Roads Department of Georgia

Total Page:16

File Type:pdf, Size:1020Kb

Roads Department of Georgia Roads Department of Georgia Preparation of design Estimated time for bidding of Estimated time for work fulfilment documentation construction works N Name Approximate Length (km) Donor Status Comment Start End Start End Start End Ongoing Construction 1 Agara-Zemo Osiauri 12.00 September 2015 June 2017 WB Construction 2 New Bypass of Zestaponi-Kutaisi 15.20 July 2013 March 2017 JICA Construction 3 Samtredia-Grigoleti (LOT I) 11.50 May 2014 May 2018 EIB Construction 4 Samtredia-Grigoleti (LOT II) 18.50 Mar-16 March 2019 EIB Construction 5 Samtredia-Grigoleti (LOT IV) 9.50 May 2015 May 2018 EIB Construction 6 Kobuleti Bypass(LOT II) 18.00 May 2013 December 2017 ADB Construction Construction of Akhmeta-Telavi-Bakurtsikhe (Bakurtsikhe-Gurjaani) 7 15.00 December 2016 June 2019 WB Construction Bypass Road (15km) 8 Reconstruction-Modernization of Nikea Str. In Kutaisi City 4.10 January 2016 May 2017 GOG Construction 9 Tianeti-Zaridzeebi-Zhinvali 12.00 February 2016 July 2017 GOG Construction 10 Kutaisi-Samtredia Lightening 41.30 January 2017 June 2017 JICA Construction Bidding of Ongoing and Planned Constructions Construction 1 Batumi Bypass Road 14.30 October 2016 May 2017 June 2017 November 2020 ADB+AIIB bidding Construction 2 Samtredia-Grigoleti (LOT III) 12.00 October 2016 March 2017 April 2017 November 2019 EIB bidding Construction 3 Zemo Osiauri-Chumateleti (LOT I) 8.25 February 2016 March 2017 April 2017 April 2020 EIB bidding Construction 4 Zemo Osiauri-Chumateleti (LOT II) 14.50 February 2016 March 2017 April 2017 April 2020 WB bidding 5 Grigoleti-Choloki 14.50 April 2016 May 2017 April 2017 October 2017 November 2017 November 2019 EIB Detailed design 6 Chumateleti-Kharagauli 50.00 February 2017 November 2017 June 2017 November 2017 December 2017 June 2020 ADB Detailed design February-April July-September 7 Khulo-Goderdzi (LOT I) 29.70 August-October 2017 September 2019 KUWAIT Detailed design 2017 2017 8 Goderdzi-Zarzma (LOT II) 17.40 March 2017 September 2017 October 2017 August 2019 WB -??? Detailed design Construction 9 Construction of Bridge over Debeda River 0.11 July 2016 EBRD bidding 10 Devdoraki Tunnel 1.20 January 2017 February 2017 January 2017 March 2017 Mar-17 December 2017 GOG Detailed design 11 Sno-Juta-Roshka-Shatili-Omalo-Khadori gorge-Akhmeta-Batsara 250.00 December 2016 February 2018 May 2017 June 2017 July 2017 September 2020 GOG+? Detailed design 12 Baghdati-Abastumani 60.00 January 2017 January 2018 April 2017 May 2017 June 2017 September 2020 GOG+? Detailed design 13 Zemo Imereti-Racha 50.00 January 2017 January 2018 April 2017 May 2017 June 2017 September 2020 GOG+? Detailed design 14 Sameba Church in Stepantsminda 5.66 February 2017 March 2017 April 2017 November 2017 GOG Detailed design Construction 15 Lightening works on Ruisi-Agara section 20.00 October 2016 January 2017 Mar-17 August 2017 WB bidding Construction 16 Lightening works on Zestaponi-Kutaisi 15.17 January 2017 April 2017 May 2017 October 2017 JICA bidding 17 Lightening works of Kobuleti bypass (LOT I) 12.40 February 2017 June 2017 July 2017 December 2017 ADB Detailed design Ongoing Design of Construction 1 Chumateleti-Khevi (F1) 11.10 February 2017 October 2017 September 2017 February 2018 Mar-18 March 2020 WB+??? Detailed design 2 Khevi-Ubisa (F2) 15.40 March 2017 December 2017 November 2017 April 2018 May 2018 September 2020 ADB+??? Detailed design 3 Ubisa-Shorapani (F3) 10.50 March 2017 February 2018 January 2018 June 2018 July 2018 September 2020 EIB+??? Detailed design 4 Shorapani-Argveta (F4) 15.80 March 2017 April 2018 February 2018 July 2018 August 2018 September 2020 JICA Detailed design 5 Kvesheti-Kobi 26.00 May 2017 June 2018 November 2017 April 2018 May 2018 September 2020 Design 6 Natakhtari-Zhinvali 30.00 May 2017 August 2018 May 2018 October 2018 November 2018 September 2020 Detailed design 7 Batumi (Chorokhi)-Sarpi 11.00 June 2017 April 2018 January 2018 July 2018 August 2018 September 2020 Detailed design 8 Rustavi-Red Bridge 35.00 February 2017 November 2017 November 2017 April 2018 May 2018 July 2020 Detailed design 9 Rustavi-Sadakhlo 40.00 February 2017 January 2018 November 2017 April 2018 May 2018 July 2020 Detailed design 10 Tbilisi-Sagarejo 30.00 May 2017 May 2018 January 2018 July 2018 August 2018 August 2020 Detailed design 11 Sagarejo-Bakurtsikhe 50.00 May 2017 May 2018 January 2018 July 2018 August 2018 August 2020 Detailed design 12 Zugdidi-Anaklia (PFS and FS) 90.00 February 2017 January 2018 August 2018 January 2019 February 2019 October 2020 Design 13 Gurjaani(Chumlaki)-Telavi bypass 30.00 March 2017 December 2017 December 2017 May 2018 Sep-18 September 2020 Detailed design 14 Bakurtsikhe-Tsnori 16.00 March 2018 December 2017 December 2017 May 2018 Sep-18 March 2020 Detailed design 15 River over Rioni river nearby Poti 5.00 April 2016 September 2017 October 2017 April 2018 May 2018 August 2020 Detailed design 16 Lentekhi-Mestia 35.00 December 2016 October 2017 November 2017 April 2018 May 2018 September 2020 Detailed design Total sum.
Recommended publications
  • Electricity: 8700
    Covenant of Mayors 4 Climate & Energy Workshop on Data Solutions for Evidence- Based Policy and Stakeholder UNECE Webinar George Abulashvili COM Statistics for Georgia Signatories Population Akhaltsikhe 17,903 Lanchkhuti 31,486 Akhmeta 41,641 Mtskheta 7,800 Batumi 152,839 Ozurgeti 62,500 Bolnisi 53,590 Poti 41,465 Chokhatauri 19,001 Rustavi 125,103 Dedoplistskaro 21,221 Sagarejo 51,761 Gori 77,549 Sighnagi 29,948 Gurjaani 54,337 Tbilisi 1,108,717 Kutaisi 147,635 Telavi 38,721 Kazbegi 3,795 Tianeti 9,468 Kvareli 29,827 Zugdidi 62,511 Lagodekhi 41,678 Bagdati 29,2235 2 CNC’s ; 3 CTC’s and 3 CS’s 10 SE(C)Aps developed Georgian MDCP - Mayors Club Georgia • Analysis of barriers and drivers, Development of a National Roadmap (task 3.1.2) • Development of a Benchmark Database (task 3.1.3) • Development of a Project Pipeline (task 3.1.4) Number of Projects by Sectors 80 75 N of 70 SECAP Sectors Projects 60 Adaptation CC 0 50 EE in Buildings 12 40 Renewable energy 21 30 21 Street Lighting 75 20 12 Other (transport, …) 4 10 4 TOTAL 108 0 0 Adaptation CC EE in Buildings Renewable Street Lighting Other energy Number of municipalities implementing the projects -15; total number of CoM signatories - 24. Project Investments by Sectors, 1000 EUR 50,000 45,000 43379 40,000 Investments SECAP Sectors 000 EUR 35,000 Adaptation CC 0 30,000 EE in Buildings 8,538 25,000 Renewable energy 225 20,000 Street Lighting 1,509 15,000 Other (transport, …) 43,379 10,000 8538 TOTAL 53,651 5,000 1509 0 225 0 Adaptation CC EE in Buildings Renewable energy Street Lighting Other (transport, …) The huge figure in the “Other” sector is mainly due to the EBRD and EU E5P financing of the Tbilisi CNG bus project for 34 million euros.
    [Show full text]
  • Economic Prosperity Initiative
    USAID/GEORGIA DO2: Inclusive and Sustainable Economic Growth October 1, 2011 – September 31, 2012 Gagra Municipal (regional) Infrastructure Development (MID) ABKHAZIA # Municipality Region Project Title Gudauta Rehabilitation of Roads 1 Mtskheta 3.852 km; 11 streets : Mtskheta- : Mtanee Rehabilitation of Roads SOKHUMI : : 1$Mestia : 2 Dushet 2.240 km; 7 streets :: : ::: Rehabilitation of Pushkin Gulripshi : 3 Gori street 0.92 km : Chazhashi B l a c k S e a :%, Rehabilitaion of Gorijvari : 4 Gori Shida Kartli road 1.45 km : Lentekhi Rehabilitation of Nationwide Projects: Ochamchire SAMEGRELO- 5 Kareli Sagholasheni-Dvani 12 km : Highway - DCA Basisbank ZEMO SVANETI RACHA-LECHKHUMI rehabilitaiosn Roads in Oni Etseri - DCA Bank Republic Lia*#*# 6 Oni 2.452 km, 5 streets *#Sachino : KVEMO SVANETI Stepantsminda - DCA Alliance Group 1$ Gali *#Mukhuri Tsageri Shatili %, Racha- *#1$ Tsalenjikha Abari Rehabilitation of Headwork Khvanchkara #0#0 Lechkhumi - DCA Crystal Obuji*#*# *#Khabume # 7 Oni of Drinking Water on Oni for Nakipu 0 Likheti 3 400 individuals - Black Sea Regional Transmission ZUGDIDI1$ *# Chkhorotsku1$*# ]^!( Oni Planning Project (Phase 2) Chitatskaro 1$!( Letsurtsume Bareuli #0 - Georgia Education Management Project (EMP) Akhalkhibula AMBROLAURI %,Tsaishi ]^!( *#Lesichine Martvili - Georgia Primary Education Project (G-Pried) MTSKHETA- Khamiskuri%, Kheta Shua*#Zana 1$ - GNEWRC Partnership Program %, Khorshi Perevi SOUTH MTIANETI Khobi *# *#Eki Khoni Tskaltubo Khresili Tkibuli#0 #0 - HICD Plus #0 ]^1$ OSSETIA 1$ 1$!( Menji *#Dzveli
    [Show full text]
  • Georgia the National Environmental Agency /Department of Hydrometeorology
    Ministry of Environment Protection and Natural Resources of Georgia The National Environmental Agency /Department of Hydrometeorology WMO Workshop on Climate Monitoring Including the Implementation of Climate Watch system in RA VI GEOGRAPHYCALGEOGRAPHYCAL DESCRIPTIONDESCRIPTION The territory of Georgia features a highly contrasting topography. The north of the country is occupied by the Greater Caucasus (the highest peak is Mt. Shkhara, 5068 m). The intermountain depressions south of the greater Caucasus holds the Kolkheti lowland, Inner Kartly, Lower Kartly and Alazani Plains. Still further to the south rise the Lesser Caucasus ranges of medium height, reaching a height of 2 850 m. The southern part of Georgia is covered by the volcanic South Georgian Upland dissected by specific canyon – like river gorges. The Greater Caucasus and the Lesser Caucasus ranges join with the Likhi Range which, at the same time, divides Georgia into two contrasting climatic zones: Western and Eastern Georgia. MINISTRY OF ENVIRONMENT PROTECTION AND NATURAL RESOURCES OF GEORGIA NATIONAL ENVIRONMENTAL AGENCY GeorgianGeorgian climaticclimatic mapmap Georgian hydrometeorological network met eo r o l o giuri dakvirvebis punqtebi - d ax u r u l i pu nqt ebi - moqmed i punqt ebi Hydro Meteorological Stations and Posts from 1900 till now. 180 160 140 120 Hydrometeorological 100 Stations 80 Hydrometeorological Posts 60 40 20 0 1900 1930 1960 1990 2002 2007 Climatic processing of hydrometeorological data Preparation of climatic cadastres, bulletins, reviews; Consumer service by climatological information; Application the processed data for climate monitoring with statistical and dynamical methods In this map there is presented average monthly sum of precipitations of climate Stations and their deviations from the norms from the day of its foundation.
    [Show full text]
  • Tour - Day Trip from Tbilisi Cultural & Sightseeing Tours
    Kazbegi Winter tour - Day Trip from Tbilisi Cultural & Sightseeing Tours Overview Kazbegi Winter tour Starts from: Tbilisi Available: December-March Type: Private full day tour Duration: 12 hours Total driving distance: 330 km Pick up/drop off inclusive This one-day winter tour to Kazbegi takes you to the North of Georgia – Great Caucasus mountains, Khevi province. Tour includes sightseeing Ananuri Architectural Complex, Stepantsminda History Museum and townlet, Dariali canyon and St. Triniry church on the top of the Mount Gergeti. If winter weather permits, we can see His Majesty Mount Kazbegi and take an easy hike to Gveleti waterfall. Hot lunch at local guesthouse is rewording the way. Adventure Georgian roads with us! Tour details Code: TB-PT-KW-1D Starts from: Tbilisi Max. Group Size: 15 Adults Duration: Full Day Prices Group size Price per adult Solo 265 € 2 people 142 € 3-5 people 96 € 6-15 people 64 € *Online booking deposit: 15 € 1 person from the group will be FREE of charge if 10 and more adults are traveling together Child Policy 0-1 years - Free 2-6 years - 32 € *Online booking deposit will be deducted from the total tour price. 7 years and over - Adult The balance you can pay with one of the following methods: Bank transfer - Euro/USD/GBP currency, no later than two weeks before the tour starts VISA/Mastercard - GEL (local currency) in Tbilisi only, before the tour starts, directly to your guide via POS terminal. Card service fee +3% Cash – GEL only, directly to the nearest TBC Bank office or TBC Bank Cash terminal no later than the beginning of the tour.
    [Show full text]
  • Review of Fisheries and Aquaculture Development Potentials in Georgia
    FAO Fisheries and Aquaculture Circular No. 1055/1 REU/C1055/1(En) ISSN 2070-6065 REVIEW OF FISHERIES AND AQUACULTURE DEVELOPMENT POTENTIALS IN GEORGIA Copies of FAO publications can be requested from: Sales and Marketing Group Office of Knowledge Exchange, Research and Extension Food and Agriculture Organization of the United Nations E-mail: [email protected] Fax: +39 06 57053360 Web site: www.fao.org/icatalog/inter-e.htm FAO Fisheries and Aquaculture Circular No. 1055/1 REU/C1055/1 (En) REVIEW OF FISHERIES AND AQUACULTURE DEVELOPMENT POTENTIALS IN GEORGIA by Marina Khavtasi † Senior Specialist Department of Integrated Environmental Management and Biodiversity Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Marina Makarova Head of Division Water Resources Protection Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Irina Lomashvili Senior Specialist Department of Integrated Environmental Management and Biodiversity Ministry of the Environment Protection and Natural Resources Tbilisi, Georgia Archil Phartsvania National Consultant Thomas Moth-Poulsen Fishery Officer FAO Regional Office for Europe and Central Asia Budapest, Hungary András Woynarovich FAO Consultant FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS Rome, 2010 The designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. The mention of specific companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO in preference to others of a similar nature that are not mentioned.
    [Show full text]
  • Assessment of Forest Landscape Restoration Perspectives in Georgia
    Assessment of Forest Landscape Restoration Perspectives in Georgia Based on the assessment in Tianeti, Akhaltsikhe, Akhalkalaki and Chokhatauri municipalities Final Report Consulting Company „M3“ Ltd Tbilisi December 2016 Assessment of Forest Landscape Restoration Perspectives in Georgia Based on the assessment of Tianeti, Akhaltsikhe, Akhalkalaki and Chokhatauri municipalities Final Report Reference Number: ADAGEO/C/CQS/6 Provided by: Consulting Company „M3“Ltd Cover photo: Tieneti, photo by Lasha Gabelia Tbilisi, December 2016 Table of contents 1. Introduction ........................................................................................................................................................................ 5 2. Project goals and objectives ..................................................................................................................................... 7 3. Project partners ............................................................................................................................................................... 8 4. Vision .................................................................................................................................................................................... 9 4.1. Forest Policy Concept .............................................................................................................................................. 9 4.2. Intended Nationally Determined Contribution ..............................................................................................
    [Show full text]
  • Ten-Year Development Plan for Georgian Gas Transmission Network 2018-2027
    Ten-Year Development Plan for Georgian Gas Transmission Network 2018-2027 October 2017 1 The document represents a 10-year Georgian gas transmission and related infrastructure development plan. It was prepared on the basis of 2016 and 2017 year editions of “10-Year Development Plan for Georgian Gas Transmission Infrastructure)’’, considering the actual situation of current period. The 10-year Gas Network Development Plan was discussed with the Georgian Gas Transportation Company, presented to the Ministry of Energy of Georgia, the Georgian National Energy Regulatory Commission and other stakeholders. Consultations regarding the information used in and information on the project implementation of the 10-year Gas Network Development Plan can be obtained from GOGC Strategic Planning and Projects Department. Head of the Department: Teimuraz Gochitashvili, Dr. Sci, professor, Tel: +(995 32) 2244040 (414); E-mail: [email protected] 2 Contents Abbreviations ...........................................................................................................................4 Executive summary ..................................................................................................................5 1. Introduction .....................................................................................................................7 1.1. General provisions............................................................................................................ 7 1.2. Formal and methodological basis for preparing the plan ..............................................
    [Show full text]
  • Energy Policy Review: Georgia 2020
    Georgia 2020 Energy Policy Review Georgia 2020 Energy Policy Review INTERNATIONAL ENERGY AGENCY The IEA examines IEA member IEA association the full spectrum countries: countries: of energy issues including oil, gas Australia Brazil and coal supply and Austria China demand, renewable Belgium India energy technologies, Canada Indonesia electricity markets, Czech Republic Morocco energy efficiency, Denmark Singapore access to energy, Estonia South Africa demand side Finland Thailand management and France much more. Through Germany its work, the IEA Greece advocates policies Hungary that will enhance Ireland the reliability, Italy affordability and Japan sustainability of Korea energy in its 30 Luxembourg member countries, Mexico 8 association Netherlands countries and New Zealand beyond. Norway Poland Portugal Slovak Republic Spain Sweden Switzerland Turkey United Kingdom United States The European Commission also participates in the work of the IEA Please note that this publication is subject to specific restrictions that limit its use and distribution. The terms and conditions are available online at www.iea.org/t&c/ Source: IEA. All rights reserved. International Energy Agency Website: www.iea.org Foreword The International Energy Agency (IEA) has been conducting in-depth peer reviews of energy policies of its member countries – and of other countries – since 1976, and it recently modernised these reviews to focus on some of the countries’ key energy transition and security challenges. As the IEA has opened its doors to emerging economies, in-depth reviews have come to play an increasingly prominent role in bilateral collaborations. Georgia is one of the focus countries of the EU4Energy programme, which is implemented FOREWORD by the IEA and the European Union, along with the Energy Community and the Energy Charter, and which includes Armenia, Azerbaijan, Belarus, Georgia, Kazakhstan, Kyrgyzstan, Moldova, Tajikistan, Turkmenistan, Ukraine and Uzbekistan.
    [Show full text]
  • MUNICIPAL WATER and WASTEWATER SECTOR in GEORGIA Status Report
    MUNICIPAL WATER AND WASTEWATER SECTOR IN GEORGIA Status Report By David Melua 2015 Municipal Water and Wastewater Sector in Georgia, status Report Table of Content Current situation page 3 Institutional Setting page 6 Legal framework page 16 Key findings and conclusions page 21 Abbreviations GWP – Georgian Water and Power GEL – Georgian Lari GUWSC – Georgian United Water Supply Company USAID – US agency for international Development EIB – European Investment Bank ADB – Asian Development Bank A.R. - Autonomous Republic KfW - Kreditanstalt für Wiederaufbau MDF – Municipal Development Fund WED – Water Framework Directive AA – association Agreement 2 Municipal Water and Wastewater Sector in Georgia, status Report 1. Current Situation About 95% of the urban and 35% of the rural population is supplied by centralised water service. This indicates high network coverage by international standards. The actual performance of this system is a problem, however. Poor quality of the distribution network results in a water loss rate of 10-51%, and 40% water loss in Tbilisi. All urban households suffer interrupted supply, receiving water much less than 24 hours a day, in some cities as little as 8-10 hours a day. In rural areas the supply system often does not function at all. This affects mainly people living on higher floors of buildings, because of low pressure in the sys- tem. The major reason for that is the shortage of electricity supply due to a lack of payment and also physical shortages. The majority of the connected urban households can have potentially good water quality, as the main source is groundwater. Groundwater sources provide about 90% of the water supply apart from Tbilisi.
    [Show full text]
  • GEORGIA Second Edition March 2010
    WHO DOES WHAT WHERE IN DISASTER RISK REDUCTION IN GEORGIA Second edition March 2010 Georgian National Committee of Disaster Risk Reduction & Environment Sustainable Development FOREWORD Georgia is a highly disaster-prone country, which frequently experiences natural hazards (e.g. earthquakes, floods, landslides, mudflows, avalanches, and drought) as well as man-made emergencies (e.g. industrial accidents and traffic accidents). Compounding factors such as demographic change, unplanned urbanization, poorly maintained infrastructure, lax enforcement of safety standards, socio-economic inequities, epidemics, environmental degradation and climate variability amplify the frequency and intensity of disasters and call for a proactive and multi-hazard approach. Disaster risk reduction is a cross-cutting and complex development issue. It requires political and legal commitment, public understanding, scientific knowledge, careful development planning, responsible enforcement of policies and legislation, people-centred early warning systems, and effective disaster preparedness and response mechanisms. Close collaboration of policy-makers, scientists, urban planners, engineers, architects, development workers and civil society representatives is a precondition for adopting a comprehensive approach and inventing adequate solutions. Multi-stakeholder and inter-agency platforms can help provide and mobilize knowledge, skills and resources required for mainstreaming disaster risk reduction into development policies, for coordination of planning and programmes,
    [Show full text]
  • Community Based and Civil Society Organizations of Mtskheta-Mtianeti Region S
    COMMUNITY BASED AND CIVIL SOCIETY ORGANIZATIONS OF MTSKHETA-MTIANETI REGION S E S C I L V A R CARING O E G MANAGEMENT S MISSION NON-GOVERNMENTAL VISION ORGANIZATIONS STRATEGY TEAMWORKH ELP LIFE GOALS STRATEGY NON-GOVERNMENTAL MANAGEMENT SERVICES CARING VISION MTSKHETA-MTIANETI 2 0 2 0 Community Based and Civil Society Organizations of Mtskheta-Mtianeti Region The information leaflet was published with the support of the European Union (EU) and the Konrad-Adenauer-Stiftung (KAS) as part of the Georgian Civil Society Sustainability Initiative project. Its content is entirely the responsibility of the Mtskheta-Mtianeti Regional Hub “For Better Future» and may not reflect the views of the European Union (EU) and the Konrad- Adenauer-Stiftung (KAS). ”Georgian Civil Society Sustainability Initiative” was developed and is implemented by the consortium lead by the Konrad - Adenauer - Stiftung in cooperation with four Georgian Civil Society Organizations: Civil Society Institute (CSI), Center for Training and Consultancy (CTC), Center for Strategic Research and Development of Georgia (CSRDG) and the Education Development and Employment Center (EDEC). The project is funded by the European Union and co-financed by the Konrad-Adenauer- Stiftung. Mtskheta-Mtianeti 2020 3 About the information brochure The information brochure presents 34 Community Based and Civil Society organizations of Mtskheta-Mtianeti Region. Organizations are divided according to the municipalities and each organization page contains basic contact information and fields of activity. This information was shared with Mtskheta-Mtianeti Regional Hub by the heads or contact persons of each organization and is based on November 2020 data resources. The information brochure aims to promote the community based and civil society organizations in the region.
    [Show full text]
  • Realizing the Urban Potential in Georgia: National Urban Assessment
    REALIZING THE URBAN POTENTIAL IN GEORGIA National Urban Assessment ASIAN DEVELOPMENT BANK REALIZING THE URBAN POTENTIAL IN GEORGIA NATIONAL URBAN ASSESSMENT ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2016 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved. Published in 2016. Printed in the Philippines. ISBN 978-92-9257-352-2 (Print), 978-92-9257-353-9 (e-ISBN) Publication Stock No. RPT168254 Cataloging-In-Publication Data Asian Development Bank. Realizing the urban potential in Georgia—National urban assessment. Mandaluyong City, Philippines: Asian Development Bank, 2016. 1. Urban development.2. Georgia.3. National urban assessment, strategy, and road maps. I. Asian Development Bank. The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. This publication was finalized in November 2015 and statistical data used was from the National Statistics Office of Georgia as available at the time on http://www.geostat.ge The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]