Environmental and Social Impact Assessment Report of Reliance Meghnaghat 750 MW Combined Cycle Power Plant

Total Page:16

File Type:pdf, Size:1020Kb

Environmental and Social Impact Assessment Report of Reliance Meghnaghat 750 MW Combined Cycle Power Plant Environmental and Social Impact Assessment Report of Reliance Meghnaghat 750 MW Combined Cycle Power Plant Project Number: 50253-001 October 2017 BAN: Reliance Bangladesh LNG and Power Limited Prepared by Adroit Environment Consultants Ltd, Bangladesh The environmental and social impact assessment report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Term of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT October 2017 BAN: Environmental and Social Impact Assessment of Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh by Reliance Bangladesh LNG and Power Limited A Study Conducted by Adroit Environment Consultants Ltd, Bangladesh Page | i Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report CURRENCY EQUIVALENTS (As of 05 April 2017@ OANDA.COM) Currency unit – Bangladeshi taka (BDT) $1.00 = 79.1220 Page | ii Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report ABBREVIATIONS AAQS - Ambient Air Quality Standards AAQM - Ambient Air Quality Monitoring ADB - Asian Development Bank AECL - Adroit Environment Consultants Ltd AGI - Above Ground Installation AGP - Advanced Gas Path AoI - Area of Influence APM - Architecture & Project Management ASTM - American Society for Testing of Material BBS - Bangladesh Bureau of Statistics BCSIR - Bangladesh Council 0f Scientific and Industrial Research BDT - Bangladeshi Taka BMD - Bangladesh Meteorological Department BNAAQS - Bangladesh National Ambient Air Quality Standard BNBC - Bangladesh National Building Code BOD - Biochemical Oxygen Demand BPDB - Bangladesh Power Development Board BRTA - Bangladesh Road Transport Authority BUET - Bangladesh University of Engineering & Technology BWDB - Bangladesh Water Development Board CAMS - Continuous Air Monitoring Station CCCW - Closed Cycle Cooling Water CCPP - Combined Cycle Power Plant CD - Conservation Dependent CMB - Chemical Mass Balance CMSWMF - Common Municipal Solid Waste Management Facility CO - Carbon Monoxide CO2 - Carbon-Di-Oxide COD - Chemical Oxygen Demand CR - Critically Endangered CSR - Corporate Social Responsibility CTG - Combined Turbine Generator Page | iii Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report dB (A) - A-weighted Decibel DEPC - Department of Environmental pollution Control DEM - Digital Elevation Model DIFE - Department of Inspection for Factories and Establishments DLN - Dry Low NOx DM plant - Demineralization Plant DMC - District Management Committee DO - Dissolve Oxygen DOE - Department of Environment DPHE - Directorate of Public Health Engineering ECA95 `- Environment Conservation Act, 1995 EA - Environmental Assessment ECO - Emergency Control Organisation ECC - Emergency Control Centre ECR97 - Environment Conservation Rules 1997 ED - Energy Division EHS - Environment Health & Safety EIA - Environmental Impact Assessment EMP - Environmental Management Plan EMS - Environmental Management System EN - Endangered EPC - Engineering, Procurement, and Construction EQS - Environmental Quality Standards ESIA - Environmental Social Impact Assessment ESMP - Environmental and Social Management Plan ETP - Environmental Treatment Plant EWP - Elevated Work Platform FGD - Focused Group Discussions FRP - Fibre Reinforced Plastic FSRU - Floating Storage and Re-gasification Unit GDP - Gross Domestic Product GE - General Electric GoB - Government of Bangladesh GPS - Global Positioning System Page | iv Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report GRC - Grievance Redress Committee GRM - Grievance Redress Mechanism GSB - Geological Survey of Bangladesh GTCL - Gas Transportation Company Limited GTG - Gas Turbine Generator HFO - Heavy Fuel Oil HFL - High Flood Level HFT - Himalayan Frontal Thrust HRSG - Heat Recovery Steam Generation IBAT - Integrated Biodiversity Assessment Tool IEE - Initial Environmental Examination IFC - International Finance Corporation IP - Intermediate Pressure IPD - Infrastructure Planning & Design ISO - Indian Standard Organisation IUCN - International Union for Conservation of Nature IPP - Independent Power Producers LC - Least Concern LILO - Loop In Loop Out LNG - Liquefied Natural Gas LNGT - Liquefied Natural Gas Terminal LP - Two-flow low pressure MBT - Main Boundary Thrust MCT - Main Central Thrust MoEF - Ministry of Environment and Forest MPN - Most Probable Number MSDS - Material Safety Data Sheet MSL - Mean Sea Level MW - Megawatt NABET - National Accrediation Board for Education & Training NCBI - National Center for Biotechnology Information NEAMP - National Environmental Management Action Plan NG - Natural Gas NGO - Non-Government Organization Page | v Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report NOx - Oxides of Nitrogen NOC - No Objection Certificate NT - Near Threatened NTU - Nephelometric Turbidity Unit ODS - Ozone Depleting Substances O&M - Operation & Maintenance OPML - Orion Power Meghnaghat Ltd OSHA - Occupational Safety & Health Administration PCB - Poly-Chlorinated Biphenyls PCU - Passenger Car Unit PGCB - Power Grid Company of Bangladesh PLF - Plant Load Factor PM10 - Particulate Matter PM2.5 - Particulate Matter PMU - Project Implementation unit PPP - Public-Private Partnership PS - Performance Standard PSMP - Power Sector Master Plan PUC - Pollution Under Control PVC - Polyvinyl Chloride PWD - Public Works Datum QCI - Quality Council of India RBLPL - Reliance Bangladesh LNG and Power Limited REA - Rapid Environmental Assessment RID - Rail Infrastructure Division RIL - Reliance Infrastructure Limited RPL - Reliance Power Limited SCHM - Suggestion and Complaint Handling Mechanism SEI - Significant Environmental Impacts SO2 - Sulphur dioxide SMPCL - Summit Meghnaghat Power Company Limited SPL - Sound Pressure Level SPM - Suspended Particulate Matter SPS - Safeguard Policy Statement Page | vi Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report STG - Steam Turbine Generator TDS - Total Dissolve Solid TOC - Total Organic Carbon TOR - Terms of Reference TPS - Thermal Power Station TRB - Transportation, Roads & Bridges TSS - Total Suspended Solid UGI - Underground Installation UNCED - United Nations Conference on the Environment and Development UNEP - United Nations Environment Programme USEPA - United States Environmental Protection Act VSPL - Voyants Solutions Pvt. Ltd. VU - Vulnerable Category WB - World Bank WHO - World Health Organization WSD - Water Sanitation Department WWTP - Waste Water Treatment Plant Page | vii Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report NOTES (i) The fiscal year (FY) 2017-18 of the Government of Bangladesh ends on June 30, 2017. (ii) In this report, "$" refers to US dollars. This environmental and social impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Page | viii Meghnaghat 750 MW Combined Cycle Power Plant, Narayanganj, Bangladesh ESIA Report Table of Contents 0. EXECUTIVE SUMMARY ............................................................................................... 1 0.1. INTRODUCTION .................................................................................................... 1 0.2. THE PROJECT ....................................................................................................... 2 0.3. THE PROJECT PROPONENT ................................................................................ 3 0.4. CONSULTANT ....................................................................................................... 3 0.5. POLICY AND LEGAL CONSIDERATIONS ............................................................. 3 0.6. ANALYSIS OF ALTERNATIVES ............................................................................. 4 0.7. BASELINE ENVIRONMENT ................................................................................... 5 0.7.1 Ambient Air Quality .......................................................................................... 5 0.7.2 Noise ............................................................................................................... 5 0.7.3 Water Environment .......................................................................................... 5 0.7.4 Ecology & Biodiversity ..................................................................................... 6 0.7.5 Climate ...........................................................................................................
Recommended publications
  • Fire and Other Health and Safety Incidents in the Bangladesh Garment Sector November 2012-March 2018
    Fire and Other Health and Safety Incidents in the Bangladesh Garment Sector November 2012-March 2018 5,178 worker injuries and deaths (3,875 injuries; 1,303 deaths) Safety Factory Incident Incidents Name Location Date Injuries Deaths Cause/Outcome Description 1 Tazreen 252, 253 & 258, 11/24/12 200 112 The fire, presumably caused by a short circuit, started on the ground floor of the nine-story factory, trapping the Fashions Ltd. Monoshontuspur, workers on the floors above. Because of the large amount of fabric and yarn in the factory, the fire was able to Nishenantopur, quickly spread to other floors, complicating the firefighting operations. The fire burned for more than seventeen Ashulia hours before the firefighters were successful in extinguishing it. http://www.shahidulnews.com/bangladesh-textile- factory-fire-leaves-more-than-100-dead 2 Swan Dakkin 11/26/12 0 1 The fire originated from the warehouse of Swan Garments Ltd on the 1st floor of Afnan Plaza at Mollartek around Garments Ltd Khan,Uttara, 9:30am. It was doused around 12:00 noon after hectic efforts by 13 firefighting units. Dhaka Except for the second floor, the blaze could not spread through the building. Some workers sustained minor injuries as they rushed to the main staircase to get out of the building. Bundles of threads and clothes kept in the warehouse were also gutted. 3 Al-Shahriar Palashbari, 11/27/12 0 0 Fire might have originated from an electrical short circuit at the warehouse. Fabrics was burnt. No Injury Fabric Ltd. Ashulia 4 Section Seven Chittagong EPZ 11/28/12 50 0 Power generator of the factory caught fire due to a mechanical glitch.
    [Show full text]
  • Zila Report : Narayanganj
    POPULATION & HOUSING CENSUS 2011 ZILA REPORT : NARAYANGANJ Bangladesh Bureau of Statistics Statistics and Informatics Division Ministry of Planning BANGLADESH POPULATION AND HOUSING CENSUS 2011 Zila Report: NARAYANGANJ October 2015 BANGLADESH BUREAU OF STATISTICS (BBS) STATISTICS AND INFORMATICS DIVISION (SID) MINISTRY OF PLANNING GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH ISBN-978-984-33-8615-1 COMPLIMENTARY Published by Bangladesh Bureau of Statistics (BBS) Statistics and Informatics Division (SID) Ministry of Planning Website: www.bbs.gov.bd This book or any portion thereof cannot be copied, microfilmed or reproduced for any commercial purpose. Data therein can, however, be used and published with acknowledgement of their sources. Contents Page Message of Honorable Minister, Ministry of Planning …………………………………………….. vii Message of Honorable State Minister, Ministry of Finance and Ministry of Planning …………. ix Foreword ……………………………………………………………………………………………….. xi Preface …………………………………………………………………………………………………. xiii Zila at a Glance ………………………………………………………………………………………... xv Physical Features ……………………………………………………………………………………... xix Zila Map ………………………………………………………………………………………………… xxi Geo-code ………………………………………………………………………………………………. xxii Chapter-1: Introductory Notes on Census ………………………………………………………….. 1 1.1 Introduction ………………………………………………………………………………… 1 1.2 Census and its periodicity ………………………………………………………………... 1 1.3 Objectives ………………………………………………………………………………….. 1 1.4 Census Phases …………………………………………………………………………… 2 1.5 Census Planning ………………………………………………………………………….
    [Show full text]
  • Ashuganj 400 MW Combined Cycle Power Plant (East)
    Environmental Impact Assessment (Annex 16-Part 2) May 2016 Bangladesh: Power System Expansion and Efficiency Improvement Investment Program (Tranche 3) Ashuganj 400 MW Combined Cycle Power Plant (East) Prepared by Ashuganj Power Station Company Limited (APSCL) for the Asian Development Bank. This is an updated version of the draft EIA posted in October 2015 available on http://www.adb.org/projects/documents/ashuganj-400mw-ccpp-east-updated-eia This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Erosion The Meghna river banks suffer from erosion problems annually, mostly in the monsoon and post monsoon periods. As the transmission line will not have any impact on erosion, a further detailed analysis of erosion was not required for the project. Flooding Flooding situation of the study area is very nominal. The local people informed that, only the historical flash flood occurred in the year of 1988, 1998 and 2004. Flooding of 1988 and 1998 severely affected almost the entire study area. The duration of 1988 and 1998 flood was around 1-1.5 months with flood level of 6-7 ft.
    [Show full text]
  • Invitation for E-Tender (LTM)-Furniture-1St
    GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH OFFICE OF THE EXECUTIVE ENGINEER EDUCATION ENGINEERING DEPARTMENT, NARAYANGANJ ZONE SHIKKHA BHABAN, MASDAIR, NARAYANGANJ [email protected] Memo No: 13/EED/NZ/2019-20/1666 Date: 25/07/2019 Invitation for e-Tender (LTM)-Furniture-1st SL Last Selling Last Closing Tender ID No. Name of Works no Date & Time Date & Time Manufacturing and Supplying of furniture for Academic building to 19-Aug-2019 20-Aug-2019 1 345932 Selected Firoza Khatun Adarsha Mohila Dakhil Madrasha, Sadar 17:00 16:00 Upazila, Narayanganj District. Manufacturing and Supplying of furniture for Academic building to 19-Aug-2019 20-Aug-2019 2 345930 Selected Darussunnah Kamil Madrasha, Fatullah, Sadar Upazila, 17:00 16:00 Narayanganj District. Manufacturing and Supplying of furniture for Academic building to 19-Aug-2019 20-Aug-2019 3 345929 Selected Shadipur Islamia Senior Alim Madrasha, Sonargano Upazila, 17:00 16:00 Narayanganj District. Manufacturing and Supplying of furniture for Academic building to 19-Aug-2019 20-Aug-2019 4 345928 Selected Beldi Darul Hadis Fazil Madrasha, Rupganj Upazila, 17:00 16:00 Narayanganj District. Manufacturing and Supplying of furniture for Academic building to 19-Aug-2019 20-Aug-2019 5 345927 Selected Narayanganj High School, Sadar Upazila, Narayanganj 17:00 16:00 District. Manufacturing and Supplying of furniture for Academic building to 19-Aug-2019 20-Aug-2019 6 345926 Selected Hazi Pande Ali High School, Fatullah, Sadar Upazila, 17:00 16:00 Narayanganj District. Manufacturing and Supplying of furniture for Academic building to 19-Aug-2019 20-Aug-2019 7 345925 Selected Godnail High School, Shiddirganj, Sadar Upazila, Narayanganj 17:00 16:00 District.
    [Show full text]
  • Table C-13: Distribution of Population by Religion, Residence and Community
    Table C-13: Distribution of Population by Religion, Residence and Community Administrative Unit UN / MZ / ZL UZ Vill RMO Residence Total Muslim Hindu Christian Buddhist Others WA MH Community 1 2 3 4 5 6 7 8 67 Narayanganj Zila Total 2948217 2802567 144105 963 378 204 67 1 Narayanganj Zila 1959261 1890472 67951 538 188 112 67 2 Narayanganj Zila 942354 868943 72733 396 190 92 67 3 Narayanganj Zila 46602 43152 3421 29 0 0 67 02 Araihazar Upazila Total 376550 363733 12796 13 1 7 67 02 1 Araihazar Upazila 362127 350136 11970 13 1 7 67 02 3 Araihazar Upazila 14423 13597 826 0 0 0 67 02 23 Araihazar Union Total 25593 23603 1984 6 0 0 67 02 23 1 Araihazar Union 21196 20006 1184 6 0 0 67 02 23 3 Araihazar Union 4397 3597 800 0 0 0 67 02 23 021 3 *Araihazar 3694 3008 686 0 0 0 67 02 23 021 01 3 Araihazar Krishnapura 262 202 60 0 0 0 67 02 23 021 02 3 Araihazar 2294 1748 546 0 0 0 67 02 23 021 03 3 Dighirpar 127 127 0 0 0 0 67 02 23 021 04 3 Debipura 242 162 80 0 0 0 67 02 23 021 05 3 Goal Para 195 195 0 0 0 0 67 02 23 021 06 3 Nagar Para 574 574 0 0 0 0 67 02 23 247 3 *Chhota Barai Para 703 589 114 0 0 0 67 02 23 376 1 *Faitadi 126 126 0 0 0 0 67 02 23 403 1 *Gazipur 693 494 199 0 0 0 67 02 23 467 1 *Jhaugara 4237 3831 400 6 0 0 67 02 23 467 01 1 Binar Char 963 890 73 0 0 0 67 02 23 467 02 1 Jhaugara 2320 2178 136 6 0 0 67 02 23 467 03 1 Lakhupura 254 254 0 0 0 0 67 02 23 467 04 1 Dighaldi 473 473 0 0 0 0 67 02 23 467 05 1 Jhaugara Krishnapura 227 36 191 0 0 0 67 02 23 559 1 *Kamrangir Char 6384 5833 551 0 0 0 67 02 23 559 01 1 Majar Char 553
    [Show full text]
  • Cropping Pattern, Intensity and Diversity in Dhaka Region
    Bangladesh Rice J. 21 (2) : 123-141, 2017 Cropping Pattern, Intensity and Diversity in Dhaka Region N Parvin1*, A Khatun1, M K Quais1 and M Nasim1 ABSTRACT Sustainable crop production in Bangladesh through improvement of cropping intensity and crop diversity in rice based cropping system is regarded as increasingly important in national issues. Planning of agricultural development largely depends on the authentic, reliable and comprehensive statistics of the existing cropping patterns, cropping intensity and crop diversity of a particular area, which will provide guideline to our policy makers, researchers, extensionists and development workers. The study was conducted over all 46 upazilas of Dhaka agricultural region in 2015 using pretested semi-structured questionnaire with a view to document the existing cropping patterns, cropping intensity and crop diversity in the region. From the present study, it was observed that about 48.27% net cropped area (NCA) is covered by exclusive rice cropping systems whereas deep water rice occupied about 16.57% of the regional NCA. The most dominant cropping pattern Boro−Fallow−T. Aman alone occupied about 22.59% of net cropped area (NCA) with its distribution over 32 upazilas out of 46. The second largest area was covered by single Boro cropping pattern, which was spread over 44 upazilas. Total number of cropping patterns was observed 164. The highest number of cropping pattern was identified 35 in Tangail sadar and Dhamrai upazila of Dhaka district and the lowest was seven in Bandar of Narayanganj and Palash of Narsingdi district. The lowest crop diversity index (CDI) was reported as 0.70 in Dhamrai followed by 0.72 in Monohardi of Narsingdi.
    [Show full text]
  • Bangladesh: Human Rights Report 2015
    BANGLADESH: HUMAN RIGHTS REPORT 2015 Odhikar Report 1 Contents Odhikar Report .................................................................................................................................. 1 EXECUTIVE SUMMARY ............................................................................................................... 4 Detailed Report ............................................................................................................................... 12 A. Political Situation ....................................................................................................................... 13 On average, 16 persons were killed in political violence every month .......................................... 13 Examples of political violence ..................................................................................................... 14 B. Elections ..................................................................................................................................... 17 City Corporation Elections 2015 .................................................................................................. 17 By-election in Dohar Upazila ....................................................................................................... 18 Municipality Elections 2015 ........................................................................................................ 18 Pre-election violence ..................................................................................................................
    [Show full text]
  • Hazard Incidents in Bangladesh, March, 2017
    Hazard Incidents in Bangladesh, March, 2017 Overview of Hazard Incidents in March, 2017 Five man-made hazards such as fire, landslide, speedboat and trawler capsize, embankment collapse, as well as three natural incidents, Nor’wester, Lightning and hailstorm were the major incidents stricken in this month. In this month, most frequent incident was fire. A total of 19 fire incidents occurred in Narayanganj, Dhaka, Pirojpur, Brahmanbaria, Natore, Bagerhat, Nilphamar,i Naogaon, Tangail, Dinajpur, Magura, Chittagong, Meherpur, Bandarban, Noakhali districts. In this districts, 1 people died, 40,000 other effected, 2500-3000 shanties were gutted, 98 stores and 33 houses were damaged, 3 warehouse damaged, 4 buses demolished in the fire; total loss of approximately BDT 2 crore 14 lac. The other hazards that occurred in this month were landslide, nor’wester, trawler and speedboat capsize, lightening and hailstorm. In Munsiganj, Bagerhat and Narayanganj, 38 people were died and 19 missing due to speedboat and Trawler capsize. Prepared in: March 03, 2017 Sources: NDRCC reports and Dailies, 2017 March, 2017 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Note Boat Capsize Fire Incidents Hailstorm Landslide Lightning Nor’wester Description of the Incidents in March 2017 Fire: There were 19 fire incidents in March, 2017. As for geographic spread, 15 districts (Narayanganj, Pirojpur, Brahmanbaria, Dhaka, Bagerhat, Nilphamari, Naogaon, Tangail, Dinajpur, Chittagong, Meherpur, Magura, Natore, Bandarban, Noakhali) experienced fire. Among the 19 incidents, 6 occurred in Dhaka.
    [Show full text]
  • Download 4.58 MB
    Initial Environmental Examination Document Stage: Draft Project Number: 49329-006 April 2019 BAN: Second City Region Development Project Dhaka Region Roads (Savar Upazila) Package No. CRDP-II/LGED/DHAKA/SAVAR/NCB/2018/W-03 Prepared by Local Government Engineering Department, Government of Bangladesh for the Asian Development Bank. This draft initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 15 July 2018) Currency unit - BDT BDT 1.00 = $ .0122 $1.00 = BDT 82 ABBREVIATION ADB - Asian Development Bank BDT - Bangladesh Taka BOQ - Bill of Quantities CRDP - City Region Development Project DOE - Department of Environment EARF - Environmental Assessment and Review Framework ECR - Environmental Conservation Rules EIA - environmental impact assessment EMP - environmental management plan GRC - Grievance Redress Committee GRM - grievance redress mechanism IEE - initial environmental examination LGED - Local Government Engineering Department MDSC - Management, Design and Supervision Consultant NGO - nongovernment organization NOC - no objection certificate O&M - operations and maintenance PIU - Project Implementation Unit PMCU - Project Management Coordination Unit REA - rapid environmental assessment ROW - right of way SPS - safeguard policy statement NOTE In this report, "$" refers to United States dollar.
    [Show full text]
  • Morphological Analysis & Scour Analysis of Kanchan
    IABSE-JSCE Joint Conference on Advances in Bridge Engineering-IV, August 26-27, 2020, Dhaka, Bangladesh ISBN: 978-984-34-8313-3 Amin, Okui, Bhuiyan, Rahman (eds.) www.iabse-bd.org Morphological analysis & scour analysis of Kanchan bridge over Shitalakhya river for a flood level with 100-year return period A.K.M.S. Islam, S. Kaiser, W.B. Mamoon, S.K. Bala & G.M.T. Islam Institute of Water and Flood Management, Bangladesh University of Engineering and Technology, Dhaka 1000, Bangladesh ABSTRACT: Morphological analysis is the process that determines whether a particular bridge section is morphologically stable or not and whether river training and bank protection works are necessary for control- ling river shifting and erosion. Again, statistical surveys conducted on investigation of reasons of bridge fail- ures implied that majority of bridges have failed because of excessive scouring at infrastructural elements. Planform analysis during the period from 1972 to 2018 shows that the river at the proposed bridge site has no significant shifting during the observation period. Scour analysis results from these analytical methods were somehow a little different from the model simulated scour analysis results. Pier scour was further analyzed for different pier diameters to evaluate its effect on scouring that presents scouring increases the scour depth in- creases around the piers. 1 INTRODUCTION Bridges are structures, usually built over water body to provide a passage to pass over the water body but sometimes rivers are unstable & tend to shift from their course. So A bridge, crossing an alluvial river, should therefore be designed properly with reference to possibility of this phenomena.
    [Show full text]
  • List of Upazilas of Bangladesh
    List Of Upazilas of Bangladesh : Division District Upazila Rajshahi Division Joypurhat District Akkelpur Upazila Rajshahi Division Joypurhat District Joypurhat Sadar Upazila Rajshahi Division Joypurhat District Kalai Upazila Rajshahi Division Joypurhat District Khetlal Upazila Rajshahi Division Joypurhat District Panchbibi Upazila Rajshahi Division Bogra District Adamdighi Upazila Rajshahi Division Bogra District Bogra Sadar Upazila Rajshahi Division Bogra District Dhunat Upazila Rajshahi Division Bogra District Dhupchanchia Upazila Rajshahi Division Bogra District Gabtali Upazila Rajshahi Division Bogra District Kahaloo Upazila Rajshahi Division Bogra District Nandigram Upazila Rajshahi Division Bogra District Sariakandi Upazila Rajshahi Division Bogra District Shajahanpur Upazila Rajshahi Division Bogra District Sherpur Upazila Rajshahi Division Bogra District Shibganj Upazila Rajshahi Division Bogra District Sonatola Upazila Rajshahi Division Naogaon District Atrai Upazila Rajshahi Division Naogaon District Badalgachhi Upazila Rajshahi Division Naogaon District Manda Upazila Rajshahi Division Naogaon District Dhamoirhat Upazila Rajshahi Division Naogaon District Mohadevpur Upazila Rajshahi Division Naogaon District Naogaon Sadar Upazila Rajshahi Division Naogaon District Niamatpur Upazila Rajshahi Division Naogaon District Patnitala Upazila Rajshahi Division Naogaon District Porsha Upazila Rajshahi Division Naogaon District Raninagar Upazila Rajshahi Division Naogaon District Sapahar Upazila Rajshahi Division Natore District Bagatipara
    [Show full text]
  • Annex to Chapter 3. Results Framework for the 4Th HPBSP 2016
    Annex to Chapter 3. Results Framework for the 4th HPBSP 2016-2021 Means of Result Indicator verification & Baseline & source Target 2021 timing Goal GI 1. Under-5 Mortality Rate (U5MR) BDHS, every 3 years 46, BDHS 2014 37 All citizens of GI 2. Neonatal Mortality Rate (NNMR) BDHS, every 3 years 28, BDHS 2014 21 Bangladesh enjoy health and well-being GI 3. Maternal Mortality Ratio (MMR) BMMS; MPDR 176, WHO 2015(http:// 105 www.who.int/ reproductivehealth/ publications/monitoring/ maternal-mortality-2015/ en/ GI 4. Total Fertility Rate (TFR) BDHS, every 3 years 2.3, BDHS 2014 1.7 GI 5. Prevalence of stunting among under- BDHS, every 3 years; 36.1%, BDHS 2014 25% 5children UESD, every non-DHS years GI 6. Prevalence of diabetes and hypertension BDHS, every 3 years; Dia: 11.2%; Hyp: 31.9%, Dia: 10%; Hyp: among adult women (Estimated as elevated blood NCD-RF, every 2 years BDHS 2011 30% sugar and blood pressure among women and men aged 35 years or older) GI 7. Percentage of public facilities with key BHFS, every 2 years FP: 38.2; ANC 7.8%; CH FP: 70%; ANC service readiness as per approved Essential 6.7%, BHFS 2014 50%; CH 50% Service Package (Defined as facilities (excluding CCs) having: a. for FP: guidelines, trained staff, BP machine, OCP, and condom; b. for ANC: Health Bulletin 2019 Health guidelines, trained staff, BP machine, hemoglobin, and urine protein testing capacity, Fe/folic acid tablets; c. for CH: IMCI guideline and trained staff, child scale, thermometer, growth chart, ORS, zinc, Amoxicillin, Paracetamol, Anthelmintic) Program
    [Show full text]