Tr ipura Priority List 2010-11 (Rs. in Crore) Sl. Name of project Project Depart- Stat e No. Cost ment Priority Ranking 1. Transm iss ion Project (Phase-I): 400 KV S/Stn. At 75 .00 Power 1 Surjamaninagar (to be charged at 132 KV) & infrastructure development, West T ripura (1st Yr.= Rs.16 .10 Cr., 2nd Yr.= Rs.24 .80 Cr., 3rd Yr.= Rs.24 .20 Cr., 4th Yr.= Rs.9.90 Cr.) 2. Transm iss ion Project (Phase-I): 132 KV D/C line from 8.00 Power 2 Surjamaninagar to Budhjungnagar (20 Km) & ass ociated Fdr. Bay at Budhjungnagar, West District (1st Yr.= Rs.1.70 Cr., 2nd Yr.= Rs.1.85 Cr., 3rd Yr.= Rs.2.65 th 3. TCrra.,n 4smiYssr.=ionR sProject.1.80 C r(.)P hase-I): 132 KV D/C line from 10 .00 Power 3 Surjamaninagar to 79 Till a Grid S/Stn. (15 Km) including Fdr. Bay & site developm ent, West T ripura District (1st Yr.= Rs.2.20 Cr., 2nd Yr.= Rs.3.35 Cr., 3rd Yr.= Rs.3.15 Cr., 4th Yr.= Rs.1.30 Cr.) 4. Upg radation of Regional College of Educa tion at 10 .00 Y.A. & 4 Panisa gar, for 2nd work, i.e. Sports Auditorium, 300 seated Girls Hostel, Voll eyball , Tenn is Ground, Handb all ground & Athletic Track etc. (2010 - 11 =Rs.5.00 Cr., 2011 -12 =Rs.5.00 Cr.) 5. Improvement and Upg radation of the Road from 10 .50 PWD 5 Airport to New Capital Complex via Nabagram, (Length – 4.648 Km) 6. Improvement and Upg radation of the Road from 30 .10 PWD 6 to Melaghar, West Tripura District (Length – 9.02 4 Km) 7. Establi shment of 4 ITIs in Sub-Division Headquarters 20 .00 Industri 7 (Sonamura under West Tripura District, Sabroom under es & , Gandacherra under Comm er and under West Tripura District @Rs.5.00 Cr.) ce 8. Establi shment of Veterinary College (Phase-II), West 15 .85 ARDD 8 Tripura District 9. Improvement & Upg radation of the Road from Motor 34 .60 PWD 9 Stand – Agartala Railway Station to NH-44 Bypass Via (R & B) Chitt aranjan Road and Central Road, West T ripura District (Length : 10.775 Km) 10 . Construction of Multi-storied State Ayurvedic Hospital at 4.74 Health 10 Agartala, West Tripura District Add itional List 0 11 . Transm iss ion Project (Phase-II) 400 KV D/C 201 .00 Power 11 Transmiss ion line from Suryamaninagar to Purbakanchanbari (charged at 132 KV) (approx. length 13 0 Km.) (Rs.20100 .00 lakhs) 12 . Transm iss ion Project (Phase-I) 132 KV D/C line from 12 .00 Power 12 Suryamaninagar to Rokhia (30 Km. and site development and Fdr. Bay at Rokhia) 13 . Augm entation of P.K. Bari S/station with 132 KV Bay for 5.00 Power 13 termination of 400 KV line (Rs.500 .00 lakhs) 14 . Construction of (G+3) storied 350 seated combined 14 .75 YA & 14 Hostel for Girl’s and Boy’s in the existing premises of Sports Sahid Bhagat Singh Comp lex at Agartala, West Tripura 15 . In frastructure Developm ent of Tripura Medica l College, 166 .91 Health & 15 Hapania, Agartala, West Tripura (Phase I) FW 16 . In frastructure Developm ent of Tripura Medica l College, 113 .80 Health & 16 Hapania, Agartala, West Tripura (Phase II ) FW

17 . Improvement and upg radation of the Road Conn ecting 29 .42 PWD 17 Sub-Division Head quarter with NH 44/ Pecharthal (R&B) (NH44) to Kanchanpur Road (26.50 Km)/ Phase- I. Portion from Pecharthal to Machmara (8.50 Km) 18 . Development of Purbasha Comp lex at Agartala (Phase- 4.00 HH&S 18 II), West Tripura 19 . Modernisa tion of Veteinary Training In stitute R.K. Nagar 14 .37 ARDD 19 (P hase II ), West Tripura 20 . Subroo m Sub-Divisional Hospital, South Tripura 28 .34 Health 20 21 . Sonamura Hospital, West Tripura 15 .00 Health 21 22 . Melaghar Sub-Divisional Hospital, West Tripura 15 .00 Health 22 23 . Enh ancement of capacity of Central Tea Processing 5.33 I & C 23 factory of Tripura Tea Developm ent Corporation Ltd. 24 . Procurement of 2 (two) High Capacity Direct rotary 6.99 DWS 24 water well drilling rigs including alli ed acc essories & equipm ents for piped water supp ly scheme s in Tripura 25 . Construction of 5 (five) Foo d Sto ra ge Godown 3.23 Foo d 25 Total 853 .93