201__.g. "___."______Annex 2.5.B List of planned restrictions on the public railway infrastructure of the State Joint Stock Company "Latvijas dzelzceļš" In accordance with Annex VII to Directive 2012/34 / EU of the European Parliament and of the Council (approved by EU Delegated Decision No (EU) 2017/2075 of 04.09.2017)

Information on the conditions of the firearms The company that Planned period Train movements Indicative Application submitted infrastructure Name of LDz infrastructure Nature of the restriction / Scheduled Restriction on referral duration of the Restriction of operation Impact on railway No filing date restrictions object / Railway line section name of the works Initiation of a number of duration conditions/available journey on End of restriction on day par capacity Notes an application for planned restriction days alternative routes alternative routes (if applicable) (if applicable) (day, night (hours per day) (to be completed by (to be completed by (to be completed by (dd.mm.gggg) (text) (text) (text) (mm.gggg.) (mm.gggg.) (ddd) or day / night) from 1 to 24 LDz DTP) LDz DTP) LDz DTP) 000 00.0000 00.0000 000 00 000% From 2021

SJSC "Latvijas dzelzceļš" Track renewal ("A" type 001 12.08.2020. Track division Section Kraslava-Skaista km 433,35- km 436,85 05.2021. 09.2021. 048 day 07 <30% Correction capital repair) management

SJSC "Latvijas dzelzceļš" Track renewal ("B" type 002 12.08.2020. Track division Section Gluda-Dobelekm 60,0-km 65 04.2021. 08.2021. 038 day 07 <30% Correction capital repair) management

SJSC "Latvijas dzelzceļš" level crossing capital 003 12.08.2020. Track division Different infrastructure objects 06.2021. 10.2021. 014 day/night 08 <30% Correction repair management

SJSC "Latvijas dzelzceļš" 004 12.08.2020. Track division Different infrastructure objects Switching point repair 07.2021. 10.2021. 012 day 09 ~30% management

SJSC "Latvijas dzelzceļš" Repair of engineering 005 12.08.2020. Track division Different infrastructure objects 05.2021. 10.2021. 090 day 10 <50% buildings management

SJSC "Latvijas dzelzceļš" 006 12.08.2020. Track division Different infrastructure objects Track renewal 07.2021. 10.2021. 016 day 07 <30% Correction management

Carried over from 2020 007 20.10.2020. European railway lines Riga pasazieru station Station reconstruction 03.2021. 12.2026. 306 day/night 24 ~50% (concerted with EDZL/BERERIX) Bilding works (track, SJSC "Latvijas dzelzceļš" Riga railway junction development (modernization signalling, electricity, 2 times a week in 008 29.10.2020. Development Directorate of the section Sarkandeugava-Mangali- 07.2021. 12.2023. 184 08 <30% - - Correction supply, daylight time Project manager division Ziemelblazma) telecommunications)

1 Annex to SJSC “Latvijas dzelzceļš” (Latvian Railway) Network statement 2022 Continuation of Annex 2.5.B List of planned restrictions on the public railway infrastructure of the State Joint Stock Company "Latvijas dzelzceļš" In accordance with Annex VII to Directive 2012/34 / EU of the European Parliament and of the Council (approved by EU Delegated Decision No (EU) 2017/2075 of 04.09.2017)

Information on the conditions of the firearms The company that Planned period Train movements Indicative Application submitted infrastructure Name of LDz infrastructure Nature of the restriction / Scheduled Restriction on referral duration of the Restriction of operation Impact on railway No filing date restrictions object / Railway line section name of the works Initiation of a number of duration conditions/available journey on End of restriction on day par capacity Notes an application for planned restriction days alternative routes alternative routes (if applicable) (if applicable) (day, night (hours per day) (to be completed by (to be completed by (to be completed by (dd.mm.gggg) (text) (text) (text) (mm.gggg.) (mm.gggg.) (ddd) or day / night) from 1 to 24 LDz DTP) LDz DTP) LDz DTP) 000 00.0000 00.0000 000 00 000% From 2022 SJSC "Latvijas dzelzceļš" Track renewal ("A" type 001 12.08.2020. Track division Section Kraslava-Skaista km 433,35- km 436,85 05.2022. 09.2022. 048 day 07 <30% Correction capital repair) management SJSC "Latvijas dzelzceļš" Track renewal ("B" type 002 12.08.2020. Track division Section Gluda- km 65,0-km70,0 04.2022. 10.2022. 038 day 007 <30% Correction capital repair) management SJSC "Latvijas dzelzceļš" Level crossing capital 003 12.08.2020. Track division Different infrastructure objects 06.2022. 10.2022. 014 day/night 008 <30% Correction repair management SJSC "Latvijas dzelzceļš" 004 12.08.2020. Track division Different infrastructure objects Switching point repair 07.2022. 10.2022. 010 day 09 ~30% Correction management SJSC "Latvijas dzelzceļš" Repair of engineering 005 12.08.2020. Track division Different infrastructure objects 05.2022. 10.2022. 090 day 10 <50% Correction buildings management SJSC "Latvijas dzelzceļš" 006 12.08.2020. Track division Different infrastructure objects Track renewal 07.2021. 10.2022. 016 day 07 <30% Correction management Carried over from 2020 007 20.10.2020. European railway lines Riga pasazieru station Station reconstruction 03.2021. 12.2026. 365 day/night 24 ~50% (concerted with EDZL/BERERIX) Bilding works (track, SJSC "Latvijas dzelzceļš" Riga railway junction development (modernization signalling, electricity, 2 times a week in 008 29.10.2020. Development Directorate of the section Sarkandeugava-Mangali- 07.2021. 12.2023. 365 08 <30% Correction supply, daylight time Project manager division Ziemelblazma) telecommunications) Bilding works (track, SJSC "Latvijas dzelzceļš" Modernization of railway infrastructure to increase signalling, electricity, 2 times a week in 009 29.10.2020. Development Directorate 07.2022. 12.2023. 184 08 <30% New project the speed of trains: Riga-Jelgava, Riga-Daugavpils supply, daylight time Project manager division telecommunications) Modernization of railway passenger infrastructure Riga-Jelgava (Atgazene, Balozi, BA Turiba, Tiraine, Jaunolaine, Daibe, ozolnieki); Riga- TukumsII (Kemeri, Smarde, Milzkalne, I, Tukums II); Riga-Bolderaja (Bolderaja - Silikatu, Bolderaja - Slokas); Riga-Krustpils (Skirotava, Bilding works (track, SJSC "Latvijas dzelzceļš" Gaisma, Dole, Ikskele, Jaunogre, Ogre, Parogre, signalling, electricity, 2 times a week in 010 29.10.2020. Development Directorate 03.2022. 12.2023. 306 08 <30% New project Ciemupe, Kegums, Lielvarde, Jumprava, supply, daylight time Project manager division Skriveri,); Zemitani-Skulte (Zemitani, Brasa, telecommunications) Sarkandaugava, Dauderi*, Mangali, Zemelblazma, Vecdaugava, Vecaki, Kangale, Garciems, Garupe, Carnikava, Gauja, Lilaste, Pabazi, Saukrasti, Kisupe, Zvejniekciems, Skulte); Riga- (Alfa)

Bilding works (pedestrian SJSC "Latvijas dzelzceļš" Installation of fences and pedestrian crossings in crossing (Skirotava), 2 times a week in 011 29.10.2020. Development Directorate railway infrastructure objects Tornakalns - ; pedestrian tunel 03.2022. 12.2023. 306 08 <30% New project daylight time Project manager division Zasulauks-Lacupe, Jugla-Cekurkalns; Skirotava (Cekurkalns), signalling, telecommunications)

2 Annex to SJSC “Latvijas dzelzceļš” (Latvian Railway) Network statement 2022 Continuation of Annex 2.5.B List of planned restrictions on the public railway infrastructure of the State Joint Stock Company "Latvijas dzelzceļš" In accordance with Annex VII to Directive 2012/34 / EU of the European Parliament and of the Council (approved by EU Delegated Decision No (EU) 2017/2075 of 04.09.2017)

Information on the conditions of the firearms The company that Planned period Train movements Indicative Application submitted infrastructure Name of LDz infrastructure Nature of the restriction / Scheduled Restriction on referral duration of the Restriction of operation Impact on railway No filing date restrictions object / Railway line section name of the works Initiation of a number of duration conditions/available journey on End of restriction on day par capacity Notes an application for planned restriction days alternative routes alternative routes (if applicable) (if applicable) (day, night (hours per day) (to be completed by (to be completed by (to be completed by (dd.mm.gggg) (text) (text) (text) (mm.gggg.) (mm.gggg.) (ddd) or day / night) from 1 to 24 LDz DTP) LDz DTP) LDz DTP) 000 00.0000 00.0000 000 00 000% From 2023

SJSC "Latvijas dzelzceļš" Track renewal ("A" type 001 12.08.2020. Track division Section Kraslava-Skaista km 433,35- km 436,85 05.2023. 09.2023. 048 day 07 <30% Correction capital repair) management

SJSC "Latvijas dzelzceļš" Track renewal ("B" type 002 12.08.2020. Track division Section Dobele-Biksti km 73,1-km 76,3 04.2023. 07.2023. 012 day 07 <30% Correction capital repair) management SJSC "Latvijas dzelzceļš" Track renewal ("B" type 003 12.08.2020. Track division Section Gluda-Dobele km 65,0-km70,1 08.2023. 10.2023. 24 day 07 <30% Correction capital repair) management SJSC "Latvijas dzelzceļš" Level crossing capital 004 12.08.2020. Track division Different infrastructure objects 05.2023. 10.2023. 014 day/night 08 <30% Correction repair management SJSC "Latvijas dzelzceļš" 005 12.08.2020. Track division Different infrastructure objects Switching point repair 07.2023. 10.2023. 010 day 09 ~30% Correction management SJSC "Latvijas dzelzceļš" Repair of engineering 006 12.08.2020. Track division Different infrastructure objects 05.2023. 10.2023. 090 day 10 <50% Correction buildings management SJSC "Latvijas dzelzceļš" 007 12.08.2020. Track division Different infrastructure objects Track renewal 07.2023. 10.2023. 016 day 07 <30% Correction management Carried over from 2020 008 20.10.2020. European railway lines Riga pasazieru station Station reconstruction 03.2021. 12.2026. 365 day/night 24 ~50% (concerted with EDZL/BERERIX) Bilding works (track, SJSC "Latvijas dzelzceļš" Riga railway junction development (modernization signalling, electricity, 2 times a week in 009 29.10.2020. Development Directorate of the section Sarkandeugava-Mangali- 07.2021. 12.2023. 365 08 <30% Correction supply, daylight time Project manager division Ziemelblazma) telecommunications)

Bilding works (track, SJSC "Latvijas dzelzceļš" Modernization of railway infrastructure to increase signalling, electricity, 2 times a week in 010 29.10.2020. Development Directorate 07.2022. 12.2023. 184 08 <30% New project the speed of trains: Riga-Jelgava, Riga-Daugavpils supply, daylight time Project manager division telecommunications) Modernization of railway passenger infrastructure Riga-Jelgava (Atgazene, Balozi, BA Turiba, Tiraine, Jaunolaine, Daibe, ozolnieki); Riga- TukumsII (Kemeri, Smarde, Milzkalne, Tukums I, Tukums II); Riga-Bolderaja (Bolderaja - Silikatu, Bolderaja - Slokas); Riga-Krustpils (Skirotava, Bilding works (track, SJSC "Latvijas dzelzceļš" Gaisma, Dole, Ikskele, Jaunogre, Ogre, Parogre, signalling, electricity, 2 times a week in 011 29.10.2020. Development Directorate 03.2022. 12.2023. 306 08 <30% New project Ciemupe, Kegums, Lielvarde, Jumprava, supply, daylight time Project manager division Skriveri,); Zemitani-Skulte (Zemitani, Brasa, telecommunications) Sarkandaugava, Dauderi*, Mangali, Zemelblazma, Vecdaugava, Vecaki, Kangale, Garciems, Garupe, Carnikava, Gauja, Lilaste, Pabazi, Saukrasti, Kisupe, Zvejniekciems, Skulte); Riga-Sigulda (Alfa) Bilding works (pedestrian SJSC "Latvijas dzelzceļš" Installation of fences and pedestrian crossings in crossing (Skirotava), 2 times a week in 012 29.10.2020. Development Directorate railway infrastructure objects Tornakalns - Olaine; pedestrian tunel 03.2022. 12.2023. 306 08 <30% New project daylight time Project manager division Zasulauks-Lacupe, Jugla-Cekurkalns; Skirotava (Cekurkalns), signalling, telecommunications)

3 Annex to SJSC “Latvijas dzelzceļš” (Latvian Railway) Network statement 2022