JIGAWA STATE DUE PROCESS AND PROJECT MONITORING BUREAU CONTRACT AWARDED ARIL, 2021 S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING COMP.PERIO C MINISTRIES D O N T 1 R
Al-Juraj Synergy Nig 08/04/02021 Supply of Diesel to Urban Town Streetlights Generator at Gumel malam Madori Road in Gumel LGA (Lot-8D) JEC/247/2021/VOL.I/17 Ltd 20,994,750.00 Local Govt 12 Months 2
Supply of Diesel to urban town Streetlights Generators at Sule Tankarkar Gumel Road in Sule Tankarkar LGA Al-Juraj Synergy Nig 08/04/02021 (Lot-24A) JEC/246/2021/VOL.I/17 Ltd 14,996,250.00 Local Govt 12 Months 3
Al-Juraj Synergy Nig 08/04/02021 Supply of Diesel to Urban Streetlights Generator at Malam Madori Court in Malam Madori LGA (Lot-19A) JEC/245/2021/VOL.I/17 Ltd 17,995,500.00 Local Govt 12 Months 4
Constr. Of of 1No. Solar Powered water Supply Scheme at Babura Gidan makeri in babura Constituency Lot- Mufamabex Concept 23/04/2021 12 JEC/261/2021/VOL.I/13 Nig ltd 7,225,058.20 Min of Water Res 3 month 5
Constr. Of 1no. Solar powered Water supply scheme at babura Kofar Arewa Bayan Asibiti in Babura Mufamabex Concept 23/04/2021 Constituency Lot-13 JEC/262/2021/VOL.I/13 Nig ltd 7,225,058.20 Min of Water Res 3 month 6
Constr. Of 8No. Hand Pump Boreholes at Tashar Gambo, kwadage malamawa, Gidan Nagawo malamawa, Gangara Duhuwa, Gidan Ibrah, G/Alh. Hardo unguuwar gawo, Duhuwa and Bela Fulani in babura Mufamabex Concept 23/04/2021 constituency Lot-2 JEC/305/2021/VOL.I/17 Nig ltd 7,313,040.00 Min of Water Res 6 Weeks
Page 1 of 8 7
Constr of 1No. Friday Prayer Mosque (2021 Constituency project) Lot-85 at Yar Kirya Type (B) in Babura Mufamabex Concept 27/04/2021 Constituency JEC/109/2021/VOL.I/26 Nig ltd 11,001,599.70 Cabinet Office 12 Weeks 8
AYH Investment Co 23/04/2021 Constr. Of 1No Solar powered water supply scheme at kasaga tsohuwa in Guri Constituency Lot-28 JEC/325/2021/VOL.I/13 Ltd 7,153,382.58 Min of Water Res 3 Months 9
23/04/2021 Constr. Of 1No. Hand Pump Borehole at IGGI Kudu Tsallake in Birnin Kudu Constituency Lot-3 JEC/324/2021/VOL.I/17 Nabakwai Gen Ent 912,997.00 Min of Water Res 2 weeks 10
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Dumba in Kaugama Constituency Lot-34 JEC/280/2021/VOL.I/13 Nabakwai Gen Ent 7,246,504.45 Min of Water Res 3 Months 11
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Hadin in Kaugama Constituency Lot-35 JEC/324/2021/VOL.I/13 Nabakwai Gen Ent 7,246,504.45 Min of Water Res 3 Months 12
Mufamabex Concept 23/04/2021 Constr. Of 1No Solar powered water supply scheme at Kara'ade unguwar gamji in babura Constituency Lot-11 JEC/260/2021/VOL.I/13 Nig ltd 7,225,058.20 Min of Water Res 3 Months 13
Alh. Umaru Babandoki 29/04/2021 Constr. Of Hadejia Emirate Museum (2021 Constituency Project) Lot-165 at Hadejia Constituency JEC/180/2021/VOL.I/28 Nig Ltd 15,798,385.80 Cabinet Office 12 Weeks 14
AYH Investment Co 23/04/2021 Constr. Of 1No solar powered supply scheme at Kubulu in Guri Constituency Lot-25 JEC/273/2021/VOL.I/13 Ltd 7,153,382.58 Min of Water Res 3 Months 15
AYH Investment Co 23/04/2021 Constr. Of 1No Solar powered water supply scheme at majanguwa in Guri Constituency Lot-27 JEC/275/2021/VOL.I/13 Ltd 7,153,382.58 Min of Water Res 3 Months 16
AYH Investment Co 23/04/2021 Constr. Of 1No. Solar powered water supply scheme at garin Malam in Guri Constituency Lot-29 JEC/276/2021/VOL.I/13 Ltd 7,153,382.58 Min of Water Res 3 Months
Page 2 of 8 17
AYH Investment Co 23/04/2021 Constr. Of 1No. Solar Powered water supply scheme at Jarmari in Guri Constituency Lot-24 JEC/272/2021/VOL.I/13 Ltd 7,153,382.58 Min of Water Res 3 Months 18
AYH Investment Co 23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Giryo in Guri constituency Lot-22 JEC/271/2021/VOL.I/13 Ltd 7,153,382.58 Min of Water Res 3 Months 19
AYH Investment Co 23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Yallari Gana in Guri Constituency Lot-21 JEC/270/2021/VOL.I/13 Ltd 7,153,382.58 Min of Water Res 3 Months 20 Constr. Of 13No. Hand Pump Boreholes at Rugar Manu Gaye, Rugar Alh. Haruna Majanna, Rugar Shara Dangolori, Gidan Umaru, Diginsa Gari, Wailare Rugar Saidu, Rugar umaru Kanda, Fulanin Guragura, Laraba Kachallari, Dalari Kachallari Fulanin Gwadari, Fulanin Kabiwa Karanga and Fulanin Kilbu in Birniwa AYH Investment Co 23/04/2021 Constituency Lot-4 JEC/306/2021/VOL.I/17 Ltd 11,848,557.50 Min of Water Res 6 Weeks 21 Constr. Of 24No. Hand Pump boreholes at Kamugatawa , Rugar mammare, Aguran ung. Dakeje, Turakawa G. Jauro Guda, g/Dan Ba'andi Kafinta K/Hausa, Zabau G. Su marka, layin su Aima K/Hausa, kanzan Gari, kauzawa Makabarta, Damanyo Rugar Ori, Kargo, G/Musa Larsha Kyari Babba, Tambale, galadimawa, Hadagwaligwai, manaba, Birkidi, Ganzarawa, Kazakwa G. Uba, Kununu G. Sha'aibu dan Fulani, Alimawa G. Gidan Adede Gen Ent 23/04/2021 wanzan, Giware G. Chad and Maruwa Kumo in Kafin Hausa Constituency Lot-19 JEC/313/2021/VOL.I/17 Ltd 21,998,400.00 Min of Water Res 8 weeks 22
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Male in Gumel Constituency Lot-31 JEC/277/2021/VOL.I/13 Ngaloma Constr Co Ltd 7,266,257.58 Min of Water Res 3 Months 23
23/04/2021 Constr. Of 1No Solar Powered water Supply scheme at Hammado Kofar Fada in Gumel Constituency Lot-32 JEC/278/2021/VOL.I/13 Ngaloma Constr Co Ltd 7,266,257.58 Min of Water Res 3 Months 24
Replacement of 1No SQ Flex Solar Pumps at Kokinami (Mekanya) and Extension of pipeline at Tukufar Sabo 23/04/2021 Kofa NTA (Galagamma ) in Gumel Constituency Lot-33 JEC/279/2021/VOL.I/13 Ngaloma Constr Co Ltd 3,616,515.00 Min of Water Res 3 Months 25
Constr. Of 2No. 5 Daily Prayer Mosques (2021 Constituency Project) Lot-81 at Sakkwatawa and Burji in Miga Gidan Adede Gen Ent 27/03/2021 Constituency JEC/105/2021/VOL.I/26 Ltd 2,843,515.70 Cabinet Office 12 Weeks 26 Constr. Of 25no. Hand Pump Boreholes at Kwari, Gidan Dago, Kore Malam, Kwadage Chamber, Gidan Badukai, Sabuwar Maraya, Gidan Barwa, Yar Mashaya, Marayar Gara Fulani, Jaruwa Fulani, Nahuce, Akena, gaida Gidan Dogo, Atuman, Kaman tsara, makai, Likindin, Koma bulkaci Fulani, gama Jiki Tsari, Dinzai Gidan Taura, Dinzai kwariba, Yola askawa, kargo, Barnoji Gidan Dinya and Narba Kauye in Jahun Constituency Lot- Gidan Adede Gen Ent 23/04/2021 46 JEC/323/2021/VOL.I/17 Ltd 22,859,875.00 Min of Water Res 12 Weeks
Page 3 of 8 27
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Damonadari in Gagarawa Constituency Lot-55 JEC/286/2021/VOL.I/13 Amm Manzo Nig Ltd 7,271,336.95 Min of Water Res 3 Months 28
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Firya in Gagarawa Constituency Lot-58 JEC/289/2021/VOL.I/13 Amm Manzo Nig Ltd 7,271,336.95 Min of Water Res 3 Months 29
23/04/2021 Constr. Of 1No. Solar powered water Supply scheme at Zingaran in Gagarawa Constituency Lot-57 JEC/288/2021/VOL.I/13 Amm Manzo Nig Ltd 7,271,336.95 Min of Water Res 3 Months 30
23/04/2021 Constr. Of 1No. Solar powered water Supply scheme at Jagindi in gagarawa Constituency Lot-56 JEC/287/2021/VOL.I/13 Amm Manzo Nig Ltd 7,271,336.95 Min of Water Res 3 Months 31
23/04/2021 Constr. Of 1No. Solar Powered water Supply Scheme at Arbuna in Auyo Constituency Lot-2 JEC/258/2021/VOL.I/13 Amm Manzo Nig Ltd 7,271,336.95 Min of Water Res 3 Months 32
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Gidan Jigawa in Auyo constituency Lot-1 JEC/257/2021/VOL.I/13 Amm Manzo Nig Ltd 7,271,336.95 Min of Water Res 3 Months 33
Constr. Of 8No. Hand Pump Boreholes at malkaderi Fulanin Gurinbi, Maitsintsiya Fulani, Ganji Fulani (G. Alh. Dake), Medu Fulani G/Bawa, Gayawa Tudun Fulani G/musa, Magaji Fulani G/Alh. Wakili, maijiruwa Fulani 23/04/2021 G/Mal. Hudi and mai Aduwa Fulanin g/mai Duna in Gagarawa constituency Lot-8 JEC/309/2021/VOL.I/17 Amm Manzo Nig Ltd 7,303,976.00 Min of Water Res 6 Weeks 34
23/04/2021 Constr. Of 1No Solar powered water supply scheme at Ajja in Kanya Constituency Lot-71 JEC/295/2021/VOL.I/13 Deetech Nig Ltd 7,175,957.58 Min of Water Res 3 Months 35
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Danhalili kanya Constituency Lot-70 JEC/294/2021/VOL.I/13 Deetech Nig Ltd 7,175,957.58 Min of Water Res 3 Months 36
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Unguwar Magaji in Yankwashi Constituency Lot-73 JEC/297/2021/VOL.I/13 Deetech Nig Ltd 7,267,668.51 Min of Water Res 3 Months
Page 4 of 8 37
23/04/2021 Constr. Of 1No. Solar powered watersupply scheme at Kuzunzumi in kanya Constituency Lot-72 JEC/296/2021/VOL.I/13 Deetech Nig Ltd 7,175,957.58 Min of Water Res 3 Months 38
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Durbe in Yankwashi Constituency Lot-74 JEC/298/2021/VOL.I/13 Deetech Nig Ltd 7,267,668.51 Min of Water Res 3 Months 39
23/04/2021 Constr. Of 1No. Hand pump Borehole at kanya in kanya Constituency Lot-20 JEC/314/2021/VOL.I/17 Deetech Nig Ltd 913,750.00 Min of Water Res 4 Weeks 40
Gidan Adede Gen Ent 27/04/2021 Constr. Of wall fencing (2021 Constituency Project) Lot-137 at Andaza Primary School in Kiyawa Constituency JEC/154/2021/VOL.I/26 Ltd 5,864,355.25 Min of Water Res 12 Weeks 41
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Kyambo in Kanya Constituency Lot-68 JEC/292/2021/VOL.I/13 Deetech Nig Ltd 7,175,957.58 Min of Water Res 3 Months 42
23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Yada in Kanya Constituency Lot-69 JEC/293/2021/VOL.I/13 Deetech Nig Ltd 7,175,957.58 Min of Water Res 3 Months 43
Pullad Global Consult 23/04/2021 Constr. Of 1No. Solar powered water supply scheme at Dadin Duniya in Dutse Constituency Lot-50 JEC/285/2021/VOL.I/13 Ltd 7,278,956.02 Min of Water Res 3 Months 44
Constr. Of 5No. Hand Pumps Boreholes at Digawa, Zango, Ilasawa Gidan gawo and Tsatsago in Dutse Pullad Global Consult 23/04/2021 Constituency Lot-7 JEC/308/2021/VOL.I/17 Ltd 4,560,690.00 Min of Water Res 4 Weeks 45
Constr. Of 2no. 5 Daily Prayer Mosque (2021 Constituency Project) Lot 57B at gidan Tsamiya and Garbo in 21/04/2021 Miga Constituency JEC/79/2021/VOL.I./26 Loyalty Properties Ltd 4,683,148.34 Min of Water Res 12 Weeks 46
Constr. Of 6No. Of Hand Pumps Boreholes at Ung. Shamaki, Makabarta (HDJ Gen. Hospital) makabarta Alh. Umaru Babandoki 23/04/2021 Makara Huta, Layin Dan Batalle, Gandun Sarki and Kwanar Bazawarai in hadejia Constituency (Lot-13) JEC/310/2021/VOL.I/17 Nig Ltd 5,449,600.00 Min of Water Res 8 weeks
Page 5 of 8 47
Contr. Of 7No. Water Collection point at maigatari gangaren Kotu, matoya, maidi, Dakido, tsuru, Kattakara Alh. Umaru Babandoki 23/04/2021 and Garin Karam in maigatari Constituency Lot-38 JEC/321/2021/VOL.I/17 Nig Ltd 14,207,275.95 Min of Water Res 6 Weeks 48
Amia Integ Serv Nig 23/04/2021 Constr. Of 1No Solar powered water supply scheme at Asayaya in taura Constituency Lot-36 JEC/281/2021/VOL.I/13 Ltd 7,235,781.33 Min of Water Res 3 Months 49
Constr. Of 6No. Water collection point at kanya Karama, Medori, tsamiyar Zaki, Haushen Dole, gatare and Alh. Umaru Babandoki 23/04/2021 Tsnikaina in Birniwa Constituency Lot-31 JEC/319/2021/VOL.I/17 Nig Ltd 12,177,845.10 Min of Water Res 8 weeks 50
Lines & Dimension Nig 21/04/2021 Constr. Of 1No 5 Daily prayer mosque (2021 constituency project) Lot-32 at Jigawa in Gwaram Constituency JEC/60/2021/VOL.I/26 Ltd 2,336,627.25 Cabinet Office 12 Weeks 51
Supply of Solar electrification (2021 Constituency Project) Lot-151 at S/gwaram Masjid in Gwaram Lines & Dimension Nig 21/04/2021 Constituency JEC/167/2021/VOL.I./26 Ltd 3,997,061.78 Cabinet Office 12 Weeks 52
Supply of solar electrification (2021 Constituency Project) Lot-150 at S/Gwaram Central Mosque in Gwaram Lines & Dimension Nig 21/04/2021 Constituency JEC/166/2021/VOL.I/26 Ltd 4,073,794.20 Cabinet Office 12 Weeks 53
Renovation of 1No. Friday prayer Mosque (2021 Constituency Project) Lot-125 at Sabuwar Gwaram in Lines & Dimension Nig 21/04/2021 Gwaram Constituency JEC/142/2021/VOL.I/26 Ltd 4,680,980.16 Cabinet Office 12 Weeks 54
Constr. Of 22.5m3 of Overhead Tank replacement of solar panels at Kukule and Kadaita in Gagarawa 23/04/2021 Constituency Lot-59) JEC/290/2021/VOL.I/13 Amm Manzo Nig Ltd 3,891,930.00 Stowa 3 Months 55
23/04/2021 Constr. Of solar powered water supply scheme at Digawar hausawa in Ringim Constituency Lot-15 JEC/264/2021/VOL.I/13 Khairussabah Nig Ltd 7,265,693.20 Stowa 3 Months 56
23/04/2021 Constr. Of 1No. solar powered water supply scheme at Kwanadar in Ringim Constituency Lot-18 JEC/267/2021/VOL.I/13 Khairussabah Nig Ltd 7,265,693.20 Stowa 3 Months
Page 6 of 8 57
Jignaj Global Constr 23/04/2021 Constr. Of 1No. solar powered water supply scheme at bakwarga/Gofara in BujiConstituency Lot-87 JEC/300B/2021/VOL.I/13 Ltd 7,326,927.89 Stowa 3 Months 58
Jignaj Global Constr 23/04/2021 Constr. Of 1No. solar powered water supply scheme at Chakwama in Buji Constituency Lot-88 JEC/300A/2021/VOL.I/13 Ltd 7,326,927.89 Stowa 3 Months 59
Constr. Of 6No. Hand Pump Boreholes at Ahoto Hinari, Buji Muhi, Falgeri, gantsa Badaure, Kukuma Guduba Jignaj Global Constr 23/04/2021 tsangaya and madabe Friday Mosque in Buji Constituency Lot-5 JEC/307A/2021/VOL./17 Ltd 5,469,600.00 Ruwasa 6 Weeks 60
Constr. Of 3No. 5 daily prayern mosque (2021 Constituency project ) Lot-58 at Iyakar gari, Garko and Pullad Global Consult 21/04/2021 Gambawa in miga Constituency JEC/81/2021/VOL.I./26 Ltd 7,006,463.67 Cabinet Office 12 Weeks 61
Constr. Of 3No. 5 daily prayern mosque (2021 Constituency project ) Lot-53 at hankaka, Bosuwa and bakawa Pullad Global Consult 21/04/2021 in maigatari Constituency JEC/75/2021/VOL.I/26 Ltd 7,016,790.75 Cabinet Office 12 Weeks 62
Danfatu & Sons Nig 23/04/2021 Constr. Of 1No Solar powered water supply scheme at Jama'ar ayam in Auyo Constituency Lot-3 JEC/259/2021/VOL.I/13 Ltd 7,243,682.58 Stowa 3 Months 63
Constr. Of 8no. Hand pumps Boreholes at Kabari Sarki dan tunku, Fulanin Gizo Yamma, Fulanin Gizo gabas, Kwagga Kofar gabas, Dankuliya Fulani, Dan kuliya Bima, Karya danki K/G mal. Rabiu and Bayan dutse in Yanduna Ventures Nig 23/04/2021 Kazaure Constiteuncy Lot-22 JEC/316/2021/VOL./17 ltd 7,284,200.00 Ruwasa 6 Weeks 64
Replacement of 6no. SQ Flex Solar Pumps at Sankara 2, Sankara, Dallare, Dan Makeri, Gidan Lage and Marb Engr Multy Serv 27/04/2021 Kyarama in Ringim Constituency Lot-20 JEC/269/2021/VOL.I/16 Ltd 7,551,337.50 Min of Water Res 3 Months 65
23/04/2021 Constr. Of 1No Solar Powered water supply scheme at Sada in Yankwashi Constituency Lot-75 JEC/299/2021/VOL.I/13 Deetech Nig Ltd 7,267,668.51 Stowa 3 Months 66
Constr. Of 10No. Hand pump boreholes at Harba Rotso, Akuwa, Dangwala, Kabob Cikin hari, Markaba, Gwazaye, andaza Kudu S/ung Masallacin Juma'a andaza, jama'ar Isah and Zorare in Kiyawa Constituency Lot- Gidan Adede Gen Ent 23/04/2021 24 JEC/317/2021/VOL.I/17 Ltd 9,110,625.00 Ruwasa 6 Weeks
Page 7 of 8 67
Constr. Of 7No. Water Collection points at Kiyawa Makara Huta, Kiyawa Sabuwar madina, Andaza gabashi, Gidan Adede Gen Ent 23/04/2021 Andaza ung. Gora, katanga Cikin Gari, Gurduba Cikin Gari and Tsirma in Kiyawa Constituency Lot-37 JEC/320/2021/VOL.I/17 Ltd 14,169,736.00 Ruwasa 6 Weeks 68
Amia Integ Serv Nig 23/04/2021 Constr. Of 1no. Solar Powered water supply scheme at Kaya Gazara in taura Constituency Lot-37 JEC/282/2021/VOL.I/13 Ltd 7,235,781.33 Stowa 3 Months 69
Constr. Of 8no. Hand pumps Boreholes at dangyatin bakin titi, Gora, Zagau, Alfa,Azamago, Asayaya, 23/04/2021 Makabarta Tsagaiwa and Kulawa maduga in miga constituency lot-26 JEC/318/2021/VOL.I/17 Loyalty Properties Ltd 7,310,000.00 Ruwasa 6 Weeks 70 Constr. Of 14No. Hand Pumps Boreholes at Gidan Fara, Gidan Malamai Isah fulani, Kadama, Digawar yalwa, Magudawar Ruwa, darai Gidan Duma, Tsurutawa, Fulanin yalwa Ung. Arewa kunanyi, Sabuwar Maraya Rinde, malamawa Nardu, Unguwar Wada Lambun Runde, tata dan Zai and Zangon Usman Kulawa gamji in 23/04/2021 Jahun Constituency Lot-17 JEC/312/2021/VOL.I/17 Loyalty Properties Ltd 12,792,500.00 Ruwasa 4 Weeks 71
Constr. Of 1No. Friday prayer Mosque( 2021 Constituency project ) lot107 at Zazzabau ( Dankumbo Ward) In 29/04/2021 Maigatari constituency JEC/124/2021/VOL.I/30 zurfat Investment Ltd 9,182,246.85 Cabinet Office 12 Weeks 72
AL-sabur Global link 25/03/2021 Completion of danmasara industrial Layout Electrification project in Dutse LGA JEC/252/20211/VOL.I/6 Nig Ltd 25,973,854.19 Rural Elect Board 8 weeks 73
Design Plus 28/04/2021 Consultancy services rendered at Sule Lamido University, Kafin Hausa (Phase 1 & II of the University Project) FGPC/133/2012/VOL.I/77 Consultants 150,073,731.16 Min of Education 6 weeks 74 Constr. Of 22no. Hand Pump Boreholes at Maiyadiya, Toron Kayi, Baban Cha, Gonina, Kwarin Harbo, Billawa, Tafkawa, Chadi Kuka Kwance, Kulawa mai kasuwa, Kadirawa, Rugar Gabas, wayo koyawa, badawa, gabarin, Damutawa Gabashi, Fulanin Yamma, Dinza, Zangon Kura, Unguwar Tarai, Daidai, Gunka, Huci, Taraya, Kafin Pullad Global Consult 23/04/2021 Nono and Gidan ganji in Jahun Constituency Lot-14 JEC/311/2021/VOL.I/17 Ltd 22,859,875.00 Ruwasa 6 Months
772,386,015.14