29Th Release Page 1 of 33 * for DPWH, Only the Region and PMO Office Are Listed CPES Reports On-Going and Completed Projects from July 1, 2016 to June 30, 2019
Total Page:16
File Type:pdf, Size:1020Kb
CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Brgy. Kabac, Granby Trading And Construction 27554 L Balai Bantayan 1 6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory Bantayan, Cebu Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 Davao Del Norte 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - New Cortez-San Jose Carcor Panas Rd. Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Corella, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - New Cortez-San Jose Carcor Panas Rd. del Norte Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Tagum City, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - Km.1822+821, Apokon Sect. del Norte "R.R. Seismundo Construction & Supply" / Const. of Flood Control Structure (Sheet Piles & Grouted Monkayo, COMVAL JV-12-116 L A MA GE2 11/27/2012 1st XI LF 27.838 240 08/28/12 04/24/13 0.86 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - Davao Concrete Products Joint Venture Riprap) Agusan River, Brgy. Inambatan Province "R.R. Seismundo Construction & Supply" / Pantukan 2nd LD, Rechanneling and Construction of Dike in Kingking River, Compostela Valley Double J Construction And Supply Joint JV-16-948 L A MA GE Compostela Valley 3/20/18 1st/Final LF 44.251 185 3/10/17 9/10/17 0 C 0.475 0.133 0.3 - - - 90.80 *90.8% Very Satisfactory Mosahamat Section ( Left Side) DEO Venture Province Basey Pointe, Brgy. (Cavdeal) Cavite Ideal International Procurement of Fully Developed Lots and Complete Housing 84.13% 5599 L AAA Tingib, Basey, 01/26/18 Final NHA LF 290.000 862 3/7/2015 10/11/2017 -1.99 D 0.399 0.200 0.244 - - - 84.29 Construction And Development Corp. Units Satisfactory Samar (Cavdeal) Cavite Ideal International Brgy. Tingib, Basey, 5599 L AAA Basey Pointe 2 2/3/2018 1st NHA LF 225.387 636 06/25/16 03/26/18 -39.75 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 - Construction And Development Corp. Samar Repair/Rehab. of Drainage Canal along Sorsogon-Bacon- Bibincahan, *83.3% 0405 Construction & Supply 34735 L B SB GE 5/30/2017 1st & Final Sorsogon 1st DEO LF 2.841 90 12/11/2016 3/10/2017 0.00 C 0.400 0.133 0.300 - - - 83.30 Manito Road, Bibincahan, Sorsogon City Sorsogon City Satisfactory Construction of Flood Mitigation Structures (Baybay Dagat San Fernando, 0405 Construction & Supply 34735 L D SB GE Dike) Sitio Bacolod along Bito River, San Fernando, Masbate 6/14/2016 1st Masbate 3rd DEO LF 4.653 115 3/3/16 6/25/16 0.00 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% - Masbate Construction / Repair / Rehabilitation of Multi-Purpose 0405 Construction & Supply 34735 L B SB GE Monreal, Masbate 8/19/2017 1st Masbate 3rd DEO LF 3.881 150 11/4/2016 4/2/2017 0.00 O 0.488 0.133 0.300 - - - 92.10 - Building (Municipal Hall), Monreal, Masbate Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/ Improvement of *92.9% 11-16 Construction 29646 L AAA MA GE Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta. Bamban, Tarlac 11/21/17 1st & Final DPWH LF 45.616 147 4/17/17 9/10/17 0.00 C 0.496 0.133 0.300 - - - 92.90 Very Satisfactory 0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta. 0+129, Bamban, Tarlac 121 Construction Corporation (Formerly: 121 Improvement/Concreting with Drainage System along Brgy. Zaniga, 84.30% 21686 L D SB GE 11/29/2014 1st NCR LF 6.684 120 8/14/14 12/11/14 1.00% O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% Construction) Ballesteros Street Mandaluyong City Satisfactory Brgy. Kanluran, San Construction of Flood Control Structure, Brgy. Kanluran, San Vicente, Camarines Camarines Norte 89.6% 128 Dragon Construction And Supplies 35408 L B SB GE 3/14/2016 1st LF 0.949 30 3/23/15 4/22/15 - C 0.396 0.2 0.3 0 0 0 89.60% Vicente, Camarines Norte, 2nd Legislative District Norte, 2nd DEO Very Satisfactory Legislative District Slope Protection (Grouted Riprap) along Isabela-Maluso Rd., 2M Construction & Enterprises 33331 L C SB GE2 Basilan Province 3/13/2013 1st IX LF 4.842 75 02/15/13 04/30/13 3.25 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - Matarling Sect. at K15+190-K15+249 at Lubigan Vitali Zamboanga City 87.5% 2M Construction & Enterprises 33331 L B SB GB Construction of Water System Level II District Zamboanga 3/7/2016 1st LF 1.945 75 9/18/15 12/1/15 (+)1.33% C 0.428 0.147 0.3 0 0 0 87.50% DEO Satisfactory City Road Widening Including Drainage along Ipil-Magdaup Wharf Ipil, Zamboanga Zamboanga 2M Construction & Enterprises 33331 L B MA GE 3/13/18 2nd/Final LF 16.187 177 6/5/17 11/28/17 -1% C 0.487 0.201 0.278 - - - 96.60 92.92% Very Satisfactory Road (S01143MN) (K2014+800 - K2015+297) Sibugay Sibugay 2nd DEO Concreting of Barangay Camanggaan - Calapugan, FMR, Natividad, Pangasinan 3rd 2-R Construction & Supply 15304 L B MA GE 3/19/18 1st/Final LF 3.977 119 8/29/17 12/25/17 0.2101 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory Brgy. Camanggaan-Calapugan Pangasinan DEO Raising of Grade of Dike Agno River Basin Flood Control Asingan, PANGASINAN 3RD 91.1% 2-R Construction & Supply 15304 L C SB GE Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/2015 1st LF 9.167 120 8/26/15 12/23/15 0.05 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10% Pangasinan DEO Very Satisfactory K0364+(-219) to Off Carriageway Improvement at Lingayen Capitol Loop, K0364+836, Pangasinan 2nd *87.36% 2-R Construction & Supply 15304 L C SB GE 9/2/2016 Final LF 9.34 105 3/6/15 6/19/15 - C 0.473 0.133 0.3 - - - 90.60% K0364+(-219) to K0364+836, Lingayen, Pangasinan Lingayen, DEO Satisfactory Pangasinan Indv. Project - Rehab./Reconst. of National Roads w/ Slips, Iriga City, KO *92.7% 301 Engineers 38364 L B - GE Slope Collapse and Landslide along Iriga City-Masoli Road 479+700-KO 11/16/17 1st & Final DPWH LF 5.071 132 3/8/17 7/17/17 2.94 C 0.493 0.134 0.300 - - - 92.70 Very Satisfactory 479+923 Construction of School Building, Brgy. Caranan, Pasacao, Brgy. Caranan, Camarines Sur 1st 93% 301 Engineers 38364 L B SB GB Camarines Sur Pasacao, 8/25/2016 1st & Final LF 1.937 90 3/17/15 6/14/15 0.02 C 0.497 0.133 0.3 0 0 0 0.9300 DEO Very Satisfactory Camarines Sur Construction of One Storey Two Classroom (Toilet Attached) Cabadbaran City, 87.4% 3C'Sl Construction And Supply 36393 L D SB GB 3/14/2016 1st ADN DEO LF 1.927 90 10/15/15 1/12/16 0 C 0.441 0.133 0.3 0 0 0 87.40% Tolosa CES, Cabadbaran City, Agusan del Norte Agusan del Norte Satisfactory Rehabilitation of San Francisco River Control (San Francisco- *93.4% 3Diamonds Construction Corporation 35457 L B SB GE Maguiron Section) Guinobatan, Albay 11/6/17 1st & Final DPWH LF 9.328 105 7/8/17 10/20/17 16.57 C 0.500 0.134 0.300 - - - 93.40 Very Satisfactory Construction of Flood Control along Cabugao River, Brgy. Cabugao, Ilocos 3G A Construction & Supply 35033 L D SB GE 3/16/18 1st/Final Ilocos Sur 1st DEO LF 9.304 140 3/4/17 9/20/17 38.57% C 0.479 0.133 0.3 - - - 91.20 *91.20% Very Satisfactory Turod - Patac Sur Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project Analysis) Asin (KM 8)-Nangalisan 86.32% 3K Rock Engineering 27908 L A MB GE San Pascual, Tuba, Benguet-LU Road, K0273+707 - Tuba, Benguet 11/17/2016 2nd & Final Benguet 1st DEO LF 33.303 196 2/16/2016 8/29/2016 0.00 C 0.408 0.175 0.3 0 0 0 0.8830 Satisfactory K0273+728, K0273+790 - K0274+127, K0275+351 - K0275+613, K0275+629 - K0275+1014, K0275+1050 - K0275+1240, Tuba, Benguet *1st/Final 29th Release Page 1 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO.