Department of Public Works and Highways
Total Page:16
File Type:pdf, Size:1020Kb
Manapla Cadiz City Victorias City REPUBLIC OF THE PHILIPPINES Sagay City Escalante City Silay City Talisay City Negros Occidental 1st DEO Toboso Bacolod City DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Bacolod City DEO Murcia Calatrava Bago City Salvador Benedicto Pulupandan REGION VI San Carlos City Valladolid Negros Occidental 4th DEO San Enrique WESTERN VISAYAS La Carlota Pontevedra Canlaon La Castellana Vallehermoso Moises Padilla ILOILO CITY Hinigaran (Magallon) Isabela Binalbagan The Site Negros Occidental 2nd DEO Himamaylan Guihulngan City Negros Oriental 1st DEO PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG Ilog La Libertad Kabankalan City Jimalalud Cauayan Tayasan BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, Ayungon NEGROS Candoni Bindoy (Payabon) Sipalay City OCCIDENTAL NEGROS ISLAND K0016+000 - K0017+869 Negros Occidental 3rd DEO Mabinay Manjuyod Hinoba-an (Asia) Bais City BAGO CITY, NEGROS OCCIDENTAL Tanjay City Kalumboyan Pamplona Amlan (Ayuquitan) NEGROS STATION LIMIT: K0011+000 - K0012+000, K0012+000, K0014+000 - K0015+956, K0016+000 - K0017+869 San Jose Basay ORIENTAL N Sibulan Bayawan City Negros Oriental 2nd DEO (Tulong) Santa Catalina Dumaguete City Valencia (Luzurriaga) Bacong Negros Oriental 3rd DEO WIDTH = 14.00/17.20 m. Dauin Siaton Zamboanguita THICKNESS = 50 mm. V I C I N I T Y M A P NET LENGTH = 4.828 Km. / 19.839 lane km ROAD SECTION : BEG. OF PROJECT (BEG. OF SECTION 1) L = 1,982 m. L = 87 m. K0011+000 SECTION 1 SECTION 2 SECTION 3 TO BAGO CITY TO BACOLOD CITY END OF SECTION 1 BEG. OF SECTION 2 END OF SECTION 2 BEG. OF SECTION 3 END OF SECTION 3 K0012+000 K0014+000 K0015+956 K0016+000 K0017+869 LAYOUT PLAN S C A L E N T S INDEX OF SHEET 1 - LAYOUT PLAN, VICINITY MAP & INDEX OF SHEETS 2 - GENERAL NOTES, SUMMARY OF QUANTITIES, TYPICAL ROADWAY SECTION 3 - 8 - STRAIGHTLINE DIAGRAM PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, LAYOUT PLAN REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 VICINITY MAP 01 INDEX OF SHEETS JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO IV FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : GENERAL NOTES 1. ALIGNMENTS & GRADES ARE SUBJECT TO ADJUSTMENT TO SUIT EXISTING FIELD CONDITIONS. 2. DISTANCES AND ELEVATIONS ARE IN METERS UNLESS INDICATED OTHERWISE. 3. GRADE SHOWN ARE TOP OF FINISHED PAVEMENT. 4. ALL WORKS SHALL COMPLY WITH THE STANDARD SPECIFICATION FOR HIGHWAYS AND BRIDGES SUMMARY OF QUANTITIES REVISED 20013 & SPECIAL PROVISIONS & SUPPLEMENTAL SPECIFICATION PERTAINING TO THIS PROJECT. 5. WATERING & COMPACTI0N OF ALL EMBANKMENTS SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEMS. THE COST OF PERFORMANCE THEREOF SHALL BE CONSIDERED ITEM NO. DESCRIPTION UNIT QUANTITY REMARKS INCLUDED IN THE CONTRACT UNIT PRICE BID FOR OTHER ITEMS. 6. ARTICLE 4.7 OF THE GENERAL REQUIREMENTS & COVENANT IS HEREBY AMENDED AS FOLLOWS: THE 2 REMOVAL OF BUILDING, HOUSES, UTILITY POLES, FENCES & OTHER PUBLIC UTILITIES WILL NOT BE THE 302(2) EMULSIFIED ASPHALT m 70407.00 RESPONSIBILITY OF THE CONTRACTOR BUT WILL BE REMOVED BY THE " DPWH " PRIOR TO THE 2 CONSTRUCTION. 310(1)c BITUMINOUS CONCRETE SURFACE WEARING COURSE, HOT-LAID (50mm) m 70407.00 2 7. MISCELLANEOUS CLEARING, REMOVAL OF TREES, REMOVAL OF CONCRETE FLOORS, CONCRETE 612(1) REFLECTORIZED THERMOPLASTIC PAVEMENT MARKING m 2037.00 SIDEWALKS, OBSOLETE SEWER PIPES, INLETS & OTHER MISCELANEOUS REMOVAL NOT SHOWN IN THE PLANS SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEMS AND PAYMENTS SHALL BE CONSIDERED INCLUDED IN THE UNIT PRICE BID FOR THOSE ITEMS. 8. WHEN SHOWN IN THE PLAN OR AS DIRECTED BY THE ENGINEER, UNSUITABLE SUB-GRADE MATERIAL SHALL BE EXCAVATED BELOW THE GROUND SURFACE TO REQUIRED WIDTH & DEPTH, THE AREA TO BE EXCAVATED SHALL BE BACKFIELD WITH APPROVED MATERIAL. NO EMBANKMENT MATERIAL SHALL PLACED UNTIL THE FOUNDATION IS STABLE. 9. TO ALL CONSTRUCTION WITH PORTLAND CEMENT CONCRETE PAVEMENT SURFACE WHERE NO DETOUR IS AVAILABLE IF POSSIBLE TRAFFIC SHALL BE MADE TO PASS OUTSIDE OF EMBANKMENT PRISM IN ORDER TO MINIMIZE THE EFFECT OF VIBRATION TO THE SETTING CONCRETE. VEHICLE SHOULD REQUIRE TO TRAVEL IN VERY MUCH REDUCED SPEED. 10 EXACT LOCATIONS OF PRIVATE ENTRANCES, SIDEWALKS OR SIDE STREETS SHALL BE DETERMINED IN THE FIELD BY THE ENGINNER INCHARGED. ENTRANCES AND DRIVEWAYS TO PRIVATE PROPERTIES SHALL BE PAVED WITH CONCRETE PAVEMENTAS CASE MAYBE. 11 EXACT LOCATIONS, GRADIENTS, LENGTHS, TOP & INVERT ELEVATIONS OF ALL DRAINAGE STRUCTURES THAT ARE REQUIRED SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER IN - CHARGE. PIPE CULVERTS SHALL BE LAID SUCH GRADES THAT THERE WILL BE A CUSHION OF 0.60m OF FILL OVER THE TOP OF PIPE. 12 QUANTITIES ARE SUBJECT TO DECREASE OR INCREASE AS PER ACTUAL ACCOMPLISMENT AND AS CERTIFIED BY THE ENGINEER. 13 THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS OF AND PROVIDE ACCESSIBILITY FACILITIES FOR PERSONS WITH DISABILITY IN ACCORDANCE WITH D.O 37 S.2009. CL OF ROADWAY 2.00 m. 3.50 m. 3.50 m. 3.50 m. 3.50 m. 2.00 m. PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, GENERAL NOTES REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 SUMMARY OF QUANTITIES 02 TYPICAL ROAD SECTION JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO III FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 03 STRAIGHT LINE DIAGRAM JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO III FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 04 STRAIGHT LINE DIAGRAM JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO III FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 05 STRAIGHT LINE DIAGRAM JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO III FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 06 STRAIGHT LINE DIAGRAM JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO III FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 07 STRAIGHT LINE DIAGRAM JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO III FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, REGION VI, WESTERN VISAYAS K0016+000 - K0017+869 08 STRAIGHT LINE DIAGRAM JOSE ROY H. LAGON MARILOU G. ZAMORA JOSE AL V. FRUTO, CES E LEA N. DELFINADO, CESO III FORT SAN PEDRO RESERVATION, ILOILO CITY 11 ENGINEER IV OIC-CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR BAGO CITY, NEGROS OCCIDENTAL DATE : DATE : DATE : DATE : PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.