BRADDOCK METRO STATION REDEVELOPMENT
TATION S
ETRO M
June 26, 2014 26, June EDEVELOPMENT R www.alexandriava.gov/Braddock Charles Houston Recreation Center Recreation Houston Charles RADDOCK Joint City/WMATA Community Meeting City/WMATA Joint B BRADDOCK METRO STATION REDEVELOPMENT
2
EETING M
OF
of URPOSE
WMATA P
Alexandria Wall, Stan Susan Eddy, City Eddy, Susan Obtain Input on Metro on Metro Input Obtain Station and Transit Needs Transit and and Plan Small Area Present Progress Implementation Introduce WMATA’s Joint WMATA’s Introduce RFP Process Development
• • Presenters:
•
• • BRADDOCK METRO STATION REDEVELOPMENT
3
Joint Development Joint
Twinbrook EVELOPMENT Example: Example: D
to to
RIENTED
to create create to oriented - O
for high for
): Pedestrian auto minimize dependence ridership Uses Mixed origins destinations and Density
– – –
Oriented Development Development Oriented (TOD At Metro sites, WMATA WMATA sites, Metro At Transit to is committed RANSIT
• T BRADDOCK METRO STATION REDEVELOPMENT
4
? Rendering White Flint Joint Development Development Joint Flint White Example: Example:
EVELOPMENT
D
use - OINT J
IS
term ground lease for lease for ground term -
HAT
WMATA prefers to enter a enter to prefers WMATA long of the site. development development solicitation solicitation development selects a developer. WMATA Oriented Development Development Oriented (TOD). joint a competitive Through WMATA to commercial, commercial, to WMATA or mixed residential a Transit create to developers A creative program that that program A creative owned by property markets
• •
• W BRADDOCK METRO STATION REDEVELOPMENT
5
BJECTIVES O
EVELOPMENT
D
term revenues for for revenues term use development use development - - OINT
Generate long Generate WMATA Area Plan objectives Plan Area Complement existing neighborhoods Provide mixed Provide spaces public and active Help the City implement Small Promote and enhance transit transit enhance and Promote ridership Integrate WMATA transit facilities facilities transit WMATA Integrate access station safe Foster
•
• •
• • • • WMATA J WMATA BRADDOCK METRO STATION REDEVELOPMENT
6
OINT J
ETRO M
OAD
R
is physically is physically
Transit operations Transit access Station site Development
EVELOPMENT RADDOCK – – –
transit operations and operations transit interests community Develop RFP to protect protect to RFP Develop Metro Station Metro development Road Braddock at feasible Find out whether private private whether Find out D B
• • BRADDOCK METRO STATION REDEVELOPMENT
7
LAN P
EIGHBORHOOD N
ETRO M
range plan to outline the future of the the outline future plan to range -
RADDOCK “redevelopment site” “redevelopment Outlined Outlined a funding strategy as a identified Site Metro Braddock improvements, pedestrian safety enhancements, enhancements, safety pedestrian improvements, etc.) Long (new built environment neighborhood’s streetscape retail, parks, projects, development Approved by City Council City Council in 2008 by Approved
B
• •
• • BRADDOCK METRO STATION REDEVELOPMENT
8
LAN P
EIGHBORHOOD N
ETRO
M
RADDOCK B BRADDOCK METRO STATION REDEVELOPMENT
9
LAN P
EIGHBORHOOD N
ETRO
M
RADDOCK B BRADDOCK METRO STATION REDEVELOPMENT
10
Owners) (Multiple
Building Fee Simple Homes Homes Simple Fee WRIT Office WRIT
& &
Fields Braddock Braddock
ONDITIONS C
Colecroft Colecroft
Condominiums ONSIDERATIONS
C
ITE
XISTING S
E
St/Braddock Rd intersection Rd St/Braddock concerns at West West at concerns Flooding, pedestrian safety, safety, Flooding, pedestrian management traffic (BRT) station (BRT) Future Bus Rapid Transit Transit Rapid Bus Future Allowable FAR: 0.25/0.50 0.25/0.50 FAR: Allowable Permit) Use Special (with Parcel Area: 3.19 acres 3.19 Area: Parcel Zoning: UT Zoning:
• • • • • BRADDOCK METRO STATION REDEVELOPMENT
11
LAN P
THE
OF
uses: Office, Hotel, Hotel, uses: Office, 3.0 (417,000sf (417,000sf 3.0
ECOMMENDATIONS :
Intersection R -
Joint Development with Development Joint ARHA Maximum Height: 77ft Height: Maximum T Retail FAR development) Zoning: CDD (Coordinated (Coordinated CDD Zoning: District) Development Land
• • •
• • • Zoning and Land Use Land and Zoning BRADDOCK METRO STATION REDEVELOPMENT
12
LAN P
THE
MPLEMENTING I
station and incorporate and incorporate station guidelines into those WMATA to study future future study to WMATA of requirements operational City to draft guidelines draft to City the Braddock based on Plan Neighborhood Metro
• •
Accompany the Accompany RFP Development of GuidelinesDevelopment to BRADDOCK METRO STATION REDEVELOPMENT
13
TATION S
ETRO
M
3% drove and and parked 3% drove 21% by bus 21% by off 9% dropped 5% biked 62% walked
– – – – –
Customer Arrival: Customer Weekday Ridership: Ridership: Weekday 4,408
•
• Key Characteristics: Characteristics: Key BRADDOCK METRO STATION REDEVELOPMENT
14
CCESS
A :
AND
TATION S
RANSIT pace T rray ETRO S
A
off M -
Single
Curbside Curbside
of acks
up/Drop R - paces XISTING S ike Lockers ike Feet Feet E Pick Ride: Taxi Taxi 12 B Share Bike Carsharing 68 Bike 4 160 for 10 Motorcycle 5 DASH Routes Routes 5 DASH 21 Spaces 5 Bus Bays in in 5 Bus Bays Routes Bus 5 Metro
– – – – – – – – – – – :
Bike and Bike
Kiss and Ride: and Kiss Bus BRADDOCK METRO STATION REDEVELOPMENT
15
EEDS
N :
TATION S
PERATIONAL
ETRO O
M
UTURE F
Vertical Clearance Vertical Bus Lanes and Turning Bus Lanes and Turning Movements
– –
Future BRT and Streetcar and BRT Future WMATA and DASH buses buses and DASH WMATA Kiss and Ride and Kiss Pedestrian and Bike ADA Accessible Transit Accessible ADA
• • • • • Study: Study: WMATA Joint Development Development Joint WMATA To be developed as part of of part as be developed To BRADDOCK METRO STATION REDEVELOPMENT
16
TATION
WMATA S WMATA
OF
What’s working? working? What’s What isn’t isn’t working? What that we should address? address? should we that
exploring over the summer? the over exploring
ISCUSSION Is there anything else we should be be should else we anything there Is D Are there any existing transit/access issues transit/access existing any there Are BRADDOCK METRO STATION REDEVELOPMENT
17
TUDY
S
FOR
TEPS S
EVELOPMENT EXT D Evaluation Evaluation N
for joint development development joint for
OINT J Development Requirements and and Requirements Development
solicitation solicitation 2014) (Fall Community Meeting Draft Draft Guidelines Operations/Transit Analysis Analysis Operations/Transit Study Feasibility Stormwater
•
• •
• • BRADDOCK METRO STATION REDEVELOPMENT
18
WMATA WMATA (about 18 months) (about Planning Process & Process Planning Developer Selection Developer
EVELOPMENT D
OINT J
FTER A
Compact Public Hearing (Public Input) (Public Hearing Compact Public Selection of Developer Agreement Development of Joint Approval and Negotiation Plan of Site Development Modifications Transit of Future Identification Issuance of Joint Development Solicitation Development of Joint Issuance Proposals of Evaluation
ROCESS TUDY
S P
• • • • • • • BRADDOCK METRO STATION REDEVELOPMENT
19
City of Alexandria Alexandria Development Development & Public Input & Public (about 2 years) (about Review Process Process Review
EVELOPMENT
D
OINT
J
FTER
A
Recommendation Recommendation • Planning Commission Hearing (Public Input) (PublicCommission Hearing Planning Input) (PublicHearing Council Community Presentations (Public Input) (Public Community Presentations
• • •
Final Site Plan Review Plan Site Final Preliminary Site Plan Review Plan Site Preliminary Concept Site Plan Review Review Plan Site Concept
• • •
Rezoning Request CDD) (UT to Request Rezoning DSUP Process
ROCESS TUDY • • Development Review Site Plan Process Process Plan Site Review Development
S P • BRADDOCK METRO STATION REDEVELOPMENT
20
CHEDULE S
November, 2014 November, - TUDY Deliverable Dates Dates Deliverable
S
October, 2014 October, 2014 October, October Draft June, 2014 June, 2014 June, 2014 2014 July, ETRO
M
OAD
R
Guidelines
-
Braddock Road Station included in the 2014 Board Board included in the 2014 Station Road Braddock Solicitation Development Joint Metro approved RADDOCK
• B Draft Final Report Draft Public Meeting Future Transit Analysis Transit Future and Design Feasibility Guidelines Market Assessment Market Public Public Meeting Existing Conditions Existing Task