Tripura District (1St Yr.= Rs.1.70 Cr., 2Nd Yr.= Rs.1.85 Cr., 3Rd Yr.= Rs.2.65 Th 3

Tripura District (1St Yr.= Rs.1.70 Cr., 2Nd Yr.= Rs.1.85 Cr., 3Rd Yr.= Rs.2.65 Th 3

Tr ipura Priority List 2010-11 (Rs. in Crore) Sl. Name of project Project Depart- Stat e No. Cost ment Priority Ranking 1. Transm iss ion Project (Phase-I): 400 KV S/Stn. At 75 .00 Power 1 Surjamaninagar (to be charged at 132 KV) & infrastructure development, West T ripura District (1st Yr.= Rs.16 .10 Cr., 2nd Yr.= Rs.24 .80 Cr., 3rd Yr.= Rs.24 .20 Cr., 4th Yr.= Rs.9.90 Cr.) 2. Transm iss ion Project (Phase-I): 132 KV D/C line from 8.00 Power 2 Surjamaninagar to Budhjungnagar (20 Km) & ass ociated Fdr. Bay at Budhjungnagar, West Tripura District (1st Yr.= Rs.1.70 Cr., 2nd Yr.= Rs.1.85 Cr., 3rd Yr.= Rs.2.65 th 3. TCrra.,n 4smiYssr.=ionR sProject.1.80 C r(.)P hase-I): 132 KV D/C line from 10 .00 Power 3 Surjamaninagar to 79 Till a Grid S/Stn. (15 Km) including Fdr. Bay & site developm ent, West T ripura District (1st Yr.= Rs.2.20 Cr., 2nd Yr.= Rs.3.35 Cr., 3rd Yr.= Rs.3.15 Cr., 4th Yr.= Rs.1.30 Cr.) 4. Upg radation of Regional College of Educa tion at 10 .00 Y.A. & 4 Panisa gar, North Tripura District for 2nd work, i.e. Sports Auditorium, 300 seated Girls Hostel, Voll eyball , Tenn is Ground, Handb all ground & Athletic Track etc. (2010 - 11 =Rs.5.00 Cr., 2011 -12 =Rs.5.00 Cr.) 5. Improvement and Upg radation of the Road from 10 .50 PWD 5 Agartala Airport to New Capital Complex via Nabagram, West Tripura District (Length – 4.648 Km) 6. Improvement and Upg radation of the Road from 30 .10 PWD 6 Sonamura to Melaghar, West Tripura District (Length – 9.02 4 Km) 7. Establi shment of 4 ITIs in Sub-Division Headquarters 20 .00 Industri 7 (Sonamura under West Tripura District, Sabroom under es & South Tripura District, Gandacherra under Dhalai District Comm er and Khowai under West Tripura District @Rs.5.00 Cr.) ce 8. Establi shment of Veterinary College (Phase-II), West 15 .85 ARDD 8 Tripura District 9. Improvement & Upg radation of the Road from Motor 34 .60 PWD 9 Stand – Agartala Railway Station to NH-44 Bypass Via (R & B) Chitt aranjan Road and Central Road, West T ripura District (Length : 10.775 Km) 10 . Construction of Multi-storied State Ayurvedic Hospital at 4.74 Health 10 Agartala, West Tripura District Add itional List 0 11 . Transm iss ion Project (Phase-II) 400 KV D/C 201 .00 Power 11 Transmiss ion line from Suryamaninagar to Purbakanchanbari (charged at 132 KV) (approx. length 13 0 Km.) (Rs.20100 .00 lakhs) 12 . Transm iss ion Project (Phase-I) 132 KV D/C line from 12 .00 Power 12 Suryamaninagar to Rokhia (30 Km. and site development and Fdr. Bay at Rokhia) 13 . Augm entation of P.K. Bari S/station with 132 KV Bay for 5.00 Power 13 termination of 400 KV line (Rs.500 .00 lakhs) 14 . Construction of (G+3) storied 350 seated combined 14 .75 YA & 14 Hostel for Girl’s and Boy’s in the existing premises of Sports Sahid Bhagat Singh Comp lex at Agartala, West Tripura 15 . In frastructure Developm ent of Tripura Medica l College, 166 .91 Health & 15 Hapania, Agartala, West Tripura (Phase I) FW 16 . In frastructure Developm ent of Tripura Medica l College, 113 .80 Health & 16 Hapania, Agartala, West Tripura (Phase II ) FW 17 . Improvement and upg radation of the Road Conn ecting 29 .42 PWD 17 Sub-Division Head quarter with NH 44/ Pecharthal (R&B) (NH44) to Kanchanpur Road (26.50 Km)/ Phase- I. Portion from Pecharthal to Machmara (8.50 Km) 18 . Development of Purbasha Comp lex at Agartala (Phase- 4.00 HH&S 18 II), West Tripura 19 . Modernisa tion of Veteinary Training In stitute R.K. Nagar 14 .37 ARDD 19 (P hase II ), West Tripura 20 . Subroo m Sub-Divisional Hospital, South Tripura 28 .34 Health 20 21 . Sonamura Hospital, West Tripura 15 .00 Health 21 22 . Melaghar Sub-Divisional Hospital, West Tripura 15 .00 Health 22 23 . Enh ancement of capacity of Central Tea Processing 5.33 I & C 23 factory of Tripura Tea Developm ent Corporation Ltd. 24 . Procurement of 2 (two) High Capacity Direct rotary 6.99 DWS 24 water well drilling rigs including alli ed acc essories & equipm ents for piped water supp ly scheme s in Tripura 25 . Construction of 5 (five) Foo d Sto ra ge Godown 3.23 Foo d 25 Total 853 .93 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us