CPES Report July 1-2005 to June 30-2008.Pdf CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB) 3/F, Jupiter Bldg., #56 Jupiter St., Bel-Air Village, Makati City Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791 CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports - On-going and Completed Projects from July 1, 2005- June 30, 2008 BACKGROUND: This report is prepared in connection with the REPORT COVERAGE: implementation of Constructors Performance Evaluation System This report contains CPES rating and other project-related (CPES) pursuant to Section 12, Annex E - Evaluation of information of on-going and completed foreign assisted (FA) and Contractors Performance of the Implementing Rules and locally funded (LF) infrastructure projects being undertaken by Regulations (IRR) of RA No. 9184 (Government Procurement either local, foreign or joint venture constructors. The projects Reform Act). Item 4 - Submission and Dissemination of presented in these report covers: road, bridge, housing, building, Evaluation Results of Section 12, specifically mandated PDCB to ports and harbor, irrigation and flood control, and water supply consolidate the CPES evaluation results of all ongoing and projects. completed projects and disseminate the same to all offices/agencies/corporations concerned. REPORT CONTENTS: USES OF CPES INFORMATION: The CPES rating and other information is designed to Presented in this report are the names of constructors serve the information needs of the following: a) government arranged alphabetically with the corresponding project agencies undertaking infrastructure projects; b) industry planners classification. Information available in this report comprises three and decision makers, c) constructors, d) project owners, e) (3) parts, as follows: 1) Constructor General Information; 2) banking and financing institutions, f) insurance companies, g) Project Data; and 3) CPES Rating. consulting firms, h) professional associations, and i) embassies. Information on contractors CPES ratings shall be used for Part 1 of the report includes the name of constructor/s and the following purposes: a) Pre-qualification/Eligibility Screening of PCAB License Number. Constructors; b) Awarding of Contracts; c) Project Monitoring and Control; d) Issuance of Certificate of Completion; e) Policy Formulation/Review; f) Industry Planning; and g) Granting of Information contained in Part 2 pertains to the project Incentives/Awards, and in adopting measure to further improve project name, Implementing Agency, contract amount, and status performance of contractors in the prosecution of government of project (on-going or completed). projects. 1 Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental, safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description. SOURCES OF INFORMATION Data contained in this report were culled from the CPES Summary Report submitted by the *Departments of Public Works and Highways (DPWH), Science and Technology (DOST), National Irrigation Administration (NIA), National Housing Authority, Philippine Ports Authority (PPA), Pasig River Rehabilitation Commission (PRRC), and Bases Conversion Development Authority (BCDA) covering the period July 1, 2005 – June 30, 2008. With regards to data on negative slippage, this is when constructor got 0.00 on time this matter may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other Related Problems. Please see the enumerated problems on each classification on page 5 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project. For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned implementing agencies listed below: Melrose Pailma (DPWH) Tess Pantalla (NIA) Ma. Otelia F. Eclavea (NHA) Amy Gamay (PRRC) Bong Fortunado (BCDA Tel. Nos. 304-3511 Tel. Nos. 927-0923 Tel. Nos. 928-4561 Tel. Nos. 433-3444 Tel. Nos. 816-6666 Arnaldo C. Reyes (DOST) Arnold Villegas (PPA) Tel. Nos. 837-2071 loc. 2120 527-8356 loc. 356 For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 3rd Floor, Jupiter 1 Building, 56 Jupiter Street, Bel-Air Village, Makati City; call us at 897-0791/896-1801; or e-mail us at [email protected]. You may access this report on this website http://www.gppb.gov.ph. 2 CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES I. ASPECTS OF EVALUATION 1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood Control and 70 % for Vertical Projects such as Housing, Building, Power Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be subjected to just one (1) final visit. 2. Upon Completion (40 % for Horizontal Projects and 30 % for Vertical Projects)- final visit when the Implementing Office reported 100 % completion II. CRITERIA FOR EVALUATION Amended Guidelines as Approved by NEDA Infracom 19 May 2005 During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Materials 0.30 Time 0.10 Time 0.30 Facilities 0.03 Total 1.00 Environmental, Safety 0.07 and Health (ESH) Resources Deployment 0.10 Total 1.00 3 As approved by NEDA Infracom 30 January 1998 During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Time 0.50 Time 0.10 Facilities 0.03 Total 1.00 Environmental, Safety 0.07 Resources Deployment 0.10 Total 1.00 III. CPES RATING & ITS QUALITATIVE DESCRIPTION AS APPROVED MAY 2005 *CPES RATING/QUALITATIVE DESCRIPTION CODE DESCRIPTION >90% Outstanding >80% but < 90% Very Satisfactory >70% but < 80% Satisfactory >60% but < 70% Fair < 60% Poor 4 UNIFORM CODING SCHEME FOR THE CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) - IMPLEMENTING GUIDELINES *CAUSES OF DELAY CONSTRUCTOR-RELATED PROBLEMS AGENCY RELATED PROBLEMS C-W01 - Insufficient manpower deployed in project site A-VO1- Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time extension C-EO2 - Lack/Insufficient/Inadequate equipment deployed in project site A-SO1- Delays in the approval of suspension order C-MO1- Lack/Inadequate/Insufficient supply of construction A-DO1- Changes in construction designs Materials A-FO1- Delays in the release of funds C-RO1- Lack of financial resources A-RO1- Right of Way (ROW) acquisition problem (squatter relocation problems, relocation of of utilities, (i.e. PLDT, MERALCO posts and other similar cases) 5 CAUSES OF DELAY OTHER- RELATED PROBLEMS O-WO1- Unfavorable weather condition (Occurrence of natural Calamities; occurrence of flooding/ siltation on site; Unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.) 6 CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports - On-going and Completed Projects from July 1, 2005 to June 30, 2008 FUNDIN CATEGORY PROJECT DATE of CONTRACT DATE SLIPP CPES NAME of LICENSE NO. of IMPL. G STATU L/F EVALUA DUR AGE WMS MTL TIME FAC ESH RDR VISIT CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION VISIT AGENCY SOURC AMOUNT (Php, M) STARTED COMP S TION (C.D.) (%) RATING E Const. of Cemented Footbridge, Sapang Calumpit, 121 Construction 21686 L C SB GE1 05/17/06 Final III LF 0.946 60 01/01/06 03/16/06 0.00 C 0.304 0.285 0.300 - - - 88.90 Bayan Bulacan Const. of MPB @ Bulacan State Malolos, 121 Construction 21686 L D SB GB1 08/18/06 1st III LF 0.945 54 07/17/06 09/09/06 1.00 O 0.356 0.225 0.100 0.030 0.035 0.100 84.60 University Compound Bulacan Sitio Lourdes, 2H2L Construction 16293 L B MA GE1 Conc. of Road @ Package 3-2 Brgy. 03/06/07 1st/Final XI LF 0.565 120 12/08/06 04/06/07 66.84 C 0.343 0.300 0.300 - - - *94.30 Togatto, Davao City Const. (Completion) of Sch. Bldg. @ dela 2H2L Construction 16293 L B SB GB1 Antipolo City 05/30/07 1st/Final IVA LF 0.791 120 03/23/07 07/20/07 42.50 C 0.366 0.200 0.300 - - - *86.60 Paz E/S Brgy. 29-C, 2H2L Construction 16293 L B SB GB1 Const. of MPB @ Jacinto St. 09/05/07 1st/Final XI LF 0.471 105 01/07/07 09/05/07 2.40 C 0.365 0.300 0.300 - - - *96.50 Davao City 2-R Construction & Impvt./Rehab. of PMA Road, PMA Cut=off 15304 L D SB GE1 Baguio City 11/26/07 1st/Final CAR LF 4.811 30 03/22/07 04/20/07 55.96 C 0.260 0.200 0.300 - - - *76.00 Supply Road 1&2 Manolo Completion of Multi-Purpose Bldg., 3E Construction 19588 L B MA GB1 Fortich, 03/03/08 5th X LF 2.365 120 12/27/05 06/20/07 - C 0.335 0.136 0.000 - - - 47.10 (Water District, Phase IV) Tankulan Bukidnon Km.480+000- 310 Construction Asphalt Overlay of Tigaon-Goa-Lagonoy Km.490+000, 4875 L AAA LB GE1 08/27/05 Final V FA 47.945 243 01/26/04 06/12/05 0.20 C 0.450 - 0.500 - - - 95.00 Specialist Corporation Road Camarines Sur Tumana, 310 Construction 4875 L AA LA GE1 Const. of Tumana Bridge (Phase III) Concepcion 11/15/05 Final NCR LF 26.854 180 01/08/05 09/15/05 0.00 C 0.221 0.190 0.300 - - - 71.10 Specialist Corporation I, Marikina City Makati City- 310 Construction Estrella-Pantaleon Bridge Approaches 4875 L AA LA GE1 Manadaluyon 03/06/08 1st NCR LF 38.631 330 04/29/04 02/08/08 1.50 O 0.359 0.200 0.100 0.030 0.047 0.067 80.30 Specialist Corporation (Across Pasig River) g City, M.M.

  1482
Recommended publications
  • Cpes Reports)
    CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES – PHILIPPINE DOMESTIC CONTRUCTION BOARD CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (CPES REPORTS) (ON-GOING/COMPLETED PROJECTS) From January 1, 2005 – December 31, 2007 You may access this report on this website http://www.gppb.gov.ph CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB) 3/F, Jupiter Bldg., #56 Jupiter St., Bel-Air Village, Makati City Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791 CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports - On-going and Completed Projects from January 1, 2005 – December 31, 2007 BACKGROUND: REPORT COVERAGE: This report is prepared in connection with the implementation of This report contains CPES rating and other project-related Constructors Performance Evaluation System (CPES) pursuant to information of on-going and completed foreign assisted (FA) Section 12, Annex E - Evaluation of Contractors Performance of and locally funded (LF) infrastructure projects being the Implementing Rules and Regulations (IRR) of RA No. 9184 undertaken by either local, foreign or joint venture (Government Procurement Reform Act). Item 4 - Submission and constructors. The projects presented in these report covers: Dissemination of Evaluation Results of Section 12, specifically road, bridge, housing, building, ports and harbor, irrigation mandated PDCB to consolidate the CPES evaluation results of all and flood control, and water supply projects. ongoing and completed projects and disseminate the same to all offices/agencies/corporations concerned. REPORT CONTENTS: USES OF CPES INFORMATION: Presented in this report are the names of constructors The CPES rating and other information is designed to serve the arranged alphabetically with the corresponding project information needs of the following: a) government agencies classification.
    [Show full text]
  • CSHP) DOLE-Regional Office No
    REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 March 2019 Date No. Project Owner/General Contractor Project Name and Location Remarks Approved DPWH Region VI / MGB CONSTRUCTION & IMPROVEMENT/REHABILILTATION OF BORACAY 1 03/12/2019 Concurred TRADING CIRCUMFERENTIAL ROAD SECTION 3 - BORACAY ISLAND DPWH Region VI / S.T. SALCEDO 18GO0103 REPAIR/MAINTENANCE OF THE OFFICE 2 03/15/2019 Concurred CONSTRUCTION CORP. MAIN/CANTEEN BUILDING, OFFICE VI COMPOUND PHASE II 18GF0123 CONSTRUCTION OF MULTI-PURPOSE BUILDING 3 DPWH 1st DEO / J.E. TICO CONST., CO., INC. (CLASSROOM) - UP VISAYAS ILOILO HIGH SCHOOL - MIAG- 03/15/2019 Concurred AO PROPOSED ADMINISTRATION OFFICE BUILDING WITH 4 BY ADMINISTRATION / ALVIN JAMES GUINTO 03/07/2019 Approved FENCING BY ADMINISTRATION / ALPHA-ONE REALTY 5 PROPOSED TWO-STOREY RESIDENTIAL HOUSE 03/07/2019 Approved DEV'T CORP. BY ADMINISTRATION / SPS KEITH JASPER & 6 PROPOSED TWO-STOREY APARTMENT 03/07/2019 Approved NOVIMIE ESPINA BY ADMINISTRATION / YASSIER DAN PROPOSED RENOVATION OF A 2-STOREY RESIDENTIAL 7 03/08/2019 Approved PENDON BUILDING BY ADMINISTRATION / SPS JUANCHO & PROPOSED RENOVATION OF A 2-STOREY RESIDENTIAL 8 03/08/2019 Approved ROSALINDA GUILLAMAS BUILDING BY ADMINISTRATION / MRS. EDNA 9 PROPOSED TWO-STOREY RESIDENTIAL 03/08/2019 Approved SOBERANO & MR. DANTE SOBERANO BY ADMINISTRATION / VANESSA BORRES 10 PROPOSED TWO-STOREY COMMERCIAL BUILDING 03/12/2019 Approved ROBLES PROPOSED ONE (1) UNIT, TWO (2) STOREY APARTMENT 11 BY ADMINISTRATION / JOCELYN TORECILLO 03/12/2019 Approved BUILDING PROPOSED ONE (1) UNIT,ONE (1) STOREY RESIDENTIAL 12 BY ADMINISTRATION / MARIA PAZ SUAREZ 03/12/2019 Approved BUILDING WITH ROOF DECK 13 BY ADMINISTRATION / PABLO T.
    [Show full text]
  • 29Th Release Page 1 of 33 * for DPWH, Only the Region and PMO Office Are Listed CPES Reports On-Going and Completed Projects from July 1, 2016 to June 30, 2019
    CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Brgy. Kabac, Granby Trading And Construction 27554 L Balai Bantayan 1 6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory Bantayan, Cebu Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 Davao Del Norte 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - New Cortez-San Jose Carcor Panas Rd. Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Corella, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - New Cortez-San Jose Carcor Panas Rd. del Norte Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Tagum City, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - Km.1822+821, Apokon Sect.
    [Show full text]
  • FY 2020 DENR FOI Registry
    FREEDOM OF INFORMATION 2020 162 Office: Regional Office FOI 2020 Year-Quarter Tracking Number Request Type Date Received Title of Request Extension? Status Date Finished Days Lapsed Cost Appeal/s filed? Remarks year and Internal FOI Tracking if request was lodged date request was title of information requested if the agency status of request date request was number of days fees paid by If the requesting Additional details about the request quarter of report number through eFOI or lodged by requesting requested for processed/finished by lapsed the requesting party or any other coverage standard (paper-based) party (YYYY-MM-DD) extension or the agency; if not yet facilitating the party for citizen filed an additional 20 working processed/finished, request; if facilitation of appeal for the days (YES or NO) indicate ONGOING finished within request; if specific request the same day, none, indicate ( YES or NO) indicate 0 FREE Rrequest for an Inventory of Affected Trees for the Proposed Cy 2020 2020-Q1 01-13-20 STANDARD 12/19/2019 Infrastructure Projects the Widening of Iloilo-Antique Road at Brgy. Supa, NO Successful 0 NO San Jose and Odiong, Sibalom, Antique Etc Request for the Re- Computation and Correction of Lot Data of Lot 1019-H, 2020-Q1 01-15-20 STANDARD 12/20/2019 Title No. T-137183 involving the property owned by M & L Agricultural and NO Successful 0 NO Industrial Coirpat Brgy. Fabrica, Sagay,City Request for Correction in the Discrepancy of Sublot Number reflected in the 2020-Q1 01-16-20 STANDARD 12/20/2019 Approved Survey Plan, of Lot 1187, owned by Nestor Aplinario et al.
    [Show full text]
  • Church Pushes Back 500 Years of Christianity
    CBCP AUGUST 31 - SEPTEMBER 27, 2020, VOL.Monitor 24, NOS. 18 & 19 [email protected] PROTAGONIST OF TRUTH, PROMOTER OF PEACE Church pushes back 500 Pope names US Years of Christianity archbishop as celebration new nuncio to the By Roy Lagarde Philippines THE quincentennial celebration of the arrival of Christianity in the Philippines will be extended for another year due to the pandemic, a church official said. The scheduled culmination of the celebration in April 2021 will now be the launch of a yearlong celebration that will end in April 2022. Bishop Pablo Virgilio David, acting president of bishops’ conference, said Pope Francis and Archbishop Charles John Brown in the Vatican in December, 2018. the decision to move the VATICAN MEDIA dates of the historic event POPE Francis on Sept. 28 envoy to Asia’s most was due to the health crisis. Catholic bishops arrive for a Mass at the Cebu Metropolitan Cathedral on Jan. 27, 2018. PHOTO BY ROY LAGARDE “Due to the crisis caused has chosen Archbishop predominantly Christian by the Covid-19 pandemic, 31, 1521. Clergy set on Aug. 4 to 6, The preparation kicked Charles John Brown to be nation. it was necessary to change On Sept. 12, the Diocese 2021 has been cancelled. off in 2013, with each year his next ambassador to the Bishop Broderick Pabillo, the schedule of our of Maasin began a 200-day Instead of a retreat, the dedicated to a specific theme Philippines. the apostolic administrator celebration of the 500 years countdown to the 500th bishops’ Commission on the related to the faith and new The 60-year-old American of Manila, assured Brown of of Christianity,” David said.
    [Show full text]
  • Republic of the Philippines Office of The
    REPUBLIC OF THE PHILIPPINES OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL IMPROVEMENT / WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH ROAD K0046+(-910) - K0048+533; K0059+781 - K0060+307.50; K0065+448 - K0071+696.60 MUN. OF BINALBAGAN, NEGROS OCCIDENTAL SECTION ID = S00127NR NET LENGTH = 10.06 KM WIDTH = 3.35 METERS THICKNESS = 0.30 METERS BEGINNING OF PROJECT BEGINNING OF SECTION 1 STA. 45+090.00 ( K0046+(-910) ) N W E END OF SECTION 1 ( BEG. EXISTING WIDENING ) STA. 48+502.05 ( K0048+533 ) S 1BDJGJD0DFBO INDEX OF SHEETS: 8FTU1IJMJQQJOF4FB NO. SHEET CONTENTS 1 LAY OUT PLAN, VICINITY MAP & INDEX OF SHEETS 2 TYPICAL ROAD SECTION DETAIL PAVEMENT DESIGN PARAMETER GENERAL NOTES TYPICAL DETAIL OF OPEN LINED CANAL Project Site THERMOPLASTIC PAVEMENT MARKINGS DETAIL END OF SECTION 2 3 SUMMARY OF QUANTITIES STA. 60+285.74 ( K0060+307.50 ) SCHEDULE OF ITEMS BEGINNING OF SECTION 2 ( END OF EXISTING WIDENING ) STA. 59+781.00 ( K0059+781 ) SPECIFICATIONS GROUTED RIPRAP DETAIL ELEVATION DETAILS OF WEEPHOLES L O C A T I O N M A P 4 STANDARD PLAN OF PORTLAND CEMENT CONCRETE PAVEMENT Manapla Cadiz City 5 STANDARD PLAN OF METAL GUARDRAIL Sagay City Victorias City Escalante City 6 STANDARD PLAN OF CHEVRON SIGNS Silay City 7 STANDARD REINFORCED CONCRETE PIPE CULVERT DETAILS Talisay City Negros Occidental 1st DEO BEGINNING OF SECTION 3 Toboso ( MAGSAYSAY BR. APP. "B" ) Bacolod City 8 - 22 PLAN & PROFILE STA. 65+448.00 ( K0065+448 ) Bacolod City DEO Murcia Calatrava Bago City 23 - CROSS-SECTION
    [Show full text]
  • Caltex Stations As of 21 July 2020
    List of Liquid Fuel Retail Stations or LPG Dealers Implementing the 10% Tariff (EO 113) Company: CHEVRON As of: July 21, 2020 Note: Passing on of additional import duties to retailers for diesel has ceased on July 9, 2020. This submission may change should there be local purchases that have levied the additional duties. Address Implementation Tariff Rate No. Retailer Name Source Depot Province City/Municipality Date (PhP) 1 RDL FUEL POINT INC. Valenzuela North Expressway, MalInta, Valenzuela 1.62 Batangas 2 NORTH WEST STAR GAS CORP.-WILSON San Juan OrtIgas Ave / WIlson St., San Juan 1.62 Batangas 3 ACHIEVERS MCKINLEY San Juan OrtIgas Ave/McKInley, San Juan 1.62 Batangas 4 STAREV MOTORIST SERVICE CENTER Mandaluyong EDSA / BonI Ave, Mandaluyong CIty 1.62 Batangas 5 RDL FUEL POINT INC. MakatI EDSA/Harvard, MakatI CIty 1.62 Batangas 6 DON DEXTER- SLEX Laguna San AntonIo, San Pedro, Laguna 1.62 Batangas 7 NORTHERN STAR ENERGY AND FUEL PasIg Pioneer/Shaw Blvd, PasIg CIty 1.62 Batangas 8 RDL FUEL POINT INC. Pampanga San Fernando, Pampanga 1.62 MarIveles 9 RDL FUEL POINT DISTRIBUTION Pampanga Mcarthur HIghway, BarrIo Dolores, San Fernando, Pampanga 1.62 MarIveles 10 MARIA MAY ORINO LEE Bicol Goa, CamarInes Sur 1.62 Batangas 11 GARDENSTATE ENTERPRISES INC. Agusan Ochoa St. Cor. L. Jaena St.,Butuan CIty, Agusan Norte 1.62 Cabadbaran 12 IRON CITY STATION SurIgao Claver, SurIgao del Norte 1.62 Cabadbaran 13 ANELYN DAUBNEY Zamboanga TampIlIsan, Zamboanga Del Norte 1.62 Jimenez 14 WILLIAM TAN ENT. INC. (TINIGUIBAN) Palawan NatIonal HIghway, TInIguIban, Puerto PrIncesa, Palawan 1.62 Batangas 15 WILLIAM TAN ENT.
    [Show full text]
  • World Bank Document
    El467 BACOLOD - KABANICALAN ROAD ( Bacolod - San Enrique Section) 10 XSACOL,OI) - ICABANI(ALAN ROAD ( Uacolod - San 13iriquc Scction) Public Disclosure Authorized 1. EXECUTIVE SUMMARY 1.1 Brief Inti-oduclion 'Thc Environmental Impact Assessrncnt (EIA) Study of the proposed Bacolod - ICabanIcalan Road (Bacolod - San Enrique Section) Project is presented in the form of an Environmental Impact Statement (EIS) document to secure an Environmental Compliance Certificate (ECC) in accordance with the requirement of the revised rules and rcgu lations for the EIS System en1 bodied in the DENR's Department Adn~inistrativc Ordcr (11.40) No. 96 -37. Public Disclosure Authorized 1.2 Bricf Description of Mcihodology 'I'lic preparations of the EIS was carried out through the collection of primary and secondary data obtained from various sources sucl~as envirollniental reporls, provillcial and municipal profiles, ~ncdiunitern1 development plans, orlicr publisl~cd rcports and Ieasibility studies undertalten by the DI'WI-1. Site illspections and actual interviews with affected persons provided first hand information. Elldorsernent from tlle LGU's and public consultation documents were also gathered to establish the s~1pp01-tncedcd for the proposed project. 1.3 Scopc and Liinitatioln of the EIS study Public Disclosure Authorized 'file project involves wicicning or tlie existing two-lane road from Bacolod Cily to Sail Enriquc town proper. Thc BIA study focuses on the entire stretch of tlie road exccpt in areas wl~cretl~ere are existing ongoing works under tlie Regular Infrastructure Projects of tlie Bago and Bacolod City District Ellgineering Orfices. The stitdy also talces into consideration the social and pllysical impacts of the project specifically on affectcd Saniilics and structures due to widening.
    [Show full text]
  • Department of Public Works and Highways 621 Xviii
    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 621 XVIII. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS A. OFFICE OF THE SECRETARY For general administration and support, support to operations, and operations including locally-funded and foreign-assisted projects, as indicated hereunder.................................................................................................... P 100,826,083,000 ---------------- New Appropriations, by Program/Project ====================================== Current Operating Expenditures Maintenance and other Personal Operating Capital Total Services Expenses Outlays A. PROGRAMS I. General Administration and Support a. General Administration and Support Services P 605,721,000 P P P 605,721,000 --------------- ---------------- Sub-Total, General Administration and Support 605,721,000 605,721,000 --------------- ---------------- II. Support to Operations a. Policy Formulation, Program Planning and Standards Development 234,028,000 234,028,000 b. Regional Support (Planning and Design, Construction, Maintenance and Material Quality Control and Hydrology Divisions) 216,190,000 216,190,000 c. Operational Support for the Maintenance and Repair of Infrastructure Facilities and Other Related Activities 252,462,000 252,462,000 --------------- ---------------- Sub-Total, Support to Operations 702,680,000 702,680,000 --------------- ---------------- III. Operations a. Construction, Maintenance, Repair and Rehabilitation of Infrastructure Facilities 4,227,000,000 15,000,000 4,242,000,000 b. Maintenance, Repair and Rehabilitation
    [Show full text]
  • CSHP) DOLE-Regional Office No
    REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 March 2018 Date No. Project Owner/General Contractor Project Name and Location Remarks Approved Construction of Himamaylan By-Pass Bridge Himamaylan,Negros 1 Galeno Construction 1-Feb-18 Concurred Occidental 2 Galeno Construction Construction of Talave Bridge San Carlos, Negros occidental 1-Feb-18 Concurred 17RE0173-CONSTRUCTION OF ONE(1) UNIT, ONE(1) STORY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) AT 3 HUMMING BIRD CONST. & SUPPLY 2-Feb-18 Concurred RAMON TORRES SAGASA NATIONAL HIGH SCHOOL BAGO CITY, NEGROS OCCIDENTAL. 17RE0171CONSTRUCTION OF ONE(1) UNIT, ONE(1) STOREY, 4 HUMMING BIRD CONST. & SUPPLY ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) AT 2-Feb-18 Concurred RAMON TORRES SAGASA 17RE0126-CONSTRUCTION OF FARM TO MILL ROAD, 5 JAIME B. CHING ENTERPRISES CROSSING MERCED TO MERCED SEVILLINO PROPER DBS 2-Feb-18 Concurred PONTEVEDRA, NEGROS OCCIDENTAL 17RE0166-CONSTRUCTION OF THREE(3) UNITS, ONE(1) STOREY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) 6 JAIME B. CHING ENTERPRISES 2-Feb-18 Concurred AT RAMON TOREES MA-AO SUGAR CENTRAL NATIONAL HIGH SCHOOL BAGO CITY, NEGROS OCCIDENTAL 17RE0167-CONSTRUCTION OF TWO(2) UNITS, ONE(1) STOREY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) 7 JAIME B. CHING ENTERPRISES 2-Feb-18 Concurred AT RAMON TORRES MA-AO SUGAR CENTRAL NATIONAL HIGH SCHOOL 17RE0183-CONSTRUCTION OF TWO(2) UNITS, ONE(1) RA CONSTRUCTION AND GENERAL STOREY, ONE(1) CLASSROOM WORKSHOP BUILDING (7X18) 8 2-Feb-18 Concurred MERCHANDISE VALLADOLID
    [Show full text]
  • Caltex Stations EO113
    CHEVRON (CALTEX) STATIONS IMPLEMENTING THE 10% TARIFF Estimated Address Estimated No. Retailer Name Date * Source Depot Tariff Province City/Municipality Kerosene 1 RDL FUEL POINT INC. Valenzuela North Expressway, Malinta, Valenzuela 28-Jul-20 Batangas P1.56/liter 2 NORTH WEST STAR GAS CORP.-WILSON San Juan Ortigas Ave / Wilson St., San Juan 28-Jul-20 Batangas P1.56/liter 3 ACHIEVERS MCKINLEY San Juan Ortigas Ave/McKinley, San Juan 28-Jul-20 Batangas P1.56/liter 4 STAREV MOTORIST SERVICE CENTER Mandaluyong EDSA / Boni Ave, Mandaluyong City 28-Jul-20 Batangas P1.56/liter 5 RDL FUEL POINT INC. Makati EDSA/Harvard, Makati City 28-Jul-20 Batangas P1.56/liter 6 DON DEXTER- SLEX Laguna San Antonio, San Pedro, Laguna 28-Jul-20 Batangas P1.56/liter 7 NORTHERN STAR ENERGY AND FUEL Pasig Pioneer/Shaw Blvd, Pasig City 28-Jul-20 Batangas P1.56/liter 8 RDL FUEL POINT INC. Pampanga San Fernando, Pampanga 28-Jul-20 Mariveles P1.56/liter Mcarthur Highway, Barrio Dolores, San Fernando, 9 RDL FUEL POINT DISTRIBUTION Pampanga 28-Jul-20 Mariveles P1.56/liter Pampanga 10 MARIA MAY ORINO LEE Bicol Goa, Camarines Sur 28-Jul-20 Batangas P1.56/liter Ochoa St. Cor. L. Jaena St.,Butuan City, Agusan 11 GARDENSTATE ENTERPRISES INC. Agusan 28-Jul-20 Cabadbaran P1.56/liter Norte 12 IRON CITY STATION Surigao Claver, Surigao del Norte 28-Jul-20 Cabadbaran P1.56/liter 13 ANELYN DAUBNEY Zamboanga Tampilisan, Zamboanga Del Norte 28-Jul-20 Jimenez P1.56/liter National Highway, Tiniguiban, Puerto Princesa, 14 WILLIAM TAN ENT.
    [Show full text]
  • (CSHP) DOLE-Regional Office No. 6 September 2018
    REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 6 September 2018 Date No. Project Owner/General Contractor Project Name and Location Remarks Approved 18GM0186 Construction of One (1) Unit One (1) Storey ICT DPWH Negros Occidental - 3rd DEO / Golden 1 Laboratory Building at Caningay National High School - Banga 09/20/2018 Concurred Pace Construction Extension at Candoni, Negros Occidental 18GM0109 Construction of 1 Unit Two (2) Storey Science DPWH Negros Occidental - 3rd DEO / Rock 2 Laboratory Building at Salong NHS, Kabankalan City, Negros 09/20/2018 Concurred Willian Construction & Supply Occidental DPWH-Negros Occidental 2nd DEO/Jaime B. Concreting of Access Road at Prk. Sua-Trinidad, Brgy. DSB, 3 09/19/2018 Concurred Ching Pontevedra, Negros Occidental DPWH-Negros Occidental 2nd DEO/Jaime B. Improvement of Multi-purpose Government Center (MPGC) at 4 09/19/2018 Concurred Ching Brgy. 1-Poblacion, Pontevedra, Negros Occidental DPWH-Negros Occidental 2nd DEO/Jaime B. Concrete Paving at Brgy. Bta. Rizal, Pontevedra, Negros 5 09/19/2018 Concurred Ching Occidental Upgrading of Yonson (Castellano) - Macasilao Provincial Road DPWH-Negros Occidental 2nd DEO/Jaime B. 6 (Phase III), Rural Access (Road Upgrading), Brgy. Macasilao, 09/17/2018 Concurred Ching Calatrava, Neg. Occ. DPWH-Bacolod City Deo / J.H.Pajara 18GO0079 Talave Br. (BO0182NR) along Bacolod North Road., 7 Construction Corp. / Silver Dragon Construction. 09/10/2018 Concurred San Carlos City, Negros Occidental Lumber and Glass Supply, Inc. DPWH-Bacolod City Deo / J.H.Pajara 18GO0063 Construction of Revetment Wall along Ilog-Bongol 8 Construction Corp. / Silver Dragon Construction.
    [Show full text]