Bharat Petroleum Corporation Limited, ENNORE COASTAL INSTALLATION, Athipattu Village, Ponneri Taluk, Thiruvallur Dist

Total Page:16

File Type:pdf, Size:1020Kb

Bharat Petroleum Corporation Limited, ENNORE COASTAL INSTALLATION, Athipattu Village, Ponneri Taluk, Thiruvallur Dist Bharat Petroleum Corporation Limited, ENNORE COASTAL INSTALLATION, Athipattu village, Ponneri Taluk, Thiruvallur Dist. Tamil Nadu 600120 ADDITIONAL STORAGE FOR ETHANOL, BIO-DIESEL, KEROSENE (SKO) & AVIATION TURBINE FUEL (ATF) RISK ANALYSIS STUDY REPORT October 2016 RiskChem Engineering Chennai Project Details 1. Report No. 1604 2. Report date OCTOBER 2016 RRA STUDY FOR ADDITIONAL STORAGE AT ENNORE COASTAL 3. Title & subtitle INSTALLATION 4. Reporting RISKCHEM ENGINEERING organization name & #4 FIRST STREET, VGP GOLDEN BEACH SOUTH PART III address CHENNAI 600 119 Mob: 098401 44908 Ph: 044 2453 0699 email: [email protected] BHARAT PETROLEUM CORPORATION LTD., SOUTHERN REGIONAL OFFICE, 5. Supporting 1,RANGANATHAN GARDEN, OFF 11TH MAIN ROAD, organization name & POST BOX NO.1212&1213, address ANNA NAGAR WEST CHENNAI 600040 TAMILNADU 6. Sponsoring RFQ Number/ Date: 6000977879/ 26.09.2016 organization reference(s) COLLECTIVE RFQ Number: 1000265379 Main Report 33 7. No. of pages Annexures 21 Risk analysis studies were carried out for additional storage of ethanol. Bio-diesel, kerosene and ATF at BPCL’s POL installation at Ennore, Tamil Nadu. The exercise has been undertaken in compliance with The Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 (Amended 2000) that govern installations involving hazardous chemicals The methodology and guidelines given in INDIAN STANDARD HAZARD IDENTIFCATION AND RISK ANALYSIS - CODE OF PRACTICE (IS 15656:2006) were adopted for the analysis. Risk analysis tools used in the assessment include PHA, consequence and frequency analyses. The assessment was based on site and operation related information provided by the client. The findings are the result of the application of the best available techniques and practices applicable to the project. The conclusions drawn are the educated and unbiased opinion of the consultant. Signatory: DR. A. KOSHY (Chem. Engg.) (PROJECT CONSULTANT) OCTOBER 2016 Executive Summary of Risk Analysis Study A risk analysis study was undertaken to assess the risk levels of additional storage at BPCL’s POL Installation at Ennore. The main findings are summarized below. 1. The hazardous outcomes from eleven potential hazardous scenarios were envisaged for the the proposed additional storage at the POL installation. 2. The consequences for each of these hazardous scenarios were estimated and the effects on life & property quantified. This included effects of thermal radiation from tank fires, pool fires, and flash fires 3. The estimated effects in terms of damage distances were projected on the installation layout to demarcate vulnerable areas with respect to plant personnel, property and the public. 4. The effects from tank & pool fires and flash fires were found to be localized and fall within the proximity of dykes 5. The damage zones are largely confined within the installation with no significant impacts falling outside. 6. The risk was assessed considering the full implementation of the M.B. Lal Committee recommendations. 7. No impact is expected to fall on personnel stationed at the manned locations within the site from the proposed additional storage units. 8. The risk of fires from the proposed additional storage affecting the operating personnel was found to be negligible. The risk zones will be mainly confined within the plant site and will not have any effect on the persons outside the plant. 9. This report is to be considered as an addendum to the Risk Analysis report for the Ennore Coastal Installation. The recommendations from the report for the existing facility hold good for the current report. Additional measures for risk reduction have been provided for the proposed additional storage Table of Contents CHAPTER ONE PROJECT DESCRIPTION 1 1.1 Introduction 1 1.2 Description of the proposed additions onsite 1 1.3 Objective and Scope of Risk Analysis studies 2 APPENDIX 1 BRIEF DESCRIPTION OF PROPOSED ADDITIONAL STORAGE UNITS 4 CHAPTER TWO HAZARD IDENTIFICATION 6 2.1 Hazard Identification Methods used and the basis 6 2.2 Source characteristics - Hazard Classification based on Inherent Hazards 6 2.3 Credible accident sources/worst case scenarios - Past Accident Analysis. 7 2.4 Methodology for Hazard Identification - Fire & Explosion Index (F&EI) 8 2.5 Summary 9 APPENDIX 2 FIRE & EXPLOSION INDEX WORKSHEET 10 CHAPTER THREE CONSEQUENCE MODELLING 11 3.1 Preamble 11 3.2 System Boundaries 11 3.3 Identification and Construction of Hazardous Scenarios 11 3.4 Consequence Modelling 13 3.5 Damage Contour Plots 15 3.6 Summary 19 APPENDIX 3 OUTPUTS FROM CONSEQUENCE CALCULATIONS 20 CHAPTER FOUR DETERMINATION OF RISK AT THE INSTALLATION - PROBABILITY ASSESSMENT 24 4.1 Accident Frequency Estimation 24 4.2 Summary of Safety & Automation features 24 4.3 Failure Frequency Analysis 25 4.4 Observations 26 CHAPTER FIVE EVALUATION OF RISK TO PERSONNEL WITHIN AND OUTSIDE THE INSTALLATION 27 5.1 Preamble 27 5.2 Risk Evaluation 27 5.3 Potential for Secondary/ Cascade Events 29 5.4 Summary 29 CHAPTER SIX MAJOR FINDINGS & RECOMMENDATIONS 30 6.1 Preamble 30 6.2 Main Findings of Consequence Assessment 30 6.3 Incident Frequencies of Hazardous Outcomes within the installation 31 6.4 Summary of Risk levels arising at the Installation 31 6.5 Evaluation of Risk from additional storage units 31 6.6 Additional measures for Risk Reduction for additional storage units 32 6.7 Conclusion 33 ANNEXURE I MATERIAL SAFETY DATA SHEETS 34 ANNEXURE II PAST ACCIDENT ANALYSIS 46 ANNEXURE III INFORMATION USED IN THE STUDIES 51 ANNEXURE IV IDENTIFYING INDEPENDENT PROTECTION LAYERS (IPLS) – LAYERS FOR DEFENSE AGAINST A POSSIBLE ACCIDENT 53 ANNEXURE V MODELS USED IN CONSEQUENCE ANALYSIS 54 LIST OF ABBREVIATIONS A/G Above Ground ALARP As Low As Reasonably Practicable AR Alcohol Resistant BPCL Bharat Petroleum Corporation Limited CAS Credible Accident Scenarios CCA Cause-Consequence Analysis CCOE Chief Controller of Explosives CO2 Carbon dioxide CR Cone Roof CW Cross Wind DW Down Wind F&EI Fire & Explosion Index FR Fixed Roof FW Fire Water GPH General Process Factor HPCL Hindustan Petroleum Corporation Limited IS Indian Standard KL kiloliter MBLCR M B Lal Committee Recommendations MF Material Factor MSDS Material Safety Data Sheet OGP International Association of OIL & GAS PRODUCERS OISD Oil Industry Safety Directorate OWS Oil Water Separator PESO Petroleum and Explosives Safety Organisation PHA Preliminary Hazard Assessment PL Pipeline PM Preventive Maintenance POL Petroleum, Oils, Lubes RADD Risk Assessment Data Directory RO Retail Outlets ROSOV Remote Operated Shut Off Valve SMS Safety Management System SOP Standard Operating Procedures SPH Special Process Factor STD Standard TF Tank Farm TLFG Tank Lorry Filling Gantry TT Tank Truck U/G Underground BPCL ENNORE COASTAL INSTALLATION Risk Analysis for Additional Storage CHAPTER One Project Description 1.1 Introduction Bharat Petroleum Corporation Limited’s (BPCL) POL Installation located at Ennore, adjacent to the HPCL terminal, receives, stores and distributes Motor Spirit and High Speed Diesel (MS & HSD). The corporation proposes to provide additional storage for Ethanol, Bio-diesel, SKO and ATF at this location. The existing total petroleum storage tankage capacity is 1,17,035 KL in both aboveground and underground tanks. The proposed additional storage will increase the capacity by 48,176 KL, through the introduction of twelve aboveground tanks. These tanks are to be located within three new dykes within the installation. The proposed addition will not require any change in land acquisition, as the tanks will be located within the premises, adjacent to the existing storage tanks. The proposed introduction will in no way alter the current activities of the existing installation. As the storage involves flammable materials that are classified as hazardous1, risk analysis studies were conducted to assess the degree of risk. The report contains the results of this study carried out for the proposed onsite storage of ethanol, bio-diesel, SKO and ATF. The management of the plant has entrusted the risk analysis studies to be carried out by consultants from RiskChem Engineering (RCE), Chennai. 1.2 Description of the proposed additions onsite The installation provides bulk storage for large quantities of petroleum products in aboveground storage tanks, with smaller quantities in underground tanks. The existing and additional product wise capacity at the facility is shown in Table1.1 Table 1.1 Product wise Storage Capacity at Ennore Coastal installation (Existing & Propsed) S. No Product Existing capacity (KL) Additional capacity (KL) 1 MS (Motor Spirit) 56620 - 2 HSD (High Speed Diesel) 60115 - 3 Ethanol 200 7724 4 SLOP ( MIXED PRODUCTS) 100 - 5 Bio-diesel - 7484 6 SKO - 16484 7 ATF - 16484 TOTAL 117035 48176 The additional storage units for ethanol, biodiesel, SKO and ATF are proposed to be located within three tank farms north of the existing tankfarms for MS and diesel. 1 As per the various rules and schedules given under The Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 (Amended 2000) of the Environment (Protection) Act, 1986. RCE 1 BPCL ENNORE COASTAL INSTALLATION Risk Analysis for Additional Storage The risk analysis report for the existing installation is to be referred for details of the location and other aspects of the site description. The existing facilities for pipeline receipt, decanting facilities and loading facilities for tank trucks will be used for the receipt, storage and dispatch of the proposed products. The
Recommended publications
  • SNO APP.No Name Contact Address Reason 1 AP-1 K
    SNO APP.No Name Contact Address Reason 1 AP-1 K. Pandeeswaran No.2/545, Then Colony, Vilampatti Post, Intercaste Marriage certificate not enclosed Sivakasi, Virudhunagar – 626 124 2 AP-2 P. Karthigai Selvi No.2/545, Then Colony, Vilampatti Post, Only one ID proof attached. Sivakasi, Virudhunagar – 626 124 3 AP-8 N. Esakkiappan No.37/45E, Nandhagopalapuram, Above age Thoothukudi – 628 002. 4 AP-25 M. Dinesh No.4/133, Kothamalai Road,Vadaku Only one ID proof attached. Street,Vadugam Post,Rasipuram Taluk, Namakkal – 637 407. 5 AP-26 K. Venkatesh No.4/47, Kettupatti, Only one ID proof attached. Dokkupodhanahalli, Dharmapuri – 636 807. 6 AP-28 P. Manipandi 1stStreet, 24thWard, Self attestation not found in the enclosures Sivaji Nagar, and photo Theni – 625 531. 7 AP-49 K. Sobanbabu No.10/4, T.K.Garden, 3rdStreet, Korukkupet, Self attestation not found in the enclosures Chennai – 600 021. and photo 8 AP-58 S. Barkavi No.168, Sivaji Nagar, Veerampattinam, Community Certificate Wrongly enclosed Pondicherry – 605 007. 9 AP-60 V.A.Kishor Kumar No.19, Thilagar nagar, Ist st, Kaladipet, Only one ID proof attached. Thiruvottiyur, Chennai -600 019 10 AP-61 D.Anbalagan No.8/171, Church Street, Only one ID proof attached. Komathimuthupuram Post, Panaiyoor(via) Changarankovil Taluk, Tirunelveli, 627 761. 11 AP-64 S. Arun kannan No. 15D, Poonga Nagar, Kaladipet, Only one ID proof attached. Thiruvottiyur, Ch – 600 019 12 AP-69 K. Lavanya Priyadharshini No, 35, A Block, Nochi Nagar, Mylapore, Only one ID proof attached. Chennai – 600 004 13 AP-70 G.
    [Show full text]
  • Marine Infrastructure Developer Private Limited (MIDPL)
    Marine Infrastructure Developer Private Limited (MIDPL) Executive Summary PROPOSED REVISED MASTER PLAN DEVELOPMENT OF KATTUPALLI PORT December 2020 PREPARED BY C1161303 NABET ACCREDITED Certificate No: NABET/EIA/2023/RA 0175 RP003, Rev. A L&T Infrastructure Engineering Ltd. Client: Marine Infrastructure Developer Private Limited (MIDPL) Project: Proposed Revised Master Plan Project No.: Development of Kattupalli Port C1161303 Title: Document No.: Rev.: Executive Summary RP003 A This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\ports\2016\c1161303 - ceia kattupalli port nor be copied or otherwise made use of either in full or in part by such person or expansion\outputs\reports\rp003-executive summary\13.12.2020\executive body without our prior permission in writing. summary-14.12.2020.docx Notes: 1. Revision Details: SAP TKS A 13.12.2020 Second Submission SNV BRT S SNV SAP TKS 0 26.10.2020 First Submission Sd/- Sd/- Sd/- IRR BRT S Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved Table of Contents Proposed Revised Master Plan Development of Kattupalli Port C1161303 Executive Summary RP003 rev. A TABLE OF CONTENTS 1 Introduction .....................................................................................................................................1 2 Project Site ......................................................................................................................................1
    [Show full text]
  • Twentieth Annual Report 2019-20
    (A Company of Chennai Port Trust) Ministry of Ports, Shipping and Waterways, Government of India (CIN: U45203TN1999GOI043322) TWENTIETH ANNUAL REPORT 2019-20 KAMARAJAR PORT LIMITED Board of Directors DIN Shri Sunil Paliwal, Chairman-cum-Managing Director 01310101 Shri P. Raveendran, Nominee Director- ChPT 07640613 Shri S. Balaji Arunkumar, Nominee Director- ChPT 07526368 Shri V.M.V. Subba Rao, Independent Director 02435597 Capt. Anoop Kumar Sharma, Independent Director 03531392 Smt. Sarla Balagopal, Independent Director 01572718 Key Officials Depositories Shri Sanjay Kumar, National Securities Depository Limited General Manager (CS & BD) Central Depositories Services (India) Limited Shri M. Gunasekaran, Registered Office General Manager (Finance) cum CFO 2nd Floor (North Wing) & 3rd Floor Jawahar Building, Capt. A.K. Gupta, 17, Rajaji Salai, Chennai - 600 001. General Manager (Marine Services) Ph: 044 - 25251666-70 / Fax : 044 - 25251665 Shri V. Krishnasamy, Registrar & Share Transfer Agent General Manager (Operation) Link Intime India Private Limited Shri P. Radhakrishnan, C-101, 247 Park, L.B.S Marg Deputy General Manager (Civil) Vikhroli (West), Mumbai – 400 083. Ph : 022 – 49186000 / Fax : 022 - 49186060 Smt. Jayalakshmi Srinivasan Statutory Auditors Company Secretary M/s. B. Thiyagarajan & Co. Debenture Trustees Chartered Accountants (i) SBICAP Trustee Company Ltd Internal Auditors Mistry Bhavan, 4th Floor, M/s. Joseph & Rajaram 122, Dinshaw Vachha Road, Chartered Accountants Churchgate, Mumbai – 400 020. Ph: 022 – 43025555 Secretarial
    [Show full text]
  • Master Plan for Kamarajar Port
    Master Plan Report - Final May 2016 MASTER PLAN FOR KAMARAJAR PORT Master Plan for Kamarajar (Ennore) Port Prepared for Ministry of Shipping / Indian Ports Association Transport Bhawan, 1st Floor, South Tower, NBCC Place Sansad Marg, B. P Marg, Lodi Road New Delhi,110001 New Delhi - 110 003 www.shipping.nic.in www.ipa.nic.in Prepared by AECOM India Private Limited, 9th Floor, Infinity Tower C, DLF Cyber City, DLF Phase II, Gurgaon, Haryana, India, Pin 122002, India Telephone: +91 124 4830100, Fax: +91 124 4830108 www.aecom.com July 2016 © AECOM India Private Limited 2016 This document has been prepared by AECOM India Private Limited for the sole use of our client (the “Client”) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM India Private Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM India Private Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM India Private Limited. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of AECOM India Private Limited. SAGARMALA: Master Plan for Kamarajar (Ennore) Port Final Report Quality Information Client: Indian Ports Association/ Ministry of Shipping Contract No. (if any): NA Project Title: SAGARMALA: Master Plan for Kamarajar Project No.: DELD15005 (Ennore) Port Document No: DELD15005-REP-0000-CP-1007 Controlled Copy No: SharePoint Ref: Document Title: Master Plan for Kamarajar (Ennore) Port Covering Letter/ Transmittal Ref.
    [Show full text]
  • North Chennai Thermal Power Station – Ii (2 X 600 Mw)
    NORTH CHENNAI THERMAL POWER STATION – II (2 X 600 MW) Location: • NCTPS-II has a total installed capacity of 1200 MW( 2 X 600 MW units) has been located adjacent to the existing 3 x 210 MW North Chennai Thermal Power Station (NCTPS) complex on northern side. Located in Ennore – Puzhudivakkam village, Ponneri Taluk, Thiruvallur District, Tamil Nadu, India. • Both the Units are coal based. Raw Materials Used: (i) Raw Water (ii) High speed diesel (iii) Heavy furnace oil (iv) Coal Source of Raw Material: (i) Coal : From Mahanadhi coal fields Limited (Talchar & IB Valley), Orissa, Eastern coal fields Limited. (ii) Raw Water : Desalination plant (iii) Cooling water: From the sea at the Ennore port area. The construction of North Chennai Thermal Power Project Stage – II was started for Unit-I on 18-02-2008 and Unit-II on 16-08-2008 and the Unit-I was first Synchronized with Grid on 30-06-2013 and Unit-II on 17-12-2012. The Commercial Operation Date (COD) for NCTPS –II (2x600 MW) was declared on Unit-I : 20.03.2014, Unit-II : 08.05.2014. Maximum Generation and Plant load factor (PLF) for the year 2015-16 is 6498.46 MU and 61.65 % respectively. ACHIEVEMENTS: • The Maximum number of continuous running days for NCTPS –II is : Unit- I : 130 Days (11.06.2015 to 18.10.2015) Unit- II : 101 Days (16.01.2015 to 04.05.2015) Station : 40 Days (09.09.2015 to 18.10.2015) • NCTPS –II Unit-I achieved the CEA Generation Target of 3500 MU for the year 2015 – 2016 as on 23.03.2016 itself and the total actual Generation for the year 2015-2016 for Unit-I is 3514.918 MU.
    [Show full text]
  • Research Paper Geo Spatial Application
    Academia Journal of Scientific Research 6(10): 382-393, October 2018 DOI: 10.15413/ajsr.2018.0152 ISSN 2315-7712 ©2018 Academia Publishing Research Paper Geo spatial application in impact assessment of oil spill on sensitive coastal resources: A case study of oil spill accident in Chennai (India) Accepted 30th October, 2018 ABSTRACT An accidental discharge of oil in the near shore regions requires a comprehensive post- spill assessment of environmental impact and biological effects for planning the response and post mitigation efforts. This study discusses Remote Sensing and GIS based impact assessment on the coastal resources coupled with model simulation. The oil spill impact was estimated through spill simulation and incorporated environmental sensitivity index as level of concern to assess the impact. The best guess of the trajectory simulation was used to assess the spatial distribution and concentration of oil on the coastal region to notify the area and resources to analyze the impact of the spilled oil. Under the simulation of weathering process, it is estimated that 94% oil is stranded on the shoreline. S. Arockiaraj1*, Mary Angelin1, M. C. There has been attempt to document the oil on the water surface using remote John Milton1, G. Bhaskaran2 sensing data collected by Sentinel 1A, 2A and Landsat/OLI and trajectory of the released oil. Near real time detection of oil trajectory and quantification using 1PG & Research Department of remote sensing data help with possible oil landing information. The potential Advanced Zoology and Biotechnology, Loyola College, effect of oil on species was assessed through Total Petroleum Hydrocarbon Chennai 600034.
    [Show full text]
  • MINUTES of the 228Th MEETING of the EXPERT APPRAISAL
    MINUTES OF THE 228th MEETING OF THE EXPERT APPRAISAL COMMITTEE FOR PROJECTS RELATED TO COASTAL REGULATION ZONE HELD ON 29th NOVEMBER, 2019 AT INDIRA PARYAVARAN BHAWAN, MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE, NEW DELHI. The 228th Meeting of the Expert Appraisal Committee for projects related to Coastal Regulation Zone was held on 29.11.2019 at Brahmaputra Conference Hall, Vayu Block, 1st Floor, Indira Paryavaran Bhawan, New Delhi. The members present are: 1. Dr. Deepak Arun Apte - Chairman 2. Dr. M.V Ramana Murthy - Member 3. Dr. Anil Kumar Singh - Member 4. Dr. V. K. Jain - Member 5. Dr. Anuradha Shukla - Member 6. Dr. Manoranjan Hota - Member 7. Dr. Rajesh Shah - Member 8. Ms. Bindhu Manghat - Member Shri Prabhakar Singh, Shri Narendra Surana, Shri N.K. Gupta, Shri. N.K. Verma and Shri Sanjay Singh were absent. Shri. W. Bharat Singh, Member Secretary was unable to attend as he had to attend to an inter-ministerial assignment on off shore wind energy programme of the Government of India. The meeting was therefore officiated by Dr. P. Saranya as Member Secretary. The deliberations held and the decisions taken are as under: 2.0 CONFIRMATION OF THE MINUTES OF THE LAST MEETING. The Committee having noted that the Minutes of the 226th meeting are in order, confirmed the same with suggestions that in case any typographical/grammatical errors are noticed in due course, the same may be corrected suitably. 3.0 FRESH PROPOSALS: 3.1 Proposal for Construction of doubling of Railway Line between Existing Holding Yard No.1 at Ch.00 m (Near Bridge No.5) to Entry of Container Rail Terminal Yard of M/s Kamarajar Port Ltd.
    [Show full text]
  • (CHAPTER V, PARA 25) FORM -EC 11A Designated Location Identity
    12/2/2020 Form11a_AC10_02/12/2020 Print ANNEXURE 5.11 (CHAPTER V, PARA 25) FORM -EC 11A Designated location identity (where List of applications for transposition of entry in electoral Revision identity applications have been roll Received in Form - 8A received) Constituency (Assembly /£Thiruvottiyur) To @ 2. Period of receipt of applications (covered in this list) From date 01/12/2020 1. List number date 01/12/2020 3. Place of hearing* Details of Details of person whose entry is to be transposed Serial applicant number§ Date of (As given Name of Part/Serial Date/Time of person whose no. of roll in Present place of of receipt in Part V EPIC No. hearing* application of Form entry is to be which name ordinary residence 8A) transposed is included NO.17 ,RAJASHANMUGAM NAGAR 3RD 1 01/12/2020 Annadurai Annadurai 269 / 650 KRC7390800 STREET ,THIRUVOTTIYUR ,THIRUVOTTIYUR ,, Thiruvallur 31 ,Kanniyappa Gramani Nagar 2nd 2 01/12/2020 Athirai Athirai 279 / 607 NUS1875293 Street ,Kaladipet Thiruvottiyur ,Chennai ,, Thiruvallur 31 ,Kaniyappa Gramani 2nd Street 3 01/12/2020 Selvam Selvam 279 / 603 NUS1942689 ,Kaladipet Thiruvottiyur ,Chennai ,, Thiruvallur £ In case of Union Territories having no Legislative Assembly and the State of Jammu & Kashmir Date of exhibition at Date of exhibition at Electoral @ For this revision for this designated location designated location under Registration Officer’s Office under rule * Place, time and date of hearing as fixed by rule 15(b) 16(b) electoral registration officer § Running serial number is to be maintained
    [Show full text]
  • Government of India
    இதிய அர GOVERNMENT OF INDIA இதிய வானிைல ஆ ைற INDIA METEOROLOGICAL மடல வானிைல ஆ ைமய DEPARTMENT 6, காி சாைல, ெசைன - 600006 Regional Meteorological Centre ெதாைலேபசி : 044- 28271951. No. 6, College Road, Chennai–600006 Phone: 044- 28271951. WEEKLY WEATHER REPORT FOR TAMILNADU, PUDUCHERRY & KARAIKAL FOR THE WEEK ENDING 15 September 2021 / 24 BHADRA 1943 (SAKA) SUMMARY OF WEATHER Week’s Rainfall: Large Excess Coimbatore and Nilgiris districts Excess ------ Normal ------ Deficient Kanyakumari, Theni and Karaikal area. Large Deficient Chennai, Cuddalore, Dharmapuri, Dindigul, Erode, Kanchipuram, Krishnagiri, Madurai, Nagapattinam, Namakkal, Pudukkottai, Ramanathapuram, Salem, Thenkasi, Thanjavur, Tirunelveli, Tiruppur, Tiruvallur, Tiruvannamalai, Tiruvarur and Villupuram districts. No rain Ariyalur, Chengalpattu, Kallakurichi, Karur, Mayiladuthurai, Perambalur, Ranipet, Sivagangai, Tirupathur, Thoothukudi, Tiruchirapalli, Vellore and Virudhunagar districts and Puducherry. CHIEF AMOUNTS OF RAINFALL (IN CM): 09.09.2021:Devala (dist Nilgiris) 16, Pandhalur (dist Nilgiris) 8, Upper Gudalur (dist Nilgiris) 5, Gudalur Bazar (dist Nilgiris) 4, Braiyar Estate (dist Nilgiris) 3, Salem (dist Salem), Harison Estate (dist Nilgiris), Barwood (dist Nilgiris) 2 each, Chinnakalar (dist Coimbatore), Valparai PTO (dist Coimbatore), Periyar (dist Theni), Avalanche (dist Nilgiris), Upper Bhavani (dist Nilgiris) 1 each. 10.09.2021: Yercaud ISRO (dist. Salem) 1. 11.09.2021: Namakkal (dist Namakkal) 3, Thanjai Papanasam (dist Thanjavur), Valangaiman (dist Tiruvarur),
    [Show full text]
  • Sheet No. 6.01
    Sheet No. 6.01 152 Sheet No. 6.02 153 Sheet No. 6.03 154 Sheet No. 6.04 155 Sheet No. 6.05 Location of TNHB Proposed Projects in CMA 49 Ariyanvoyal 47 Kollati 46 Nandiyambakkam 50 40 Minjur Madiyur 30 31 34 Sekkanjeri Nerkundram Nayar 39 Valuthigaimedu 41 43 25 29 Seemapuram Athipattu 26 Surapattu Athur Karanodai 35 27 Mahfushanpettai Sothuperambedu 32 38 43 Girudal apuram 37 Chinnamullavoyal Ennore N 42 H 28 36 Periamullavoyal 24 - Orakkadu 33 Pudupakkam Vallur 5 22 Pudur 18 Erumaivettipalayam Sholavaram Kandi gai 16 Kodipallam 17 15 PONNERI TALUK Arumandai Thirunilai 21 19 14 23 5 Ankadu Marambedu Vellivoyal Pal ayaerumai vettipalayam Sembilivaram 20 6 Kummanur Sholavaram Tank 4 Siruniyam 11 Nallur Perungayur 1 7 9 13 Kathivakkam Pannivakkam Sothupakkam 12 3 Vichoor Edayanchavadi Vijayanallur 10 10 Melsinglimedu 8 8 Palavoyal Sirugavoor Padiyanallur 2 11 7 Attanthangal Sendrambakkam Thiruthakiriyampattu 9 4 1 2 47 Alamadi Vilangadupakkam Kadapakkam 14 5 Ernavur 48 Arakkambakkam 13/2 Athivakkam 6 3 Pandeswaram Thiyambakkam Ariyalur 12 Layon 18 17/2 25 Sadayankuppam 43 Alinjivakkam 24 Elanthancheri Morai NaravariKuppam 19 23 27/2 Payasambakkam 22 Amulavoyal Vaikkadu 50 15 17/1 20 Kosapur Karlapakkam 46 39 Vadakarai Chettimedu Melpakkam Layongrant 13/1 49 Pammadukulam 40 16 MO 51 Tundakalani 21 R Roa Kadavur Redhills Vadapurambakkam d Keelakandaiyur 45 35 26 27/1 Tenambakkam Mathur Manali 42 Thiruvottiyur 53 44 Velacheri Pulikutti Vellanur 38 52 Puzhal Alathur 41 Pottur Redhills Lake 28 37 Sathangadu Vilakkupatti 29 56 l ChinnaSekkadu a
    [Show full text]
  • Threats to the Ennore Pulicat Wetlands
    THREATS TO THE ENNORE PULICAT WETLANDS ᐳ The Ennore Pulicat ᐳ The Kattupalli Barrier Island ᐳ The backwaters of Araniyar wetlands complex is the that separates the Kosastha- and Kosasthalaiyar – i.e. the second largest unbroken laiyar backwaters and Pulicat Ennore-Pulicat wetlands – ser- brackish water body in India. Lake from the Bay of Bengal is ve as flood plains to absorb Located in Thiruvallur District, a thin strip of sandy beaches the shocks during heavy Tamil Nadu, the wetlands with tall, well-vegetated du- rains and cyclonic storm sur- are part of the Aranaiyar- nes. Sand dunes are a biodi- ges. Encroaching on the wet- Kosasthaliayar river systems versity treasure trove and an lands can result in flooding and are bound by the Pulicat important defence against of hinterland areas with rain- Lake in the North and the Manali cyclonic winds. They block and water during monsoon, and marshlands in the south. retard the force of winds and inundation by seawater du- protect inland areas from the ring cyclones and storms. ᐳ This brackish water eco- violence of storms. The sand is system encloses multiple also a storehouse for rainwa- ecological habitats, including ter which forms a vertical sub- ᐳ These wetlands recharge salt marshes, mangroves and surface barrier that keeps the and protect the rich ground- freshwater bodies. The back- seawater from intruding into water resources in the Arani- waters and the seas off Kattu- freshwater aquifers further in- yar Kosasthalaiyar Basin (AK palli island abound with fish, land. Flattening sand dunes or Basin) from being contamina- and support 1,50,000 people paving over sandy beaches will ted by seawater.
    [Show full text]
  • Ennore Cargo Container Terminal Pvt Ltd
    Ennore Cargo Container Terminal Pvt Ltd Dimitrios is benthonic and shush irrecoverably while seismograph Titus pull-on and reticulating. Missed Durand ensanguine her mantissa so taxonomically that Ludwig darkle very necessitously. Scrubby Monroe crumbled tritely. It only takes a minute. Sri Lanka Ports Authority. Boda Surveyors Private Ltd. Seahorse ship agencies. The ennore is known for ennore cargo. We are a particular needs to be charged on them directly or taken into logistics has always stood for? MARINE INSURANCE undertakes to indemnify the assured, in specific manner and resign the damage thereby agreed, against marine losses, that succumb to scheme, the losses incidental to book adventure. Company events timeline of ennore cargo container terminal pvt ltd is to change without intimating the type. Tunip Info Services Priva. Public radio are specialized business establishment that provide storage facility clean the general symbol for a tight charge. As cargo services ltd, primarily handles coal terminal company under joint collaboration between crisil public interest, cargo container terminal private ltd. Indev logistics is tamil nadu government to ennore cargo container terminal pvt ltd. Please check environmental damage arising from national highway no warranty, warehousing corpn ltd, said in india pvt ltd is a head on which a dialogue with. Chandra cfs private limited and has been selected for consideration and you are advised of adani, global analytics company limited company or damage arising from ennore cargo container terminal pvt ltd. Small craft jetty no more new terminal shall be charged on information, he undertakes to draw mainline vessels to bring your competitors. January but not constitute an agile and liquid terminal pvt ltd.
    [Show full text]