Townland Consultants

Total Page:16

File Type:pdf, Size:1020Kb

Townland Consultants EXAMPLES OF PROJECTS IN INDONESIA Project TCL Project Description Client Lead Duration Completed Ref. Consultant of Project (year) (months) Master Planning for IP9 TOWNLAND was commissioned to PT. Sumber TOWNLAND 1997 Town Centre undertake the Master Planning of an Mitrarealtindo Development (43 ha) in Innovative Commercial Mixed-Use Complex Kelapa Gading on a 43 ha Site. Post Evaluation of the IP10 Post-Evaluation of a Master Layout Plan for PT. Sumber TOWNLAND 1997 Master Layout Plan and Mitra Gading Apartments and preparation Mitrarealtindo Preparation of a of an alternative Concept Plan for a 12 Concept Plan for storey residential development on a 7 ha Residential Site. Development (7 ha) at Kelapa Gading, Jakarta Urban Design and IP13 TOWNLAND was commissioned to PT. Bakrieland TOWNLAND 1999 Coordination of Master undertake the Urban Design and Master Development, Planning for a 200 ha Planning for the Project, comprising a 200 Tbk New Town Development ha Site about 100 km from Jakarta. The New in Purwakarta Town comprises predominantly residential uses and supporting facilities. Future development includes a business park and a tertiary education facility. Landscape Design for IP4/4 TOWNLAND prepared an Innovative Golf PT. Pulo Mas TOWNLAND 2 2000 Golf Courts Proposal, Court Concept and Framework Landscaping Jaya Pulo Mas, East Jakarta to Golf Court, Driving Range and Ancillary Facilities. Master Layout Planning IP21 TOWNLAND prepared the Master Layout PT. Waringin TOWNLAND 5 2000 for Warehouse and Plan for a 13.5 ha Site within the 100 ha Pluit Multicipta Commercial District Distribution Centre in Northwest Jakarta. Master Plan (13.5 ha) in Uses include light industrial, warehousing Kapuk Kamal Raya, and supporting commercial facilities. North Jakarta Urban Design Guidelines IP45 The Project envisioned to lay down the Premier Les TOWNLAND 1 2001 for Mega Kebon Jeruk development principles for an Nouveaux Development, West environmentally friendly residential Constructeurs Jakarta extension to a mixed upper-income/low income urban area. The provision of urban public spaces responsive to the existing environment was a key requisite. TOWNLAND provided a planning and development assessment, starting from a survey of the existing environment and resulting in urban design guidelines for future development. Master Planning, Site IP30 TOWNLAND was commissioned to prepare PT. Bukit TOWNLAND 6 2002 Planning, Landscape the Conceptual Layout Plan, Site Plan, Sentul, Tbk Design and Urban Grading Plan, Landscape Plan and Urban Design Guidelines for Design Guidelines for the Project. Development of a 21.1 ha Residential Area (R15) in Bukit Sentul, West Java Conceptual Planning IP36 TOWNLAND was commissioned to prepare PT. Misaya TOWNLAND 3 2002 and Landscape Design the Concept Plan, Landscape Plan and Properindo of for Washington Park (0.1 Specification for the Project. Sinar Mas ha) in Legenda Wisata Cibubur, West Java Page 1 of 84 EXAMPLES OF PROJECTS IN INDONESIA Project TCL Project Description Client Lead Duration Completed Ref. Consultant of Project (year) (months) Consultancy Advisory IP43 TOWNLAND was commissioned to provide PT. Panca TOWNLAND 21 2003 Services to New Town Consultancy Advisory Services to a New Wiratama Sakti, Developer Town Developer. Tbk Planning and Design IP55 TOWNLAND was commissioned to assist in Selapan Jaya KPMG 3 2003 Consultancy Services for the Planning and Design for Development of Group National Forest Park of Tourism in the Park. Mount Sinabung (50,000 ha), Sibayak, Kara Regency, Province of North Sumatra Planning and Design IP57 TOWNLAND was engaged to provide Interbeton BV TOWNLAND 3 2003 Consultancy Services for Planning and Design Consultancy Services Concrete Pre-Cast Plant/ to the Project. Pre-cast Housing Scheme (300 Low- Income Units), Batam Island Provincial Master Plan IP46 TOWNLAND led a multi-disciplinary PT. Caltex TOWNLAND 11 2003 (to year 2020), Riau consortium of International and Pacific Province (87,023 sq km), Indonesian Consultants responsible for Indonesia / Sumatra producing a comprehensive Master Plan University of for Riau Province, Indonesia. The Master Riau Plan provided a consensus platform for long-term decision making on physical, economic and social development in the Province up to 2020. Expert opinions were delivered in some 25 fields of development from planning mechanisms to tourism development, from international economic co-operation to health care development. The Project took place during a process of decentralisation by the Indonesian Parliament, which returned a substantial access to local resources and revenues to the Regency administrations and local authorities. A series of executable 5 year Action Plans of prioritised investments, underscored with appropriate institutional development recommendations, were developed as a key component of the Master Plan. Page 2 of 84 EXAMPLES OF PROJECTS IN INDONESIA Project TCL Project Description Client Lead Duration Completed Ref. Consultant of Project (year) (months) Development IP58 A strategic Planning Report was prepared PT. Thiess TOWNLAND N/A 2003 Consultancy Advisory for Construction Services to be provided by Contractors Services to Thiess Thiess covering, inter alia, details on key Indonesia Contractors in Their local Government, community, industry and Tender to Provide other personnel; advice on local capability Contracting Services to undertake work by subcontract including civil works, piping and mechanical works, structural steel fabrication and erection and electrical and instrumentation, including assessment on local management capability, financial capability and commercial skills; details on supporting infrastructure available; key actions required to facilitate success in securing the construction services contract. Social/Community Risk IP59 The Consultancy Service Assignment was Amoseas TOWNLAND N/A 2004 Mitigation Advisory focussed upon concerted actions vis-à-vis Indonesia Services, Company the local community in the vicinity of the Incorporated Darajat Plant 3, Garut, new Plant and within Kabupaten Garut. The West Java actions were geared towards creating mutual benefits for the Company and for the local population as a result of the construction of the new Plant including, inter alia, risk mitigation and non- disturbance of the construction schedule. Phase 1 was a short survey assignment sufficient to formulate a clearer understanding of the scope of potential issues and to make proposals for Phase 2, a multi-disciplinary study of options. Subsequent Phases dealt with setting up mitigation activities, mitigation during construction and community relations during operations. Pre-design Open IP75 TOWNLAND prepared a design entry for The Urban & TOWNLAND 2 2004 Competition of Ngasem the Ngasem Market Tourism Area in the Regional Market Tourism Area central district of Yogyakarta. The design Development (1.28 ha approx.), focused on meeting the daily needs of local Institute for Yogyakarta, Central Java residents through the provision of Yogyakarta / traditional market activities and on Local attracting tourists to the Market through Government the provision of spaces for the sale of local arts and crafts, the integration of gathering and performance spaces, and through unique architectural and landscape design. FIRST PRIZE AWARDED. Master Planning of 710 - TOWNLAND prepared a Conceptual Plan PT. Mustika TOWNLAND 3 2004 ha of Land at Cikande, and Master Layout Plan for a Lodan Serang, West Java Comprehensive Business Use/Industrial Development with Supporting Uses on the Site. Page 3 of 84 EXAMPLES OF PROJECTS IN INDONESIA Project TCL Project Description Client Lead Duration Completed Ref. Consultant of Project (year) (months) Landscape Consultancy IP53 TOWNLAND prepared a Landscape Concept Mr Kwee TOWNLAND 3 2005 Services for a Private Plan, Landscape Plan, Working Drawings Cahyadi Garden (8,000 sqm.), JI. and Specification Document for the Private Kumala Widia, Candra VIII, Garden. Kebayoran, Jakarta Boulevard Redesign IP62/2(i TOWNLAND was commissioned to develop PT. Kawasan TOWNLAND 8 2005 and Theming, Cikarang, i) themes and detailed designs for Industri New Town, Bekasi, West streetscape upgrading within an Jababeka,Tbk Java established residential and industrial estate on the fringe of Jakarta. The Project will contibute to the marketability of the Cikarang Estate as a high end residential enclave. Bintaro Urban Design IP71 TOWNLAND was commissioned to develop PT. Jaya Realty TOWNLAND 3 2005 Study and Master Design Themes and a Master Layout Plan Propertindo Planning (16 ha) for for a landmark retail and entertainment Retail and destination in Bintaro, Jakarta. The Entertainment innovative design comprised a Destination, West Java combination of themed indoor and outdoor retail spaces, with entertainment functions centred along a scenic and comprehensively landscaped riverwalk. Master Layout Plan for IP74 TOWNLAND in association with Vincent j.h. Private Sector Vincent j.h. Lo 2 2005 Royal Bali Resort (425 Lo Chartered Architect was tasked with the Consortium Chartered ha), Nusa Perida, Bali preparation of a Master Layout Plan for a Architect proposed Casino, Theme Park, Hotel and Marina Development on Nusa Perida Island in Bali. The development will incorporate a World Class Casino, supported by three 18 hole Golf Courses, a Convention / Exhibition Centre, a series of themed Hotels, an Outdoor Theme Park and Elephant Sanctum, a Marina, Floating Restaurants and High End Retirement
Recommended publications
  • JM Update FY 2016
    Jasa Marga Update FY 2016 1 List of Content 3 Company in Brief 9 Toll Road Industry in Indonesia 12 Jasa Marga’s Strategic Projects 18 Funding Strategy 22 Financial Highlights 2 I COMPANY IN BRIEF Proven Track Record in Indonesian Toll Road Business Leading toll road operator in Indonesia with 38 years of experience. Start 1978 1983 1984 1986 1987 1988 1990 1991 1998 2001 2003 2009 2011 2013 2014 2015 2016 Operation BORR (Section 2 & 3)(2) Jagorawi Cipularang JORR W2 North Surabaya- Padaleunyi Palikanci (4) (Section 1-4)(2) Gempol- Gempol (2) Jakarta- Surabaya- Pasuruan Ulujami- Bogor Outer Semarang Cikampek Ring Road Mojokerto Pondok Aren (Section 4)(2) Semarang- Belmera BORR Semarang-Solo Solo(2) Jakarta Outer (Section 1)(2) (Section 2)(2) Ring Road Cengkareng- Jakarta-Tangerang (2) (JORR) Gempol- Kunciran (2) Surabaya-Mojokerto Pandaan Kunciran-Serpong(2) Prof. Dr. Ir. (Section 1A)(2) Sedyatmo Jakarta Inner Surabaya-Mojokerto(2) Ring Road (JIRR) Toll Road (1) Semarang-Solo BORR Medan-Kualanamu- Concessions (2) Tebing Tinggi(2) (Section 1)(2) (Section 2A) Solo-Ngawi(2) Ngawi-Kertosono(2) Nusa Dua-Ngurah Rai-Benoa(2) Cinere-Serpong(2) Semarang-Batang(2) Pandaan-Malang(2) Balikpapan-Samarinda(2) Manado-Bitung(2) Jakarta-Cikampek II Elevated(2) Number of 1 2 4 6 7 8 9 10 11 12 13 14 16 17 18 19 19 31 Concessions Total Length (km) under Corresponding 59 84 131 223 246 329 394 437 463 469 527 531 544 554 576 590 593 1.260 Concessions(3) Note: (1) Jakarta Inner Ring Road (JIRR) is comprised of the Cawang-Tomang-Pluit concession granted to Jasa Marga and Cawang-Tanjung Priok-Pluit concession granted to CMNP.
    [Show full text]
  • Indonesian Toll Roads NEUTRAL (Unchanged)
    Alpha Asiamoney's 2014 Asiamoney’s Southeast Asia 2013 Finance Asia's Sector flash 2013 2014 Best Best Domestic Best Best Domestic Research Call Equity House Equity House Equity House FMCG Sector 7 April 2015 Indonesian toll roads NEUTRAL (Unchanged) Bob Setiadi E-mail: [email protected] Phone: +6221 250 5081 ext. 3605 Policy updates Exhibit 1. Sector summary Code Ratings Share price +/- P/E EPS grwth . 4 SOEs to construct Trans-Sumatra toll-road sections: Upon obtaining CP TP (%) (x) (%) IDR3.6tn capital injection, Hutama Karya, a non-listed construction SOE, JSMR BUY 7,125 8,000 12.3 30.0 14.9 recently signed a toll-road concession agreement (PPJT) for the 17km Source: Bloomberg, Bahana estimates Based on closing prices on 7 April 2015 Medan-Binjai toll road, one of four Trans Sumatra toll-road sections (exhibit 8), assigned to Hutama Karya based on Presidential Decree No.100/2014. Exhibit 2. Inflation sensitivity to toll revenue Effect on toll-road revenue Inflation rate (%) The government plans to issue a new decree to form a consortium between 2015F 2016F Hutama Karya and three other listed SOEs (Jasa Marga, Waskita Karya and 11.0 2.0% 8.4% 12.0 2.2% 9.1% Wijaya Karya) to develop the Trans-Sumatra toll roads, utilizing the same 13.0 (base case) 2.4% 9.8% scheme that was successful in constructing the Bali Mandara toll road. While 14.0 2.6% 10.5% 15.0 2.8% 11.2% we support government’s plan to accelerate the Trans-Sumatra project, we Source: Bahana estimates; Note: Based on 2-year inflation are awaiting the announcement of the consortium agreements, as the adjustment Trans-Sumatra offers a relatively low IRR (7-17%) which could result in Exhibit 3.
    [Show full text]
  • Mode Shift Travel Demand Management Evaluation from Jakarta’S Experience
    Proceedings of the Eastern Asia Society for Transportation Studies, Vol.7, 2009 Mode Shift Travel Demand Management Evaluation From Jakarta’s Experience Muhammad Nanang PRAYUDYANTO Ofyar Z. TAMIN Ph.D Student Professor Department of Civil Engineering Department of Civil Engineering Institute Technology Bandung (ITB) Institute Technology Bandung (ITB) Jl. Ganesha 10 Jl.Ganesha 10 Phone&Fax : 062 - 022 2502350 Phone&Fax : 062 - 022 2502350 E-mail: [email protected] E-mail: [email protected] Abstract: The study is meant to simply evaluate the mode shift TDM operational strategies from selected alternatives, available for metropolitan cities in Indonesia. Jakarta would be selected as sample city, while it has been producing more than 20 million trips every day, concentrating at very small area of 20 km2 out of 656 km2. Development of Busway, School Buses, Jakarta Staggered Working Hours and Road Pricing schemes would be elaborated, comparing with the current vehicle occupancy “3 in 1” policy. Selection of strategies would including transportation, financing and environmental aspects. Key words: TDM, mode shift, congestion. 1. BACKGROUND The influences of motorization and urbanization in Indonesia, later followed by sub- urbanization in many metropolitan areas, have been of interest to transportation and urban researchers for the last few decades (Bappenas-JICA, 2004, Tamin, 2006, Prayudyanto, 2007, Soehodho, 2007, Susilo, 2007). However, most of the studies were based on evidence in developed countries. It is unclear whether the results were also valid in developing countries, since the transportation conditions of both situations are different in many fundamental ways. Sprawling urban growth with a poor public transport network has also supported the trend of motorization among urban residents in developing countries cities in Indonesia, such in Jakarta, Surabaya, Medan, Makassar and Bandung.
    [Show full text]
  • Mapping and Payment on Tangerang to West Jakarta's Toll Road's Gate Using Non-Determenistic Finite State Automata
    Mapping and Payment on Tangerang to West Jakarta’s Toll Road’s Gate Using Non-Determenistic Finite State Automata Deka Primatio D.1, Farrel Irsyad F.2, Kharansyah Tawaddu S.3, M. Rizky Zaldi4, Raul Andrian5 {[email protected], [email protected] 2, [email protected], [email protected] 4, [email protected]} Faculty of Information and Technology, Universitas Multimedia Nusantara, Jl. Scientia Boulevard, Gading Serpong, Tangerang, Banten, Indonesia 15527 1,2,3,4,5 Abstract. In this research, the concept of Non-Deterministic Finite Automata is used for mapping and simulating the payment system for the Tangerang - West Jakarta toll road. Currently, toll road construction is being intensively developed, because it is one of the government's flagship programs, namely infrastructure development. Tolls in Indonesia apply a uniform fare system without priorit izing the calculation of vehicle mileage, the main disadvantage of this system is that it does not take into account the possibility of attracting users who travel short distances by making toll rate differences. Therefore, this study designed a mapping with payment system based on the calculation of the distance traveled by the vehicle from the toll gate in to the toll gate out. The implementation in the form of simulations is carried out using a raptor in the form of a conceptual and systematic flowchart program, and the simulation works effectively, starting from the balance scan to the suitability of the toll gate exit output and the distance traveled. The concept of Non -Deterministic Finite Automata can be a method for creating payment systems and mapping toll gate.
    [Show full text]
  • Annual Report 2018
    20 18 Laporan Tahunan Annual Report TOLL INTEGRATION FOR THE BETTER FUTURE PT Marga Lingkar Jakarta PENDAHULUAN PREFACE 01 PT MARGA LINGKAR JAKARTA ANNUAL REPORT 2018 2 IKHTISAR KEUANGAN & PENDAHULUAN OPERASIONAL LAPORAN MANAJEMEN PROFIL PERUSAHAAN PREFACE FINANCIAL & OPERATIONAL MANAGEMENT REPORT COMPANY PROFILE HIGHLIGHTS TOLL INTEGRATION FOR THE BETTER FUTURE Integrasi tarif jalan tol Jakarta Outer Ring Road The Jakarta Outing Ring Road (JORR) toll tariff (JORR) yang mulai diimplementasikan pada integration which has been implemented since 29 tanggal 29 September 2018 adalah tahapan September 2018 is a stage towards a multilane menuju transaksi tol menerus atau multilane free free flow (MLFF) that will take effect in 2019. The flow (MLFF) yang akan diberlakukan dalam waktu integration is also aimed at improving services yang tidak lama lagi. Integrasi transaksi tol JORR and supporting the national logistics system to be ini juga bertujuan meningkatkan pelayanan dan more efficient and competitive. mendukung sistem logistik nasional agar lebih efisien dan berdaya saing. Dengan integrasi tarif jalan tol ini, pengguna tol The toll integration makes the payment system hanya melakukan satu kali transaksi pada gerbang becomes open in which toll users will only have tol masuk (on-ramp payment) atau jauh-dekat satu to make one transaction on the toll gate (on-ramp tarif. Sebelumnya, pengguna tol harus melakukan payment) at one tariff. Previously, toll users were 2-3 kali transaksi untuk menggunakan tol JORR charged a closed transaction system by having sepanjang 76,85 km yang dikelola oleh 4 badan to conduct 2-3 transactions to use the 76.85 km usaha jalan tol (BUJT) berbeda.
    [Show full text]
  • Urbanization & Labor Productivity in Indonesia
    Urbanization & Labor Productivity in Indonesia Zulfan Tadjoeddin (Western Sydney University ) Valerie Mercer-Blackman ( Asian Development Bank ) Forum Kebijakan Ketenagakerjaan (FKK) SMERU Research Institute, Jakarta, 24 July 2018 60% of Indonesia’s population will be living in urban enclaves by 2035 % of the Population Urban 120 100 80 60 40 20 0 Brazil India Indonesia Japan Malaysia Philippines PRC Thailand US Viet Nam 2000 2015 2035 Sources: Indonesia: BPS (2014); all other countries: UN DESA (2015 and 2014) Agglomeration is positively correlated with a higher share of wellwell----educatededucated workers Relationship Between Agglomeration and High-Skilled Human Capital a. Indonesia b. Java 35% 20% y = 9E-06x + 0.0719 y = 8E-06x + 0.0507 18% 30% R² = 0.2127 R² = 0.4419 16% 25% 14% 20% 12% 10% 15% 8% 10% 6% 4% 5% post-graduate workers (%) workers post-graduate post-graduate workers (%) workers post-graduate 2% 0% 0% - 5,000 10,000 15,000 20,000 - 5,000 10,000 15,000 20,000 population density population density Note: Java covers 108 districts Source: Authors But bbbenefitsbenefits of urbanization are overwhelmed by structurstructuralal problems (left), thus contributing to lower productivity gains especially in large cities (right) Structural Problems Associated with Average Annual Growth of Productivity and Urbanization Wage Earnings, 2007–2014 (%) 5.0 4.4 Congestion due to inadequate 4.5 4.1 4.2 transport facilities 4.0 3.6 3.6 3.6 3.5 3.0 3.0 2.8 Stressed infrastructure required to 3.0 2.5 accommodate increasing flow of 2.5 people 2.0 1.5 Housing difficulties due to 1.0 inadequate supply and related regulatory problems 0.5 0.0 Environmental pressures 1-Kab 2-Small 3-Medium 4-Large 5-Metro (e.g., water availability, sanitation, city city city city flooding, waste management) Earning Productivity Sources: Cervero (2014); Monkkonen (2013); Firman (2009); Kab = Kabupaten Jago-on et al (2009) Source: Calculations using BPS data.
    [Show full text]
  • Jasa Marga Update Fy2020holders Meeting 1 August 2019 Company Overview
    Jasa Marga Update FY2020holders Meeting 1 August 2019 Company Overview 2 Company Highlights Brief Snapshot Company Highlights • Leading toll road operator in Indonesia with more than 40 years of • Largest toll road operator in Indonesia with 67% market share in experience. term of operated commercial toll roads lengths (± 1,191 km). • 34 toll road concessions with total length of 1,603 km. • The longest concession period holder in Asia reflecting stable • 70% shares owned by the Government of Indonesia. income. • Listed on the Indonesia Stock Exchange since 2007, with a market cap • Strategically important with strong government ownership. Rp33.6 trillion as of 30th December 2020. • Resilient industry with strong government focus. • Key business • Strong financial profile with promising growth going forward. • Construction, operation and maintenance of toll road • Supporting business / other business • Toll Road Operation Services (Provides operation services for Jasa Marga Group and other toll road investors) Vision & Mission • Toll Road Maintenance Services (Provides maintenance services for Jasa Marga Group and other toll road investor) To be the largest, trusted and sustainable national toll Vision road network company. • Prospective Business (Manages rest areas and other properties on toll road corridors) FY2020 Revenue Breakdown 1. Lead toll road business along the end-to-end value chain professionally and continuously to improve National connectivity Toll Revenue – Other Business Subsidiaries Revenue 2. Optimize regional development for community 17% 9% progress Mission 3. Increase value for shareholders.. 4. Enhance customer satisfaction through service excellence Toll Revenue – Jasa 5. Encourage the development and enhancement of Marga employee performance in a harmonious (13 old concessions environment.
    [Show full text]
  • Transformation for Sustainability
    PT JASA MARGA (Persero) Tbk TRANSFORMATION FOR SUSTAINABILITY 2017 SUSTAINABILITY REPORT Highlights of Company Message from the Board Message from the Board Concerning Sustainability Profile of Commissioners of Directors Sustainability Report Performance 2017 HIGHLIGHTS OF SUSTAINABILITY 5 COMPANY PROFILE 20 PERFORMANCE REPORT OF THE BOARD OF 37 REPORT OF THE BOARD OF 43 COMMISSIONERS DIRECTORS 49 57 CONCERNING SUSTAINABLE SUSTAINABILITY REPORT GOVERNANCE 2017 2 PT Jasa Marga (Persero) Tbk. 2017 Sustainability Report Sustainable Sustainability GRI Standards POJK No. 51 of 2017 Indeks GRI Governance Performance Application Statement Reference Standards Opsi “Core” TABLE OF CONTENTS THEME 3 HIGHLIGHTS OF SUSTAINABILITY PERFORMANCE 6 Economic Aspect 6 Environmental Aspect 8 Social Aspect 10 AWARD AND CERTIFICATIONS 12 IMPORTANT EVENTS 14 SUSTAINABILITY PERFORMANCE ASPECTS OVERVIEW 17 A COMPANY PROFILE 20 Vision, Mission, and Sustainability Values 21 Brief Profile 24 Scale of Business 26 Employee Profile 27 Policy in Employment Opportunities 31 Share Ownership Information 32 Operation Area 32 Business Field 33 Membership of the Association 35 Significant Changes 35 B MANAJEMENT REPORT 36 Message from the Board of Commissioners 37 Message from the Board of Director 43 C ABOUT SUSTAINABILITY REPORT 2017 49 D SUSTAINABILITY GOVERNANCE 57 Structure of Governance 58 Position of GMS, Board of Commissioners and Directors 60 Risk Management Control 75 Stakeholders Management 77 Supply Chain 80 The Problems Encountered 81 E SUSTAINABILITY PERFORMANCE 84 Economic Aspect 84 Social Aspect 85 Environmental Aspect 98 Product Responsibility 102 FEED BACK SHEET 106 STATEMENTS OF GRI STANDARDS APPLICATION 107 INDEX OF FINANCIAL SERVICES AUTHORITY REGULATION (FSA) NO.51 108 INDEX OF GRI STANDARDS IN OPTION “CORE” 109 PT Jasa Marga (Persero) Tbk.
    [Show full text]
  • Jasa Marga Update 1Q2021olders Meeting 1 August 2019 Company Overview
    Jasa Marga Update 1Q2021olders Meeting 1 August 2019 Company Overview 2 Company Highlights Brief Snapshot Company Highlights • Leading toll road operator in Indonesia with more than 40 years of • Largest toll road operator in Indonesia with 67% market share in experience. term of operated commercial toll roads lengths (± 1,214 km). • 34 toll road concessions with total length of 1,603 km. • The longest concession period holder in Asia reflecting stable • 70% shares owned by the Government of Indonesia. income. • Listed on the Indonesia Stock Exchange since 2007, with a market cap • Strategically important with strong government ownership. Rp29.3 trillion as of 31st March 2021. • Resilient industry with strong government focus. • Key business • Strong financial profile with promising growth going forward. • Construction, operation and maintenance of toll road • Supporting business / other business • Toll Road Operation Services (Provides operation services for Jasa Marga Group and other toll road investors) Vision & Mission • Toll Road Maintenance Services (Provides maintenance services for Jasa Marga Group and other toll road investor) To be the largest, trusted and sustainable national toll Vision road network company. • Prospective Business (Manages rest areas and other properties on toll road corridors) 1Q2021 Revenue Breakdown 1. Lead toll road business along the end-to-end value chain professionally and continuously to improve National connectivity. 2. Optimize regional development for community progress. Mission 3. Increase value for shareholders. 4. Enhance customer satisfaction through service excellence. 5. Encourage the development and enhancement of employee performance in a harmonious environment. 3 Company Key Development Milestone ✓Government offered the opportunities ✓Jasa Marga was established with for the private sector to participate in focus on business management, toll road business through Build, maintenance and procurement of Jasa Marga became a public Operate and Transfer (BOT) system the toll road network.
    [Show full text]
  • Along with Indonesia's Rapid Economic Growth of About 8 Percent Annually
    TRANSPORTATION AND LAND USE DYNAMICS IN METROPOLITAN JAKARTA Bambang Susantono This article is an attempt to build an understanding of current interactions between land development and transportation infrastructure in the Jakarta Metropolitan Area. The in tention is to pro vide a basis for further research in transportation and land use planning in megacities in the developing world. Four issues are revealed by the discussion. Firs t, transportation infrastructure development has promoted urban sprawl in Jakarta 's peripheries. Second, the in creased accessibility of suburbs, combined with poor land management and corrup t public servants have resulted in uncontrolled development in Jakarta 's urban fringes. Third, the curren t situation of Jakarta's organic growth has resulted from the informal development practices which dominate the land development in Jakarta 's suburbs. Fourth, the government should .be more consistent in following their own plans and regulations. Otherwise, the uncontrolled development which has reached an alarming position will be far more difficult to handle. Introduction Along with Indonesia's rapid economic growth of about 8 percent annually in the last decade, the city of Jakarta has been experiencing some dramatic changes in its landscape. As the dominating economic and political center of the country, Jakarta has been growing economically and demographically at least twice as fast as the nation as a whole. Yet the planning and management responses to those changes have been inadequate because of various limitations. As a consequence, land use changes often do not conform with the plans, employment centers are located regardless of the traffic impacts in the surrounding areas, and traffic congestion is found in almost every corner of the city.
    [Show full text]
  • Jasa Marga Update 1Q2019 Company Overview Company Overview
    Jasa Marga Update 1Q2019 Company Overview Company overview Brief Snapshot Company Highlights • Leading toll road operator in Indonesia with 40 years of experience ✓ Largest toll road operator in Indonesia with 66% market share in • 33 toll road concessions with total length of 1,527 km terms of commercial toll roads lengths (±1.000 km) and 80% • 70% owned by the Government of Indonesia market share of toll road transaction volume • Publically listed on the Indonesia Stock Exchange since 2007, with a ✓ The longest concession period holder in Asia reflecting stable market cap IDR 43 trillion as of March 31st, 2019 income • Key business ✓ Strategically important with strong government ownership – Construction, operation and maintenance of toll road ✓ Resilient industry with strong government focus • Supporting business / other business ✓ Strong financial profile with promising growth going forward – Toll Road Operation Services (Provides operation services for Jasa Marga Group and other toll road investors) – Toll Road Maintenance Services (Provides maintenance services for Jasa Marga Group Vision & Mission and other toll road investor) – Property (Manages rest areas and other properties on toll road corridors) To be the largest, trusted and sustainable national toll 1Q2019 Segmental Revenue Breakdown Vision road network company. Other Business Toll Revenue – Revenue 1. Lead toll road business along the end-to-end value 8% Subsidiaries chain professionally and continuously to improve 13% National connectivity 2. Optimize regional development for community progress Mission 3. Increase value for shareholders.. Toll Revenue – Jasa Marga 4. Enhance customer satisfaction through service (13 old excellence concessions in balance sheet) 5. Encourage the development and enhancement of 79% employee performance in a harmonious environment.
    [Show full text]
  • New Town Development in Jakarta Metropolitan Region (JMR): a Perspective of Spatial Segregation
    New Town Development in Jakarta Metropolitan Region (JMR): a Perspective of Spatial Segregation Tommy Firman Department of Regional and City Planning Institute of Technology, Bandung Indonesia The extent to which land and new town development has reinforced spatial segregation in Jakarta Metropolitan Region (JMR) is discussed. The demand for new town has been essentially generated by the need for security and fulfilling exclusive life style, while innovative have been able to sell an image of new town as a symbol of ‘modernism.’ New town development has reinforced spatial segregation in three ways: First, it has polarized the middle and upper income groups, resulting in scattered pockets of exclusive residential areas. Second, within the new towns themselves, the upper middle and high class occupied exclusive designed areas and to the highest security possible. Third, in several new towns urban development management are carried out by the developers, instead of by the City Hall. The spatial segregation in JMR can be classified as ‘self segregation’ or ‘voluntary segregation.’ It would continue and it is inevitable, resulted from socioeconomic and political condition of the urban society as a whole. This paper is concerned with the extent to which land and new town development have reinforced spatial segregation in Jakarta Metropolitan Region, the largest concentration of urban population and economic activities in Indonesia. Spatial segregation refers to the residential separation of sub-groups within a wider population which could be associated primarily with racial groups, ethnicity, religious beliefs or income status (Johnston et al, 1983). According to van Kempen and Ozuckren (1998) spatial segregation comes into existence when some areas show an overrepresentation and other areas an underrepresentation of members of group.
    [Show full text]