Symposium and Field Workshop on Ediacaran Stratigraphy of South

Total Page:16

File Type:pdf, Size:1020Kb

Symposium and Field Workshop on Ediacaran Stratigraphy of South Dayangcha International Workshop on the Cambrian-Ordovician boundary(DIWCOB) (September 20- 25, 2017 Changchun NE China) First Circular Rationale In the past 16 years, there have been tremendous advances in understanding of the Cambrian-Ordovician boundary on the basis of the study of the GSSP fixed at Green Point, Newfoundland in 2001. New discoveries and knowledge of fossils (conodonts, graptolites, trilobites etc.), radiometric dates and chemo-stratigraphic data have been published at an unprecedented pace. In the meantime, because each research group has been working more or less independently, there have been numerous discrepancies and inconsistencies with regard to important biomarkers of the Cambrian-Ordovician boundary and its relation to chemostratigraphic excursions, and sequence stratigraphic surfaces. This workshop is motivated by the need to resolve these discrepancies and to discuss the feasibility of re-defining a set of criteria for subdivision and correlation of the Cambrian-Ordovician boundary, in China and beyond. The workshop, supported by NSFC and Ministry of Science and Technology of China (NCSC), will be organized by National Commission on Stratigraphy of China (NCSC), Jilin Provincial Bureau of Land and Resources (JPBLR) and Wuhan Center for Geological Survey (WCGS) (Institute of Geology and Mineral Resources (WIGMR) and hosted by the Research Center of Paleontology and Stratigraphy (RCPS) of Jilin University together with Baishan City Bureau (BCBLR) and Jiangyuan District Bureau of Land and Resources (JDBLR). It will be held from 20-25 September, 2017 at Jilin University, Changchun, NE China. A full two-day in-door meeting will cover all aspects of research on the Cambrian-Ordovician boundary, and the following field excursion of three days will travel to Jiangyuan area of Baishan City to examine the Dayangcha section (potential GSSP for the Cambrian-Ordovician boundary) and another relevant sections nearby, where participants can discuss and identify critical problems that need to be resolved and evaluate possible criteria for subdivision and 1 correlation of the Cambrian-Ordovician boundary. It is hoped that our efforts will better coordinate the development of tools and criteria for study of global Cambrian-Ordovician boundary sections. Organizing and Scientific Committee Professor Stanley C. Finney, Department of Geological Sciences California State University - Long Beach, USA Professor David A.T. Harper, Department of Earth Sciences and Principal, Van Mildert College, Durham University, Durham UK Professor Shanchi Peng, Nanjing Institute for Geology and Palaeontology, Nanjing, China Professor Zejiu Wang, NCSC, Beijing, China Professor Gabriella Bagnoli, University of Pisa, Italy Professor Huazhou Yao, WCGS, Wuhan, China Professor Chunlin Sun, RCPS, Jilin University, Changchun, China Additional field trip leaders Professor Svend Stouge, University of Copenhagen, Denmark Professor Jörg Maletz, Free University, Germany Professor Xiaofeng Wang, WCGS, Wuhan, China Professor Chuanshan Wang, WCGS, China Dr. Chunpo Yan, WCGS, Wuhan, China Miss Wei Sun, RCPS, Jilin University, Changchun, China Host city Changchun, Capital of Jilin province, located on northeastern China is known as the spring city of the Northland, internationalized metropolis in Northeast Asia, China's biggest automobile industrial city and international films city. The Organizing Committee would like to invite all researchers with an interest in the stratigraphy, sedimentology, geochemistry and palaeobiology around the Cambrian-Ordovician boundary to participate in the Dayangcha International Workshop on the Cambrian-Ordovician boundary. A full two--day conference program will cover all aspects of the Cambrian-Ordovician boundary geobiology, and will include sightseeing to visit the puppet emperor's Palace inside Changchun. Venue Topical sessions will be held at the Jilin University Travel and accommodation 2 Changchun is well connected by air and by high speed train to Beijing, Shanghai, Guangzhou, Hong Kong and other provincial capital cities of China. The Organizers will arrange for students to meet you in Changchun airport or railway station if participants inform us in advance of your exact arrival date and time. Geological palace of Jilin University The last emperor’s Palace Symposium Schedule and Topics I、Registration September 20(exact location to be advised in Second Circular) 3 II、Indoor Meeting :September 21- 22 1. Report and discussion topics suggested The meeting schedule will ensure that each participant has 15-20 minutes reporting time followed by 5 minutes discussion. We hope that each participant will be able to report at the meeting on progress and problems in your research on the above topic, or in a related field (latest Cambrian and Early Ordovician) that you have studied in recent years. Specific reporting time will be informed when receive your receipt. 2. September 22 afternoon: Sightseeing - visiting the last emperor’s Palace or other places III、Field Workshop (September 23-25) (Schedule subject to change as required) Sep. 23: Travel to Jiangyuan County of Baishan City Sep. 24 morning: Field work in the Dayangcha section, to examine the litho-, bio- , chemo-and sequence-stratigraphic succession, including the boundary level with characteristic conodonts and graptolites described in the field guidebook. Sep. 24 afternoon: Field work in the Erdoupuzi area to examine the beds bearing graptolites of Psigraptus biozone, and visit to quarry focusing on lithological features of Early Tremadocian, bearing conodonts, graptolite and trilobites etc. Sep. 25: Field work to Changbaishan to examine the Cambrian-Ordovician boundary on the way to the largest Crater Lake in China--- the famous Changbaishan Tianchi (in the Changbai mountain volcanic cone on top of the main peak), recognized by the Guinness Book of Records as the World's highest Volcano Lake. You will see peaks everywhere around the Lake, and a clear green pond that is the source of Songhua River, Tumen River and Yalu River and then travel back to Changchun in the evening. Registration and abstract submission Registration and abstract submission will open on January 10, 2017. Please fill out the attached expression of interest form and email it to Miss Zhang Miao at [email protected] or Prof. Wang Xiaofeng (ycwangxiaofeng@ 163.com) All participants will be invited to submit abstract(s) for posters and oral presentations from January 10, 2017 onwards. Authors are responsible for the scientific content of their abstracts. The deadline for registration and abstract submission will be 31 May, 2017. 4 Dayangcha section Showing complete conodont succession and its relation with δ13C excursions 5 The earliest planktic graptolites recorded from the Dayancha section Tianchi in Changbai Mountains, located in the southeast of Jilin Province, is a lake in China and North Korea. Water up to 2150 m above sea level, is known as "the sky pond" 6 Geologists (Maletz J.,Stouge S., Wang Xiaofeng, Tang Zhihua and Wang Chuanshan working around Tianchi, the largest Crater Lake in China Registration fee Registration will be about Chinese Yuan 4000 or USD 600 per person for 5 days (each day for USD 120). Final rates will be provided in a subsequent circular, and are anticipated, but cannot be guaranteed, to be less than the preliminary estimates given here. Workshop fees will cover the participant’s costs of accommodation, attending the conference and field trips,entitling them to attend the welcome reception, conference sessions, morning and afternoon refreshments, conference dinner, abstract submission, and related field trip and conference information. Student and early bird rates will be offered. We anticipate being able to offer a limited number of financial assistance packages to student attendees dependent upon availability of funds. If you are interested in applying for one of these, please complete the form below and return it to Miss Zhang Miao (email: [email protected] ) or Prof. Wang Xiaofeng ([email protected]) Accompanying delegates will get half-price discount for the registration fee. 7 Provisional program An Icebreaker Reception will be held on the evening of 20th September 2017. nd The Symposium will take place on 21st and 22 September 2017. Themed symposia will focus on the Cambrian-Ordovician boundary and Ordovician palaeontology, stratigraphy and geochemistry. Further specific themes will be announced based on responses to this First Circular. Presentations on current research will be in the form of 15-20 minute talks, and poster displays. Talks and posters are to be presented in English. Registration and abstract submission will open in January 10, 2017 The deadline for registration and abstract submission will be 31 May, 2017 8 Dayangcha International Workshop on the Cambrian-Ordovician boundary (DIWCOB)(September 20- 25, 2017 Changchun NE China) Expression of interest form *Title *First name *Surname *Institution Contact postal address (including country) Contact e--mail address I am [if applicable] A full--time student (please provide your institution and name of supervisor) I will be bringing a partner or accompanying delegate or delegates Name(s) : I anticipate contributing a talk/poster [please indicate which] with the provisional title/topic: Please return completed form to Miss Zhang Miao (email: [email protected] ) or Prof. Wang Xiaofeng ([email protected]) 9 Dayangcha International Workshop on the Cambrian-Ordovician boundary(DIWCOB) (September
Recommended publications
  • 2015 White Paper Smart Learning Environments in China.Pdf
    September 2015, Beijing Smart Learning Institute of Beijing Normal University White Paper: Smart Learning Environments in China 2015 (Executive Summary) Learning and Smart Learning Environments - 2 - White Paper: Smart Learning Environments in China 2015 (Executive Summary) “Livability and Innovation”: the Dual-core System of a Smart City With “People Experience of Smart Living" and "City Innovation capacity" as the dual-core, a smart city has the characteristics of smart travelling, smart living, smart learning, smart economy, smart environment and smart governance. Livability and innovation are fundamental drivers of city development, core objectives of promoting the city to operate healthily and dynamically, and efficient ways of solving those difficulties associated with the development of a "Smart City". "Smart Learning" plays a supportive role in leading city innovation capacity in culture and promoting people experience of smart living with high technology. Promoting .Entrepreneurial creativity .Internet plus economic .Convenient traffic pattern .Efficient access .Employment and Venture .Ubiquitous network access opportunities .Urban security Smart Smart .Medical and health care Economy Travelling .Civil happiness Smart Smart People Experience Environment City Innovation Living Capacity .Green building .Green energy .Green urban plan Smart Smart Governance Learning .Service policy .21st century skills .Transparency and open data .Inclusive education .Widespread use of digital government .Infusing ICT into education Leading - 3 -
    [Show full text]
  • 대외경제정책연구원-2014 KIEP Visiting Fellows Program.Hwp
    2014 2014 KIEP KIEP Visiting Fellows Program KIEP Fellows Visiting Visiting Fellows Program Edited by JEONG Hyung-Gon Edited by JEONG Hyung-Gon 370 Sicheong-daero, Sejong-Si 339-705, Korea Tel: (8244) 414-1042 / Fax: (8244) 414-1043 URL: http://www.kiep.go.kr 2014 KIEP Visiting Fellows Program Edited by JEONG Hyung-Gon The Contents of the KIEP Visiting Fellow Program do not reflect or represent the official opinion of KIEP. The KIEP Visiting Fellows Program is published with the aim of promoting discussions among researchers, and to remember the outstanding achievements by the visiting fellows who came to KIEP. KOREA INSTITUTE FOR INTERNATIONAL ECONOMIC POLICY (KIEP) 370 Sicheong-daero, Sejong-Si 339-705, Korea Tel: (8244) 414-1042 Fax: (8244) 414-1043 URL: http://www.kiep.go.kr LEE Il Houng, President Published 2015 in Korea by KIEP ⓒ 2015 KIEP Acknowledgements In 2009, Korea Institute for International Economic Policy (KIEP) launched "Visiting Fellows Program (VFP)" with the view of advancing cross-border exchanges of knowledge, information, insights and expertise. Since its inception, the VFP has demonstrated that sharing thoughts and ideas through face-to-face contacts and dialogue works as a catalyst for enhancing mutual understanding among scholars and professionals with diverse background. By successfully implementing the VFP for the past 7 years, KIEP has been motivated to assume the role as a hub for international economic research in the region. As a host of the program, KIEP has many mandates. One of those tasks is to let more people know what has been accomplished through the program and how valuable it is.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Initial Environmental Examination
    Initial Environmental Examination April 2014 PRC: Jilin Urban Development Project Prepared by the Jilin Provincial Government for the Asian Development Bank. CURRENCY EQUIVALENTS (Inter-bank average exchange rate as of March 2014) Currency Unit - Yuan (CNY) CNY 1.00 = US$ 0.1613 US$ 1.00 = CNY 6.2 ABBREVIATIONS ADB - Asian Development Bank BCMG - Baicheng Municipal Government BEDZ - Baicheng Economic Development Zone CIEE - consolidate initial environmental examination CNY - Chinese Yuan BOH - Bureau of Health BSMG - Baishan Municipal Government CSC - construction supervision company DFR - draft final report DMF - design and monitoring framework EHS - environmental, health, and safety EIA - environment impact assessment EIRR - economic internal rate of return EMP - environmental management plan EMS - environmental monitoring station EMU - environment management unit EPB - environmental protection bureau EPD - environmental protection department FGD - focus group discussion FIRR - financial internal rate of return FSR - feasibility study report GAP - gender action plan GDP - gross domestic product GHG - greenhouse gas GRM - grievance redress mechanism IEE - initial environmental examination ISWM - integrated solid waste management ITS - intelligent transportation system JPDRC - Jilin Provincial Development and Reform Commission JPEPD - Jilin Provincial Environmental Protection Department JPFD - Jilin Provincial Financial Department JPG - Jilin Provincial Government JPSLR - Jilin Provincial State Land and Recourse Bureau LAR - land acquisition
    [Show full text]
  • Jilin Urban Development Project: Baseline Surveying Report Of
    Social Monitoring Report #1 Semiannual Report August 2015 People’s Republic of China: Jilin Urban Development Project Prepared by Shanghai Yiji Construction Consultants Co., Ltd. for the Jilin Provincial Government and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 31 August 2015) Currency unit – Chinese Yuan (CNY) CNY1.00 = $0.16 $1.00 = CNY6.39 ABBREVIATIONS ADB – Asian Development Bank AP – affected person ISWM – integrated solid waste management Jilin PMO – Jilin project management office PRC – People’s Republic of China RP – resettlement plan WEIGHTS AND MEASURES mu – 0.006 ha square meter – m2 NOTE In this report, "$" refers to US dollars. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Baseline Surveying Report of Socioeconomic Pro- files (External Resettlement Monitoring No.1) August 2015 PRC: Jilin Urban Development Project Prepared by Shanghai Yiji Construction Consultants Co., Ltd. for the Jilin Provincial Govern- ment and the Asian Development Bank. Report Director: Wu Zongfa Report Co-compiler: Wu Zongfa, Su Daoming, Ma Zhenpeng, Zhan Zexiong Gong Jing, Ling Ke, Chen Yulin, Wu Qinyue E-mail: [email protected] Abbreviations ADB Asian Development Bank AP affected person ISWM integrated solid waste management Jilin PMO Jilin project management office PRC People’s Republic of China RP resettlement plan Note In this report, “$”refers to “US dollars”.
    [Show full text]
  • RRP Economic Analysis
    Jilin Urban Development Project (RRP PRC 46048) ECONOMIC ANALYSIS A. Background 1. The urban population in the People’s Republic of China (PRC) increased drastically from 170 million in 1978 to 730 million in 2013, and the urbanization rate increased from 17.9% to 53.7%. From 1980 to 1995, the PRC has pursued urbanization with a growth rate 0.53% per year. The urbanization process accelerated in 1995, with an average annual growth of about 1.4% per year. Urbanization still lags behind some countries, however; for example, the average urbanization rate in Europe is 70%. Urbanization is perceived as one of the PRC’s main economic driving forces, especially as the country seeks to boost domestic consumption and the rebalance economic activity from investment and exports to demand-driven, service-oriented growth.1 The National Urbanization Strategy (2014–2020) indicates that the past trend of urban development should be sustained.2 The urbanization rate should reach 60% by 2020 and 70% by 2030. 2. In 2012, the population of Baicheng Municipality was 2 million, total gross domestic product (GDP) was CNY61.54 billion, and 12.2% GDP growth. In the same year, Baishan Municipality had a population of 1.2 million, total GDP of CNY60.06 billion, and 12.4% GDP growth.3 Both cities have high urban poverty rates (12.5% in Baishan and 10.2% in Baicheng), well above the Jilin Province average of 6.0%. The population of Baishan City was 480,000 in 2012, and is projected to reach 700,000 by 2020; Baicheng City’s population was 330,000 in 2012, and is projected to reach 600,000 in 2020.
    [Show full text]
  • Certificate of Registration Dated Oct 21 2014 for Additional Certified Sites
    CERTIFICATE OF REGISTRATION This is to certify that Jilin Forest Industry Jinqiao Flooring Group Co.,Ltd . , , No. 9788 North Kaixuan Road, Kuancheng District Changchun City, Jilin Province China Refer to Attachment to Certificate of Registration dated Oct 21 2014 for additional certified sites complies with the requirements of Forest Stewardship Council® - Chain of Custody Certification for the following scope of registration Tracking of wood based material Product types: engineered flooring W11.5.5, veneer W7, sawn timber W5.2 Claim: FSC 100%, FSC Mix System(s) used: transfer Standard(s) version: FSC STD-40-004 V2-1, FSC-STD-50-001 V1-2 and FSC-STD-40-003 V1-0 SAI Certificate No.: FSC20124 Issue Date: 10/21/2014 FSC Code: SAI-COC-001258 Original Certification Date: 1/31/2011 SAI File Number: AS204448 Current Certification Date: 10/21/2014 (1) Certificate Expiry Date : 10/20/2019 Issue number: 3 Chris Jouppi President, Samer Chaouk QMI-SAI Canada Limited Head of Policy, Risk and Certification SAI Global Certification Services Pty Ltd Registered by: SAI Global Certification Services Pty Ltd, 286 Sussex Street, Sydney NSW 2000 Australia with QMI-SAI Canada Limited, 20 Carlson Court, Suite 200, Toronto, Ontario M9W 7K6 Canada (SAI GLOBAL). This registration is subject to the SAI Global Terms and Conditions for Certification. While all due care and skill was exercised in carrying out this assessment, SAI Global accepts responsibility only for proven negligence. This certificate remains the property of SAI Global and must be returned to them upon request. To verify that this certificate is current, please refer to the SAI Global maintains an On-Line Certification Register: http://www.qmi-saiglobal.com/qmi_companies/ (1)The validity of this certificate shall be verified on www.info.fsc.org The list of the products groups included in the scope of this certificate may be obtained from SAI Global Certification Services Pty Ltd upon request or found at www.info.fsc.org.
    [Show full text]
  • Jilin Urban Development Project: CBSW3, CBSW4, CBSW5, And
    Updated Resettlement Plan April 2019 People’s Republic of China: Jilin Urban Development Project (CBSW3: Water treatment plant I [site & civil], CBSW4: Water treatment plant II [processing], CBSW5: Water distribution network I [main line], CBSW6: Water distribution network I [branch line]) CURRENCY EQUIVALENTS (as of 30 April 2019) Currency unit – Chinese Yuan (CNY) CNY1.00 = $0.15 $1.00 = CNY6.73 ABBREVIATIONS ADB – Asian Development Bank AP – affected person AH – affected household DMS – detailed measurement survey HH – household LA – land acquisition LAR – land acquisition and resettlement PMO – project management office RP – resettlement plan WTP – water treatment plant WEIGHTS AND MEASURES mu – 0.006 ha square meter – m2 NOTE In this report, "$" refers to US dollars. Prepared by the People’s Government of Baishan City for the Asian Development Bank. This updated resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area Jilin Urban Development Project Updated Resettlement Plan for CBSW3 and CBSW4 (WTP and Entry Road), CBSW5 (Main Distribution Pipeline) and CBSW6 (Branch Distribution Pipeline) of Baishan City Water Supply Project April 2019 Updated Resettlement Plan for CBSW3 and CBSW4 (WTP and Entry Road), CBSW5 (Main Distribution Pipeline) and CBSW6 (Branch Distribution Pipeline) of Baishan City Water Supply Project This updated resettlement plan (RP) should be read together with the agreed RP as of May 2014 available at https://www.adb.org/projects/documents/jilin-urban-development-project- baishan-urban-water-supply-rp i Table of Contents A.
    [Show full text]
  • 46048-002: Jilin Urban Development Project
    Environmental Due Diligence Report Project Number: 46048-002 Loan Number: 3211 September 2020 People’s Republic of China: Jilin Urban Development Project Prepared by the Construction Office under Leading Group for Baishan Utilization of ADB Loan Infrastructure Project. This environmental due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area Environmental Due Diligence Report for Contract Variation of Waste-to-Energy (WTE) Incineration Plant as Associated Facility in Baishan City Prepared by the Construction Office under Leading Group for Baishan Utilization of ADB Loan Infrastructure Project. 1 PROPOSED CHANGES 1. According to the Article 20 in the Memorandum of Understanding under ADB Loan 3211-PRC dated May 28, 2018, Jilin Provincial Government suggested to cancel the composting and landfill of municipal solid waste of Baicheng and Baishan cities and change the treatment method to solid waste incineration. ADB mission also agreed to cancel the municipal solid waste composting and the landfill components, including CBSSW2 MSW sorting and composting center civil works, EBSSW3 MSW sorting and composting center equipment, and CBSSW3 sanitary landfill. The change will not cause any change for waste classification and collection source.
    [Show full text]
  • New Construction Project of Jilin- Hunchun Railway
    IPP 486 Public Disclosure Authorized New Construction Project of Jilin- Hunchun Railway Public Disclosure Authorized Social Assessment & Minority Development Plan Public Disclosure Authorized Prepared by: Western Development and Research Center of Minzu University of China Chinese Minorities Research Center, Minzu University of China Beijing · February 2011 Public Disclosure Authorized CONTENTS Page ABSTRACT .............................................................................................................................................................4 1. TASKS, INVESTIGATION METHODS AND PROCESS .....................................................................8 1.1 TASKS AND BASIS ..........................................................................................................................................8 1.1.1 Tasks.........................................................................................................................................................8 1.1.2 Basis..........................................................................................................................................................8 1.2 COMPETENCE IN ASSESSMENT ...................................................................................................................9 1.3 INVESTIGATION AND RESEARCH METHODS AND PROCESS .................................................................12 1.3.1 Location selection and methods of typical-case investigation........................................................................12
    [Show full text]
  • Ding He Mining Holdings Limited 鼎 和 礦 業 控 股 有 限 公 司 (Incorporated in Hong Kong with Limited Liability) (Stock Code: 705)
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. Ding He Mining Holdings Limited 鼎 和 礦 業 控 股 有 限 公 司 (Incorporated in Hong Kong with limited liability) (Stock Code: 705) CHANGE OF DIRECTORS AND CHANGE OF MEMBER OF BOARD COMMITTEES The board (the “Board”) of directors (the “Directors”) of Ding He Mining Holdings Limited (the “Company”) hereby announces that with effect from 3 January 2019:- (i) Mr. Mr. Wu Ju Shi (“Mr. Wu”) has resigned as an executive Director as he would like to devote more time to his personal development; (ii) Ms. Irene Fang (“Ms. Fang”) has resigned as an independent non-executive Director as she would like to devote more time to his personal development, and ceased to be a member of each of the audit committee (the “Audit Committee”), remuneration committee (the “Remuneration Committee”) and nomination committee (the “Nomination Committee”) of the Company; (iii) Ms. Fan Haijuan (“Ms. Fan”) has been appointed as an independent non-executive Director, a member of each of the Audit Committee, the Remuneration Committee and the Nomination Committee; and (iv) Mr. Liu Fa (“Mr. Liu”) has been appointed as an independent non-executive Director and a member of the Audit Committee. Each of Mr. Wu and Ms. Fang confirmed that he/she has no disagreement with the Board or the Company and there is no other matter relating to his/her resignation that needs to be brought to the attention of the shareholders of the Company or The Stock Exchange of Hong Kong Limited (the “Stock Exchange”).
    [Show full text]
  • Annual Development Report on China's Trademark Strategy 2013
    Annual Development Report on China's Trademark Strategy 2013 TRADEMARK OFFICE/TRADEMARK REVIEW AND ADJUDICATION BOARD OF STATE ADMINISTRATION FOR INDUSTRY AND COMMERCE PEOPLE’S REPUBLIC OF CHINA China Industry & Commerce Press Preface Preface 2013 was a crucial year for comprehensively implementing the conclusions of the 18th CPC National Congress and the second & third plenary session of the 18th CPC Central Committee. Facing the new situation and task of thoroughly reforming and duty transformation, as well as the opportunities and challenges brought by the revised Trademark Law, Trademark staff in AICs at all levels followed the arrangement of SAIC and got new achievements by carrying out trademark strategy and taking innovation on trademark practice, theory and mechanism. ——Trademark examination and review achieved great progress. In 2013, trademark applications increased to 1.8815 million, with a year-on-year growth of 14.15%, reaching a new record in the history and keeping the highest a mount of the world for consecutive 12 years. Under the pressure of trademark examination, Trademark Office and TRAB of SAIC faced the difficuties positively, and made great efforts on soloving problems. Trademark Office and TRAB of SAIC optimized the examination procedure, properly allocated examiners, implemented the mechanism of performance incentive, and carried out the “double-points” management. As a result, the Office examined 1.4246 million trademark applications, 16.09% more than last year. The examination period was maintained within 10 months, and opposition period was shortened to 12 months, which laid a firm foundation for performing the statutory time limit. —— Implementing trademark strategy with a shift to effective use and protection of trademark by law.
    [Show full text]