List of Banks and Financial Institutions As of Mid Jul, 2019 (Licensed by NRB)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Website Disclosure Subsidy.Xlsx
Subsidy Loan Details as on Ashad End 2078 S.N Branch Name Province District Address Ward No 1 Butwal SHIVA RADIO & SPARE PARTS Lumbini Rupandehi BUTWAL-06,RUPANDEHI,TRAFFIC CHOWK 6 2 Sandhikharkaka MATA SUPADEURALI MOBILE Lumbini Rupandehi BUTWAL-06,RUPANDEHI 06 3 Butwal N G SQUARE Lumbini Rupandehi BUTWAL-11,KALIKANAGAR 11 4 Butwal ANIL KHANAL Lumbini Rupandehi TILOTTAMA-5,MANIGARAM 5 5 Butwal HIMALAYAN KRISHI T.P.UDH.PVT.LTD Lumbini Rupandehi TILOTTAMA-05,RUPANDEHI,MANIGRAM 5 6 Butwal HIMALAYAN KRISHI T.P.UDH.PVT.LTD Lumbini Rupandehi TILOTTAMA-05,RUPANDEHI,MANIGRAM 5 7 Butwal HIMALAYAN KRISHI T.P.UDH.PVT.LTD Lumbini Rupandehi TILOTTAMA-05,RUPANDEHI,MANIGRAM 5 8 Butwal HARDIK POULTRY FARM Lumbini Kapilbastu BUDDHA BHUMI-02,KAPILBASTU 2 9 Butwal HARDIK POULTRY FARM Lumbini Kapilbastu BUDDHA BHUMI-02,KAPILBASTU 2 10 Butwal HARDIK POULTRY FARM Lumbini Kapilbastu BUDDHA BHUMI-02,KAPILBASTU 2 11 Butwal RAMNAGAR AGRO FARM PVT.LTD Lumbini Nawalparasi SARAWAL-02, NAWALPARASI 2 12 Butwal RAMNAGAR AGRO FARM PVT.LTD Lumbini Nawalparasi SARAWAL-02, NAWALPARASI 2 13 Butwal BUDDHA BHUMI MACHHA PALAN Lumbini Kapilbastu BUDDHI-06,KAPILVASTU 06 14 Butwal TANDAN POULTRY BREEDING FRM PVT.LTD Lumbini Rupandehi BUTWAL-11,RUPANDEHI,KALIKANAGAR 11 15 Butwal COFFEE ROAST HOUSE Lumbini Rupandehi BUTWAL-09,RUPANDEHI 09 16 Butwal NUTRA AGRO INDUSTRY Lumbini Rupandehi BUTWAL 13 BELBAS, POUDEL PATH 13 17 Butwal SHUVA SAMBRIDDHI UNIT.AG.F PVT.LTD. Lumbini Rupandehi SAINAMAINA-1, KASHIPUR,RUPANDEHI 1 18 Butwal SHUVA SAMBRIDDHI UNIT.AG.F PVT.LTD. Lumbini Rupandehi SAINAMAINA-1, KASHIPUR,RUPANDEHI 1 19 Butwal SANGAM HATCHERY & BREEDING FARM Lumbini Rupandehi BUTWAL-09, RUPANDEHI 9 20 Butwal SHREE LAXMI KRISHI TATHA PASUPANCHH Lumbini Palpa TANSEN-14,ARGALI 14 21 Butwal R.C.S. -
Logistics Capacity Assessment Nepal
IA LCA – Nepal 2009 Version 1.05 Logistics Capacity Assessment Nepal Country Name Nepal Official Name Federal Democratic Republic of Nepal Regional Bureau Bangkok, Thailand Assessment Assessment Date: From 16 October 2009 To: 6 November 2009 Name of the assessors Rich Moseanko – World Vision International John Jung – World Vision International Rajendra Kumar Lal – World Food Programme, Nepal Country Office Title/position Email contact At HQ: [email protected] 1/105 IA LCA – Nepal 2009 Version 1.05 TABLE OF CONTENTS 1. Country Profile....................................................................................................................................................................3 1.1. Introduction / Background.........................................................................................................................................5 1.2. Humanitarian Background ........................................................................................................................................6 1.3. National Regulatory Departments/Bureau and Quality Control/Relevant Laboratories ......................................16 1.4. Customs Information...............................................................................................................................................18 2. Logistics Infrastructure .....................................................................................................................................................33 2.1. Port Assessment .....................................................................................................................................................33 -
Integrated Urban Development Project- Siddharthanagar Municipality
Draft Initial Environmental Examination September 2011 NEP: Integrated Urban Development Project- Siddharthanagar Municipality Prepared by the Government of Nepal, Ministry of Physical Planning and Works for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 5 August 2011) Currency unit – Nepalese rupee (NRs/NRe) NRs1.00 = $0.01391 $1.00 = NRs 71.874 ABBREVIATIONS ADB - Asian Development Bank CBO - community building organization CLC - City Level Committees CPHEEO - Central Public Health and Environmental Engineering Organization CTE - Consent to Establish CTO - Consent to Operate DSMC - Design Supervision Management Consultant EAC - Expert Appraisal Committee EIA - Environmental Impact Assessment EMP - Environmental Management Plan GRC - Grievance Redress Committee H&S - health and safety IEE - initial environmental examination IPCC - Investment Program Coordination Cell lpcd - liters per capita per day MFF - Multitranche Financing Facility MSW - municipal solid waste NEA - national-level Executing Agency NGO - nongovernmental organization NSC - National level Steering Committee O&M - operation and maintenance PMIU - Project Management and Implementation Unit PSP - private sector participation SEA - State-level Executing Agency SEIAA - State Environment Impact Assessment Authority SIPMIU - State-level Investment Program Management and Implementation Units SPS - Safeguard Policy Statement TOR - terms of reference UD&PAD - Urban Development & Poverty Alleviation Department UDD - Urban Development Department ULB - urban local body WEIGHTS AND MEASURES dbA – decibels ha – hectare km – kilometer km2 – square kilometer l – liter m – meter m2 – square meter M3 – cubic meter MT – metric tons MTD – metric tons per day NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. -
Short Listed Candidates for the Post
.*,ffix ryryffi-ffiffiWffir@fuffir. rySW{Jrue,€ f,rc, "*,*$,S* S&s#ery W€ryff$,,,SffWryf ryAeW Notice for the Short Listed Candidates applying in the post of "Trainee Assistantrr Details fot Exam: a. 246lestha,2076: Collection of Entrance Card (For Surrounding Candidates). b. 25nJestha, 2076: Collection of Entrance Card 8:00AM to 9:45AM in Exam Center (For Others). (Please carry Original Citizenship Certificate and l passport size photo). Written Test (Exam) : Date : 25'hJesth, 2076 Saurday (8ftJune, 2019). Time : 10:00 AM to 11:30 AM tVenue : Oxford Higher Secondary School, Sukhkhanagar, Butwal, Rupandehi. Paper Weightage : 100 Marks Composition Subjective Questions : 02 questions @ 10 marks = 20 marks Objective Questions : 40 questions @ 02 marks = B0 marks Contents 1,. General Banking Information - 10 objective questions @ 2 marks = 20 marks 2. Basic Principles & Concept of Accounting - 10 objective questions @2marks = 20 marks 3. Quantitative Aptitude 10 objective questions @ 2 marks = 20 marks 4. General ISowledge - 10 objective questions @ 2 marks = 20 marks (2 Subjective questions shall be from the fields as mentioned above). NOTE: ,/ I(ndly visit Bank's website for result and interview notice. For Futther Information, please visit : Ffuman Resource Department Shine Resunga Development Bank Limited, Central Office, Maitri Path, But'ural. enblrz- *rrc-tr fffir tarmrnfrur *ffi ffi{" ggffrus gevrcgemmrup w mes'g:iwme ffiAru${ frffi. S4tq t:e w r4r4.q klc S.No. Name of Applicant Address 7 Aakriti Neupane Sainamaina-03, M u reiva RuoanriEh] -
SASEC Road Improvement Project
Social Monitoring Report Semiannual Report (July-December 2018) January 2019 NEP: SASEC Road Improvement Project Prepared by Department of Roads, Project Directorate (ADB), for Ministry of Physical Infrastructure & Transport and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. pGovernment of Nepal Ministry of Physical Infrastructure and Transport DEPARTMENT OF ROADS Project Directorate (ADB) Bishalnagar, Kathmandu, Nepal CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF SASEC ROADS IMPROVEMENT PROJECT (SRIP) (ADB Loan No.: 3478-NEP) SEMI-ANNUAL REPORT NO. 3 (SOCIAL MONITORING) SASEC Roads Improvement Project Package 1: EWH- Narayanghat Butwal Road, Section I (64.425 Km) Package 2: EWH- Narayanghat Butwal Road, Section II (48.535 Km) Package 3: Bhairahawa – Lumbini - Taulihawa Road, (41.130 Km) (July - December) 2018 Submitted by M/S Korea Engineering Consultants Ltd. Corp.- MEH Consultant (P) Ltd., Kyong Dong Engineering Co. Ltd. JV In association with MULTI – Disciplinary Consultants (P) Ltd. & Seoul, Korea. SOIL Test (P) Ltd. SEMI-ANNUAL (SOCIAL MONITORING) REPORT 3 July - December 2018 Social Monitoring Report Semi-Annual Report No. 3 (July - December 2018) NEP: Loan No. 3478 SASEC Road Improvement Project (SRIP) Prepared by: Department of Roads, Project Directorate (ADB), for Ministry of Physical Infrastructure & Transport and the Asian Development Bank. -
The Gaze Journal of Tourism and Hospitality (2021) 12:1, 23-43 the GAZE JOURNAL of TOURISM and HOSPITALITY
The Gaze Journal of Tourism and Hospitality (2021) 12:1, 23-43 THE GAZE JOURNAL OF TOURISM AND HOSPITALITY Th e Impact of COVID-19 on Tourism: A Case Study of Lumbini, Nepal Bhim Bahadur Kunwar Lecturer, Lumbini Buddhist University, Lumbini [email protected] Article History Abstract Received 31 August 2020 Accepted 18 October 2020 Th is research aims to discover and present the impacts of COVID-19 in tourism in the context of Lumbini and its premises. As COVID-19 spread globally, it has created many challenges in health and security, daily lives, the national economy, and the global tourism industry. Th e COVID- 19 outbreak has been considered as the most challenging tragedy that occurred in the world aft er the 2nd world war. Keywords Th e World Health Organization (WHO) had listed Nepal also COVID-19, tourism, as a country with a high-risk zone of COVID-19.Th e travel Lumbini - Nepal, restriction and nationwide lock-down implemented by many insecurity, impacts countries including Nepal have resulted in a stranded traveler’s movement. As the consequences ticket reservation, fl ight services, transportation, hotel, and restaurants were closed and several job losses were registered in the tourism sector. Th e negative eff ects like fear, threat, frustration, and losing the confi dence of tourism entrepreneurs appeared. Th is has brought changes in the tourists’ behavior and their motivation to travel for the next few years. In Lumbini businesses like Corresponding Editor Ramesh Raj Kunwar lodges, hotels, restaurants, and travel offi ces were also severely [email protected] aff ected by the pandemic. -
Lumbini Girls' School, Nepal
Lumbini Girls’ School, Nepal Reporting period: May 1, 2017 – September 30, 2017 Prepared by: Gaurav Pradhan and Deanna Boulard Organization: Real Medicine Foundation Nepal (www.realmedicinefoundation.org) Project title: Lumbini Girls’ School Project location: Lumbini Sanskritik, Rupandehi District, Lumbini Zone, Nepal Students walking past bricks for the new school building May–September 2017 Real Medicine Foundation 11700 National Blvd., Suite 234 Los Angeles, CA 90064 +1.310.820.4502 1 Background Lumbini is 205 km west of the capital city, Kathmandu, and has the lowest female literacy rate in Nepal, at just 18%. Issues such as the marriage of girls before age 12, parents’ reluctance to have their girls in school with boys after puberty, the dowry system, and restriction of women’s decision-making all play a role in suppressing the rights and potential of women in the region. On a larger scale, discrimination and lack of education for women contribute to Lumbini’s struggle with severe malnutrition, lack of medical care, and high infant and maternal mortality rates. Karuna Girls’ School is working to change these statistics by providing education for girls from grades 6–12, as well as vocational training for underprivileged girls and women in Lumbini. Since this is an all-girls school, parents are more willing to allow their daughters to attend, and Karuna Girls’ School has gained some popularity in the region. During the course of 2016, the school grew from serving 150 students to 186 students. The curriculum emphasizes reading, writing, computer literacy, health, hygiene, nutrition, and family planning, while vocational training includes courses in computer literacy and tailoring. -
Assessing the Environmental Impacts of Urbanization in Siddharthanagar, Nepal
University of New Mexico UNM Digital Repository Economics ETDs Electronic Theses and Dissertations Summer 7-24-2020 ASSESSING THE ENVIRONMENTAL IMPACTS OF URBANIZATION IN SIDDHARTHANAGAR, NEPAL Bishal Raj Khanal Universitty of New Mexico Follow this and additional works at: https://digitalrepository.unm.edu/econ_etds Part of the Economics Commons Recommended Citation Khanal, Bishal Raj. "ASSESSING THE ENVIRONMENTAL IMPACTS OF URBANIZATION IN SIDDHARTHANAGAR, NEPAL." (2020). https://digitalrepository.unm.edu/econ_etds/113 This Thesis is brought to you for free and open access by the Electronic Theses and Dissertations at UNM Digital Repository. It has been accepted for inclusion in Economics ETDs by an authorized administrator of UNM Digital Repository. For more information, please contact [email protected], [email protected], [email protected]. Bishal Raj Khanal Candidate Economics Department This thesis is approved, and it is acceptable in quality and form for publication: Approved by the Thesis Committee: Alok K Bohara , Chairperson Andrew Goodkind Sarah S Stith Jingjing Wang i Assessing the Environmental Impacts of Urbanization in Siddharthanagar Nepal BY Bishal Raj Khanal B.Arch., 2014 MLA, 2018 THESIS Submitted in Partial Fulfillment of the Requirement for the Degree of Master of Arts Economics The University of New Mexico Albuquerque, New Mexico July, 2020 ii Dedication To the unyielding researchers; and to everyone who is saving lives in the Corona pandemic. and to my wife, Prakriti and to my family and friends. iii Acknowledgment I am grateful to my Chair, Dr. Alok K. Bohara, who has been a continuous source of motivation to me. I am thankful to my committee Dr. -
Revisit to Functional Classification of Towns in Nepal
The Geographical Journal of Nepal Vol. 10: 15-27, 2017 Central Department of Geography, Tribhuvan University, Kathmandu, Nepal Revisit to functional classification of towns in Nepal Chandra Bahadur Shresthaa, and Shiba Prasad Rijalb aSanepa, Lalitpur, Nepal; bDepartment of Geography Education, Tribhuvan University, Kirtipur, Kathmandu, Nepal; *Corresponding author Email: [email protected] The present study on functional classification of the towns in Nepal is a revisit to the study made in 1980 applying the similar methodology. The previous study was based on census data of 1971 and the present study on census data of 2011. The percentages of surplus labour force in proportion to national level were computed considering five activities groups involved in non-agricultural sectors. Then, the arithmetic means of each activity group were calculated and the standard deviations from the means were taken for measuring the functional specialization.The study revealed that both the degree of urbanization and level of functional specialization have considerably increased during a period of four decades. There were only 16 towns in 1971, which increased to 58 in 2011. The number of specialized towns has increased by six folds from 4 in 1971 to 26 in 2011. The level of urbanization has now been a prominent phenomenon as compared to that in 1971. In 1971, even the then large towns were with high agricultural labor force. Now, the proportion of agricultural labor force has declined considerably. However, agriculture labor forces constitute to be dominant in more than 15 smaller towns. It indicates that urban economic base is not being taken into account while incorporating places as municipalities in several cases. -
S.N Local Government Bodies EN स्थानीय तहको नाम NP District
S.N Local Government Bodies_EN थानीय तहको नाम_NP District LGB_Type Province Website 1 Fungling Municipality फु ङलिङ नगरपालिका Taplejung Municipality 1 phunglingmun.gov.np 2 Aathrai Triveni Rural Municipality आठराई त्रिवेणी गाउँपालिका Taplejung Rural municipality 1 aathraitribenimun.gov.np 3 Sidingwa Rural Municipality लिदिङ्वा गाउँपालिका Taplejung Rural municipality 1 sidingbamun.gov.np 4 Faktanglung Rural Municipality फक्ताङिुङ गाउँपालिका Taplejung Rural municipality 1 phaktanglungmun.gov.np 5 Mikhwakhola Rural Municipality लि啍वाखोिा गाउँपालिका Taplejung Rural municipality 1 mikwakholamun.gov.np 6 Meringden Rural Municipality िेररङिेन गाउँपालिका Taplejung Rural municipality 1 meringdenmun.gov.np 7 Maiwakhola Rural Municipality िैवाखोिा गाउँपालिका Taplejung Rural municipality 1 maiwakholamun.gov.np 8 Yangworak Rural Municipality याङवरक गाउँपालिका Taplejung Rural municipality 1 yangwarakmuntaplejung.gov.np 9 Sirijunga Rural Municipality लिरीजङ्घा गाउँपालिका Taplejung Rural municipality 1 sirijanghamun.gov.np 10 Fidhim Municipality दफदिि नगरपालिका Panchthar Municipality 1 phidimmun.gov.np 11 Falelung Rural Municipality फािेिुुंग गाउँपालिका Panchthar Rural municipality 1 phalelungmun.gov.np 12 Falgunanda Rural Municipality फा쥍गुनन्ि गाउँपालिका Panchthar Rural municipality 1 phalgunandamun.gov.np 13 Hilihang Rural Municipality दिलििाङ गाउँपालिका Panchthar Rural municipality 1 hilihangmun.gov.np 14 Kumyayek Rural Municipality कु म्िायक गाउँपालिका Panchthar Rural municipality 1 kummayakmun.gov.np 15 Miklajung Rural Municipality लि啍िाजुङ गाउँपालिका -
NEP: SASEC Road Improvement Project
Environmental Monitoring Report Semiannual Report (July to December 2018) April 2019 NEP: SASEC Road Improvement Project Prepared by Department of Roads, Project Directorate (ADB), for Ministry of Physical Infrastructure & Transport and the Asian Development Bank. This Environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Government of Nepal Ministry of Physical Infrastructure and Transport DEPARTMENT OF ROADS Project Directorate (ADB) Bishalnagar, Kathmandu, Nepal CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF SASEC ROADS IMPROVEMENT PROJECT (SRIP) (ADB Loan No.: 3478-NEP) SEMI-ANNUAL REPORT NO. 3 (ENVIRONMENTAL MONITORING) SASEC Roads Improvement Project Package 1: EWH- Narayanghat Butwal Road, Section I (64.425 Km) Package 2: EWH- Narayanghat Butwal Road, Section II (48.535 Km) Package 3: Bhairahawa – Lumbini - Taulihawa Road, (41.130 Km) (July - December) 2018 Submitted by M/S Korea Engineering Consultants Ltd. Corp.- MEH Consultant (P) Ltd., Kyong Dong Engineering Co. Ltd. JV In association with MULTI – Disciplinary Consultants (P) Ltd. & Seoul, Korea. SOIL Test (P) Ltd. SEMI-ANNUAL -
List of Banks and Financial Institutions As of Mid April, 2018 (Licensed by NRB) Class: "A" (Commercial Banks) (Rs
List of Banks and Financial Institutions As of Mid April, 2018 (Licensed by NRB) Class: "A" (Commercial Banks) (Rs. in Crore) Operation Paid up S.No. Name Head Office Working Area Date (A.D.) Capital 1 Nepal Bank Ltd. 1937/11/15 Dharmapath,Kathmandu 804.27 National Level 2 Agriculture Development Bank Ltd. 1968/01/21 Ramshahpath, Kathmandu 1393.79 National Level 3 Nabil Bank Ltd. 1984/07/12 Beena Marg, Kathmandu 804.32 National Level 4 Nepal Investment Bank Ltd. 1986/03/09 Durbarmarg, Kathmandu 1064.56 National Level 5 Standard Chartered Bank Nepal Ltd. 1987/02/28 Nayabaneshwor, Kathmandu 801.14 National Level 6 Himalayan Bank Ltd. 1993/01/18 Kamaladi, Kathmandu 811.45 National Level 7 Nepal SBI Bank Ltd. 1993/07/07 Kesharmahal, Kathmandu 804.69 National Level 8 Nepal Bangaladesh Bank Ltd. 1994/06/06 Kamaladi, Kathmandu 808.81 National Level 9 Everest Bank Ltd. 1994/10/18 Lazimpat , Kathmandu 810.69 National Level 10 Kumari Bank Ltd. 2001/04/03 Durbarmarg, Kathmandu 596.95 National Level 11 Laxmi Bank Ltd. 2002/04/03 Hattisar, Kathmandu 822.17 National Level 12 Citizens Bank International Ltd. 2007/04/20 Narayanhitipath, Kathmandu 803.32 National Level 13 Prime Commercial Bank Ltd. 2007/09/24 Kamalpokhari, Kathmandu 803.33 National Level 14 Sunrise Bank Ltd. 2007/10/12 Gairidhara, Kathmandu 815.26 National Level 15 Century Commercial Bank Ltd. 2011/03/10 Putalisadak , Kathmandu 806.34 National Level 16 Sanima Bank Ltd. 2012/02/15 Nagpokhari, Kathmandu 800.13 National Level 17 Machhapuchhre Bank Ltd. 2012/7/9* Lazimpat , Kathmandu 805.57 National Level 18 NIC Asia Bank Ltd.