FY 2020 DENR FOI Registry

Total Page:16

File Type:pdf, Size:1020Kb

FY 2020 DENR FOI Registry FREEDOM OF INFORMATION 2020 162 Office: Regional Office FOI 2020 Year-Quarter Tracking Number Request Type Date Received Title of Request Extension? Status Date Finished Days Lapsed Cost Appeal/s filed? Remarks year and Internal FOI Tracking if request was lodged date request was title of information requested if the agency status of request date request was number of days fees paid by If the requesting Additional details about the request quarter of report number through eFOI or lodged by requesting requested for processed/finished by lapsed the requesting party or any other coverage standard (paper-based) party (YYYY-MM-DD) extension or the agency; if not yet facilitating the party for citizen filed an additional 20 working processed/finished, request; if facilitation of appeal for the days (YES or NO) indicate ONGOING finished within request; if specific request the same day, none, indicate ( YES or NO) indicate 0 FREE Rrequest for an Inventory of Affected Trees for the Proposed Cy 2020 2020-Q1 01-13-20 STANDARD 12/19/2019 Infrastructure Projects the Widening of Iloilo-Antique Road at Brgy. Supa, NO Successful 0 NO San Jose and Odiong, Sibalom, Antique Etc Request for the Re- Computation and Correction of Lot Data of Lot 1019-H, 2020-Q1 01-15-20 STANDARD 12/20/2019 Title No. T-137183 involving the property owned by M & L Agricultural and NO Successful 0 NO Industrial Coirpat Brgy. Fabrica, Sagay,City Request for Correction in the Discrepancy of Sublot Number reflected in the 2020-Q1 01-16-20 STANDARD 12/20/2019 Approved Survey Plan, of Lot 1187, owned by Nestor Aplinario et al. at Brgy. NO Successful 0 NO Cabatangan, Talisay City Request for the Certified copies of Lot Data Computations of the landholdings 2020-Q1 01-17-20 STANDARD 12/20/2019 Successful 0 NO Pontevedra Cad, Lot No. 1952 etc. Reqquest for Certification as to No Records on File of Lot Data Computation 2020-Q1 01-18-20 STANDARD 12/20/2019 Of Lot 40.d 8174 embraced by Title No. T-141136 involving the property NO Successful 0 NO owned by Cecelia Carreonet al, at brgy. Vlll, Victorias City Request for a Certified copy of Lot Data Computation and Plan Lot 1 and 2 2020-Q1 01-19-20 STANDARD 12/26/2019 Psu-110739 and Certification of Cadastral Lot Equivalent of Psu 110739, at NO Successful 0 NO brgy. Santol, San Dionisio, Iloilo 2020-Q1 01-20-20 STANDARD 12/26/2019 Request for the 2 Certified Copiues of Approved Ssurvey Plan and narrative NO Successful 0 NO TD of the landholdings Bsd-06-00021, Lot no.2669 at Nagba, Cuartero, Capiz Request for the Certified Copies of Approved Survey Plan of Lot 1081, Psd-06- 2020-Q1 01-21-20 STANDARD 12/26/2019 NO Successful 0 NO 030509 (AR) located at Brgy. Agsilong, Concepcion, Iloilo Request for the Cancellation of Approved Subdivision Plan of Lot 683, Title 2020-Q1 01-22-20 STANDARD 12/20/2019 NO Successful 0 NO No. T-112721 at brgy. San Isidro, E.B. Magalona, Negros Occidental Request for the Cancellation of Approved Subdivision Plan Psd-06-082443 2020-Q1 01-23-20 STANDARD 12/20/2019 NO Successful 0 NO (AR) lot No. 592-C, Title No. T-247133 at Brgy. Bulanon, Sagay City 2020-Q1 01-24-20 STANDARD 12/20/2019 Request for Cancellation of Approved Subdivision Plan Psd-06-082442 (AR) NO Successful 0 NO Lot No. 592-B, Lot No. 595-B, Title No. 218349 at brgy. Bulanon, Sagay City Request for the Cancellation of Title No. T-218347 at Brgy, Bulanon, Sagay 2020-Q1 01-25-20 STANDARD 12/20/2019 NO Successful 0 NO City Request for Cancellation of Approved Subdivision Plan Psd-06-052957 (AR) 2020-Q1 01-26-20 STANDARD 12/20/2019 Successful 0 NO Lot H-214004 Tiutle No. P-1883 at Brgy Jerusalem, Cadiz City Request for the Cancellation of Approved Subdivision Plan Psd-06-050513 2020-Q1 01-27-20 STANDARD 12/20/2019 (AR) Lot 2648-B LRC Psd 102 450, Title No. 22730 at Brgy. Libertad, NO Successful 0 NO Escalante, Negros Occidental Request for the Cancellation of Approved Subdivision Plan Psd-06-077932, 2020-Q1 01-28-20 STANDARD 12/20/2019 NO Successful 0 NO Lot 706 Cadiz CADASTRE Title No T-10521 at brgy. Sicaba, Cadiz City etc. Request for the Rejection of the Assigned Survey Number of unapproved 2020-Q1 01-29-20 STANDARD 12/20/2019 Subdivision Plans Pcs-06-004362(AR) Lot 885-G-I, Psd-06-06-00738 8 Lot NO Successful 0 NO 449-B at Brgy. Minapasok, Calatrava, Negros Occidental Reiterating Request for the Approval of the Extension of the Validity of Tree 2020-Q1 01-36-20 STANDARD 2/22//19 Cutting Permit for the Widening of the iloilo-Road Capiz at brgy. Batuan, YES Successful 0 NO Pototan, iloilo Request for a Certification (LUC Form No. 6) wether or not the subject land is 2020-Q1 01-65-20 STANDARD 12/11/2019 within NIPAS , Mossy and Virgin Forest etc.TCT No. 215214 Lot No 137-B-86- NO Successful 0 NO A at brgy. Cansilayan, Murcia, Negros Occ. Request for a Technical Description of Lot 2945/Lot Data 2020-Q1 01-71-20 STANDARD 1/10/2020 NO Successful 0 NO Computation/Certification that No Title/Patent Year-Quarter Tracking Number Request Type Date Received Title of Request Extension? Status Date Finished Days Lapsed Cost Appeal/s filed? Remarks Request for 10,000 bamboo Clums for a massive Tree Planting Activity on 2020-Q1 01-71-20 STANDARD 1/10/2020 NO Successful 0 NO june 2020 Focusing on the Floodway and the Jaro River banks Seeking Assistance to help locate the Lot 3, Plan Psd- 56734 under TCT No. 2020-Q1 01-78-20 STANDARD 11/14/2020 NO Successful 0 NO CLOA-T-312 of brgy. Sto. Rosario, Ajuy, Iloilo Request for Certification of Cadastral lot Equivalent for Lot 1-A-1, Psd 06- 2020-Q1 01-85-20 STANDARD 1/15/2020 NO Successful 0 NO 019245 with TCT 133887 at brgy. Pasig, Sara, Iloilo Request for Correction relative to the Preparation of Lot involved for Heading of Sublots of Psd-06-069080 (AR) under Survey Plan No. Psd 06-086344 AR 2020-Q1 01-86-20 STANDARD 1/15/2020 NO Successful 0 NO from corrected Plan bearing Lot 1, Psu 74903 under Psd-06-06960 AR at Brgy. Agbanawan, Banga, Aklan Request for the Cancellation of Approved Subdivision Plan Csd-060409- 2020-Q1 01-87-20 STANDARD 1/15/2019 NO Successful 0 NO 004371 (AR) covering Lot 1630, Cad 992-D at brgy. Rosal, Libacao, Aklan Request for Correction on the Approved Survey Plan under Psd-06-094954 2020-Q1 01-88-20 STANDARD 1/9/2020 (AR) covered by Lot No. 387, Csd 1343-D at brgy. Quezon, San Carlos City, NO Successful 0 NO Negros Occ. Request for a Certified copy of Lot Data Computation of the landholdings Alex 2020-Q1 01-89-20 STANDARD 1/16/2020 NO Successful 0 NO Vicaran Lot N0. 9156, Inabasan Sibalom, Antique etc. Reqquest for Correction/Change of Bearing of Lot Data Reference of Lot 2, 2020-Q1 01-90-20 STANDARD 1/16/2020 bsd-06-003404 (AR) by Title No. CLOA T-10333 at Brgy. Sto. Tomas, Btac. NO Successful 0 NO Viejo, Iloilo Request for the Cancellation of Approved Subdivision Plan Csd 06-009445 2020-Q1 01-91-20 STANDARD 1/15/2019 NO Successful 0 NO (AR) Lot portion of Lot 7900. Cad. 786 - D at brgy. Sigcay, Banga, Aklan Request for Cancellation of Approved Subdivision Plan Csd-060409-0044370 2020-Q1 01-92-20 STANDARD 1/15/2019 NO Successful 0 NO (AR) Lot 1635 Cad. 992-D at Brgy. Rosal, Libacao, Aklan Request for Cancellation of Approved Subdivision Plan Csd-060409-0044370 2020-Q1 01-93-20 STANDARD 1/17/2020 NO Successful 0 NO (AR) Lot 1635 Cad. 992-D at Brgy. Rosal, Libacao, Aklan Request for Certification that No Records on File of Lot 7802 involving the 2020-Q1 01-116-20 STANDARD 1/17/2020 NO Successful 0 NO pproperty owned by Pepito Hernaez at Brgy. Fatima, Tobias, |Fornier, Antique Request for a Certified copy of Lot Data Computation of the landholding of lot 2020-Q1 01-117-20 STANDARD 1/2/2020 10102-E Pandana, Valderrama, Survey Survey No. Csd-06-007060 (AR) etc. Successful 0 NO Request for a Correction/Change of Distance in reference Data of lot 7585, 2020-Q1 01-118-20 STANDARD 1/17/2020 Cad 261, Cabatuan Cadastre along Line 18-19 at Brgy. Ito Sur, Cabatuan, NO Successful 0 NO Iloilo Request for a Certification as to Cadastral Lot Equivalent and its 2020-Q1 01-119-20 STANDARD 1/17/2020 corresponding Area Plan Psu-6193, Title no. T-59390 at Brgy. M. Chavez, San NO Successful 0 NO Lorenzo, Guimaras Request for the Certifified copies of Lot Data Computations of the 2020-Q1 01-12020 STANDARD 1/16/2019 landholdings T-131654 Paglumotan, Norberto, Tabugon, Negros Occiden tal Successful 0 NO etc. Request for a Certification as to the True and Correct Area of lot 950, Cad 2020-Q1 01-121-20 STANDARD 1/16/2019 NO Successful 0 NO 605, Case 5 Title no. CLOA-5710 at Brgy. San Roque, Libertad, Antique Request for the Cancellation of Approved Subdivision Plan Psd-06-063654, 2020-Q1 01-122-20 STANDARD 1/22/2019 Lot No.
Recommended publications
  • CSHP) DOLE-Regional Office No
    REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 March 2019 Date No. Project Owner/General Contractor Project Name and Location Remarks Approved DPWH Region VI / MGB CONSTRUCTION & IMPROVEMENT/REHABILILTATION OF BORACAY 1 03/12/2019 Concurred TRADING CIRCUMFERENTIAL ROAD SECTION 3 - BORACAY ISLAND DPWH Region VI / S.T. SALCEDO 18GO0103 REPAIR/MAINTENANCE OF THE OFFICE 2 03/15/2019 Concurred CONSTRUCTION CORP. MAIN/CANTEEN BUILDING, OFFICE VI COMPOUND PHASE II 18GF0123 CONSTRUCTION OF MULTI-PURPOSE BUILDING 3 DPWH 1st DEO / J.E. TICO CONST., CO., INC. (CLASSROOM) - UP VISAYAS ILOILO HIGH SCHOOL - MIAG- 03/15/2019 Concurred AO PROPOSED ADMINISTRATION OFFICE BUILDING WITH 4 BY ADMINISTRATION / ALVIN JAMES GUINTO 03/07/2019 Approved FENCING BY ADMINISTRATION / ALPHA-ONE REALTY 5 PROPOSED TWO-STOREY RESIDENTIAL HOUSE 03/07/2019 Approved DEV'T CORP. BY ADMINISTRATION / SPS KEITH JASPER & 6 PROPOSED TWO-STOREY APARTMENT 03/07/2019 Approved NOVIMIE ESPINA BY ADMINISTRATION / YASSIER DAN PROPOSED RENOVATION OF A 2-STOREY RESIDENTIAL 7 03/08/2019 Approved PENDON BUILDING BY ADMINISTRATION / SPS JUANCHO & PROPOSED RENOVATION OF A 2-STOREY RESIDENTIAL 8 03/08/2019 Approved ROSALINDA GUILLAMAS BUILDING BY ADMINISTRATION / MRS. EDNA 9 PROPOSED TWO-STOREY RESIDENTIAL 03/08/2019 Approved SOBERANO & MR. DANTE SOBERANO BY ADMINISTRATION / VANESSA BORRES 10 PROPOSED TWO-STOREY COMMERCIAL BUILDING 03/12/2019 Approved ROBLES PROPOSED ONE (1) UNIT, TWO (2) STOREY APARTMENT 11 BY ADMINISTRATION / JOCELYN TORECILLO 03/12/2019 Approved BUILDING PROPOSED ONE (1) UNIT,ONE (1) STOREY RESIDENTIAL 12 BY ADMINISTRATION / MARIA PAZ SUAREZ 03/12/2019 Approved BUILDING WITH ROOF DECK 13 BY ADMINISTRATION / PABLO T.
    [Show full text]
  • 29Th Release Page 1 of 33 * for DPWH, Only the Region and PMO Office Are Listed CPES Reports On-Going and Completed Projects from July 1, 2016 to June 30, 2019
    CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Brgy. Kabac, Granby Trading And Construction 27554 L Balai Bantayan 1 6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory Bantayan, Cebu Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 Davao Del Norte 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - New Cortez-San Jose Carcor Panas Rd. Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Corella, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - New Cortez-San Jose Carcor Panas Rd. del Norte Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Tagum City, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - Km.1822+821, Apokon Sect.
    [Show full text]
  • Republic of the Philippines Office of The
    REPUBLIC OF THE PHILIPPINES OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL IMPROVEMENT / WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH ROAD K0046+(-910) - K0048+533; K0059+781 - K0060+307.50; K0065+448 - K0071+696.60 MUN. OF BINALBAGAN, NEGROS OCCIDENTAL SECTION ID = S00127NR NET LENGTH = 10.06 KM WIDTH = 3.35 METERS THICKNESS = 0.30 METERS BEGINNING OF PROJECT BEGINNING OF SECTION 1 STA. 45+090.00 ( K0046+(-910) ) N W E END OF SECTION 1 ( BEG. EXISTING WIDENING ) STA. 48+502.05 ( K0048+533 ) S 1BDJGJD0DFBO INDEX OF SHEETS: 8FTU1IJMJQQJOF4FB NO. SHEET CONTENTS 1 LAY OUT PLAN, VICINITY MAP & INDEX OF SHEETS 2 TYPICAL ROAD SECTION DETAIL PAVEMENT DESIGN PARAMETER GENERAL NOTES TYPICAL DETAIL OF OPEN LINED CANAL Project Site THERMOPLASTIC PAVEMENT MARKINGS DETAIL END OF SECTION 2 3 SUMMARY OF QUANTITIES STA. 60+285.74 ( K0060+307.50 ) SCHEDULE OF ITEMS BEGINNING OF SECTION 2 ( END OF EXISTING WIDENING ) STA. 59+781.00 ( K0059+781 ) SPECIFICATIONS GROUTED RIPRAP DETAIL ELEVATION DETAILS OF WEEPHOLES L O C A T I O N M A P 4 STANDARD PLAN OF PORTLAND CEMENT CONCRETE PAVEMENT Manapla Cadiz City 5 STANDARD PLAN OF METAL GUARDRAIL Sagay City Victorias City Escalante City 6 STANDARD PLAN OF CHEVRON SIGNS Silay City 7 STANDARD REINFORCED CONCRETE PIPE CULVERT DETAILS Talisay City Negros Occidental 1st DEO BEGINNING OF SECTION 3 Toboso ( MAGSAYSAY BR. APP. "B" ) Bacolod City 8 - 22 PLAN & PROFILE STA. 65+448.00 ( K0065+448 ) Bacolod City DEO Murcia Calatrava Bago City 23 - CROSS-SECTION
    [Show full text]
  • World Bank Document
    El467 BACOLOD - KABANICALAN ROAD ( Bacolod - San Enrique Section) 10 XSACOL,OI) - ICABANI(ALAN ROAD ( Uacolod - San 13iriquc Scction) Public Disclosure Authorized 1. EXECUTIVE SUMMARY 1.1 Brief Inti-oduclion 'Thc Environmental Impact Assessrncnt (EIA) Study of the proposed Bacolod - ICabanIcalan Road (Bacolod - San Enrique Section) Project is presented in the form of an Environmental Impact Statement (EIS) document to secure an Environmental Compliance Certificate (ECC) in accordance with the requirement of the revised rules and rcgu lations for the EIS System en1 bodied in the DENR's Department Adn~inistrativc Ordcr (11.40) No. 96 -37. Public Disclosure Authorized 1.2 Bricf Description of Mcihodology 'I'lic preparations of the EIS was carried out through the collection of primary and secondary data obtained from various sources sucl~as envirollniental reporls, provillcial and municipal profiles, ~ncdiunitern1 development plans, orlicr publisl~cd rcports and Ieasibility studies undertalten by the DI'WI-1. Site illspections and actual interviews with affected persons provided first hand information. Elldorsernent from tlle LGU's and public consultation documents were also gathered to establish the s~1pp01-tncedcd for the proposed project. 1.3 Scopc and Liinitatioln of the EIS study Public Disclosure Authorized 'file project involves wicicning or tlie existing two-lane road from Bacolod Cily to Sail Enriquc town proper. Thc BIA study focuses on the entire stretch of tlie road exccpt in areas wl~cretl~ere are existing ongoing works under tlie Regular Infrastructure Projects of tlie Bago and Bacolod City District Ellgineering Orfices. The stitdy also talces into consideration the social and pllysical impacts of the project specifically on affectcd Saniilics and structures due to widening.
    [Show full text]
  • Department of Public Works and Highways 621 Xviii
    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 621 XVIII. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS A. OFFICE OF THE SECRETARY For general administration and support, support to operations, and operations including locally-funded and foreign-assisted projects, as indicated hereunder.................................................................................................... P 100,826,083,000 ---------------- New Appropriations, by Program/Project ====================================== Current Operating Expenditures Maintenance and other Personal Operating Capital Total Services Expenses Outlays A. PROGRAMS I. General Administration and Support a. General Administration and Support Services P 605,721,000 P P P 605,721,000 --------------- ---------------- Sub-Total, General Administration and Support 605,721,000 605,721,000 --------------- ---------------- II. Support to Operations a. Policy Formulation, Program Planning and Standards Development 234,028,000 234,028,000 b. Regional Support (Planning and Design, Construction, Maintenance and Material Quality Control and Hydrology Divisions) 216,190,000 216,190,000 c. Operational Support for the Maintenance and Repair of Infrastructure Facilities and Other Related Activities 252,462,000 252,462,000 --------------- ---------------- Sub-Total, Support to Operations 702,680,000 702,680,000 --------------- ---------------- III. Operations a. Construction, Maintenance, Repair and Rehabilitation of Infrastructure Facilities 4,227,000,000 15,000,000 4,242,000,000 b. Maintenance, Repair and Rehabilitation
    [Show full text]
  • CSHP) DOLE-Regional Office No
    REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 March 2018 Date No. Project Owner/General Contractor Project Name and Location Remarks Approved Construction of Himamaylan By-Pass Bridge Himamaylan,Negros 1 Galeno Construction 1-Feb-18 Concurred Occidental 2 Galeno Construction Construction of Talave Bridge San Carlos, Negros occidental 1-Feb-18 Concurred 17RE0173-CONSTRUCTION OF ONE(1) UNIT, ONE(1) STORY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) AT 3 HUMMING BIRD CONST. & SUPPLY 2-Feb-18 Concurred RAMON TORRES SAGASA NATIONAL HIGH SCHOOL BAGO CITY, NEGROS OCCIDENTAL. 17RE0171CONSTRUCTION OF ONE(1) UNIT, ONE(1) STOREY, 4 HUMMING BIRD CONST. & SUPPLY ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) AT 2-Feb-18 Concurred RAMON TORRES SAGASA 17RE0126-CONSTRUCTION OF FARM TO MILL ROAD, 5 JAIME B. CHING ENTERPRISES CROSSING MERCED TO MERCED SEVILLINO PROPER DBS 2-Feb-18 Concurred PONTEVEDRA, NEGROS OCCIDENTAL 17RE0166-CONSTRUCTION OF THREE(3) UNITS, ONE(1) STOREY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) 6 JAIME B. CHING ENTERPRISES 2-Feb-18 Concurred AT RAMON TOREES MA-AO SUGAR CENTRAL NATIONAL HIGH SCHOOL BAGO CITY, NEGROS OCCIDENTAL 17RE0167-CONSTRUCTION OF TWO(2) UNITS, ONE(1) STOREY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) 7 JAIME B. CHING ENTERPRISES 2-Feb-18 Concurred AT RAMON TORRES MA-AO SUGAR CENTRAL NATIONAL HIGH SCHOOL 17RE0183-CONSTRUCTION OF TWO(2) UNITS, ONE(1) RA CONSTRUCTION AND GENERAL STOREY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) 8 2-Feb-18 Concurred MERCHANDISE VALLADOLID
    [Show full text]
  • (CSHP) DOLE-Regional Office No. 6 September 2018
    REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 September 2018 Date No. Project Owner/General Contractor Project Name and Location Remarks Approved 18GM0186 Construction of One (1) Unit One (1) Storey ICT DPWH Negros Occidental - 3rd DEO / Golden 1 Laboratory Building at Caningay National High School - Banga 09/20/2018 Concurred Pace Construction Extension at Candoni, Negros Occidental 18GM0109 Construction of 1 Unit Two (2) Storey Science DPWH Negros Occidental - 3rd DEO / Rock 2 Laboratory Building at Salong NHS, Kabankalan City, Negros 09/20/2018 Concurred Willian Construction & Supply Occidental DPWH-Negros Occidental 2nd DEO/Jaime B. Concreting of Access Road at Prk. Sua-Trinidad, Brgy. DSB, 3 09/19/2018 Concurred Ching Pontevedra, Negros Occidental DPWH-Negros Occidental 2nd DEO/Jaime B. Improvement of Multi-purpose Government Center (MPGC) at 4 09/19/2018 Concurred Ching Brgy. 1-Poblacion, Pontevedra, Negros Occidental DPWH-Negros Occidental 2nd DEO/Jaime B. Concrete Paving at Brgy. Bta. Rizal, Pontevedra, Negros 5 09/19/2018 Concurred Ching Occidental Upgrading of Yonson (Castellano) - Macasilao Provincial Road DPWH-Negros Occidental 2nd DEO/Jaime B. 6 (Phase III), Rural Access (Road Upgrading), Brgy. Macasilao, 09/17/2018 Concurred Ching Calatrava, Neg. Occ. DPWH-Bacolod City Deo / J.H.Pajara 18GO0079 Talave Br. (BO0182NR) along Bacolod North Road., 7 Construction Corp. / Silver Dragon Construction. 09/10/2018 Concurred San Carlos City, Negros Occidental Lumber and Glass Supply, Inc. DPWH-Bacolod City Deo / J.H.Pajara 18GO0063 Construction of Revetment Wall along Ilog-Bongol 8 Construction Corp. / Silver Dragon Construction.
    [Show full text]
  • Department of Public Works and Highways
    Manapla Cadiz City Victorias City REPUBLIC OF THE PHILIPPINES Sagay City Escalante City Silay City Talisay City Negros Occidental 1st DEO Toboso Bacolod City DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Bacolod City DEO Murcia Calatrava Bago City Salvador Benedicto Pulupandan REGION VI San Carlos City Valladolid Negros Occidental 4th DEO San Enrique WESTERN VISAYAS La Carlota Pontevedra Canlaon La Castellana Vallehermoso Moises Padilla ILOILO CITY Hinigaran (Magallon) Isabela Binalbagan The Site Negros Occidental 2nd DEO Himamaylan Guihulngan City Negros Oriental 1st DEO PREVENTIVE MAINTENANCE OF ROAD: (ASPHALT OVERLAY) ALONG Ilog La Libertad Kabankalan City Jimalalud Cauayan Tayasan BACOLOD SOUTH ROAD - K0011+000 - K0012+000, K0014+000 - K0015+956, Ayungon NEGROS Candoni Bindoy (Payabon) Sipalay City OCCIDENTAL NEGROS ISLAND K0016+000 - K0017+869 Negros Occidental 3rd DEO Mabinay Manjuyod Hinoba-an (Asia) Bais City BAGO CITY, NEGROS OCCIDENTAL Tanjay City Kalumboyan Pamplona Amlan (Ayuquitan) NEGROS STATION LIMIT: K0011+000 - K0012+000, K0012+000, K0014+000 - K0015+956, K0016+000 - K0017+869 San Jose Basay ORIENTAL N Sibulan Bayawan City Negros Oriental 2nd DEO (Tulong) Santa Catalina Dumaguete City Valencia (Luzurriaga) Bacong Negros Oriental 3rd DEO WIDTH = 14.00/17.20 m. Dauin Siaton Zamboanguita THICKNESS = 50 mm. V I C I N I T Y M A P NET LENGTH = 4.828 Km. / 19.839 lane km ROAD SECTION : BEG. OF PROJECT (BEG. OF SECTION 1) L = 1,982 m. L = 87 m. K0011+000 SECTION 1 SECTION 2 SECTION 3 TO BAGO CITY TO BACOLOD CITY END OF SECTION 1 BEG. OF SECTION 2 END OF SECTION 2 BEG. OF SECTION 3 END OF SECTION 3 K0012+000 K0014+000 K0015+956 K0016+000 K0017+869 LAYOUT PLAN S C A L E N T S INDEX OF SHEET 1 - LAYOUT PLAN, VICINITY MAP & INDEX OF SHEETS 2 - GENERAL NOTES, SUMMARY OF QUANTITIES, TYPICAL ROADWAY SECTION 3 - 8 - STRAIGHTLINE DIAGRAM PROJECT TITLE / LOCATION : SHEET CONTENTS : PREPARED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.
    [Show full text]
  • DPWH Atlas 1,000,000 1,000,000
    IV. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS A. OFFICE OF THE SECRETARY Current Operating Expenditures ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ Maintenance and Other Personal Operating Capital Services Expenses Outlays Total ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ B. PROJECT(s) I. Locally-Funded Project(s) a. National Arterial and Secondary National Roads and Bridges 61,312,377,000 61,312,377,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ 1. Urgent National Arterial/Secondary Roads and Bridges 35,942,030,000 35,942,030,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ a. Traffic Decongestion 4,378,406,000 4,378,406,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ 1. Metro Manila 1,965,430,000 1,965,430,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ a. Construction/ Improvement (Concreting/ Widening) / Rehabilitation of NAIA Expressway and other Major Roads in Metro Manila 300,000,000 300,000,000 b. Opening/ Concreting of Taguig Diversion Road, Taguig 60,000,000 60,000,000 c. Concreting of Congressional Avenue Extension, Quezon City 215,000,000 215,000,000 d. Construction (Opening) of Circumferential Road 6 (C-6) Including RROW 150,000,000 150,000,000 e. Construction of Pres. Garcia Avenue(C-5) Extension 250,000,000 250,000,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ 1. Sucat to Coastal Section including ROW 187,000,000 187,000,000 2. C.P. Garcia to Magsaysay Avenue 63,000,000 63,000,000 f. Widening/Concreting of McArthur Highway (Manila North Road) including Traffic Management 940,430,000 940,430,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ 1. Meycauayan (Bulacan) to Mabalacat (Pampanga), (Intermittent Sections) 745,000,000 745,000,000 ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ a. Civil Works 595,000,000 595,000,000 b. Traffic Management 150,000,000 150,000,000 2. Tarlac Province (Intermittent Sections) 165,430,000 165,430,000 3. Urdaneta City, Pangasinan including ROW 30,000,000 30,000,000 g.
    [Show full text]
  • Philippines-USD-Payout-Locations.Pdf
    Network Agent Name Agent Location Name Address Line 1 Address Line 2 City Province Postal Code Phone Code City Phone Number I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC. - BANGUE TORRIJOS STREET ZONE 5 BANGUED ZONE 5 BANGUED ABRA 2800 I-PAY COMMERCE VENTURES INC RAMAS UYPITCHING SONS INC A BITO POBLACION ABUYOG 6510 I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC. - AGOO L NATIONAL HIGHWAY SAN ANTONIO AGOO LA UNION 2504 I-PAY COMMERCE VENTURES INC RAMAS UYPITCHING SONS INC. - P SO UBOS REAL ST. AJUY 5012 I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC. - ALAMIN MARCOS AVE BRGY PALAMIS ALAMINOS CITY PANGASINAN I-PAY COMMERCE VENTURES INC RAMAS UYPITCHING SONS INC. - A 50 KINABRANAN KINABRANAN ZONE I (POB.) ALLEN SAMAR 6405 I-PAY COMMERCE VENTURES INC RAMAS UYPITCHING SONS INC - AL MURAYAN POBLACION ALTAVAS 5616 I-PAY COMMERCE VENTURES INC DIGITAL PARADISE INC. - MARQUE 3RD LEVEL SPACE 3050 MARQUEE MALL ANGELES PAMPANGA 2009 HOZUM CORP 1226 CANDD MCARTHUR HIGHWAY NINOY AQUINO I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC ANGELE MARISOL ANGELES PAMPANGA 2009 I-PAY COMMERCE VENTURES INC DIGITAL PARADISE INC (NETOPIA) P OLIVEROS 3 CORNER G MASANGKAY ST G/F/F MARIKINA VALLEY CUPANG ANTIPOLO RIZAL 1870 I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC COGEO SITIO KASAPI MARCOS HI WAY BAGONG NAYON ANTIPOLO RIZAL 1870 I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC MASINA 195 MARCOS HIGHWAY MAYAMOT ANTIPOLO RIZAL 1870 SUMULONG MEMORIAL CIRCLE CIRCUMFERENTIAL RD CHRISTMAR I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC. SAN ROQ VILL ANTIPOLO RIZAL 1870 I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC APALIT MCARTHUR HIGHWAY BRGY SAMPALOC APALIT PAMPANGA 2016 I-PAY COMMERCE VENTURES INC LUZON RAM CYCLES INC.
    [Show full text]
  • (CSHP) DOLE-Regional Office No. 6 March 2018
    REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 March 2018 Date No. Project Owner/General Contractor Project Name and Location Remarks Approved Upgrading/Expansion/Improvement of City Health Office, Bacolod 1 Silvergraces Construction & Construction Supply 03/01/18 Concurred City Supreme ABF Construction & Construction Supply Construction of Farm to Mill Road of National Highway, Brgy. Luna 2 03/01/18 Concurred Company, Inc. to Brgy. Andres Bonifacio, Cadiz City, Negros Occidental Construction/Rehabilitation of Accessibility Facilities for Physically 3 Silvergraces Construction & Construction Supply 03/01/18 Concurred Challenged Person 18GM0041 - Construction of KM. 110 to Sitio Mahayag, Brgy. 4 R.A.G. Corona Construction & Aggregates Supply 03/01/18 Concurred Dancalan, Ilog, Negros Occidental Construction of One (1) Storey - Two (2) Classroom at A. Lizares 5 Silvergraces Construction & Construction Supply 03/01/18 Concurred Elem. School, Brgy. Granada, Bacolod City Rehabilitation of Multi-Purpose Building Francisco R. Flores 6 Gilbor Milestone Const. Svcs & Supply 03/02/18 Concurred Elementary School at Brgy. Pta. Taytay, Bacolod City Retrofitting/Strengthening of Pahanocoy Bridge 3 (B00327NR) 7 Jaime B. Ching Enterprises along Bacolod Circumferential Road at Brgy. Pahanocoy, Bacolod 03/06/18 Concurred City 17RC0076 - Construction of 1 - Unit 1 - Storey 2 Classroom 8 CGGFR Const. and Const. Supply (7M*18M Plus Corridor) School Building at Riverside Elementary 03/06/18 Concurred School, Isabela, Negros Occidental 17REO110 Repair/Maintenance of Drainage Channel along Bago 9 Sans Construction & Supply 03/06/18 Concurred Mambucal Road at Bago City, Negros Occidental 10 Silvergraces Construction & Construction Supply Construction of Roads at Brgy.
    [Show full text]
  • 4Th Quarter 2015 Page 1 of 27 DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 4Th Quarter CY 2015
    DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 4th Quarter CY 2015 CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL RATING/ No. of No. of NAME OF LICENSE DATE of NO. of *IMPL. FUNDING SLIPPA CPES VISIT L/F AMOUNT DUR STATUS QUALITATIVE REMARKS Project Contractor CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION EVALUATION VISIT AGENCY SOURCE STARTED COMPGE (%) 0.40/0.50 0.30/0.20 0.15/0.30 0.030 0.070 0.050 RATING (Php, M) (C.D.) DESCRIPTION 12-30 CONSTRUCTION Construction of 1-CL Trinidad Palawan 1st 87.7% 1 1 37025 L A SB GB Roxas, Palawan 11/13/2015 1st/Final LF 1.070 90 42008 42097 0.00% C 0.444 0.133 0.300 - - - 87.70 AHD & SUPPLY Cario PS DEO Satisfactory Raising of Grade of Dike Agno River Basin Flood Control 2-R CONSTRUCTION & PANGASINAN 2 2 15304 L C SB GE Project (Phase III), Brgy. Asingan, Pangasinan 11/16/2015 First LF 9.167 120 8/26/2015 12/23/2015 0.05 OG 0.391 0.240 0.150 0.030 0.050 0.050 91.10 - AHD SUPPLY 3RD DEO Cabalitian, Asingan, Pangasinan Rehabilitation/Major Repair of Permanent Bridges Tagbinunga Bridge (B00549LT) along Daang Leyte Fifth 91.7% 3 3 3A'S BUILDERS 33251 L D SB GE Mahaplag, Leyte 11/15/2015 1st/Final LF 5.403 150 3/2/2015 7/29/2015 0.00% C 0.484 0.133 0.300 - - - 91.70 AHD Maharlika (LT), Mahaplag, Leyte DEO Very Satisfactory Construction/Rehabilitation of Barangay Poblacion II, 722 CONSTRUCTION, Road with Drainage, Barangay Phase III Constantino, Bulacan 92.6% 4 4 INC.
    [Show full text]