms and a collaborative biography of Sir John Crawford. The Minerals Council of Australia represents Australia’s exploration, mining and minerals processing industry, nationally and internationally, in its contribution to sustainable economic and social development. This publication is part of the overall program of the MCA, as endorsed by its Board of Directors, but does not necessarily reflect the views of individual members of the Board. ISBN 978-0-9925333-4-2 MINERALS COUNCIL OF AUSTRALIA Level 3, 44 Sydney Ave, Forrest ACT 2603 (PO Box 4497, Kingston ACT Australia 2604) P. + 61 2 6233 0600 | F. + 61 2 6233 0699 W. www.minerals.org.au | E. [email protected] Copyright © 2015 Minerals Council of Australia. All rights reserved. Apart from any use permitted under the Copyright Act 1968 and subsequent amendments, no part of this publication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the publisher and copyright holders.
    [Show full text]