CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Brgy. Kabac, Granby Trading And Construction 27554 L Balai Bantayan 1 6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory Bantayan, Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - New Cortez-San Jose Carcor Panas Rd. Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Corella, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - New Cortez-San Jose Carcor Panas Rd. del Norte Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Tagum City, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - Km.1822+821, Apokon Sect. del Norte "R.R. Seismundo Construction & Supply" / Const. of Flood Control Structure (Sheet Piles & Grouted Monkayo, COMVAL JV-12-116 L A MA GE2 11/27/2012 1st XI LF 27.838 240 08/28/12 04/24/13 0.86 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - Davao Concrete Products Joint Venture Riprap) Agusan River, Brgy. Inambatan Province "R.R. Seismundo Construction & Supply" / Pantukan 2nd LD, Rechanneling and Construction of Dike in Kingking River, Compostela Valley Double J Construction And Supply Joint JV-16-948 L A MA GE Compostela Valley 3/20/18 1st/Final LF 44.251 185 3/10/17 9/10/17 0 C 0.475 0.133 0.3 - - - 90.80 *90.8% Very Satisfactory Mosahamat Section ( Left Side) DEO Venture Province Basey Pointe, Brgy. (Cavdeal) Ideal International Procurement of Fully Developed Lots and Complete Housing 84.13% 5599 L AAA Tingib, Basey, 01/26/18 Final NHA LF 290.000 862 3/7/2015 10/11/2017 -1.99 D 0.399 0.200 0.244 - - - 84.29 Construction And Development Corp. Units Satisfactory (Cavdeal) Cavite Ideal International Brgy. Tingib, Basey, 5599 L AAA Basey Pointe 2 2/3/2018 1st NHA LF 225.387 636 06/25/16 03/26/18 -39.75 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 - Construction And Development Corp. Samar Repair/Rehab. of Drainage Canal along -Bacon- Bibincahan, *83.3% 0405 Construction & Supply 34735 L B SB GE 5/30/2017 1st & Final Sorsogon 1st DEO LF 2.841 90 12/11/2016 3/10/2017 0.00 C 0.400 0.133 0.300 - - - 83.30 Manito Road, Bibincahan, Sorsogon City Sorsogon City Satisfactory Construction of Flood Mitigation Structures (Baybay Dagat San Fernando, 0405 Construction & Supply 34735 L D SB GE Dike) along Bito River, San Fernando, 6/14/2016 1st Masbate 3rd DEO LF 4.653 115 3/3/16 6/25/16 0.00 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% - Masbate Construction / Repair / Rehabilitation of Multi-Purpose 0405 Construction & Supply 34735 L B SB GE Monreal, Masbate 8/19/2017 1st Masbate 3rd DEO LF 3.881 150 11/4/2016 4/2/2017 0.00 O 0.488 0.133 0.300 - - - 92.10 - Building (Municipal Hall), Monreal, Masbate Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/ Improvement of *92.9% 11-16 Construction 29646 L AAA MA GE Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta. Bamban, 11/21/17 1st & Final DPWH LF 45.616 147 4/17/17 9/10/17 0.00 C 0.496 0.133 0.300 - - - 92.90 Very Satisfactory 0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta. 0+129, Bamban, Tarlac 121 Construction Corporation (Formerly: 121 Improvement/Concreting with Drainage System along Brgy. Zaniga, 84.30% 21686 L D SB GE 11/29/2014 1st NCR LF 6.684 120 8/14/14 12/11/14 1.00% O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% Construction) Ballesteros Street Mandaluyong City Satisfactory Brgy. Kanluran, San Construction of Flood Control Structure, Brgy. Kanluran, San Vicente, Camarines 89.6% 128 Dragon Construction And Supplies 35408 L B SB GE 3/14/2016 1st LF 0.949 30 3/23/15 4/22/15 - C 0.396 0.2 0.3 0 0 0 89.60% Vicente, Camarines Norte, 2nd Legislative Norte, 2nd DEO Very Satisfactory Legislative District Slope Protection (Grouted Riprap) along -Maluso Rd., 2M Construction & Enterprises 33331 L C SB GE2 Province 3/13/2013 1st IX LF 4.842 75 02/15/13 04/30/13 3.25 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - Matarling Sect. at K15+190-K15+249 at Lubigan Vitali Zamboanga City 87.5% 2M Construction & Enterprises 33331 L B SB GB Construction of Water System Level II District Zamboanga 3/7/2016 1st LF 1.945 75 9/18/15 12/1/15 (+)1.33% C 0.428 0.147 0.3 0 0 0 87.50% DEO Satisfactory City Road Widening Including Drainage along Ipil-Magdaup Wharf Ipil, Zamboanga Zamboanga 2M Construction & Enterprises 33331 L B MA GE 3/13/18 2nd/Final LF 16.187 177 6/5/17 11/28/17 -1% C 0.487 0.201 0.278 - - - 96.60 92.92% Very Satisfactory Road (S01143MN) (K2014+800 - K2015+297) Sibugay Sibugay 2nd DEO Concreting of Camanggaan - Calapugan, FMR, Natividad, 3rd 2-R Construction & Supply 15304 L B MA GE 3/19/18 1st/Final LF 3.977 119 8/29/17 12/25/17 0.2101 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory Brgy. Camanggaan-Calapugan Pangasinan DEO Raising of Grade of Dike Agno River Basin Flood Control Asingan, PANGASINAN 3RD 91.1% 2-R Construction & Supply 15304 L C SB GE Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/2015 1st LF 9.167 120 8/26/15 12/23/15 0.05 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10% Pangasinan DEO Very Satisfactory K0364+(-219) to Off Carriageway Improvement at Lingayen Capitol Loop, K0364+836, Pangasinan 2nd *87.36% 2-R Construction & Supply 15304 L C SB GE 9/2/2016 Final LF 9.34 105 3/6/15 6/19/15 - C 0.473 0.133 0.3 - - - 90.60% K0364+(-219) to K0364+836, Lingayen, Pangasinan Lingayen, DEO Satisfactory Pangasinan Indv. Project - Rehab./Reconst. of National Roads w/ Slips, Iriga City, KO *92.7% 301 Engineers 38364 L B - GE Slope Collapse and Landslide along Iriga City-Masoli Road 479+700-KO 11/16/17 1st & Final DPWH LF 5.071 132 3/8/17 7/17/17 2.94 C 0.493 0.134 0.300 - - - 92.70 Very Satisfactory 479+923 Construction of School Building, Brgy. Caranan, Pasacao, Brgy. Caranan, 1st 93% 301 Engineers 38364 L B SB GB Camarines Sur Pasacao, 8/25/2016 1st & Final LF 1.937 90 3/17/15 6/14/15 0.02 C 0.497 0.133 0.3 0 0 0 0.9300 DEO Very Satisfactory Camarines Sur Construction of One Storey Two Classroom (Toilet Attached) Cabadbaran City, 87.4% 3C'Sl Construction And Supply 36393 L D SB GB 3/14/2016 1st ADN DEO LF 1.927 90 10/15/15 1/12/16 0 C 0.441 0.133 0.3 0 0 0 87.40% Tolosa CES, Cabadbaran City, Agusan del Norte Satisfactory Rehabilitation of San Francisco River Control (San Francisco- *93.4% 3Diamonds Construction Corporation 35457 L B SB GE Maguiron Section) Guinobatan, 11/6/17 1st & Final DPWH LF 9.328 105 7/8/17 10/20/17 16.57 C 0.500 0.134 0.300 - - - 93.40 Very Satisfactory Construction of Flood Control along Cabugao River, Brgy. Cabugao, Ilocos 3G A Construction & Supply 35033 L D SB GE 3/16/18 1st/Final 1st DEO LF 9.304 140 3/4/17 9/20/17 38.57% C 0.479 0.133 0.3 - - - 91.20 *91.20% Very Satisfactory Turod - Patac Sur Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project Analysis) Asin (KM 8)-Nangalisan 86.32% 3K Rock Engineering 27908 L A MB GE San Pascual, Tuba, -LU Road, K0273+707 - Tuba, Benguet 11/17/2016 2nd & Final Benguet 1st DEO LF 33.303 196 2/16/2016 8/29/2016 0.00 C 0.408 0.175 0.3 0 0 0 0.8830 Satisfactory K0273+728, K0273+790 - K0274+127, K0275+351 - K0275+613, K0275+629 - K0275+1014, K0275+1050 - K0275+1240, Tuba, Benguet

*1st/Final 29th Release Page 1 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway-4 Kennon KO 238 + 880-KO 239 3K Rock Engineering 27908 L A MB GE Tuba, Benguet 11/16/2016 1st Regional Office LF 46.620 282 2/19/2016 11/26/2016 -0.03 O 0.331 0.289 0.121 0.03 0.055 0.033 0.8590 - + 048, KO237 + 123- KO238 + 000, KO228 + 791-KO229+000, KO228+080-KO228+440, Tuba, Benguet

Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project Analysis) Asin (Km 8) - Nangalisan *86.9% 3K Rock Engineering 27908 L A MB GE San Pascual, Tuba, Benguet, K0273+707 to K0273+728; Tuba, Benguet 3/29/2017 1st & Final Benguet 1st DEO LF 33.303 195 2/17/2016 8/29/2016 0.00 C 0.437 0.132 0.300 - - - 86.90 Satisfactory K0273+790 to K0274+127; K0275+531 to K0275+631; K0275+629 to K0275+1014; K0275+1050 to K0275+1240, Tuba, Benguet

Road Upgrading (Unpaved to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) (Intermittent Sections) of 3K Rock Engineering 27908 L A MB GE 8/27/2015 1st CAR LF 75.709 221 5/26/15 1/1/16 -16.41% O 0.363 0.241 0 0.03 0.061 0.033 72.80% - Kabugao - Pudtol - Luna - Bdry. Road, K0611+917 to K0612+961, K0612+973 to K0613+699, K0613+723 to K0614+500, Apayao Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road BENGUET 1ST 3K Rock Engineering 27908 L A MB GE Standard (HDM-4 Project Analysis) Asin Km. 8 - Naglisan - San Tuba, Benguet 8/23/2016 1st LF 33.303 195 2/16/16 8/28/16 0.01 O 0.339 0.24 0.15 0.02 0.051 0.05 0.8500 - DEO Pascual, Tuba, Benguet- Road, K0273+707 to K0273+728, K0273+790 to K0274+ Road Upgrading (Gravel to Concrete) of Asin -Nanganban - 3K Rock Engineering/Rvc Construction (J.V.) 27908 L B MA GE San Pascual Road K0270+594 - K0272+220 ; K0275+5311 - 8/16/2014 1st CAR LF 91.358 237 3/28/14 11/19/14 7.20 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 - K0275+7178 Concreting of Barangay Road, Barangay Salvacion, Del Del Gallego, Camarines Sur 5th 3-L Construction 16745 L B MA GE 8/16/2017 1st LF 1.410 40 5/25/2017 7/3/2017 0.02 O 0.496 0.133 0.300 - - - 92.90 - Gallego, Camarines Sur Camarines Sur DEO Construction/Improvement of Roads and Concreting of Brgy. Alianza, San Camarines Sur 1st 92.4% 3-L Construction 16745 L D SB GE Roads, Brgy. Alianza, San Fernando, Camarines Sur Fernando, 6/8/2016 1st & Final LF 1.844 45 3/7/16 4/20/16 0.00 C 0.475 0.149 0.3 0 0 0 92.40% DEO Very Satisfactory Camarines Sur Concreting of Mataoroc (Zone 3- Zone 5 FMR) Barangay Minalabac, Camarines Sur 1st 3-L Construction 16745 L B MA GE 4/6/2018 1st/Final LF 4.723 90 9/29/2017 1/26/2017 0.00 C 0.490 0.146 0.300 - - - 94.50 *94.50% Very Satisfactory Mataoroc Camarines Sur DEO Barangay Cluster 5-Local Infrastructure Program-Repair/Rehab. of Multi- 90% 3N Construction & Supply 37872 L D SB GB Sweetland, 3/10/2016 1st 2nd DEO LF 0.7682 75 10/12/15 12/26/15 (+)1.33% C 0.467 0.133 0.3 0 0 0 90.00% Purpose Building, Barangay Sweetland, Buenavista, Bohol Very Satisfactory Buenavista, Bohol Cluster 6 - Network Development - Improvement/Widening of Malinao, Albay and National Roads - Secondary Road along DM- Jct.-Legazpi-Sto. along Ligao- 3Rb Construction And Supply 19541 L B MA GE Domingo-Tabaco-Cam. Sur Bdry. Roads, Malinao, Albay and Tabaco Roads, 6/8/2017 1st Albay 1st DEO LF 92.711 190 3/6/2017 9/11/2017 0.02 O 0.387 0.232 0.150 0.03 0.061 0.033 89.30 - along Ligao-Tabaco Roads, Buang, Tabaco City, Albay 1st LD Buang, Tabaco City, Albay 1st LD Cluster 6- Network Development - Improvement/ Widening of National Roads - Secondary Roads along DM- Junction - Legazpi - Sto. Domingo- Tabaco - Camarines Sur Bdry Roads, Malinao and 3Rb Construction And Supply 19541 L B MA GE 8/24/2017 1st Albay 1st DEO LF 92.771 190 3/6/2017 9/11/2017 (+) 4.37% O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 - Malinao, Albay and along Ligao- Tabaco Roads, Buang , Tabaco City Tabaco City, Malinao and Tabaco City

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment along Pooc Sta. Rosa City, *84.4% 3Rb Construction And Supply 19541 L B MA GE 3/19/2017 1st & Final 2nd LF 19.002 140 1/28/2016 6/15/2016 0.00 C 0.344 0.200 0.300 - - - 84.40 Creek, Barangay Balibago and Barangay Macabling, Sta. Rosa Laguna Satisfactory City, Laguna Extension of River Control, Sta. 0+112.50 - Sta. 0+232.50, Sta. 0+112.50 - Sta. Bongabong, Tabaco City, Albay 0+232.50, *92.6% 3Rb Construction And Supply 19541 L B MA GE 3/13/2017 1st & Final Albay 1st DEO LF 16.705 128 3/21/2016 7/26/2016 0.00 C 0.485 0.141 0.300 - - - 92.60 Bongabong, Very Satisfactory Tabaco City, Albay Widening of National Roads Outside N1 DM Jct-Legazpi-Sto. Domingo-Tabaco-Camarines Sur Bdry. K0552+532- Malilipot, Albay and 94.4% 3Rb Construction And Supply 19541 L B MA GE 3/7/2016 1st Albay 1st DEO LF 43.1972 147 3/25/15 8/18/15 - C 0.448 0.196 0.3 0 0 0 94.40% K0553+660, K0554+600-K0555+400, Malilipot, Albay and Tabaco City Very Satisfactory Tabaco City Prieto Diaz, 3Rb Construction And Supply 19541 L B MA GE-5 Prieto Diaz Port Development Project 8/19/2015 1st DOTC LF 8.512 124 05/01/15 09/01/15 1.12 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 - Sorsogon Cluster 9-Construction/Rehabilitation/Improvement of River Estancia, Malinao, 91.3% 3Rb Construction And Supply 19541 L B MA GE 3/7/2016 1st Albay 1st DEO LF 3.9755 218 6/22/15 1/25/16 - C 0.48 0.133 0.3 0 0 0 91.30% Control Section, Estancia, Estancia, Malinao, Albay Albay Very Satisfactory Cluster 9-Construction/Rehabilitation/Improvement of River San Antonio and Control, San Antonio and San Vicente, Tabaco City and Diaro San Vicente, and Estancia, Malinao,, Albay 91.8% 3Rb Construction And Supply 19541 L B MA GE Tabaco City and 6/11/2016 1st & Final Albay 1st DEO LF 29.927 218 6/22/15 1/25/16 0.00 C 0.485 0.133 0.3 0 0 0 91.80% Very Satisfactory Diaro and Estancia, Malinao,, Albay

*1st/Final 29th Release Page 2 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION MISAMIS Museum, Tudela, 89.1% 3R'S Builders And Resources 35922 L D SB GB Construction of Multi-Purpose Building 3/16/2016 1st OCCIDENTAL 2ND LF 1.937 120 4/13/15 8/11/15 0 C 0.458 0.133 0.3 0 0 0 89.10% Very Satisfactory DEO Construction of 2STY 4CL School Building at Andabuen Benito Soliven, 4 A'S Construction 9446 L B SB GB 3/18/2017 1st Isabela 2nd LF 5.996 150 8/23/2016 1/19/2017 -0.20 O 0.341 0.299 0.000 0.03 0.047 0.033 75.00 - National High School Benito Soliven, Isabela Isabela Construction of Two (2) Storey Four (4) Classroom School Benito Soliven, 4 A'S Construction 9446 L B SB GB Building at Andabuen National High School Benito Soliven, 11/19/2016 1st Isabela 2nd LF 5.996 150 8/23/2016 1/19/2017 0.02 O 0.389 0.2 0.15 0.02 0.052 0.05 0.8610 - Isabela Isabela Floridablanca, 4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 2/5/2015 2nd BCDA L 18.951 120 09/03/14 12/31/14 21.45 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 - Floridablanca, 4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 11/20/2014 1st BCDA L 18.951 120 09/03/14 12/31/14 0.00 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 - Pampanga and 2014 heavy maintenance works along SCTEX lot 2 - Bridge 4B Construction Corporation L Pampanga/Region 10/31/2014 1st BCDA L 12.430 90 08/03/14 11/01/14 0.00 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 - revetment, slope and drainage repair works 3 Repair/ Maintenance of Flood Control Structure along *90.2% 525 Construction 28532 L B MA GE Balagtas River, San Juan Section, Balagtas, Balagtas, Bulacan 5/31/2017 1st & Final Bulacan 1st DEO LF 18.325 150 10/5/2016 3/3/2017 0.00 C 0.469 0.133 0.300 - - - 90.20 Very Satisfactory Construction of Flood Control Structure along Balagtas at *86.7% 525 Construction 28532 L B MA GE Balagtas, Bulacan 8/25/2017 1st & Final Bulacan 1st LF 4.628 90 4/25/2017 7/23/2017 0.33 C 0.367 0.200 0.300 - - - 86.70 Dalig, Balagtas, Bulacan Satisfactory Rehabilitation of Roads Brgy. Igulot - Brgy. Binang - Brgy. 525 Construction 28532 L B MA GE Bocaue, Bulacan 9/19/2016 1st Bulacan 1st DEO LF 34.143 210 4/3/16 10/29/16 0.00 O 0.312 0.3 0.15 0.03 0.042 0.05 0.8840 - Turo Valenzuela-Obando-Meycauayan Flood Control Project- (Sta. 3+475.40-Sta. Meycauayan, Construction of River wall Protection, 3+567.00), Right Bulacan Second 89.5% 525 Construction 28532 L B MA GE 3/8/2016 1st LF 24.1599 201 8/24/15 3/11/16 0.31% C 0.398 0.207 0.15 0.03 0.06 0.05 89.50% Meycauayan-Valenzuela Boundary Phase I, RS , (Sta. 3+475.40- Side, Meycauayan, DEO Very Satisfactory Sta. 3+567.00), Right Side, Meycauayan, Bulacan Bulacan Valenzuela-Obando-Meycauayan Flood Control Project - Meycauayan - Construction of Riverwall Protection, Meycauayan, 89.42% 525 Construction 28532 L A MB GE 6/7/2016 2nd & Final Bulacan 2nd LF 24.159 201 8/24/15 3/11/16 0.00 C 0.491 0.102 0.3 0 0 0 89.30% Meycauayan-Valenzuela Boundary Phase I, RS (Sta. 3+475.40 - Bulacan Very Satisfactory Sta. 3+567.00), Right Side Construction of Flood Control Structure along Angat River, *90.5% 525 Construction 28532 L B MA GE Pulilan, Bulacan Pulilan, Bulacan 11/17/17 1st & Final DPWH LF 10.880 150 6/8/17 11/4/17 6.21 C 0.472 0.133 0.300 - - - 90.50 Very Satisfactory Local Infrastructure Program - Improvement of Multi-Purpose 89% 5'S Construction & Supply 32404 L D SB GB Building (Public Market) 4th Legislative District , Brgy. Banate, Iloilo 3/9/2016 1st Iloilo 2nd DEO LF 1.969 259 7/16/15 3/31/16 (+) 6.91% C 0.457 0.133 0.3 0 0 0 89.00% Satisfactory , Banate Iloilo Improvement of Multi-Purpose Building/ Barangay Hall, 5'S Construction & Supply 32404 L D SB GB Iloilo City 3/23/18 1st/Final Iloilo City DEO LF 1.914 118 6/13/17 10/8/17 0.20 C 0.492 0.133 0.3 - - - 92.50 *92.50% Very Satisfactory Barangay Punong Lapuz, Iloilo City MFO 1 - National Road Network Services, Network Development Off-Carriageway Improvement including City, Batangas 2nd *91.6% 6 Jewels Construction 34737 L C SB GE Drainage, Secondary Roads Batangas Road, K0134+(- 8/25/2017 1st & Final LF 5.287 45 2/9/2017 3/25/2017 0.17 C 0.483 0.133 0.300 - - - 91.60 Batangas DEO Very Satisfactory 664) - K0134+(-414), K0134+100 - K0134+407, Batangas City, Batangas Local Infrastructure Program - Construction/ Improvement of Brgy. Calicanto, 91.2% 6 Jewels Construction 34737 L D SB GE Draiange Facilitites 9/21/2016 1st & Final Batangas 2nd LF 1.880 56 3/27/16 5/21/16 0.00 C 0.479 0.133 0.3 0 0 0 0.9120 Batangas City Very Satisfactory Rehabilitation & Improvement of Bustos Dam and Picnic 626 Construction & Trading, Inc. 34990 L D SB GE Bustos, Bulacan 9/27/18 2nd TIEZA LF 7.500 90 10/19/16 9/9/18 -2.07 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going Grounds Balungao, 626 Construction & Trading, Inc. 34990 L D SB GE Improvement of Hot and Cold Spring Resort 10/9/2015 2nd TIEZA LF 12.000 240 01/21/15 09/19/15 -4.710 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 - Pangasinan Balungao, 626 Construction & Trading, Inc. 34990 L D SB GE Improvement of Balungao Hot and Cold Spring Resort 5/27/2015 1st TIEZA LF 11.800 180 01/21/15 07/19/15 -17.71 O 0.397 0.299 0 0.030 0.045 0.017 78.74 Pangasinan 722 Construction, Inc.(Formerly: 722 Repair/Rehabilitation/Improvement along Baliuag-Candaba 78.50% 21923 L A MA GE Baliuag, Bulacan 11/24/2014 1st III LF 12.104 72 9/27/14 12/7/14 0.69% O 0.295 0.240 0.150 0.030 0.037 0.033 78.50% Construction) Road K0054+000 to K0057+000 Unsatisfactory Provision of Techvoc Workshop Buildings/Laboratories for Ilocos Sur 2nd Senior High School, Narvacan NCHS Narvacan, Ilocos *92.3% 739 Builders 31174 L B MA GB 6/4/2017 1st & Final District Engineering LF 2.307 85 12/1/2016 2/23/2017 -0.02 C 0.484 0.199 0.240 - - - 92.30 Sur Very Satisfactory Office Construction of Drainage Canal, Vigan-Sta. Catalina Road, *88.8% 739 Builders 31174 L B MA GE Vigan, Ilocos Sur 8/17/2017 1st & Final Ilocos Sur 1st DEO LF 11.177 120 3/10/2017 7/7/2017 -0.02 C 0.488 0.172 0.228 - - - 88.80 K0407+405-K0408+288 Satisfactory Provision of Techvoc Workshop Building/Laboratories for Narvacan, Ilocos Ilocos Sur 2nd 739 Builders 31174 L B MA GB Senior High School, Narvacan National High School, 3/18/2017 1st LF 2.306 115 12/1/2016 3/25/2017 -0.10 O 0.225 0.300 0.051 0.03 0.052 0.033 69.10 - Sur DEO Narvacan, Ilocos Sur Provincial 31174 / Upgrading and Improvement of Sta. Lucia - Nagrebcan - Sta. Lucia, Ilocos 739 Builders / Arthit Corporation L MA SB 10/9/2018 1st Government of LF 44.784 211 9/20/2018 4/26/2018 0.63 O 0.40 0.30 0.15 0.03 0.07 0.05 100.00 - On - Going 40667 Ronda Road Sur / Region 1 Ilocos Sur Construction of Two (2) Storey, Four Classroom Building for *82.7% 811 Trading & Construction 21215 L A MA GB Sta. Cruz, Marinduq 8/25/2017 1st & Final DEO LF 7.115 262 6/1/2016 2/17/2017 - C 0.473 0.200 0.154 - - - 82.70 Punong NHS, Sta. Cruz, Marinduque Satisfactory Construction of 2 Storey/ 8 Classrooms at Doroteo S. Naujan, Oriental *68.8% 811 Trading & Construction 21215 L A MA GB Mendoza SR Memorial National High School, Naujan, Oriental 8/17/2017 1st & Final LF 10.769 210 8/22/2016 3/19/2017 - C 0.488 0.200 0.000 - - - 68.80 Mindoro DEO Poor Mindoro

*1st/Final 29th Release Page 3 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction of 2 Storey/8 Classrooms at Doroteo S. Naujan, Oriental Mindoro Oriental 811 Trading & Construction 21215 L A MA GB Mendoza, Sr., Memorial National High School, Naujan, Oriental 11/17/2016 1st LF 10.821 150 8/22/2016 1/18/2017 -0.04 O 0.349 0.3 0.109 0.03 0.058 0.033 0.8790 - Mindoro DEO Mindoro 811 Trading & Construction/ Great Lakes Construction of Wawa Seawall, Calapan City, Oriental Mindoro Calapan City, Mindoro Oriental JV-15-1249 L A B GE 8/26/2016 2nd LF 18.576 181 3/9/16 9/5/16 0.15 O 0.382 0.2 0.3 0 0 0 0.8820 - Enterprises, Joint Venture Oriental Mindoro DEO Paving of Shoulder with Drainage and Slope Protection, San Teodoro, Mindoro Oriental 876 Construction 24224 L D B GE 8/26/2016 2nd LF 1.293 75 1/27/16 4/10/16 0.00 O 0.455 0.158 0.3 0 0 0 0.9130 - Calapan North Road (CNR) Oriental Mindoro DEO Cluster-Road Widening along Daang Maharlika (S00223LT), 888 Acy Enterprises 32898 L B MA GE K1024+443-K1024+699, K1024+721-K1025+607 Southern 11/6/17 1st DPWH LF 33.567 240 3/19/17 11/13/17 -3.75 O 0.344 0.254 0.112 0.03 0.056 0.033 82.90 -

Off-Carriageway Improvement Along Jct. Taft-Oras-San K0939+500- Policarpio-Arteche Road (S00167SM) K0939+500-K0940+744; K0940+744; K0942+280-K0943+344, K0943+432-K0944+1087, Eastern K0942+280- 888 Acy Enterprises 32898 L B MA GE Samar K0943+344, 8/15/2017 1st LF 39.857 210 3/8/2017 10/3/2017 (+)0.37% O 0.364 0.300 0.150 0.03 0.012 0.033 88.90 - DEO K0943+432- K0944+1087, Eastern Samar Rehab./Major Repair of Permanent Bridges, Canlawis Bridge *84.5% 888 Acy Enterprises 32898 L B MA GE along Lilo-an-San Ricardo Road (B00368LT), Pintuyan, - 3/30/2017 1st & Final LF 19.585 247 1/27/2016 9/29/2016 0.00 C 0.412 0.133 0.300 - - - 84.50 DEO Satisfactory Southern Leyte Rehab./Major Repair of Permanent Lo-oc Bridge along Bdry. Lo-oc, Tomas So. Leyte-Maasin-Macrohon-Sogod-Daang Maharlika Southern Leyte 87.5% 888 Acy Enterprises 32898 L B MA GE Oppus, Southern 11/14/2016 1st & Final LF 9.699 170 1/27/2016 7/14/2016 0.00 C 0.442 0.133 0.3 0 0 0 0.8750 (B00330LT), Lo-oc, Tomas Oppus, Southern Leyte DEO Satisfactory Leyte Rehab./Major Repair of Permanent Dinahugan Bridge along Padre Burgos, Southern Leyte 888 Acy Enterprises 32898 L B MA GE Bdry. So. Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 6/26/2016 1st LF 19.148 202 1/27/16 8/15/16 0.00 O 0.367 0.24 0.15 0.03 0.056 0.05 89.30% - Southern Leyte DEO (B003011LT) Along Brdy, S. leyte- Rehab/Major Repair of Permanent Bridges, Pandan Bridge, Maasin-Macrohon- Southern Leyte 888 Acy Enterprises 32898 L A MA GE Along Brdy, S. leyte-Maasin-Macrohon-Sogod-Daang 6/3/2015 1st LF 8.812 150 3/4/15 7/31/15 - O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% - Sogod-Daang DEO Maharlika Maharlika Off-Carriageway Improvement along Taft - Oras - San Policarpio - Arteche Road, K0939+500 - K0940+744, Eastern Samar 888 Acy Enterprises 32898 L B MA GE Eastern Samar 4/10/18 2nd/Final LF 39.857 210 3/8/17 10/3/17 0.00% C 0.481 0.186 0.3 - - - 96.70 91.48% Very Satisfactory K0942+280 - K0943+344, K0943+432 - K0944+490, K0944+672 - DEO K0944+1087 Road Widening along Daang Maharlika, K1024+443- Southern Leyte 888 Acy Enterprises 32898 Southern Leyte 04/09/18 LF 33.567 240 42,813 43,052 0 C 0.482 0.133 0.300 - - - 91.50 *91.50% Very Satisfactory L B MA GE K1024+699.00; K1024+721-K1025+607.000 1st/Final DEO Construction of 4 STY, 8-CL at Amlan NHS Amlan 2nd District, 92.4% 8G Construction And General Services 35783 L B SB GB 11/18/2016 1st & Final LF 14.868 230 10/26/2015 6/11/2016 0.00 C 0.491 0.133 0.3 0 0 0 0.9240 Negros Oriental 2nd DEO Very Satisfactory Rehabilitation/Improvement of Farm to Market Road at Ayungon, Negros Negros Oriental 86.8% 8G Construction And General Services 35783 L B SB GE Jandalamanon, Kilaban, Gomentoc and Candanaay, 3/11/2016 1st LF 3.7437 50 6/26/15 8/14/15 0 C 0.435 0.133 0.3 0 0 0 86.80% Oriental First DEO Satisfactory Ayungon, Negros Oriental Rehabilitation of Multi-Purpose Building, Barangay Sta. Catalina, Negros Oriental 86.9% 8G Construction And General Services 35783 L B SB GB Manalungon, Negros Oriental 3rd 8/24/2016 1st & Final LF 1.940 180 2/2/16 7/30/16 0.00 C 0.436 0.133 0.3 0 0 0 0.8690 3rd DEO Satisfactory LD Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Rd. including Drainage (Marinduque Circumferencial Boac-Mogpog, 8R'S Construction 22997 L B A GE Road), K0004+000-K0004+600, K0005+300-K0005+486, and 8/27/2016 1st Marinduque DEO LF 26.202 257 2/22/16 11/4/16 0.02 O 0.347 0.259 0.15 0.03 0.025 0.033 0.8440 - Marinduque K0005+670-K0005+832, Boac-Mogpog, Marinduque

Barangay San Roque, Delfin Albano, Isabela Delfin Albano, *88% 969 Construction & Supplies 35818 L D or C SB GB 6/2/2017 1st & Final Isabela 1st DEO LF 1.410 91 2/14/2017 5/15/2017 0.00 C 0.442 0.138 0.300 - - - 88.00 Isabela Satisfactory Repair/Rehab of Agusan River Flood Control, Osmena A B Aponesto Construction, Parts & Supply 22998 L A MA GE Section, Compostela along Montevista – Compostela – New Compostela Valley 8/9/2014 1st XI LF 30.533 183 12/27/13 7/27/14 -2.74 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 - Bataan – Maragusan – Mati Bdry. Road. Construction of River Bank Protection, Siffu Flood Control A De Guia Construction 18228 L AA MA GE Roxas, Isabela 8/28/2015 1st Isabela 2nd DEO LF 18.346 215 2/24/15 9/26/15 0.32% O 0.354 0.3 0.15 0.03 0.04 0.05 92.40% - Project, Sittio Gabit Section, Roxas, Isabela Pinili-Nueva Era Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road, K0453+(- National Roads including Drainage Based on Pavement A J Taylan Construction & Development/Jlp 224)-K0454+1013, Ilocos Sur 2nd JV-14-518 L A MB GE Management System/Highway Development and Management- 8/26/2015 1st LF 37.519 219 4/29/15 12/4/15 (+)2.27 O 0.355 0.209 0.15 0.03 0.051 0.05 84.50% - Construction & Supply Joint Venture K0455+884- DEO 4(HDM-4), Pinili-Nueva Era Road, K0453+(-224)-K0454+1013, K0456+433, Pinili K0455+884-K0456+433, Pinili Road, Road, Ilocos Norte MFO-1 National Road Network Services: Network A. B. Taylan Construction & Development / Development: Widening of National Roads (Arterial)-along N1, Allacapan, Regional Office No. *88.6% North Tech Builders And Construction Supply JV-14-115 L AAA - GE 6/1/2017 1st & Final LF 74.138 294 2/15/2016 12/4/2016 0.00 C 0.452 0.134 0.300 - - - 88.60 Bangag-Magapit Road, K0686+(-512) - K0687+980, Bangag- Cagayan II Satisfactory Joint Venture Magapit, Allacapan, Cagayan Replacement/ Raising of PHHC Bridge (S00130NR) along A. C. Rivero Development Corporation 5122 L A MB GE Bacolod City 11/16/17 1st DPWH LF 19.600 255 4/26/17 1/5/18 0.34 O 0.391 0.240 0.150 0.03 0.04 0.05 90.10 - Bacolod Circumferential Road, Bacolod City

*1st/Final 29th Release Page 4 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Rehabilitation/ Improvement of Existing Dike along Lucung A. C. Soliven Construction * General River, Upstream of Sta. Maria Section, Left Side, Sta. (-)2+050 *85.4% 19278 L B MA GE Concepcion, Tarlac 8/20/2017 1st & Final Tarlac 2nd DEO LF 37.231 147 2/16/2017 7/12/2017 0.00 C 0.421 0.133 0.300 - - - 85.40 Merchandise to Sta. (-)2+132 and Sta. (-)2+200 to Sta. (-)2+619.60, Satisfactory Concepcion, Tarlac Asset Preservation of National Roads Preventive Maintenance - Asset Preservation of National Roads - A. D. Pendon Construction & Supply, Inc. San Remigio, 3466 L A MB GE Rehabilitation/Reconstruction/Upgrading of Damaged Paved 6/9/2016 1st DEO LF 29.476 223 8/14/15 3/23/16 0.00 O 0.23 0.291 0.121 0.008 0.022 0 67.20% - (Formerly: A. D. P. Construction & Supply) Antique National Roads Including Drainage, Odiong - Sibalom - San Remigio - Leon Road, San Remigio, Antiq Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved A. D. Pendon Construction & Supply, Inc. National Roads including Drainage, Iloilo- Road (Pavia 3466 L A MB GE Iloilo 11/16/2016 1st ILOILO 4TH DEO LF 7.258 170 6/30/2016 12/16/2016 0.04 O 0.341 0.24 0.15 0.03 0.05 0.05 0.8610 - (Formerly: A. D. P. Construction & Supply) Diversion), K0010+449 to K0010+824.30, Iloilo

A. D. Pendon Construction & Supply, Inc. Upgrading of Delgado St. K0001+(-402)-K0001+(-100), K0001+(- 3466 L A MB GE Iloilo City 9/1/2016 1st ILOILO DEO LF 22.611 22.611 3/26/00 4/16/00 0.00 O 0.275 0.3 0.05 0.03 0.058 0 0.7130 - (Formerly: A. D. P. Construction & Supply) 100)-K0001+080, Iloilo City Construction/ Rehabilitation of Flood Control Projects, Nagassican, A. De Guia Construction 18228 L AA MA GE 8/12/2014 1st II LF 19.500 184 4/3/14 10/3/14 13.19 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 - Nagassican Flood Control Projects, Sta. 0+000 to Sta. 0+224 Santiago City Construction of Drainage System / Protection Works along 88.90% A. De Guia Construction 18228 L AA MA GE Daang Maharlika, Isabela 4th LD K0311+590 - K0314+350, San Cordon, Isabela 10/27/2014 1st II LF 19.403 231 3/26/14 11/11/14 0.96% O 0.347 0.300 0.150 0.030 0.029 0.033 88.90% Satisfactory Luis - Caquilingan Concreting of San Pablo-Salvacion Road, Barangay San Pablo Barangay San *90.3% A. DE GUIA CONSTRUCTION 18228 L AA MB GE Alicia, Isabela 11/11/17 1st & Final DPWH LF 6.930 122 2/28/17 6/29/17 0.00 C 0.470 0.133 0.300 - - - 90.30 Pablo Alicia, Isabela Very Satisfactory Network Development - Improvement/ Widening of National Roads Primary Roads - Other Primary Roads along National and San A. DE GUIA CONSTRUCTION 18228 L AA MB GE Roads along Santiago - Tuguegarao Road, K0369+000 - 8/19/2017 1st Isabela 2nd DEO LF 91.157 251 2/27/2017 11/4/2017 0.02 O 0.381 0.240 0.150 0.03 0.07 0.033 90.40 - Miguel, Isabela K0371+000, K0373+000 - K0374+000, K0374+947 - K0376+000, Aurora and San Miguel, Isabela MFO 1 - National Road Network Services: Network K0382+977- Development: Improvement/Widening of National Roads, K0383+450 L/S, Primary Roads along N1 Daang Maharlika (LZ) - K0382+977- K0383+830- K0383+450 L/S, K0383+830-K0386+182 L/S, K0386+291- K0386+182 L/S, K0387+215 L/S, K0382+977-K0383+450 R/S, K0383+83 K0386+291- K0387+215 L/S, K0382+977- K0383+450 R/S, A. DE GUIA CONSTRUCTION 18228 L AA MB GE 6/15/2016 1st Regional Office LF 79.349 248 2/4/16 10/8/16 0.02 O 0.393 0.24 0.15 0.03 0.047 0.05 91.00% - K0383+830- K0385+006 R/S, K0385+220- K0386+014 R/S, K0386+102- K0386+193 R/S, K0386+375- K0387+215 R/S

Network Development-Improvement/Widening of National Roads-Primary Roads-Other Primary Roads along National Aurora and San A. DE GUIA CONSTRUCTION 18228 L AA MB GE 04/09/18 Isabela 2nd DEO LF 91.157 281 42,793 43,073 0 C 0.363 0.200 0.300 - - - 86.30 91.40% Very Satisfactory Roads along Santiago-Tuguegarao Road, K0369+000- Manuel, Isabela K0371+000, K0373+000-K0374+000 & K0374+947-K0376+000 2nd/Final Network Development, Improvement/Widening of National Isabela-Sinamar A. DE GUIA CONSTRUCTION 18228 L AA MA GE Roads, Santiago-Tuguegarao Road, K0342+(-039)- Sur, San Mateo, 3/20/18 1st/Final Isabela 3rd DEO LF 45.847 179 4/4/17 9/29/17 0.00% C 0.461 0.176 0.300 - - - 93.70 *93.70% Very Satisfactory K0343+884, Oscar, Ramon Isabela Construction of Multi-Purpose Building at Dona Aurora Quezon City 2nd A. Dela Cruz Builders Inc. 38836 L D SB GB Quezon City 3/17/18 1st/Final LF 14.724 250 7/14/17 3/20/18 0.06 C 0.490 0.132 0.300 - - - 92.20 *92.20% Very Satisfactory Elementary School, Brgy. Doña Aurora, Quezon City DEO Flood Management Services Construction/Maintenance of A. J. Lava Builders Corp. (Formerly: A. J. Lava Flood Mitigation Structures and Drainage System Brgy. San Jose, 92% 22265 L B MA GE 11/11/2015 1st 1ST DEO LF 27.612 180 6/10/15 12/6/15 0.0018 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00% Builders) Improvement/Riprapping of Sitio Kapatagan River Antipolo City Very Satisfactory (Downstream), Brgy. San Jose, Antipolo City, 2nd LD Construction of Apatot Bridge and Approaches, Pinili, Ilocos Ilocos Norte 2nd 86.9% A. J. Taylan Construction Corporation 2336 L B MA GE Pinili, Ilocos Norte 11/15/2016 1st & Final LF 27.042 270 3/23/2013 12/17/2013 0.05 C 0.35 0.3 0.101 0.03 0.055 0.033 0.8690 Norte DEO Satisfactory Laoag River Basin Flood and Sabo Project, Concrete Brgy. Sta Monica, ILOCOS NORTE 91.1% A. J. Taylan Construction Corporation 2336 L B MA GE Revetment along Bongo River, Brgy. Sta Monica, Sitio 2, San Sitio 2, San Nicolas, 3/9/2016 2nd LF 9.649 194 8/12/15 2/22/16 0 C 0.42 0.2 0.3 0 0 0 91.10% 2ND DEO Very Satisfactory Nicolas, Ilocos Norte Ilocos Norte A. M. Oreta and Co., Incorporated 108 L AAA LB Region 2-PIDP-CBIMO Sta. Ana, Cagayan 9/19/2015 1st NIA LF 80.788 690 04/01/14 10/09/15 -1.58 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 - Construction of Flood Control Wall along Agbalili River, A. M. P. Construction 16574 L B MA GE Altavas, 8/28/2016 1st AKLAN DEO LF 34.428 34.428 12/14/00 1/16/01 0.00 O 0.388 0.3 0.003 0.03 0.058 0 0.7790 - Altavas, Aklan Construction of Flood Control Revetment Wall along Agbalili A. M. P. Construction 16574 L B MA GE Altavas, Aklan 6/11/2016 2nd AKLAN DEO LF 34.428 274 9/29/15 6/28/16 0.00 O 0.385 0.3 0.104 0.023 0.055 0.033 90.00% - River, Altavas, Aklan Construction/ Maintenance of Flood Mitigation Structures and A. M. P. Construction/ Forthright Construction Drainage System, Rehabilitation/ Improvement of Pampanga Palayan City, Nueva 2nd JV-16-1612 L A MA GE 8/23/2017 1st LF 39.200 161 5/10/2017 10/17/2017 0.02 O 0.309 0.300 0.150 0.02 0.042 0.05 87.10 - Joint Venture River Control, Brgy. Sapang Buho, Palayan City, Nueva Ecija Ecija DEO

*1st/Final 29th Release Page 5 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Network Development/ Widening of National Roads- Secondary Road--Ilocos Norte Road K0409+000- K0409+100, K0409+115-K409+178, K0409+307-K0409+404, K0409+531-K0409+648, K0409+748-K0410+139, K0410+159- 85.8% A. P. B. Construction 17055 L B MA GE Abra 11/20/2015 1st Regional Office LF 81.971 286 6/25/15 4/5/16 2.15% O 0.318 0.29 0.15 0.022 0.045 0.033 85.80% K0410+360, K0410+369-K0410+777, K0411+050-K0411+220, Satisfactory K0412+122-K0412+499, K0413+000-K0414+354, K0414+764- K0415+747, K0416+175-K0416+445, K041

Construction of Barangay Hall/Evacuation Center, Brgy. Brgy. Salvacion, 96% A. P. Consebido Construction And Trading 33616 L D SB GB Salvacion, Roxas, 11/23/2016 1st & Final Palawan First DEO LF 1.982 100 3/7/2016 6/14/2016 0.10 C 0.481 0.179 0.3 0 0 0 0.9600 Roxas, Palawan Very Satisfactory Sta. 00+012.70-Sta. Construction of Barangay Road, Barangay Dumarao, Sta. 89.9% A. P. Consebido Construction And Trading 33616 L D SB GE 0+149.00, Roxas, 3/10/2016 1st Palawan First DEO LF 1.9478 100 7/20/15 10/27/15 -1.00% C 0.429 0.2 0.27 0 0 0 89.90% 00+012.70-Sta. 0+149.00, Roxas, Palawan Very Satisfactory Palawan Retrofitting/Strengthening of Disiluad Br. (B01939LZ) along Disiluad, Aglipay, 91.9% A. P. D. Construction 17467 L A MB GE Cordon-Aurora Boundary Road (Isabela Boundary - Jct. 3/17/2016 1st LF 29.4724 180 7/12/15 1/7/16 62.00% C 0.486 0.133 0.3 0 0 0 91.90% Quirino Very Satisfactory Dumabato) Barangay Sta. Monica, Inagawan Construction of Multi-Purpose Building, Barangay Sta. 96% A. R. Lustre Jr. Construction 7680 L AAA LA GB Sub. And San 3/11/2016 1st Palawan 3rd DEO LF 1.9142 156 2/7/15 7/12/15 - C 0.483 0.177 0.3 0 0 0 96.00% Monica, Inagawan Sub. And San Miguel, Puerto Princesa City Very Satisfactory Miguel, Puerto Princesa City Local Infrastructure Program - Construction of 2 Storey, 4 Brgy. Luyos, 89.4% A. Sandoval Construction & Supply 35991 L B SB GB Classroom School Building, Luyos NHS, Brgy. Luyos, Tanauan City, 6/30/2016 1st & Final Batangas 3rd LF 8.464 180 6/30/15 12/26/15 0.00 C 0.461 0.133 0.3 0 0 0 89.40% Very Satisfactory Tanauan City, Batangas 3rd LD Batangas 3rd LD Road Concreting, Bato to Likate Road, Brgy. Bato and Kilate, Davao City 2nd 88.3% A. Y. U. Engineering And Construction 25632 L B MA GE Toril, Davao City 9/2/2016 2nd & Final LF 9.800 105 4/14/16 7/27/16 0.00 C 0.483 0.133 0.3 0 0 0 0.9160 Toril, Davao City DEO Satisfactory Netwrork Development, Improvement of National Roads along North Road, K0508+050-K0508+125; K0508+140- K0508+250; K0508+329; K0508+410-K0509+755; K0509+760- Pasuguin, Ilocos *90.6% A.B Taylan Construction & Development 25273 L A MB GE 11/8/17 1st & Final DPWH LF 144.750 255 2/24/17 11/5/17 0.00 C 0.473 0.133 0.300 - - - 90.60 K0510+501; K0519+000-K0520+200; K0521+000-K0522+500; Norte Very Satisfactory K0522+500-K0523+060

Construction of Multi-Purpose Building, Brgy. North Centro, Brgy. North Centro, Camarines Sur 1st 93.1% A.B. Opeña Builders 33996 L D SB GB Sipocot, Camarines Sur Sipocot, Camarines 6/6/2016 1st & Final LF 1.881 120 3/10/15 7/7/15 0.00 C 0.484 0.147 0.3 0 0 0 93.10% DEO Very Satisfactory Sur Construction of Multi-Purpose Building at Colacling National Lupi, Camarines *92.1% A.B. Opeña Builders 33996 L D SB GB High School 11/15/17 1st & Final DPWH LF 0.955 60 7/27/17 9/24/17 3.33 C 0.488 0.133 0.300 - - - 92.10 Sur Very Satisfactory Concreting of Barangay Road at Brgy. Mabini, Del Gallego, Brgy. Mabini, Del Camarines Sur 5th *87.7% A.B. Opeña Builders 33996 L D SB GE Camarines Sur Gallego, Camarines 6/1/2017 1st & Final LF 1.410 40 2/23/2017 4/3/2017 0.00 C 0.443 0.134 0.300 - - - 87.70 DEO Satisfactory Sur Concreting of Barangay Road, Barangay Sta. Cruz, Cabusao, Cabusao, Camarines Sur 5th A.B. Opeña Builders 33996 L D SB GE 8/16/2017 1st LF 1.881 45 5/25/2017 7/8/2017 0.02 O 0.489 0.134 0.300 - - - 92.30 - Camarine Sur Camarine Sur DEO Cluster: Completion/Construction of Multi-Purpose Building at Brgy. Ragay, Camarines 5th 89.9% A.B. Opeña Builders 33996 L D SB GB Brgy. Ragay, Camarines Sur 11/24/2016 1st & Final LF 2.883 90 6/22/2016 9/19/2016 0.03 C 0.466 0.133 0.3 0 0 0 0.8990 Camarines Sur DEO Very Satisfactory

Improvement/Widening of National Road along N1, Manila K0494+396- North Roads, K0494+396-K0495+024; K0496+164-K0496+423; K0495+024; K0496+775-K0497+444; K0497+834-K0498+000; K0499+200- K0496+164- K0500+676; K0500+676-K0500+698; K0500+676-K0500+756; K0496+423; K0503+380-K0506+084; K0503+380-K0506+048, Bacarra, K0496+775- Ilocos Norte K0497+444; K0497+834- K0498+000; K0499+200- K0500+676; Regional Office No. A.B. Taylan Construction & Development 28233 L A MB GE 11/16/2016 1st LF 146.250 325 1/27/2016 12/16/2016 0.04 O 0.49 0.133 0.3 0 0 0 0.9230 - K0500+676- I K0500+698; K0500+676- K0500+756; K0503+380- K0506+084; K0503+380- K0506+048, Bacarra, Ilocos Norte Construction of Final Mitigation Structure along Badoc River, A.B. Taylan Construction & Development/ Ilocos Norte 2nd *92.4% JV-16-621 L B MA GE U/S and D/S of Badoc Bridge Badoc, Ilocos Norte 8/16/2017 2nd & Final LF 44.100 225 2/24/2017 10/6/2017 0.12 C 0.457 0.200 0.300 - - - 95.70 Badoc Builders & Supply Joint Venture DEO Very Satisfactory Road Upgrading (Unpaved to Paved) Based on Gravel Road K0481+643- A.B. Taylan Construction & Development/ Strategies, Traffic Benchmark for Upgrading to Paved Road K0482+046; Regional Office No. *92.8% JV-15-404 L AAA MB GE 8/17/2017 1st & Final LF 146.249 300 1/26/2016 11/20/2016 0.00 C 0.491 0.145 0.292 - - - 92.80 Badoc Builders & Supply Joint Venture Standards (HDM-4) along Batac-Pinili via Maipalig Road K0482+186- I Very Satisfactory (S04765LZ) K0485+624

*1st/Final 29th Release Page 6 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Upgrading of Drainage System Along El Dorado Street, Parañaque City, A.C Rivero Development Corporation 5122 L A MA GE 11/21/17 1st DPWH LF 14.035 261 3/20/17 12/5/17 -7.06 O 0.376 0.300 0.079 0.03 0.056 0.033 87.40 - Barangay Bosco, District II Manila Rehabilitation/Reconstruction of Proposed Slope Protection Iligan City, Lanao *92.3% A.C Rivero Development Corporation 5122 L A MB GE along Sta. Felomina-Bonbonon-Digkilaan-Rogongon Road del Norte Lone 11/14/17 1st & Final DPWH LF 33.582 193 3/9/17 9/17/17 10.35 C 0.448 0.175 0.300 - - - 92.30 Very Satisfactory K1526+000-K1526+200 R/S District Agno River Basin & Allied Rivers Flood Control Project - A.C Soliven Construction & General Brgy. Gualsic, *87.1% 19278 L B MA GE Heightening of Villasis-Alacala Earth Dike Phase I, Agno River 11/14/17 1st & Final DPWH LF 44.687 220 3/13/17 10/18/17 0.00 C 0.438 0.133 0.300 - - - 87.10 Merchandise Alcala, Pangasinan Satisfactory Control Concreting and Sidewalk Improvement of Phase 2, Scout Quezon City 2nd A.C. Mojares Construction, Inc. 1771 L AAA MA GE Quezon City 6/3/2014 1st LF 10.018 207 2/20/15 9/14/15 (+) 41.00 O 0.394 0.24 0.15 0.015 0.028 0.05 87.70% - Tobias St., Brgy. Laging Handa, Quezon City DEO Rehabilitation/ Reconstruction of National Roads with Slips, K1135+300 to A.C. Rivero Development Corporation Slope Collapse and Landslide along Tomas Oppus Street K1136+000, Southern Leyte *93.2% 5122 L A MA GE 6/3/2017 1st & Final LF 27.915 260 2/5/2016 10/21/2016 0.00 C 0.499 0.133 0.300 - - - 93.20 (Formerly: A.C. Rivero Construction) Maasin City, DEO Very Satisfactory Southern Leyte CY 2016 Basic Education Facilities Fund (BEFF), Provision of A.C. Rivero Development Corporation *89.5% 5122 L A MA GB Tech Voc. Laboratores, Batch 12, Merida Vocation School, - 4/1/2017 1st & Final Leyte 4th Deo LF 2.556 90 9/14/2016 12/12/2016 (+)7.78% C 0.462 0.133 0.300 - - - 89.50 (Formerly: A.C. Rivero Construction) Very Satisfactory Merida, Leyte Indv. Project - Concreting of Monte-Calvario-Igbac-Barangay A.C. Rivero Development Corporation *91.6% 5122 L A MB GE Road, Brgy. Monte-Calvario and Igbac Buhi, Camarines 11/16/17 1st & Final DPWH LF 9.860 83 4/26/17 7/17/17 0.00 C 0.484 0.132 0.300 - - - 91.60 (Formerly: A.C. Rivero Construction) Very Satisfactory Off-Carriageway Improvement including Drainage along A.C. Rivero Development Corporation 5122 L A MB GE Liloan-San Ricardo Road (S00218LT), K1070+685 to Southern Leyte 11/6/17 1st DPWH LF 45.307 270 3/19/17 12/13/17 10.00 O 0.368 0.239 0.150 0.03 0.065 0.05 90.20 - (Formerly: A.C. Rivero Construction) K1072+000 A.C. Rivero Development Corporation Replacement of PHHC Bridge along Bacolod Circumferential 5122 L A MB GE Bacolod City 6/6/2017 2nd Bacolod City LF 34.299 330 3/4/2016 1/27/2017 -0.12 O 0.373 0.200 0.029 0.03 0.058 0.033 72.33 - (Formerly: A.C. Rivero Construction) Road A.C. Rivero Development Corporation Replacement of PHHC Bridge along Bacolod Circumferential *68.34% 5122 L A MB GE Bacolod City 8/23/2017 2nd & Final Bacolod City LF 34.299 330 3/4/2016 1/27/2017 - C 0.490 0.134 0.000 - - - 62.40 (Formerly: A.C. Rivero Construction) Road, Bacolod City Poor MFO-1: National Road Network Services Off-Carriageway A.C. Rivero Development Corporation Improvement including Drainage-Secondary Roads Flaring of Cagayan de Oro Cagayan de Oro 5122 L A MB C 03/16/18 1st/Final LF 9.221 195 02/20/17 09/02/17 -0.06 C 0.477 0.200 0.120 - - - 79.70 *79.70% Unsatisfactory (Formerly: A.C. Rivero Construction) Intersection along Carrmen-Patag-Bulua Road K1440+(-272) City City 1st DEO and K1441+370 Road Upgrading (Unpaved to Paved) Based on Gravel Road A.C. Rivero Development Corporation Strategies Traffic Benchmark for Upgrading to Paved Road 5122 L A MB C Iligan City 3/22/18 1st/Final LF 33.269 202 3/9/17 9/26/17 0.08% C 0.492 0.133 0.300 - - - 92.50 *92.50% Very Satisfactory (Formerly: A.C. Rivero Construction) Standards (HDM-4 Project Analysis) along Sta. Felomina- 2nd DEO Bonbonon-Digkilaan-Rogongon Road K1535+891-K1536+457 A.C. Rivero Development Corporation Construction and Maintenance of Bridges along National Olingan, Dipolog Zamboanga del *81% 5122 L A MB GE 3/15/2017 1st & Final LF 21.622 355 5/29/2015 5/17/2016 -0.05 C 0.459 0.199 0.152 - - - 81.00 (Formerly: A.C. Rivero Construction) Roads (Replacement of Weak Bridge) at Olingan Bridge City Norte 1st DEO Unsatisfactory A.C. Rivero Development Corporation Upgrading/Conc. of San Juanico-Basey-Sohoton Rd., 5122 L A MA GE1 Basey, Samar 8/7/2012 1st VIII LF 47.065 200 04/27/12 11/12/12 23.72 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 - (Formerly: A.C. Rivero Construction) K0913+721.75-K0917+915.72, w/ exceptions A.C. Rivero Development Corporation Const./Completion of Subang Daku Bridge, Subang Daku Sogod, Southern 5122 L A MA GE1 8/17/2012 1st VIII LF 42.820 220 02/20/12 09/26/12 0.24 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 - (Formerly: A.C. Rivero Construction) River, San Miguel Leyte A.C. Rivero Development Corporation Const./Impv't. of San Miguel-Jct. Buac Rd., Daang Maharlika Sogod, Southern 5122 L A MA GE1 8/19/2012 1st VIII LF 35.731 220 02/20/12 09/26/12 0.24 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 - (Formerly: A.C. Rivero Construction) Rd (Km1207+000 - Km1209+454.40) Leyte A.C. Rivero Development Corporation Const./Completion of Maasin Flood Control along Tomas Maasin City, Southern Leyte 5122 L A MA GE 6/26/2016 1st LF 25.281 180 2/5/16 8/2/16 0.00 O 0.32 0.3 0.15 0.03 0.056 0.05 90.60% - (Formerly: A.C. Rivero Construction) Oppus Street (Road ID S00222LT) Southern Leyte DEO A.C. Rivero Development Corporation Construction of River Control, Brgy. Calico-an, Borongan City, Borongan City, Eastern Samar 84.8% 1 L A MA GE 8/30/2016 1st & Final LF 9.794 95 2/10/16 5/14/16 0.00 C 0.415 0.133 0.3 0 0 0 0.8480 (Formerly: A.C. Rivero Construction) Eastern Samar Eastern Samar DEO Satisfactory Construction and Maintenance of Bridges along National A.C. Rivero Development Corporation Zamboanga Del Zamboanga del 93.6% 5122 L A MB GE Roads (Widening of Permanent Bridges to more than 2 lanes) 11/21/2016 1st & Final LF 22.247 295 5/29/2015 3/18/2016 0.00 C 0.436 0.2 0.3 0 0 0 0.9360 (Formerly: A.C. Rivero Construction) Norte Norte 1st DEO Very Satisfactory Miputak Bridge along Dipolog-Oroquieta Road Widening of Permanent Bridges from 1 Lane to 2 Lanes A.C. Rivero Development Corporation Palawan Second 5122 L A MB GE Malatgao Bridge (B00168PW) along Quezon, Punta, Baja Rd., Quezon, Palawan 11/22/2016 1st LF 18.408 220 6/26/2016 1/31/2017 0.12 O 0.388 0.176 0.15 0.03 0.04 0.05 0.8340 - (Formerly: A.C. Rivero Construction) DEO Quezon, Palawan Brgy. Bonbonon, Iligan City Completion of Dodiongan Bridge along Sta. Felomina- A.C. Rivero Development Corporation K01526+058- Lanao del Norte 5122 L A MB GE Bonbonon-Digkilaan-Rogongon Road, Brgy. Bonbonon, 9/3/2015 1st LF 37.105 236 2/18/15 10/11/15 1.32% O 0.384 0.285 0.15 0.02 0.045 0.05 93.40% - (Formerly: A.C. Rivero Construction) K01526+118, 2nd DEO Iligan City K01526+058-K01526+118, K01526+910-K01526+297 K01526+910- K01526+297y A.C. Rivero Development Corporation Off-Carriageway Improvement along Jct. Taft - Oras - San K0950+000 - Eastern Samar 5122 L A MB GE 6/29/2015 1st LF 33.355 150 3/17/15 8/13/15 - O 0.297 0.3 0.15 0.03 0.04 0.033 85.00% - (Formerly: A.C. Rivero Construction) Policarpio-Arteche Road, K0950+000 - K0955+000 K0955+000 DEO Replacement of Permanent Weak Bridge, Ramon Magsaysay A.C. Rivero Development Corporation Bridge (B00469MN) Along Jct. Switch-Jct. Monte Alegre Road Ramon Magsaysay, Zamboanga del 88.074% 5122 L A MB GE 8/30/2016 2nd & Final LF 29.101 290 5/11/15 2/24/16 0.00 C 0.467 0.133 0.3 0 0 0 0.9000 (Formerly: A.C. Rivero Construction) Sur 1st DEO Satisfactory

A.C. RIVERO DEVELOPMENT CORPORATION Replacement of Permanent Weak Bridge, Ramon Magsaysay Ramon Magsaysay, Zamboanga del 5122 L A MB GE 8/29/2015 1st LF 29.101 230 5/11/15 12/26/15 (+)19.46 O 0.288 0.2989 0.15 0.03 0.051 0.05 86.79% - (Formerly: A.C. Rivero Construction) Bridge (B0469MN) along Jct. Switch-Jct.Monte Alegre Road Zamboanga del Sur Sur 1st

Construction and Maintenance of Bridges along National A.C. RIVERO DEVELOPMENT CORPORATION Roads - (Widening of Permanent Bridges to more than 2 Zamboanga del Zamboanga del 5122 L A MB GE 6/11/2016 1st LF 22.574 250 5/29/15 2/2/16 0.00 O 0.388 0.24 0.12 0.03 0.04 0.033 85.10% - (Formerly: A.C. Rivero Construction) lanes), Miputak Bridge (BO1192MN) along Dipolog-Oroquieta Norte Norte 1st DEO National Road

*1st/Final 29th Release Page 7 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction and Maintenance of Bridges along National A.C. Rivero Development Corporation Dipolog-Oroquieta Zamboanga del 5122 L A MB GE Roads (Replacement of Permanent Weak Bridge), Olingan 8/25/2016 2nd LF 21.559 340 5/29/15 5/2/16 0.00 O 0.38 0.24 0.105 0.03 0.045 0.017 0.8170 - (Formerly: A.C. Rivero Construction) National Road Norte 1st DEO Bridge (B01193MN) Construction and Maintenance of Bridges along National Rd. Olingan, Dipolog A.C. Rivero Development Corporation (Replacement of Permanent Weak Bridge) at Olingan Bridge Zamboanga Del 85.5% 5122 L A MB GE City, Zamboanga 11/16/2015 1st LF 21.218 220 5/29/15 1/3/16 0.16% O 0.371 0.22 0.15 0.022 0.042 0.05 85.50% (Formerly: A.C. Rivero Construction) along Dipolog-Oroquieta National Road, Olingan, Dipolog City, Norte 1st DEO Satisfactory del Norte Construction/ Maintenance of Flood Control Mitigation A.C. Rivero Development Corporation Brgy. Poblacion, *90.3% 5122 L A MA GE Structure and Drainage, Construction of Sibugay Flood 8/22/2017 1st & Final Leyte 4th DEO LF 9.299 90 2/15/2017 5/15/2017 - C 0.403 0.200 0.300 - - - 90.30 (Formerly: A.C. Rivero Construction) Albuera, Leyte Very Satisfactory Control Brgy. Poblacion, Albuera, Leyte A.C. Rivero Development Corporation / Jqd Const./Impv't./Concreting of Access Road Leading to San Franciso, Southern Leyte 87.8% Construction And General Services Joint JV-15-513 L A MB GE Napantao Dive Site (Napantao Road), San Franciso, Southern 11/15/2016 1st & Final LF 37.270 220 3/20/2016 10/25/2016 0.00 C 0.424 0.154 0.3 0 0 0 0.8780 Southern Leyte DEO Satisfactory Venture Leyte A.C. Rivero Development Corporation / Jqd Rehabilitation/Major Repair of Permanent Weak Bridges, Libagon, Southern Southern Leyte (+)22.63 83.9% Construction And General Services Joint JV-14-1038 L A MB GE Otikon Bridge Along Daang Maharlika (B00598LT), Libagon, 11/16/2015 1st LF 31.056 195 6/24/15 1/4/16 O 0.249 0.3 0.15 0.03 0.06 0.05 83.90% Leyte DEO % Satisfactory Venture Southern Leyte A.C. Rivero Development Corporation / Jqd Rehabilitation/Major Repair of Permanent Weak Bridge, Otikon Libagon, Southern 88.1% Construction And General Services Joint 0 L A MB GE 3/7/2016 2nd Southern Leyte LF 31.056 195 6/24/15 1/4/16 0 C 0.45 0.194 0.3 0 0 0 88.10% Bridge along Daang Maharlika, Libagon, Southern Leyte Leyte Satisfactory Venture Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage System, A.C Soliven Construction & General Magalang, Pampanga 3rd 19278 L B MA GE Construction of Flood Control Facilities at Paranum Creek, 6/8/2017 1st LF 17.784 150 2/12/2017 7/11/2017 0.10 O 0.370 0.242 0.150 0.03 0.065 0.033 89.00 - Merchandise Pampanga DEO Sta. 0+000 - Sta. 0+110 and Sta. 0+390 - Sta. 1+170, (L/S), Brgy. Camias, Magalang, Pampanga Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage System; A.C Soliven Construction & General Magalang, Pampanga 3rd *89.04% 19278 L B MA GE Construction of Flood Facilities at Paranum Creek, Barangay 8/19/2017 2nd & Final LF 17.784 150 2/12/2017 7/11/2017 0.00 C 0.392 0.199 0.300 - - - 89.10 Merchandise Pampanga DEO Very Satisfactory Camias, Sta. 0+000 to Sta. 0+110, Magalang, Pampanga

Construction/Maintenance of Flood Mitigation Structure & Brgy. Mabanogbog, Drainage Systems - Agno River Basin Flood Control Project- Namcamaliran A.C Soliven Construction & General Extension/ Construction of Bank Protection of River Course, Pangasinan 3rd 19278 L B MA GE Pinmaludpod, 11/25/2016 1st LF 34.299 250 5/26/2016 1/30/2017 0.00 O 0.4 0.3 0.15 0.03 0.035 0.025 0.9400 - Merchandise Brgy. Mabanogbog, Namcamaliran Pinmaludpod, Urdaneta DEO Urdaneta City, City, Pangasinan Pangasinan Construction/Maintenance of Flood Mitigation Structures & Drainage Systems - Agno River Basin Flood Control Project - A.C Soliven Construction & General Urdaneta City, Pangasinan 3rd 19278 L B MA GE Extension/Construction of Bank Protection of River Course, 3/23/2017 2nd LF 34.299 250 5/26/2016 1/30/2017 -0.09 O 0.400 0.300 0.060 0.03 0.04 - 83.00 - Merchandise Pangasinan DEO Brgy. Mabanogbog, Nancamairan, Pinmalupod, Urdaneta City, Pangasinan Construction of Bank Protection Works, Agnooo River Basin A.C Soliven Construction & General Asingan, PANGASINAN 3RD 91.4% 19278 L B MA GE Flood Control Project (Phase III) Brgy. Bantog, Asingan, 11/16/2015 1st LF 18.336 180 8/26/15 2/23/16 0.025 O 0.389 0.24 0.15 0.03 0.055 0.05 91.40% Merchandise Pangasinan DEO Very Satisfactory Pangasinan Construction of Bank Protection, Agno River Basin Flood Barangay Bantog, A.C Soliven Construction & General PANGASINAN 3RD 91.28% 19278 L B MA GE Control Project (Phase III), Barangay Bantog, Asingan, Asingan, 3/18/2016 2nd LF 18.335 180 8/28/15 2/23/16 0.0444 C 0.414 0.197 0.3 0 0 0 91.28% Merchandise DEO Very Satisfactory Pangasinan Pangasinan Construction/Rehabilitation of Drainage along National A.C Soliven Construction & General Malasiqui, PANGASINAN 4TH 86.2% 19278 L B SB GE Roads, Villasis-Malassiqui-San Carlos Road, K0190+785- 3/15/2016 1st LF 34.3 226 3/13/15 10/24/15 0 C 0.362 0.2 0.3 0 0 0 86.20% Merchandise Pangasinan DEO Satisfactory K0192+800 with Exception (B/S), Malasiqui, Pangasinan Construction of Drainage along Mandurriao-Jaro K0006+100- Road,K0006+100-K0007+082, K0007+082, Mandurriao, Iloilo K0007+082, A.D. Pendon Construction & Supply, Inc. 3466 L - MA GE City K0007+082, 8/24/2017 1st Iloilo City DEO LF 38.376 191 2/27/2017 9/5/2017 0.00 O 0.392 0.200 0.150 0.022 0.037 0.05 85.10 - (Formerly: Adp Construction & Supply Mandurriao, Iloilo City Concreting of Ipil-Sagana Bridge Approaches "A" and "B" and Bongabong, Southern Mindoro A.D.L. Constrak 26442 L B B GE Sta. Cruz Road, Brgy. Ipil and Sagan and Sta. Cruz, 8/24/2016 1st LF 3.290 35 3/27/16 4/30/16 0.00 O 0.424 0.164 0.3 0 0 0 0.8880 - Oriental Mindoro DEO Bongabong, Oriental Mindoro Rehabilitation/Reconstruction of Paclasan Seawall, Roxas, Roxas, Oriental Southern Mindoro A.D.L. Constrak 26442 L B SB GE 3/18/2017 1st LF 3.627 67 9/19/2016 11/24/2016 0.02 O 0.438 0.200 0.300 - - - 93.80 - Oriental Mindoro Mindoro DEO A.D. Pendon Construction & Supply, Inc. Const. of Slope Protection along Jct. Bancal-Leon-Antique 3466 L A MA GE2 Leon, Iloilo 3/22/2013 1st VI LF 13.802 188 11/05/12 05/11/13 0.59 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 - (Formerly: Adp Construction & Supply Boundary Rd., K0031+722-K0031+891 A.D. Pendon Construction & Supply, Inc. Poblacion, Pavia, 82.60% 3466 L A MA GB Construction of Multi-Purpose Building 10/28/2014 1st VI LF 4.227 120 6/17/14 10/14/14 -2.91% O 0.362 0.214 0.121 0.030 0.049 0.050 82.60% (Formerly: Adp Construction & Supply Iloilo Satisfactory A.D. Pendon Construction & Supply, Inc. Construction/Rehab. Of Drainage System along Balasan- 87.50% 3466 L A MB GE Carles, Iloilo 10/29/2014 1st VI LF 43.954 274 4/24/14 1/22/15 6.46% O 0.373 0.218 0.150 0.030 0.054 0.050 87.50% (Formerly: Adp Construction & Supply Carles Road, Brgy. Barosbos Satisfactory Road Upgrading (Gravel to Paved) along Davao- A.D. Pendon Construction & Supply, Inc. 3466 L A MB GE Coastal Road km. 1671+600 to km. 1673+060, Biton-Lanao 8/7/2014 2nd XI LF 40.082 208 3/7/13 9/30/13 0.00 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 - (Formerly: Adp Construction & Supply Section A.D. Pendon Construction & Supply, Inc. Rd. Upgrading (Gravel to Paved) along Davao-Sarangani 3466 L A MB GE1 Davao del Sur 8/6/2013 1st XI LF 40.082 179 03/07/13 09/01/13 -19.55 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 - (Formerly: Adp Construction & Supply Coastal Rd., Km.1671+600-Km.1673+060, Biton-Lanao Sect. Malag-it Box Culvert along Iloilo East Coast-Capiz Road A.D. Pendon Construction & Supply, Inc. 75.40% 3466 L A MB GE (Construction of Malag-it Bridge along Iloilo East Coast-Capiz Pontevedra, Capiz 10/29/2014 1st VI LF 35.132 240 5/23/14 1/17/15 -37.28% O 0.388 0.249 0.000 0.030 0.054 0.033 75.40% (Formerly: Adp Construction & Supply Unsatisfactory Road)

*1st/Final 29th Release Page 8 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION A.D. Pendon Construction & Supply, Inc. Widening of Caradio-an Bridge alog Bacolod South Road, City, 74.10% 3466 L A MB GE 10/23/2014 1st VI LF 24.804 273 2/16/14 11/15/14 -11.60% O 0.378 0.221 0.034 0.030 0.045 0.033 74.10% (Formerly: Adp Construction & Supply Barangay Caradio-an Poor A.D. Pendon Construction & Supply, Inc. 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 6/14/2010 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 - (Formerly: Adp Construction & Supply Rehab./Reconst./Upgrading of Damaged Paved National A.D. Pendon Construction & Supply, Inc. 3466 Road, Roxas City Boundary-Panitan Road-Jct. Bailan Road, 8/31/2010 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 - (Formerly: Adp Construction & Supply Capiz (KM.112+750-Km.122+705) with exception A.D. Pendon Construction & Supply, Inc. Construction of Drainage System along Iloilo East Coast K0204+106, Sara, 3466 L A MA GE 6/9/2015 1st Iloilo Third DEO LF 44.467 252 2/18/15 10/27/15 2.63% O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% - (Formerly: Adp Construction & Supply Capiz Road Iloilo K0203+(-882) to A.D. Pendon Construction & Supply, Inc. 3466 L A MB GE Widening of Sara-San Dionisio Road K0203+243, Sara, 6/9/2015 1st Iloilo Third DEO LF 26.054 175 2/16/15 8/9/15 29.00% O 0.344 0.252 0.15 0.022 0.035 0.05 85.30% - (Formerly: Adp Construction & Supply Iloilo Chainage 0-200, Chainage 942- Network Development, Widening of National Road, Secondary 1182 10-200 A.D. Pendon Construction & Supply, Inc. 3466 L A MB GE Road along Roxas City, Cagay-Sibaguan Balijuangan-Cudian- (0+304.80) 6/6/2015 1st Capiz First DEO LF 10.341 121 3/12/15 7/10/15 -4.53% O 0.368 0.251 0.105 0.03 0.035 0.033 82.20% - (Formerly: Adp Construction & Supply Ijisan Road (K0104+760- K0105+000), Pontevedra, Capiz Construction of Standard One (1) Unit - 2 Sty 10-CL School Negros Occidental *87.23% A.F.G Construction & Construction Supply 17161 L A MA GB Building, Eustacio Lopez NHS, Silay City, Negros Occidental - 3/22/2017 2nd & Final LF 17.397 235 4/3/2016 11/23/2016 0.00 C 0.476 0.132 0.300 - - - 90.80 1st DEO Satisfactory Repair/Imporvement of Multi Purpose Building, Barangay A.F.G Construction & Construction Supply 17161 L A MA GB Cebu City 4/12/18 1st/Final Cebu City DEO LF 2.908 75 7/20/17 10/2/17 4.00% C 0.499 0.133 0.300 - - - 93.20 *93.20% Very Satisfactory Kasambagan Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road including Drainage Based on Pavement Barangay Paticui, Negros Occidental A.F.G Construction & Construction Supply 17161 L A MB GE Management System / Highway Development and , Negros 8/27/2015 1st LF 12.674 127 5/6/15 9/9/15 0.25% O 0.358 0.239 0.15 0.03 0.05 0.033 86.00% - 2nd Management - 4 (HDM-4) (Intermittent Section) along Occidental Hinigaran - Isabela Road, K0058+263 - K0059+000 Concreting of Barangay Road, Brgy. Sta. Teresa, Dumalag, *85.5% A.F.G Construction & Construction Supply 17161 L A MB GE Dumalag, Capiz 11/10/17 1st & Final DPWH LF 9.407 97 2/6/17 5/13/17 0.00 C 0.420 0.135 0.300 - - - 85.50 Capiz Satisfactory A.F.G Construction & Construction Supply 17161 L A MA GE1 Const. of Tangalan-Ibajay Rd. Aklan 3/19/2013 1st VI LF 45.834 179 01/15/13 07/12/13 7.79 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 - Odiong-Sibalom-San Remegio-Leon Rd. Upgrading (Gravel to San Remigio, A.F.G Construction & Construction Supply 17161 L A MA GE1 8/15/2013 1st VI LF 40.453 179 02/22/13 08/19/13 15.36 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 - Paved), Km. 129+328-Km. 131+275 Antique Construction of Standard One (1) Unit - 2 Sty 10-CL School Silay City, Negros Negros Occidental A.F.G Construction & Construction Supply 17161 L A MA GE Building at Brgy. Eustaquio Lopez NHS, Silay City, Negros 6/16/2016 1st LF 17.396 175 4/3/16 9/24/16 0.00 O 0.304 0.3 0.15 0.03 0.023 0.05 85.70% - Occidental First DEO Occidental Const. of Two (2) Storey, Eight (8) Cl Sch. Bldg., Leonora A.F.G Construction & Construction Supply 17161 L A MA GB1 San Miguel, Iloilo 8/22/2013 1st VI LF 8.949 150 04/03/13 08/30/13 -4.25 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 - Salapantan NHS A.F.G Construction & Construction Supply 17161 L A MA GE1 Replacement/Const. of Bridge, Brgy. Tubog Hamtic, Antique 8/15/2012 1st VI LF 7.587 180 02/29/12 08/26/12 5.13 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 - Construction of Multi-Purpose Building at Brgy. Candumarao, Hinigaran, Negros Negros Occidental 90.4% A.F.G Construction & Construction Supply 17161 L A MA GB Hinigaran, Negros Occfidental 6/15/2016 1st & Final LF 1.965 60 2/2/16 4/1/16 0.00 C 0.497 0.107 0.3 0 0 0 90.40% Occfidental Second DEO Very Satisfactory Construction of 2-CL Alimanguan National High School Brgy. San Vicente, A.F.G Construction & Construction Supply 17161 L A MA GB 6/5/2015 1st Palawan 1st DEO LF 1.721 120 2/17/15 6/16/15 0.00% O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% - Alimanguan Palawan Rehabilitation/Reconstruction/Upgrading of Damaged Paved K0058+263 to National Road Including Drainage Based on Pavement K0059+000Barang Negros Occidental 88.4% A.F.G Construction & Construction Supply 17161 L A MB GB Management System/Highway Development and Management- ay Paticui, 3/14/2016 1st LF 12.6742 157 5/6/15 10/9/15 0 C 0.451 0.133 0.3 0 0 0 88.40% Second DEO Satisfactory 4 (HDM-4) (Intermittent Section) along Hinigaran-Isabela Road, Hinigaran, Negros K0058+263 to K0059+000Barangay Occidental Preventive Maintenance Based on Pavement Management System/Highway Development and Management -4 (HDM-4) La Castellana and Negros Occidental A.F.G Construction & Construction Supply 17161 L A GE 03/14/18 1st/Final LF 46.210 221 04/16/17 11/22/17 -0.05 C 0.485 0.134 0.161 - - - 78.00 *78.00% Unsatisfactory Jct Bagonawa-La Castellana-Isabela Road, K0057+244 to Isabela 2nd DEO K0072+800 Off-Carriageway Improvement including Drainage of Puerto K0090+000- Princesa North Road, K0090+000-K0090+600, K0091+100- K0090+600, K0091+350, K0095+200-K0096+246, K0103+600-K0103+961, K0091+100- K0107+600-K0107+720, Roxas, Palawan K0091+350, A.F.G. Construction And Construction K0095+200- *89.38% Supply/Yurich Builders And Construction JV-15-1239 L A MA GE K0096+246, 3/13/2017 2nd & Final Palawan 1st DEO LF 45.859 280 8/4/2016 5/10/2017 0.00 C 0.380 0.200 0.300 - - - 88.00 Very Satisfactory Supplu Joint Venture K0103+600- K0103+961, K0107+600- K0107+720, Roxas, Palawan MFO1-National Road Network Services-Construction and Maintenance of Bridge along National Roads- *93.3% A.H. Raga Construction 36952 L - SB GE Rehabilitation/Major Repair of Permanent Bridges-Zapote Br. Bacoor City, Cavite 11/28/17 1st & Final DPWH LF 9.593 180 7/17/17 1/12/18 29.00 C 0.500 0.133 0.300 - - - 93.30 Very Satisfactory (BO2887LZ) Manila-Cavite (NCR Bdry-Jct Cavite City Section), Bacoor City, Cavite

*1st/Final 29th Release Page 9 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction/Improvement of Access Roads leading to Declared Tourism Destinations; Guisset-Binga-Baloy- A.I.P Construction 32458 L A MA GE Itogon, Benguet 11/8/17 1st DPWH LF 96.500 386 4/10/17 4/30/18 11.63 O 0.376 0.240 0.150 0.03 0.056 0.05 90.20 - Tinongdan Road leading to Binga Dam and Mt. Ugo, Site for International Sky Running Event

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on Pavement A.I.P Construction 32458 L A MA GE Management System/Highway Development and Management- Baguio City 9/4/2015 1st Baguio City DEO LF 13.442 104 6/15/15 9/26/15 2.59% O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% - 4 (HDM-4) (Intermittent Section), Lt. Takay Road, K0308+(-599) to K0308+000 & K0308+616 to K0308+754, Baguio City Rehabilitation/Reconstruction of National Roads with Slips, 85.1% A.I.P Construction 32458 L A MA GE Slope Collapse and Landslide, Marcos Highway, K0280+(-725) Baguio City 9/1/2016 1st & Final BAGUIO CITY DEO LF 5.509 84 2/19/16 5/12/16 0.00 C 0.418 0.133 0.3 0 0 0 0.8510 Satisfactory to K0280+(-640), Baguio City Road Opening/Const. of Missing Links of National Road, A.J Taylan Construction Corporation 2336 L A MB GE1 9/9/2009 1st I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 - Solsona-Kabugao Road, Ilocos Norte Side A.J. Lava Builders Corp. (Formerly: A.J. Lava Repair & Maint. of Flood Control & Drainage Structures along 22265 L C SB GE2 Rodriguez, Rizal 11/19/2012 1st IVA LF 2.449 90 09/11/12 12/09/12 29.23 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 - Builders) Rofriguez-San Jose-Quezon City Rd. Flood Management Services, Construction/ Maintenance of Brgy. San Jose, A.J. Lava Builders Corp. (Formerly: A.J. Lava Flood Mitigation Structures and Drainage System 86.3% 22265 L B SB GE Antipolo City, 2nd 6/21/2016 1st & Final Rizal 1st LF 46.503 240 6/22/15 2/16/16 0.00 C 0.43 0.133 0.3 0 0 0 86.30% Builders) Improvement/ Riprapping of Siito Kapatagan River Satisfactory LD (Upstream), Brgy. San Jose, Antipolo City, 2nd LD MFO2-Flood Management Services, Construction/ Maintenance of Flood Mitigation Structure and Drainage A.J. Lava Builders Corp. (Formerly: A.J. Lava 22265 L B MA GE Systems - Construction/ Maintenance of Flood Mitigation Montalban, Rizal 3/12/18 1st/Final Rizal 2nd DEO LF 28.350 212 2/20/17 9/19/17 0.00% C 0.497 0.133 0.300 - - - 93.00 *93.00% Very Satisfactory Builders) Structures Drainage Systems - Construction of Flood Control Structures along Montalban, Rizal MFO-1 National Road Network Services-Asset Preservation of National Roads Preventive Maintenance Based on Pavement A.J. Lava Builders Corp. (Formerly: A.J. Lava *90.6% 22265 L B MA GE Management System/Highway Development and Management- Taytay, Rizal 11/21/17 1st & Final DPWH LF 14.260 60 2/20/17 4/20/17 36.46 C 0.410 0.196 0.300 - - - 90.60 Builders) Very Satisfactory 4 (HDM-4) Cabrera - Antipolo Road, K0026+(-554) to K0026+000, Taytay, Rizal San Isidro, A.J. Taylan Construction Corp/FR Espiritu Jr. 86.10% JV-14-074 L B MA GE Additional Priority Flood Control Project Dumalneg, Ilocos 10/21/2014 1st I LF 41.179 163 9/11/14 2/20/15 0.36% O 0.299 0.276 0.150 0.030 0.056 0.050 86.10% Builders (JV) Satisfactory Norte Laoag River Basin Flood and Sabo Project, Concrete San Nicolas, Ilocos ILOCOS NORTE 90.5% A.J Taylan Construction Corporation 2336 L B MA GE Revetment along Bongo River Brgy. Sta. Monica, Sitio 2, San 11/13/2015 1st LF 9.650 194 8/12/15 2/21/16 0.016 O 0.38 0.24 0.15 0.03 0.055 0.05 90.50% Norte 2ND DEO Very Satisfactory Nicolas, Ilocos Norte A.J. Taylan Construction Corporation/ J.L.P Improvement/Concreting of Sand Dunes Access Road Ilocos Norte 2nd JV-16-1092 L B MA GE Paoay, Ilocos Norte 8/16/2017 1st LF 39.688 210 2/16/2017 9/13/2017 0.10 O 0.381 0.214 0.150 0.03 0.058 0.05 88.30 - Construction And Supply Joint Venture DEO Construction/Maintenance of Flood Control Mitigation Structures and Drainage Systems, Damaged Flood Control A.J. Taylan Construction Corporation/ J.Q.C. Facilities/Structures under the Laoag River Basin and Flood Ilocos Norte 2nd *89.9% Summit Construction And Development JV-15-1238 L B MA GE Laoag, Ilocos Norte 8/16/2017 1st & Final LF 14.700 396 3/21/2016 4/20/2017 0.02 C 0.466 0.133 0.300 - - - 89.90 Control and Sabo Project (LRBDCSP)-Batac City Flood DEO Very Satisfactory Corporation Control, Quiaoit River, Eroded Bank Embankment

Road Upgrading (Unpaved to Paved) Based on Gravel Road Strategies Traffic Benchmark for Upgrading to Paved Road A.J. Taylan Construction Corporation/Djcm Regional Office No. 92.2% JV-15-412 L B MA GE Standards (HDM-4 Project Analysis) along Batac-Pinili via Ilocos Norte 8/26/2016 1st & Final LF 83.728 211 1/27/16 8/24/16 0.07 C 0.489 0.133 0.3 0 0 0 0.9220 Construction Corporation Joint Venture I Very Satisfactory Maipalig Road, K0485+624 o K0485+978; K0486+023 to K0486+304; K0+486+389 to K0488+039 Construction/Maintenance of Flood Mitigation Structures and Drainage System, Damaged Flood Control A.J. Taylan Construction Corporation/ J.Q.C. Facilities/Structures under the Laoag River Basin Flood Ilocos Norte 2nd Summit Construction And Development JV-15-1238 L B MA GE Ilocos Norte 3/15/2017 1st LF 14.699 396 3/22/2016 4/21/2017 0.04 O 0.390 0.239 0.150 0.03 0.04 0.033 88.20 - Control and Sabo Project (LRBDCSP) Batac City Flood DEO Corporation Control, Quiaoit River, Eroded Bank Embankment, Ilocos Norte Road Upgrading (Gravel to Paved) Based on Gravel Road A.J. Taylan Construction Corporation/Zedik Strategies, Traffic Benchmark for Upgrading to Paved JV-13-345 L B MA GE Ilocos Norte 8/8/2014 1st I LF 28.942 236 2/14/14 10/7/14 27.99 O 0.380 0.240 0.150 0.030 0.055 0.033 88.80 - Builders (JV) Standard (HDM-4 Project Analysis) of Piniti-Banna (Espiritu) Road A.J.Taylan Construction Corp./Jlp Construction Ilocos Norte 2nd JV-16-1092 L B MA GE Improvement/Concreting of Sand Dunes Access Road Paoay, Ilocos Norte 3/15/18 2nd/Final LF 39.688 236 2/17/17 2/17/17 2.58% C 0.46 0.12 0.3 - - - 88.00 89.00% Satisfactory & Supply, Joint Venture DEO Off-Carriageway Improvement Paving Shoulders/Construction *91.8% A.L Acharon Construction & Supply 33068 L B SB GE along Makar-Kiamba Road K1667+270 to K1667+720 General Santos City 11/15/17 1st & Final DPWH LF 13.150 150 6/4/17 10/31/17 0.00 C 0.473 0.145 0.300 - - - 91.80 Very Satisfactory Construction of the Diversion Works and Canal System of A.L Acharon Construction & Supply 30872 11/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 - Libertad CIP - Phase 2 A.L Acharon Construction & Supply 30872 L C SB GE2 Benolho CIS 10/6-10/08 1st NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 - Construction of Classroom in Areas Experiencing Classroom Shortage - Construction of Two (2) Storey, Two (2) Classroom Brgy. Bawing, South 88.9% A.L Acharon Construction & Supply 33068 L D SB GB 3/18/2016 - LF 4.3497 120 3/26/15 7/24/15 (+)0.95% C 0.473 0.116 0.3 0 0 0 88.90% School Building, Bawing Elementary School Brgy. Bawing, General Santos City 2nd Satisfactory General Santos City

*1st/Final 29th Release Page 10 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION K1667+270 - Off-Carriageway Improvement - Paving of Shoulders/ A.L Acharon Construction & Supply 33068 L B B GE K1667+720, 3/22/18 1st/Final LF 11.019 120 6/4/17 10/1/17 0.00% C 0.476 0.133 0.3 - - - 90.90 *90.90% Very Satisfactory Construction Along Makar-Kiamba Road 2nd DEO General Santos City Rehabilitation/ Improvement of Sepung Ilog, Sta. Lucia, Sta. Sta. Ana, *92.6% A.L. Dare Construction 11932 L B MA GE Ana By Pass Road, Sta. 0+000 to Sta. 1+227, Sta. Ana, 11/27/17 1st & Final DPWH LF 25.187 135 2/16/17 6/30/17 0.00 C 0.493 0.133 0.300 - - - 92.60 Pampanga Very Satisfactory Pampanga Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int. Candaba, A.L. Dare Construction 11932 L B MA GE1 7/29/2013 1st III LF 11.909 139 03/25/13 08/10/13 -1.40 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30 Sect.) at Candaba-San Miguel Rd., K0070+290-K0071+184 Pampanga Drainage Improvement of Commonwealth Avenue Drive to Brgy. Batasan Hills, A.L. Salazar Construction, Inc. 3899 L AAA LA GE 8/25/2015 1st QC 1st DEO LF 17.562 270 4/7/15 1/1/16 22.77% O 0.38 0.24 0.15 0.023 0.045 0.05 88.80% - Zuzuaregui, Brgy. Batasan Hills, Quezon City Quezon City Const./Widening/Upgrading/Rehab. of Access Rd. to Taytay- A.L. Salazar Construction, Inc. 3899 L AAA LA GE1 Taytay, Palawan 3/12/2013 2nd IVB LF 89.312 450 03/28/12 06/20/13 -11.99 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 - Bantulan Port (Km.210+000-Km.214+211) Const./Widening/Upgrading/Rehab. of Access Road A.L. Salazar Construction, Inc. 3899 L AAA LA GE1 Taytay, Palawan 8/3/2012 1st IVB LF 81.362 349 03/28/12 02/19/13 2.82 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 - (Km.210+000-Km.214+211) Drainage Improvement of Commonwealth Avenue Drive to Brgy. Batasan Hills, Quezon City 1st 89.2% A.L. Salazar Construction, Inc. 3899 L AAA LA GE 4/12/2016 2nd LF 17.5621 270 4/7/15 1/1/16 0 C 0.465 0.133 0.3 0 0 0 89.20% Zuzuaregui, Brgy. Batasan Hills, Quezon City Quezon City DEO Very Satisfactory Rehabiliation/Improvement of drainage System along C-3 87.80% A.L. Salazar Construction, Inc. 3899 L AAA LA GE Caloocan City 11/22/2014 1st NCR LF 17.425 209 5/2/14 11/26/14 0.36% O 0.380 0.240 0.150 0.030 0.045 0.033 87.80% Road Satisfactory A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 2/24/2010 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 - A.M Oreta & Co ., Inc / Ibc International Builders 95.00% JV-07096 L AAA B Kalibo Airport Development Project Kalibo,Aklan 8/22/2017 Final DOTC LF 309.889 450 04/04/10 02/03/17 0.000 C 0.483 0.200 0.300 - - - - Corporation (Joint Venture) Satisfactory Construction/Rehabilitation of Brgy Hall Brgy. Langkong, 62.1% A.M. Ayunan Construction 13983 L AAA SB GB 11/11/2015 1st Cotabato First DEO LF 0.924 75 8/12/15 11/24/15 (-) 9.80% O 0.363 0.16 0.052 0.03 0 0.016 62.10% M'lang, Cotabato Poor Barangay Construction/Rehabilitation of Barangay Hall Barangay 64.53% A.M. Ayunan Construction 13983 L AA SB GB Langkong, M'lang, 3/10/2016 - Cotabato 1st LF 0.924 75 8/12/15 10/26/15 (-)9.80% C 0.496 0.2 0.006 0 0 0 64.53% Langkong, M'lang, Cotabato Poor Cotabato A.M Oreta & Co ., Inc / Ibc International Builders JV-07096 L AAA LB Kalibo Airport Development Project Pook, Kalibo, Aklan 6/17/2015 1st DOTC LF 287.056 360 04/04/10 09/24/15 4.92 O 0.381 0.300 0.150 0.020 0.044 0.033 92.80 - Corporation (Joint Venture) Const. of Drainage System along Iloilo-Capiz Rd. (Old Route) A.M. Oreta / IBC (Joint Venture) JV-11-210 L AAA LB GE2 Jaro, Iloilo City 8/6/2012 1st VI LF 42.875 240 01/04/12 08/30/12 6.12 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 - Nat'l Rd. CPU Sect., Iloilo City Repair/Maintenance of Flood Control Talavera River Control, Talavera, Nueva Nueva Ecija 1st *85.4% A.M.P. Construction 16574 L B MA GE 6/2/2017 1st & Final LF 1.901 70 12/19/2016 2/26/2017 0.00 C 0.419 0.135 0.300 - - - 85.40 Brgy. Sicsican Matanda, Talavera, Nueva Ecija Ecija DEO Satisfactory Construction of Flood Control Revetment Wall along Agbalili 83.7% A.M.P. Construction 16574 L B MA GE Altavas, Aklan 3/15/2016 1st Aklan DEO LF 34.428 244 9/29/15 4/29/16 (-) 4.87% O 0.328 0.3 0.101 0.03 0.045 0.033 83.70% River Satisfactory Construction/ Maintenance of Flood Mitigation Structures and A.M.P. Construction/ Forthright Construction Palayan City, Nueva Nueva Ecija 2nd JV-16-1612 L A MA GE Drainage Systems, Rehabilitation/ Improvement of Pampanga 3/15/18 2nd/Final LF 39.200 161 5/10/17 10/17/17 0.00% C 0.472 0.133 0.3 - - - 90.50 88.46% Satisfactory Joint Venture Ecija DEO River Control, Brgy. Sapang Buho, Palayan City, Nueva Ecija

A.M.P. Construction/ Forthright Construction Improvement/ Rehabilitation of Revetment along Talavera Talavera, Nueva Nueva Ecija 1st JV-16-933 L A MA GE 3/13/18 1st/Final LF 31.723 240 7/10/17 3/6/18 25.94% C 0.413 0.141 0.3 - - - 85.40 *85.40% Satisfactory Joint Venture River Barangay Basang Hamog, Talavera, Nueva Ecija Ecija DEO A.P Palacios Construction 29021 L C SB GE1 Rehab./Impvt. of Dikidit-Suguit FTMR 9/8/2009 1st III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 - Construction of Two (2) Units Technical-Vocational Livelihood A.P. Consebido Construction And Trading 33616 L D SB GB (TVL) Laboratories/Worshop Roxas National Comprehensive Roxas, Palawan 3/13/2017 1st Palawan 1st DEO LF 5.347 140 7/3/2016 11/19/2016 0.01 O 0.451 0.200 0.300 - - - 95.10 - High School, Roxas, Palawan Concreting of Ore West Capangdanan Road *84% A.P.B. Construction 17055 L B MA GE Bantay, Ilocos Sur 11/9/17 1st & Final DPWH LF 24.500 175 4/12/17 10/3/17 0.00 C 0.407 0.133 0.300 - - - 84.00 Satisfactory Improvement/Widening of National Roads along Pangasinan- Pangasinan-Nueva Pangasinan 3rd *91.4% A.P.B. Construction 17055 L B MA GE Nueva Ecija Roa, K0180+417-K0181+745; K0183+129- 8/21/2017 1st & Final LF 46.372 300 4/4/2017 1/28/2018 0.54 C 0.479 0.135 0.300 - - - 91.40 Ecija Road DEO Very Satisfactory K0184+062 Improvement/Upgrading of Naguilian-Bagulin Road Leading Naguilian-Bagulin, LA UNION 2ND 83.36% A.P.B. Construction 17055 L B MA GE to Tudingan Falls and Kedlap Burial Cave, Sta. 266+980-Sta. 3/14/2016 2nd LF 41.295 179 5/22/15 11/16/15 0.1117 C 0.261 0.2 0.3 0 0 0 83.36% La Union DEO Satisfactory 271+279 with Exception, Naguilian-Bagulin, La Union Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations, Chaya - 83.8% A.P.B. Construction 17055 L B MA GE Mayoyao, 8/27/2016 1st & Final IFUGAO 2ND DEO LF 35.857 386 5/9/15 5/28/16 0.00 C 0.362 0.176 0.3 0 0 0 0.8380 Nagchayan leading to Barangays Chaya and Nagchayan, Satisfactory Mayoyao, Ifugao Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide: Magsaysay Ave. (Trinidad Rd.), A.P.B. Construction 17055 L B MA GE Baguio City 9/1/2016 1st BAGUIO CITY DEO LF 19.805 177 3/14/16 9/6/16 -0.03 O 0.387 0.3 0.118 0.03 0.04 0.017 0.8920 - K0251+996 to K0251+1024; K0252+255 to K0252+270; K0252+350 to K0252+444, Baguio City Off-Carriageway Improvement along Baguio-Bontoc Road, A.P.B. Construction 17055 L B MA GE K0253+(-586) to K0253+000, K0259+450 to K0259+600, La Tridad, Benguet 6/2/2015 1st Benguet 1st DEO LF 18.999 150 2/20/15 7/19/15 (-) 0.02% O 0.333 0.274 0.149 0.03 0.05 0.035 87.10% - K0260+500 to K0262+000 Improvement/Upgrading of Naguilian-Bagulin Road Leading A.P.B. Construction 17055 L B MB GE to Tudingan Falls and Kedlap Burial Cave Sta. 266+980 to Sta. Naguilian, La Union 8/30/2015 1st La Union 2nd DEO LF 41.295 179 5/22/15 11/17/15 (+)0.69 O 0.335 0.287 0.15 0.023 0.037 0.05 88.20% - 271+279, Naguilian, La Union Rehab./Reconst./Upgrading of Damaged Paved National A.P.B. Construction 17055 L C SB GE1 Baguio City 8/18/2011 1st CAR LF 5.610 102 05/06/11 08/15/11 - O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 - Road, PMA cut-off Road 2 K0+000-K0+360

*1st/Final 29th Release Page 11 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION MFO-1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading Tertiary - Reconstruction from Concrete to Concrete - Mt. Paracelis, Mountain A.P.O. General Construction 7010 L B MA GE 11/11/17 1st DPWH LF 28.581 250 4/17/17 12/22/17 2.62 O 0.351 0.240 0.150 0.03 0.061 0.05 88.20 - Province - Ifugao Road (Kiling-Paracelis Section), K0456+753- Province K0457+000, K0459+300-K0460+000

Construction of 4 Storey 12 Classroom School Building La Union 2nd Senior High School in Aringay A.P.O. General Construction 7010 L B MA GB Aringay, La Union 6/6/2017 2nd District Engineering LF 21.893 255 10/10/2016 6/21/2017 -0.01 O 0.397 0.239 0.138 0.03 0.065 0.033 90.20 - Office Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Cordillera Natonin, Mt. *86.1% A.P.O. General Construction 7010 L B MA GE Standard (HDM-4 Project Analysis) Junction-Talubin-Barlig- 6/3/2017 1st & Final Administrative LF 97.500 455 3/18/2016 6/15/2017 0.00 C 0.428 0.133 0.300 - - - 86.10 Province Satisfactory Natonin-Paracelis-Calaccad Road, K0443+054 - K0446+000 Region, R.O.

Construction of 4 Storey 12 Classroom School Building A.P.O. General Construction 7010 L A MA GB Aringay, La Union 3/18/2017 1st La Union 2nd DEO LF 21.481 195 10/10/2016 4/22/2017 -0.04 O 0.285 0.300 0.112 0.03 0.041 0.033 80.10 - Senior High School, Aringay, La Union Road Upgrading (Gravel to Paved) along Acop-Kapangan- Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 - 89.30% A.P.O. General Construction 7010 L B MA GE K0287+685, K0289+214 - K0289+473, K0289+549 - K0289+709, Kapangan, Benguet 11/20/2014 1st CAR LF 72.026 267 6/9/14 3/2/15 10.93% O 0.362 0.240 0.150 0.030 0.061 0.050 89.30% Very Satisfactory K0290+901 - K0291+000, K0292+016 - K0292+114, K0298+781 - K0299+514, K0299+531 - K0299+816 Rd. Upgrading (gravel to concrete) along Acop-Kapangan- Kibungan-Bakun Rd., K0285+444-K0286+840 V.S. (K0285+423- A.P.O. General Construction 7010 L B MA GE1 Benguet 11/21/2012 1st CAR LF 59.896 237 04/26/12 12/18/12 0.78 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 - K0286+836 as per RBIA) & K0345+470-K0348+000 V.S. (K0345+500-K0348+000 as per RBIA) Road Upgrading (Unpaved to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis)(Intermittent Sections) along - Ifugao Road (Kiling - Paracelis Paracelis, Mountain 87.08% A.P.O. General Construction 7010 L B MA GE 3/13/2016 2nd Regional Office LF 57.843 248 4/7/15 12/10/15 0.0255 C 0.35 0.186 0.3 0 0 0 87.08% Section), K0460+508 to K0460+868, K0467+904 to K0469+000, Province Satisfactory K0471+451 to K0472+061, K0473+155 to K0473+582, K0474+350 to K0474+368, K0477+312 to K0477+341, Paracelis, Mountain Province

Road Upgrading (Unpaved to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) (Intermittent Sections) along Mt. Province - Ifugao Road (Kiling - Paracelis Section), Paracelis, Mt. A.P.O. General Construction 7010 L B MA GE 8/29/2015 1st CAR LF 54.883 237 4/7/15 11/29/15 1.01% O 0.367 0.246 0.15 0.03 0.051 0.05 89.40% - K0460+508 to K0460+868, K0467+904 to K0469+000, Province K0471+451 to K0472+061, K0473+155 to K0473+582, K0474+350 to K0474+368, K0477+312 to K0477+341, Paracelis, Mt. Province Rd. Upgrading (Gravel to Paved) Int. Sect., Acop-Kapangan- A.P.O. General Construction 7010 L B MA GE1 Benguet 8/1/2013 1st CAR LF 23.654 207 02/05/13 08/30/13 0.91 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 - Kibungan-Bakun Rd., K0348+000-K0349+000 Manolo Fortich, 62.60% A.R. & Mark Builders 31673 L C SB GB Const. of Multi-Purpose Building, BUSECO Compound 10/21/2014 1st X LF 7.920 124 7/28/14 11/28/14 -13.35% O 0.304 0.240 0.017 0.010 0.022 0.033 62.60% Poor Const. of 1-Storey, 1-CL & 1-Storey, 1-CL Kinder at Maramag Maramag, A.R. & Mark Builders 31673 L D SB GB1 8/8/2013 1st X LF 1.448 187 03/25/13 09/27/13 -2.86 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 - South PS, Pob. Bukidnon Asphalt Overlay of Puerto Princesa South Road, K000+000 - *92.9% A.R. Lustre, Jr. Construction 7680 L AAA LA GE K000+420, K001+420 - K002+300 Puerto Princesa City 11/17/17 1st & Final DPWH LF 29.860 105 3/24/17 7/6/17 0.00 C 0.429 0.200 0.300 - - - 92.90 Very Satisfactory Asphalt Overlay of Puerto Princesa South Road K0000+000 to K0000+000 to K000+420, K000+420 to K002+300, Puerto Princesa City, K000+420, Palawan K000+420 to A.R. Lustre, Jr. Construction 7680 L AAA LA GE 6/5/2017 1st Palwan 3rd LF 29.884 90 3/23/2017 6/20/2017 0.03 O 0.385 0.298 0.150 0.03 0.037 0.033 93.30 - K002+300, Puerto Princesa City, Palawan Asphalt Overlay of Puerto Princesa South Road, K0000+000 to Puerto Princesa A.R. Lustre, Jr. Construction 7680 L AAA LA GE K0000+420, K0000+420 to K0002+300, Puerto Princesa City, 8/24/2017 1st Palawan 3rd DEO LF 29.860 105 3/23/2017 7/5/2017 - O 0.489 0.133 0.300 - - - 92.20 - City, Palawan Palawan Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide Puerto Princesa South Road, K0139+214 to K0139+214 to K0139+245, K0139+292 to K0139+397, K0139+245, K0140+033 to K0140+111, K0141+807 to K0141+880, K0139+292 to K0142+000 to K0142+300, Espanola, Palawan K0139+397, K0140+033 to *90.2% A.R. Lustre, Jr. Construction 7680 L AAA LA GE K0140+111, 3/14/2017 1st & Final Palawan 2nd DEO LF 47.859 266 10/7/2016 6/29/2017 0.06 C 0.402 0.200 0.300 - - - 90.20 Very Satisfactory K0141+807 to K0141+880, K0142+000 to K0142+300, Espanola, Palawan

*1st/Final 29th Release Page 12 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Puerto Princesa South Road, K0139+214- K0139+214-K0139+245, K0139+292-K0139+397, K0140+033- K0139+245, K0140+111, K0141+807-K0141+880, K0142+000-K0142+300, K0139+292- Española, Palawan K0139+397, K0140+033- Palawan Second A.R. Lustre, Jr. Construction 7680 L AAA LA GE K0140+111, 11/22/2016 1st LF 47.859 266 7/10/2016 4/1/2017 0.46 O 0.34 0.3 0.15 0.03 0.05 0.033 0.9030 - DEO K0141+807- K0141+880, K0142+000- K0142+300, Española, Palawan

Conc. of Puerto Princesa South Rd. (Aborlan Sect. A.R. Lustre, Jr. Construction 7680 L AAA MB GE1 Aborlan, Palawan 3/15/2013 1st IVB LF 62.614 240 12/14/12 08/10/13 -10.01 O 0.362 0.240 0.150 0.030 0.055 0.033 87.00 - Km.60+024.80-Km.64+000 w/ exceptions) Asphalt Overlay along Malvar Road and Puerto Princesa Puerto Princesa A.R. Lustre, Jr. Construction 39263 L C 0 GE South Road K0002+1005 - K0002+1784 & K0002+300 - 9/2/2016 1st Palawan 3rd DEO LF 10.092 40 3/17/16 4/25/16 0.00 O 0.437 0.135 0.3 0 0 0 0.8720 - City, Palawan K0002+567, Puerto Princesa City, Palawan Const. of Taguliat Bridge along PPSR-JCT-Napsan-Apurawan A.R. Lustre, Jr. Construction 7680 L AAA MB GE1 Puerto Princesa City 8/15/2013 1st IVB LF 18.839 515 05/17/12 10/14/13 -10.34 O 0.373 0.300 0.047 0.030 0.042 0.033 82.50 - Rd., K0037+675 Construction of Multi-Purpose Building, Villa Dolores Subd. Barangay Sto. Pampanga 3rd 82.8% A.R.T. Dwell Lifestyle Store And Eco Builders 38284 L B SB GB Domingo, Angeles 9/21/2016 1st & Final LF 4.652 150 3/18/16 8/14/16 0.00 C 0.395 0.133 0.3 0 0 0 0.8280 DEO Satisfactory City, Pampanga Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Concreting of Brgy. *88.9% A.S. Obquia Construction 19844 L D SB GE , Bohol 11/10/17 1st & Final DPWH LF 9.344 108 3/30/17 7/15/17 2.78 C 0.428 0.161 0.300 - - - 88.90 Poblacion Road leading to Sarangani Ricefield and Boongon Satisfactory Dam, Candijay, Bohol Lily Hill Street, Clark A.S.S. Construction 31509 L B Design & Build of Site Development Phase 2 - Road Network Freeport, 9/27/18 1st & Final DOST LF 6.965 275 7/7/17 4/7/18 0.00 C 0.45 0.19 0.30 - - - 94.04 *94.04% Very Satisfactory Pampanga Lily Hill Street, Clark A.S.S. Construction 31509 L B Construction of Academic Building III Phase 2 Freeport, 09/27/18 1st & Final DOST LF 17.888 230 09/01/17 04/18/18 0.00 C 0.48 0.19 0.30 - - - 96.80 *96.80% Outstanding Pampanga A.S.S. Construction 31509 L D MA GB1 Completion of ACA Building II 05/14-15/09 1st DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 - Asset Preservation of National Roads Rehab./ Reconst./ Upgrading of Damaged Paved National Roads including Drainage Based on Pavement Management System/ Highway A.S.V. Construction Supply And Services 13490 L C SB GE Orion, Bataan 3/16/18 1st/Final Bataan 2nd DEO LF 3.388 48 8/9/17 9/25/17 0% C 0.418 0.2 0.3 - - - 91.80 *91.80% Very Satisfactory Development and Management - 4 (HDM-4) of Jct. Layac Bal.- Mar. Port Road, K0128+048 - K0128+126, K0128+706 - K0128+842, Bataan Province Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along NRJ Cuevas-Bislig Road, A.T. Dumlao Construction, Inc. (Formerly: Trento, Agusan del 91% 34028 L B MA GE K1378+327 - K1378+443 (RBIA Chainage), K1378+320 - 11/11/2015 1st LF 25.215 208 6/24/15 1/17/16 (+) 11.11 O 0.383 0.252 0.15 0.03 0.045 0.05 91.00% Andoni T. Dumlao, Civil Engineer-Contractor) Sur 2nd DEO Very Satisfactory K1378+450 (Survey), (S00464MN), Trento, Agusan del Sur)

A.T. Dumlao Construction, Inc. (Formerly: Construction/Widening of Adlayan Bridge along Daang San Francisco, 34028 L B MA GE 8/8/2014 1st XIII LF 36.650 196 2/20/14 9/3/14 -9.08 O 0.400 0.240 0.060 0.030 0.065 0.033 82.80 - Andoni T. Dumlao, Civil Engineer-Contractor) Maharlika (Agusan - Davao Section) K1307+585 - K1307+614.8 Agusan del Sur

A.T. Dumlao Construction, Inc. (Formerly: Replacement of San Pedro Bridge along Daang Maharlika Alegria, Surigao del 34028 L B MA GE1 11/21/2012 2nd XIII LF 14.945 390 01/13/12 02/06/13 -2.26 O 0.360 0.231 0.127 0.030 0.055 0.033 83.60 - Andoni T. Dumlao, Civil Engineer-Contractor) (Surigao-Agusan Rd.) Brgy. San Pedro Norte

A.T. Dumlao Construction, Inc. (Formerly: Replacement of Lengigon Bridge (Temporary to Permanent) 78.50% 34028 L B MA GE Argao, Cebu 10/24/2014 1st VII LF 12.230 270 2/26/14 11/22/14 -44.15% O 0.400 0.300 0.000 0.030 0.055 0.000 78.50% Andoni T. Dumlao, Civil Engineer-Contractor) along Argao - Moalboal Road, Municipality of Argao Unsatisfactory

A.T. Dumlao Construction, Inc. (Formerly: Reconst. of Timamana Bridge along Daang Maharlika Tubod, Surigao del 34028 L B MA GE1 3/14/2013 1st XIII LF 24.213 496 12/16/11 04/24/13 0.29 O 0.305 0.252 0.150 0.030 0.056 0.050 84.30 - Andoni T. Dumlao, Civil Engineer-Contractor) Highway (Surigao-Agusan Rd.), Brgy. Timamana Norte Construction/ Maintenance of Permanent Bridges along A.T. Dumlao Construction, Inc. (Formerly: Km. 1130+839.50 - 97.8% 34028 L A MA GE National Roads Widening of Reyes Bridge (B00851MN) along 11/21/2016 1st & Final LF 29.100 325 4/17/2015 3/6/2016 0.00 C 0.478 0.2 0.3 0 0 0 0.9780 Andoni T. Dumlao, Civil Engineer-Contractor) Km. 1130+869.50 1st DEO Outstanding Daang Maharlika A.T. Dumlao Construction, Inc. (Formerly: Rehab./Reconst. of Hubang Bridge along Daang Maharlika San Francisco, 34028 L B MA GE1 3/9/2013 1st XIII LF 19.141 380 01/27/12 02/10/13 - O 0.338 0.300 0.000 0.030 0.058 0.033 75.90 - Andoni T. Dumlao, Civil Engineer-Contractor) (Agusan-Davao Rd.) Km.1307+369-Km.1307+536 Agusan del Sur

A.T. Dumlao Construction, Inc. (Formerly: Replacement of San Pedro Bridge along Daang Maharlika Alegria, Surigao del 34028 L B MA GE1 3/14/2013 3rd XIII LF 15.781 435 01/13/12 03/23/13 0.42 O 0.355 0.223 0.150 0.030 0.035 0.033 82.60 - Andoni T. Dumlao, Civil Engineer-Contractor) (Surigao-Agusan Rd.), Brgy. San Pedro Norte

A.T. Dumlao Construction, Inc. (Formerly: Rehabilitation of the Reinforced Concrete Deck Girder (RCDG) Bayabas, Surigao Regional Office No. 34028 L A MA GE 3/16/18 1st/Final LF 58.373 427 4/27/16 6/27/17 0.22% C 0.498 0.133 0.3 - - - 93.10 *93.10% Very Satisfactory Andoni T. Dumlao, Civil Engineer-Contractor) Bridge del Sur XIII Brgy. Poblacion, A.V.M. Construction and Supplies 114114 NHA Bayside Subdivision Housing Project Bislig City, Surigao 10/24/2014 1st NHA L 19.225 330 10/04/13 03/06/15 5.49 O 0.376 0.300 0.095 0.030 0.023 0.033 85.74 - del Sur Road Concreting Bato-Kilate Road, Barangay Bato and Kilate, Barangay Bato and Davao City 2nd A.Y.U Engineering And Construction 25632 L B MA GE Toril District, Davao City Kilate, Toril District, 6/15/2016 1st LF 9.799 105 4/14/16 7/27/16 0.27 O 0.362 0.218 0.15 0.03 0.051 0.05 86.10% - DEO Davao City

*1st/Final 29th Release Page 13 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction of Two (2) Storey Six (6) Classroom School Sto. Niño Tugbok Davao City Second 98.4% A.Y.U Engineering And Construction 0 L 0 0 GB Building at Mintal NCHS-Sto. Niño High School, Sto. Niño 3/11/2016 1st LF 8.0138 150 9/10/15 2/6/16 - C 0.493 0.191 0.3 0 0 0 98.40% District, Davao City DEO Outstanding Tugbok District, Davao City Outstanding K1509+(-060) to Rehabilitation/Reconstruction/Improvement of Quezon 93.4% A.Y.U Engineering And Construction 25632 L B MB GE K1509+280, Davao 3/17/2016 1st Davao City DEO LF 27.4042 170 5/1/15 10/17/15 - C 0.434 0.2 0.3 0 0 0 93.40% Boulevard, K1509+(-060) to K1509+280, Davao City Very Satisfactory City Concreting of Sitio Mohon - Sitio Kauswagan, Brgy. Langub Talomo District, Davao City First A.Y.U Engineering And Construction 25632 L B MA GE (Phase 2) FMR, Brgy. Langub, Talomo District, Davao City 11/17/2016 1st LF 9.850 90 9/19/2016 12/17/2016 0.00 O 0.44 0.133 0.3 0 0 0 0.8730 - Davao City DEO

Brgy. Matabang A5R Dynamic Const. Corp. ARN Builders Inc. L AA Abra De Ilog Port Expansion Project Abra De Ilog 04/18/18 1st PPA LF 76.000 360 10/02/17 09/27/18 1.07 O 0.40 0.30 0.15 0.03 0.07 0.00 95.00 - On - Going (JV) MFO 2-Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage *83.3% Aarcon Builders 28336 L A MA GE Bacoor, Cavite 11/29/17 1st & Final DPWH LF 37.227 177 5/4/17 10/27/17 0.00 C 0.400 0.133 0.300 - - - 83.30 Systems, Construction of Revetment along Maliksi River, Satisfactory Phase II, Bacoor, Cavite, 2nd Legislative District MFO 2 - Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Aarcon Builders 28336 L A MA GE Bacoor, Cavite 8/18/2017 1st Cavite 2nd DEO LF 37.228 177 5/4/2017 10/27/2017 0.26 O 0.388 0.240 0.150 0.03 0.07 0.05 92.80 - Systems, Construction of Revetment along Maliksi River, Phase II, Bacoor, Cavite 2nd LD Improvement of Parañaque River Mouth Sheet Piling (Phase Parañaque City, Aarcon Builders 28336 L A MA GE III), Sta. 0+186 to Sta. 0+630 with Exception North Side, 9/15/2016 1st LF 45.262 210 3/15/16 10/10/16 -0.05 O 0.345 0.3 0.095 0.03 0.04 0.033 0.8430 - Manila 2ND DE0 Parañaque City, Manila Construction of River Bank Protection, Brgy. Naboc, Brgy. Naboc, Compostela Valley AB Aponesto Construction, Parts & Supply 22998 L A MA GE Monkayo, Compostela Valley Monkayo, 3/17/2017 1st LF 96.500 324 8/24/2015 7/12/2016 0.00 O 0.488 0.133 0.300 - - - 92.10 - DEO Compostela Valley Conc. of Lublub-Bolilac-Salad Road, Km.277+707.50- AB Aponesto Construction, Parts & Supply 22998 9/5/2010 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 - Km.278+711 Construction of One (1) Unit Two (2) Storey Six (6) Classroom AB Aponesto Construction, Parts & Supply / Compostela Valley JV-15-1869 L A SB GB Building with Toilet at Mangayon National High School, Compostela 3/18/2017 1st LF 8.880 200 8/24/2016 3/11/2017 0.00 O 0.482 0.135 0.300 - - - 91.70 - FFJJ Construction Joint Venture DEO Compostela Provision of TechVoc Workshop Building- Patin-ay National Prosperidad, Agusan del Sur 1st *89.5% Abada Construction And Supply 37005 L A MD GB High School 3/13/2017 1st & Final LF 2.596 90 10/17/2016 1/14/2017 0.00 C 0.462 0.133 0.300 - - - 89.50 Agusan del Sur DEO Very Satisfactory Construction of One (1) Storey Six (6) CL with Toilet Attached Las Nieves, Abada Construction And Supply 37005 L D SB GB 11/24/2016 1st Butuan City DEO LF 5.813 170 9/7/2016 2/23/2017 (+)15.75 O 0.383 0.3 0.15 0.03 0.041 0.05 0.9540 - @ Lingayao National High School Agusan del Norte Concreting of Santor - Andarayan Barangay Road, Delfin, *84.6% Abe General Contractor 33982 L D SB GE Albano, Isabela 8/18/2017 1st & Final Isabela 1st DEO LF 9.404 110 3/20/2017 7/7/2017 0.00 C 0.412 0.134 0.300 - - - 84.60 Albano, Isabela Satisfactory Abulug Construction Company, Inc. 5593 L B MA GE1 Const. of Colony Road 11/13/2008 1st II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 - Abulug Developers And Builders Co., Inc. Reblocking along Manila North Road (Fugu Bdry.-Bangag 2366 L AAA LB GE1 5/21/2009 1st II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 - (Formerly: F. Vargas Construction) Section) Abulug Developers And Builders Co., Inc. Construction of Flood Control System (Gabion with Steel Dugayung, 85% 2366 L AA MB GE 3/8/2016 1st Cagayan 3rd LF 39.1985 300 4/28/15 2/21/16 - C 0.417 0.133 0.3 0 0 0 85.00% (Formerly: F. Vargas Construction) Sheet Piles), Dugayung, Amulung Cagayan Amulung Cagayan Satisfactory Const./Imprv't of Access Road to Sabsaban Falls & Eco Park Aribungos, AC Rivero Development Corporation (Formerly: 83.2% 5122 L A MB GE Brooke's Point, 11/10/2015 1st Palawan 2nd Deo LF 31.345 172 6/1/15 11/19/15 0 O 0.308 0.3 0.15 0.006 0.035 0.033 83.20% AC Rivero Construction) Satisfactory Palawan AC Rivero Development Corporation (Formerly: Const. of Bridge at Dodiongan Box Culvert along Sta. 87.80% 5122 L A MB GE Iligan City 10/29/2014 1st X LF 24.567 295 1/30/14 11/20/14 7.27% O 0.339 0.278 0.150 0.010 0.051 0.050 87.80% AC Rivero Construction) Felomina-Bonbon-Digkilaan-Rogongon Road Satisfactory Construction/ Rehabilitation of Multi-Purpose Buildings of Montinola, Iloilo 2nd District *97.9% Acamada Builder's & Construction Supply 39355 L C SB GB Cabatuan Iloilo 3rd LD, Brgy. Jelicuon, Montinola, Cabatuan, 6/4/2017 1st & Final LF 3.955 125 9/21/2016 1/23/2017 0.00 C 0.478 0.201 0.300 - - - 97.90 Cabatuan, Iloilo Engineering Office Outstanding Iloilo Accuracy Builders Enterprise 27507 L B MA GE Rehabilitation of Banaue Hotel Roofing Banaue, Ifugao 1/13/2014 1st TIEZA LF 19.880 180 06/19/13 12/18/13 -9.81 S 0.304 0.300 0.052 0.150 0.008 0.033 71.14 - Rd. Upgrading (Gravel to Conc.) Nat'l Secondary Rd., K1657+(- ACJ Construction Resources 10635 L B MA GE1 Arakan, Cotabato 8/10/2012 1st XII LF 46.844 384 08/11/11 08/29/12 0.90 O 0.354 0.244 0.150 0.030 0.051 0.050 87.90 - 247)-K1659+824 along Paco-Roxas-Arakan Valley Rd. Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l ACJ Construction Resources 10635 L B MA GE1 Secondary Rd., Km.1628+584-Km.1630+803 along Kidapawan- Magpet, Cotabato 8/17/2011 1st XII LF 24.178 180 04/06/11 10/03/11 -34.26 O 0.342 0.300 0.000 0.030 0.045 0.033 75.00 - Magpet-Pangao-an Rd. Concreting of Poblacion Magpet-Nowa Road (Nowa Basak ACJ Construction Resources 10635 L B MA GE1 3/10/2009 1st XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 - Sect.) Concreting/Rehabilitation of Takepan -Saranay Farm to Takepan, Pikit, COTABATO 2ND 88.3% ACJ Construction Resources 10635 L B MA GE 6/12/2016 1st & Final LF 3.980 51 7/31/15 9/19/15 0.00 C 0.45 0.133 0.3 0 0 0 88.30% Market Road, Takepan, Pikit, Cotabato Cotabato DEO Satisfactory Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section ACJ Construction Resources 10635 L B MB GE1 9/5/2009 1st XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 - (Km. 1648+300-Km.1649+385.63) Improvement/Widening of Daang Maharlika Road, K0897+000 Acme Builders Corporation 6442 L A MA GE Tacloban City 4/11/2018 1st/Final Tacloban City DEO LF 23.316 166 7/10/2017 12/22/2017 0.00 C 0.476 0.148 0.300 - - - 92.40 *92.40% Very Satisfactory to K0897+820, K0903+-(077) to K0903+133 Construction of Slope Protection (Retaining Wall) along *89.6% Acme Builders Corporation 6442 L A MA GE Tigbao Sta. Fe San Miguel Road (S00033LT), K0905+586 to - 4/3/2017 1st & Final Tacloban City DEO LF 2.793 90 7/28/2016 10/25/2016 (+)22% C 0.396 0.200 0.300 - - - 89.60 Very Satisfactory K0905+655, Tacloban City Rd. Upgrading of Tigbao-Sta. Fe-San Miguel Rd., K0910+000- Acme Builders Corporation 6442 L A MA GE1 Tacloban City 8/22/2013 1st VIII LF 55.416 270 02/27/13 11/23/13 2.49 O 0.383 0.240 0.150 0.012 0.042 0.050 87.70 - K0911+500 & K0913+000-K0913+900 Acme Builders Corporation 6442 L B MA GE1 Construction of Bagacay Bridge 3/2/2009 1st VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -

*1st/Final 29th Release Page 14 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Rehab./Strengthening of Rosales Bridge along Daang Calbayog City, Acme Builders Corporation 6442 L A MA GE1 8/14/2013 1st VIII LF 25.251 165 02/06/13 08/16/13 3.00 O 0.393 0.242 0.150 0.030 0.060 0.033 90.80 - Maharlika (SM) (San Isidro-San Juanico Bridge) Samar Road Upgrading along Tigbao-Sta. Fe-San Miguel Road K0913+940- K0914+764 (S00030LT), *92.3% Acme Builders Corporation 6442 L A MB GE K0907+455- 4/3/2017 1st & Final Tacloban City DEO LF 41.625 179 7/28/2016 1/22/2017 (+)10% C 0.490 0.133 0.300 - - - 92.30 Very Satisfactory K097+638 (S00033LT), Tacloban City Rehab./Reconst./Impvt./Upgrading of Damaged Pavement, Acme Builders Corporation 6442 6/17/2010 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 - Tacloban Baybay South Rd. Acme Builders Corporation / B. Vicencio Const. of Palo East By Pass Road (Const. of Bernard Reed II JV-07-066 L A MB GE1 8/31/2009 3rd VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 - Construction Bridge) Acme Builders Corporation / MWJ Construction Const. of Albuera-Burauen Road including Bridges, Burauen JV-08-243 L A MB GE1 9/2/2009 1st VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 - (JV) Sect. Road Widening Including Drainage along Daang Maharlika (SM), San Isidro-San Juanico Bridge, K0691+(-570) to Acme Builders Corporation/ B. Vicencio *89.89% JV-15-1423 L AA LA GE K0691+000, K0694+000 to K0694+192, K0694+300 to Calbayog, Samar 11/14/17 2nd & Final DPWH LF 138.704 359 6/16/16 6/9/17 2.95 C 0.453 0.132 0.300 - - - 88.50 Construction Joint Venture Very Satisfactory K0695+020, K0704+000 to K0705+000, K0706+000 to K0707+000 and K0710+(565) to K0711+101 Rehabilitation/ Improvement of Calauag Seawall Calauag, *90% Adad Engineering Services And Supply 25477 L C SB GE Quezon Calauag, Quezon 6/3/2017 1st & Final Quezon 4th DEO LF 9.552 60 11/21/2016 1/19/2017 0.00 C 0.400 0.200 0.300 - - - 90.00 Very Satisfactory Local Infrastructure Program, Concrete Paving of Road 89.2% ADB Dynamic Builders & Supply 33359 L B MA GE Shoulder, Rawis (Junction)-Catubig Road, Dango-Oleras Northern Samar 3/16/2016 1st LF 3.7339 30 2/25/15 3/26/15 0 C 0.459 0.133 0.3 0 0 0 89.20% 2nd Very Satisfactory Section, K0798+000-K0798+200, Northern Samar Repair/Maintenance of Cawayan Revetment II, Brgy. Cawayan, Catarman, Northern Northern Samar 88.3% ADB Dynamic Builders & Supply 33359 L B SB GE 3/15/2016 1st LF 3.8965 108 11/3/15 1/31/16 0 C 0.45 0.133 0.3 0 0 0 88.30% Catarman, Northern Samar Samar 1st Satisfactory Rehab./Reconst. of Damaged Paved National Roads Gingoog- Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1 9/10/2009 1st X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 - Calveria-Villanueva Road Rehab./Reconst. of Damaged Paved National Rd. along Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1 Butuan City-CDO-Iligan Rd.,(Agusan- 9/16/2009 1st XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 - Sect.)Libertad-Bancasi Sect. Const./Completion/Continuation of Unfinished Bridge and Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GB1 9/16/2009 1st XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 - Approaches, Brgy. Libertad Adfil Corporation (Formerly: Adfil Construction) 14437 L AA LA GE1 Concreting of NRJ-Bahbah-Talacogon Rd. 9/13/2009 1st XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 - Construction of Agusan - Bukidnon Road, Sta. 1262+260 - Sta. Buenavista, Agusan Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE 8/5/2014 1st XIII LF 40.140 209 2/4/14 9/1/14 0.51 O 0.360 0.264 0.150 0.030 0.037 0.050 89.10 - 1265+120 del Norte Rehab./Reconstruction/Replacement/Retrofitting of Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE Magsaysay Bridge along Butuan - Cagayan de Oro - Iligan Butuan City 8/15/2014 1st XIII LF 36.843 234 2/14/14 10/5/14 12.89 O 0.384 0.234 0.150 0.030 0.047 0.050 89.50 - (Agusan - Misamis Oriental) Const./Improvement of Road to Support River Rhine Cruise Brangay Banza, Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE 8/14/2014 1st XIII LF 26.706 148 4/25/14 9/19/14 0.58 O 0.332 0.254 0.150 0.030 0.070 0.050 88.60 - leading to Banza Ruins, Barangay Banza Butuan City Adfil Corporation (Formerly: Adfil Construction) 14437 Rehab. of Magsaysay Bridge along Iligan City 9/9/2010 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 - Repair/Maintenance with Asphalt Overlay of Tabon-Tabon Slip Adfil Corporation (Formerly: Adfil Construction) 14437 6/17/2010 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 - along Agusan- Davao Road Improvement of Taguibo Riverbank Protection Sta. 0+000 to Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LB GE Butuan City 3/22/18 1st/Final Butuan City DEO LF 24.125 155 7/3/17 12/4/17 0.00% C 0.499 0.143 0.3 - - - 94.20 *94.20% Very Satisfactory Sta.0+200 Improvement/Widening of National Roads, Daang Maharlika San Isidro - Pasta (Agusan-Davao Section) K1313+077 to K1314+401, K1314+625 Regional Office No. Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LB GE Rosario, Agusan 3/20/18 1st/Final LF 193.207 420 5/4/16 6/27/17 0% C 0.465 0.135 0.3 - - - 90.00 *90.00% Very Satisfactory to K1314+830, K1315+052 to K1317+523, K1319+960 to XIII del Sur K1320+444, K1320+665 to K1321+532 Road Upgrading (Gravel to Paved) of Butuan City-Pianing- 86.60% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE Butuan City 10/30/2014 1st XIII LF 127.287 270 5/15/14 2/8/15 0.02% O 0.346 0.240 0.150 0.024 0.056 0.050 86.60% Tandag Road, K1237+055 - K1240+040, with exceptions Satisfactory Widening/Conc. of Add'l. Lane Both Directions along Butuan Buenavista, Agusan Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 8/6/2013 1st XIII LF 86.661 240 03/25/13 11/19/13 14.58 O 0.390 0.238 0.150 0.030 0.035 0.050 89.30 - City-Cagayan de Oro-Iligan Rd., K1249+461-K1253+310.50 del Norte Construction of Agusan-Bukidnon Road, Sta. 1262+260 - Sta. Buenavista, Agusan 85.80% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE 10/21/2014 1st XIII LF 40.140 271 2/4/14 11/1/14 0.46% O 0.387 0.182 0.150 0.024 0.065 0.050 85.80% 1265+120 del Norte Satisfactory Rehab./Reconst./Replacement/Retrofitting of Salvacion Bridge Trento, Agusan del Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE 8/8/2014 1st XIII LF 36.656 196 2/18/14 9/2/14 10.85 O 0.400 0.200 0.150 0.030 0.042 0.050 87.20 - along NRJ Cuevas - Bislig Road, K1374+670 - K1374+731 Sur Reconstruction/Replacement/Completion of Minusong Bridge 92.40% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE along Butuan-Cagayan de Oro-Iligan Road (Agusan--Misamis Agusan del Norte 10/21/2014 1st XIII LF 34.627 270 2/4/14 10/30/14 0.05% O 0.343 0.286 0.150 0.030 0.065 0.050 92.40% Very Satisfactory Oriental), Km1269+217 Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika Butuan City 8/23/2013 2nd XIII LF 19.207 219 1/30/13 09/05/13 1.87 O 0.397 0.240 0.150 0.018 0.040 0.050 89.50 - Widening of Permanent Bridges to more than 2 Lanes, Wawa Brgy. Wawa, Regional Office No. 98.9% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE Bridge (B00896MN)along Daang Maharlika (Agusan-Davao Sibagat, Agusan del 11/23/2016 1st & Final LF 219.820 400 8/26/2015 9/28/2016 (+)2.56% C 0.489 0.2 0.3 0 0 0 0.9890 XIII Outstanding Section) Sur

*1st/Final 29th Release Page 15 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Completion of East-West Lateral Road Connecting Agusan Agusan del Norte Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE del Sur/Agusan del Norte to Bukidnon, Simbalan-Dulag 11/11/17 1st DPWH LF 76.093 270 4/3/17 12/28/17 0.01 O 0.383 0.300 0.150 0.03 0.055 0.033 95.10 - 1st LD Section Widening of Minalum Bridge (B00817MN) Along dAang *92.2% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE Maharlika (Surigao-Agusan Section) (Phase II) Butuan City 11/11/17 1st & Final DPWH LF 11.972 96 4/3/17 7/7/17 0.00 C 0.488 0.134 0.300 - - - 92.20 Very Satisfactory Construction of By-Passes/ Diversion Road, Including ROW, Regional Office No. Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE NRJ Daang Maharlika, Taguibo-Masao Port, (Pagatpatan- Agusan del Norte 6/27/2017 1st LF 125.444 409 9/8/2016 10/21/2017 0.09 O 0.394 0.300 0.150 0.03 0.07 0.05 99.40 - XIII Lumbocan-Masao Section) Widening of Daang Maharlika (Agusan- Davao Section K1304, K130+(- 4040 to K1307 + 471, K1309+ Regional Office No. *87.56% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE 138.10 to 3/15/2017 2nd & Final LF 169.798 390 5/20/2015 6/12/2016 0.00 C 0.478 0.133 0.300 - - - 91.10 XIII Satisfactory K1312+810, San Francisco, Agusan del Sur Widening of Permanent Bridges to more than 2 lanes, Wawa Brgy. Wawa, Bridge (B00896MN) along Daang Maharlika (Agusan-Davao 82.5% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE Sibagat, Agusan del 11/9/2015 1st Regional Office LF 207.695 340 8/26/15 7/30/16 (+) 19.17 O 0.317 0.24 0.15 0.03 0.055 0.033 82.50% Road Section), Brgy. Wawa, Sibagat, Agusan del Sur Satisfactory Sur Widening of Daang Maharlika (Agusan-Davao Section), San Francisco, 83.5% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE K1304+(-404) - K1307-471, K1309+138.1 - K1312+810, San 11/11/2015 1st Regional Office LF 169.799 300 5/20/15 3/14/16 (+) 29.68 O 0.257 0.3 0.15 0.03 0.065 0.033 83.50% Agusan del Sur Satisfactory Francisco, Agusan del Sur Construction of Road Slip Along Butuan City-Malaybalay Brgy. Bit-os, Butuan 91.9% Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE Road, Brgy. Bit-os, Butuan City 9/2/2016 1st & Final Butuan City DEO LF 18.330 160 3/10/16 8/16/16 0.00 C 0.481 0.138 0.3 0 0 0 0.9190 City Very Satisfactory Esperanza, Agusan Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA LA GE2 Rehab. of Salvacion (Crossing Luna Flood Control) 8/20/2012 1st XIII LF 16.733 285 03/07/12 12/17/12 47.69 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 - del Sur Rehab./Reconst./Upgrading of Butuan City-Cagayan de Oro- Iligan City Rd. a)K1494+049-K1495+240; b)K1499+692- Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1 Misamis Oriental 3/12/2013 2nd X LF 48.167 285 06/13/12 03/24/13 3.06 O 0.293 0.271 0.150 0.010 0.050 0.050 82.40 - K1499+712; c)K1500+678-K1500+902; d)K1501+905- K1507+000; e)K1508+000-K1508+919 Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds., Butuan City-Cagayan de Oro City-Iligan City Rd.: a.)K1494+049- Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1 K1495+240; b.)K1499+692-K1499+712; c.)k1500+678- Misamis Oriental 11/23/2012 1st X LF 44.537 255 06/13/12 02/23/13 7.85 O 0.332 0.300 0.150 0.030 0.040 0.050 90.20 - K1500+902; d.)K1501+905-K1507+000; e.)K1508+000- K1508+919 Conc. of Agusan-Malaybalay Road, Km. 1283+183.50- Esperanza, Agusan Adfil Corporation (Formerly: Adfil Construction) 14437 L AA MB GE1 3/31/2012 1st XIII LF 39.495 300 08/26/11 06/20/12 0.49 O 0.351 0.300 0.150 0.030 0.040 0.050 92.10 - Km.1284+780 del Sur Const./Impv't of Rd. to Support River Rhine Cruise, Banza Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Butuan City 3/21/2013 1st XIII LF 29.509 155 01/30/13 07/03/13 2.48 O 0.313 0.300 0.150 0.024 0.060 0.033 88.00 - Ruins Widening/Conc. of Add'l Lane along Daang Maharlika Cabadbaran, Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 (Agusan-Surigao Rd.) Cabadbaran City Sect., Sta.1213+540- 3/11/2013 1st XIII LF 29.059 142 02/08/13 06/29/13 24.99 O 0.365 0.300 0.150 0.030 0.050 0.033 92.80 - Agusan del Norte Sta.1215+520 Rehab./Reconst./Strengthening of Minusong Bridge along Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Butuan-Cagayan de Oro-Iligan (Agusan Misamis Oriental) Agusan del Norte 8/6/2012 2nd XIII LF 28.848 270 01/12/12 10/22/12 3.53 O 0.383 0.246 0.150 0.030 0.045 0.033 88.70 - Km.1269+217, Aclan, Nasipit Widening of Daang Maharlika (Agusan-Usrigao Rd.) Pob., Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Agusan del Norte 8/6/2012 2nd XIII LF 27.390 255 01/12/12 09/22/12 1.10 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 - Cabadbaran Sect. Widening of Butuan-Cagayan de Oro-Iligan Rd. (Agusan- Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Agusan del Norte 8/6/2012 1st XIII LF 24.129 255 01/12/12 09/22/12 0.77 O 0.336 0.296 0.150 0.030 0.055 0.033 90.00 - Misamis Oriental Sect.) Pob., Buenavista Sect. Rehab./Reconst./Strengthening of Minusuang Bridge along Tubay, Agusan del Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 8/7/2012 2nd XIII LF 23.512 270 01/11/12 10/22/12 0.80 O 0.326 0.240 0.150 0.030 0.055 0.050 85.10 - Daang Maharlika (Surigao-Agusan Rd.) Km.1206+561 Norte Rehab./Reconst./Strengthening of Maraput Bridge along Tubay, Agusan del Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Daang Maharlika (Surigao-Agusan Rd.) Km.1207+192, Brgy. 8/7/2012 2nd XIII LF 23.512 285 01/12/12 10/22/12 1.45 O 0.325 0.240 0.150 0.030 0.055 0.050 85.00 - Norte Victory Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika Butuan City 3/21/2013 1st XIII LF 18.426 171 01/30/13 07/19/13 11.89 O 0.390 0.300 0.150 0.030 0.054 0.033 95.70 - Completion of La Union Bridge along Pandanon-Magallanes Cabadbaran, Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 3/11/2013 1st XIII LF 15.889 150 01/23/13 06/21/13 37.30 O 0.312 0.300 0.150 0.020 0.047 0.033 86.20 - Rd. Agusan del Norte Completion of Maraput Bridge along Daang Maharlika Tubay, Agusan del Adfil Corporation (Formerly: Adfil Construction) 14437 L AAA MB GE1 3/11/2013 1st XIII LF 9.115 120 12/26/12 04/24/13 21.54 O 0.348 0.300 0.150 0.030 0.037 0.033 89.80 - (Surigao-Agusan Rd.), Sta.1207+192 Norte Construction of Lower Agusan River Bank Protection Adfil Corporation/Ramises Construction (Joint Butuan City, Agusan *93.3% JV-16-785 L AAA LB GE 11/11/17 1st & Final DPWH LF 46.438 159 4/3/17 9/8/17 17.77 C 0.500 0.133 0.300 - - - 93.30 Venture) del Norte 1st LD Very Satisfactory Construction of By-Passes/ Diversion Roads, Including ROW Butuan City, Agusan Regional Office No. Adfil Corporation/JQG Builders Joint Venture JV-15-1822 L AAA LA GE NRJ Daang Maharlika, Taguibo-Masao Port, (Banza-Muag 6/27/2017 1st LF 144.680 428 9/29/2016 11/30/2017 -0.01 O 0.347 0.300 0.141 0.03 0.07 0.033 92.10 - del Norte XIII Section) Upgrading of NRJ Butuan Cuty - Mayor Democrito D. Plaza II Sitio Matin-ao, Adfil Corporation/Ramises Construction (Joint 91.8% JV-14-491 L AAA MB GE Ave. Road Leading to Mt. Mayapay (Delta Discovery Park), Bonbon, Butuan 3/15/2016 1st Butuan City DEO LF 36.833 317 3/3/15 1/13/16 0.0074 C 0.485 0.133 0.3 0 0 0 91.80% Venture) Very Satisfactory Sitio Matin-ao, Bonbon, Butuan City City DPWH Component Project under the Help for Catubig Adige Sta. Clara (JV) JV-06-032 L AAA LB GE1 5/30/2009 5th VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 - Agricultural Advancement Proj.

*1st/Final 29th Release Page 16 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION DPWH Component Project under the HELP for Catubig Adige Sta. Clara (JV) JV-06-032 FA/LF AAA LB GE1 8/25/2008 3rd VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 - Agricultural Project (HCAAP) San Fernando, Adimre Construction 25534 L B MA Region III-San Fernando, Pampanga LTFRB Regional Office 7/5/18 1st and Final DOTr LF 2.381 120 1/25/18 5/24/18 0.00 C 0.50 0.20 0.30 99.50 *99.50% Outstanding Pampanga Puerto Princesa, Adimre Construction 25534 L B MA Puerto Princesa Airport Development Project Palawan, Region IV- 3/9/2017 3rd & Final DOTC L 65.90 460 10/07/2015 11/30/2016 0.00 C 0.497 0.200 0.300 - - - 99.71 B Puerto Princesa, Adimre Construction 25534 B MA Puerto Princesa Airport Development Project Palawan/ Region 3/29/2016 1st DOTC LF 64.553 420 10/07/15 11/29/16 4.24 O 0.353 0.300 0.150 0.020 0.039 0.050 91.23 - 4B Puerto Princesa, Adimre Construction 25534 L B MA Puerto Princesa Airport Development Project Palawan/ Region 9/20/2016 2nd DOTC LF 64.553 420 10/07/15 11/30/16 -8.79 O 0.396 0.300 0.062 0.020 0.039 0.033 85.05 - 4B Adimre Construction 25534 L B MA Taytay Airport Development Project Taytay, Palawan 07/22/15 1st DOTC LF 10.794 154 02/27/15 09/01/15 -11.75 O 0.390 0.300 0.033 0.030 0.044 0.050 84.70 - Adimre Construction 25534 L B MA GB1 Const. of Three Storey Six CL Sch. Bldg. Tibagan NHS Bustos, Bulacan 8/14/2013 1st III LF 7.027 180 04/02/13 09/28/13 3.82 O 0.326 0.240 0.150 0.030 0.047 0.033 82.60 - Adimre Construction 25534 L B MA GB-1 Marinduque Airport Development Project Gasan, Marinduque 8/7/2015 1st DOTC LF 6.293 120 07/05/15 11/01/15 27.87 O 0.384 0.300 0.150 0.015 0.035 0.050 93.40 - Const. of Drainage Canal along Pulilan-Calumpit Rd., Pulilan Adimre Construction 25534 L B SB GE2 Pulilan, Bulacan 8/2/2012 1st III LF 11.886 170 05/08/12 10/24/12 1.71 O 0.376 0.283 0.150 0.022 0.060 0.050 94.10 - Section Km. 46+000-Km. 47+200 Brgy. Panasahan & Adimre Construction 25534 L B SB GE-5 Malolos Port Development Project Brgy. Namayan, 8/19/2014 1st DOTC LF 9.625 254 03/12/14 11/20/14 29.72 O 0.397 0.300 0.150 0.010 0.009 0.050 91.56 - Malolos, Bulacan Meycauayan, Adimre Construction 25534 L B SB GE-5 Meycauayan Port Development Project 7/9/2014 1st DOTC LF 8.300 150 03/12/14 08/09/14 0.68 O 0.385 0.300 0.150 0.020 0.035 0.033 92.30 - Bulacan Brgy. Paliwas & Adimre Construction 25534 L B SB GE-5 Obando Port Development Project Bargy. Binuangan, 8/18/2014 1st DOTC LF 8.109 194 03/13/14 10/22/14 7.73 O 0.378 0.300 0.150 0.010 0.016 0.033 88.65 - Obando, Bulacan Adimre Construction 25534 L B SB GE-5 Balagtas Port Development Project Balagtas, Bulacan 7/10/2014 1st DOTC LF 7.802 180 03/13/14 09/09/14 0.61 O 0.385 0.300 0.150 0.020 0.040 0.033 92.80 - Brgy. Lawigan, Adimre Construction 25534 L B Lawigan Port Development Project Catarman Camigiun 9/14/2017 1st DOTC LF 8.399.916 150 05/04/15 10/24/17 1 C 0.399 0.300 0.150 0.010 0.023 0.050 93.20 - /Region X ADP Construction & Supply 3466 L A Const. of Sta. Barbara Catching DAM and Canal Struc. Legares, Iloilo 4/5/2014 1st NIA LF 16.962 150 04/17/13 04/30/14 0.00 O 0.327 0.245 0.150 0.018 0.032 0.050 82.20 - Badbaran CIP, ADP Construction & Supply 3466 L GE2 Const. of Various CIP's Package 1 - Badbaran CIP 4/13/2013 1st NIA LF 24.770 210 02/13/13 09/22/13 26.15 O 0.348 0.249 0.150 0.000 0.027 0.050 82.40 - Dumarao, Capiz Reconstruction/Improvement of Dumalag Municipal Road, Brgy. Poblacion, 89.8% ADP Construction & Supply 3466 L A MB GE Brgy. Poblacion, Dumalag, Capiz (Section I) Dumalag, Capiz 11/13/2015 1st Capiz 2nd LF 35.960 224 7/2/15 2/11/16 14.45% O 0.366 0.232 0.15 0.03 0.07 0.05 89.80% Very Satisfactory (Section I) Construction of a 4STY 8CL Sschool Building, Bonfal National Bayombong, Nueva Adroit Construction 11169 L A - GB 3/15/2017 1st 1st LF 15.914 331 6/28/2016 5/24/2017 0.00 O 0.390 0.240 0.150 0.03 0.051 0.033 89.40 - High School Bayombong, Nueva Vizcaya Vizcaya Construction of 4 Sty. 8 CL. School Building, Bonfal National Bayombong, Nueva *89.61% Adroit Construction 11169 L B MA GB High School Bayombong, Nueva Vizcaya 11/8/17 2nd & Final DPWH LF 0.043 331 6/28/16 5/24/17 0.00 C 0.466 0.135 0.300 - - - 90.10 Vizcaya Very Satisfactory Off-Carriageway Improvement Including Drainage, Nueva Ecija- *88.6% Adroit Construction 11169 L B MA GE K0139+382.50 to K0139+993.50, Nueva Ecija-Pangasinan 11/22/17 1st & Final DPWH LF 4.687 60 7/3/17 8/31/17 0.00 C 0.386 0.200 0.300 - - - 88.60 Pangasinan Road Satisfactory Road Construction of a 4STY 8CL School Building, Bonfal National Boyombong, Nueva Nueva Vizcaya 1st *89.79335% Adroit Construction 11169 L B MA GB High School Boyombong, Nueva Vizcaya 8/24/2017 2nd & Final LF 15.914 331 6/28/2016 5/24/2017 0.00 C 0.471 0.134 0.300 - - - 90.50 Vizcaya DEO Very Satisfactory Construction of a 2STY 8CL School Building Ganduz National Pantabangan, Nueva Ecija 1st *92.5% Adroit Construction 11169 L B MA GB High School, Pantabangan, Nueva Ecija, 2nd LD 8/21/2017 1st & Final LF 11.565 150 11/22/2016 4/20/2017 0.00 C 0.493 0.132 0.300 - - - 92.50 Nueva Ecija DEO Very Satisfactory Wangal, La Adroit Construction 11169 L B Building Improvement / Renovation 11/09/18 1st NIA LF 28.830 210 5/29/18 6/7/18 10.21 O 0.39 0.24 0.15 0.02 0.04 0.05 89.52 - On - Going Trinidad, Benguet Advance Foundation Const. System Corp. / Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao JV-09-289 L AAA LB GE1 Rizal, Cagayan 3/30/2011 1st II LF 112.029 240 09/13/10 05/10/11 -63.60 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 - Abulug Developer Builders Const. Inc. (JV) Road Sitio Lakay, Brgy. Advance Tech Construction and Trading Bunga, 35288 L B SB GE-5 Cabucgayan Seaport Construction 8/11/2015 1st DOTC LF 8.606 240 04/29/15 12/24/15 20.87 O 0.400 0.300 0.150 0.015 0.029 0.050 94.42 - Corporation Cabuacgayan, Brgy. Funda-Dalipe, Advance Tech Construction and Trading *93.75% 35288 L B SB Antique Airport Port Development San Jose, Antique/ 3/23/2017 1st & Final DOTC L 7.47 180 09/21/2016 03/19/2017 (-) 1.37 C 0.438 0.200 0.300 - - - 93.75 Corporation V. Satisfactory Region VI Advance Tech Construction and Trading Miag-ao, Iloilo/ 35288 L B SB Miag-ao Feeder Port Development 2/16/2017 2nd & Final DOTC L 7.16 120 09/21/2015 01/18/2017 0.00 O 0.500 0.200 0.300 - - - 100.00 - Corporation Region VI Advance Tech Construction and Trading Miag-ao, Iloilo/ 35288 L B SB Miag-ao Feeder Port Development 11/16/2016 1st DOTC LF 7.161 120 09/21/16 01/18/17 1.09 O 0.400 0.300 0.150 0.020 0.041 0.050 96.08 - Corporation Region 6 Brgy. Iquiran, Advance Tech Construction and Trading 35288 B SB Construction of Brgy. Iquiran Wharf Daram, Western 10/14/2015 1st DOTC LF 9.438 180 06/03/15 11/29/15 18.64 O 0.400 0.300 0.150 0.020 0.018 0.050 93.75 - Corporation Samar/ Region VIII Brgy. Iquiran, Advance Tech Construction and Trading 95.91% 35288 SB Construction of Iquiran Wharf Daram, Western 1/21/2016 2nd & Final DOTC LF 9.438 180 06/03/15 11/25/15 0.00 C 0.492 0.200 0.300 - - - 99.15 Corporation V. Satisfactory Samar/ Region VIII

*1st/Final 29th Release Page 17 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Advance Tech Construction and Trading Brgy. Bunga, 95.30% 35288 B SB Cabucgayan Port Development Project 2/16/2016 2nd & Final DOTC LF 8.602 240 04/29/15 07/25/16 57.13 C 0.467 0.200 0.300 - - - 96.70 Corporation Canucgayan, Biliran V. Satisfactory Advance Tech Construction and Trading *96.20% 35288 L B MA Badoc Port Development Project Badoc, Ilocos Norte 5/17/2018 1st & Final DOTC LF 9.147 150 11/1/2017 3/30/2018 0.00 C 0.462 0.200 0.300 - - - 96.20 Corporation Outstanding Advance Tech Construction and Trading Sta. Cruz, *97.10% 35288 L B MA Mongpong Port Development Project 5/31/2018 1st & Final DOTC LF 8.530 150 11/1/2017 3/30/2018 0.00 C 0.471 0.200 0.300 - - - 97.10 Corporation Marinduque Outstanding Advance Tech Construction and Trading Volcano Island, 35288 L B SB Volcano Island Port Development Project 08/30/18 1st and Final DOTr LF 9.077 155 1/22/18 6/25/18 0.00 C 0.48 0.20 0.30 97.70 *97.70% Outstanding Corporation Talisay, Batangas Caminawit, San Advance Tech Construction and Trading 35288 L B SB Caminawit Port Development Project Jose, Occidental 11/06/18 1st and Final DOTr LF 7.382 180 1/22/18 07/20/18 0.00 C 0.44 0.20 0.30 93.90 *93.90% Very Satisfactory Corporation Mindoro Advance Tech Construction and Trading *97.30% 35288 L B SB Tuguegarao LTFRB Regional Office Building Project Tacloban City, Leyte 4/12/2018 1st & Final DOTC LF 4.904 120 1/11/2018 5/10/2018 23.33 C 0.473 0.200 0.300 - - - 97.30 Corporation Outstanding Construction and Maintenance of Bridges along National Advanced Foundation Construction System Abulug, Cagayan Regional Office No. JV-13-601 L AAA LB GE Roads-Construction of Bridges-On-going, Lucban Bridge 6/1/2015 2nd LF 278.183 674 3/18/14 1/20/16 16.94% O 0.398 0.3 0.15 0.024 0.05 0.033 95.50% - Corp./Pulsar Construction (JV) Province I along Manila North Road Advanced Foundation Construction System, 15449 L AAA LB GE1 Lucban Bridge & Approaches Phase I along Manila North Rd. Abulug, Cagayan 8/1/2013 1st II LF 153.067 450 03/26/13 06/18/14 23.14 O 0.328 0.300 0.150 0.030 0.056 0.033 89.70 - Corp. Locally Funded Projects: Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Advanced Foundation Construction Systems Projects, Roads and Bridges - Local Bridges: Construction of Angadanan, JV-16-1596 L AAA LB GE 11/11/17 1st DPWH LF 437.067 750 4/10/17 4/29/19 20.53 O 0.335 0.240 0.150 0.03 0.06 0.05 86.50 - Corp./ Pulsar Construction (JV) Pigalo Bridge and Approaches along Alicia-Angadanan-San Isabela Guillermo Provincial Road Angadanan, Isabela

Construction and Maintenance of Bridges along National Advanced Foundation Construction System JV- Roads-Widening of Permanent Bridges to more than 2-lanes, Corp./ R.U. Aquino Construction And L AAA LB GE Mexico, Pampanga 11/27/17 1st DPWH LF 83.123 420 11/23/16 1/16/18 1.29 O 0.348 0.240 0.150 0.03 0.061 0.033 86.17 - Sto. Domingo Bridge (B01480LZ) along Jose Abad Santos Development Corporation Joint Venture 15449 Avenue Road (formerly GSO), Mexico, Pampanga Construction and Maintenance of Bridges along National Advanced Foundation Construction System 92.70% JV-13-601 F AAA LB GE Roads - Construction of Bridges - On going; Lucban Bridge Abulug, Cagayan 10/22/2014 1st II LF 253.267 650 3/18/14 12/27/15 23.35% O 0.456 0.225 0.150 0.030 0.033 0.033 92.70% Corp./Pulsar Construction(JV) Very Satisfactory along Manila North Road PICC Complex, 92.50% Advanced Matrix Construction Inc. 32873 L MA Structural Retrofitting of Buildings at PICC Phase 1 1/27/2016 Final BSP LF 36.535 240 12/18/13 07/31/16 0.00 C 0.481 0.200 0.300 - - - 98.10 Pasay City Very Satisfactory

PICC Complex, 93.50% Advanced Matrix Construction Inc. 32873 L MA Full Upgrading of Toilets at PICC 1/26/2016 Final BSP LF 29.298 210 02/20/14 07/18/15 0.00 C 0.481 0.200 0.300 - - - 98.10 Pasay City Very Satisfactory Security Plant 84.30% Advanced Matrix Construction Inc. 32873 L MA New Roofing System for Building E Roofdeck 3/2/2016 Final BSP LF 23.296 321 02/06/14 12/23/14 3.54 C 0.469 0.200 0.194 - - - 86.30 Complex Satisfactory Rehabilitation of Common Maintenance Shop (CMS) at BSP, 86.90% Advanced Matrix Construction Inc. 32873 L MA Building A, SPC 1/27/2016 Final BSP LF 19.053 188 10/29/13 10/01/14 6.02 C 0.466 0.200 0.119 - - - 78.50 SPC Satisfactory Security Plant 92.70% Advanced Matrix Construction Inc. 32873 L AA Replacement of Ceiling at the Skywalk Complex, Quezon 9/30/2016 1st & Final BSP LF 3.900 70 12/23/15 03/01/16 0.00 C 0.427 0.200 0.300 - - - 92.70 Very Satisfactory City BSP, Security Plant Advanced Matrix Construction Inc. 32873 L A Rehabilitation of Building B Lighting System Complex, East Ave., 10/8/2013 1st BPS LF 2.000 60 03/26/13 11/20/13 4.50 O 0.346 0.279 0.150 0.030 0.035 0.050 89.00 - Quezon City Security Plant Advanced Matrix Construction Inc. 32873 L MA New Roofing System for Building E Roofdeck 11/19/2014 1st BSP L 22.300 120 02/06/14 06/05/14 7.87 O 0.389 0.300 0.071 0.020 0.030 0.025 83.50 - Complex BSP, Security Plant Improvement of BSP-SPC Parking Lot at BSP Security Plant Complex, Cor BIR Advanced Matrix Construction Inc. 32873 L MA 3/31/2013 1st BSP LF 13.800 180 03/22/13 09/07/13 0.00 O 0.399 0.190 0.150 0.030 0.051 0.050 87.00 - Complex Road, East Ave., Quezon City Construction of One (1) Unit Senior High School Unique Workshop Building (Under DepEd CY 2016 BEFF Technical Naga City, Camarines Sur *94.8% AE Belleza Builders 35594 L B SB GB 3/18/2017 1st & Final LF 2.624 90 9/19/2016 12/17/2016 0.00 C 0.482 0.166 0.300 - - - 94.80 Vocational Laboratory Batch 10), Carayan National High Camarines Sur 2nd DEO Very Satisfactory School, Naga City, Camarines Sur Construction of Revetment along Ayala River at Calle San Zamboanga City AEJ Hardware Construction & Enterprises 34740 L D SB GE Zamboanga City 11/23/2016 1st LF 3.851 295 2/8/2016 11/28/2016 0.00 O 0.417 0.2 0.3 0 0 0 0.9170 - Miguel Site DEO Construction/Rehabilitation of Flood Control Mitigation Tugbungan, Zamboanag City 86.2% AEJ Hardware Construction & Enterprises 34740 L D SB GE 3/7/2016 1st LF 9.3975 274 11/12/14 8/12/15 0 C 0.362 0.2 0.3 0 0 0 86.20% Facilities along Tumaga River Basin Zamboanga City DEO Satisfactory Repair/Rehab. of Licomo Failed Rd. Shoulder along Maria AEJ Hardware Construction & Enterprises 34740 L D SB GE1 Clara Lobregat Highway (Pagadian-ZC Rd.), K1851+500- Zamboanga City 3/11/2013 1st IX LF 1.880 64 02/26/13 05/01/13 -2.60 O 0.363 0.240 0.124 0.030 0.035 0.033 82.50 - K1851+600 Retrofitting/Strengthening of Permanent Bridge of Tictapul Zamboanga City AEJ Hardware Construction & Enterprises 34740 L B SB GE Bridge (B00557MN) along Pagadian City-Zamboanga City Zamboanga City 03/19/18 1st/Final LF 5.615 89 03/22/17 06/18/17 0.00 C 0.369 0.169 0.300 - - - 83.80 *83.80% Satisfactory DEO Road AEJ Hardware Construction & Enterprises/ Construction of Flood Control at Labuan River, Labuan Mamsar Construction And Industrial JV-16-459 L AAA MA GE Section, (Including Right of Way Acquisition), Zamboanga - 11/7/17 1st DPWH LF 25.217 304 7/19/18 5/18/19 3.56 O 0.369 0.240 0.150 0.03 0.06 0.05 89.90 - Corporation Joint Venture City 1st LD Agafer Construction 7912 L B SB GE2 Const. of Cagayan River Control 11/11/2008 2nd II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -

*1st/Final 29th Release Page 18 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction of Two (2) Storey Six (6) Classroom School Barobo, Surigao del *93.3% Aguero Construction 23338 L B MA GE Building Tambing National High School 11/11/17 1st & Final DPWH LF 8.100 200 10/13/16 4/30/17 2.71 C 0.500 0.133 0.300 - - - 93.30 Sur Very Satisfactory Construction of Two (2) Storey Eight (8) CL at La Trinidad *94.3% Aguero Construction 23338 L B MA GB Integrated Secondary School Butuan City 7/7/2017 1st & Final Butuan City LF 12.373 210 10/19/2016 5/16/2017 0.00 C 0.499 0.144 0.300 - - - 94.30 Very Satisfactory Construction of Two (2) Storey Eight (8) Classrooms School COTABATO FIRST Aguero Construction 23338 L B MA GB Building at Manobo National High School, Magpet, Cotabato Magpet, Cotabato 3/16/2017 1st LF 10.618 165 8/18/2016 1/29/2017 -0.70 O 0.331 0.300 0.000 0.03 0.058 - 71.90 - DEO Repair/ Maintenance Road Slip along NRJ Cuevas-Bislig Road K1388+820 to K1388+870(S0046 Agusan del Sur *87.7% Aguero Construction 23338 L A MA GE 3/14/2017 1st & Final LF 6.616 123 10/3/2016 2/2/2017 0.00 C 0.444 0.133 0.300 - - - 87.70 4MN) Trento, 2nd DEO Satisfactory Agusan del Sur Concreting of Lemsinolon Farm to Market, Brgy. Lemsinolon, South COTABATO (+)10.66 85.3% Aguero Construction 23338 L B MA GE T'Boli, South Cotabato 0 11/19/2016 1st & Final LF 2.951 80 4/7/2016 6/25/2016 C 0.382 0.171 0.3 0 0 0 0.8530 1ST DEO % Satisfactory Construction of Two (2) Storey, 6 CL Senior High School 92% Aguero Construction 23338 L B MA GB Building at Esperanza NHS Koronadal City South Cotabato South Cotabato 8/30/2016 1st & Final South Cotabato LF 8.172 150 11/9/15 4/6/16 0.00 C 0.487 0.133 0.3 0 0 0 0.9200 Very Satisfactory

Construction of 2-Storey, 6-CL Senior High School Building at Koronadal City, 85.4% Aguero Construction 23338 L B SA GB 3/7/2016 1st South Cotabato 1st LF 8.172 150 11/9/15 4/7/16 (+)0.26% O 0.349 0.24 0.15 0.03 0.035 0.05 85.40% Esperanza NHS Koronadal City, South Cotabato South Cotabato Satisfactory Prosperidad, Provincial Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road Agusan del Sur / 12/19/17 1st Government of LF 62.645 270 08/29/17 05/25/18 -4.46 O 0.39 0.23 0.11 0.03 0.06 0.05 86.80 - On - Going (13) Agusan del Sur Prosperidad, Provincial Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road Agusan del Sur / 04/06/18 2nd Government of LF 62.645 270 08/29/17 05/25/18 -3.70 O 0.40 0.23 0.11 0.03 0.06 0.05 88.50 - On - Going Caraga (13) Agusan del Sur Prosperidad, Provincial Aguero Construction 23338 L A Concreting of NRJ Patin-ay-Lucac-Pisaan Road Agusan del Sur / 11/13/18 Final Government of LF 63.910 429 08/29/17 10/31/18 3.13 C 0.49 0.20 0.30 - - - 98.50 92.00% Very Satisfactory Caraga (13) Agusan del Sur San Francisco, Provincial Concreting of NRJ Barangay 1-Das agan-Barobo Boundary Aguero Construction 23338 L A Agusan del Sur / 1/7/19 Final Government of LF 60.938 409 8/29/17 10/11/18 0.22 C 0.47 0.20 0.30 - - - 97.00 93.55% Very Satisfactory Road Caraga (13) Agusan del Sur San Francisco, Provincial Concreting of NRJ Barangay 1-Das agan-Barobo Boundary Aguero Construction 23338 L A Agusan del Sur / 2/20/18 2nd Government of LF 60.533 270 8/29/17 5/25/18 21.00 O 0.39 0.24 0.15 0.03 0.05 0.05 91.20 - Road Caraga (13) Agusan del Sur San Francisco, Provincial Concreting of NRJ Barangay 1-Das agan-Barobo Boundary Aguero Construction 23338 L A Agusan del Sur / 12/18/17 1st Government of LF 60.533 270 8/29/17 5/25/18 4.58 O 0.39 0.24 0.15 0.03 0.05 0.05 91.30 - Road Caraga (13) Agusan del Sur Construction of Two (2) Storey Six (6) Classroom School Barobo, Surigao del Aguero Construction 23338 L A MB GB 03/19/18 2nd/Final LF 8.100 200 10/13/16 04/30/17 0.00 C 0.481 0.160 0.300 - - - 94.10 *94.03% Very Satisfactory Building Tambis National High School Sur 2nd DEO Repair/ Rehabilitation of Bolok River Bank Protection, Koronadal City, *88.9% Aguero Construction 24880 L A MA GE 11/7/17 1st & Final DPWH LF 13.150 150 3/9/17 8/5/17 8.00 C 0.456 0.133 0.300 - - - 88.90 Poblacion Section South Cotabato Satisfactory Construction of Two Storey Six Classroom School Building Barobo, Surigao del Surigao del Sur (+)15.40 Aguero Construction 23338 L B MA GB 11/17/2016 1st LF 8.100 140 10/13/2016 3/1/2017 O 0.392 0.3 0.15 0.03 0.035 0.033 0.9400 - Tambis National High School Sur 2nd DEO % Construction of Slope Protection/Retaining Wall along Pico- Lamtang Road, K0256+300 - K0256+420, K0258+163 - Aguinsod General Construction 34741 L B SB GE La Tridad, Benguet 6/2/2015 1st Benguet 1st DEO LF 8.292 120 2/20/15 6/19/15 (+) 1.00% O 0.237 0.3 0.15 0.02 0.045 0.05 80.20% - K0258+235, K0259+670 - K0259+700, K0260+665 - K0260+725, K0262+500 - K0262+585 Construction of Two (2) Storey Six Classroom School Guiwan, Zamboanga City *92.1% Ahe Construction 33486 L S SB GB Building at Guiwan ES 3/22/2017 1st & Final LF 7.696 275 3/30/2016 12/29/2016 0.00 C 0.484 0.137 0.300 - - - 92.10 Zamboanga City DEO Very Satisfactory Widening of Governors Drive (Carmona-Dasmariñas-Trece G.M.A. and Ahnex Builders & Ready Mix Corporation 32296 L AAA MA GE1 8/15/2012 1st IVA LF 38.813 190 02/07/12 08/14/12 -6.91 O 0.366 0.300 0.081 0.030 0.055 0.033 86.50 - Martires City Rd.) inc. Drainage System Carmona, Cavite Ahnex Builders & Ready Mix Corporation 32296 L AAA MA GE1 Widening of Cavite-Batangas Rd., Km.22+000-Km.23+653 Imus, Cavite 11/23/2012 1st IVA LF 30.797 369 02/07/12 02/08/13 -4.41 O 0.352 0.300 0.106 0.022 0.050 0.033 86.30 - Green Park Ville, Procurement of Fully Developed Lots and Completed Brgy. Takas, Aina Construction 30026 L 11/23/18 1st NHA LF 147.000 602 7/29/17 3/22/19 4.54 O 0.39 0.30 0.15 0.03 0.06 0.05 98.29 - On - Going Housing Units (510 units) Valderrama, Antique Aina Construction/Eddmari Construction And Procument of 1000 Fully Developed House and Lot Packages Bgry. Bagacay, San L 2/2/2018 1st NHA LF 289.600 604 09/22/16 03/18/18 1.03 D 0.368 0.300 0.150 0.030 0.056 0.050 95.41 - Trading - Jv (St, Peter and Paul Housing Project) Dionisio, Iloilo MFO-1 National Road Network Services - Asset Preservation of National Roads Preventive Maintenance Based on Pavement Management System/ Highway Development and Antipolo City, 2nd *87% AJ Lava Builders Corp. 22265 L B MA GE 6/8/2017 1st & Final Rizal 1st DEO LF 29.351 90 2/23/2017 5/23/2017 0.54 C 0.437 0.133 0.300 - - - 87.00 Management-4 (HDM-4), Marikina-Infanta Road, K0031+426 to LD Satisfactory K0035+658, Antipolo City, 2nd LD

Rehabilitation of Drainage System Including Curbs and Gutter Metro Manila 1st AJ Lava Builders Corp. 22265 L B MA GE Pasig City 3/16/18 1st/Final LF 13.700 332 4/11/17 3/8/18 7.78% C 0.489 0.134 0.3 - - - 92.30 *92.30% Very Satisfactory and Sidewalk, Imelda Avenue DEO Rehabilitation of Drainage System Including Curbs and Gutter Imelda Avenue, AJ Lava Builders Corp. 22265 L B MA GE 11/23/17 1st DPWH LF 13.700 270 4/11/17 1/5/18 1.89 O 0.397 0.240 0.150 0.03 0.06 0.033 91.00 - and Sidewalk Pasig City

*1st/Final 29th Release Page 19 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction of Flood Mitigation Structure along Badoc River, Ilocos Norte 2nd AJ Taylan Construction Corporation / Badoc U/S and D/S of Badoc Bridge 2336 L B MA GE Badoc, Ilocos Norte 6/2/2017 1st District Engineering LF 41.895 195 2/24/2017 9/6/2017 0.19 O 0.372 0.240 0.150 0.03 0.06 0.05 90.20 - Builders & Supply Joint Venture Office Construction of Flood Control Structure along Bislak River Ilocos Norte 1st AJ Taylan Construction Corporation / DJCM Brgy. Dagupan, JV-16-1034 L B MA GE 5/31/2017 1st District Engineering LF 42.424 220 2/24/2017 10/1/2017 0.48 O 0.367 0.240 0.150 0.03 0.061 0.05 89.80 - Construction Corporation Joint Venture Vintar, Ilocos Norte Office AJ Taylan Construction Corporation/DJCM Construction of Flood Control Structure along Bislak River Brgy. Dagupan, Ilocos Norte 1st *91.102% Construction Corporation (Formerly: Djcm JV-16-1034 L B MA GE 8/15/2017 2nd & Final LF 44.093 220 2/24/2017 10/1/2017 0.18 C 0.498 0.133 0.300 - - - 93.10 Vintar, Ilocos Norte DEO Very Satisfactory Construction) Joint Venture Construction and Maintenance of Bridges along National AJ Tylan Const., Corp./DJCM Const/VVH Const., Pagudpud, Ilocos 86.50% JV-13-702 L A MA GE Roads-Widening of Permanent Bridges, Subec Bridge along 10/21/2014 1st I LF 36.706 304 5/9/14 3/8/15 0.01% O 0.330 0.249 0.150 0.030 0.056 0.050 86.50% Corp./ZEDIK Builders (DAVZ JV) Norte Satisfactory MNR Ajan Jeada, Inc. (Formerly: Jeada 17869 L A MB GB1 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 1st NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 - Construction) Ajan Jeada, Inc. (Formerly: Jeada 17869 L A MB GE1 Impv't. of Bahi-Cagubulacao Rd. (Cagraray Eco Park) Bacacay, Albay 8/3/2011 1st V LF 18.989 221 01/03/11 08/11/11 0.63 O 0.317 0.300 0.150 0.030 0.045 0.033 87.50 - Construction) Cluster 4-Local Infrastructure Program-Construction of Local Ajan Jeada, Inc. (Formerly: Jeada 91.7% 17869 L A MA GE Road (Road Opening) and Drainage Canal and Slope Camalig, Albay 3/8/2016 1st Albay 2nd DEO LF 4.2732 114 2/9/15 6/2/15 (+)6.514 C 0.484 0.133 0.3 0 0 0 91.70% Construction) Very Satisfactory Protection, Camalig, Albay Midsayap-Marbel Road K1777+353 to K1779+553.16 with Tantangan, South South Cotabato 88% AJYSC Marketing 26924 L A MA GE exception Luayan-Dumadalig Section, Tantangan South 11/9/2015 1st LF 47.958 234 3/31/15 11/19/15 (+) 0.09% O 0.36 0.248 0.15 0.03 0.042 0.05 88.00% Cotabato First DEO Satisfactory Cotabato, 2nd LD Midsayap-Marbel Road, K1777+409 - K1780+120 (with exceptions), Luayan-Dumadalig Section Tantangan, South Cotabato Modified To: MFO1 - Widening of National Tantangan, South 87.28% AJYSC Marketing 26924 L A MA GE 3/8/2016 - South Cotabato 1st LF 47.9577 234 11/19/15 7/10/16 0.00% C 0.362 0.2 0.3 0 0 0 87.28% Secondary Road, - Midsayap - Marbel Road, K1777+353 - Cotabato Satisfactory K1779+553.16 (with exceptions), Luayan-Dumadalig Section Tantangan, South Cotabato

Midsayap-Marbel Road, K1777+409-K1780+1020 ( with exceptions), Luayan-Dumadalig Section, Tantangan, South Tantangan, South South Cotabato AJYSC Marketing 26924 L A MA GE Cotabato Modified to: MF01- Widening of Secondary Road- 6/2/2015 1st LF 43.944 174 3/31/15 9/20/15 15.05% O 0.358 0.24 0.15 0.03 0.02 0.033 83.10% - Cotabato DEO Midsayap-Marbel Road, K1777+353-K1779+553.16 ( with exceptions), Luayan-Dumadalig Section Construction and Namleaning of Bridges along National South Cotabato (-) 66.9% AJYSC Marketing 26924 L A MA GE Roads- Widening of Permanent Bridges to more than 2 lanes, General Santos City 11/18/2015 1st LF 25.481 176 4/1/15 10/12/15 O 0.346 0.3 0 0 0.023 0 66.90% Second DEO 24.00% Poor Bawing Bridge along Makar-Kiamba Road Completion of Drainage Canal along Dulawan-Marbel Rd. (New AJYSC Marketing 26924 L A MA GE2 Tacurong City 3/11/2013 3rd XII LF 17.419 214 05/19/12 12/28/12 - O 0.364 0.300 0.000 0.030 0.050 0.033 77.70 - Carment Sect.) Completion of Drainage Canal along Dulawan-Marbel Rd., New AJYSC Marketing 26924 L A MA GE2 Tacurong City 11/24/2012 2nd XII LF 17.419 214 05/19/12 12/28/12 -4.81 O 0.359 0.300 0.102 0.030 0.055 0.000 84.60 - Carmen Sect. Completion of Drainage Canal along Dulawqan-Marbel Rd. Tacurong City, AJYSC Marketing 26924 L A MA GE2 8/8/2012 1st XII LF 17.419 196 05/29/12 12/10/12 -6.47 O 0.386 0.300 0.085 0.030 0.045 0.033 87.90 - (New Carment Sect.) Rehab./Improvement of Bulok Bridge along Marbel-Makar AJYSC Marketing 26924 L A MA GE2 6/5/2009 1st R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 - Road Construction/Rehabilitation of Flood Control Mitigation Facilities Major River Basins- River Basin: Banga, South 59.2% AJYSC Marketing 26924 L A MB GE 3/7/2016 1st South Cotabato 1st LF 16.5484 160 9/30/15 3/8/16 (-)8.61% O 0.201 0.248 0.064 0.022 0.04 0.017 59.20% Construction of Bank Protection along Cotabato-Marbel Road, Cotabato Poor Km. 1723+100 Banga, South Cotabato Const./Replacement of Banga Bridge and Approaches Phase AJYSC Marketing 26924 3/8/2010 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 - II Provincial Improvement of NHW Jct. Lomutan - Upper Kalaneg Farm to Maitum, Sarangani AJYSC Marketing 26924 L A 3/20/19 1st Government of LF 41.336 480 1/8/18 9/13/18 -9.37 O 0.02 0.30 0.14 0.24 0.06 0.02 77.29 - On - Going Market Road Province Sarangani Construction of River Control along Alah River (Panas- Isulan, Sultan AJYSC Marketing 26924 L A MA GE 11/8/17 1st DPWH LF 18.503 259 3/6/17 11/19/17 0.00 O 0.355 0.235 0.150 0.03 0.042 0.033 84.50 - Bambad-Section) K0+000 - K0+210 Kudarat Rehabilitation/Reconstruction/Upgrading of Damaged South AKH Construction and Trading Corporation 20759 L A MA GE Super Highway East Service Road, K13+890 to K16+793, Parañaque City 9/3/2015 1st NCR LF 27.364 165 5/15/15 10/26/15 8.29% O 0.376 0.24 0.15 0.03 0.053 0.05 89.90% - Parañaque City Preventive Maintenance Based on Pavement Management 87.90% AKH Construction and Trading Corporation 20759 L A MA GE System/Highway Development and Management-4 (HDM-4) Sta. Mesa, Manila 11/24/2014 1st NCR LF 22.598 206 5/28/14 12/19/14 0.17% O 0.381 0.240 0.150 0.030 0.045 0.033 87.90% Satisfactory along V. Mapa Street Concrete Reblocking along commonwealth Ave., Quezon City, AKH Construction and Trading Corporation 20759 L A MA GE K0017+061 - K0020+(-262), K0016+938 - K0019+731, Quezon Quezon City 6/6/2015 1st NCR LF 17.988 273 10/29/14 7/28/15 (+) 21.83 O 0.387 0.24 0.15 0.024 0.056 0.05 90.70% - City Proposed Repair/Rehab. Of Road along Jalandoni St., CCP AKH Construction and Trading Corporation 20759 L A MA GE Pasay City 8/17/2014 1st NCR LF 8.100 90 5/21/14 8/18/14 14.30 O 0.446 0.215 0.150 0.030 0.040 0.030 91.10 - Complex Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int. AKH Construction and Trading Corporation 20759 L AAA MB GE1 Sect.) of Mendiola Extension (Chainage 0000-Chainage 0119, Manila 3/13/2013 1st NCR LF 2.678 69 02/20/13 04/29/13 10.22 O 0.366 0.200 0.150 0.030 0.048 0.033 82.70 - A) Prev. Maint. (Int. Sect.) of Mendiola (Chainage 0119-085)

*1st/Final 29th Release Page 20 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION AKN Construction Corporation (Formerly: Akn Construction of Drainage System along PNR Railroad Track in Muntinlupa City, Las Piñas- 85.8% 11845 L AAA LB GE 11/24/2016 1st & Final LF 24.116 180 9/4/2015 3/1/2016 0.00 C 0.425 0.133 0.3 0 0 0 0.8580 Construction) Cupang, Muntinlupa City, Metro Manila Metro Manila Muntinlupa DEO Satisfactory Construction of Flood Control Structure Upper Paliko Creek, AKN Construction Corporation (Formerly: AKN Las Piñas- *88.4% 11845 L AAA - GE Brgy. Cupang, 8/15/2017 1st & Final LF 17.690 318 8/2/2016 6/15/2017 0.00 C 0.439 0.145 0.300 - - - 88.40 Construction) Muntinlupa DEO Satisfactory Muntinlupa City Dredging of Parañaque River Mouth (Phase II), Parañaque AKN Construction Corporation (Formerly: AKN Parañaque City, METRO MANILA 93.48% 11845 L AAA LB GE City, Metro Manila 6/8/2016 2nd & Final LF 86.132 240 5/12/15 1/6/16 0.01 C 0.433 0 0.5 0 0 0 93.30% Construction) Metro Manila 2ND DE0 Very Satisfactory AKN Construction Corporation (Formerly: AKN District I, Makati City, 84.50% 11845 L AAA LB GE Slope Protection of Estero Tripa De Gallina, Barangay Bangkal 11/19/2014 1st NCR LF 17.321 150 6/18/14 11/14/14 -9.07% O 0.357 0.300 0.059 0.030 0.049 0.050 84.50% Construction) M.M. Satisfactory AKN Construction Corporation (Formerly: AKN Widening/Conc. of R-10 inc. ROW, (Const. of Footbridge at 11845 L AAA MA GE1 Tondo, Manila 4/15/2011 1st NCR LF 17.977 248 06/25/10 02/27/11 1.67 O 0.371 0.296 0.150 0.030 0.035 0.050 93.20 - Construction) corner Pacheco) AKN Construction Corporation (Formerly: AKN Rehab./Reconstruction of Muntinlupa Insular Prison Road 11845 L AAA MB GE1 9/9/2009 1st NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 - Construction) and its Vicinity, Brgy. Poblacion Dredging of Paranaque River Mouth (Phase I), Paranaque City, AKN Construction Corporation (Formerly: AKN Metro Manila 2nd 93.6% 11845 L AAA MA GE Metro Manila Metro Manila 12/3/2015 1st LF 86.133 240 5/12/15 1/1/16 (+)6.05% O 0.4 0.2 0.05 0.036 0.25 - 93.60% Construction) DEO Very Satisfactory Repair/Maintenance of Flood Control- Sta.00+723.80- Sagasa, , *91.2% AL Chris Construction 12406 L B B GE Sta.00+840 (Downstream), Sagasa, Balilihan, Bohol 3/14/2017 1st & Final Bohol 1st DEO LF 3.932 60 10/27/2016 12/25/2016 0.07 C 0.479 0.133 0.300 - - - 91.20 Bohol Very Satisfactory Construction of Multi-Purpose Building, Municipality of Municipality of Bohol 1st District *92.6% AL Chris Construction 12406 L B MA GB Alburquerque, Bohol Alburquerque, 6/1/2017 1st & Final LF 9.777 150 6/30/2016 11/26/2016 0.00 C 0.494 0.132 0.300 - - - 92.60 Engineering Office Very Satisfactory Bohol MFO-1-National Road Network Services-Asset Preservation of the Road, Rehabilatation/Reconstruction/Upgrading of Damaged Paved National Roads Including Drainage Based on Pavement Management System /Highway Development and AL Chris Construction 12406 L B MB GE Loon, Bohol 8/20/2017 1st Bohol 1st DEO LF 28.924 181 4/29/2017 10/26/2017 0.11 O 0.391 0.300 0.150 0.018 0.045 0.05 95.40 - Management System-4 (HDM-4), Secondary P00102023VS, North Road, K0024+120 - K0025+000 and K0028+330 - K0028+393

Provincial BERRRP-Candumayao () - Cabanugan (San Isidro) Catigbian-San AL Chris Construction 12406 1/19/2015 1st Government of L 8.874 209 06/05/14 01/14/15 -0.59 O 0.338 0.300 0.066 0.030 0.051 0.050 83.50 - rd. Isidro, Bohol Bohol MFO-1- National Road Network Service-Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads Including Drainage Based on AL Chris Construction 12406 L B MA GE Pavement Management System/Highway Development Loon, Bohol 4/3/18 2nd/Final Bohol 1st DEO LF 30.457 186 4/29/17 10/31/17 0.00 C 0.465 0.133 0.3 - - - 89.80 93.16% Very Satisfactory Management-4 (HDM-4) Secondary at Tagbilaran North Road (Tagbilaran-Jetafe Section)-S00030BH, 1) K0024+120- K0025+000 and K0028+330-K0028+393 Jose T. Arranguez Construction of 1 Unit 1-Storey, 3 CL School with Toilet Davao del Sur 97.1% AL Handasa Construction 0 L 0 0 GB Sr. ES, Kiblawan, 3/14/2016 1st 1 2.9325 150 11/23/15 4/20/16 (+)11.67 O 0.4 0.3 0.15 0.03 0.041 0.05 97.10% Attached, Jose T. Arranguez Sr. ES, Kiblawan, Davao del Sur Second DEO Outstanding Davao del Sur Outstanding Construction of One (1) Unit, One (1) Storey, Three (3) Classroom School with Toilet Attached at Jose T. Arrangues Kiblawan, Davao Davao del Surd 96.2% AL Handasa Construction 36974 L D SB GB 6/13/2016 2nd & Final LF 2.932 120 11/23/15 3/21/16 0.00 C 0.461 0.18 0.3 0 0 0 94.10% SR., Elementary School, Kiblawan, Davao del Sur del Sur 2nd DEO Outstanding

Construction of TechVoc Workshop Building, Sulop NHS, Sulop, Davao del Davao del Sur 91.6% AL Handasa Construction 36974 L D SB GB Sulop, Davao del Sur 11/21/2016 1st & Final LF 2.580 90 3/15/2016 6/12/2016 0.01 C 0.483 0.133 0.3 0 0 0 0.9160 Sur Second DEO Very Satisfactory Locally funded projects-Local Infrastructure Program- Brggy. Demoloc, AL Handasa Construction 36974 L D SB GB Buildings and other Structures-Multipurpose/Facilities- Malita, Davao 3/14/18 1st/Final LF 1.479 105 4/19/17 8/1/17 0% C 0.476 0.133 0.3 - - - 90.90 *90.90% Very Satisfactory DEO Construction of Multi-Purpose Building of Demoloc ES Ocidental Tagoloan, Lanao del Norte, Rehabilitation/Reconstruction of National Road with Slip, K1536+610 - LANAO DEL 97.2% AL Hussein Construction 18438 L A MA GE Slope Collapse and Landslides, Lanao del Norte 3/14/2016 1st LF 44.7894 235 2/25/15 10/18/15 0 C 0.473 0.199 0.3 0 0 0 97.20% K1536+750; NORTE 1ST DEO Outstanding Circumferential Road (LDNICR) K1544+120 - K1544+725 K1536+610- Rehabilitation/Reconstruction of National Road with Slips, K1536+750; Collapse and Landslides, Lanao del Norte Interior K1544+120- Lanao del Norte AL Hussein Construction 18438 L A MA GE 9/3/2015 1st LF 44.744 205 2/25/15 9/17/15 0.34% O 0.384 0.24 0.15 0.03 0.06 0.05 91.40% - Circumferential Road (LDN1CR), K1536+610-K1536+750; K1544+725, 1st DEO K1544+120-K1544+725, Tagoloan, Lanao del Norte Tagoloan, Lanao del Norte Network Development Off-Carriageway Improvement AL Hussein Construction / NDP Construction Including Drainage Tertiary Road: Lanao del Norte Interior Tagoloan, Lanao Lanao del Norte JV-16-514 L A MB GE 3/22/18 1st/Final LF 39.240 250 2/13/17 10/20/17 0 C 0.418 0.133 0.3 - - - 85.10 *85.10% Satisfactory Development Joint Venture Circumferential Road (LDNICR) S00941MN, K1535+(-560)- del Norte 1st DEO K1539+000 Rehab./Retrofitting of Pili Bridge along Cumadcad-San Isidro- *87.9% Al Niño Construction & Supply 18378 L B 0 GE Castilla, Sorsogon 5/30/2017 1st & Final Sorsogon 1st DEO LF 4.680 120 11/17/2016 3/16/2017 0.00 C 0.445 0.134 0.300 - - - 87.90 Poblacion Road, Castilla, Sorsogon Satisfactory Satisfactory

*1st/Final 29th Release Page 21 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Concreting of Capuy Road, Sorsogon City 91.5% Al Niño Construction & Supply 18378 L B MA GE Sorsogon City 11/18/2016 1st & Final Sorsogon 1st DEO LF 2.875 120 3/7/2016 7/4/2016 0.00 C 0.482 0.133 0.3 0 0 0 0.9150 Very Satisfactory Cluster II - Const. of Various School Bldg. Projects under FY Al Niño Construction & Supply / Steven Pilar & Castilla, JV-16-249 L B MA GB 2016 Basic Educational Facilities Fund (BEFF) Batch 11, Pilar 5/30/2017 1st Sorsogon 1st DEO LF 40.187 210 11/23/2016 6/20/2017 0.15 O 0.376 0.205 0.150 0.03 0.054 0.05 86.50 - Construction & Supply Joint Venture Sorsogon City & Castilla, Sorsogon City Construction of Multi-Purpose Covered Court, Brgy. Dambo, *93.1% Alagon Construction 32626 L D SB GB Pangil, Laguna Pangil, Laguna 11/23/17 1st & Final DPWH LF 4.498 120 2/9/17 6/8/17 0.00 C 0.498 0.133 0.300 - - - 93.10 Very Satisfactory Al-B Development Corporation (Formerly: Al-B Rehab./Reconst./Upgrading along Angeles-Porac- 11740 6/1/2010 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 - Construction) Floridablanca-Dinalupihan Rd. Network Development, Widening of National Roads, (Arterial Al-B Development Corporation (Formerly: Al-B Roads-Outside N1), Angeles-Porac-Floridablanca-Dinalupihan Angeles City, Pampanga Third 11740 L A MA GE 8/29/2015 1st LF 34.069 210 4/29/15 11/24/15 1.90% O 0.379 0.24 0.15 0.03 0.07 0.05 91.90% - Construction) Road at KO084+(-615) to KO085+(-024), Angeles City, Pamapanga 1st LD DEO Pamapanga 1st LD Network Development, Widening of National Roads, (Arterial K0084+(-615) to Al-B Development Corporation (Formerly: Al-B Roads-Outside N1, Angeles-Porac-Floridablanca-Dinalupihan K0085+(-024), Pampanga Third 91.86% 11740 L A MA GE 3/17/2016 2nd LF 34.0666 232 4/29/16 12/16/16 0.43% C 0.485 0.133 0.3 0 0 0 91.86% Construction) Road), K0084+(-615) to K0085+(-024), Angeles City, Pampanga Angeles City, DEO Very Satisfactory 1st LD Pampanga 1st LD Flood Management Services; Construction/ Maintenance of Al-B Development Corporation (Formerly: Al-B Flood Mitigation Structures & Drainage System; Angeles City, 83.8% 11740 L A MA GE 11/20/2016 1st & Final Pampanga 3rd LF 37.124 150 3/18/2016 8/14/2016 0.00 C 0.338 0.2 0.3 0 0 0 0.8380 Construction) Repair/Rehabilitation of Slope Protection along Taug River Pampanga Satisfactory Angeles City, Pampanga Locally Funded Projects: Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Al-B Development Corporation (Formerly: Al-B Magalang, Pampanga 3rd 11740 L A MA GE Projects: Roads and Bridges, Local Roads, Improvement/ 3/21/18 1st/Final LF 27.574 180 6/25/17 12/21/17 0% C 0.452 0.133 0.3 - - - 88.50 *88.50% Satisfactory Construction) Pampanga DEO Rehabilitation of Ayala - Sto. Niño - Turu, Magalang, Pampanga AL-B Dev't Corp./ Ping-Ann's Construction and JV-14-075 L A MA GE Reconstruction of River Terminal Loboc, Bohol 6/24/2015 1st TIEZA LF 19.550 240 11/04/14 07/01/15 -5.350 O 0.375 0.300 0.097 0.030 0.070 0.050 92.10 - Trading (JV) Road Upgrading (Unpaved to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Pantao Ragat, LANAO DEL 83.5% Al-Badr Construction 11387 L B MA GE Standards (HDM-4 Project Analysis) (Intermittent Section) 6/13/2016 1st & Final LF 24.483 131 2/19/16 6/28/16 0.31 C 0.411 0.124 0.3 0 0 0 83.50% Lanao del Norte NORTE 1ST DEO Satisfactory Tertiary Road:Lanao del Norte Interior Circumferential Road (LDNICR), K1553+729 -K15 Rehabilitation/Upgrading of Mapang (Taas) Formon Road, Bongabong, Southern Mindoro Alberto Uy Construction & Development 20924 L B MA GE 8/28/2015 1st LF 14.477 149 4/7/15 9/2/15 1.64% O 0.368 0.24 0.15 0.03 0.057 0.05 89.50% - Bongabong, Oriental Mindoro Oriental Mindoro DEO Barangay Anilao, Southern Mindoro Alberto Uy Construction & Development 20924 L B MA GE Concreting of Sitio Sulbod Road Bongabong, 03/21/18 1st/Final LF 10.617 175 04/25/17 10/16/17 0.01 C 0.473 0.200 0.300 - - - 97.30 *97.30% Outstanding DEO Oriental Mindoro MFO-1: National Road Network Services: Various Projects Benguet 2nd under Asset Preservation of National Roads within DPWH- *87.9% Alcel Construction 15129 L A MA GE Buguias, Benguet 6/7/2017 1st & Final District Engineering LF 26.161 325 2/7/2006 12/28/2006 0.00 C 0.445 0.134 0.300 - - - 87.90 Benguet Second District Engineering Office (Cluster I-2016), Satisfactory Office Acop-Kapangan-Kibungan-Bakun Road, Road Upgrading (Gravel-Paved) Along Gurel-Bokod-Kabayan- Alcel Construction 15129 L A MA GE Buguias-Abatan Road, K0338+481-K0339+838, Kabayan, Kabayan, Benguet 8/14/2014 1st CAR LF 46.461 240 1/31/14 9/27/14 0.13 O 0.361 0.240 0.150 0.023 0.050 0.050 87.40 - Benguet Alaminos City, Alcel Construction 15129 L A MA GE1 Const. of Access Rd. for Alaminos Airport (Phase I) 8/16/2012 1st I LF 17.991 253 12/13/11 08/21/12 6.64 O 0.384 0.240 0.150 0.030 0.045 0.033 88.20 - Pangasinan Alaminos, Alcel Construction 15129 L A MA GE1 Const. of Access Rd. to Airport, Alaminos City Airport 3/15/2013 1st I LF 1.821 45 02/22/13 04/07/13 18.23 O 0.390 0.300 0.150 0.010 0.023 0.033 90.60 - Pangasinan Construction and Maintenance of Bridges along National Pangasinan 1st *93.3% Alcel Construction 15129 L AAA MB GE Roads (Magalong Br.) Pangasinan- Road Mabini, Pangasinan 8/24/2017 1st & Final LF 8.149 120 2/20/2017 6/19/2017 0.03 C 0.500 0.133 0.300 - - - 93.30 DEO Very Satisfactory MFO-1 Various Projects: Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on Pavement *95.5% Alcel Construction 15129 L A MB GE Benguet 3/30/2017 1st & Final Benguet 2nd DEO LF 10.316 280 3/9/2016 12/13/2016 0.00 C 0.455 0.200 0.300 - - - 95.50 Management System/Highway Development and Management- Very Satisfactory 4 (HDM-4) (Intermittent Sections), Acop - Kapangan -Kibungan - Bakun Road Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations - Turod 86.9% Alcel Construction 15129 L A MB GE Luna, Apayao 8/30/2016 1st & Final CAR LF 96.499 389 4/13/15 5/5/16 0.00 C 0.369 0.2 0.3 0 0 0 0.8690 - San Gregorio - Shalom - Lusok Road Leading to Lusok Cave, Satisfactory Luna, Apayao Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destination 83.3% Alcel Construction 15129 L A MB GE Luna, Apayao 8/30/2016 1st & Final CAR LF 96.491 389 4/13/15 5/5/16 0.00 C 0.333 0.2 0.3 0 0 0 0.8330 Poblacion - Lappa - Marag leading to Marag Valley, Luna, Satisfactory Apayao Rehabilitation/Reconstruction/Upgrading of Alaminos-Bolinao Alaminos City, PANGASINAN 1ST 88.5% Alcel Construction 15129 L A MB GE Road, K0325+000 to K0326+000, K0321+(-204) to K0323+133, 6/14/2016 1st & Final LF 46.011 270 5/22/15 2/15/16 0.14 C 0.385 0.2 0.3 0 0 0 88.50% Pangasinan DEO Satisfactory Alaminos City, Pangasinan

*1st/Final 29th Release Page 22 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION K0325+000 to K0326+000, Rehabilitation/Reconstruction/Upgrading of Alaminos-Bolinao K0321+(-204) to Pangasinan 1st Alcel Construction 15129 L A MB GE Road, K0325+000 to K0326+000, K0321+(-204) to K0323+133, 9/1/2015 1st LF 43.823 240 5/22/15 1/17/16 (+)29.75 O 0.331 0.3 0.15 0.023 0.042 0.05 89.60% - K0323+133, DEO Alaminos City, Pangasinan Alaminos City, Pangasinan National Road Network Services: Various Projects under Buguias and BENGUET 2ND Alcel Construction 15129 L A MB GE Asset Preservation of National Roads within DPWH - Benguet 8/24/2016 1st LF 26.335 222 3/9/16 10/16/16 -0.04 O 0.334 0.3 0.105 0.03 0.051 0.033 0.8530 - Kapangan, Benguet DEO 2nd, Buguias and Kapangan, Benguet Construction of Road Baywalk, Brgy. Baybay Lopez, Binmaley, PANGASINAN 2ND 89.1% Alcel Construction 15129 L A MB GE Binmaley, Pangasinan 9/2/2016 1st & Final LF 18.617 180 7/14/15 1/9/16 0.00 C 0.458 0.133 0.3 0 0 0 0.8910 Pangasinan DEO Very Satisfactory Installation/Application/Construction of Road Safety Devices along Odiong-Sibalom-San Remigio-Leon Road, KO104+(-448)- Hamtic, San Jose, KO134+000, Sibalom-Alangan Road, KO107+(-555)- 97.8% Alcel Construction 15129 L A MB GE Sibalom & San 6/9/2016 1st & Final ANTIQUE DEO LF 10.431 70 12/16/15 2/23/16 0.00 C 0.478 0.2 0.3 0 0 0 97.80% KO110+175, San Remigio-Bugo Road, KO118+(-448)- Outstanding Remigio, Antique KO126+223, Bantayan-San Pedro-Cubay Road, KO

Provincial Sta. Barbara, Alcel Construction 15129 L MB Rehabilitation of Banaoang - Mapandan Road 1/22/18 1st Government of LF 45.449 195 7/12/17 5/28/18 2.74 O 0.36 0.30 0.15 0.03 0.05 0.05 93.20 - On - Going Pangasinan Pangasinan Sta. Barbara, Provincial Alcel Construction L Rehabilitation of Banaoang-Mapandan Road Pangasinan / 1/22/18 1st Government of LF 45.449 195 7/12/17 8/14/17 2.74 O 0.39 0.30 0.15 0.03 0.047 0.05 96.70 - On - Going Region 1 Pangasinan Network Development Construction of Missing Gaps Alcel Construction/ DJCM Construction K0537+554 - connecting National Roads, including RROW along Ilocos *91.94% Corporation (Formerly: Djcm Construction) JV-16-1033 L A MA GE K0540+050, Nueva 11/8/17 2nd & Final DPWH LF 144.715 299 2/14/17 12/9/17 28.61 C 0.474 0.134 0.300 - - - 90.80 Norte-Apayao Road Very Satisfactory Joint Venture Era, Ilocos Norte Alcel Construction/Oriental Sales Center and Prev. Maint. of Manila North Rd. K0169+700-K0172+105 w/ Carmen, Rosales, JV-12-432 L A MA GE1 8/9/2013 1st I LF 34.285 150 03/27/13 08/23/13 0.44 O 0.345 0.300 0.150 0.030 0.047 0.033 90.50 - Contractor (J.V.) exception w/n the District Pangasinan Off-Carriageway Improvement Including Drainage along Alcel Construction/Rodekom General Benguet - Nueva Vizcaya Road, K0290+000 to K0293+662, BENGUET 1ST 89.8% JV-15-680 L A MB GE Bokod, Benguet 8/23/2016 1st & Final LF 44.022 165 2/7/16 7/20/16 0.00 C 0.407 0.191 0.3 0 0 0 0.8980 Construction And Enterprise Joint Venture K0293+703 to K0297+792, K0297+852 to K0302+000, Bokod, DEO Very Satisfactory Benguet Replacement of Permanent Weak Bridges along Gurel-Bokod- Alcel Construction/Rodekom General Kabayan-Buguias-Abatan Road Alanod Bridge (B02667LZ) K0337+760, Benguet 1st District *87.6% JV-15-797 L A MB GE 5/30/2017 1st & Final LF 26.162 250 2/7/2016 10/13/2016 0.00 C 0.442 0.134 0.300 - - - 87.60 Construction And Enterprise Joint Venture Kabayan, Benguet Engineering Office Satisfactory

Widening of Butuan City - Cagayan de Oro City - Ilagan City Cagayan de Oro Alebon Genuine Merchandising Incorporated 26300 L B MA GE 8/4/2014 1st X LF 18.578 191 1/31/14 8/10/14 0.00 O 0.383 0.300 0.150 0.030 0.040 0.050 95.30 - Road Km1425+500 - Km.1426+500 City Rehab/Reconst/Upgrading of Damaged Paved National Roads CDO-Cadre Including Drainage Based on Pavement Management Circumferential Ext., Cagayan de Oro Alebon Genuine Merchandising Incorporated 26300 L B MA GE System/Highway Development and Management-4 (HDM-4) Rd., Chainage 0- 6/11/2015 1st LF 8.865 170 2/9/15 7/28/15 - O 0.353 0.3 0.15 0.02 0.025 0.05 89.80% - City First DEO (Intermittent Section) CDO-Cadre Circumferential Ext., Rd., 556.00, Cagayan Chainage 0-556.00, Cagayan de Oro City de Oro City Cagayan de Oro Alebon Genuine Merchandising Incorporated 26300 L B MA GE1 Widening of Carmen-Patag-Bulua Rd., Bulua-Patag Sect. 3/11/2013 1st X LF 4.198 37 01/15/13 02/20/13 6.52 O 0.371 0.244 0.150 0.010 0.037 0.050 86.20 - City Brgy. Poblacion, Construction of Concrete Revetment along Kinoguitan By- Alebon Genuine Merchandising Incorporated 26300 L B SB GE Kinoguitan, Misamis 8/11/2014 1st X LF 13.482 210 1/20/14 8/17/14 0.18 O 0.383 0.300 0.150 0.030 0.047 0.033 94.30 - Pass Road Oriental Concreting of Barangay Macasandig FMR, Macasandig, Macasandig, Cagayan de Oro Alebon Genuine Merchandising Incorporated 26300 L B A GB Cagayan de Oro City Cagayan de Oro 3/24/2017 1st LF 4.350 150 11/8/2016 4/6/2017 0.00 O 0.393 0.300 0.115 0.03 0.054 0.017 90.90 - City 2nd DEO City Concreting of Barangay Macasandig FMR Cagayan De Oro *93.1% Alebon Genuine Merchandising Incorporated 26300 L B MA GE 11/6/17 1st & Final DPWH LF 3.728 150 11/8/16 4/6/17 0.00 C 0.431 0.200 0.300 - - - 93.10 City Very Satisfactory

Off-Carriageway Improvement Including Drainage along Brgy. Ma. Cristina, Lanao del Norte Alfahad Builders And Enterprises 40063 L D SB GE 03/22/18 1st/Final LF 6.224 37 03/09/17 04/14/17 0.00 C 0.492 0.133 0.300 - - - 92.50 *92.50% Very Satisfactory Overton-Abaga Boundary Road KO 1531+176-KO 1532+675 Iligan City 2nd DEO Construction of 3-storey, 9-classroom School Building at Lanao del Norte Al-Fahdel Const. and Eng'g. 17953 L B MA GB Iligan City East High School-Hinaplanon Annex, Iligan City Iligan City 8/27/2016 1st LF 15.003 210 7/29/16 2/23/17 0.00 O 0.317 0.246 0.15 0.03 0.054 0.05 0.8470 - 2nd DEO Road Project (Concreting), Brgy. Poblacion, Kapatagan- Sapad, Tertiary: Kapatagan-Sapad Road, Sta. 0+000-Sta. LANAO DEL 90.7% Al-Fahdel Const. and Eng'g. 17953 L B MA GE Lanao del Norte 11/23/2016 1st & Final LF 49.442 224 1/25/2016 9/4/2016 0.00 C 0.468 0.139 0.3 0 0 0 0.9070 2+037.36 with Box Culvert, Kapatagan-Sapad, Lanao del Norte NORTE 1ST DEO Very Satisfactory

Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta. Al-Fahdel Const. and Eng'g. 17953 L B MA GE1 6/5/2009 1st X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 - 1602+000-Sta. 1603+000 with exception Construction of 3-Storey, 9-Classroom School Building at Lanao del Norte *87.55% Al-Fahdel Const. and Eng'g. 17953 L B A GB Iligan City East High School, Hinaplanon Annex, Iligan City Iligan City 3/20/2017 2nd & Final LF 15.003 240 5/23/2016 1/17/2017 0.00 C 0.500 0.142 0.300 - - - 94.20 2nd DEO Satisfactory

*1st/Final 29th Release Page 23 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Butadon, Repair/Rehab. of Rd. Slip (down) along Dobleston-Butadon Al-Fahdel Const. and Eng'g. 17953 L B MA GE1 Kapatagan, Lanao 11/28/2012 1st X LF 3.790 59 10/04/12 12/01/12 0.23 O 0.363 0.226 0.150 0.030 0.023 0.033 82.50 - Nat'l Rd. (Secondary Rd.), K2007+860-K2007+900 del Norte Network Development: Improvement/Widening of National SND, Lanao del *89.9% Al-Fahdel Const. and Eng'g. 17953 L B MA GE Roads: Primary Roads: Malabang-Dobleston-Tukuran Road Norte K2001+244- 11/15/17 1st & Final DPWH LF 32.233 162 2/13/17 7/24/17 0.00 C 0.409 0.190 0.300 - - - 89.90 Very Satisfactory K2002+244 Construction of 2-Storey, 6-Classroom School Building, Lawig Ifugao 1st District *92.5% Alfalfa Construction 29712 L A MA GB National High School (Main) Lamut, Ifugao 6/1/2017 1st & Final LF 8.947 140 6/27/2017 11/13/2017 0.00 C 0.492 0.133 0.300 - - - 92.50 Engineering Office Very Satisfactory Road Upgrading of Banaue-Hungduan Benguet Bdry. Road Alfalfa Construction 29712 L B MA GE1 Hungduan, Ifugao 4/8/2011 1st CAR LF 16.560 177 01/20/11 07/02/11 -6.00 O 0.385 0.300 0.090 0.010 0.054 0.017 85.60 - Hapao-Abatan Section Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects - Construction of 86.7% Alfalfa Construction 29712 L A MA GB Office of the Vice President (OVP)-Office of Senior Citizens Hungduan, Ifugao 3/11/2016 1st Ifugao 1st DEO LF 1.855 150 8/12/15 1/8/16 0 C 0.434 0.133 0.3 0 0 0 86.70% Satisfactory Affairs (OSCA), (Multi-Purpose Building Center), Hungduan, Ifugao Rehabilitation/Reconstruction of National Roads with Slips, 85% Alfalfa Construction 29712 L A MA GE Slope Collapse and Landslide along Banaue-Hungduan- Hungduan, Ifugao 8/25/2016 1st & Final IFUGAO 1ST DEO LF 1.849 89 3/28/16 6/24/16 0.00 C 0.417 0.133 0.3 0 0 0 0.8500 Satisfactory Benguet Boundary Road, Hungduan, Ifugao Construction/ Improvement/ Rehabilitation of Barangay 91.3% Alfalfa Construction 29712 L A MB GE Tanap, Lawig FMR, Lamut, Ifugao Lamut, Ifugao 11/20/2016 1st & Final Ifugao 1st DEO LF 1.889 36 6/30/2016 8/4/2016 0.00 C 0.48 0.133 0.3 0 0 0 0.9130 Very Satisfactory Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Banaue-Mayoyao-A. Lista- Banaue, Mayoyao Alfalfa Construction 29712 L A MB GE Isabela Bdry Rd., K0354+544 to K0354+567, K0361+813 to 8/27/2016 1st IFUGAO 2ND DEO LF 28.461 180 3/18/16 9/13/16 0.04 O 0.324 0.293 0.15 0.022 0.037 0.05 0.8760 - & Aguinaldo, Ifugao K0361+863, K0363+680 to K0363+702, K0363+702 to K0363+730, K0364+350 to K0364+630, K03 Repair/Rehabilitation/Improvement (Reblocking, Additional Alfalfa Construction/Carlyz Construction Joint Pavement Width with Drainage Improvement), K0315+(-147) to 85.9% JV-15-870 L B MB GE Kiangan, Ifugao 8/26/2016 1st & Final IFUGAO 1ST DEO LF 9.497 156 1/29/16 7/2/16 -0.01 C 0.448 0.133 0.278 0 0 0 0.8590 Venture K0318+000 with Exception, Kiangan-Tinoc-Buguias, Kiangan, Satisfactory Ifugao Alfie's Const. & Const. Supply, Inc. (Formerly: 17162 L A MB GE1 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road 3/5/2009 2nd VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 - Alfie's Construction & Const. Supply)

Alfie's Const. & Const. Supply, Inc. (Formerly: Completion of Bridge 2 - Km. 66+910 along 17162 L A MB GE1 3/5/2009 4th VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 - Alfie's Construction & Const. Supply) Hinigaran-Isabela Road

Alfie's Const. & Const. Supply, Inc. (Formerly: Const. of Access Rd. for Himoga-an Bridge, Bacolod North Sagay City, Negros 17162 L A MB GE1 8/12/2013 1st VI LF 109.290 310 01/15/13 11/20/13 10.51 O 0.342 0.240 0.150 0.030 0.042 0.050 85.40 - Alfie's Construction & Const. Supply) Rd., Sta. 71+035.20-Sta. 74+557.20 Occidental

Alfie's Const. & Const. Supply, Inc. (Formerly: Road Upgrading of Villahermoso-Canla-on City-La Castellana La Castellana, 17162 L A MB GE1 8/10/2013 1st VI LF 23.131 182 01/28/13 07/28/13 -3.18 O 0.356 0.206 0.047 0.030 0.035 0.033 70.70 - Alfie's Construction & Const. Supply) Road, K0074+205-K0074+995 Negros Occidental

Alfie's Const. & Const. Supply, Inc. (Formerly: Widening of Catabla Bridge 3 along Bacolod Silay Airport Talisay City, Negros Negros Occidental 17162 L A MA GE 3/20/18 1st/Final LF 30.061 180 5/9/17 12/4/17 0.00 C 0.498 0.133 0.3 - - - 93.10 *93.10% Very Satisfactory Alfie's Construction & Const. Supply) Access Road Occidental 1st DEO Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Alfie's Const. & Const. Supply, Inc. (Formerly: City, 0% 17162 L A MB GE Standard (HDM-4 Project Analysis - Intermittent Sections) 10/24/2014 1st VI LF 48.461 209 5/29/14 12/23/14 O 0.361 0.232 0.150 0.030 0.048 0.033 85.40% Alfie's Construction & Const. Supply) Negros Occidental Poor National Secondary Road, Kabankalan Jct. Salong Tapi Dacongcogon Bantayan Road - Package B Alfie's Const. & Const. Supply, Inc. (Formerly: Conc. of Nat'l Rd. along Bacolod South Rd., K0086+061- Kabankalan City, 17162 L A MB GE1 8/11/2012 1st VI LF 32.631 222 01/27/12 09/04/12 0.31 O 0.242 0.300 0.150 0.030 0.050 0.050 82.20 - Alfie's Construction & Const. Supply) K0088+003 Negros Occidental Conc. of Junction Bearin-Salong-Tapi-Dacongcogon- Alfie's Const. & Const. Supply, Inc. (Formerly: 17162 L A MB GE1 Bantayan Raod (Km. 99+675.50-Km.131+142.75 w/ exception, 9/17/2009 2nd VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 - Alfie's Construction & Const. Supply) Brgy. Salong & Batayan Construction/ Improvement of Junction National Road - Alfie's Const. & Const. Supply, Inc. (Formerly: Talisay - Concepcion-Mucia Road with exception Leading to Talisay City, Negros Regional Office No. *91.2% 17162 L A MB GE 8/25/2017 1st & Final LF 197.818 450 3/15/2016 6/7/2017 - C 0.479 0.133 0.300 - - - 91.20 Alfie's Construction & Const. Supply) Campuestohan Resort, Talisay City, Negros Occidental Occidental VI Very Satisfactory

Improvement/Widening of Bacolod Silay Airport Access Road, K0012+403 - Alfie's Const. & Const. Supply, Inc. (Formerly: K0012+623, Negros Occidental 91.1% 17162 L A MB GE 9/3/2016 1st & Final LF 9.848 96 3/28/16 7/1/16 0.00 C 0.478 0.133 0.3 0 0 0 0.9110 Alfie's Construction & Const. Supply) Talisay, Negros 1st DEO Very Satisfactory Occidental Repair/Rehabilitation/Improvement of Bacolod South Road, K0046+(-910) - K0046+(-910) - K0047+700 with exception Hinigaran, Negros K0047+700 with Alfie's Const. & Const. Supply, Inc. (Formerly: Negros Occidental 85.8% 17162 L A MB GE Occidental, NIR exception 6/14/2016 1st & Final LF 6.934 151 6/14/16 11/11/16 0.00 C 0.42 0.138 0.3 0 0 0 85.80% Alfie's Construction & Const. Supply) Second DEO Satisfactory Hinigaran, Negros Occidental, NIR Alfie's Const. & Const. Supply, Inc. (Formerly: Widening of Guihalaran (B00494NR) Bridge 2 along Bacolod Silay City, Negros Negros Occidental 17162 L A MB GE 3/20/18 1st/Final LF 23.734 200 5/9/17 11/24/17 0.00% C 0.487 0.133 0.3 - - - 92.00 *92.00% Very Satisfactory Alfie's Construction & Const. Supply) Silay Airport Access Road Occidental 1st DEO

*1st/Final 29th Release Page 24 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Widening of National Roads along Bacolod South Road, Alfie's Const. & Const. Supply, Inc. (Formerly: Hinigaran, Negros Regional Office, 89.6% 17162 L A MB GE K0048+542-K0051+468; K0052+444-K0053+600; K0064+250- 11/16/2015 1st LF 119.102 310 5/20/15 3/24/16 (+)7.18% O 0.373 0.238 0.15 0.03 0.055 0.05 89.60% Alfie's Construction & Const. Supply) Occidental NIR Very Satisfactory K0065+360, Hinigaran, Negros Occidental Widening of Bacolod Circumferential Road (South) with Alfie's Const. & Const. Supply, Inc. (Formerly: Bacolod City, Regional Office, 83.8% 17162 L A MB GE Drainage (including RROW), K0006+451 - K0011+476, Bacolod 11/9/2015 1st LF 81.443 255 3/16/15 11/25/15 (-)7.23% O 0.337 0.3 0.078 0.03 0.06 0.033 83.80% Alfie's Construction & Const. Supply) Negros Occidental NIR Satisfactory City, Negros Occidental Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road along , K0039+771- K0040+288; K0061+420-K0062+000; K0075+903-K0075+953; Alfie's Const. & Const. Supply, Inc. (Formerly: K0076+620-K0077+000; K0080+060-K0081+000; K0081+558- Manapla, Negros Regional Office, 83.9% 17162 L A MB GE 11/19/2015 1st LF 75.626 265 4/8/15 12/28/15 (+)0.75% O 0.34 0.214 0.15 0.03 0.055 0.05 83.90% Alfie's Construction & Const. Supply) K0082+000; K0082+000-K0083+000; K0036+902-K0036+952; Occidental NIR Satisfactory K0038+200-K0038+406; K0041+843-K0042+300; K0042+500- K0043+000, Manapla, Negros Occidental

Rehabilitation/Reconstruction/Upgrading of Bacolod North Alfie's Const. & Const. Supply, Inc. (Formerly: Road, K0086+000 - K0087+000, K0087+540 - K0088+327, Sagay City, Negros Regional Office, 89.3% 17162 L A MB GE 11/19/2015 1st LF 68.500 280 3/11/15 12/15/15 (+)0.04% O 0.371 0.237 0.15 0.03 0.055 0.05 89.30% Alfie's Construction & Const. Supply) K0088+362 - K0090+933, Sagay City, Negros Occidental Occidental NIR Very Satisfactory

K0086+000 - K0087+000, Alfie's Const. & Const. Supply, Inc. (Formerly: Rehabilitation/Reconstruction/Upgrading of Bacolod North K0087+540 - Regional Office 17162 L A MB GE 8/25/2015 1st LF 65.069 250 3/11/15 11/15/15 17.60% O 0.357 0.24 0.15 0.03 0.06 0.05 88.70% - Alfie's Construction & Const. Supply) Road, K0088+327, No.VI K0088+362 - K0090+933 Construction/Replacement of Permanent Weak Bridges along Brgy. Tapi, Alfie's Const. & Const. Supply, Inc. (Formerly: National Road, Tapi Bridge (B00211NR), along Kabankalan Negros Occidental 87.9% 17162 L A MB GE Kabankalan City, 11/14/2015 1st LF 10.094 286 2/26/15 12/8/15 (+)11.0% O 0.363 0.241 0.15 0.03 0.045 0.05 87.90% Alfie's Construction & Const. Supply) Jct. Salong Tapi Dacongcogon Bantayan Road, Brgy. Tapi, 3rd DEO Satisfactory Negros Occidental Kabankalan City, Negros Occidental Construction/Replacement of Permanent Weak Bridges along Barangay Tapi, Alfie's Const. & Const. Supply, Inc. (Formerly: National Road Tapi Bridge (B00211NR), K0115+044 along Negros Occidental 89.26% 17162 L A MB GE Kabankalan City, 3/8/2016 2nd LF 10.094 306 2/26/15 12/28/15 0 C 0.48 0.133 0.3 0 0 0 89.26% Alfie's Construction & Const. Supply) Kabankalan Junction Salong Tapi, Dacongcogon Bantayan Third DEO Very Satisfactory Negros Occidental Road, Barangay Tapi, Kabankalan City, Negros Occidental Improvement/Widening of National Roads along Bacolod K0057+740- Alfie's Const. & Const. Supply, Inc. (Formerly: South Road K0059+781, 89.94% 17162 L A MB GE 11/22/2016 2nd & Final NIR LF 45.720 179 3/30/2016 9/24/2016 0.00 C 0.485 0.133 0.3 0 0 0 0.9180 Alfie's Construction & Const. Supply) Binalbagan, Negros Very Satisfactory Occidental Rehabilitation/Major Repair of Tan-ao Bridge (B00175MN) Alfie's Const. & Const. Supply, Inc. (Formerly: Saga City, Negros Negros Occidental 93.3% 17162 L A MB GE along Bacolod North Road 11/25/2016 1st & Final LF 13.861 88 3/30/2016 6/25/2016 0.00 C 0.5 0.133 0.3 0 0 0 0.9330 Alfie's Construction & Const. Supply) Occidental 1st DEO Very Satisfactory

Alfie's Const. & Const. Supply, Inc. (Formerly: Const. of the Remaining Structures: Himogaan Bridge, Sta. Sagay City, Negros 17162 L A MB GE1 8/12/2013 1st VI LF 116.246 505 05/14/12 09/30/13 0.66 O 0.376 0.240 0.150 0.030 0.042 0.050 88.80 - Alfie's Construction & Const. Supply) 71+035.20-Sta. 74+557.20 Occidental

Preventive Maintenance Based on Pavement Management Hinigaran, Alfies Construction & Construction Supply, Negros Occidental 17162 L A MB GE System/Highway Development and Management -4 (HDM-4) of Binalbagan and 3/15/18 1st/Final LF 29.692 207 4/16/17 11/8/17 -3.00% C 0.456 0.133 0.21 - - - 79.90 *79.90% Unsatisfactory Inc./Aqua Dragon Construction & Supply 2nd DEO Bacolod South Road, K0046+(-910) to K0081+486 Himamaylan Improvement/Widening of National Roads along Bacolod Alfie's Const. & Const. Supply, Inc. (Formerly: Binalbagan, Negros Regional Office, 17162 L A MB GE South Road, K0057+740 - K0059+781, 8/30/2016 1st LF 45.720 209 3/30/16 10/24/16 0.00 O 0.357 0.239 0.15 0.03 0.061 0.05 0.8870 - Alfie's Construction & Const. Supply) Occidental NIR Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) of Bacolod South Road, K0046+(-910)-K0046+ (-045), Hinigaran, Alfie'S Construction And Construction Supply/ K0049+830-K0050+090, K0058+275-K0058+500, K0060+600- Binalbagan and Negros Occidental Aqua Dragon Construction & Supply Joint JV-16-1465 L A MB GE K0060+389, K0063+303-K0063+747, K0071+042-K0071+632, 8/20/2017 1st LF 28.152 166 4/16/2017 9/28/2017 0.01 O 0.375 0.240 0.150 0.03 0.061 0.05 90.60 - Himamaylan City, 2nd DEO Venture K0072+000-K0072+075, K0072+901.50-K0073+430, K0081+121- Negros Occidental K0081+486, Hinigaran, Binalbagan and Himamaylan City, Negros Occidental

Improvement/Riprapping of Sasa Creek Second Alfrego Builders & Supply 19284 L D SB GE2 6/11/2009 1st XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 - Congressional District Dinagat-Loreto Rehabilitation/Reconstruction of National Roads with Slip, Road, San Jose, Algamon Construction 30704 L B MA GE 8/31/2015 2nd Dinagat Island LF 6.385 180 3/20/15 9/15/15 (+) 0.17% O 0.366 0.234 0.15 0.03 0.046 0.05 87.60% - Slope Collapse and Land Slide Along Dinagat-Loreto Road Province of Protection Works along Daang Maharlika, (Surigao-Ipil-Lipata Algamon Construction 30704 L C SB GE2 Surigao City 11/21/2012 1st XIII LF 4.735 120 08/16/12 12/13/12 -7.90 O 0.395 0.268 0.071 0.020 0.045 0.017 81.60 - Rd.) Kinabutan Bridge II, Brgy. Rizal Rehabilitation/ Reconstruction of National Roads with Slip, San Jose, Province DINAGAT Algamon Construction 30704 L B MA GE 6/11/2015 1st LF 6.385 180 3/20/15 9/15/15 (+) 0.92% O 0.366 0.234 0.15 0.03 0.045 0.033 85.80% - Slope Collapse and Land Slide along Dinagat - Loreto Road of Dinagat Islands ISLANDS DEO Conc. of Tablas Circumferential Road (Doña Juana-Binunga- Algimar Construction 15232 L A MA GE1 8/27/2009 1st IVB 19.652 180 O 0.319 0.291 0.150 0.030 0.047 0.033 87.00 - an Section) Concreting of Tablas Circumferential Road (Hinugasan- Algimar Construction 15232 L A MA GE1 5/21/2009 1st IV-B 19.298 180 O 0.312 0.236 0.150 0.030 0.040 0.033 80.10 - Camantaya Section)

*1st/Final 29th Release Page 25 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Repair of Damaged Rd. Sect. along Looc-Odiongan-San Tablas Island, Algimar Construction 15232 L A MA GE1 11/29/2012 1st IVB LF 15.860 210 09/20/12 04/17/13 26.67 O 0.306 0.291 0.150 0.030 0.040 0.033 85.00 - Andres Rd., Km.104+400-Km.122+400 (IS) Algimar Construction 15232 L A MA GE1 Const. of Bridge Approaches @ Maingaran Bridge 2/27/2009 1st V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 - K0154+460- K0156+369.50, K0168+685- Rehabilitation/Reconstruction of Puerto Princesa South Road, K0169+338.70, K0154+460-K0156+369.50, K0168+685-K0169+338.70, 85.2% Algimar Construction 15232 L AA MB GE K0173+714- 3/8/2016 1st Regional Office LF 75.5646 258 7/24/15 4/6/16 0.20% O 0.272 0.3 0.15 0.03 0.05 0.05 85.20% K0173+714-K0173+919.50, K0184+479.00-K0184+532.98, Satisfactory K0173+919.50, Espanola, Palawan K0184+479.00- K0184+532.98, Espanola, Palawan Road Upgrading Based on Gravel Road Strategies Traffic San Fernando, Algimar Construction 15232 L AA MB GE 6/11/2015 1st Masbate 3rd LF 37.877 178 3/9/15 9/6/15 3.50% O 0.352 0.253 0.15 0.018 0.051 0.05 87.40% - Benchmark for Upgrading to Paved Road Standard Masbate Road Upgrading(Gravel to Paved) Based on Gravel Road Strategies Traffic Benchmark for Upgrading to Paved Road San Fernando, Masbate Third Algimar Construction 15232 L AA MB GE 9/3/2015 2nd LF 37.877 200 3/11/15 9/26/15 0.21% O 0.321 0.281 0.15 0.03 0.06 0.05 89.20% - Standard (HDM-4 Project Analysis) San Fernando-Talisay Masbate DEO Road, San Fernando, Masbate Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved the San Fernando, 88.3% Algimar Construction 15232 L AA MB GE 6/11/2016 3rd & Final Masbate 3rd DEO LF 37.876 179 3/11/15 9/5/15 0.00 C 0.383 0.2 0.3 0 0 0 88.30% Road Standard (HDM-4 Project Analysis) San Fernando- Masbate Satisfactory Talisay Road, San Fernando, Masbate Road Upgrading ( Gravel to Paved) Quezon-Aramaywan Road, 86.40% Algimar Construction 15232 L AA MB GE Quezon, Palawan 11/22/2014 1st IV LF 34.958 209 5/28/14 12/22/14 -2.00% O 0.360 0.240 0.130 0.030 0.054 0.050 86.40% K0154+950-K0156+851.20 with Exception Satisfactory Road Upgrading (Unpaved to Paved) of Tablas Circumferential Road, K0029+765-K0029+990, K0112+196.60- K00112+281, K0115+190-K0115+219, K0115+392-K0115+838, Tablas Island, Algimar Construction 15232 L AA MB GE K0116+300-K0116+674, Re-aligned to Road Upgrading 6/12/2015 1st Romblon DEO LF 29.682 145 4/15/15 9/6/15 0.00% O 0.381 0.24 0.15 0.03 0.051 0.05 90.20% - Romblon (Unpaved to Paved) of Tablas Circumferential Road, K0029+765-K0029+990, K0115+090-K0115+219, K0115+392- K0115+838, K0116+300-K0116+674. Const. of 1 Unit 7x7 S/B at Teofilo Tamabago E/S, Palanas Algimar Construction 15232 L A SB GB1 5/26/2009 1st V 0.843 90 O 0.292 0.300 0.150 0.030 0.032 0.033 83.70 - South realigned to Dimasalang C/S Upgrading of Balud-Tawad-Milagros-Aroroy Road (Bangad Algimar Construction 15232 L A MA GE1 Masbate 8/9/2011 1st V LF 96.100 360 11/23/10 11/17/11 17.47 O 0.382 0.237 0.150 0.030 0.061 0.033 89.30 - Sect.) Algon Engineering Construction Corporation 270 L AAA LB GB1 Construction of Overhead Water Tank with Cistern 4/29/2009 Final DOST 3.153 124 O 0.373 0.291 0.12 0.03 0.07 0.05 93.40 - Construction of Tugas Bridge, Camp 1, Maramag, Bukidnon Camp 1, Maramag, Bukidnon 2nd Algon Engineering Construction Corporation 270 L A A GB 3/14/2017 2nd LF 20.424 266 3/6/2016 11/26/2016 -0.03 O 0.393 0.300 0.050 0.03 0.07 0.033 87.60 - Bukidnon DEO Widening (2 into 4 lanes) of Davao-Cotabato Road (Jct. Digos- Cotabato Section) including RROW (Brgy. Sinawilan-Brgy. Davao del Sur Lone Algon Engineering Construction Corporation 270 L AAA LB GE Tubod Section), K1575+610-K1576+000, K1576+419- 11/13/17 1st DPWH LF 174.689 300 4/11/17 2/4/18 0.11 O 0.385 0.239 0.150 0.022 0.047 0.05 89.30 - District K1578+776, K1579+294-K1581+398, K1581+434-K1581+814, K1582+553-K1583+884 Widening (with Reblocking) of Davao-Cotabato Road (Jct. Digos-Cotabato Section), K01564+(-278) to K01564+800, K01567+(-364) to K01567+448, K01567+448 to K01568+200 Davao del Sur 1st Algon Engineering Construction Corporation 270 L AAA LB GE Davao del Sur 3/15/2017 1st LF 140.776 383 4/12/2016 4/29/2017 0.01 O 0.367 0.240 0.150 0.03 0.061 0.05 89.80 - (LS), K01570+000 to K01571+500, K01572+198 to K01573+893, DEO including Road-Right of-Way, Davao del Sur

Widening (with Reblocking) of Davao-Cotabato Road (Jct. Digos Cotabato Section), K1564+(-278)-K1564+800, K1567+(- K1564+(-278)- 364)-K1567+448, K1567+448-K1568+200(LS), K1570+000- K1564+800, K1571+500, K1572+198-K1573+893, Davao del Sur, Including K1567+(-364)- Road Right-of-Way (RROW) (as per RBIA Station Limits), K1567+448, Davao del Sur K1567+448- K1568+200(LS), K1570+000- Davao Del Sur First Algon Engineering Construction Corporation 270 L AAA LB GE K1571+500, 11/19/2016 1st LF 140.776 331 4/12/2016 3/8/2017 0.00 O 0.351 0.24 0.15 0.03 0.037 0.05 0.8580 - DEO K1572+198- K1573+893, Davao del Sur, Including Road Right-of-Way (RROW) (as per RBIA Station Limits), Davao del Sur

Conc. of NRJ Bayugan-Calaitan-Tandag Rd. (Km.1273+491.80- Bayugan, Agusan Algon Engineering Construction Corporation 270 L AAA LB GE1 3/20/2013 2nd XIII LF 159.496 495 12/26/11 05/03/13 4.25 O 0.312 0.300 0.150 0.030 0.051 0.050 89.30 - Km.1281+040 w/ exception) del Sur Widening of Davao-Bukidnon Rd., Davao City, Tugbok-Mintal Algon Engineering Construction Corporation 270 L AAA LB GE1 Davao City 8/7/2013 1st XI LF 46.965 209 02/26/13 09/22/13 -0.69 O 0.352 0.298 0.143 0.030 0.025 0.033 88.10 - Sect., Km.1693+400-Km.1697+335.40

*1st/Final 29th Release Page 26 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. along Algon Engineering Construction Corporation 270 L AAA LB GE1 Davao-Cotabato Rd. (Davao City-Jct. Digos) Sta.1556+000- Davao del Sur 3/24/2012 1st XI LF 46.285 249 07/21/11 03/25/12 -4.97 O 0.360 0.300 0.100 0.030 0.041 0.033 86.40 - Sta.1561+249 Algon Engineering Construction Corporation 270 L AAA LB GE1 Widening of Davao-Bukidnon Rd. Davao City 8/17/2012 1st XI LF 36.342 210 01/31/12 08/27/12 -0.29 O 0.379 0.213 0.147 0.030 0.055 0.033 85.70 - Prev. Maint. (Int. Sects.) along Pres. Diosdado Macapagal Algon Engineering Construction Corporation 270 L AAA LB GE1 Highway, a)Km.1712+000-Km.1712+802.90; b)Km.1713+303- 3/20/2013 1st XI LF 24.973 52 01/25/13 03/17/13 7.83 O 0.319 0.299 0.150 0.030 0.040 0.050 88.80 - Km.1713+815.64 Conc. of NRJ Bayugan-Lalaitan-Tandag Rd. Km. 1273+491.80- Bayugan, Agusan Algon Engineering Construction Corporation 270 L AAA LB GE1 11/29/2012 1st XIII LF 159.496 435 12/26/11 03/04/13 12.50 O 0.332 0.289 0.150 0.030 0.060 0.050 91.10 - Km. 1281+040 (w/ exceptions) del Sur Rehabilitation/Recons-truction of National Roads with Slips, Balo-I, Lanao del Slope Collapse and Landslide, Iligan City - Marawi City via Bito- Norte, Km. 1539+ (- Abaga Road, Tertiary: Bito-Abaga Road, Balo-I, Lanao del 1805)- Norte, Km. 1539+ (-1805)-K1539+(1745); K1539+ (-1350)- K1539+(1745); K1539+(-1283); K1539+ (-1350)- K1539+(-1283); Lanao del Norte 89.8% Al-Hussein Construction 18438 L A MA GE 8/28/2016 1st & Final LF 8.667 122 1/25/16 5/25/16 0.00 C 0.465 0.133 0.3 0 0 0 0.8980 K1539+(-720)- 1st DEO Very Satisfactory K1539+ (-590); K1539+(-571)- K1539+(-498); K1539+ (-244)- K1539+000 Rehabilitation/ Major Repair of Joovellar Bridge (B00039PN) 97.2% Alj Construction And Supply 30571 L D SB GE along Guimbal -Igbaras - Tubungan - Leon Road, K0036+728, Igbaras, Iloilo 11/24/2016 1st & Final ILOILO 1ST DEO LF 0.949 30 2/5/2016 3/5/2016 0.07 C 0.5 0.172 0.3 0 0 0 0.9720 Outstanding Igbaras, Iloilo Construction of Multi-Purpose Building, Brgy. Poblacion 70% Alj Construction And Supply 30571 L D SB GB Pavia, Iloilo 8/24/2016 1st & Final ILOILO 4TH DEO LF 1.921 1.9205 3/30/00 3/30/00 0.00 C 0.5 0.2 0 0 0 0 0.7000 ( IV), Pavia, Iloilo Poor Construction/Maintenance of Flood Mitigation Structure & Aljon Construction & Supply / Rolco Drainage Systems, Const. of Flood Control/Drainage Jct JV-16-1613 L B MA GE Virac, 11/17/17 1st DPWH LF 32.584 131 7/30/17 12/7/17 -4.00 O 0.337 0.240 0.110 0.03 0.05 0.033 80.00 - Construction & Development Corpora National Road to Cavinitan Barangay Road-Sto. Domingo River Sta. 0+854-Sta. 2+700 Allado Construction Company, Inc / Quadcore Brgy. Bacay, 92.13% Very L Bacay Peoples Village 9/1/2017 Final NHA LF 289.90 613 02/03/2016 10/01/2017 2.76 O 0.427 0.194 0.300 - - - - Construction - J.V Dumangas, Iloilo Satisfactory Provincial Rehabilitation of Jct Sayre Highway (Kibawe) - Natulongan - Allado Construction Company, Inc. 073-667 L AAA GE1 Kibawe Bukidnon/X 11/23/2011 1st Government of LF 19.145 226 04/05/11 01/16/12 -5.65 O 0.310 0.290 0.090 0.030 0.060 0.050 83.00 - Bukangliwayway Footbridge P1C Bukidnon Construction of Multi-Purpose Building (Cooperative *90.9% Allen Construction 12584 L B MA GB Building), Brgy. Calabalabaan, Muñoz, Nueva Ecija Muñoz, Nueva Ecija 11/22/17 1st & Final DPWH LF 1.430 60 7/9/17 9/6/17 0.00 C 0.475 0.134 0.300 - - - 90.90 Very Satisfactory Talavera, Nueva Allen Construction 12584 L MB Casecnan Multipurpose Irrigation & Power Project - IC PH II 5/22/2018 1st NIA LF 7.968 610 9/22/2016 5/24/2018 0.00 O 0.32 0.3 0.15 0.03 0.06 0.05 90.70 - On - Going Ecija Restoration of Embankment @ D-Main & Const. of Thresher Talavera, Nueva Allen Construction 12584 L SB GE2 7/21/2012 1st NIA LF 8.653 90 07/11/12 8.80 O 0.358 0.293 0.150 0.030 0.057 0.050 93.77 - Crossing with Turn-out @ Div II Service Area Ecija Preventive Maintenance of Iloilo East Coast Capiz Road, San Dionisio and *88.4% Allencon Development Corporation 12302 L D SB GE K0195+395 - K0196+000 and K0250+545 - K0250+669, San 3/27/2017 1st & Final Iloilo 3rd DEO LF 8.700 75 8/1/2016 10/14/2016 0.00 C 0.450 0.134 0.300 - - - 88.40 Barotac Viejo, Iloilo Satisfactory Dionisio and Barotac Viejo, Iloilo Const. of Coastal Protection Works along Iloilo-Antique Rd. Allencon Development Corporation 12302 L D SB GE2 Guimbal, Iloilo 8/14/2013 1st VI LF 7.301 244 12/28/12 08/28/13 0.48 O 0.269 0.300 0.150 0.030 0.037 0.050 83.60 - K0026+700-K0027+151 Allencon Development Corporation 12302 L D SB GE1 Reconst. of Cabasi Bridge along Iloilo-Antique Rd., Km.30+534 Guimbal, Iloilo 8/14/2012 1st VI LF 4.978 240 01/20/12 09/15/12 1.68 O 0.279 0.300 0.150 0.030 0.040 0.050 84.90 - MFO 1-National Road Network Services-Asset Preservation of National Roads-Rehabilitation/ Reconstrtuction/Upgrading of Damaged Paved National Roads including Drainage based on Alleyway Construction 15310 L A MA GE PMS/HDM-4 Tertiary-Reconstruction from Concrete to Manila City 8/19/2017 1st North Manila DEO LF 14.699 120 5/24/2017 9/20/2017 0.19 O 0.397 0.242 0.150 0.02 0.027 0.033 86.90 - Concrete-Delpan Ext. Road-Chainage 010.80-Chainage 347.78 (S02380LZ); Chainage (-)24.60-Chainage 309.15 (S02381LZ)

Construction/Maintenance of Flood Mitigation Structures and Alleyway Construction 15310 L A MA GE Drainage System (RCBC) along Raxabago Chainage 285.00 to Tondo, Manila 6/11/2015 1st North Manila DEO LF 33.638 200 3/20/15 10/5/15 (-) 4.40 O 0.37 0.24 0.106 0.012 0.06 0.033 82.10% - Chainage 504.00, Tondo, Manila City 2nd LD Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Control/Drainage at NORTH MANILA Alleyway Construction 15310 L A MA GE Sampaloc, Manila 6/10/2016 1st LF 13.954 180 2/1/16 7/29/16 0.02 O 0.381 0.24 0.15 0.022 0.035 0.05 87.80% - Pureza St. crossing Lardizabal and Arevalo, Sampaloc, Manila DEO

Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects- Manila City 2nd 85.20% Alleyway Construction 15310 L A MA GE Construction/Rehabilitation of various Projects in Manila City 11/24/2014 1st NCR LF 9.099 120 9/9/14 1/6/15 13.40% O 0.365 0.229 0.150 0.030 0.045 0.033 85.20% Legislative District Satisfactory 2nd LD - Rehabilitation with Drainage Improvement of Torres Bugallon St. And Vicinity Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Control/Drainage at 89.6% Alleyway Construction 15310 L A MA GE Sampaloc, Manila 11/28/2016 1st & Final North Manila DEO LF 13.954 180 2/1/2016 7/29/2016 0.00 C 0.463 0.133 0.3 0 0 0 0.8960 Pureza Street crossing Lardizabal and Arevalo, Sampaloc, Very Satisfactory Manila

*1st/Final 29th Release Page 27 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Allied Trade Resources Multi-Purpose Capitol Drive, 31667 L B MA GB1 DOTC CARAGA Regional Office Development Project 8/27/2013 1st DOTC L 10.258 180 04/22/13 10/18/13 38.26 O 0.389 0.300 0.150 0.015 0.004 0.050 90.71 - Cooperative Butuan City Patin-ay, Allied Trade Resources Multi-Purpose 31667 L B MA GB1 PATIN-AY LTO District Office Development Project Prosperidad, 8/28/2013 1st DOTC L 5.147 180 04/08/13 10/04/13 2.99 O 0.391 0.240 0.150 0.015 0.030 0.050 87.64 - Cooperative Agusan del Sur Construction of Four (4) Storey, Eight (8) Classroom School *91.4% Almakar Builders and Metal Works 21929 L B MA GB Building, Aniban Central School, Bacoor City, Cavite Bacoor City, Cavite 11/28/17 1st & Final DPWH LF 15.956 251 5/31/16 2/5/17 0.00 C 0.480 0.134 0.300 - - - 91.40 Very Satisfactory Construction of Revetment along Bacoor River, Banalo Almakar Builders and Metal Works 21929 L B MA GE Bacoor, Cavite 3/22/2018 1st/Final Cavite Sub DEO LF 37.274 192 9/4/2017 3/14/2018 0.00 C 0.480 0.133 0.300 - - - 91.30 *91.30% Very Satisfactory Section, Phase III, Bacoor, Cavite MFO 2-Flood Management Services, Construction, Maintenance of Flood Mitigation Structures and Drainage Dasmariñas City, 95.5% Almakar Builders and Metal Works 21929 L B MA GE 4/5/2016 1st Cavite 1st DEO LF 27.0325 281 6/6/15 3/12/16 0 C 0.455 0.2 0.3 0 0 0 95.50% System, West River Bank Stabilization Project along Imus Cavite Very Satisfactory River (Phase I and II) Cavite 4th LD, Dasmariñas City, Cavite Almakar Builders and Metal Works 21929 L C SB GB1 Const. of MPB in Poblacion I-A Imus, Cavite 11/23/2012 1st IVA LF 0.681 135 07/18/12 11/29/12 1.20 O 0.342 0.300 0.150 0.020 0.041 0.033 88.60 - Construction of Unit Four (4) Storey Eight (8) Classroom Manjuyod, Negros Negros Oriental 1st *91.8% Almana Construction And Dev't Corporation 38859 L AAA MB GB School Building at Manjuyod NHS 5/30/2017 1st & Final LF 14.577 180 8/15/2016 2/10/2017 0.00 C 0.485 0.133 0.300 - - - 91.80 Oriental DEO Very Satisfactory

Construction of Pili River Control, Poblacion, Castilla, First District of 90% Alnino Construction & Supply 18378 L D MA GE 3/11/2016 1st Sorsogon 1st DEO LF 9.5035 150 2/3/15 7/2/15 - C 0.467 0.133 0.3 0 0 0 90.00% Sorsogon, First District of Sorsogon Sorsogon Very Satisfactory Cluster V-Const. of Various Sch. Building Project under FY Alnino Construction & Supply/Steven 2015 Basic Educational Facilities Fund (BFFF) Batch 6, Const. East Dist., Sorsogon 92% 3 L 0 0 GB 8/31/2016 1st & Final Sorsogon 1st DEO LF 6.126 150 11/23/15 4/20/16 0.00 C 0.487 0.133 0.3 0 0 0 0.9200 Construction & Supply Joint Venture of Two Storey Four (4) Classroom 7mx9m Sch. Bldg, Cabidan City Very Satisfactory ES, East Dist., Sorsogon City Provincial Upgrading/Improvement of Nabunturan-Nuevo Iloco Nabunturan, Alonzo Construction 32145 L MB 3/27/18 Final Government of LF 75.900 140 10/21/17 3/6/18 0.00 C 0.50 0.20 0.30 - - - 100.00 *100.00% Outstanding Provincial Road Phase II Compostel Valley Compostela Valley

Nabunturan & Provincial Upgrading/Improvement of Nabunturan-Nuevo Iloco Alonzo Construction 32145 L Mawab, Laak, 7/25/18 1st Government of LF 75.713 140 10/18/17 8/19/18 0.93 O 0.38 0.29 0.15 0.03 0.06 0.05 96.08 - On - Going Provincial Road Phase II Compostela Valley Compostela Valley

New Bataan, Provincial Alonzo Construction / Gemma Construction Rehabilitation of Cabinuangan - Magangit FMR with 3 units L Compostela Valley 6/3/19 1st Government of LF 190.825 450 12/21/18 2/28/20 11.49 O 0.36 0.26 0.15 0.03 0.06 0.05 90.90 - On - Going and Supply Bridge Retrofitting Works Province, Region XI Compostela Valley Improvement/Repair/Rehabilitation of Existing Flood Control Alpha & Omega Gen. Contractor & *88.9% 38958 L A - GE Structures Angat River Tanauan Section, Bustos, Bulacan Bustos, Bulacan 11/28/17 1st & Final DPWH LF 9.311 60 10/18/17 12/16/17 26.47 C 0.456 0.133 0.300 - - - 88.90 Development Corp. Satisfactory Asset Preservation of National Roads - Rehabilitation/ K0578+800 - Reconstruction/ Upgrading of Damaged Paved National K0579+732, Roads Including Drainage Based on Pavement Management K0580+604 - System - Highway Development Management (HDM-4) Tertiary Alpha Ryder Construction And Supplies 12197 L A MA GE K0580+906, 8/15/2017 1st Sorsogon 1st DEO LF 47.040 240 5/11/2017 1/5/2018 0.10 O 0.386 0.237 0.150 0.022 0.03 0.033 85.80 - Reconstruction from Concrete to Concrete Junction Donsol- K0583+540 - Banuang Gurang Road, K0578+800 - K0579+732, K0580+604 - K0583+832 Donsol, K0580+906, K0583+540 - K0583+832 Donsol, Sorsogon Sorsogon Rehab./Reconst. National Roads with Slips, Slope Collapse & Landslide Jct. Donso-Banuang Gurang Road, K0582+000- Alpha Ryder Construction And Supplies 12197 L A MA GE Donsol, Sorsogon 11/18/2016 1st Sorsogon 1st DEO LF 55.519 260 3/13/2016 11/27/2016 0.01 O 0.351 0.227 0.15 0.03 0.056 0.05 0.8640 - K0584+000, K0856+050-K0587+000, w/ excpetions, Donsol, Sorsogon Construction of Flood Control Structure along San Isidro Brgy. San Isidro, Sorsogon 2nd *92.6% Alpha Ryder Construction And Supplies 12197 L A MB GE River including the removal of old bridge (obstruction to river 6/3/2017 1st & Final LF 58.500 260 3/23/2016 12/7/2016 0.00 C 0.426 0.200 0.300 - - - 92.60 Bulan, Sorsogon DEO Very Satisfactory flow), Brgy. San Isidro, Bulan, Sorsogon Rehab./Reconstruction of Anahaw River Control, Macabog, Macabog, *89.5% Alpha Ryder Construction And Supplies 12197 L A MB GE Sorsogon City 5/30/2017 1st & Final Sorsogon 1st DEO LF 4.680 76 3/23/2017 6/6/2017 0.00 C 0.462 0.133 0.300 - - - 89.50 Sorsogon City Very Satisfactory Construction and Maintenance of Bridges along National Roads - Rehabilitation/ Major Repair of Permanent Bridges, *95.1% Alphatec Chemical Corporation 39938 L B MA GE , Bohol 11/9/17 1st & Final DPWH LF 8.781 172 5/16/17 11/3/17 0.00 C 0.496 0.155 0.300 - - - 95.10 Panas Bridge (B00190BH) along Tagbilaran North Road ( Very Satisfactory Tagbilaran - Getafe Section), Talibon, Bohol Contract ID No. 16FBD122: Construction and Maintenance of Bridges along National Roads: Rehabilitation/ Major Repair of *93.3% Alphatec Chemical Corporation 39938 L B SB GE Permanent Bridge Primary along Daang Maharlika at Upi Upi, Gamu, Isabela 11/13/17 1st & Final DPWH LF 13.230 81 2/7/17 4/28/17 0.34 C 0.500 0.133 0.300 - - - 93.30 Very Satisfactory Bridge (B01174LZ) Upi, Gamu, Isabela

Retrofitting/Major Repair of Permanent Bridges Overpass Ilocos Norte 1st Bridge 1 (B03221lLZ) along Manila North Road *93.2% Alphatec Chemical Corporation 39938 L B SB GE Laoag City 6/1/2017 1st & Final District Engineering LF 1.997 45 3/13/2017 4/26/2017 0.06 C 0.499 0.133 0.300 - - - 93.20 Very Satisfactory Office

*1st/Final 29th Release Page 28 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Retrofitting/ Major Repair of Permanent Bridges Overpass Ilocos Norte 1st Bridge 2 (B03224LZ) along Manila North Road *93.1% Alphatec Chemical Corporation 39938 L B SB GE Laoag City 6/1/2017 1st & Final District Engineering LF 1.996 45 3/13/2017 4/26/2017 0.06 C 0.498 0.133 0.300 - - - 93.10 Very Satisfactory Office Construction and Maintenance of Bridges along National Roads-Rehabilitation/ Major Repair of Permanent Bridges, Alphatec Chemical Corporation 39928 L B MA GE Talibon, Bohol 4/5/18 2nd/Final Bohol 2nd DEO LF 8.781 172 5/16/17 11/3/17 0% C 0.437 0.133 0.3 - - - 87.00 91.86% Very Satisfactory Panas Bridge (B00190BH) along Tagbilaran North Road (Tagbilaran-Getefe Section) Construction of 3-Storey Daniel Maramba National High Sta. Barbara, *91.5% Alphin Trading & Construction 26260 L B MA GB School Alumni Association MPB-Education Center 11/15/17 1st & Final DPWH LF 9.690 240 3/21/17 11/15/17 0.00 C 0.484 0.131 0.300 - - - 91.50 Pangasinan Very Satisfactory Construction/ Rehabilitation of River Dike along Sinucalan Brgy. Banzal, Sta. Pangasinan 4th River *85.3% Alphin Trading & Construction 26260 L B MA GE Barbara, 6/8/2017 1st & Final District Engineering LF 13.997 146 10/4/2016 2/26/2017 0.04 C 0.420 0.133 0.300 - - - 85.30 Satisfactory Pangasinan Office Construction/Rehabilitation of River Dikes along Sinucalan Sta. Barbara, Pangasinan 4th *83.3% Alphin Trading & Construction 26260 L A MA GE River Brgy. Banzal, Sta. 0+000 to Sta. 0+601, Sta. Barbara, 3/24/2017 1st & Final LF 13.997 146 9/28/2016 2/20/2017 0.04 C 0.400 0.133 0.300 - - - 83.30 Pangasinan DEO Satisfactory Pangasinan Improvement/ Widening of Sta. Barbara Old Road, K0.199+(- K0.199+(-096) - Alphin Trading & Construction/Aquino De La 096) - K0.199+904, Sta. Barbara, Pangasinan K0.199+904, Sta. Pangasinan 4th 87.2% - L D SB GE 11/24/2016 1st & Final LF 29.400 196 1/21/2016 8/3/2016 0.00 C 0.439 0.133 0.3 0 0 0 0.8720 Cruz Eng'G & Construction Joint Venture Barbara, DEO Satisfactory Pangasinan Mangaldan, Alphin Trading & Construction 26260 L B SB GE Improvement of Mangaldan Municipal Plaza 3/14/19 Final TIEZA LF 15.000 202 5/8/18 12/4/18 0.00% C 0.475 0.193 0.3 96.80 96.80% Outstanding Pangasinan Rehabilitation of Flood Control Structures and Tributaries at Quezon City 1st *83.3% Alpiz Construction And Development Corp. 11039 L B MA GE Quezon City 8/24/2017 1st & Final LF 24.399 300 3/23/2016 1/16/2017 0.00 C 0.333 0.200 0.300 - - - 83.30 Brgy. Payatas DEO Satisfactory Rehabiltitation/Improvement of Flood Control Structures and QUEZON CITY Alpiz Construction And Development Corp. 11039 L B MA GE Quezon City 9/16/2016 1st LF 22.195 270 3/23/16 12/17/16 0.20 O 0.359 0.3 0.15 0.022 0.035 0.033 0.8990 - Tributarities, Brgy. Payatas, Quezon City 1ST DEO Rehabilitation of Flood Control Structures and Tributaries, Quezon City 1st Alpiz Construction And Development Corp. 11039 L B MA GE Quezon City 6/8/2017 1st LF 27.482 210 3/2/2017 9/27/2017 0.00 O 0.400 0.240 0.150 0.022 0.037 0.05 89.90 - Brgy. Payatas, Quezon City DEI Construction of One (1) Storey, 2-Classroom School Building Lanao del Norte *92% Alqaod Construction And Supply 39078 L D B GB at Servillano G. Reuyan Memorial Elementary School, Iligan Iligan City 3/20/2017 1st & Final LF 2.042 90 8/8/2016 11/5/2016 0.02 C 0.492 0.128 0.300 - - - 92.00 2nd DEO Very Satisfactory City Rehab./Const./Impvt. of Zambaonga City-Pagadian Road (with Alraf Construction & Enterprises 17297 L AAA LA GE1 9/2/2009 3rd IX 46.408 295 O 0.338 0.300 0.150 0.030 0.055 0.050 92.30 - Intermittent Section) Alraf Construction & Enterprises 17297 L AAA LA GE1 Rehab./Const./Impvt. of Zamboanga City-Pagadian Road 5/26/2009 2nd IX 44.695 253 O 0.396 0.300 0.150 0.030 0.042 0.050 96.80 - Construction/Upgrading/Rehabilitation of Drainage along Alraf Construction & Enterprises 17297 L AAA MA GE National Roads pagadian-Zamboanga City Road, K1929+700- Zamboanga City 9/3/2015 1st Zamboanga City LF 16.984 218 6/22/15 1/25/16 (+)0.31% O 0.351 0.24 0.15 0.03 0.054 0.05 87.50% - K1932+540 (Boalan-Dvisoria-Putik Section), Zamboanga City Construction/Upgrading/ Rehabilitation of Drainage along K1929+700 to National Roads Pagadian-Zamboanga City Road K1932+540 Zamboanga City 88.14% Alraf Construction & Enterprises 17287 L AAA MA GE (Boalan-Divisoria 9/2/2016 2nd & Final LF 16.983 248 6/22/15 2/24/16 0.00 C 0.458 0.133 0.3 0 0 0 0.8910 DEO Satisfactory Putik Section), Zamboanga City Widening of National Roads along Pagadian-City-Zamboanga K1916+560- Regional Office No. Alraf Construction & Enterprises 17297 L AAA MB GE City Road, Manicahan-Cabaluay-Culianan Section, K1916+560- K1923+396.70, 8/24/2015 1st LF 148.858 280 4/20/15 1/25/16 (+)7.42 O 0.354 0.24 0.15 0.022 0.056 0.05 87.20% - IX K1923+396.70, Zamboanga City Zamboanga City Upgrading/Concrete Paving of Nat'l Rd. along Liloy-Siocon Zamboanga del Alraf Construction & Enterprises 17297 L AAA MB GE1 11/27/2012 1st IX LF 64.478 244 04/10/12 12/09/12 -0.50 O 0.264 0.300 0.145 0.030 0.059 0.033 83.10 - Rd., Kipit-La Libertad-Loay-Imelda San Roque Sect. Norte Settled/Collapsed PCCP along Maria Clara L. Lobregat H-way Alraf Construction & Enterprises 17297 L AAA MB GE1 (Pagadian ZC Road) w/n Km.1867+000 to K1868+000, Zamboanga City 3/12/2013 1st IX LF 2.514 78 02/22/13 05/11/13 -0.60 O 0.400 0.240 0.144 0.030 0.038 0.033 88.50 - Mangusu Sect. Construction of the RCDG Bridge and Approaches along sta.2 + 602 - sta.2 Alraf Construction & Enterprises/Wee Builders Lamisahan Road, Sta.0 + 000- Sta.2 + 800 Modified to + 741 Brgy. Zamboanga City JV-15-1371 L AAA MA GE 3/23/2017 1st LF 39.052 420 3/30/2016 5/23/2017 (+)0.32% O 0.366 0.212 0.150 0.03 0.05 0.05 85.80 - (Joint Venture) Construction of Steel Brideg and Approaches along Lamisahan, DEO Lamisahan Road Zamboanga City Construction of RCDG Bridge and Approaches along/Modified Sta. 0+000-Sta. to Construction of Steel Bridge and Approaches along 2+800, Lamisahan, Lamisahan Road, Lamisahan Road Zamboanga City Alraf Construction & Enterprises/Wee Builders 2nd LD/Sta. 2+602- Zamboanga City JV-15-1371 L AAA LA GE 11/24/2016 1st LF 39.052 420 3/30/2016 5/23/2017 0.00 O 0.367 0.276 0.15 0.024 0.05 0.05 0.9170 - (Joint Venture) Sta. 2+741, Brgy DEO Lamisahan, Zamboanga City 2nd LD Construction/Maintenance of Flood Control Mitigation Structures and Drainage System - Rehabilitation of Flood *88.3% Alro Construction & Development Corporation 18361 L A MA GE Daraga, Albay 3/20/2017 1st & Final Albay 2nd DEO LF 27.859 189 3/7/2016 9/11/2016 0.00 C 0.450 0.133 0.300 - - - 88.30 Control System along Busay River (Left Side), Daraga, Albay Satisfactory

Guicadale Rd. Network to Int'l Airport, Albay (Comun-Cotmon- Alro Construction & Development Corporation 18361 L A MA GE1 Camalig, Albay 8/11/2013 1st V LF 46.044 215 02/06/13 09/08/13 4.90 O 0.362 0.245 0.150 0.030 0.052 0.033 87.20 - Del Rosario Rd. Sect.)

*1st/Final 29th Release Page 29 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction/Rehabilitation of Flood Control Mitigation Facilities along Major River basins and Prinicipal Rivers- 98.8% Alro Construction & Development Corporation 18361 L A MA GE Kabilugan/Velasco/Batu River Basin (Lake Bicol , Camalig, Albay 9/2/2016 1st & Final Albay 2nd DEO LF 34.530 158 6/15/16 11/19/16 0.51 C 0.5 0.188 0.3 0 0 0 0.9880 Outstanding Const./Improvement of Salugan Flood Control, Camalig, Albay

Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Pili - Tigaon - Albay Patitinan Section, Boundary Road (Construction of Slope Protection), Camarines Sur 3rd *92.6% Alro Construction & Development Corporation 18361 L A MB GE Sagñay, Camarines 6/7/2017 1st & Final LF 28.310 256 3/13/2016 11/23/2016 0.00 C 0.426 0.200 0.300 - - - 92.60 K0500+300 to K0500+400, K0504+500 to K0504+673, DEO Very Satisfactory Sur K0504+800 to K0504+900, Patitinan Section, Sagñay, Camarines Sur Camarines Sur-Albay Diversion Road, Asn Fernando-Oas- Daraga Section of the PAN Philippine Highway including Bula, Camarines 97.4% Alro Construction & Development Corporation 18361 L A MB GE Bridges-Camarines Sur Section, Upgrading of Bula-Nabua 6/6/2016 1st & Final Regional Office LF 97.498 258 6/24/16 3/8/17 0.00 C 0.491 0.183 0.3 0 0 0 97.40% Sur Outstanding (ACC-PCCP) including Slope Protection, Bula, Camarines Sur

Camarines Sur-Albay Diversion Road, San Fernando-Oas- Daraga Section of the PAN Philippine Highway Including Bula, Camarines Regional Office No. Alro Construction & Development Corporation 18361 L A MB GE 9/5/2015 1st LF 92.618 196 6/24/15 1/5/16 1.06% O 0.391 0.24 0.15 0.03 0.06 0.05 92.10% - Bridges-Camarines Sur Section, Upgrading of Bula-Nabua Sur V (ACC-PCCP) Including Slope Protection, Bula, Camarines Sur Rehabilitation/Reconstruction of National Roads with Slip, Sagnay, Camarines Camarines Sur 3rd Alro Construction & Development Corporation 18361 L A MB GE Slope Collapse and Landslide along Pili-Tigaon-Albay 4/5/18 1st/Final LF 23.095 246 3/5/17 11/5/17 41.99% C 0.483 0.2 0.3 - - - 98.30 *98.30% Outstanding Sur DEO Boundary Road, K0497+000-K0497+370 Construction/Maintenace of Flood Mitigation Structures and 91.3% Alro Construction & Development Corporation 18361 L A MA GE Drainage System Rehabilitation of Flood Control System Daraga, Albay 11/16/2016 1st & Final Albay 2nd DEO LF 27.859 189 3/7/2016 9/11/2016 0.00 C 0.471 0.142 0.3 0 0 0 0.9130 Very Satisfactory along Busay River (Left Side), Daraga, Albay Al's Enterprise and Construction 9721 L A MA GB1 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) 3/17/2009 2nd VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 - Alta Negros Industrial Supply Corporation 33806 L C SB GE1 Repair/Rehab. of Lacson Street Bacolod City 8/13/2012 1st VI LF 6.465 145 04/10/12 09/01/12 3.89 O 0.332 0.297 0.150 0.015 0.029 0.033 85.60 - Improvement/Rehabilitation of Multi-Purpose Building, Brgy. Brgy. 16 San Althea Construction 18717 L B SB GB 16 San Jacinto, Laoag City, Ilocos Norte Jacinto, Laoag City, 11/16/2016 1st Ilocos Norte DEO LF 5.346 170 6/23/2016 12/9/2016 -0.05 O 0.384 0.263 0.104 0.03 0.047 0.033 0.8610 - Ilocos Norte Concreting of Farm to Market (FMR) in First District of Albay: Brgy. San Carlos, 88.1% Alxm Construction 33436 L B MA GE Ocncreting of San Carlos- San Vicente (San Carlos Section) 11/15/2016 1st & Final Albay 1st DEO LF 9.234 103 6/27/2016 10/7/2016 0.00 C 0.448 0.133 0.3 0 0 0 0.8810 Tabaco City, Albay Satisfactory FMR, Brgy. San Carlos, Tabaco City, Albay Brgy. San Isidro, Alxm Construction 33436 L B MA GE Construction of Flood Control Structure along Danlog River Barcelona, 6/10/2015 1st Sorsogon 2nd LF 21.347 171 2/16/15 8/5/15 -3.84% O 0.379 0.3 0.112 0.03 0.06 0.05 93.10% - Sorsogon Widening of National Roads along Santiago-Tuguegarao K0329+165- Road K0329+389 (RS), K0329+155- K0329+428 (LS), K0330+000 - Alxm Construction/Meta Construction Joint 96.9% JV-14-911 L B MA GE L0330+205, 6/15/2016 1st & Final Isabela Fourth LF 45.255 239 4/29/15 12/23/15 0.02 C 0.469 0.2 0.3 0 0 0 96.90% Venture Outstanding K0330+215- K0331+661.8, Rizal, Santiago City- Raniag, Ramon, Isabela Road Upgrading (Gravel to Concrete) of Inawayan-Baracatan Regional Office No. 92.1% Alzam Enterprises 19113 L A MA GE Road, Davao City Davao City 11/24/2016 1st & Final LF 128.713 260 4/29/2015 1/13/2016 0.00 C 0.488 0.133 0.3 0 0 0 0.9210 XI Very Satisfactory Rd. Upgrading (Gravel/Asphalt to Concrete) of Mintal (Davao- Alzam Enterprises 19113 L A MA GE1 Bukidnon Rd.) Bago Oshiro-Bago Gallera (Old Davao- Davao City 8/21/2013 1st XI LF 72.933 269 03/06/13 11/29/13 -2.68 O 0.374 0.300 0.123 0.030 0.025 0.030 88.20 - Cotabato Rd.) Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. (IS)/ Alzam Enterprises 19113 L A MA GE1 Imprv't./Widening of Davao-Bukidnon Rd. leading to Phil. Davao City 8/21/2012 1st XI LF 45.680 250 01/25/12 09/30/12 1.46 O 0.387 0.221 0.150 0.030 0.055 0.033 87.60 - Eagle Foundation, Km.1698+780-Km.1701+828 Alzam Enterprises 19113 L A MA GE1 Widening of Davao-Cotabato Rd. Davao City 8/21/2012 1st XI LF 43.791 250 01/24/12 09/29/12 6.06 O 0.292 0.287 0.150 0.030 0.045 0.050 85.40 - Widening of Davao-Cotabato Rd., Davao City, Lizada Sect., Toril District, Davao Alzam Enterprises 19113 L A MA GE1 8/5/2013 1st XI LF 37.443 179 02/26/13 08/23/13 -0.29 O 0.343 0.292 0.147 0.030 0.025 0.033 87.00 - Km.1525+920-Km.1527+800 City Alzam Enterprises 19113 L A MA GE2 Const. of Davao River Control Proj. Davao City 3/21/2013 1st XI LF 22.942 221 12/02/12 07/10/13 39.30 O 0.377 0.240 0.150 0.020 0.045 0.050 88.20 - Rd. Upgrading (Gravel to Paved) of Inawayan-Baracatan Rd., Alzam Enterprises 19113 L A MA GE1 Toril, Davao City 3/12/2013 1st XI LF 6.854 55 01/22/13 03/17/13 0.00 O 0.269 0.235 0.150 0.030 0.045 0.050 77.90 - Km.1538+770-Km.1539+110 Off-carriageway Improvement of Davao City Diversion Road K01498+(-349) to Davao City 1st *90.2% Alzam Enterprises 19113 L A MB GE Including Improvement of Drainage K01498+(-349) to K01499+871, 3/24/2017 2nd & Final LF 19.601 185 2/15/2016 8/17/2016 0.00 C 0.456 0.134 0.300 - - - 89.00 DEO Very Satisfactory K01499+871, Davao City Davao City Off-Carriageway Improvement of Davao City Diversion Road K1498+(-349)- Alzam Enterprises 19113 L A MB GE Including Improvement of Drainage, K1498+(-349)-K1499+871, K1499+871, Davao 6/16/2016 1st Davao City DEO LF 19.008 170 2/15/16 8/2/16 0.00 O 0.374 0.262 0.15 0.03 0.047 0.05 91.30% - Davao City City

*1st/Final 29th Release Page 30 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Brgy. Esperanza to Provincial Municipality of Sto. Alzam Enterprises 19113 L Rehabilitation of Esperanza - Sto. Tomas Farm to Market Road 4/13/18 1st Government of LF 117.410 853 4/22/17 7/22/19 -9.36 O 0.03 0.06 0.05 0.33 0.30 0.06 82.40 - On - Going Tomas, Davao del Davao del Norte Norte Brgy. Esperanza to Municipality of Sto. Provincial of Davao Alzam Enterprises 19113 L Rehabilitation of Esperanza - Sto Tomas Farm to Market Road 4/13/18 1st LF 117.410 853 4/22/17 7/22/19 -9.36 O 0.03 0.06 0.05 0.33 0.3 0.056 82.40 - On - Going Tomas, Davao del del Norte Norte Alzen Engineering & Construction Supplies/ Road Upgrading (Unpaved to Paved) of Matalam-Lampayan- Matalam, North REGIONAL *89.8% Borderline Construction & Supply Joint 13911 L A MA GE Antipas Road, K1663+687.36-K1668+658; K1668+658- 3/17/2017 1st & Final LF 146.055 235 2/26/2016 10/17/2016 0.00 C 0.446 0.152 0.300 - - - 89.80 Cotabato OFFICE NO. XII Very Satisfactory Venture K1670+260, Matalam, North Cotabato Road Upgrading Gravel to Paved at Baranga, Sta. 0+000 to Zamboanga City Amarro Construction & Realty Developer 34562 L D SB GE Zamboanga City 3/20/18 1st/Final LF 2.916 149 3/22/17 8/17/17 0.05 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory Sta. 0+200 DEO Local Infrastructure Program-Construction of Multi-Purpose *94.274% Amazing Builders And Construction 32932 L D SB GB Building (Covered Court), Lumangog Ubay, Bohol 8/21/2017 2nd & Final Bohol 2nd DEO LF 2.965 90 4/3/2017 7/1/2017 - C 0.499 0.180 0.300 - - - 97.90 Very Satisfactory Local Infrastructure Program - Construction of Multi-Purpose Lomangog, Ubay, Bohol 2nd District Amazing Builders And Construction 32932 L C SB GB Building (Covered Court), Lomangog, Ubay, Bohol 6/3/2017 1st LF 2.822 90 4/3/2017 7/1/2017 0.25 O 0.398 0.240 0.150 0.03 0.059 0.05 92.70 - Bohol Engineering Office Construction of 2-Storey 6-Classroom School Building at Bacolod, Lanao del Lanao del Norte 90.3% Ammar Construction And Enterprises 35325 L B SB GB Binuni-Demologan NHS, Bacolod, Lanao del Norte 11/17/2015 1st LF 8.186 150 8/25/15 1/22/16 (+) 8.00% O 0.386 0.24 0.15 0.03 0.047 0.05 90.30% Norte 2nd Very Satisfactory Repair/ Maintenance of Flood Control, Talavera River Control, Talavera, Nueva *90% Amp Construction 16574 L B MA GE Brgy. Sicsican Matanda Talavera, Nueva Ecija 3/23/2017 1st & Final Nueva Ecija 1st LF 1.901 70 12/19/2016 2/26/2017 0.00 C 0.400 0.200 0.300 - - - 90.00 Ecija Very Satisfactory Repair/Rehabilitation (Upgrading) Bacolod City Boundary Brgy. Alangilan, Road, Bacolod City, 91.1% Amphil Construction & Consulting Services 33716 L B SB GE K0017+190 to 9/2/2016 1st & Final Bacolod City DEO LF 8.692 120 1/5/16 5/3/16 0.00 C 0.478 0.133 0.3 0 0 0 0.9110 Very Satisfactory K0019+586 w/ exceptions Replacement of San Pedro Bridge along Daang Maharlika Alegria, Surigao del Andoni T. Dumlao Civil Engineer - Contractor 34028 L B MA GE1 8/8/2012 1st XIII LF 14.945 375 01/13/12 01/22/13 1.71 O 0.328 0.290 0.150 0.030 0.060 0.050 90.80 - (Surigao-Agusan Rd.), Brgy. San Pedro Norte Repair/Reconst. Of Boan Bridge along Daang Maharlika Rosario, Agusan Andoni T. Dumlao Civil Engineer - Contractor 34028 L B MA GE1 (Agusan-Davao Rd.) Km.1331+632-Km.1380+775 w/ 8/18/2012 1st XIII LF 12.163 240 01/27/12 09/24/12 1.25 O 0.312 0.262 0.150 0.030 0.050 0.033 83.70 - del Sur exceptions Concreting of Sinomoc Camanse Tipan Road, Sinacaban, Misamis Angel & Sam Construction & General Sinacaban, 82.5% 19968 L B MA GE Misamis Occidental 8/31/2016 1st & Final Occidental 2nd LF 23.188 190 6/15/15 12/21/15 0.00 C 0.397 0.128 0.3 0 0 0 0.8250 Merchandise Misamis Occidental Satisfactory DEO Angel & Sam Construction & General 19968 L B MA GE1 Rehab. of ICBR Puerto-Cugman Section 3/2/2009 1st X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 - Merchandise Angel & Sam Construction & General Const. of 2 units, 1 Storey, 1 Classroom School Building, Aglayan, 73.70% 19968 L B MA GB 10/24/2014 1st X LF 2.022 105 7/28/14 11/9/14 0.35% O 0.250 0.278 0.150 0.010 0.016 0.033 73.70% Merchandise Aglayan ES Malaybalay City Poor Provincial Angel & Sam Construction & General Cabanglasan, 19968 L B Concreting of Miglamin-Cabulohan-Iba Road 1/16/19 1st Government of LF 53.682 271 7/26/18 4/22/19 4.46 O 0.28 0.29 0.15 0.02 0.06 0.05 84.87 - On - Going Merchandise Bukidnon Bukidnon Concreting of Delapa-Sipaloc Road Section (FMR) Brgy. Delapa Sibutad, Zamboanga Del *89.6% Animas Bros Construction 35002 L B SB GE 2/6/2017 1st & Final LF 9.601 60 10/5/2016 12/3/2016 0.00 C 0.463 0.133 0.300 - - - 89.60 Zamboanga del Norte 3rd DEO Very Satisfactory Norte Construction of One (1) Unit Technical & Vocational Dapitan City, Zamboanga Del *86.6% Animas Bros Construction 35002 L B SB GB Workshop/ Building Laboratory Zamboanga del 3/16/2017 1st & Final LF 2.562 60 10/20/2016 12/18/2016 (+)2.31% C 0.433 0.133 0.300 - - - 86.60 Norte 3rd DEO Satisfactory Norte Concreting of Barangay Palola Farm to Market Road Barangay Palola, 87.7% Anncon Builders 36097 L D SB GE 11/17/2016 1st & Final Quezon 1st LF 1.910 21 4/4/2016 4/24/2016 0.00 C 0.444 0.133 0.3 0 0 0 0.8770 Barangay Palola, Lucban, Quezon Lucban, Quezon Satisfactory Const. of Iriga Flood Control Project (Consolidation Dam, Antonio V. Nidea Construction 6382 2/28/2010 V 28.505 240 O 0.352 0.240 0.150 0.030 0.035 0.033 84.00 - Ground Sill, Slope Protection & Damage Canal) Cluster 9 - Construction / Maintenance of Flood Mitigation Antonio V. Nidea Construction, Inc. (Formerly: Structures and Drainage System: Rehabilitation/ 6382 L A MB GE Tabaco City 8/24/2017 1st Albay 1st DEO LF 93.004 243 3/13/2017 11/10/2017 0.00 O 0.391 0.292 0.150 0.022 0.033 0.033 92.10 - Antonio V. Nidea Construction) Construction/ Estension of Seawall at Fatima, San Roque And Sto. Cristo, Tabaco City Antonio V. Nidea Construction, Inc. (Formerly: 6382 L A MB GE Construction of Access Road, Brgy. Gapo Daraga, Albay 04/02/18 1st/Final Albay 2nd DEO LF 19.418 151 42,879 43,029 0 C 0.480 0.135 0.300 - - - 91.50 *91.50% Very Satisfactory Antonio V. Nidea Construction) Construction/Maintenance of Flood Mitigation Structures and Antonio V. Nidea Construction, Inc. (Formerly: Albay 1st District 6382 L A MB GE Drainage Systems Rehabilitation/Construction/ Extension of Tabaco City, Albay 04/12/18 2nd/Final LF 96.500 288 03/13/17 12/25/17 0.00 C 0.478 0.133 0.300 - - - 91.10 87.90% Satisfactory Antonio V. Nidea Construction) DEO Seawall at Fatima, San Roque and Sto. Cristo Antonio V. Nidea Construction, Inc. (Formerly: 6382 L A MA GB1 Const./Repair/Rehab. of MPB, Albay III DEO Paulog, Ligao City 8/9/2013 1st V LF 3.679 90 06/25/13 09/22/13 6.65 O 0.334 0.286 0.150 0.030 0.040 0.033 87.30 - Antonio V. Nidea Construction) Antonio V. Nidea Construction, Inc. (Formerly: Guicadale Platform Rd., Cotmon-Maninila-Taplacon-Taloto 6382 L A MB GE1 Camalig, Albay 8/10/2013 1st V LF 22.843 206 02/01/13 08/25/13 -3.26 O 0.366 0.241 0.117 0.030 0.041 0.033 82.80 - Antonio V. Nidea Construction) Rd., (Cotmon-Maninila Sect.)

*1st/Final 29th Release Page 31 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) along Jct. Victoria - *91.9% APD Construction 180 L AA LA GE Maddela - Alicia - Kasibu Boundary Road (Jct. Victoria - Maddela, Quirino 8/23/2017 1st & Final Quirino DEO LF 46.707 180 2/8/2017 8/6/2017 0.00 C 0.485 0.134 0.300 - - - 91.90 Very Satisfactory Kasibu Boundary Road), K0385+661 to K0386+000 and K0397+720 to K0397+1599, Maddela, Quirino

MFO 1 - National Road Upgrading (Unpaved to Paved) Based K0393+558- on Gravel Road Strategies, Traffic Benchmark for Upgrading K0395+000, to Paved Road Standards (HDM-4 Project Analysis) K0395+915- (Intermittent Sections), Jct. Abbag Guingin Boundary Road K0396+084, K0398+101- 95.4% APD Construction 17467 L AA MB GE 6/14/2016 1st & Final Regional Office LF 159.196 300 3/30/15 1/23/16 0.37 C 0.454 0.2 0.3 0 0 0 95.40% K0398+478, Very Satisfactory K0399+316- K0400+000, K0400+564- K0403+243.5 Preventive Maintenance based on Pavement Management System / Highway Development and Management-4 (HDM-4) Diffun & Asphalt Overlay along Cordon-Aurora Boundary Road 91.2% APD Construction 17467 L A MB GE Cabarroguis, 6/14/2016 1st & Final Quirino LF 41.217 137 2/25/16 7/10/16 0.36 C 0.479 0.133 0.3 0 0 0 91.20% (Isabela Boundary-Jct. Dumabato), K0330+000-K0331+640, Very Satisfactory Quirino K0337+653-K0337+694, K0337+739-K0338+319, K0

Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, K0405+160- APD Construction 17467 L AA LA GE Slope Collapse and Landslike - Tertiary Roads along Jct. K0405+185, 3/21/18 1st/Final Quirino DEO LF 24.284 200 7/4/17 1/29/18 0.01 C 0.492 0.133 0.3 - - - 92.50 *92.50% Very Satisfactory Abbag-Guingin Bdry. Road - (Construction of Road Slope Nagtipunan, Quirino Protection Struture) Retrofitting/ Strenghtening of Ingay Bridge (B00168 PN) along *93.4% Aqua Dragon Construction & Supply 36405 L C SB GE Gumbal - Tubungan Road, Iloilo City Iloilo City 11/13/17 1st & Final DPWH LF 7.715 140 3/14/17 7/31/17 29.11 C 0.500 0.134 0.300 - - - 93.40 Very Satisfactory Retrofitting/ Strengthening of Permanent Bridges, Moog K0096+759, Brgy. Negros Occidental *76.5% Aqua Dragon Construction & Supply 36405 L C SB GE Bridge (B00219NR) Along Bacolod South Road (Kabankalan- Vista Alegre, Ilog, 6/2/2017 1st & Final LF 4.651 67 2/21/2017 4/28/2017 0.00 C 0.332 0.133 0.300 - - - 76.50 3rd DEO Unsatisfactory Hinoba-an Section) Negros Occidental Retrofitting/ Strengthening of Lanutan Bridge (B00136PN) Iloilo 1st District *99.7% Aqua Dragon Construction & Supply 36405 L C SB GE along Iloilo - Antique Road, Miag-ao, Iloilo, Miag-ao, Iloilo Miag-ao, Iloilo 6/6/2017 1st & Final LF 5.776 106 3/14/2017 6/27/2017 0.48 C 0.497 0.200 0.300 - - - 99.70 Engineering Office Outstanding Retrofitting/ Strengthening of Ingay Bridge along Guimbal- *93.4% Aqua Dragon Construction & Supply 36405 L C SB GE Tubungan Road, Tubungan, Iloilo Tubungan, Iloilo 8/23/2017 1st & Final Iloilo 1st DEO LF 7.715 140 3/14/2017 7/31/2017 0.29 C 0.500 0.134 0.300 - - - 93.40 Very Satisfactory

Construction of Level II Water System at Brgy. Manlucahoc, City, Negros Negros Occidental 90.4% Aqua Dragon Construction & Supply 36405 L C SB GB 3/8/2016 1st LF 2.475 60 9/8/16 11/6/16 0 C 0.471 0.133 0.3 0 0 0 90.40% Sipalay City, Negros Occidental Occidental Third DEO Very Satisfactory Pikit, Cotabato / Aqualand Engineering and Construction 38209 L D Malitubog Maridagao Irrigation Project Stage II 5/12/18 1st NIA LF 2.172 474 11/11/2016 2/28/2018 -58.70 O 0.40 0.30 0.00 0.02 0.06 0.05 82.10 - On - Going Region XII Construction of Bantayan River Control, Bantayan River San Roque, *91.9% Aqualine Construction 11555 L AA MA GE Basin, San Roque, Northern Samar 11/14/17 1st & Final DPWH LF 24.399 180 2/17/17 8/15/17 2.16 C 0.486 0.133 0.300 - - - 91.90 Northern Samar Very Satisfactory

Rehabilitation/Reconstruction of National Roads with Slips, KO970+670 - Slope Collapse, and Landslide along Palo - Carigara - Ormoc KO970+685, Road KO972+300- KO972+352, KO972+380 - KO972+415, KO+972+500 - KO972+338, KO972+538 - KO972+ 577, Regional Office No. *92.2% Aqualine Construction 11555 L A MA GE KO972+900 - 4/7/2017 1st & Final LF 43.625 265 7/6/2016 3/27/2017 0.00 C 0.488 0.134 0.300 - - - 92.20 VIII Very Satisfactory KO972+918, KO977+480 - KO977+495, KO977+505 - KO977+520, Section ID: S00074LT and S000075LT, Capoocan, Leyte 2nd District Construction of Pambujan River Control Brgy. Dale, San San Roque, Northern Samar Aqualine Construction 11555 L AAA MB GE 8/17/2017 1st LF 41.612 195 4/3/2017 10/14/2017 -0.01 O 0.375 0.235 0.141 0.03 0.035 0.033 84.90 - Roque, Northern Samar Northern Samar 2nd DEO

*1st/Final 29th Release Page 32 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019

CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Construction/Mainte-nance of Flood Mitigation Structrures and Drainage Systems, Construction of Bantayan River San Roque, Northern Samar 87.1% Aqualine Construction 11555 L AA MB GE 11/23/2016 1st & Final LF 48.075 201 2/12/2016 8/30/2016 0.01 C 0.371 0.2 0.3 0 0 0 0.8710 Control Structures (Bantayan River Basin), San Roque, Northern Samar Second DEO Satisfactory Northern Samar Repair/Improvement of Bantayan River Control along Bantayan, San Northern Samar 90.3% Aqualine Construction 11555 L AA MB GE Catarman (Boundary)-Rawis Road Bantayan-San Roque 3/16/2016 1st LF 16.3142 180 6/24/15 12/20/15 (+) 4.08 C 0.47 0.133 0.3 0 0 0 90.30% Roque 2nd Very Satisfactory Section, K0768+100-K0768+200, Bantayan, San Roque Narra, National Irrigation System Rehabilitation & Improvement Aqualine Construction 11555 L AA Palawan/Region IV- 8/6/2016 1st NIA LF 189.364 730 08/26/15 08/24/17 -12.77 O 0.316 0.300 0.022 0.030 0.051 0.033 75.27 - Project B Opong, San Improvement/Widening of National Roads along Daang Aqualine Construction 11555 L AAA LA GE Rioque, Tolosa, 4/2/18 1st/Final Leyte 1st DEO LF 57.286 150 7/17/17 12/13/17 0.00% C 0.478 0.133 0.3 - - - 91.10 *91.10% Very Satisfactory Maharlika K0931+509-K0932+945, K0932+952-K0933+659 Leyte Manaoag, San Aqualine Construction - ITP Construction, Inc. 11555 / AA / National Irrigation Sector Rehabilitation and Improvement Jacinto, San L 11/10/2017 1st NIA FA 92.79 608 10/5/2016 6/4/2018 1.17 O 0.367 0.237 0.150 0.030 0.070 0.050 90.39 - (Joint Venture) 9392 AAA Project Fabian, Pangasinan San Geronimo Aqualine Construction /C.R Domingo 86.81% 2992 L A Nueva Viscaya bagabag Irrigation System ,Bagabag ,Nueava 9/20/2017 Final NIA LF 79.364 1,225 05/17/13 10/27/16 0 C 0.410 0.200 0.300 - - - - Construction, Inc. (Jv) Satisfactory Viscaya San Geronimo, Aqualine Construction/C.R. Domingo 2992 L A Nueva Viscaya Bagabag Irrigation System Bagabag, Nueva 9/29/2015 1st NIA LF 74.478 866 05/17/13 09/30/15 -10.30 O 0.373 0.296 0.047 0.030 0.045 0.050 84.05 - Construction, Inc. (JV) Viscaya Construction of Flood Control Structures, Tumaga River Zamboanga City 1st Zamboanga City Aquaterra Konstrukt Inc. 15929 L A MB GE Basin at Pasonanca-Luyuhan (Including Right of Way 3/23/2017 1st LF 43.496 465 3/30/2016 7/7/2017 -0.06 O 0.274 0.300 0.089 0.03 0.04 0.033 76.60 - LD DEO Acquisition ) Construction/ Repair/ Rehabilitation/ Improvement of Various Aquaterra Konstrukt Inc. 15929 L AA MA GE Infrastructure including Local Projects, Construction of Water Panay, Capiz 3/16/18 First Capiz 1st DEO LF 55.003 277 7/9/17 4/11/18 0.72% OG 0.389 0.220 0.150 0.030 0.070 0.050 90.90 - On - Going Supply Project Aquaterra Konstrukt Inc. / Mcgabriel Construction of Flood Control Structure at Maasin Creek Maasin, Zamboanga City JV-16-449 L A MB GE 3/20/18 Second LF 22.504 487 3/22/17 7/21/18 1% OG 0.3 0.3 0.15 0.03 0.05 0.05 88.00 - On - Going Construction Joint Venture (Including ROW Acquisition) Zamboanga City DEO Construction of Flood Control Structure, Tumaga River Basin *82.6% Aquaterra Konstrukt Inc. 15929 L A MA GE at Pasonanca-Luyahan Section (Including Right of Way - 11/6/17 3rd & Final DPWH LF 43.716 525 3/30/16 9/5/17 0.00 C 0.420 0.133 0.300 - - - 85.30 Satisfactory Acquisition), Zamboanga City Construction/Repair/ Improvement of Flood Control at Tumaga, Zamboanga City 86.64% Aquaterra Konstrukt Inc. 15929 L A MB GE Tumaga River, Pasomanca Section, Tumaga, Zamboanga City 6/15/2016 3rd & Final LF 10.547 311 3/30/15 2/3/16 0.00 C 0.461 0.133 0.3 0 0 0 89.40% Zamboanga DEO Satisfactory Construction/Repair/Improvement of Flood Control at Tumaga Aquaterra Konstrukt Inc. 15929 L A MB GE Zamboanga City 9/3/2015 1st Zamboanga City LF 9.766 191 3/30/15 10/7/15 (+)0.18% O 0.34 0.24 0.15 0.03 0.051 0.05 86.10% - River, Pasonanca Section, Zamboanga City Construction/Repair/Improvement of Flood Control at Tumaga Zamboanga City 83.5% Aquaterra Konstrukt Inc. 15929 L A MB GE Zamboanga City 11/9/2015 2nd LF 9.766 161 3/30/15 9/6/15 5.43% O 0.268 0.3 0.15 0.02 0.047 0.05 83.50% River, Pasonanca Section, Zamboanga City DEO Satisfactory Construction of Flood Control Structure Tumaga River Basin Zamboanga City Aquaterra Konstrukt Inc. 15929 L A MC GE at Pasonanaca-Luyahan (Including Right-of-Way Acquisition) Zamboanga City 11/24/2016 1st LF 43.496 465 3/30/2016 7/7/2017 -0.02 O 0.339 0.3 0.128 0.015 0.035 0.033 0.8500 - DEO Aquaterra Konstrukt, Inc./ Mcgabriel Construction of Flood Control at Maasin Creek (Including JV-16-449 L AAA MB GE - 11/7/17 1st DPWH LF 22.504 487 3/22/17 7/21/18 -0.01 O 0.392 0.240 0.150 0.03 0.059 0.05 92.10 - Construction Joint Venture Right of Way Acquisition), Zamboanga City Widening of Urdaneta Jct. - Dagupan Road, K0192+650 to Sta. Barbara, PANGASINAN 4TH 87.3% Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE 8/30/2016 1st & Final LF 49.000 236 3/9/15 10/30/15 0.03 C 0.44 0.133 0.3 0 0 0 0.8730 K0194+680, Sta. Barbara, Pangasinan Pangasinan DEO Satisfactory Widening of Carmen Jct.-Bayambang-Manat Road, Bayambang, PANGASINAN 4TH 89.7% Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE K0.190+169 - K0.193+864.60 (Bayambang Section), 11/26/2015 1st LF 49.000 264 3/11/15 11/29/15 0.0114 O 0.372 0.24 0.15 0.03 0.055 0.05 89.70% Pangasinan DEO Very Satisfactory Bayambang, Pangasinan KO202+695 - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Pangasinan 3rd Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE KO203+060 6/8/2015 1st LF 12.518 131 2/20/15 6/30/15 -7.60% O 0.351 0.3 0.074 0.03 0.045 0.033 83.30% - National Road including Drainage along Manila North Road DEO (Bobonan Section) Construction/ Improvement of Access Roads Leading to Airports, Seaports & Declared Tourism Destinations, Pangasinan 3rd Balungao, *92.3% Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE Concreting/Rehabilitation/Improvement of Peralta Road to 6/7/2017 1st & Final District Engineering LF 34.447 279 5/17/2016 2/19/2017 0.00 C 0.489 0.134 0.300 - - - 92.30 Pangasinan Very Satisfactory Mabini - San Andres Barangay Road Leading to Mt. Balungao Office Hilltop Adventure Widening of Permanent Bridges to more than two lanes Urdaneta City, Pangasinan 3rd Aquino-Dela Cruz Engineering & Construction 16751 L B MA GE 8/21/2017 1st LF 25.962 289 3/13/2017 12/26/2017 0.11 O 0.367 0.181 0.150 0.022 0.045 0.05 81.50 - including ROW at Mitura Bridge (B00726LZ) Pangasinan DEO

*1st/Final 29th Release Page 33 of 33 * For DPWH, only the region and PMO office are listed