29Th Release Page 1 of 33 * for DPWH, Only the Region and PMO Office Are Listed CPES Reports On-Going and Completed Projects from July 1, 2016 to June 30, 2019

29Th Release Page 1 of 33 * for DPWH, Only the Region and PMO Office Are Listed CPES Reports On-Going and Completed Projects from July 1, 2016 to June 30, 2019

CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO. L/F PROJECT NO. of VISIT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE PCAB ARC TYPE LOCATION EVALUATION SOURCE AMOUNT STARTED COMP E (%) RATING DESCRIPTION (C.D.) DESCRIPTION Brgy. Kabac, Granby Trading And Construction 27554 L Balai Bantayan 1 6/8/18 Final NHA LF 130.310 882 3/30/15 8/28/17 -6.07 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory Bantayan, Cebu Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 Davao Del Norte 8/12/2013 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - New Cortez-San Jose Carcor Panas Rd. Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Corella, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 45.784 179 01/23/13 07/20/13 0.00 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - New Cortez-San Jose Carcor Panas Rd. del Norte Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Tagum City, Davao "R.R. Seismundo Construction & Supply" 10961 L A MA GE1 3/18/2013 1st XI LF 17.793 125 01/25/13 05/29/13 0.00 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - Km.1822+821, Apokon Sect. del Norte "R.R. Seismundo Construction & Supply" / Const. of Flood Control Structure (Sheet Piles & Grouted Monkayo, COMVAL JV-12-116 L A MA GE2 11/27/2012 1st XI LF 27.838 240 08/28/12 04/24/13 0.86 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - Davao Concrete Products Joint Venture Riprap) Agusan River, Brgy. Inambatan Province "R.R. Seismundo Construction & Supply" / Pantukan 2nd LD, Rechanneling and Construction of Dike in Kingking River, Compostela Valley Double J Construction And Supply Joint JV-16-948 L A MA GE Compostela Valley 3/20/18 1st/Final LF 44.251 185 3/10/17 9/10/17 0 C 0.475 0.133 0.3 - - - 90.80 *90.8% Very Satisfactory Mosahamat Section ( Left Side) DEO Venture Province Basey Pointe, Brgy. (Cavdeal) Cavite Ideal International Procurement of Fully Developed Lots and Complete Housing 84.13% 5599 L AAA Tingib, Basey, 01/26/18 Final NHA LF 290.000 862 3/7/2015 10/11/2017 -1.99 D 0.399 0.200 0.244 - - - 84.29 Construction And Development Corp. Units Satisfactory Samar (Cavdeal) Cavite Ideal International Brgy. Tingib, Basey, 5599 L AAA Basey Pointe 2 2/3/2018 1st NHA LF 225.387 636 06/25/16 03/26/18 -39.75 D 0.325 0.265 0.000 0.030 0.054 0.030 70.66 - Construction And Development Corp. Samar Repair/Rehab. of Drainage Canal along Sorsogon-Bacon- Bibincahan, *83.3% 0405 Construction & Supply 34735 L B SB GE 5/30/2017 1st & Final Sorsogon 1st DEO LF 2.841 90 12/11/2016 3/10/2017 0.00 C 0.400 0.133 0.300 - - - 83.30 Manito Road, Bibincahan, Sorsogon City Sorsogon City Satisfactory Construction of Flood Mitigation Structures (Baybay Dagat San Fernando, 0405 Construction & Supply 34735 L D SB GE Dike) Sitio Bacolod along Bito River, San Fernando, Masbate 6/14/2016 1st Masbate 3rd DEO LF 4.653 115 3/3/16 6/25/16 0.00 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% - Masbate Construction / Repair / Rehabilitation of Multi-Purpose 0405 Construction & Supply 34735 L B SB GE Monreal, Masbate 8/19/2017 1st Masbate 3rd DEO LF 3.881 150 11/4/2016 4/2/2017 0.00 O 0.488 0.133 0.300 - - - 92.10 - Building (Municipal Hall), Monreal, Masbate Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/ Improvement of *92.9% 11-16 Construction 29646 L AAA MA GE Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta. Bamban, Tarlac 11/21/17 1st & Final DPWH LF 45.616 147 4/17/17 9/10/17 0.00 C 0.496 0.133 0.300 - - - 92.90 Very Satisfactory 0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta. 0+129, Bamban, Tarlac 121 Construction Corporation (Formerly: 121 Improvement/Concreting with Drainage System along Brgy. Zaniga, 84.30% 21686 L D SB GE 11/29/2014 1st NCR LF 6.684 120 8/14/14 12/11/14 1.00% O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% Construction) Ballesteros Street Mandaluyong City Satisfactory Brgy. Kanluran, San Construction of Flood Control Structure, Brgy. Kanluran, San Vicente, Camarines Camarines Norte 89.6% 128 Dragon Construction And Supplies 35408 L B SB GE 3/14/2016 1st LF 0.949 30 3/23/15 4/22/15 - C 0.396 0.2 0.3 0 0 0 89.60% Vicente, Camarines Norte, 2nd Legislative District Norte, 2nd DEO Very Satisfactory Legislative District Slope Protection (Grouted Riprap) along Isabela-Maluso Rd., 2M Construction & Enterprises 33331 L C SB GE2 Basilan Province 3/13/2013 1st IX LF 4.842 75 02/15/13 04/30/13 3.25 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - Matarling Sect. at K15+190-K15+249 at Lubigan Vitali Zamboanga City 87.5% 2M Construction & Enterprises 33331 L B SB GB Construction of Water System Level II District Zamboanga 3/7/2016 1st LF 1.945 75 9/18/15 12/1/15 (+)1.33% C 0.428 0.147 0.3 0 0 0 87.50% DEO Satisfactory City Road Widening Including Drainage along Ipil-Magdaup Wharf Ipil, Zamboanga Zamboanga 2M Construction & Enterprises 33331 L B MA GE 3/13/18 2nd/Final LF 16.187 177 6/5/17 11/28/17 -1% C 0.487 0.201 0.278 - - - 96.60 92.92% Very Satisfactory Road (S01143MN) (K2014+800 - K2015+297) Sibugay Sibugay 2nd DEO Concreting of Barangay Camanggaan - Calapugan, FMR, Natividad, Pangasinan 3rd 2-R Construction & Supply 15304 L B MA GE 3/19/18 1st/Final LF 3.977 119 8/29/17 12/25/17 0.2101 C 0.461 0.133 0.3 - - - 89.40 *89.40% Very Satisfactory Brgy. Camanggaan-Calapugan Pangasinan DEO Raising of Grade of Dike Agno River Basin Flood Control Asingan, PANGASINAN 3RD 91.1% 2-R Construction & Supply 15304 L C SB GE Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/2015 1st LF 9.167 120 8/26/15 12/23/15 0.05 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10% Pangasinan DEO Very Satisfactory K0364+(-219) to Off Carriageway Improvement at Lingayen Capitol Loop, K0364+836, Pangasinan 2nd *87.36% 2-R Construction & Supply 15304 L C SB GE 9/2/2016 Final LF 9.34 105 3/6/15 6/19/15 - C 0.473 0.133 0.3 - - - 90.60% K0364+(-219) to K0364+836, Lingayen, Pangasinan Lingayen, DEO Satisfactory Pangasinan Indv. Project - Rehab./Reconst. of National Roads w/ Slips, Iriga City, KO *92.7% 301 Engineers 38364 L B - GE Slope Collapse and Landslide along Iriga City-Masoli Road 479+700-KO 11/16/17 1st & Final DPWH LF 5.071 132 3/8/17 7/17/17 2.94 C 0.493 0.134 0.300 - - - 92.70 Very Satisfactory 479+923 Construction of School Building, Brgy. Caranan, Pasacao, Brgy. Caranan, Camarines Sur 1st 93% 301 Engineers 38364 L B SB GB Camarines Sur Pasacao, 8/25/2016 1st & Final LF 1.937 90 3/17/15 6/14/15 0.02 C 0.497 0.133 0.3 0 0 0 0.9300 DEO Very Satisfactory Camarines Sur Construction of One Storey Two Classroom (Toilet Attached) Cabadbaran City, 87.4% 3C'Sl Construction And Supply 36393 L D SB GB 3/14/2016 1st ADN DEO LF 1.927 90 10/15/15 1/12/16 0 C 0.441 0.133 0.3 0 0 0 87.40% Tolosa CES, Cabadbaran City, Agusan del Norte Agusan del Norte Satisfactory Rehabilitation of San Francisco River Control (San Francisco- *93.4% 3Diamonds Construction Corporation 35457 L B SB GE Maguiron Section) Guinobatan, Albay 11/6/17 1st & Final DPWH LF 9.328 105 7/8/17 10/20/17 16.57 C 0.500 0.134 0.300 - - - 93.40 Very Satisfactory Construction of Flood Control along Cabugao River, Brgy. Cabugao, Ilocos 3G A Construction & Supply 35033 L D SB GE 3/16/18 1st/Final Ilocos Sur 1st DEO LF 9.304 140 3/4/17 9/20/17 38.57% C 0.479 0.133 0.3 - - - 91.20 *91.20% Very Satisfactory Turod - Patac Sur Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project Analysis) Asin (KM 8)-Nangalisan 86.32% 3K Rock Engineering 27908 L A MB GE San Pascual, Tuba, Benguet-LU Road, K0273+707 - Tuba, Benguet 11/17/2016 2nd & Final Benguet 1st DEO LF 33.303 196 2/16/2016 8/29/2016 0.00 C 0.408 0.175 0.3 0 0 0 0.8830 Satisfactory K0273+728, K0273+790 - K0274+127, K0275+351 - K0275+613, K0275+629 - K0275+1014, K0275+1050 - K0275+1240, Tuba, Benguet *1st/Final 29th Release Page 1 of 33 * For DPWH, only the region and PMO office are listed CPES Reports On-going and Completed Projects from July 1, 2016 to June 30, 2019 CATEGORY CONTRACT DATE FINAL RATING/ PROJECT DATE OF FUNDING SLIPPAG CPES VISIT QUALITATIVE NAME OF CONSTRUCTOR LICENSE NO.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    33 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us