Whole Foods Plaza • DEIS •

Draft Environmental Impact Statement

For: Whole Foods Plaza, Town of Brighton County of Monroe,

Prepared for:

Ramsey A. Boehner, Environmental Review Liaison Officer Brighton Town Board as Lead Agency Brighton Town Hall 2300 Elmwood Avenue Rochester, NY14618 585-784-5250

Contributors / Preparers:

Daniele Family of Companies (Project Sponsor) SBLM Architects 2740 Monroe Avenue 545 West 45th Street Rochester, NY14618 New York, NY 10036 585-271-1111 212-995-5600

Costich Engineering, D.P.C.- Mike Montalto Foundation Design, P.C.- James Baker 217 Lake Avenue 335 Colfax Street Rochester, NY 14608 Rochester, NY 14606 585-458-3020 585-458-0824

SRF Associates – Steve Ferranti 3495 Winton Place Building E, suite 110 Rochester, NY 14623 585-272-4660 Date of Receipt

Date of Acceptance

Deadline for Written Comments

January 21, 2016

1

TABLE OF CONTENTS

TABLE OFCONTENTS ...... 2

LIST OF TABLES ...... 7

LIST OF FIGURES ...... 9

LIST OF APPENDICIES ...... 12

1.0 Executive Summary...... 17

Description of Action ...... 17

Needs and Benefits ...... 19

Incentives ...... 23

Amenities ...... 24

Impacts and Mitigation...... 25

Geology, Soils and Topography ...... 25

Surface Waters/Drainage...... 26

Transportation ...... 30

Land Use and Zoning ...... 32

Community Services ...... 34

Visual Resources ...... 35

Cultural Resources ...... 36

Noise ...... 37

Construction Impacts...... 38

Alternatives ...... 39

2.0 Description of the Proposed Action ...... 41

2.1 Location and Setting...... 41

2

Whole Foods Plaza DEIS Town of Brighton

2.2 Design and Layout ...... 42

2.2.1 Proposed Impervious Area and Ratio of Greenspace to Impervious area (4) ..... 51

2.2.2 Total Building Area, Height, Square Footage, Number of Floors (5) ...... 54

2.2.3 Vehicle and Bicycle Parking (7) ...... 56

2.2.4 Traffic Control Features and Patterns (8) ...... 57

2.2.5 Drainage Improvements (9) ...... 58

2.2.6 Sanitary Sewers (9) ...... 60

2.2.7 Public Water (9) ...... 61

2.2.8 Buffers and Landscaping (10) ...... 63

2.2.9 Proposed Public And Private Amenities, And Improvements Ownership (12) .. 65

2.2.10 Lighting (13) ...... 67

2.2.11 Hours of Operation (15) ...... 69

2.2.12 Approvals (16)...... 70

2.2.12 Wetlands (17) ...... 72

2.2.13 Consistency with Municipal Planning Tools (20) ...... 72

2.2.14 Right to Access – Redevelopment Site (21)...... 78

2.2.15 Right to Access – Access Management Plan (22)...... 81

2.3 Design and Layout ...... 82

2.3.1 Purpose ...... 82

2.3.2 Needs ...... 83

2.3.3 Benefits...... 84

2.3.4 Proposed Incentives...... 101

2.3.5. Proposed Amenities...... 117

2.4 Approvals ...... 130

2.5 Construction and Operation ...... 134

3 Whole Foods Plaza DEIS Town of Brighton

2.5.1 Construction Schedule and Sequenc e ...... 134

2.5.2 Operation ...... 137

2.6 Neighborhood Input / Communications ...... 138

3.0 Environmental Setting ...... 141

3.1 Geology, Soils and Topography ...... 141

3.2 Surface Waters/Drainage...... 144

3.3 Terrestrial and Aquatic Ecology ...... 148

3.3.1 Woodlots and Trees ...... 149

3.3.2 Wildlife...... 150

3.4 Transportation ...... 151

3.4.1 Existing Traffic Conditions Analysis ...... 151

3.4.2 Traffic Operations ...... 155

3.5 Land Use and Zoning ...... 159

3.5.1 Density Analysis Study ...... 162

3.6 Community Services ...... 164

3.6.1 Water Service ...... 164

3.6.2 Sanitary Sewer...... 165

3.6.3 Private Utilities ...... 166

3.6.4 Police ...... 167

3.6.5 Fire ...... 167

3.6.6 Ambulance ...... 167

3.6.7 Educational Services ...... 167

3.6.8 Health Care Services ...... 168

3.6.9 Current Town and School Taxes ...... 168

3.6.10 Recreational ...... 169

4 Whole Foods Plaza DEIS Town of Brighton

3.6.11 Sidewalks ...... 169

3.7 Visual and Cultural Resources ...... 170

3.7.1 Visual ...... 170

3.7.2 Historical and Archeological ...... 171

3.8 Noise...... 172

3.9 The Auburn-Rochester Railroad, and Access Easements ...... 173

3.9.1 The Auburn-Rochester Railroad ...... 173

4.0 Environmental Impacts and Mitigation ...... 174

4.1 Geology, Topography and Soils ...... 174

4.2 Surface Waters /Stormwater Management ...... 181

4.3 Terrestrial and Aquatic Ecology ...... 192

4.3.1 Woodlots and Trees ...... 192

4.2.1 Wildlife...... 193

4.4 Transportation ...... 194

4.5 Land Use and Zoning ...... 215

4.5.1 Density Analysis Study ...... 230

4.6 Community Services ...... 232

4.6.1 Water Service ...... 232

4.6.2 Sanitary Sewer...... 233

4.6.3 Private Utilities ...... 236

4.6.4 Police ...... 237

4.6.5 Fire ...... 237

4.6.6 Ambulance ...... 238

4.6.7 Educational Services ...... 239

4.6.8 Health Care Services ...... 240

5 Whole Foods Plaza DEIS Town of Brighton

4.6.9 Recreational ...... 241

4.6.10 Sidewalks ...... 241

4.6.11 Town Tax Rate/Budget and Fiscal Impacts ...... 243

4.7 Visual and Cultural...... 244

4.7.1 Visual ...... 244

4.7.2 Historical and Archeological ...... 249

4.8 Noise...... 250

4.9 Construction ...... 255

5.0 Unavoidable Environmental Impacts ...... 261

6.0 Alternatives ...... 262

6.1 Development of the Site Under Existing Zoning Regulations ...... 262

6.2 Alternate Developed Use ...... 263

6.3 Alternate Site Plans ...... 264

6.4 Potential Allowable Future Uses of Buildings ...... 269

6.5 No Action Alternative ...... 269

6 LIST OF TABLES

2.2.1-1 Existing Facilities Summary

2.2.1-2 Proposed Facilities Summary

2.2.11-1 Operational Volume Summary

2.3.3-1 Whole Foods Plaza Property Tax Calculations

2.3.3-2 Whole Foods Plaza Sales Tax Calculations

2.3.4-1 Summary of Incentives

2.3.5-1 Whole Foods Plaza Open Space Parcel Value

2.3.5-2 Summary of Amenities

3.1-1 Stormwater Infiltration Results

3.2-1 Redevelopment Site Existing Peak Discharge Rates

3.2-2 Access Management Area Existing Peak Discharge Rates

3.2-3 Existing Stormwater Runoff Pollutant Loads

3.4.1-1 Delay Study Results

3.4.2-1 Capacity Analysis Results – Existing & Background Conditions Unsignalized

Intersections

3.4.2-2 Capacity Analysis Results – Existing & Background Conditions Signalized

Intersections

3.5-1 Land Use Summary

3.6.1-1 Hydrant Test Flow Data Summary

3.6.2-1 Sanitary Sewer Summary

3.8-1 Existing Ambient Noise Level Summary

4.2-1 Redevelopment Site Un-detained Peak Discharge Rates

4.2-2 Redevelopment Site Detained Peak Discharge Rates

7

Whole Foods Plaza DEIS Town of Brighton

4.2-3 Access Management Area Un-detained Peak Discharge Rates

4.2-4 Access Management Area Detained Peak Discharge Rates

4.2-5 Stormwater Runoff Post Development Pollutant Loads – No Treatment

4.2-6 Stormwater Runoff Post Development Pollutant Loads – Post Treatment

4.2-7 Stormwater Runoff Post Development Pollutant Loads – Load Removal in

Treatment

4.2-8 Stormwater Runoff Post Development Pollutant Loads – Reduction in

Pollutant Loading from Existing Conditions

4.4-1 Site Generated Trips w/Trip Adjustments

4.4-2 Capacity Analysis Results – Unsignalized Intersections

4.4-3 Capacity Analysis Results – Signalized Intersections

4.4-4 Queuing Analysis Results – PM Peak Hour

4.4-5 Segment Volume Summary

4.4-6 Peak Hour Gap Analysis Results

4.6.2-1 Sanitary Sewer Summary

4.8-1 Ambient / Future Noise Levels and Human Reaction

6.1-8 Summary of Plans and Alternatives

8 Whole Foods Plaza DEIS Town of Brighton

LIST OF FIGURES

2.1.1 Site Location Map

2.1.2 Overall Project Area Sketch

2.2.1 Existing Features/Demolition Plan3

2.2.1A Access Management Existing Features/Demolition Plan

2.2.1B Developed Erosion Control & Sedimentation Plan

2.2.1C Access Management Area Developed Erosion Control

& Sedimentation Plan

2.2.1D Site Plan Exhibit

2.2.1E Access Management Site Plan Exhibit

2.2.1F Grading Plan

2.2.1G Utility Plan

2.2.1H Access Management Grading/ Utility Plan

2.2.1I Landscape Plan

2.2.1J Typical Island Planting Details

2.2.1K Lighting Plan

2.2.2 SLBM Site Plan

2.2.2A Ground Floor Plans

2.2.2B Mezzanine Floor Plans

2.2.2C Roof Plan

2.2.2D Whole Foods Exterior Elevation

2.2.2E Inline Shopping Center Elevations

2.2.2F Proposed Sections

2.2.3 - 2.2.3C Preliminary Architectural Rendering

9 Whole Foods Plaza DEIS Town of Brighton

2.2.4 Access Management Plan/ Existing Features & Demolition Exhibit

2.2.4A Access Management Plan/ Parking Improvement Exhibit

2.2.5 Bulk Data Lot Plan

2.2.5A Bulk Data Summary

2.2.5B Access Management Bulk Data Summary

2.2.5C Plaza Bulk Data Lot Plan

2.2.6 Zoning Map

2.2.7 Green Infrastructure Location Exhibit

2.2.7A Access Management Green Infrastructure Location Exhibit

2.2.7B Green Infrastructure (Typical Bio-Retention Detail)

2.2.7C Green Infrastructure (Typical Porous Pavement Detail)

2.2.8 Dedicated Parking/Gathering Exhibit

2.2.9 Proposed Sidewalk Network System Exhibit

2.2.10 Rendering Of Pedestrian/ Bike Area & Proposed Berm

2.2.10A Site Amenities Concept Imagery

2.2.11 Typical Berm Cross-Section

2.2.12 Community Vision Plan

2.3.1 Existing Multi-Use Trails & Trails Currently Under Development

2.3.2 Project Recommendation Near-Term Implementation Window

2.3.3 Auburn Trail Along Grass Area

2.3.3A Auburn Trail Along Parking Area

2.3.3B Existing Auburn Trail

2.3.4 Forever Wild Value Exhibit

2.6.1 – 2.6.1B Public Comment Summary

3.3.1 Whole Foods Soils Map

10 Whole Foods Plaza DEIS Town of Brighton

3.3.1A Access Management Soils Map

3.3.2 Overall Drainage Area Map

3.3.2A Whole Foods Existing Drainage Area Map

3.3.2B Access Management Existing Drainage Area Map

3.3.2C Stormwater Routing Exhibit

3.3.5 Monroe County Water Authority Record Mapping

3.7.1 Monroe Avenue Corridor Views

4.1.1 Earth Work Exhibit

4.2.1 Developed Drainage Area Map

4.2.1A Access Management Developed Drainage Area Map

4.2.2 Outlet Control Details

4.2.2A Access Management Outlet Control Structure Detail

4.7.1- 4.7.1H Visual Impact Study

4.8.1 Sign Location Exhibit

4.8.1A Monument Sign

4.8.1B Proposed Sections

11 Whole Foods Plaza DEIS Town of Brighton

LIST OF APPENDICIES

1 SEQR Documents

• Initial Incentive Zoning Application Letter Of Intent 2/18/15

• Amended Incentive Zoning Application Letter Of Intent 5/15/15

• Town Board Meeting 5/27/15 Seeking Lead Agency Status

• Town Board Meeting 7/8/15 Adopting Positive Declaration

• SEQR Documentation Report

• Full E.A.F.

• Regional Resource Mapping

• Town Resource Mapping

• Conceptual Drainage Review

• Water Distribution

• Site Lighting

• Traffic

• Signage

• DEIS Final Scope

2 Planning Tools

• Monroe Avenue Corridor Community Vision Plan

• Comprehensive Plan 2000

• Open Space Index

• Bike Walk Brighton

• Regional Trail Initiative Executive Summary

• NYS Climate Smart Communities 2.0

12 Whole Foods Plaza DEIS Town of Brighton

3 Traffic Impact Study And Related Correspondence

• Whole Foods Draft Traffic Impact Study; Revised 1/16

• Alternatives Traffic Impact Study

• Alternate 4 Capacity Analysis

• Monroe County DOT Correspondence

• New York State DOT Correspondence

• Traffic Signal Estimate

4 Cultural Resources And Related Correspondence

• Office of Parks, Recreation & Historic Preservation (OPRHP)

Consultation Request and Determination Letter

5 Alternate Plans

• Plan Consistent with Current Zoning

• Previously Submitted Alternatives

6 Utilities

• Sanitary Sewer Capacity Analysis

• Watermain & Services

• R G & E Will Serve Letter

7 Amenities

• 20 Year Property Tax Calculations

• Amenities Trail Map

• Amenities Combined Costs

• Excerpt From AASHTO Guide For The Development Of Bicycle

Facilities

13 Whole Foods Plaza DEIS Town of Brighton

8 Lighting

• LitePro Computer Generated Lighting Calculations

• Cut Sheets, Lighting Plan & IES Standards

9 Visual Impact Assessment

• Visual Impact Study

• Aerial Images of Clover Lanes

• Existing Neighborhood Vantage Points Photographs

10 Rights To Access / Land Acquisition

• Existing Whole Foods Access Easement To Allens Creek Road

• R G & E Exhibit Plan

• License Agreement for Use of RG & E Property

• R G &E License Agreement Site Plan

• R G & E License Agreement Exhibit with Dimensions

• Declaration of Cross Access Easements and Shared Parking Agreement

• Cross Access And Shared Parking Agreement Letter From Sakura Home

• Animal Hospital E-Mails Regarding Cross Access

• Purchase Of State Owned Property Adjacent To 2717 Monroe Avenue

• Metes and Bounds Survey Map

• DEIS Boundary Map

• Lot Descriptions

14 Whole Foods Plaza DEIS Town of Brighton

11 Geotechnical Investigation

• Soil Maps And Descriptions

• Geotechnical Evaluation Whole Foods Building Area

• Geotechnical Evaluation Remaining Plaza

• Earthwork Map

• Earthwork Report

12 Vegetation And Wildlife Reports

• Potential For Wildlife Use OF Habitat Adjacent To 2740/2750 Monroe

Avenue Report

• NYSDEC National Heritage Program Data Base Letter

• Tree Survey

13 Noise Impact Assessment

• Noise Analysis Study

14 Asbestos Survey

• 2740 Mario’s Asbestos Survey

• 2750 Clover Lanes Bowling Alley Asbestos Survey

• 2800 Mamasan’s Asbestos Survey

15 Signage

• Sign Package

16 Architectural Plans & Elevations

• Whole Foods Building Plans

• Whole Foods Concept Elevation

15 Whole Foods Plaza DEIS Town of Brighton

17 Density Analysis

• Monroe Avenue Corridor Density Analysis

• Bulk Data Plan

• On Site Bulk Data Table

• Off Site Bulk Data Table

18 Neighborhood Input/ Communications

• Project Sponsor Public Meeting Notes 2-23-15

• Public Comments

• Public Comments Summary

• Public Comments Master Chart

• Public Comment Topics Graph

19 Storm Water Management Plan & Engineering Report

• Storm Water Management Plan And Engineering Report

16 Whole Foods Plaza DEIS Town of Brighton

1.0 Executive Summary

This Draft Environmental Impact Statement (DEIS) has been prepared in accordance with the requirements of the New York state Environmental Quality Review Act (SEQR) and its implementing regulations found at 6 NYCRR Part 617. The content is as specified by the Scoping

Outline for the Whole Foods Plaza project adopted by the Town Board acting as Lead Agency and dated September 23, 2015.

Description of Action

The proposed action subject to review is an Incentive Zoning Application for the redevelopment of a 10.1± acre site to be redeveloped as Whole Foods Plaza. The lands for the redevelopment project are currently owned by or under contract by the Daniele Family of Companies for redevelopment by the Daniele Family of Companies. The Daniele Family of Companies is the project sponsor. Further details of the Incentive Zoning Application is contained in Section 2.2

and Appendix 1.

Whole Foods Plaza is a multitenant retail center proposed for a 10.1 +/- acre site in the Town of

Brighton, County of Monroe, New York. The site is located on the north side of New York State

Route 31 (Monroe Avenue) approximately 600 feet west of the intersection of Monroe Avenue

and Clover Street and approximately at the inter section of the interchange with NYS Route 590

and bordered by Clover Street to the north, as shown in Figure 2.1.1. Further details on the proposed project are contained in Section 2.2 of this DEIS.

Monroe Avenue in the project site vicinity is an important commercial corridor connecting the

Town of Brighton to metropolitan Rochester and eastern suburbs. Approximately 600 feet east of

17 Whole Foods Plaza DEIS Town of Brighton the project site Monroe Avenue connects with Clover Street, NYS Route 590 connects with

Monroe Avenue approximately 1600 feet west of the project site. The proposed redevelopment plans to provide sole access to the redevelopment site via two driveways on Monroe Avenue.

Implementation of an access management plan to benefit commercial properties on the south side of Monroe Avenue and motorists traveling the Monroe Avenue Corridor within the project area.

Further details on the access management plan are contained in Section 2.2.4 of this DEIS. Further details on the transportation and traffic setting of the site are contained in Section 3.4 of this DEIS.

The Whole Foods Plaza redevelopment project is to be completed in a single phase. As proposed the Whole Foods Plaza redevelopment project will provide a multitenant retail center within a revitalized commercial setting. The project will provide a variety of specialty upscale retail uses in a pedestrian friendly cohesive redevelopment with enhanced multimodal connectivity to the surrounding residential neighborhoods and Monroe Avenue corridor.

The redevelopment proposal involves the development of approximately 93,900 square-feet of retail space within four buildings. The anchor tenant will be a natural and organic foods market/grocery. The tenant will be Whole Foods Market. The anchor building will be a single story 50,000 square-foot natural and organic foods market/grocery with a 3,900 square-foot mezzanine. The redevelopment proposal also includes the development of two single story multitenant retail buildings; 31,780 square-foot retail building and 6,300 square-foot “outparcel” style retail building. The fourth building is planned for a single story 1,980 square-foot specialty coffee shop with a drive through. Figure 2.2.1D shows the site plan for the site. Further details on the proposed redevelopment project are contained in Section 4.5 of this DEIS.

18 Whole Foods Plaza DEIS Town of Brighton

Needs and Benefits

The proposed redevelopment project will significantly upgrade the property and this important gateway to the Town of Brighton. An exciting food market anchor, attractive architecture, and cohesive design will help to update and transform this section of Monroe Avenue. The proposal will include quality design, landscaping and architecture, with architecture contemplated to be consistent with the anchor tenant, including use of regional materials and a waste management plan that will look to re-use a substantial amount of the material from the existing buildings that are proposed to be demolished.

The redevelopment project will significantly upgrade the Monroe Avenue corridor in the project area by providing a cohesive redevelopment of three properties which will meld upscale architectural elements, landscaping elements which will enhance the building architecture and provide enhanced visual interest, screening, and buffering to the surrounding neighborhoods.

The Whole Foods Plaza redevelopment project is designed to meet the changing commercial property needs and community business offerings. The redevelopment project will provide needed improvements to the properties to allow them to continue to be commercially viable and sustainable into the future.

Pedestrian access is incorporated in the plan, providing access to the site for pedestrians and bicycles including amenities like bicycle racks. The pedestrian friendly development will enhance the neighborhood by improving walkability and fostering neighborhood business. The project sponsor also proposes to address safety on the trail by separating vehicle traffic from pedestrian and bicycle activity on the trail with the use of a separation guard rail. The project will create new

19 Whole Foods Plaza DEIS Town of Brighton pedestrian connections, consolidate parking, and improve vehicular access to and from Monroe

Avenue. Pedestrian connections and way-finding signage will also be incorporated into the

development.

The new Lifestyle Center design will also improve vehicular access and circulation. A new traffic

signal with pedestrian crosswalk will be installed on Monroe Avenue. The anticipated location

will align the Clover Lanes property and the Sakura Home restaurant site. Installation of the traffic signal will allow for the implementation of an access management plan which will benefit businesses on the south side of the Monroe Avenue corridor and provide increased safety to the traveling public.

In addition to the amenities of this project, this development provides substantial public benefits; among them are:

1. Fulfilling the Town of Brighton’s Vision of the Monroe Avenue Corridor Plan.

The Monroe Avenue Corridor Plan has a number of distinct elements which are addressed

by this plan. Those elements are both aesthetic in nature (dealing with placement of

buildings) and safety-related (relative to Monroe Avenue vehicular, pedestrian, multimodal

and bicycle access). Project design has incorporated the goals of the Corridor Plan. Further

details on the Monroe Avenue Corridor Plan are contained in Appendix 2 of this DEIS.

2. Diversity of Retail Offerings within the Town of Brighton.

The addition of a natural and organic foods market/grocery is of substantial benefit to the

residents of the Town of Brighton. At present, the Town is home to a Tops Market on

South Clinton Avenue, several pharmacies selling some grocery items and occasional

20 Whole Foods Plaza DEIS Town of Brighton

specialty or convenience type stores. Residents currently have access to full service grocery

stores in their adjacent communities requiring residents to shop for groceries outside of the

Town, such as at the Pittsford or East Avenue Wegman's stores, both of which are at or

above capacity. This highly regarded and sought after retailer also brings to the market a

focus on all-natural and organic, promoting a healthy living lifestyle that is not necessarily

the focus of existing competition. In addition, the lead tenant within the plaza enhances

the possibility of bringing new and upscale retailers to the remainder of the Center. There

is a natural following of the lead tenant and some of those prospective tenants are in

discussions with the project sponsor.

3. Tax Revenues.

The proposed development will generate a significant increase in tax revenues that benefit

the Town, schools, state and federal agencies. The yearly property taxes currently

generated are $190,600 plus or minus and includes tax exempt property (The First Baptist

Church parcel). The future projected property taxes (using current tax rates) are expected

to be $438,300 plus or minus. The proposed development will contribute approximately

$14,038,880 over the next 25 years in property taxes; of which $11,626,998 will go directly

to the Town of Brighton. In addition, this project will be a source of additional sales tax,

mortgage tax and income tax revenue above what the properties are generating now by a

similar percentage increase as property taxes. The Project Sponsor estimates an increase

of approximately $3,438,000 in annual sales tax revenue, based on estimated current and

projected sales volumes on the proposed site. Further details on the tax revenues generated

by the redevelopment project are contained in Section 2.3 and Appendix 7 of this DEIS.

21 Whole Foods Plaza DEIS Town of Brighton

4. No COMIDA.

While this property may be eligible for a payment in lieu of taxes (PILOT)

Agreement and substantial benefits under programs sponsored by the County of

Monroe Industrial Development Agency the project sponsor has committed that

they will, in accordance with the Town of Brighton's preference, forgo any request

for such benefits. Forgoing any request for COMIDA will apply to any and all

buildings or uses of the site.

The proposed action will meet the needs of the Town of Brighton as identified in the Town’s

Comprehensive Plan 2000. Further details of the Town’s Comprehensive Plan are contained in

Appendix 2 of this DEIS.

The pertinent goals addressed by this proposed action include:

• Provide pedestrian and bicycle linkages between neighborhoods and commercial

areas;

• Permit quality commercial development that provide a sound economic base;

• Provision of a balance in the type of grocery retail;

• Preservation of priority area of open space and residential buffer;

• Satisfaction of recreational needs of Town residents through pedestrian and bicycle

access,

• Maintenance and enhancement of the visual character of the community;

22 Whole Foods Plaza DEIS Town of Brighton

Incentives

The Whole Foods Plaza redevelopment project involves proposed incentives associated with redevelopment of the site and implementation of the access management plan. The proposed incentive categories relate to bulk area requirements, relief from obtaining individual special use permits for the uses proposed, and signage. Table 2.3.4-1 summarizes the Requested Incentives by Lot, inclusive of the applicable Town Code section.

The bulk area incentives relate primarily to dimensional deviations from the Code, in large part dictated by the split zoning of the development lands. The addition of 1.2 acres of RLA zoned land to the northern portion of the site (behind the current Mario's and Clover Lanes properties) generates the need for a use incentive to allow commercial improvements and activity to extend into the 1.2 acres of the adjacent RLA District. Other use incentives proposed relate to conditional permit uses which carry a favorable legal presumption of being permitted and in harmony with the neighborhood. To that end, the incentives seek to avoid unnecessary duplication in the review process.

Bulk area incentives related to the implementation of the access management plan serve to address preexisting non-conforming site conditions. These conditions are beyond the control of the project sponsor.

Further details of the requested incentives are contained in Section 2.3.4 of this DEIS.

23 Whole Foods Plaza DEIS Town of Brighton

Amenities

The Whole Foods Plaza redevelopment will provide amenities which will be of public benefit.

Typically, amenities address specific infrastructure or development needs or improvements in the area of the proposed development project. Several such amenities of benefit to the community are offered as part of the application. The amenities associated with the Whole Foods redevelopment project include, but are not limited to:

• Improvements to the Auburn Trail System

• Installation of a Traffic Signal with Pedestrian Controls on Monroe Avenue

• Implementation of an Access management plan for the southern properties on the

Monroe Avenue Corridor

• Preservation of Open Space

• Redevelopment of the site with multimodal connectivity to the surrounding

commercial and residential neighborhoods

The proposed amenities are further detailed below and summarized in Table 2.3.5-2. The value of the amenities is estimated to be in excess of $636,404, before including on-going maintenance costs for certain amenities of $3000 per year.

Further details on the project amenities are contained in Section 2.3.5 of this DEIS.

24 Whole Foods Plaza DEIS Town of Brighton

Impacts and Mitigation

Geology, Soils and Topography

Impacts

The redevelopment proposal will result in the disturbance of approximately 9.4 +/- acres of the

10.1 acre redevelopment site. The existing buildings and pavements will be removed to facilitate regrading of the site, construction of building foundations and the installation of utility infrastructure and stormwater management facilities. The general site topography of the site is to be maintained. Regrading of the site is to be performed to provide positive drainage of the pavement surfaces, provide ADA accessibility throughout the site and to minimize the amount of materials to be imported.

Implementation of the access management plan for the southern Monroe Avenue corridor properties will result in a disturbance of approximately 0.74 +/- acres of land. Regrading of areas for the implementation of the access management plan will be performed to provide positive drainage of pavement surfaces. The grading of the affected areas will blend with the existing grades within the disturbance area. Approximately 0.4 +/- acres of vegetation will be removed to construct the managed access improvements.

Mitigation

The impacts associated with redevelopment of the site will be mitigated through the design and construction phases to produce a grading plan which will result in a cohesive, more visually appealing site grading scheme which optimizes the volume of cuts and fills for the site. Mitigation measures to avoid and minimize soil erosion and resulting downstream sedimentation, and tracking of soils onto the area roadways will be employed. With the inclusion of such measures, designed

25 Whole Foods Plaza DEIS Town of Brighton and implemented specifically to address issues at the site, no significant erosion and sedimentation impacts should occur. Redevelopment of the site does not result in an appreciable removal of vegetation. Due to site soils, unsuitable soils within the proposed Whole Foods building footprint will need to be removed. Inclusion of a subsurface stormwater management facility designed specifically to address issues at the site will minimize the volume of soils needed to be imported to the site.

The impacts associated with the implementation of the access management plan for the southern

Monroe Avenue Corridor properties will be mitigated through the design and construction phases to produce a grading plan which compliments the existing improvements and topography.

Mitigation measures to avoid and minimize soil erosion and resulting downstream sedimentation, and tracking of soils onto the area roadways will be employed. With the inclusion of such measures, designed and implemented specifically to address issues at the site, no significant erosion and sedimentation impacts should occur. Inclusion of a subsurface stormwater management facility designed specifically to address issues at the site will minimize the disturbance area needed to construct the access management plan improvements.

It is concluded that no significant impacts to off-site areas due to geologic, soil or topographic conditions will result from the proposed redevelopment project.

Surface Waters/Drainage

Impacts

The impacts associated with the redevelopment of the site due to changes in the sites surface and groundwater conditions include an increase in the total volume of runoff from the site. The

26 Whole Foods Plaza DEIS Town of Brighton proposed redevelopment will result in a decrease in the stormwater discharge rates for the site.

The impervious surface area coverage of the site will increase slightly as a result of the

redevelopment. Drainage patterns for the site will be improved by modifying drainage conditions

where portions of the site shed stormwater onto the adjacent residential properties to the north of

the project. The surface water will be discharged into the watershed area at a

controlled rate of disposition improving the impact on the Irondequoit Creek watershed in both

disposition rate and water quality.

The impacts associated with the implementation of the access management plan for the southern

Monroe Avenue Corridor properties due to changes in the sites surface and groundwater conditions

include an increase in the total volume of runoff from the site. The implementation of the access

management plan will result in a decrease in the stormwater discharge rates for the site. The

impervious surface area coverage of the site will increase slightly as a result of implementing the

access management plan. Drainage patterns for the site will be improved by modifying drainage

conditions where portions of the properties shed stormwater to Monroe Avenue. The surface water

will be discharged into the Irondequoit Creek watershed area at a controlled rate of disposition

improving the impact on the Irondequoit Creek watershed in both disposition rate and water

quality.

Mitigation

Potential impacts to surface waters and drainage for the redevelopment site have been evaluated on a basis of hydrological mapping and analysis. While the project will introduce additional impervious surface areas to the site, impacts due to surface runoff will be fully mitigated by the proposed stormwater management system. The stormwater management system designed for the

27 Whole Foods Plaza DEIS Town of Brighton site meets or exceeds the latest NYS standards for both water quantity and water quality mitigation, including the newest green infrastructure standards. Green infrastructure practices to be implemented include, preservation of undisturbed areas, development within less sensitive areas, disconnection of roof areas, vegetated filter areas, permeable pavement, and subsurface detention.

Stormwater runoff for the redevelopment project will be collected through inlets and subsurface collection piping and conveyed by a closed piping network to a network of subsurface detention piping. Discharge rates from the collection system will be controlled through the use of outlet piping sizing and orifice plates to result in decreased runoff rates for the redevelopment project from the existing site conditions. Given this, it is concluded that the proposed project will not result in any significant off-site impacts related to storm peak flow rates, stormwater volumes or stormwater quality. Thus water quality, flow conditions and associated habitats for downstream water area should remain essentially unaffected by the proposed development.

Potential impacts to surface waters and drainage for the access management plan have been evaluated on a basis of hydrological mapping and analysis. While the project will introduce additional impervious surface areas to the properties included in the implementation of the access management plan, impacts due to surface runoff will be fully mitigated by the proposed stormwater management system. The stormwater management system designed for the site meets or exceeds the latest NYS standards for both water quantity and water quality mitigation, including the newest green infrastructure standards. Green infrastructure practices to be implemented include vegetated filter areas, and subsurface detention. Stormwater runoff for the redevelopment project will be collected through inlets and subsurface collection piping and conveyed by a closed piping network to a network of subsurface detention piping. Discharge rates from the collection system will be controlled through the use of outlet piping sizing and orifice plates to result in decreased runoff rates for the redevelopment project from the existing site conditions. Given this, it is concluded

28 Whole Foods Plaza DEIS Town of Brighton that the implementation of the access management plan will not result in any significant off-site impacts related to storm peak flow rates, stormwater volumes or stormwater quality. Thus water quality, flow conditions and associated habitats for downstream water area should remain essentially unaffected by the proposed development.

It is concluded that impacts from the Whole Foods Plaza redevelopment project and implementation of the access management plan related to surface and groundwater resources will be mitigated to the maximum extent feasible and practical.

Terrestrial and Aquatic Ecology

Impacts

Potential impacts to terrestrial and aquatic ecology have been evaluated based on a Terrestrial and

Aquatic Ecology Study prepared for the project. The redevelopment proposal will result in loss of approximately 0.5 acres of shrubland and wooded areas. The implementation of the access management plan will result in the loss of approximately 0.4 acres of shrubland. The upland habitat on the project site is considered common and abundant in this region and the loss will not be significant either locally or regionally.

Mitigation

Potential impacts to terrestrial and aquatic ecology for the Whole Foods redevelopment project will be mitigated by minimizing the disturbance to vegetated areas.

It is concluded that no significant impacts to terrestrial or aquatic ecology will result from the proposed redevelopment project.

29 Whole Foods Plaza DEIS Town of Brighton

Transportation

Impacts

The Traffic Impact Study (TIS), completed in January 2016, evaluates the potential traffic impacts resulting from the proposed Whole Foods Plaza redevelopment project. This segment of Monroe

Avenue is heavily traveled and presents numerous challenges for motorists to enter and exit adjacent properties. The Whole Foods Plaza redevelopment project proposes to redevelop properties along the north side of Monroe Avenue in keeping with the Town of Brighton’s Monroe

Avenue Corridor Community Vision Plan [Appendix 2]. In addition, the Conceptual Access

Management Plan [Figure 4] improves access to properties along the south side of Monroe Avenue by providing a new signalized intersection that will service many of the south side properties across from the development with various cross access agreements and shared cross access roads designed and built by the project sponsor. This new signal also provides a safe pedestrian crossing across Monroe Avenue, particularly for patrons of the existing hotels and restaurants. Currently, the closest signal controlled crosswalk is located at the Clover Street intersection.

The results of the traffic study indicate that a new signal at the full access driveway is warranted with development of the Whole Foods Plaza project. The existing Mario’s driveway should allow right-in/right-out/left-in turns only. Left-turns out will be prohibited. A new traffic signal and properties along the south side connected with easements and a rear lot access road, shows that the study intersections will experience small to moderate increases in delay during the weekday AM and PM, and Saturday midday peak hours.

The proposed redevelopment plans to provide sole access to the site via two driveway on Monroe

Avenue.

30 Whole Foods Plaza DEIS Town of Brighton

Further details on the TIS is contained in Sections 3.4, 4.4 and Appendix 3 of this DIES.

Further details on the Town of Brighton’s Monroe Avenue Corridor Community Vision Plan is contained in Appendix 2 of this DEIS.

The future growth and vitality of this segment of the Monroe Avenue Corridor depends largely on achieving a balance between the future transportation and land use demands within the corridor. In reaching that balance, a number of issues must be considered and trade-offs made as identified in the report. The January 2016 Traffic Study, contemplates many alternatives and recommends what is proposed.

Mitigation

The addition of a new traffic signal will improve the flow of traffic and pedestrian access into and out of this retail corridor. The improvements to the Auburn Trail, improvements and agreements facilitated by the project sponsor on the properties to the south of Monroe Avenue across from the redevelopment, will greatly improve the safety and accessibility to and from these retail sites on this heavily traveled commercial corridor. There will be a reduction in curb cuts and improved internal movement within the sites including movement for pedestrian and bicycle use. The

Rochester Genesee Regional Transportation Authority has been consulted to insure safe and convenient access to mass transit on both the north and south side of Monroe Avenue along this corridor are contemplated and made a part of this plan.

Further details on the exiting traffic volumes are contained in Section 3.4 and Appendix 3 of this

DEIS.

31 Whole Foods Plaza DEIS Town of Brighton

Land Use and Zoning

Impacts

The impacts associated with the redevelopment of the site relating to Land Use and Zoning include the demolition of the existing Mario’s Restaurant, Clover Lanes and Mamasan’s Restaurant facilities and redevelopment of the site as Whole Foods Plaza.

With respect to zoning and land use, all commercial uses proposed for the project are permitted under the commercial zoning of the property upon acquiring special use permits. The redevelopment plan creates variations to the bulk area and signage requirements for the redevelopment which are addressed in the Incentive Zoning Application for the project.

In terms of impacts to the immediate surrounding neighborhood, the project site lies within the

Monroe Avenue commercial corridor. The Monroe Avenue commercial corridor adjoins residential neighborhoods to the north. The redevelopment site is located immediately east of the

NYS Route 590 corridor. The proposed Whole Foods Plaza redevelopment is consistent with the

Town of Brighton Comprehensive Plan 2000, Town of Brighton Comprehensive Bicycle and

Pedestrian Master Plan / Bike Walk Brighton, Climate Smart Communities, and Town of Brighton

Monroe Avenue Corridor Community Vision Plan

The Whole Foods Plaza redevelopment project is consistent with the character and commercial development patterns for the Monroe Avenue corridor. The project is a response to the retail/commercial patterns that have emerged over the past several decades and is intended to meet market and community needs that have developed in the Town of Brighton.

32 Whole Foods Plaza DEIS Town of Brighton

Mitigation

The new development will aesthetically and economically enhance the commercial gateway into the Town of Brighton and increase its property values. The proposed project will significantly improve the character of the property which is currently developed as commercial space.

Site design and architectural design of the buildings have been coordinated to achieve maximum efficiencies to minimize the magnitude of the bulk area requirement incentives sought for the redevelopment.

The incentive zoning for the redevelopment proposal is consistent with existing uses along the

Monroe Avenue corridor while maintaining the adjacent residential buffer area. The proposed development will be among the lowest and least dense projects along the Town of Brighton’s

Monroe Avenue corridor. Furthermore, the density of the new development is only slightly more than what currently is built on the property. The density would fall below code if the entire site where contemplated as commercial. The area, which is currently developed, but still in the RLA

District is not used in calculating density or green space making those calculations appear more intensive than they are in the reality of evaluating the entire site. Further details on the density of development within the Monroe Avenue corridor are contained in Section 3.5.1 and Appendix 17 of this DEIS.

The Whole Foods Plaza redevelopment project will be submitted and reviewed by the Town’s

Planning Board, Architectural Review Board and Conservation Board and will receive input from the various boards to ensure the development plan conforms with land use and zoning guidelines and objectives.

33 Whole Foods Plaza DEIS Town of Brighton

It is concluded that no significant impacts to land use and zoning will result from the proposed redevelopment project.

Community Services

Impacts

The proposed Whole Foods Plaza redevelopment project will not create any appreciable increase in demand for community services or utility demands. No adverse impacts to community services or private utilities were identified, hence no mitigation is required. Further details on community resources are contained in Section 3.6 of this DEIS.

The redevelopment project will result in a positive fiscal impact to the community of over

$247,000 annually in increased property taxes revenue from the project. The redevelopment project will increase sales tax revenues by approximately $3,500,000 annually. The increase in property tax revenues will provide increased local funding of Town and School taxes without increases in demands for services. Redevelopment of the site will create an increase in surrounding commercial property values. The project is expected to almost double the property values of the surrounding commercial properties, increasing those taxable values and in turn revenue to the

Town and local governments by nearly 100% or $300,000+ annually.

Mitigation

Given that no adverse impacts to community services were identified, no mitigation measures are required. No tax abatements will be sought from COMIDA that would have minimized the positive impact on community resources.

34 Whole Foods Plaza DEIS Town of Brighton

It is concluded that no significant adverse impacts to community services will result from the proposed redevelopment project.

Visual Resources

Impacts

The proposed Whole Foods Plaza redevelopment project will alter the visual appearance of the site. The existing Mario’s Restaurant, Clover Lanes, and Mamasan’s Restaurant buildings are to be razed and the site cleared and reconfigured for the redevelopment of the site for the Whole

Foods Plaza.

An extensive analysis and assessment of visual impacts has been completed for this DEIS including viewshed analysis, cross-sections and detailed photo-simulations. It is found that the proposed Whole Foods Plaza redevelopment project will result in potentially significant, unavoidable visual impacts for viewers traveling along the adjacent Monroe Avenue corridor.

Impacts within the Monroe Avenue corridor will be visually consistent with the existing commercial character of the Monroe Avenue commercial corridor and, thus, will not be severe.

Motorist traveling Monroe Avenue will have visibility into the site. Views into the site and of the building facades will be softened through the use of planting beds and landscape islands.

Mitigation

Visual impacts associated with the Whole Foods Plaza redevelopment project along the Monroe

Avenue corridor are mitigated by the Architectural Design Scheme. The proposed buildings are all single-story buildings with architectural features which provide visual interest to the building facades. Buildings are set back at varying distances from the roadway with shared parking fields.

35 Whole Foods Plaza DEIS Town of Brighton

The varied building sizes and setbacks serves to break up the scale and massing of the project elements to minimize the visual impact of the redevelopment and to provide areas within the project for landscape islands to soften the sightlines of the building from the Monroe Avenue corridor.

A six foot privacy fence, as required by code, will be installed along the northern project disturbance limit adjoining the residential properties. The privacy fence will be augmented with the construction of an earthen berm with landscape plantings to limit sightlines from the residences north of Clover Street and motorists traveling along Clover Street.

It is concluded that no adverse impacts to visual resources will result from the proposed redevelopment project.

Further details on the visual resources are contained in Section 3.7 of this DEIS.

Cultural Resources

Impacts

The Whole Foods Plaza redevelopment is located in an area designated as sensitive for archaeological sites and is located within 5 miles of the Heritage Trail. The Whole

Foods Plaza redevelopment is occurring on previously developed lands. The project proposal was submitted to the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) for review of potential impacts on cultural resources. The OPRHP has conducted their review and found that the project will have no impact on archeological and/or historic resources listed in or eligible for the New York State and National Registers of Historic Places.

36 Whole Foods Plaza DEIS Town of Brighton

Mitigation

Given that no adverse impacts to Cultural Resources were identified, no mitigation measures are required.

Further details on the cultural resources are contained in Section 3.7 of this DEIS.

Noise

Impacts

Redevelopment of the site will be performed in accordance with Town Code requirements for hours of construction and will be performed utilizing standard construction equipment and practices, therefore significant adverse noise impacts are expected due to redevelopment of the site.

Plaza operations will be typical of commercial enterprises. Deliveries will occur during the hours the Plaza is open and no significant noise impacts are expected due to the proposed Whole Foods

Plaza redevelopment project.

Mitigation

Although no significant adverse noise impacts were identified, the vegetated berm and privacy fencing to be installed at the northern limits of the redevelopment project will serve to reduce noise levels at the northern boundary of the project. It is concluded that no significant noise impacts will result from the proposed redevelopment project.

37 Whole Foods Plaza DEIS Town of Brighton

Further details on noise are contained in Section 3.8 of this DEIS.

Construction Impacts

Impacts

Construction related impacts are anticipated to be limited to a single construction phase that is anticipated to last 18 months or less. During the construction period, impacts will include dust and noise generation; limited impairment to local traffic flow associated with construction vehicle traffic, utility work, curb cuts, installation of the new traffic signal, relocation and improvement of the Auburn Trail and general visual changes.

Mitigation

Construction practices will comply with Town of Brighton codes which reference times of day for work to mitigate the noise disturbance to the residential neighborhoods. Additionally, the significant wooded hedge row and wooded area will act as a sound and dust barrier. There is no blasting stone anticipated. Dust will be monitored daily during construction and will be controlled with water on an as needed basis. Erosion and sediment control devices will be installed at the start of the construction activity and inspected and repaired as needed. A truck tire washing station will be set up at a stabilized construction access if needed to remove soil from the truck tires. Signs will be installed directing users of the Auburn Trail along temporary detours to navigate safely around the construction area. Work on the main road will be done in cooperation with NYSDOT to minimize the negative impact on traffic.

It is concluded that no significant impacts associated with construction activities will result from the proposed redevelopment project.

38 Whole Foods Plaza DEIS Town of Brighton

Further details on the construction are contained in Section 2.5 of this DEIS.

Alternatives

In addition to the proposed action, numerous alternatives were evaluated and considered by the project sponsor. The alternatives considered can be categorized into five categories. The alternative categories evaluated include the following:

1. Development of the site under the density limits permitted under existing zoning

regulations;

2. Alternate land uses allowed under the existing zoning including residential, retail and

other non-residential uses;

3. Investigation of alternate site layouts, including a reduction in size of the buildings and

elimination of the drive-through uses;

4. Potential allowable future uses of the buildings;

5. No action alternative.

The description of the proposed action has been revised based on on-going discussions with Town

Staff and comments received to date from the community.

39 Whole Foods Plaza DEIS Town of Brighton

Summary of Plans and Alternatives

40 2.0 Description of the Proposed Action

2.1 Location and Setting

Whole Foods Plaza is a multitenant retail center proposed for a 10.1 acre site in the Town

of Brighton, Monroe County, New York. The site is located on the north side of New York

State Route 31 (Monroe Avenue) approximately 600 feet west of the intersection of

Monroe Avenue and Clover Street and approximately at the intersection of the interchange

with NYS Route 590 and bordered by Clover Street to the north, as shown in Figure 2.1.1.

Further details on the proposed project are contained in section 2.2.

The Whole Foods Plaza redevelopment project includes the implementation of an access

management plan affecting five commercial properties on the south side of Monroe

Avenue. Figures 2.1.2 and 2.2.1A depict the properties included in the access management

plan. Further details on the proposed access management plan are contained in Section

Monroe Avenue in the project site vicinity is an important commercial corridor connecting

the Town of Brighton to metropolitan Rochester and eastern suburbs. Approximately 600

feet east of the project site Monroe Avenue connects with Clover Street, Route 590

connects with Monroe Avenue at the western project limits and Allens Creek Road

connects with Monroe Avenue approximately1600 feet west of the project site. Further

details on the transportation and traffic setting of the site are contained in Section 3.4 of

this DEIS.

The Monroe Avenue corridor in the project site vicinity are developed as commercial,

retail, and office uses. Large retail complexes are located approximately 3500 feet east of

41

Whole Foods Plaza DEIS Town of Brighton

the project site along the Monroe Avenue corridor within the Town of Pittsford. Areas

north and south of the Monroe Avenue Commercial corridor are developed as residential

neighborhoods. Further details on the community character on the project site setting are

contained in section 3.5 of this DEIS.

2.2 Design and Layout

As proposed the Whole Foods Plaza redevelopment project will provide a multitenant retail

center within a revitalized commercial setting. The project will provide a variety of

specialty upscale retail uses in a pedestrian friendly cohesive redevelopment with enhanced

multimodal connectivity to the surrounding residential neighborhoods and Monroe Avenue

corridor.

The redevelopment project will require approval from the Town’s Planning Board for site

plan approval and from the Town Board for an Incentive Zoning Application. The project

site is to be redeveloped utilizing incentive zoning to provide relief from bulk area

requirements associated with existence of dual zoning classifications effecting project

lands. Further details on the approval process is contained in Sections 2.2.12 and 2.4 of

this DEIS.

The redevelopment proposal involves the development of approximately 93,900 square-

feet of retail space within four buildings. The anchor tenant will be a natural and organic

foods market/grocery. The tenant will be Whole Foods Market. The anchor building will

be a single story 50,000 square-foot natural and organic foods market/grocery with a 3,900

square-foot mezzanine. The redevelopment proposal also includes the development of two

42 Whole Foods Plaza DEIS Town of Brighton

single story multitenant retail buildings; 31,780 square-foot retail building and 6,300

square-foot “outparcel” style retail building. The fourth building is planned for a single

story 1,980 square-foot specialty coffee shop with a drive through. Access to site will

Figure 2.2.1D shows the site plan for the site. Further details on the proposed

redevelopment project are contained in Section 4.5 of this DEIS.

Table 2.2.1-2 provides a summary of the proposed redevelopment including square-footage

of buildings, number of stories/proposed building heights, number of parking spaces, and

lot coverage.

The site to be redeveloped encompasses approximately 10.1 acres of property from four

(4) properties. The redevelopment properties are the current Mario's Italian Restaurant

parcel (at 2740 Monroe Avenue, with tax identification number 137.19-2-70.32), the

Clover Lanes Bowling parcel (at 2750 Monroe Avenue, with tax identification number

150.07-2-8.11), the Mamasan's Restaurant parcel (at 2800 Monroe Avenue, with tax

identification number 150.07-2-7.1), and a 2.2 +/- acre portion of lands of the First Baptist

Church (at Allen’s Creek Road, with tax identification number 137.19-2.68.1) which

adjoins the Mario’s Restaurant parcel. Figure 2.1.2 depicts the properties to be

redeveloped. Further details on the existing project site setting are contained in Section

3.5 of this DEIS. The project sponsor owns the Mario’s and Clover Lanes parcels and has

the remaining lands under contract to purchase. The redevelopment proposal will include

the resubdivision of the properties to create a separate lot for the Whole Foods facility, a

separate lot for the balance of the commercial redevelopment, and a separate lot for lands

to be maintained as open space. Although the redevelopment will function as a cohesive

development project, separate lots will be created to allow the project funding for the

43 Whole Foods Plaza DEIS Town of Brighton

Whole Foods facility and the balance of the retail facilities to be separate so as to not

encumber one another. The lots for subdivision will create rights for shared access and

utilities between the lots by way of a Reciprocal Easement Agreement (REA) for the site.

A separate lot will be created for the residential property to be maintained as open space.

Figure 2.2.5 depicts the proposed lot configuration. Redevelopment of the Auburn trail

will require a portion of the trail to be constructed on the adjoining Rochester Gas and

Electric (RG&E) parcel. Approximately 0.03 acre of the 2.0 acre RG&E property will be

effected. RG&E has agreed to enter into a license agreement for the project sponsor for

the use of the land. Further details on the license agreement are contained in Appendix 10

of this DEIS. Further details on the proposed subdivision of the lands, inclusive of a metes

and bounds survey map, is included in Appendix 10 of this DEIS.

The redevelopment site has frontage on public right-of ways. Frontage on the right-of-

ways provides the ability to access the site from public roadways. The site has frontage on

Monroe Avenue (NYS Route 31) and Clover Street (MC-DOT Route 271). The

redevelopment site has right of access to Allens Creek Road by way of an access easement

across the office property adjoining the site to the west. The project sponsor has committed

to limiting access for the redevelopment to the Monroe Avenue project frontage.

The Mario’s Restaurant, Clover Lanes and Mamasan’s properties are dual zoned and

comprise approximately7.9 +/- acres of the 10.1 +/- acre redevelopment. Approximately

7.04 +/- acres of the Mario’s, Clover Lanes, and Mamasan’s lands are within the General

Commercial Zoning District (BF-2) and approximately 0.86 +/- acres of the lands are

within the Residential Low Density Zoning District (RLA). The lands to be acquired from

the First Baptist Church, approximately 2.20 +/- acres, are entirely within the RLA Zoning

44 Whole Foods Plaza DEIS Town of Brighton

District. The zoning district boundary defining the boundary lines between the General

Commercial Zoning District (BF-2) and Residential Low Density Zoning District (RLA)

follows the centerline of an old railway right-of-way at the eastern portion of the

redevelopment lands. Figure 2.2.6 depicts the zoning district boundary lines within the

redevelopment. No modification of the zoning district boundaries is proposed associated

with the redevelopment project.

The existing Mario's, Clover Lanes and Mamasan's facilities will be razed to facilitate for

the proposed comprehensive redevelopment of the site. Application will be made to the

Planning Board and Architectural Review Board for the removal of the existing structures

in accordance with Town Code requirements. The buildings to be razed are three (3) single

story buildings totaling 60,247 square-feet. To further the goals of the Town, and in the

interest of sound environmental stewardship, building materials from the Mario’s

Restaurant facility and Clover Lanes facility along with pavement materials, from the entire

site, are to be reclaimed for reuse. Planned reuse of materials include reclamation of the

clay tile roof shingles from the Mario’s facility, reuse of the timber from the Bowling

Center roof truss system, reuse of a portion of the lumber from the bowling approaches,

reclamation of the bowling lane beds for reuse, and rubblization of pavement surfaces for

use as fill materials. Further details on the proposed project materials reclamation

initiatives are contained later in this Section and in Section 4.5 of this DEIS.

Table 2.2.1-1 provides a summary of existing facilities including square-footage of

buildings, number of stories/building heights, number of parking spaces, and lot coverage.

45 Whole Foods Plaza DEIS Town of Brighton

The redevelopment project will improve multi-modal access and circulation to and within

the site. The site will be accessed by two (2) access points on Monroe Avenue. One of the

access points will be a four-way signalized intersection. The second access point will be

an un-signalized intersection with restricted egress from the site. A traffic signal with

pedestrian signals is proposed to be installed at the main entrance to the redevelopment site

on Monroe Avenue. The proposed location will align the primary access for the site with

the entrance to the Sakura Home restaurant site on the south side of Monroe Avenue. The

new signal also provides a safe pedestrian crossing across Monroe Avenue, particularly for

patrons of the existing hotels and restaurants. Currently, the closest signal controlled

crosswalk is located at the Clover Street intersection. The signal location has been dictated

by the New York State Department of Transportation (NYSDOT), which maintains

jurisdiction over Monroe Avenue. Figures 2.2.4 & 2.2.4A depict the development access

locations. The existing vehicle curb cut serving the Mamasan's facility will be eliminated,

as well as the vehicular connections at the rear of the properties, to the adjoining office

center to the west and Animal Hospital to the east. Multimodal transportation

improvements serving the Monroe Avenue corridor, in cooperation with the Rochester

Genesee Regional Transportation Authority, are planned. A bus shelter with wayfinding

kiosk is to be developed along the project frontage on Monroe Avenue, with connectivity

to a sidewalk network within the site. Parking areas within the site will include electronic

vehicle charging stations, dedicated spots for HOV (high occupancy vehicles) and LEV

(low emission vehicles). Tesla, a leader in electric automobile technology, is contemplating

the site for a Tesla Super Charger station, the first in the Monroe County area. Figure 2.2.8

depicts the dedicated parking areas. The project sponsor has committed to work with an

independent traffic consultant, hired by the Town, on internal and external transportation

review. Further details on the existing transportation network is contained in section 3.4 of

46 Whole Foods Plaza DEIS Town of Brighton

this DEIS. Further details on the proposed transportation network is contained in section

4.4 of this DEIS.

Pedestrian access is provided throughout the project with a sidewalk system network within

the center and connecting to the sidewalk system within the Monroe Avenue Corridor. The

sidewalk network includes a system of sidewalks designed to provide safe pedestrian

access from parking areas to buildings, from building to building and to and from the public

sidewalk system on Monroe Avenue and the multi-use Auburn Trail. Cross walk locations

and pedestrian routes have been designed to avoid pedestrian-vehicle conflicts. All

walkways within the development will be compliant with the American with Disabilities

Act (ADA) guidelines. Figure 2.2.9 depicts the proposed sidewalk network system.

The mixed use Auburn Trail, which traverses the rear of the site is proposed to be relocated,

improved and incorporated into the development. The trail connects to the village of

Pittsford to the east of Brighton. The Auburn Trail also connects to the Erie Canal trail

system in Pittsford and consequently across the state of New York. The current condition

of the Auburn Trail through the redevelopment areas is inadequate and unsafe for

pedestrian or bicycle use. The Town of Pittsford has made the trail a priority as the north

side of Monroe Avenue was developed within Pittsford. The Project Sponsor’s proposal

will revitalize this unkempt section of the trail, providing a valuable amenity for Brighton

residents. Not only will the residents near the proposed development have an opportunity

to experience the natural areas on the site, but the entire community would have use of the

trail system, bicycle and pedestrian connectivity to the redevelopment and surrounding

areas.

47 Whole Foods Plaza DEIS Town of Brighton

Improvements to the mixed use trail include constructing approximately 1060 lineal feet

(1060’) of asphalt trail. The trail is to be reconstructed to a width of ten feet (10’) wide to

comply with the American Association of State Highway (AASHTO) guidelines for mixed

use pathways. The trail is being separated from the parking areas to enhance user safety.

The radiuses, pavement cross slope, running slope, and pavement surface are in accordance

with the AASHTO recommendations for shared use trails. A pedestrian gathering area

with pedestrian linkages to the retail facilities and Monroe Avenue corridor, wayfinding

signage and centralized bicycle parking area with bicycle parking for sixteen (16) bicycles

is included in the trail system upgrades to promote access to the site by users of the trail

system. The proximity to the trail will provide enhanced pedestrian connections between

the retail and residential neighborhoods. The pedestrian friendly development will enhance

the neighborhood by improving walkability and fostering neighborhood business. At the

same time, the proposal provides for permanent protection for the adjacent residential

neighborhood, maintaining buffering and separation. The trail serves to further separate the

residential and commercial areas by providing a transitional use area between the uses.

Figure 2.2.1D depicts the relocated and improved Auburn Trail within the redevelopment.

Further details on the Auburn Trail System are included in Appendix 2 & 7 of this DEIS.

In addition to the redevelopment of the 10.1 acre “site”, traffic corridor improvements for

properties on the south side of Monroe Avenue are planned. The traffic corridor

improvements include the implementation of a managed access plan. The managed access

plan consists of improvements to five (5) properties on the south side of Monroe Avenue.

The managed access plan will provide interconnectivity, parking improvements, and access

to the proposed signalized intersection. The managed access plan will include the

acquisition of approximately 0.5 +/- acres of excess Route 590 Right-Of-Way at the rear

48 Whole Foods Plaza DEIS Town of Brighton

of the properties from the New York State Department of Transportation (NYSDOT). The

project sponsor will be purchasing the excess Right-of Way lands from the State and

conveying the purchased lands to the adjoining commercial properties. The managed

access plan will provide a common rear lot access drive, thirty-eight (38) additional parking

spaces, and cross lot access among the properties and to the proposed signalized

intersection. Cross lot access and shared parking facilities will be accomplished through

the filing of a reciprocal access easement between the properties. The project sponsor will

be designing and constructing the shared access improvements for the implementation of

the Managed Access Plan. Figures 2.2.4A, 2.2.4B depicts the Managed Access Plan and

associated properties. Further details on the managed access plan are contained in Section

4.4 of this DEIS. Further details on the existing transportation network are contained in

Section 3.4 of this DEIS.

The redevelopment project will upgrade the property and this important gateway to the

Town of Brighton. The exciting food market anchor, attractive architecture, and cohesive

design will help to update and transform this section of the Monroe Avenue corridor. The

project will feature upscale architectural design elements and materials. The

redevelopment will utilize a cohesive architectural theme to be consistent with the anchor

tenant, including the use of regional materials and a waste management plan that will look

to re-use material from the existing buildings that are proposed to be demolished. Re-use

of materials will include reclamation and re-use of materials on site and reclamation of

materials for reuse regionally. Materials to be reclaimed for use regionally include the

bowling lane beds and machines from the Clover Lanes facility and the clay tile roof

shingles from the Mario’s facility. Materials to be reclaimed for re-use on-site include

timber from the roof trusses and lumber from the bowling lane approached and setae areas

49 Whole Foods Plaza DEIS Town of Brighton

from the Clover Lanes facility. Rubblization of asphalt pavement surfaces and reclamation

of pavement subbase materials from the entire redevelopment area for reuse as general fill

materials and augmentation for use as pavement subbase material. Figures 2.2.2 through

2.2.3C depict the planned building architecture. Further detail on the proposed architecture

and proposed building views are contained in Section 4.7 of this DEIS. Further detail on

the existing building views are contained in Section 3.7 of this DEIS.

In addition to reuse of building materials the project will incorporate sustainability/green

infrastructure practices for redevelopment of the site. The buildings will incorporate light

colored roof systems and concrete pavement in areas will be utilized to help mitigate the

"heat island" effect associated with parking areas and rooftops for the development.

Landscape islands combing trees, shrubs, ornamental grasses and annual and perennial

vegetation are proposed within parking areas and adjacent to building areas to aid in

mitigating the “heat island effect” and provide visual interest and screening within the

development. Figures 2.2.1.G and 2.2.1.H depict the Landscaping Plan and island

planting details. Figures 2.2.7A and 2.2.7B depict the Permeable pavement and

engineered soil planting beds and filter strips will be utilized to reduce stormwater surface

runoff rates and provide water quality measures. Figure 2.2.7 depicts the stormwater

green infrastructure practice areas. The Whole Foods building will be constructed to U.S.

Green Building Council (USGBC) Silver LEED standards and incorporate architectural

features and materials appropriate to the Rochester area. The additional buildings of the

retail plaza will be designed to complement the Whole Foods building, providing an

architectural theme consistent throughout the development. USGBC certification for the

buildings will not be sought. Further details of the stormwater management practices is

contained in Section 4.2 of this DEIS.

50 Whole Foods Plaza DEIS Town of Brighton

The following sections provide further detail to the design intent and proposed Project

Elements:

2.2.1 Proposed Impervious Area and Ratio of Greenspace to Impervious

area (4)

The redevelopment of the site will result in an increase in the percentage of

impervious surface area. The aggregate existing impervious surface area

percentage is 84%, and is increased to 88% under developed conditions. Further

details on the Bulk Area Data Analysis is contained in Appendix 17 of this DEIS.

Table 2.2.1-1 Existing Facilities Summary provides a summary of existing facilities

including square-footage of buildings, number of stories/building heights, number

of parking spaces, and lot coverage.

51 Whole Foods Plaza DEIS Town of Brighton

Table 2.2.1-1 Existing Facilities Summary

Lot Area Building Size Parking Density Lot Coverage (Acres) Required Provided (Square Max. per code Existing Feet Gross Floor Area/ Acre) MARIO’S RESTAURANT

2.293† 12,324 S.F. 124 177 5,375 65% 79%*

† Total lot area includes tax accounts 137.19-01-81 & 137.19-02-70.32

*Lot coverage includes existing paved areas that extend beyond the existing lot lines, but does not include parking areas that have been removed from the church property to the northeast.

CLOVER LANES

4.512 43,170 S.F. 210 235 9,568 65% 90%

MAMASAN’S

1.157 4,753 s.f. 48 64 4,108 65% 81%

TOTAL 7.962 60,247 s.f. 382 476 7,567 65% 84%

Table 2.2.1-2 Summary of Proposed Facilities provides a summary of proposed

facilities including square-footage of buildings, number of stories/building heights,

number of parking spaces, and lot coverage.

52 Whole Foods Plaza DEIS Town of Brighton

Table 2.2.1-2 –Proposed Facilities Summary Building Size Parking Density Lot Coverage Required Provided (Square Max. per code Proposed Feet Gross Floor Area/ Acre) LOT 1 (5.15 Acres)

Building 1 50,000 S.F. 250 300 10,466 grocery/specialty store 3,900 S.F. dinning 20 mezzanine 35’± Ht. LOT 1 53,900 S.F. 270 300 10,466 65% 83% TOTAL: LOT 2 (3.87 Acres)

Building 2 31,780 S.F. 159 120 8,212 Mixed retail 30’ ± Ht. Building 3 1,920 S.F. 10 19 496 Retail/Restaurant 25’ ± Ht.

Building 4 6,300 S.F. 32 41 1,628 Retail/ Commercial 25’ ± Ht. LOT 2 40,000 S.F. 200 180 10,336 65% 88% TOTAL

OVERALL DEVELOPMENT (10.13 Acres)*

93,900 s.f. 470 480 9,270 65% 76% *Includes areas from Lot 3

53 Whole Foods Plaza DEIS Town of Brighton

2.2.2 Total Building Area, Height, Square Footage, Number of Floors (5)

The redevelopment proposal involves the development of approximately 93,900

square-feet of retail space within four buildings. The anchor tenant will be a natural

and organic foods market/grocery. The tenant will be Whole Foods Market. The

anchor building will be a single story 50,000 square-foot natural and organic foods

market/grocery with a 3,900 square-foot mezzanine. The redevelopment proposal

also includes the development of two single story multitenant retail buildings;

31,780 square-foot retail building and 6,300 square-foot “outparcel” style retail

building. The fourth building is planned for a single story 1,980 square-foot

specialty coffee shop with a drive through. Figure 2.2.1D shows the site plan for

the site. Further details on the proposed redevelopment project are contained in

Section 4.5 of this DEIS.

The proposed buildings are all single-story buildings. The Whole Foods building

will have a mezzanine for patron seating area and offices. The building heights are

to be within code and in keeping with the character, mass and scale appropriate for

the site and surrounding area. In all cases, the heights are below what code permits

and no higher than the structures that currently exist on the site.

Whole Foods has traditionally opened their sites up to a "public market" feel

including outdoor displays, entertainment and food service outdoors.

The architecture of the 50,000 square foot anchor building is intended to marry the

old with the new. High quality local materials will be used, that evoke a taste of

the past like the Erie Canal, while at the same time re-using a significant amount of

54 Whole Foods Plaza DEIS Town of Brighton

material from the Clover Lanes bowling alley, specifically the wood from the

bowling lanes and the large trusses that are usable from the bowling alleys roof

system. The building will also be designed and built with the possibility of

someday being repurposed.

The main in line Retail Center is intended to be 31,780 square feet and although

not matching the main anchor building, share similar design influences and colors

as to make the buildings work together. It is likely that 6-10 different retail stores

will occupy this building; for this reason, the building will be constructed so the

units are modular in nature and can be reconfigured to accommodate different size

tenants and uses in the future.

The western most “outparcel” style retail building is designed to be 1,920 square-

feet and is committed to be a coffee shop with a drive through. The popularity of

coffee has grown tremendously and become a staple of social interaction. This

parcel is designed to accommodate a limited amount of outdoor seating visible to

the main roadway. This intentional display of a vibrant and welcoming atmosphere

builds on the Lifestyle Center feeling that this center will evoke.

The eastern “outparcel” style retail building is intended to be a 6,300 square-foot

multitenant retail building. The building is anticipated to house two (2) tenants.

Design of the areas surrounding the building will include outdoor seating areas.

The architecture for the anchor building is intended to marry the old with the new.

High quality local materials will be used, that evoke a taste of the past like the Erie

55 Whole Foods Plaza DEIS Town of Brighton

Canal, while at the same time re-using a significant amount of material from the

Clover Lanes bowling alley, specifically the wood from the bowling lanes and the

large trusses that are usable from the bowling alleys roof system.

Figures 2.2.2D through 2.2.2F depict the Architectural Building Elevations.

Further details on the building Architecture is included in Section 4.7 and Appendix

16 of this DEIS.

2.2.3 Vehicle and Bicycle Parking (7)

Parking provided for the redevelopment proposal will comply with Town Code

requirements. Parking for the redevelopment proposal is being provided at a rate

of 5 spots per 1000 square feet. The 93,900 square-foot redevelopment will require

470 parking spaces. The redevelopment proposal will provide 473 parking spaces.

Figure 2.2.1D depicts the proposed site layout.

Parking for the Plaza will be shared by the users. The Whole Foods lot, Lot-1

Whole Foods 53,900 square feet, requires 270 parking spots and 293 are provided.

Lot 2 (remaining 40,000 square feet of retail) requires 200 parking spots and 180

are provided. Parking rights for the shared parking will be addressed in a

Reciprocal Easement Agreement (REA) to be filed for the Plaza. The REA is to be

filed to ensure access and parking rights between the lots is guaranteed in the event

the parcels are no longer under common ownership.

The parking areas throughout the redevelopment will comply with ADA standards

and will provide dedicated parking areas for High Occupancy Vehicle (HOV)

56 Whole Foods Plaza DEIS Town of Brighton

parking, Low Emission Vehicle (LEV) parking, Electrical Car Charging Stations

(ECCS). Signage associated with traffic control, parking designations, HOV

parking, LEV parking, ECCS, and ADA parking will be provided throughout the

Plaza. Figure 2.2.8 depicts the dedicated parking areas.

Bicycle parking will be included in a centralized location adjacent to the Auburn

Trail. Bicycle racks will provide bicycle parking for approximately sixteen (16)

bicycles. The bicycle parking area will include a pedestrian gathering area and

wayfinding Kiosk to provide a link between the Auburn Trail, Plaza, and Monroe

Avenue corridor. Figures 2.2.8, 2.2.10 and 2.2.10A depict the bicycle parking,

pedestrian gathering and wayfinding kiosk area.

2.2.4 Traffic Control Features and Patterns (8)

The redevelopment project will improve multi-modal access and circulation to and

within the site. The site will be accessed by two (2) access points on Monroe

Avenue. One of the access points will be a four-way signalized intersection. The

second access point will be an un-signalized intersection with restricted egress from

the site. The restricted egress at this location will be limited to right-out traffic

headed west bound on Monroe Avenue. The secondary access point coincides with

the existing primary access point for the Mario’s restaurant facility. A traffic signal

with pedestrian signals is proposed to be installed at the main entrance to the

redevelopment site on Monroe Avenue. The proposed location will align the

primary access for the site with the entrance to the Sakura Home restaurant site on

the south side of Monroe Avenue. The redevelopment project will not have any

means of vehicle ingress or egress to Clover Street and Allens Creek Road.

57 Whole Foods Plaza DEIS Town of Brighton

The project sponsor proposes to install and pay for the maintenance of the traffic

signal to be installed at the main entrance for the Plaza. The traffic signal location

is depicted in Figure 2.2.1D. The signalized intersection will offer an opportunity

for access management and cross access along Monroe Avenue. One curb cut on

the north side of Monroe Avenue (the driveway for the current Mamasan's

Restaurant) will be removed.

Upon entering the main entrance to the site, the main entrance drive there bends to

the west towards the Whole Foods anchor facility. This channels traffic for the

primary use, the grocery store, directly to that area. An aesthetic benefit is that the

entrance flows to the left as you enter and does not bring traffic to the rear of the

site or funnel all traffic to one location.

Drive isle placement and parking area configurations have been laid out to

minimize pedestrian/vehicle conflicts and to channel pedestrians toward walkways

and buildings.

2.2.5 Drainage Improvements (9)

The proposed redevelopment proposal will result in increased impervious surface

area and total runoff volume. The stormwater management facilities designed for

the Whole Foods Plaza redevelopment site and access management properties

meets or exceeds the latest NYS standards for both water quantity and water quality

mitigation, including the latest green infrastructure standards. Stormwater

Management facilities will be designed and constructed for both the site and the

58 Whole Foods Plaza DEIS Town of Brighton

access management plan areas. The stormwater management facilities will be

private facilities. Maintenance of the stormwater management facilities will be

provided for in maintenance agreement drawn up for the facilities in accordance

with NYS-DEC guidelines.

The proposed stormwater management facilities will be designed in accordance

with the applicable Town and State requirements. The stormwater management

practices will comply with Town Code Section 215.

Stormwater management practices to be employed for the redevelopment proposal

include, the use of permeable pavements, filter strips, engineered soils planters and

subsurface detention facilities.

The project site is located within an approximately 41 +/- acre drainage basin that

conveys stormwater runoff eastward to a tributary of Allens Creek. Currently two

primary storm discharge points exist for the project site and Stormwater outfall

patterns for the site will remain unchanged for the redevelopment site. The

drainage area is depicted in Figure 3.3.2.

The proposed project will not result in any significant off-site impacts related to

stormwater volumes or stormwater quality. Thus water quality, flow conditions

and associated habitats for downstream water should remain essentially unaffected

by the proposed redevelopment.

Further details on the existing stormwater runoff, including volumes, for the project

59 Whole Foods Plaza DEIS Town of Brighton

is contained in Section 3.2 and Appendix 19 of this DEIS.

Further details on the proposed stormwater runoff, including volumes, for the

project is contained in section 4.2 and Appendix 19 of this DEIS.

Figures 2.2.7A and 2.2.7B depict the proposed green infrastructure practices for the

site and managed access area. Figures 2.2.1F and 2.2.1H depicts the proposed

grading plan for the site and managed access area. Figures 2.2.1G and 2.2.1H

depicts the proposed utility plan for the site and managed access area.

2.2.6 Sanitary Sewers (9)

The proposed redevelopment proposal could connect to two (2) existing eight-inch

(8”) diameter dedicated Town of Brighton sanitary sewers. One of the sewers being

along the project frontage on Monroe Avenue and the other sewer adjoining the

project at the west side of the project which connects to the dedicated sewer on

Allens Creek Road. However as suggested by the Town Engineer, the project will

eliminate sanitary sewer discharges to the Monroe Avenue sewer and direct them

to the Allens Creek sewer. Both sewers discharge to a larger trunk sewer within

close proximity to the project location.

The redevelopment project will increase sanitary sewer discharge volumes to the

dedicated sewer by approximately 0.8 gallons per minute or 288 gallons per day.

The Allens Creek sanitary sewer has a full flow capacity of 420 gallons per minute

which is sufficient to convey the 19.2 gallons per minute discharges from the

project. The Town sewer system has sufficient capacity to service the additional

60 Whole Foods Plaza DEIS Town of Brighton

flows from the project.

Grease interceptors will be installed in accordance with the Monroe County

Department of Health and Monroe County Department of Environmental Services

(Pure Waters) requirements for restaurant uses.

The proposed project will not result in any significant off-site impacts related to

sanitary sewer volumes. Thus sewer capacity for downstream sanitary sewers

should remain essentially unaffected by the proposed redevelopment.

Further details on the existing sanitary sewer flows for the project is contained in

Section 3.6 and Appendix 6 of this DEIS.

Further details on the proposed sanitary sewer flows for the project is contained in

section 4.6 and Appendix 6 of this DEIS.

Figure 2.2.1G depicts the proposed utility plan for the site.

2.2.7 Public Water (9)

The project area is supplied by pubic water through a network of dedicated Monroe

County Water Authority (MCWA) watermains. The proposed redevelopment

proposal will be served by two (2) private water service connections. The Whole

Foods facility will connect to an eight-inch (8”) dedicated watermain at the western

portion of the site. The balance of the Plaza will be connected to a twelve-inch

(12”) public watermain located along the project frontage on Monroe Avenue. A

61 Whole Foods Plaza DEIS Town of Brighton

twenty-inch water distribution main traverses the project site. The 8” and 12”

watermains are interconnected with the 20” distribution main.

The redevelopment project will increase water usage by approximately 288 gallons

per day. The MCWA watermain system has sufficient flow capacity and pressure

to service the project.

The proposed project will not result in any significant off-site impacts related to

water demands. Thus watermain capacity/flows within the project area should

remain essentially unaffected by the proposed redevelopment.

Cross contamination control devices will be installed on the private water services

in accordance with the MCWA and Monroe County Department of Health

requirements.

Further details on the existing watermain flows for the project is contained in

Section 3.6 and Appendix 6 of this DEIS.

Further details on the proposed watermain demands for the project is contained in

section 4.6 and Appendix 6 of this DEIS.

Figure 2.2.1G depicts the proposed utility plan for the site.

62 Whole Foods Plaza DEIS Town of Brighton

2.2.8 Buffers and Landscaping (10)

The redevelopment project will provide buffering to the adjacent residential

neighborhoods in accordance with Town Code Section 20.-84 (C). A six foot high

privacy fence is to be installed at the western perimeter of the project disturbance.

To further enhance the buffer between the Whole Foods Plaza redevelopment, an

earthen berm is to be constructed on the project side of the privacy fence. The berm

will be an undulation land form and will be augmented with landscape plantings to

provide additional visual screening/buffering of the project from the adjoining

neighborhoods.

The project will disturb approximately 9.4 +/- acres of the 10.1 acre redevelopment

site.

Of the approximately 10.1 +/- acre site, 3.1 +/- acres are in the RLA District. 2.2

+/- acres of the RLA lands are being acquired from the First Baptist Church

("Church"). The lands to be acquired from the Church extend to Clover Street. The

residential lands are characterized by trees and low lying scrub growth. 0.7 +/-

acres of the lands to be acquired from the First Baptist Church are to remain as is

and will serve to further buffer the residential neighborhood from the project. The

RLA zoning is proposed to be maintained for this residential buffer area. Any

degradation to the screening that may occur in winter conditions will be mitigated

by additional landscaping and berm construction. Figure 2.2.11 depicts the

proposed typical berm cross-section.

63 Whole Foods Plaza DEIS Town of Brighton

Landscaping will be integrated throughout the site to enhance the architecture,

accentuate key areas or focal points and provide soft screening where appropriate,

and heavier screening where increased buffering is appropriate. The Landscaping

Plan developed for the project has been developed in accordance with the Town’s

landscape regulations. Proposed plantings along Monroe Avenue will unify the

individual buildings and delineate the limits of the Whole Foods Plaza site.

Selected plants along Monroe Avenue will be installed at grade, provide visual

interest, and will help to break up the façades of the proposed buildings.

Planted islands within the parking fields will provide visual interest and screen

views of the proposed buildings. In addition, the islands create a tree lined edge to

drive aisles, reduce the heat island effect, and help demark/provide buffering for

safe pedestrian access through the Whole Foods Plaza site.

Screening along the trail will be accomplished with trees, shrubs, and perennials.

Plantings are located to provide screening from adjacent residences, as well as

visual interest to trail users.

The plant palette was created to maximize the use of plants that are hardy in zone

5, are listed in the Town of Brighton Master Tree List, and are of native species.

The plants included include large deciduous trees, ornamental deciduous trees,

evergreen trees, deciduous and evergreen shrubs, perennials and ornamental

grasses. Some non-native ornamental plants are included to provide visual interest.

Alternate plants or cultivars may be selected to better meet the goals of the Town

of Brighton and the project sponsor. Figures 2.2.1I and 2.2.1J depict the proposed

64 Whole Foods Plaza DEIS Town of Brighton

Landscaping Plan and plant pallet for the project.

Further details on the existing buffering and neighborhood views is included in

Section 3.7 of this DEIS.

Further details on the proposed buffering and neighborhood views is included in

Section 4.7 and Appendix 9 of this DEIS.

2.2.9 Proposed Public And Private Amenities, And Improvements

Ownership (12)

The redevelopment project will provide various public and private amenities and

improvements. All public and private amenities and improvements are to be

constructed by the project sponsor at their expense.

Improvements include:

Auburn Trail - Relocation and improvements to the Auburn Trail. The trail is

located on private property between Clover Street and Allen's Creek. A ten-foot

(10”) wide pedestrian access easement covers the existing trail location. A new

easement over the relocated and improved trail will be granted by the project

sponsor to the Town for pedestrian and bicycle access. Further details on the

existing access easement are contained in Appendix 10 of this DEIS.

The Auburn Trail will be owned and maintained within the project limits by the

project sponsor.

65 Whole Foods Plaza DEIS Town of Brighton

Further improvements associated with the improvements to the Auburn Trail

include the design, construction, and maintenance of the centralized pedestrian

gathering area, bicycle racks, and wayfinding kiosk.

Traffic Signal - The proposed traffic signal will be owned and maintained by the

New York State Department of Transportation, however all costs associated with

the design, construction and maintenance will be borne by the project sponsor of

the proposed development

Open Space - The proposed 1.0 acre open space property that borders Clover Street

will remain private property however a conservation easement to the Town of

Brighton is proposed for that portion of the site. The open space will be maintained

by the project sponsor. Maintenance of the open space shall include, routine

property maintenance of the lands including rubbish removal and the removal of

fallen trees effecting public rights-of-way or adjoining properties, and maintenance

of drainage channels.

Property Acquisition for Access Management Plan - The design, acquisition of

NYSDOT excess property and construction of the improvements to the properties

located on the south side access management plan will be borne by the project

sponsor. The ownership of these properties will remain private. The acquired lands

will be transferred to the adjoining current owners. The project sponsor has

obtained consent from the effected property owner’s for the implementation of the

access management plan improvements. Further details on the access management

plan and agreements are contained in Section 4.4 and Appendix 10 of this DEIS.

66 Whole Foods Plaza DEIS Town of Brighton

Monroe Avenue Pedestrian / Multimodal Improvements – The design,

construction and maintenance of sidewalks, pedestrian gathering area, bus shelter,

and wayfinding kiosk located along the Monroe Avenue project frontage will be

borne by the project sponsor. All improvements within the NYSDOT Right-of-

Way shall be publicly owned and operated. All improvements outside the

NYSDOT Right-of-Way shall be privately owned and access easements will be

granted to facilitate public use.

Utilities – All utilities shall be designed and constructed by the project sponsor.

Sanitary sewer mains for the site shall be dedicated to the Town. Easements

covering the sanitary sewer mains will be granted to the Town by the project

sponsor. Sanitary laterals, storm sewers, water services, gas services,

telecommunications, and electrical distribution systems shall be private systems.

Buildings, Parking Areas and Landscape Areas – All buildings, parking areas

and landscape areas shall be designed, constructed, maintained and owned

privately.

2.2.10 Lighting (13)

The redevelopment project will provide site lighting in accordance with Town Code

requirements and in accordance with current Illumination Engineering Society

(EIS) recommendations. The site lighting system will incorporate energy saving

LED fixtures. Special consideration is applied to night sky compliance, selection

of lighting distributions, shielding of fixtures, and pole heights with providing safe,

67 Whole Foods Plaza DEIS Town of Brighton

uniform lighting with the focus on keeping light trespass and spillage as minimal

as possible.

Site lighting will be accomplished utilizing KIM Altitude Series LED Fixtures

mounted to nine-teen and one-half foot tall poles (19.5’). The poles will be fastened

to concrete light pole bases that will extend two-feet (2’) above grade to protect the

lighting fixtures from vehicles. The mounting height of the lighting fixtures will

be twenty-one and one-half feet (21.5’) above grade. The lighting design consists

of thirty-eight (38) lighting fixtures on twenty-five (26) poles. The lighting design

incorporates a mix of double headed and single headed fixtures to optimize the

efficiency of the lighting layout and design. The site lighting design combines pole

placements at the perimeter of the parking areas and placed throughout the parking

field. Light distribution patterns of the fixtures were chosen to maximize the

spacing of fixtures and to maximize uniformity while minimizing bright or “hot”

spots. The lighting design results in an average fixture spacing of approximately

ninety-feet (90’) to one-hundred and thirty-feet (130’) between fixtures. The

average lighting level computed for the design is 0.54 foot-candles (fc). Lighting

level calculations reflect the additive effect of all fixtures and was prepared utilizing

LitePro version 2.037 software. Lighting levels were analyzed based on a ten-foot

(10’) square grid.

Lighting control systems shall be installed to automatically control the operation of

the lighting system. Site lighting controls will turn the system on at dusk and will

turn the system off ½ hour after the anchor tenant has closed. The lighting control

system will allow for general security lighting to be provided during the hours the

68 Whole Foods Plaza DEIS Town of Brighton

plaza is closed.

Target lighting levels of 1.0 -2.0 fc are to be maintained throughout the parking

areas and walkways.

Area lighting will be integrated throughout the site to provide a level of security to

all patrons and visitors of the new Whole Foods Plaza. Light poles will be located

to provide the uniform illumination with limited disruption to the existing

neighbors and proposed residents of the development. Similar style light fixtures

will be installed throughout the development, as well as illuminated building

mounted signage. Figure 2.2.1K depicts the Lighting Plan for the project. The

proposed resultant lighting levels are depicted on the Lighting plan. Further details

on the proposed lighting system including product specification sheets and lighting

level recommendations, and lighting calculation summary report are included in

Appendix 8 of this DEIS.

2.2.11 Hours of Operation (15)

The Whole Foods anchor generally maintains hours of operation 8:00am - 10:00pm

daily with most deliveries occurring between 7:00am and 1:00pm.

The operating peaks for the facility are between 10:00am and 6:00pm with the

highest volume between noon and 4:00pm. Employee shifts are staggered

throughout the day. The remaining retail stores will have similar hours of operation

and peaks. Table 2.2.11-1 Operational Volume Summary depicts the percentages

of operation volume.

69 Whole Foods Plaza DEIS Town of Brighton

Table 2.2.11-1 – Operational Volume Summary Operation Percentage Time of Day Weekends Weekdays 6-8 am >0.5 .05 8-10 am 2.9 1.6 10-noon 7.7 5.2 Noon-2 pm 11.2 6.2 2-4 pm 11.6 6.1 4-6 pm 7.3 4.7 6-8 pm 4.6 4.1 8-10 pm 1.9 2.3 10-midnight >0.5 0.5 Midnight-2 am >0.5 >0.5 2-4 am >0.5 >0.5 4-6 am >0.5 >0.5

2.2.12 Approvals (16)

The Whole Foods Plaza redevelopment project will need various approvals at the

Municipal, Regional and State level associated with the design, construction and

operation of the facility.

Review of the project at the various municipal, regional and state level will ensure

that the project is compatible with development and building guidelines and

regulations. Input received during the project review process by various agencies

will be evaluated and incorporated in the proposed project, as is prudent and

applicable. The municipal process for obtaining the incentives sought under the

Incentive Zoning Application involves a coordinated review under SEQR and a

multi-level review and referral process by Town Staff and advisory boards. The

multi-level coordinated review by the involved agencies and staff will ensure that

the project will comply with the requirements and criteria for obtaining the required

approvals and permits.

70 Whole Foods Plaza DEIS Town of Brighton

The municipal approval process will include approvals/referrals from the Town

Board, Planning Board, Architectural Review Board, Conservation Board and

Building Department.

Municipal Approvals include, but are not limited to:

• A coordinated review of the project proposal in accordance with

the State Environmental Quality Review act (SEQR)

• Incentive Zoning Application

• Site Plan Application

• Subdivision Application

• Building Demolition Site Plan Approval and Architectural Review

Board Referral

• Construction Permits

o Building Permits

o Sewer Connection Permits

o Signage

o State Pollutant Discharge Elimination Permit (SPDES) General

Permit for Stormwater Discharges for Construction Activities

MS4 Acknowledgement

County and Regional Agency Approvals include, but are not limited to:

• MCWA Approval

• Pure Waters Approval

• Monroe County Department of Health

o Watermain Extension Approval

71 Whole Foods Plaza DEIS Town of Brighton

o Cross Contamination Control Approval

o Grease Interceptor Sizing

o Reality Subdivision Approval

• Monroe County Surveyor

State Agency Approvals include, but are not limited to:

• NYSDOT Highway Non-Utility Work

• NYSDOT Highway Work Permits

• NYSDEC SPDES Permit for Construction Activities

• NYSDEC Sanitary Sewer Extension

Further details on the approval requirements inclusive of the incentives

sought are included in Section 2.4 of this DEIS.

2.2.12 Wetlands (17)

A review of the NYS-DEC resource mapper and field review of the site, verify that

there are no State or Federal wetlands located on or near the redevelopment site.

Further detail on the NYS-DEC resource mapping is contained in Appendix 1 of

this DEIS.

2.2.13 Consistency with Municipal Planning Tools (20)

The Whole Foods Plaza redevelopment project is consistent with planning tools

which have been adopted by the Town of Brighton. The project is consistent with

the following planning Tools:

72 Whole Foods Plaza DEIS Town of Brighton

• Town of Brighton, Comprehensive Plan 2000

• Town of Brighton Comprehensive Bicycle and Pedestrian Master Plan /

Bike Walk Brighton

• Climate Smart Communities

• Town of Brighton Monroe Avenue Corridor Community Vision Plan

Town of Brighton, Comprehensive Plan 2000 - The Town’s Comprehensive Plan

2000 lists Community Goals and Land Use recommendations. It also states that

during the preparation of the document, it became apparent that existing zoning and

code regulations are not adequate to address development impacts and constraints

in some areas of Town.

The proposed development is consistent with the Comprehensive plan's

Community Goals, specifically;

• Provides for the active and passive recreational needs of the current and

future Town residents

• Provides pedestrian and bicycle linkages among parks, recreational areas

and neighborhoods and between neighborhoods and commercial areas

• Enhances the Town as a residential community and maintains property

values

• Proposes quality commercial development that will help provide a sound

economic base for the Town, and which does not compromise other

community goals

73 Whole Foods Plaza DEIS Town of Brighton

• Maintains and enhances the visual qualities of the community that give

Brighton its character, including architectural, streetscape and landscape

features

• Reduces air, water, soil, light and noise pollution

• Ensures a high quality of life for the residents of Brighton

• Provides and encourage an efficient, safe, and convenient transportation

system including roads, trails, waterways and public transit to serve the

needs of existing and projected development with the Town.

• Protects the residential character of the Town when planning transportation

improvements

• Provides for travel modes that present alternatives to the automobile

• Provides safe pedestrian linkages among neighborhoods, commercial

districts and recreation areas and with pedestrian/ bicycle routes in the city

and neighboring Towns.

The Comprehensive Plan 2000 specifically addresses the Auburn Trail as

"Improvements Necessary". The amenity proposed specifically addresses this

need.

Further details on the Town of Brighton Comprehensive Plan are included in

Appendix 2 of this DEIS.

74 Whole Foods Plaza DEIS Town of Brighton

Town of Brighton Comprehensive Bicycle and Pedestrian Master Plan / Bike

Walk Brighton - The Town's Comprehensive Bicycle and Pedestrian Master Plan

/ Bike Walk Brighton lists guiding recommendations for enhancing active

transportation.

The proposed redevelopment is consistent with the Bicycle and Pedestrian Master

Plan / Bike Walk Brighton Community Goals, specifically;

• Improves safety through implementation of infrastructure improvements

• Provides links and connections between existing active transportation assets

to support the growth of a safe, attractive and identifiable Bike Walk

Brighton network

• Makes the best of existing infrastructure and opportunities to provide a cost-

effective and sustainable active transportation system

Page 67 and figures 27, 28 and 29 of the Comprehensive Bicycle and Pedestrian

Master Plan / Bike Walk Brighton detail the plan's recommendations for the

Brighton Auburn Trail Concept. The proposed development supports the

recommendations of this plan.

Further details on the Town of Brighton Comprehensive Bicycle and Pedestrian

Master Plan / Bike Walk Brighton are included in Appendix 2 of this DEIS.

75 Whole Foods Plaza DEIS Town of Brighton

Climate Smart Communities – The Climate Smart Communities lists guidelines

for energy efficiency.

The proposed development is consistent with the Climate Smart Communities

effort, specifically;

• The redevelopment of buildings that are 22-75 years old and where built

without regard to the Climate Smart standards will incorporate the most

modern and energy efficient building systems

• The re-use of building materials from the razed structures will minimize the

waste going to land fills

• The use of LED lighting will dramatically increase efficiency on the

property from its current lighting infrastructure

• The promotion of pedestrian and bicycle use through on site bicycle parking

and linkages through the improved Auburn trail system will promote an

alternative to traditional automotive use

• The installation of electric vehicle charging stations as part of the anchor

tenants parking plan along with special parking for car pool and low

emission vehicles is unique to Brighton and in keeping with Climate

Smart strategies

• The anchor tenants commitment to building to Silver LEED certification

• Integration of public transit accessibility to the proposed development

• The anchor tenant's commitment to anti-idling delivery policy

• The anchor tenant's commitment to promoting local food systems

• Dramatically minimizing untreated stormwater run-off

76 Whole Foods Plaza DEIS Town of Brighton

• Strengthens development towards existing community centers and urban

areas

Further details on the Climate Smart communities are included in Appendix 2 of

this DEIS.

Town of Brighton Monroe Avenue Corridor Community Vision Plan

"Monroe Avenue Charrette (Appendix 2)

The Community Vision Plan is depicted in Figure 2.2.12. Further details on Town

of Brighton Monroe Avenue Corridor Community Vision Plan are included in

Appendix 2 of this DEIS.

The proposed development is consistent with the Town's Monroe Avenue

Corridor Community Vision Plan "Monroe Avenue Charrette specifically;

• Increases vehicular and pedestrian safety through traffic calming, enhanced

signage and pedestrian crossings

• Creating an environment that is both bicycle and pedestrian friendly

• Develops a parking strategy that allows for cross access and shared parking

• Promotes economic vibrancy and opportunity

• Improves sidewalks and crossings

• Enhances commercial district and provides cohesion

77 Whole Foods Plaza DEIS Town of Brighton

• Establishes an area that is a recognizable major gateway to the Town of

Brighton

• Mitigates existing hardscape areas.

• Reduces curb cuts and provides the Town to promote further cross access

and shared parking on future redevelopments.

Further details on the Town of Brighton Monroe Avenue Corridor Community

Vision Plan are included in Appendix 2 of this DEIS.

2.2.14 Right to Access – Redevelopment Site (21)

The redevelopment site has frontage on public right-of ways. Frontage on the right-

of-ways provides the ability to access the site from public roadways. The site has

frontage on Monroe Avenue (NYS Route 31) and Clover Street (MC-DOT Route

271). The project sponsor has committed to limiting access for the redevelopment

to the Monroe Avenue project frontage.

There are three specific easements located on what was the Auburn-Rochester

Railroad portion of the lands to be redeveloped which are relevant to the proposed

redevelopment. The easements provide for rights of access between the

redevelopment properties and adjoining lands. The properties involved, to the

extent that they are relevant in this redevelopment are;

The Clover Lanes Bowling Alley property- Originally owned by the Morgenstern

family and sold to the project sponsor in 2014.

78 Whole Foods Plaza DEIS Town of Brighton

Mario's Restaurant property- Originally owned by the Morgenstern family and sold

to the project sponsor in 1993.

Executive Square Office Park- Originally owned by the Morgenstern family and

sold to the Salafia family in 2010.

Mamasan's Property- Owned by several restaurant groups historically and under

contract to the project sponsor.

On July 28, 1997, an easement agreement was recorded with the Monroe County

Clerk’s office as part of the sale of each piece of the Auburn Rochester Railroad

that is located adjacent to each of the properties involved. (Appendix 10). The sale

conveyed the properties from Rochester Gas and Electric to the adjacent property

owners.

To complete the Auburn trail link, as proposed, between the eastern property line

of the redevelopment site to the Clover Street right-of-way an easement will need

to be acquired from the Animal Hospital. The easement would affect

approximately eighty feet (80’) of the proposed trail. The project sponsor will work

with the Town and Animal Hospital owner to acquire the necessary easement.

The Easement Agreement consists of 3 specific easements;

79 Whole Foods Plaza DEIS Town of Brighton

The first is a utility easement from the property owners to Rochester Gas and

Electric (RGE) giving RGE access to the easement area, poles and prohibiting the

obstruction of access from Clover Street to Allen's Creek for the purposes of

maintaining, replacing or installing equipment above or under the easement area

The second is a 10 foot wide pedestrian easement granted to the Town and adjacent

property owners for access to Allen's Creek Road. The pedestrian easement cover

the current location of the Auburn Trail. Further details on the Auburn Trail and

its configuration are contained in Section 2.3.5 A. of this DEIS.

The third is a 10 foot wide access easement granted to the owner of Clover Lanes

to Allen's Creek Road, the owners of Mario's to Allen's Creek Road and the owners

of Executive Square Office Park to Allen’s Creek Road.

It should also be noted that in addition to the publically recorded easements, there

are private agreements between the property owners for access through the

properties.

Further details and mapping for the recorded easement for the properties are

contained in Appendix 10 of this DEIS.

80 Whole Foods Plaza DEIS Town of Brighton

2.2.15 Right to Access – Access Management Plan, Southern Monroe Avenue

Corridor (22)

The redevelopment proposal includes the design and construction of improvements

to properties on the south side of the Monroe Avenue corridor to facilitate the

implementation of the proposed Access management plan. Improvements are

planned for five parcels on the south side of Monroe Avenue. The five properties

are the Dunkin Donuts, Sakura Home, former Pizza Hut, Comfort Inn and former

Friendly's facilities. The five property owners have agreed in concept to allow cross

access and shared parking. The owner of the Sakura Home property, has expressed

concerns regarding the volume of traffic that will utilize the managed access

location and has limited his consent to the access management plan to the five

properties outlined above. Figure 2.2.1E depicts the access management plan.

Further details on the limitation of access by the Sakura Home property owner are

contained in Appendix 10.

Implementation of the access management plan will include the acquisition of

excess NYS-DOT Right-of-Way, to be conveyed to the adjoin property owners,

construction of rear lot access drives, parking areas, and cross-lot access points.

The project sponsor will facilitate the preparation of a Reciprocal Easement

Agreement between the effected properties to guarantee access and parking rights

between the properties. The project sponsor has obtained easements from the

effected property owners necessary to access the site to implement the

improvements outlined in the access management plan. Further details of the

shared access agreement are contained in Appendix 10 of this DEIS.

81 Whole Foods Plaza DEIS Town of Brighton

Figure 2.2.4A depicts the access management plan improvements. Further details

on the cross access and shared parking agreement from the effected property

owners are contained in Appendix 10 of this DEIS.

2.3 Design and Layout

2.3.1 Purpose

The Daniele family has developed community friendly and esthetically pleasing

developments in the Town of Brighton and surrounding communities for over 20 years.

Examples include the Mario's Italian Restaurant, The Royal Car Washes, South point

Marina, Bazil Restaurant and The Crab Shack Restaurant. The Daniele Family has

consistently evolved and brought to Brighton new and or improved business development

that make Brighton stand out in the greater community with businesses and services that

are first class and needed in the community.

In bringing a world class grocery store to Brighton, a unique, environmentally sensitive

and successful option will grace the Town. Currently, Brighton is home to one major

grocery store, a Tops. This nationally recognized and highly sought after grocer choosing

to make Brighton their first store in Upstate New York, is a significant accomplishment for

both Brighton and Monroe County.

This section of Monroe Avenue is the gateway into Brighton and given its proximity to the

I-590 expressway, the most traveled area in Brighton. It is appropriate to have this world

class redevelopment in this location.

82 Whole Foods Plaza DEIS Town of Brighton

The new Whole Foods Plaza will include a Retail Shopping Center which will be an

attractive amenity that provides an inter-generational gathering place for residents, their

families, visitors and the general public. The Project Sponsor anticipates that this Retail

Shopping Center will offer unique natural and organic gourmet specialty products, light-

casual café fare, upscale beverages, boutique stores, and convenient services all within a

warm and inviting atmosphere that encourages safe and social interaction.

The purpose of this action is to develop the properties proposed to be redeveloped as Whole

Foods Plaza.

2.3.2 Needs

The work habits and life choices of today dictate that more people are shopping more often

and prefer options when it comes to food choices. Having another option for purchasing

food will improve the overall market including increased competition and greater diversity.

This anchor grocer will be less than half the size of the nearby Wegman's grocery store and

offers a desirable shopping experience that is smaller and more intimate.

Close, walkable neighborhood retail provides a high quality of life, partly by reducing

vehicle use. The growth of café culture reflects a healthy trend in America. More people

want streets full of life. It is foreseeable that in the future, other amenity-oriented retail

shops or upscale convenience stores may cluster in districts anchored by a boutique use

such as a gourmet grocery store and coffee house.

The proposed action will meet the needs of the Town of Brighton as identified in the

Town’s 2000 Comprehensive Plan (Appendix 2).

83 Whole Foods Plaza DEIS Town of Brighton

The pertinent goals addressed by this proposed action include:

• Provide pedestrian and bicycle linkages between neighborhoods and commercial

areas;

• Permit quality commercial development that provide a sound economic base;

• Provision of a balance in the type of grocery retail;

• Preservation of priority area of open space and residential buffer;

• Providing Cross Access / Shared Parking opportunities within the Monroe Avenue

corridor;

• Satisfaction of recreational needs of Town residents through pedestrian and bicycle

access;

• Maintenance and enhancement of the visual character of the community.

2.3.3 Benefits

The Whole Foods redevelopment project offers a range of benefits to the Town. The

benefits range from tangible physical improvements to sustainability of the commercial

corridor and enhancement of the commercial and residential neighborhood. Benefits

derived through the proposed project include, but are not limited to:

• Enhancement of the Town as a Residential Community

• Fulfilling the Town of Brighton’s Vision of the Monroe Avenue Corridor Plan.

• Diversity of Retail Offerings within the Town of Brighton

84 Whole Foods Plaza DEIS Town of Brighton

The manner in which the goals stated above are achieved is stated below:

A. Enhancement of the Town as a residential community

ó Goal - Provide for the active and passive recreational needs of current

and future Town residents.

The new Whole Foods Plaza development will provide public access to an

important trail system in the Town. This access is enhanced by the proposed

walking trail system that is known as the Auburn Trail and links North Brighton

and extends southeast into Victor NY, connecting to the Erie Canal Trail System.

Portions of the old Auburn Railroad alignment in the Towns of Brighton and

Pittsford, Monroe County, NY are also open to the public as trails. One portion,

about 2.7 miles (4.3 km), runs through Brighton from Highland Avenue at Village

Lane, south past Elmwood Avenue to Allen’s Creek Road, parallel to and just east

of Interstate 590 (that portion of the interstate was originally the bed of the Enlarged

Erie Canal, and, after the canal was rerouted south of Rochester, the alignment of

the ill-fated ).

Southeast of Allen’s Creek Road the alignment of the old Auburn Railroad passes

behind various commercial properties on the east side of Monroe Avenue. The

Auburn Trail resumes as a right-of-way through open land approximately 0.5 miles

(0.80 km) southeast of Clover Street in the Town of Pittsford. The trail crosses

French Road and continues into the Village of Pittsford, connecting with the Erie

Canal Trail at Grove Street. The old Auburn Railroad continued through the Grove

Street area (the old railroad station is currently part of the Del Monte Hotel),

crossing North Main Street (Route 96) and continuing parallel to, and east of,

85 Whole Foods Plaza DEIS Town of Brighton

Schoen Place. Further details on the Trail Maps are contained in Appendix 2 of

this DEIS.

Another section of the Auburn Railroad in Pittsford is currently usable as a trail,

starting on Pittsford-Palmyra Road (Route 31) approximately 1,000 feet (300 m)

east of the State Street Bridge over the Erie Canal, and approximately opposite the

intersection of Route 31 and Wood Creek Drive. The Auburn Trail picks up at this

point and follows the old railroad alignment south, past Mitchell Road. This short

section of the Auburn Trail, about 0.5 miles (0.80 km) in length, ends at the Erie

Canal Trail. The abutments for the trestle that once carried the Auburn Railroad

over the Canal are still visible.

Another stub of the Auburn Trail can be found on the south side of the former trestle

over the Erie Canal, starting on Knickerbocker Road, about 600 feet (180 m) south

of East Jefferson Road (Route 96.) This section of the trail continues 0.75 miles

(1.21 km) south to Mill Road, about 1,000 feet (300 m) southwest of East Street.

The old Auburn Railroad followed along the east side of Mill Road, and portions

of the trail appear and disappear as modern development encroaches on the original

alignment.

Yet another stub of the Auburn Trail follows south of Thornell Road, just east of

Mill Road, in Pittsford, to LaDue Circle and East Street. The trail continues to the

southeast of East Street, along the south side of Park Road and continuing to the

southeast behind modern housing, crossing Railroad Mills Road at Sturbridge Lane,

and continuing to Railroad Mills Road and Woolston Road. The alignment of the

86 Whole Foods Plaza DEIS Town of Brighton

original Auburn Railroad followed along the east side of Railroad Mills Road to

Probst Road (see Victor - Farmington Route, above.)

In 2002, the Regional Trails Initiative proposed a master plan for biking and hiking

trails in the Greater Rochester Area, which, among other things, recommended

connecting up the different stubs of the Auburn Trail in Brighton and Pittsford, to

join the more fully developed Victor - Farmington Trail. The proposed

development will accomplish the objective for this section of the Auburn Trail

which is currently not contiguous.

Further details on The Regional Trails Initiative Executive Summary are contained

in Appendix 2 of this DEIS.

Figures 2.3.1 and 2.3.2 depict the Existing and Initiative recommended trails.

Figure 2.3.3B depicts the existing condition of the Auburn Trail through Clover

Lanes property.

ó Goal - Preservation of priority area of open space and residential buffer.

The project sponsor will acquire approximately 2.2 +/- acres of lands from the First

Baptist Church, 1.2 acres of which are needed and incorporated into the

development site. The lands to be acquired are depicted in Site Plan for the

redevelopment site. Figure 2.2.1D depicts the Conceptual Site Plan. The property

is in the RLA Zoning District and is adjacent to the BF-2 District. The property

fronts on Clover Street and backs to the Mario’s and Clover Lanes parcels. While

the Church has contemplated the potential development or use of its excess property

87 Whole Foods Plaza DEIS Town of Brighton

over the years, selling the property for the proposed development will provide the

Church with much needed funds to complete capital improvements that would not

be possible without this sale, thus posing a hardship to the Church and its

congregation.

The project sponsor proposes to preserve 1.2 of the 2.2 +/- acres to be acquired

from the Church, fronting on Clover Street as undeveloped open space. This area

may be dedicated as a Conservation Easement. This land will serve as a substantial

forested buffer between the commercial development and adjacent residential uses.

The remaining area of the property adjacent to the Whole Foods Plaza is proposed

to be incorporated in the development site to accommodate necessary parking and

paved areas. The proposed trail described above will separate the proposed

development from the open space and residential development.

ó Goal - Ensure that the acquisition and development of open space areas

are responsive to the fiscal implications of such actions.

As the 2.2 acre church property area has been exempt from real property taxes, this

property will be designated as taxable property. The protection of open space can

have a positive fiscal impact on the county, municipalities and the school district

compared to development. This is largely because the value of open space

increases over time while maintenance costs and necessary infrastructure remain

low. In addition, the retention of land for wildlife habitat and natural stormwater

and water quality mitigation and woodlot areas that provide a natural buffer

between the residential community and the commercial development, helps

maintain the value of nearby properties, supporting the tax base.

88 Whole Foods Plaza DEIS Town of Brighton

ó Goal - Provide attractive retail opportunities that allow the local

community to shop within walking or biking distances and doing so in

a way that does not compromise the residential nature of the area.

The project layout purposely protects and enhances an existing heavily commercial

district which has limited retail options for local consumers. The project replaces

this dense commercial development with more attractive, safer, pedestrian friendly

and convenient cluster of retail options. By improving the Auburn Trail system

and installing a new signal that allows for safe passage for bicycle and pedestrian

crossing of Monroe Avenue, the project will greatly improve the walkability and

access for the local residential community. There are approximately 200 homes

within a twenty-five (25) minute walking distance of the proposed retail center.

B. Land Use

ó Goal - Enhance the Town as a residential community and maintain its

property values.

The proposed project will significantly improve the character of the property which

is currently occupied by a group of buildings of which the largest is in disrepair and

structurally unsound. The project involves various buildings which will create a

Retail Shopping Center that offers a variety of retail options anchored by a world

renowned upscale gourmet grocery store. The Whole Foods anchor establishes this

retail area as an upscale and sought after retail market that will attract new and

unique shopping options and enhance the property values of both commercial and

residential properties in the vicinity.

89 Whole Foods Plaza DEIS Town of Brighton

ó Goal - Promote development that protects sensitive buffer areas and

creates quality recreational opportunities.

As the 2.2 acre church property area has been exempt from real property taxes, this

property will be designated as taxable property. The protection of open space can

have a positive fiscal impact on the county, municipalities and the school district

compared to development. This is largely because the value of open space

increases over time while maintenance costs and necessary infrastructure remain

low. In addition, the retention of land for wildlife habitat and natural stormwater

and water quality mitigation and woodlot areas that provide a natural buffer

between the residential community and the commercial development, helps

maintain the value of nearby properties, supporting the tax base.

The project layout purposely protects and enhances an existing heavily commercial

district which has limited retail options for local consumers. The project replaces

this dense commercial development with more attractive, safer, pedestrian friendly

and convenient cluster of retail options. By improving the Auburn Trail system

and installation of a new signal that allows for safe passage for bicycle and

pedestrian crossing of Monroe Avenue, the project will greatly improve the

walkability and access for the local residential community.

C. Visual Character

ó Goal - Maintain and enhance the visual qualities of the community that

give Brighton its character, including but not limited to architectural,

streetscape and landscape features.

90 Whole Foods Plaza DEIS Town of Brighton

The proposed architecture for the new Whole Foods Plaza project includes features

that tie the new construction to aspects of Brighton's past, including aspects of the

Erie Canal Heritage using high quality natural materials, soft natural colors and

creating a unique center that is unlike the cookie cutter shopping centers of today.

Considering the current conditions of the site and the fact that it is located at one of

the prime entrances to the Town, the proposed project would result in a significant

visual improvement to the area. As it is today, the site is viewed as a disjointed

mix of many different styles and material that have little to no architectural value.

The proposed project would significantly change the aesthetics of the site due to

the impressive architectural design of the buildings, varied formats of the structures

and landscaping along the road frontage and within the site.

D. Natural Environment

ó Goal - Redevelop the site with sensitivity to walkability and areas where

the natural environment can be enhanced and utilized for the

recreational purposes intended with the Auburn Trail System.

Historically, this site has been developed over a long period of time and without

sensitivity to the Natural Environment. Although this site is in one of the most

desired commercial districts in Brighton and Monroe County, the project

deliberately focuses on improving the trail system to the north and tying pedestrian,

bicycle and multimodal transportation systems throughout the site and capturing

the natural environment that exists on the trail system.

91 Whole Foods Plaza DEIS Town of Brighton

E. Town Services

ó Goal - Provide a high quality project that does not tax the Town and

other municipal services while at the same time providing additional tax

revenue to the Town and local governments that will aid in mitigating

the increased costs of Town services on the taxpayers of Brighton.

A Fiscal Impact Analysis was conducted for the project by comparing the

expenditures and revenues, so that the fiscal impact of the proposed project could

be determined. The proposed project would result in an increased positive fiscal

impact to the community of over $247,000 in increased property taxes annually,

directly from the project. In addition, this project is expected to almost double the

property values of the surrounding commercial properties, increasing those taxable

values and in turn revenue to the Town and local governments by nearly 100% or

$300,000+. The nature of these non-residential developments also means there will

be no increase in cost to the school district while significantly increasing dollars

being paid into the education system of Brighton.

ó Goal - Ensure that Brighton residents experience a high quality of life.

The Project Sponsor has made substantial effort to ensure that the project will not

impair the quality of life for existing residents. The project will enhance some

aspects of the residents quality of life, such as by providing a major regional trail

connection, providing access to more retail options closer to home and accessible

via pedestrian and bicycle via the proposed enhanced trail system and improved

pedestrian and bicycle access on Monroe Avenue and throughout the site.

92 Whole Foods Plaza DEIS Town of Brighton

Site access points and buffering practices have been developed and incorporated

into the design of the site to accommodate concerns raised though neighborhood

discussions.

F. Transportation

ó Goal - Fulfilling the Town of Brighton’s Vision of the Monroe Avenue

Corridor Plan.

The Monroe Avenue Corridor Community Vision Plan [Appendix 2] has a number

of distinct elements which are addressed by this plan. Those elements are both

aesthetic in nature (dealing with placement of buildings) and safety-related (relative

to Monroe Avenue access). The most significant element addressed is the addition

of a traffic signal which will improve safety and access to properties along the north

and south sides of Monroe Avenue. The signal will provide a safe crossing of

Monroe Avenue where one does not currently exist through the addition of a

pedestrian crossing signal. The proposed project design has incorporated the goals

of the Corridor Plan.

ó Goal - Create and implement a cross access and shared parking plan for

the businesses on the south side of Monroe Avenue. Another key

component of the Monroe Avenue Corridor Plan and good community

planning.

The new signal location, dictated by the NYSDOT, proposes to align the existing

Clover Lanes and the Sakura Home restaurant on the south side of Monroe Avenue.

The signal will serve traffic for the new Whole Foods Plaza development, and, as

a part of this Incentive Zoning proposal, the project sponsor has actively engaged

93 Whole Foods Plaza DEIS Town of Brighton

the property owners of the south side of Monroe Avenue to design and construct

cross-access between parcels on the south side of Monroe Avenue to utilize the new

traffic signal. Access to a traffic signal would provide a significant economic

benefit to these neighboring properties and businesses, and would help to address

traffic issues related to this segment of the Monroe Avenue corridor. Another

important aspect of this amenity is the project sponsor's commitment to addressing

a long standing access management issue on the south side of Monroe Avenue. An

access management plan has been developed based upon the Town’s Monroe

Avenue Corridor Plan. The property owners, with assistance from the project

sponsor, will seek review of the Plan by the NYSDOT and the Town of Brighton

for their adoption as a master Access Management Plan including the five parcels

(Dunkin Donuts, Sakura Home, the former Pizza Hut, Comfort Inn and the former

Friendly's). The project sponsor is providing the funding needed to make access to

NYSDOT property to the south of the parcels available, to provide additional space

for parking and a cross access road. This excess property is intended to be

purchased by each adjacent property owner, funded by the project sponsor and the

project sponsor handling the actual acquisition. The project sponsor, limited by the

owner's desires to make such changes to their parcels, is committed to funding and

therefore executing the fulfillment of the Conceptual Access Management Plan

[Figure 2.2.4A].

94 Whole Foods Plaza DEIS Town of Brighton

ó Goal - Provide safe internal movement throughout the site while

balancing the needs of vehicular, pedestrian, bicycle and multimodal

modes of travel.

The new Retail Shopping Center design will also improve vehicular access and

circulation. A new traffic signal with crosswalk will be installed on Monroe

Avenue. The anticipated location will align the Clover Lanes property and the

Sakura Home restaurant. The existing curb cut at the Mamasan's property will be

eliminated. The signal location will be dictated by the New York State Department

of Transportation (NYSDOT), which maintains jurisdiction over Monroe Avenue.

Multimodal transportation improvements, in cooperation with the Rochester

Genesee Regional Transportation Authority (RGRTA) are contemplated.

Included in the development will be electronic vehicle charging stations, dedicated

spots for HOV (high occupancy vehicles) and LEV (low emission vehicles).The

project sponsor is committed to work with an independent traffic consultant, if hired

by the Town, on internal and external transportation issues.

ó Goal - Provide safe pedestrian linkages among neighborhoods,

commercial districts and recreation areas, and with pedestrian/bicycle

routes in the city and neighboring Towns.

Pedestrian access is incorporated in the plan, providing access to the site for

pedestrians and bicycles (the plaza will also include bicycle racks). The pedestrian

friendly development will enhance the neighborhood by improving walkability and

fostering neighborhood business. The project sponsor also proposes to address

95 Whole Foods Plaza DEIS Town of Brighton

safety on the trail by separating vehicle traffic from pedestrian and bicycle activity

on the trail. The project will create new pedestrian connections, consolidate

parking, and improve vehicular access to and from Monroe Avenue. Pedestrian

connections and way-finding signage will also be incorporated internal to the

development.

ó Goal - Provide provisions for public transportation.

The project sponsor has consulted with and solicited feedback from the Rochester

Genesee Regional Transportation Authority (RGRTA) and shared the plan per their

request. The RGRTA has made several recommendations and those

recommendations have been incorporated in the plan. The project sponsor will

continue to consult the RGRTA both during the final planning as well as after the

project is constructed with the intent to maximize the value for both the public and

the RGRTA. Further details on RGRTA recommendations are contained in

Appendix 3 of this DEIS.

In addition to the amenities of this project, this development provides substantial

public benefits; among them are:

1. Fulfilling the Town of Brighton’s Vision of the Monroe Avenue Corridor

Plan.

The Monroe Avenue Corridor Plan has a number of distinct elements which are

addressed by this plan. Those elements are both aesthetic in nature (dealing

with placement of buildings) and safety-related (relative to Monroe Avenue

vehicular, pedestrian, multimodal and bicycle access). Project design has

incorporated the goals of the Corridor Plan. Further details on the Monroe

96 Whole Foods Plaza DEIS Town of Brighton

Avenue Corridor Plan are contained in Appendix 2 of this DEIS.

2. Diversity of Retail Offerings within the Town of Brighton.

The addition of a natural and organic foods market/grocery is of substantial

benefit to the residents of the Town of Brighton. At present, the Town is home

to a Tops Market on South Clinton Avenue, several pharmacies selling some

grocery items and occasional specialty or convenience type stores. Residents

currently have access to full service grocery stores in their adjacent

communities requiring residents to shop for groceries outside of the Town, such

as at the Pittsford or East Avenue Wegman's stores, both of which are at or

above capacity. This highly regarded and sought after retailer also brings to the

market a focus on all-natural and organic products, promoting a healthy living

lifestyle that is not necessarily the focus of existing competition. In addition,

the anchor tenant within the plaza enhances the possibility of bringing new and

upscale retailers to the remainder of the Plaza. There is a natural following of

the lead tenant and some of those prospective tenants are in discussions with

the project sponsor.

3. Tax Revenues.

The proposed development will generate a significant increase in tax revenues

that benefit the Town, Schools, State and Federal agencies. The yearly property

taxes currently generated are $190,600 +/- and includes tax exempt property.

The 2.2 acres of land to be acquired form the First Baptist Church are currently

tax exempt. Acquisition of these lands will add to the tax roll. The future

projected property taxes (using current tax rates) are expected to be $438,300

97 Whole Foods Plaza DEIS Town of Brighton

+/-. Table 2.3.3-1 – Whole Foods Plaza Property Tax Calculations , depicts the

current tax and future tax calculations. In addition, this project will be a source

of additional sales tax, mortgage tax and income tax revenue above what the

properties are generating now by a similar percentage increase as property

taxes. The Project Sponsor estimates an increase of approximately $3,438,000

in annual sales tax revenue, based on estimated current and projected sales

volumes on the proposed site. Table 2.3.3-2 – Whole Foods Plaza Sales Tax

Calculations , depicts the current tax and future tax calculations

98 Whole Foods Plaza DEIS Town of Brighton

Table 2.3.3-1 - Whole Foods Plaza Property Tax Calculations

99 Whole Foods Plaza DEIS Town of Brighton

Table 2.3.3-2 – Whole Foods Plaza Sales Tax Calculations Existing Commerce 8% Tax Rate

Mario’s $ 396,300.00 Clover Lanes $ 96,300.00 Salvatores’ Pizza $ 40,000.00 Elaine’s Antiques $ 10,000.00 Mamasan’s $ 116,300.00 $ 658,000.00

Proposed Commerce

Whole Foods (53.9k)* $1,800,000.00 Starbucks (2k) $168,000.00 Retail “Outparcel” (6k) $448,000.00 In-line Retail (32k) $1,680,000.00 $4,096,300.00

Sales Tax Increase $3,438,000.00

*Includes a 50% reduction in sales tax revenue as certain groceries are un-taxed.

Figures based on historical averages & industry standards.

4. No COMIDA

While this property may be eligible for a payment in lieu of taxes (PILOT)

Agreement and substantial benefits under programs sponsored by the County

of Monroe Industrial Development Agency (COMIDA) the project sponsor has

committed that they will, in accordance with the Town of Brighton's preference,

forgo any request for such benefits for any building and/or use of the property.

Forgoing any request for COMIDA will apply to any and all buildings or uses

of the site.

100 Whole Foods Plaza DEIS Town of Brighton

2.3.4 Proposed Incentives

The Whole Foods Plaza redevelopment project involves proposed incentives associated

with redevelopment of the site and implementation of the access management plan. The

proposed incentive categories relate to bulk area requirements, relief from obtaining

individual special use permits for the uses proposed, and signage. Table 2.3.4-1

Summarizes the Requested Incentives by Lot.

The bulk area incentives relate primarily to dimensional deviations from the Code, in large

part dictated by the split zoning of the development lands. The addition of 1.2 acres of RLA

zoned land to the northern portion of the site (behind the current Mario's and Clover Lanes

properties) generates the need for a use incentive to allow commercial improvements and

activity to extend into the 1.2 acres of the adjacent RLA District. Other use incentives

proposed relate to conditional permit uses which carry a favorable legal presumption of

being permitted and in harmony with the neighborhood. To that end, the incentives seek

to avoid unnecessary duplication in the review process.

Bulk area incentives related to the implementation of the access management plan serve to

address preexisting non-conforming site conditions. These conditions are beyond the

control of the project sponsor. Bulk area incentives are summarized in Table 2.3.4-1.

A. Use. The lands to be acquired from the Church are located in the RLA Zoning

District. Limited activities involving parking and access are proposed to extend onto the

property to be acquired from the Church. While commercial uses are not generally

permitted in the RLA District, pursuant to Code Section 201-9(A) (3), the commercial use

is permitted to encroach into the residential district by 30 ft. The proposed incentive is to

101 Whole Foods Plaza DEIS Town of Brighton

permit commercial development to extend into the RLA District beyond the permitted 30

ft. zone. Notwithstanding this fact, the remaining approximately 1 +/- acre of land

extending between the Whole Foods Plaza development and Clover Street is proposed to

remain undeveloped open space providing an additional buffer between the commercial

and residential areas, with no access onto Clover Street

The bulk of the property is located in the BF-2 District. The identified proposed uses

include a food market, a specialty coffee shop/restaurant, and general retail. The coffee

shop requires a drive through operation. Outdoor seating may be desired by the restaurant

and/or food market. All of these uses are conditional permit uses in the BF-2 District.

Incentives are proposed to waive the conditional use permit requirement associated with

these uses, as these uses will be thoroughly reviewed as part of both the incentive zoning

application by the Town Board and site plan approval process by the Planning Board. This

request is not designed to avoid scrutiny by the Town Board or the Planning Board, but

only to confirm that the proposed use of the property is permitted as part of this overall

Incentive Zoning package.

B. Drive-Thru Location . The proposed development includes a drive through

operation for the specialty coffee shop. Pursuant to Code Section 207-14.3, drive through

operations shall not be located in the front yard. A proposed incentive is to allow the

proposed drive-thru to be located in the front yard. This relief is appropriate and necessary

for the development of the coffee shop as an “outparcel” in the larger shopping center. The

layout of the site is constrained largely by the placement of the traffic signal. The visibility

of the drive-thru is in keeping with the nature of development along this portion of Monroe

Avenue, which includes a new Dunkin Donuts with a drive thru on the south side of

102 Whole Foods Plaza DEIS Town of Brighton

Monroe Avenue.

C. Signs. Town Code Section 207-32 allows limited business identification and

directional signage. Section B allows a single attached sign on the principal building

entrance. The total area of the business identification sign permitted may not exceed 10%

of the first-floor area of the building face or 150 square ft., whichever is less. A requested

incentive is to allow a sign package which is designed to meet the needs of the individual

businesses for signage in the context of the business plaza, with visibility from both

Monroe Avenue and internal to the plaza. The sign package will exceed the amount

permitted by Code and include: (1) signage on multiple building faces (for the food market

and outparcel buildings), (2) appropriate drive thru signage, which typically requires

specialized signage (such as a menu sign), (3) an attractive monument sign identifying the

plaza and tenants, (4) signage greater than 150 square feet on Building 1, (5) logo greater

than 25% of any individual sign, and(6) additional signage contained in a sign package to

be provided in final form to the Town Board prior to the scheduling of the public hearing

on the Incentive Zoning application. A preliminary Sign Package chart and accompanying

plan is attached in Appendix 15.

D. Bulk Requirements. Among the requested incentives are relief to a limited

number of building setbacks, lot coverage, density, and pavement setbacks, as detailed on

the Conceptual Site Plan. Bulk area determinations for the redevelopment site reflect the

split-zoning of the lands. Bulk requirement for the BF-2 were applied to the BF-2 area, and

requirements applicable to the RLA are applied to the RLA area. A summary of the bulk

area requirements and conformity of the proposed redevelopment project is depicted in

Figure 2.2.5A. As outlined in the Bulk Area Summary figure, the proposed redevelopment

103 Whole Foods Plaza DEIS Town of Brighton

project is in general conformance with the preponderance of the bulk requirements under

Code.

Further details on the bulk area requirement are included in Appendix 17 of this DEIS.

Evaluation of the bulk area requirements under the split zoning categories effects the lot

coverage and development intensity calculations for the project. With respect to

impervious surface coverage, the Code provides for a maximum of 65 % impervious

surface coverage. The proposed lot coverage within the BF-2 portion of the site is 88% (the

existing impervious surface area coverage within the BF-2 portion of the development is

86%). Code provides for a maximum density of 10,000 square feet per acre in the BF-2

District. The proposed density, applied to the BF-2 portion of the site, is 13,384 square

feet per acre for Lot 1 and 12,096 square feet per acre for Lot 2. These numbers reflect the

exclusion of the RLA lands in the calculations. It should be noted that if the Code allowed

the entire proposed site to be included in these calculations, the impervious surface area of

this proposed project would be 76% and the proposed density would be 9,297 square feet

per acre. The resultant building density would be below that allowed by code and the

impervious surface coverage would be within 11% of that allowed by code.

The proposed incentives include relief from pavement setback regulations of the Town

Code applicable to the BF-2 and RLA Districts. Table 2.3.4-1 summarizes the incentives

requested by lot.

The acquisition of lands from the First Baptist Church, and the proposed resubdivision of

the Church lands will not create additional non-conformities with the bulk area requirement

104 Whole Foods Plaza DEIS Town of Brighton

for the Church lands. It is noted that the existing setback on Allen Creek, for the Church,

is non-conforming and will remain so. The Church is setback at 59.4 ft. where the Code

requires a front setback of 100 ft.

The use of RG&E lands, under license agreement from RG&E, for the redevelopment of

the Auburn Trail will not create non-conformities with the bulk area requirements for the

RG&E lands.

The requested incentives are based upon the conceptual site plan being reviewed by the

Town Board. It is common that there are changes to the final approved plan as a result of

Town reviews. Accordingly, the project sponsor is requesting that the Planning Board be

given reasonable discretion to adjust the bulk amenities to accommodate changes as a result

of its review process of the preliminary and final site plan, in the interests of arriving at the

best plan for construction.

105 Whole Foods Plaza DEIS Town of Brighton

Table 2.3.4-1 – Summary of Incentives Lot 1 Requested Incentive Code PERMITTED & CONDITIONAL USES:

Residential Low Density District (RLA): In all cases where a district boundary divides a lot in one ownership, and Section 201-9.A (3). more than 50% of the area of such lot lies in the less restricted district, the regulations prescribed by these regulations for the less restricted district shall apply to such portion of the more restricted portion of the said lot which lies within 30 feet of such district boundary. For purposes of this section, the more restricted district shall be deemed that district subject to regulations which prohibit the use intended to be made of said lot, or which require higher standards with respect to coverage, yards, screening, landscaping and similar requirements.

The requested incentive is to allow the regulations of the less restrictive zoning district to apply beyond the beyond the 30’ zone.

General Commercial District (BF2): The proposed use includes a food market. A food market is a conditionally Section 203-84.B. (5). permitted use in the BF2 Zoning District.

The requested incentive is to allow the conditional use permit requirement for this use to be waived. The use will be thoroughly reviewed as part of both the incentive zoning application by the Town Board and the site plan approval process by the Planning Board.

Use regulations within the BF2 District require that the proposed Whole Section 203-84.B. (17) Foods facility be setback from the side property line by twenty-five feet since the building is over 20,000 s.f. in size.

The requested incentive is to allow the building to be setback ten-feet (10’) from the side property line.

106 Whole Foods Plaza DEIS Town of Brighton

Lot 1 Requested Incentive Cont. Code REGULATIONS FOR SIGNS:

BF2:

Regulations for signage in commercial districts allow limited business Section 207-32.B.(1) identification and directional signage. No business identification sign shall be erected unless attached to the building face. A building on a corner lot with side walls approximately parallel to the street lines shall have one face which shall be the side containing the principal entrance. This face shall be the one on which the sign is located.

The requested incentive is to allow a free standing business sign and to allow building mounted signs to be on additional sides of the building other than the principal building entrance side.

The Business identification sign standards allow for a single attached sign Section 207-32.B. (2). on the principal building entrance. The total area of the business identification sign permitted may not exceed 10% of the first floor area of the building face or 150 square feet, whichever is less.

The requested incentive is to allow for four (4) building mounted signs totaling 410 square-feet, and a monument sign totaling 100 s.f. for a combined total of 510 s.f.

Signs may not project in any part more than 20’ above grade measured at Section 207-32.B. (3). the building face.

The requested incentive is to allow signs to project; 28’, 23’ & 25’ above grade.

107 Whole Foods Plaza DEIS Town of Brighton

Lot 1 Requested Incentive Cont. Code BULK AREA REQUIREMENTS:*

RLA: Parking and paved areas shall not exceed 35% of the rear yard. Section 207-10.E. (3).

The requested incentive is to allow 70% of the rear yard to be paved.

BF2: Minimum bulk area requirements include: Section 205-7. A front setback of 60’;

Maximum bulk area requirements include: A maximum of 65% lot coverage; A maximum density of 10,000 square feet per acre.

The requested incentives are to allow the following: A front setback of 10’; A lot coverage of 89%; A density of 14,873 square feet per acre.

No parking, paved area or aisles shall be permitted in the front yard within Section 205-18.B. 20 feet of the front property line nor within 10 feet of any lot line. A waiver shall be granted in those cases where a cross-access easement is required for shared access with an adjoining parcel.

The requested incentives are to allow the following: A front yard parking setback of 13’; Relief from granting waivers in those cases where a cross-access easement is required for shared access with an adjoining parcel.

*With regard to the bulk requirements, the requested incentives are based upon the conceptual site plan being reviewed by the Town Board. It is common that there are changes to the final approved plan as a result of Town reviews. Accordingly, the project sponsor is requesting that he Planning Board be given reasonable discretion to adjust the bulk amenities to accommodate changes as a result of its review process of the preliminary and final site plan, in the interests of arriving at the best plan for construction.

108 Whole Foods Plaza DEIS Town of Brighton

Lot 2 Requested Incentive Code PERMITTED & CONDITIONAL USES:

Residential Low Density District (RLA): In all cases where a district boundary divides a lot in one ownership, and Section 201-9 .A. (3). more than 50% of the area of such lot lies in the less restricted district, the regulations prescribed by these regulations for the less restricted district shall apply to such portion of the more restricted portion of the said lot which lies within 30 feet of such district boundary. For purposes of this section, the more restricted district shall be deemed that district subject to regulations which prohibit the use intended to be made of said lot, or which require higher standards with respect to coverage, yards, screening, landscaping and similar requirements.

The requested incentive is to allow the regulations of the less restrictive zoning district to apply beyond the beyond the 30’ zone.

General Commercial District (BF2): The proposed uses include retail, and a specialty coffee shop/restaurant. Section 203-84.B. (5). The coffee shop will incorporate a drive through operation. Outdoor seating may be desired by the restaurant. All of these uses require a Conditional Use Permit.

The requested incentive is to allow the conditional use permit requirement for these uses to be waived, as these uses will be thoroughly reviewed as part of both the incentive zoning application by the Town Board and the site plan approval process by the Planning Board.

DRIVE-THRU STANDARDS:

BF2: Drive-through service areas shall not be located in the front yard. Section 207-14.3.

The requested incentive is to allow the proposed drive through to be located in the front yard.

109 Whole Foods Plaza DEIS Town of Brighton

Lot 2 Requested Incentive Cont. Code REGULATIONS FOR SIGNS:

BF2: The term ”sign” does not include signs for the direction or convenience of Section 207-25.E. the general public, including signs which identify rest rooms or locations of public telephones or traffic control devices; however, the total area shall not exceed two square feet.

The requested incentives are to allow the following: A 2 sided “Drive Thru” sign totaling 6.46 s.f. A “Clearance” sign of 2.75 s.f. An “Exit Only” sign of 2.6 s.f.

Regulations for signage in commercial districts allow limited business Section 207-32.B. (2). identification and directional signage. The Business identification sign standards allows for a single attached sign on the principal building entrance. The total area of the business identification sign permitted may not exceed 10% of the first floor area of the building face or 150 square feet, whichever is less.

The requested incentive is to allow for eleven (11) building mounted signs totaling 1,164 square-feet (each business sign is less than 100 square feet plus building logo sign), for Building #2; to allow five (5) building mounted signs totaling 130 square feet, free standing menu boards and a free standing “Thank You” sign for Building #3, to allow four (4) building mounted signs totaling 130 square feet, for Building #4. Section 207-32.B. (3). Signs may not project in any part more than 20’ above grade measured at the building face.

The requested incentive is to allow signs to project; 30’ above grade.

110 Whole Foods Plaza DEIS Town of Brighton

Lot 2 Requested Incentive Cont. Code BULK AREA REQUIREMENTS:*

RLA: The minimum lot area required is 23,125 square feet. The area of Lot 2 Section 205-2 within the RLA district is 19,832 square feet.

The requested incentive is to allow a lot size of 19,745 square feet, if the portion of Lot 2 within the RLA district were to be considered a free standing lot.

Parking and paved areas shall not exceed 35% of the rear yard. Section 207-10.E.(3)

The requested incentive is to allow 82% of the rear yard to be paved.

BF2: Minimum bulk area requirements include: Section 205.7 A front setback of 60’;

Maximum bulk area requirements include: A maximum of 65% lot coverage; A maximum density of 10,000 square feet per acre.

The requested incentives are to allow the following: A front setback of 22’; A lot coverage of 90%; A density of 11,684 square feet per acre.

Total parking required (5 spaces/1000 s.f.; 40,000 ± s.f.) 200 spaces.

The requested incentive is to allow the following: A total of 180 parking spaces.

No parking, paved area or aisles shall be permitted in the front yard within 20 feet of the front property line nor within 10 feet of any lot line. A waiver shall be granted in those cases where a cross-access easement is required for shared access with an adjoining parcel.

The requested incentives are to allow the following: A front yard parking setback of 8’; A side yard parking setback of 5’; Relief from granting waivers in those cases where a cross-access easement is required for shared access with an adjoining parcel.

*With regard to the bulk requirements, the requested incentives are based upon the conceptual site plan being reviewed by the Town Board. It is common that there are changes to the final approved plan as a result of Town reviews. Accordingly, the project sponsor is requesting that he Planning Board be given reasonable discretion to adjust the bulk amenities to accommodate changes as a result of its review process of the preliminary and final site plan, in the interests of arriving at the best plan for construction.

111 Whole Foods Plaza DEIS Town of Brighton

Lot A Requested Incentive (Friendly’s) Code PERMITTED & CONDITIONAL USES:

General Commercial District (BF2): Section 203-84.B. (5). Existing building - former use was a restaurant. This use requires a Conditional Use Permit.

BULK AREA REQUIREMENTS:**

BF2: Maximum bulk area requirements include: Section 205-7. A maximum of 65% lot coverage;

The requested incentive is to allow the following: lot coverage of 79%;

No parking, paved area or aisles shall be permitted in the front yard within Section 205-18.B. 20 feet of the front property line nor within 10 feet of any lot line. A waiver shall be granted in those cases where a cross-access easement is required for shared access with an adjoining parcel.

The requested incentives are to allow the following: A front yard parking setback of 12’± (Existing); A side yard parking setback of 2’± (Existing); Relief from granting waivers in those cases where a cross-access easement is required for shared access with an adjoining parcel , (Shared access areas).

**Bulk requirements are based on Whole Foods Plaza Offsite Access management plan/Parking Improvement Exhibit Figure 4.2.

112 Whole Foods Plaza DEIS Town of Brighton

Lot B Requested Incentive (Comfort Suites) Code PERMITTED & CONDITIONAL USES:

General Commercial District (BF2): Section 203-84.B. (19). Existing Comfort Inn motel

BULK AREA REQUIREMENTS:**

BF2: Maximum bulk area requirements include: Section 205-7. A maximum of 65% lot coverage;

The requested incentive is to allow the following: A lot coverage of 83%;

Total parking required (1 space/guest room & 1 space /employee; 43 rooms Section 205-12. & 6 employees = 49 spaces.

The requested incentive is to allow the following: A total of 44 parking spaces.

No parking, paved area or aisles shall be permitted in the front yard within Section 205-18.B. 20 feet of the front property line nor within 10 feet of any lot line. A waiver shall be granted in those cases where a cross-access easement is required for shared access with an adjoining parcel.

The requested incentives are to allow the following: A side yard parking setback of 0’± ; Relief from granting waivers in those cases where a cross-access easement is required for shared access with an adjoining parcel, (Shared access areas).

**Bulk requirements are based on Whole Foods Plaza Offsite Access management plan/Parking Improvement Exhibit Figure 4.2.

113 Whole Foods Plaza DEIS Town of Brighton

Lot C Requested Incentive (Pizza Hut) Code USE:

General Commercial District (BF2): Section 203-84.B. (5). Proposed Mamasan’s restaurant. This use requires a Conditional Use Permit.

BULK REQUIREMENTS:**

BF2: Minimum bulk area requirements include: Section 205-7. A side yard (Not abutting residential) of 10’;

The requested incentive is to allow the following: A side yard (Not abutting residential) of 7’.

No parking, paved area or aisles shall be permitted in the front yard within Section 205-18.E. 20 feet of the front property line nor within 10 feet of any lot line. A waiver shall be granted in those cases where a cross-access easement is required for shared access with an adjoining parcel.

The requested incentive is to allow the following: A side yard parking setback of 5’± ; Relief from granting waivers in those cases where a cross-access easement is required for shared access with an adjoining parcel, (Shared access areas).

**Bulk requirements are based on Whole Foods Plaza Offsite Access management plan/Parking Improvement Exhibit Figure 4.2.

114 Whole Foods Plaza DEIS Town of Brighton

Lot D Requested Incentive (Sakura Home) Code USE:

General Commercial District (BF2): Section 203-84.B. (5). Existing Sakura Home restaurant.

BULK REQUIREMENTS:**

BF2: Maximum bulk area requirements include: Section 205-7. A maximum of 65% lot coverage;

The requested incentive is to allow the following: A lot coverage of 83%

Total parking required (1 space for each 2 patron seats; 186 seats = 93 Section 205-12. spaces.

The requested incentive is to allow the following: A total of 76 parking spaces.

No parking, paved area or aisles shall be permitted in the front yard within Section 205-18.E. 20 feet of the front property line nor within 10 feet of any lot line. A waiver shall be granted in those cases where a cross-access easement is required for shared access with an adjoining parcel.

The requested incentive are to allow the following: A side yard parking setback of 0’±; A rear yard parking setback of 1.5’±; Relief from granting waivers in those cases where a cross-access easement is required for shared access with an adjoining parcel, (Shared access areas).

**Bulk requirements are based on Whole Foods Plaza Offsite Access management plan/Parking Improvement Exhibit Figure 4.2.

115 Whole Foods Plaza DEIS Town of Brighton

Lot H Requested Incentive (Dunkin Donuts) Code USE:

General Commercial District (BF2): Section 203-84.B. (5). Existing Dunkin Donuts.

BULK REQUIREMENTS:**

BF2:

No parking, paved area or aisles shall be permitted in the front yard within Section 205-18.E. 20 feet of the front property line nor within 10 feet of any lot line. A waiver shall be granted in those cases where a cross-access easement is required for shared access with an adjoining parcel.

The requested incentives are to allow the following: A side yard parking setback of 0’±; A rear yard parking setback of 1.5’±; Relief from granting waivers in those cases where a cross-access easement is required for shared access with an adjoining parcel, (Shared access areas).

**Bulk requirements are based on Whole Foods Plaza Offsite Access Management Plan/Parking Improvement Exhibit Figure 4.2.

116 Whole Foods Plaza DEIS Town of Brighton

2.3.5. Proposed Amenities.

Typically, amenities address specific infrastructure or development needs or improvements

in the area of the proposed development project. Several such amenities of benefit to the

community are offered as part of the application. The amenities associated with the Whole

Foods redevelopment project include, but are not limited to:

• Improvements to the Auburn Trail System

• Installation of a Traffic Signal with Pedestrian Controls on Monroe Avenue

• Implementation of an Access management plan for the southern properties on the

Monroe Avenue Corridor

• Preservation of Open Space

• Redevelopment of the site with multimodal connectivity to the surrounding

commercial and residential neighborhoods

The proposed amenities are further detailed below and summarized in Table 2.3.5-2. The

value of the amenities is estimated to be in excess of $636,404, before including on-going

maintenance costs for certain amenities of $3000 per year, as described below (for the trail

and traffic signal).

A. Improvement of the Auburn Trail and Pedestrian and Bicycle Access.

The amenity offered by the project sponsor includes relocation and improvements of the

existing Auburn Trail across the redevelopment site to make it accessible, safe, and inviting

for public use. Legal means of access is not currently provided across all properties. The

trail is currently located on a pedestrian easement as well as an access easement which

permits vehicular use. Further details on the access easements are contained in Appendix

117 Whole Foods Plaza DEIS Town of Brighton

10 of this DEIS. The redevelopment proposal includes construction of 1,060 feet of multi-

use trail, 800 square-foot pedestrian gather area with wayfinding kiosk and bicycle rack

area for sixteen bicycles. The multi-use trail will provide a defined route from Clover

Street at Pittsford Animal Hospital to the west western site border connecting to the

pathway between the Church property and office complex. Pedestrian cross-walks on

Clover Street are not included in the project proposal.

The trail will be upgraded from an easement over general pavement areas to a multiuse

trail meeting AASHTO standards. The trail will be a paved asphalt trail with a width of

10-feet (10’) and will include two-foot wide buffer strips along the edges of the trail. The

path geometry incorporates curve radiuses which meet AASTO standards for bicycle use.

The cross slope and running slope of the trail will be ASSHTO and ADA compliant.

The centralized pedestrian gathering area with wayfinding Kiosk and bicycle racks

provides a connection hub for the trail system, Whole Foods Plaza, and adjoining Monroe

Avenue corridor. The hub provides trail users with a defined safe connection point to the

Plaza and Monroe Avenue corridor. The bicycle rack area allows bicyclists with a safe

and secure location to store their bicycles while visiting retails by foot. The sidewalk

network which connects to the hub is designed to promote users of the trail system to

frequent Plaza businesses and the Monroe Avenue corridor. The hub serves to transition

the trail traffic from shared use traffic to pedestrian traffic within the plaza. By

transitioning the bicycle/pedestrian traffic to pedestrian traffic entering the Plaza the

potential for conflicts are decreased to traditional pedestrian/ vehicle conflicts. The site

layout and sidewalk system layout has been designed to minimize those conflicts.

118 Whole Foods Plaza DEIS Town of Brighton

The kiosk will serve to provide users of the trail with a directory of the retail offerings

within the Plaza and overview of the trail and Monroe Avenue corridor, thereby

strengthening the trail as a community resource. Figures 2.2.3, 2.2.3A and 2.2.10 depict

the Auburn Trail configurations and proposed pedestrian gathering area. Further details

on the pedestrian gathering are included in section 4.5 of this DEIS.

The Auburn Trail will be located, as it is now, on private property and on a pedestrian

easement to the Town of Brighton. The cost of maintaining the trail will be borne by the

project sponsor or future owner of the Whole Foods Plaza. Vehicular traffic is proposed

to be separated from the trail to create a safe and pleasurable experience for those who wish

to use the trail. Further details on the Auburn Trail Redevelopment renderings are included

in Appendix 9 of this DEIS. The trail will also be connected to the proposed development

via sidewalks throughout site, with bike racks within the center. A proposed traffic signal

and crosswalk (another amenity described below) will afford trail goers safe crossing and

access to the south side of Monroe Avenue. The estimated value of this amenity is

approximately $137,472, plus the estimated annual cost of $1,200 to maintain the trail ;

Further details on the valuation of the amenities is contained in Appendix 7 of this DEIS.

The design, construction and maintenance of a trail system which is separated from

pavement areas, upgrading the portions of the trail to AASHTO compliance for a shared

use trail, development of the pedestrian gathering area, installation of bicycle racks, and

wayfinding signage is truly an amenity and is not an essential part of the commercial

development and adds no financial benefit to the project sponsor.

119 Whole Foods Plaza DEIS Town of Brighton

B. Traffic Signal and Pedestrian Crosswalk on Monroe Avenue.

The amenity offered by the project sponsor involves the design and construction and

maintenance of a signalized intersection with pedestrian controls to be located at the main

entrance to the Whole Foods redevelopment. The current and anticipated traffic generation

and potential traffic related impacts for the proposed development have been evaluated by

the project sponsor and reviewed with the NYSDOT. The project sponsor proposes to

install and pay for the maintenance of a traffic signal to be located as shown on the site

plan, together with other traffic improvements (including a right out and ingress located

where Mario's restaurant currently has its primary access). The signalized intersection will

offer an opportunity for additional access management and cross access along Monroe

Avenue. One curb cut on the north side of Monroe Avenue, being the driveway for the

current Mamasan's Restaurant, will be removed.

The cost of the traffic signal and improvements are estimated at this point to be $268,164,

an amount which will be borne by the project sponsor. While some of these costs fall under

the category of traffic mitigation, the efforts of the project sponsor go well beyond that and

the value of amenity (above and beyond immediate traffic mitigation) is valued at

$134,082, plus a portion of the ongoing annual cost maintenance of the traffic signal of

approximately $1,800.

The design, construction and maintenance of this signalized access is truly an amenity as

it facilitates the development of the access management plan proposed for the south side

of Monroe Avenue, and allows the project sponsor the opportunity to improve the cross

access for the properties on the south side of Monroe Avenue as outlined in Section C

below, establishes a pedestrian link between the northern side of the corridor with the

120 Whole Foods Plaza DEIS Town of Brighton

southern side, and improves safety and traffic flow within the project area. The project

sponsor acknowledges that this amenity does improve the proposed development and to

some degree mitigates a preexisting and future access function that is why when

establishing the value of the amenity only half of the construction value is credited as an

amenity.

C. Cross Access and Shared Parking Agreement for the Properties on the South

Side of Monroe Avenue.

The amenity offered by the project sponsor involves the design and construction of

improvements required to implement an access management plan for the southern side of

Monroe Avenue within the project area. The signal location, dictated by the NYSDOT,

proposes to line up at the existing Clover Lanes and the Sakura Home restaurant on the

south side of Monroe Avenue. The signal will serve traffic for the new Whole Foods Plaza

development, and, as a part of this Incentive Zoning proposal, the project sponsor has

actively engaged the property owners of the south side of Monroe Avenue to design and

construct cross-access between parcels on the south side of Monroe Avenue to facilitate

the ability to access the new traffic signal. Access to a traffic signal would provide a

significant economic benefit to these neighboring properties and businesses, and would

help to address traffic issues related to this segment of the Monroe Avenue corridor.

The access management plan consists of improvements to five (5) properties on the south

side of Monroe Avenue. The access management plan will provide interconnectivity,

parking improvements, and access to the proposed signalized intersection. The access

management plan will include the acquisition of approximately 0.5 +/- acres of excess

Route 590 Right-Of-Way at the rear of the properties from the New York State Department

121 Whole Foods Plaza DEIS Town of Brighton

of Transportation (NYSDOT). The project sponsor will be purchasing the excess Right-of

Way lands from the State and conveying the purchased lands to the adjoining commercial

properties. The access management plan will provide a common rear lot access drive, a

net increase of thirty-eight (38) additional parking spaces, and cross lot access among the

properties and to the proposed signalized intersection. Cross lot access and shared parking

facilities will be accomplished through the filing of a reciprocal access easement between

the properties. The project sponsor will be designing and constructing the shared access

improvements for the implementation of the access management plan. The easement

agreement for the implementation of the access management plan has already been

executed by the affected property owners and the project sponsor. Figure 2.2.1E depicts

the Access management plan and associated properties.

Further details on the easement agreement are contained in Appendix 10 of this DEIS.

Another important aspect of this amenity is the project sponsor's commitment to addressing

a long standing access management issue on the south side of Monroe Avenue. The project

sponsor will seek review by the NYSDOT and the Town of Brighton for their adoption as

a master access management plan. At this time, the five property owners have agreed in

concept to allow cross access and shared parking. The project sponsor is providing the

funding needed to make access to NYSDOT property to the south of the parcels available

to be included as additional space for parking and a cross access road. This excess property

is intended to be purchased by each adjacent property owner, funded by the project sponsor

and the project sponsor handling the actual acquisition. The project sponsor, limited by

the owner's desires to make such changes to their parcels, is committed to funding and

therefore executing the fulfillment of the Conceptual Access Management Plan.

122 Whole Foods Plaza DEIS Town of Brighton

The cost of funding the acquisition the property from the NYSDOT is approximately

$29,000. The cost of designing and constructing the cross access road and improvements

necessary for the parking lot modifications are estimated at $149,350. The costs associated

with developing and consummating the Cross Access and Shared Parking Agreement

between the land owners and gaining the proper approvals from the involved agencies is

estimated at $4,500. This brings the total value of this amenity to approximately $182,850;

see Appendix 7. The project sponsor proposes that this amenity be allowed to be given as

an assurance bond to the Town as part of these approvals. This will give the Town and

NYSDOT time to properly review the plan and approve its execution, and insure that the

project sponsor dedicate funds to execute the plan. The Conceptual Access Management

Plan contemplates additional curb cut elimination which the project sponsor cannot

guarantee, but by adoption of the plan, the Town can mandate these curb cut reductions as

part of redevelopment which will inevitably occur as part of the redevelopment that this

corridor will experience in the immediate or near future.

The design, construction and maintenance of this access is truly an amenity and is not an

essential part of the commercial development and adds no financial benefit to the project

sponsor.

D. Preservation of Passive & Active Open Space.

The amenity offered by the project sponsor is the preservation of approximately 1.0+/-

acres of developable residential lands as open space.

The project sponsor is acquiring approximately 2.2 +/- acres of lands from the First Baptist

123 Whole Foods Plaza DEIS Town of Brighton

Church, 1.2 acres of which is needed and incorporated into the development site, as shown

on the Site Plan. The property is in the RLA Zoning District and is adjacent to the BF-2

District. The property fronts on Clover Street and backs to the Mario’s and Clover Lanes

parcels. While the Church has contemplated the potential development or use of its excess

property over the years, selling the property for the proposed development will provide the

Church with much needed funds to complete capital improvements that would not be

possible without this sale, thus posing a hardship to the Church and its congregation.

The project sponsor proposes to preserve approximately 1.0 +/- acres of the lands to be

acquired from the Church, fronting on Clover Street as undeveloped open space rather than

including the lands in the development project. The remaining area of the property adjacent

to the Whole Foods Plaza is proposed to be incorporated in the development site to

accommodate necessary parking and paved areas. This area may be dedicated as a

Conservation Easement. This land will serve as an additional buffer between the

commercial development and adjacent residential uses. To help offset the land acquisition

costs the project sponsor could have exercised their right to subdivide the residential

property and offer or develop the parcel for development as a residential property. The

lands are to remain in their existing wooded condition and provide an extra layer of

buffering in addition to the code required six-foot high fence where commercial uses adjoin

residential areas. The proposed trail described above will separate the proposed

development from the open space and residential development. Further details on the value

of the amenity are contained in Appendix 7 of this DEIS. The amenity value of the

preservation of the lands as open space is estimated at $182,000.

124 Whole Foods Plaza DEIS Town of Brighton

The acquisition and preservation of this property is truly an amenity and is not an essential

part of the commercial development and adds no financial benefit to the project sponsor.

The project sponsor could create a buffer and could choose not to purchase the entire

property of the church leaving this site as a viable residential lot and bring financial gain

to the current property owner. The value of this amenity was derived using comparable

size lots and based on the project sponsors right by code to develop a single family home

on the property.

Table 2.3.5-1 provides pertinent calculations for the estimated open space lot property

value.

Figure 2.3.5.4 depicts surrounding residential properties and their values.

125 Whole Foods Plaza DEIS Town of Brighton

Table 2.3.5-1 - Whole Foods Plaza Open Space Parcel Value

126 Whole Foods Plaza DEIS Town of Brighton

2.3.5.1 The cash value of the proposed amenities.

The estimated value of the amenities is to be in excess of $636,404, before

including on-going maintenance costs for certain amenities of $3000 per year, as

described below (for the trail and traffic signal). Refer to Appendix 7. The cash

values of the proposed amenities do not include the portions deemed as mitigation

measures and solely include the true amenities that are not required by code and are

comparable to other Incentive Zoning Amenities.

127 Whole Foods Plaza DEIS Town of Brighton

Table 2.3.5-2 – Summary of Amenities Description of Amenity Cost

AUBURN TRAIL RELOCATION & MULTINODAL $137,472.00 ACCESS:

Relocation of the Auburn Trail is planned through the site and connectivity to the development and adjoining commercial corridor. Features include: 1,060 feet of 10’ wide asphalt shared use pathway; 800 s.f. pedestrian gathering areas with kiosks, way finding signage, trash receptacles, and bike racks for 16 bicycles; 120 l.f. of 5’ wide concrete walkways; A bus shelter; and 841 s.f. of pedestrian crosswalk markings

A concept plan for the site and pedestrian gathering areas are shown in Figures 2.2.1D, 2.2.8, 2.2.10 & 2.2.10A.

TRAFFIC SIGNAL: $134,082.15

The development proposal includes the design, construction, and maintenance of a signalized intersection on Monroe Avenue. Features of the signalized intersection that provides additional community benefit beyond those associated with ingress/egress to the site include: Monroe Avenue Corridor access improvements, connectivity to the commercial properties on the south side of the Monroe Avenue Corridor, and establishing pedestrian connectivity between the sidewalk network on the north and south sides of Monroe Avenue.

Further descriptions of the signalized intersection appear in Section 4.4 of the report and Figures 2.2.1B.

128 Whole Foods Plaza DEIS Town of Brighton

Description of Amenity Cost

MANAGED ACCESS – CROSS LOT $182,850.00 CONNECTIVITY:

The development proposal includes the development of a managed access plan for the south side of Monroe Avenue within the project area. The managed access plan will consist of improvements to five (5) properties on the south side of Monroe Avenue. The improvements will provide interconnectivity between the properties, connectivity to the proposed signalized intersection, and additional parking. The managed access plan will include the acquisition of approximately 0.5± acres of excess Route 590 Right –Of – Way at the rear of the properties from the New York State Department of Transportation (NYS – DOT). The managed access plan will provide a common rear lot access drive, twenty six (26) additional parking spaces, stormwater management facilities, and cross lot access among the properties, and to the proposed signalized intersection.

The conceptual plan for the managed access plan are shown is Figure 2.2.1E.

*Fencing to be added at the rear of the properties.

PRESERVATION OF OPEN SPACE: $182,000.00

The development proposal includes the preservation of 1.0 acres of land as open space. 1.0 acres of the 2.2 acres of land being acquired from the First Baptist Home will be preserved as open space rather than be incorporated into the commercial redevelopment, or developed as a residential property.

The land to be retained as open space is shown in Figure 2.2.5.

Total $636,404.15

129 Whole Foods Plaza DEIS Town of Brighton

2.4 Approvals

Application has been made to the Town of Brighton, Town Board, for the approval

of an Incentive Zoning Application for the redevelopment of lands for the Whole

Foods Plaza. The application was filed with the Town on February 18 th , 2015. A

supplemental Letter of Intent and additional information regarding the application

was filed with the Town on May 15 th , 2015. The Incentive Zoning Application is

the first in a series of applications and approval necessary for the project to progress

to approval and construction. The project will need various approvals at the

Municipal, Regional and State level associated with the design, construction and

operation of the facility. The Municipal, Regional, and State Agency review and

approval process ensures the project complies with all applicable permit, approval

and code standards.

The project will undergo a coordinated review with Municipal, Regional and State

Agencies. The Town Board has initiated a coordinated review under the State

Environmental Quality Review Act (SEQR) and its implementing regulations at

NYCRR Part 617. The Town Board classified the Whole Foods Plaza project a

Type 1 for the purposes of the environmental review. The Town Board initiated a

coordinated environmental review and declared its intent to act as Lead Agency by

notice of May 27 th , 2015 to all involved and interested agencies and the public.

With no objection from other agencies, the Town of Brighton, Town Board

declared itself lead agency and adopted a Positive Declaration for the application

on July 8 th , 2015.

130 Whole Foods Plaza DEIS Town of Brighton

Scoping is an optional process under the SEQR regulations. The Town Board

decided to conduct scoping for this project and the project sponsor submitted a draft

Scoping Document. The draft scope was reviewed by Town of Brighton staff,

Town Consultants. The Town Board conducted a public scoping meeting on

September 9 th , 2015. The Lead Agency, having reviewed the draft scoping

document and all input received, adopted a final Scoping Document at their

September 24 th , 2015 hearing.

As required under SEQR, the project sponsor has prepared a DEIS in accordance

with the final scoping document, which was submitted in October 2015. After

review of the October 2015 DEIS by Town staff and Town consultants, it was

determined in November that the DEIS was not yet adequate or complete to

commence the required public and agency review period.

It has become clear to the project sponsor that an alternative plan without access to

Clover Street and Allens Creek Road is an alternative preferred by the

neighborhoods in the immediate vicinity of the project. As such the proposed

action has been revised to reflect this plan. The DEIS has been written to address

the impacts specific to this plan. The scoping document and the issues identified

remain the same, but the impacts would now be specific to the revised plan.

This DEIS has been prepared to address the issues identified in the final Scoping

document as applicable to the revised plan as described in section 2.2 and details in

the plans.

131 Whole Foods Plaza DEIS Town of Brighton

In addition to the coordinated review under SEQR the project will undergo

Municipal, Regional and State Agency approvals. A summary of the project review

and approval process is outlined below.

With the exception of the incentives applied for in the Incentive Zoning Application

the project will comply with all applicable Municipal, Regional, and State Agency

Approvals and permitting requirements. The Incentive Zoning process will be

completed in accordance with Town Code requirements. Further details on the

incentives sought and their justification are contained in Section 2.3.4 of this DEIS.

Further details on the Incentive Zoning Application are contained in Appendix 1 of

this DEIS. Further details on the Scope Outline are contained in Appendix 1 of this

DEIS.

The municipal approval process will include approvals/referrals from the Town

Board, Planning Board, Architectural Review Board, Conservation Board and

Building Department.

Municipal Approvals include, but are not limited to:

• A coordinated review of the project proposal in accordance with the

State Environmental Quality Review act (SEQR)

• Incentive Zoning Application

• Site Plan Application

132 Whole Foods Plaza DEIS Town of Brighton

• Subdivision Application

• Building Demolition Site Plan Approval and Architectural Review

Board Referral

• Construction Permits

o Building Permits

o Sewer Connection Permits

o Signage

o State Pollutant Discharge Elimination Permit (SPDES) General

Permit for Stormwater Discharges for Construction Activities

MS4 Acknowledgement

County and Regional Agency Approvals include, but are not limited to:

• MCWA Approval

• Pure Waters Approval

• Monroe County Department of Health

o Watermain Extension Approval

o Cross Contamination Control Approval

o Grease Interceptor Sizing

o Reality Subdivision Approval

• Monroe County Surveyor

State Agency Approvals include, but are not limited to:

• NYSDOT Highway Non-Utility Work

• NYSDOT Highway Work Permits

• NYSDEC SPDES Permit for Construction Activities

• NYSDEC Sanitary Sewer Extension

133 Whole Foods Plaza DEIS Town of Brighton

It is common that there will changes to the final approved plan as a result of

Municipal, Regional and State agency review and approval process. Town reviews.

The multifaceted review and approval process ensures that the project that

ultimately gets constructed is in the best interests of all.

2.5 Construction and Operation

2.5.1 Construction Schedule and Sequenc e

Construction operation for the Whole Foods Plaza redevelopment project is

expected to be completed in a single phase approximately eighteen (18) months.

The anticipated construction duration for the redevelopment is expected to have an

eighteen (18) month duration. To ensure the construction of the access

management improvements, the project sponsor proposes that they be allowed to

provide an assurance bond to the Town as part of these approvals.

The anticipated sequence of construction commences with demolition of the

existing structures that are Mario's Restaurant, Clover Lanes Bowling Center and

Mamasan's Restaurant. Demolition of the buildings requires approval from the

Planning Board and review by the Historic Preservation Commission, Architectural

Review Board and Conservation Board in accordance with Section 73-57 of the

Town Code.

Environmental Surveys have been performed for each of the three structures

proposed for demolition. Structures at 2740 & 2800 Monroe Avenue (Mario's and

134 Whole Foods Plaza DEIS Town of Brighton

Mamasan's) are asbestos free. The structure at 2750 Monroe Avenue (Clover

Lanes) has limited asbestos that will require remediation prior to demolition. None

of the properties contain any hazardous materials. Demolition of the buildings will

be done in accordance with Town of Brighton and New York State codes and

procedures and by NYS licensed contractors. All debris that is not reclaimed or

reused from the demolition of the structures will be disposed of off-site in a legal

manor.

Further details on the Environmental Surveys performed for the structures are

contained in Appendix 14 of this DEIS.

Demolition operation for the structures will be followed by general earthwork

operations. Mass earthwork for the site will be completed in a single phase which

will include rubblization of existing pavement surfaces for reuse, removal of

unsuitable soils within the proposed building footprints and replacement with select

fills and establishing the general lines and grades for the development of the parking

areas and building pads. Mass earthwork operations will be followed by utility

infrastructure improvements for sanitary, storm, water, gas and electric. Upon

completion of the utilities infrastructure and on- site fire protection, construction of

the new buildings will commence. A five acre waiver will be sought to allow for

the mass grading to be performed in a single phase disturbing more than five acres

at one time.

Further details on the volume of soils to be exported and imported from the site are

included in Section 4.1 and Appendix 11 of this DEIS.

135 Whole Foods Plaza DEIS Town of Brighton

The existing main access point on Monroe Avenue for the Mario’s and Clover

Lanes facilities will serve as the stabilized construction access during the initial

stages of the redevelopment construction operations. Access to the site during

construction will be limited including the re-routing and fencing off of the Auburn

Trail to the north on the site and the sidewalks along Monroe Avenue.

The installation of the traffic signal will be coordinated with the New York State

Department of Transportation and will occur during the initial site work stage of

construction, although the signal will be installed, it will most likely not be

operational until the new Whole Foods Plaza is close to completion. Construction

of the site access points and utility connections within the Monroe Avenue right-

of-way will require the implementation of a Maintenance and Protection of Traffic

(MPT) plan. The MPT plan will be developed in accordance with NYSDOT

requirements and will require review and approval from the NYSDOT. The MPT

plan developed for the site will provide specific consideration to minimize the

impacts of construction vehicle traffic during the peak hour of roadway traffic.

It is expected that the 50,000 square foot Whole Foods building will be constructed

first, followed by the remaining three structures. The Whole Foods building will

require 7-9 months to complete the internal buildout of the grocery store making it

likely that the grocery store and adjoining retail stores will open at roughly the same

time or within 6 months of each other. The site construction should be completed

before any retail store opens to the public with only inside buildout construction

remaining thereafter.

136 Whole Foods Plaza DEIS Town of Brighton

The redevelopment of the site is not anticipated to create significant noise

associated with construction activities. The construction operations are to be

performed with traditional equipment and operations associated with site and

building construction. Based on the soils investigations performed for the site, no

need for blasting is anticipated.

All construction activities will occur during the hours of 7:00 am and 7:00 pm

Monday through Friday, and between 9:00 am and 6:00 pm Saturday and Sunday

in conformance with Town Code section 102-3. The project sponsor does not intent

to have construction activities occurring routinely on Sundays. Construction

activities on Sundays for site related construction will be limited to completing time

sensitive elements and delays due to inclement weather. Once the building shells

are completed, indoor construction activities which will not impact the neighboring

residential district may occur during the hours allowed under the Code.

All construction equipment and materials will be stored onsite in a safe and secure

manor. The construction access point for deliveries and workers will be clearly

demarked.

2.5.2 Operation

The new Whole Foods Plaza will be maintained by the property owner and sponsor

of this application. Services will include landscape maintenance, exterior building

maintenance, snow removal from driveways, parking areas and walks. The new

Whole Foods Plaza will be a retail shopping center with multiple uses including

137 Whole Foods Plaza DEIS Town of Brighton

grocery, foodservice, and other typical uses.

The multi-use trails along the north property line will be maintained by the property

owner of the new Whole Foods Plaza through an agreement with the Town of

Brighton. The traffic signal will be maintained by the property owner of the new

Whole Foods Plaza through an agreement with the New York State Department of

Transportation.

The Access management plan for the South Side Monroe Avenue has been

designed and will be constructed by the project sponsor who will bear all expenses

associated therewith. The access road will be maintained by the land owners

through a Cross Access and Shared Parking Agreement that was produced and

coordinated by the project sponsor and entered into by the land owners.

2.6 Neighborhood Input / Communications

Well before any formal application was submitted to the Town of Brighton, the

Project Sponsor was pro-active with the community and neighbors in

communicating the intent of the project and soliciting feedback from neighbors and

interested parties.

An open house was held on February 23, 2015 at Mario's restaurant, whereby the

Project Sponsor gave a 30 minute PowerPoint presentation to a crowd of roughly

100 neighbors on the planned project. This was at that early stage, and not

significantly dissimilar to the current plan proposed.

138 Whole Foods Plaza DEIS Town of Brighton

The sponsor had informational stations set up, manned by the corresponding

professionals involved with the project. Jerry Goldman, legal counsel with Woods

Oviatt Gilman, oversaw the legal corner to answer neighbors’ questions about

process, timing and legal matters relating to the application and desired approvals.

Steve Ferranti, a traffic consultant with SRF Associates, answered questions

relating to the traffic study, effect of the project on traffic and alternatives that were

evaluated. Mike Montalto from Costich Engineering was also available to answer

questions regarding design, layout and technical issues including utilities, drainage

and visual. The project sponsor was on hand to answer less technical questions

about why the proposed project was a good idea for the area and its effects as relates

to the community and business.

The gathering lasted approximately three hours and was very informative, for both

neighbors and the project sponsor. Included in Appendix 18 is the Public Meeting

Summary of the feedback and questions posed at the February 23 rd meeting.

A neighborhood group called Care for Clover organized a local meeting, advertised

as open to the public, to discuss the project on April 10, 2015 at the First Baptist

Church in Brighton. The Project Sponsor attended the meeting and, with the

permission of the group's leader Ben Werzinger, gave a PowerPoint presentation

outlining the Incentive Zoning application filed with the Town of Brighton. The

project sponsor then remained and answered questions from the attendees for

another 30 minutes, at which point the group's leader asked the project sponsor to

leave the meeting. Many attendees later expressed appreciation for the project

139 Whole Foods Plaza DEIS Town of Brighton

sponsor’s willingness to present what was applied for and candidly answer

questions and clarify some misinformation that had been disseminated by some of

the neighbors. They also expressed their discontent with how the project sponsor

was asked to leave the meeting that was advertised as open to the public.

The project sponsor has met with the legal counsel for the Care for Clover

neighborhood association and has agreed to work in good faith to explore the

alternatives included in this document with the desire to have a project all parties

can feel good about. The most recent meeting was September 30, 2015.

The Town of Brighton has received various phone calls and emails from residents

regarding the redevelopment project. The correspondence received by the Town

ranges from general support for the project to raising concerns over the proposed

redevelopment project. The Town has received correspondence from residents

with a number of residents corresponding on multiple occasions. The majority of

the correspondence received regarding the redevelopment proposal is in regards to

traffic concerns for the Monroe Avenue corridor and a concern with the proposed

redevelopment project making the conditions within the corridor worse. A number

of area residents expressed their concern with the redevelopment project having

secondary access points connecting to Clover Street and Allens Creek Road.

Based on comments received from the public the project sponsor has revised the

proposed action to eliminate secondary access for the project from Clover Street

and Allens Creek Road. The redevelopment project will be served from the two

(2) access points on Monroe Avenue. In addition to eliminating secondary access

140 Whole Foods Plaza DEIS Town of Brighton

from Clover Street and Allens Creek Road the project sponsor has eliminated the

second drive through operation planned for the site to reduce the traffic generations

associated with a drive through operation.

Further details and a summary of correspondence received by the Town for the

redevelopment project are included in Appendix 18 of this DEIS.

There are no future neighborhood meetings scheduled at this time.

3.0 Environmental Setting

3.1 Geology, Soils and Topography

A detailed investigation of the geology, soils, and topography of the site has been

completed. The results of the investigations are contained in two (2) reports. The first,

entitled Whole Foods Market Geotechnical Evaluation , prepared by Foundation Design,

dated May, 2015, focuses specifically evaluating subsurface conditions for the Whole

Foods building. The second, entitled Palazzo Plaza Geotechnical Evaluation , prepared by

Foundation Design, dated June of 2015, provides general geotechnical information and

subsurface conditions for the site suitable for project planning. Complete copies of both

reports are contained in Appendix 11 of this DEIS.

The geotechnical evaluations included a review of Monroe County Soil Conservation

Service Mapping (1973) and USGS Topographic Mapping (1952, 1971, and 1997).

Fieldwork was conducted in one operation and the finding and conclusions follow a similar

pattern. A total of 39 soil borings were drilled in the parcel as part of the overall study as

141 Whole Foods Plaza DEIS Town of Brighton

well as six infiltration tests performed. A summary of this information is compiled herein,

further details pertaining to the design reports and reference documents are contained in

Appendix 11.

The subsurface conditions encountered in the soil borings and test pits were generally

consistent across the project site.

The site has been developed for decades resulting in the 1973 Soil Conservation Service

mapping providing a UB or Urban Land designation. USGS mapping indicates that

structures first appeared on the parcel prior to 1971. Soil boring data indicates fill depths

of one feet to ten feet across the overall parcel. The fill contains organics and wood and

brick were noted. A definable layer of buried topsoil was not noted at all of the soil borings.

Current surface treatments include the existing structures and associated pavements.

Nearby, undisturbed soils classify as lake deposited silt with sand (Dunkirk series) or a

silty glacial till (Hilton series). Soil boring data on the parcel indicates that the native soils

are the lake deposits and therefore the Dunkirk. Figures 3.3.1 and 3.3.1A depict the soils

maps for the redevelopment site and access management areas. Further details and area

soils mapping for the redevelopment site and access management areas are contained in

Appendix 11 of this DEIS.

Beneath the lake deposits the soil borings indicate bedrock. Bedrock is the Vernon

Formation of the Salina Group and the Penfield Dolostone of the Lockport Group. Bedrock

was generally encountered at depths of seven feet to fifteen feet below grade.

142 Whole Foods Plaza DEIS Town of Brighton

Current site topography is a result of the previous development. Surface elevations

generally drop from south to north and west to east across the site. The drop in elevation

south to north is approximately 7+/- feet. The drop in elevation west to east is

approximately 3+/- feet. No surficial evidence of bedrock, such as outcroppings or exposed

cuts, exist on the site.

As stated above, six infiltration tests were performed per NYSDEC Guidelines. Results

are summarized below.

Table No. 3.1-1 – Stormwater Infiltration Results

Boring Test Infiltration Rate Number Depth (in./hr.) (feet) B15-2 6 No water level drop B15-3 4 Drop 0.359"/hr B15-13 8 Water level rose 6" (to 450.9) B15-14 6 Drop 0.047"/hr B15-21 8 Water level rose 7" (to 453.1) B15-22 4 Drop 0.172"/hr

This data seems to indicate that groundwater is located about six feet below grade and that

it will perch on top of the lower, denser soil.

Infiltration tests conducted for the evaluation of the site for suitability for implementation

of stormwater infiltration practices indicate the presence of perched water table. The

presence of the perched water table preclude the use of infiltration practices from the design

of the stormwater management facilities for the project.

143 Whole Foods Plaza DEIS Town of Brighton

3.2 Surface Waters/Drainage

The existing surface drainage for the Whole Foods Plaza redevelopment site and access

management areas follows the general site topography, primarily via sheet flow, overland

and channelized flow. The redevelopment site and access management areas are part of a

40.8 acre drainage basin which includes both on-site and off-site areas. The off-site areas

of the drainage basin are comprised primarily of developed, residential and commercial

lands. The off-site drainage basin also includes roadway areas from Monroe Avenue and

NYS route 590 on and off ramps. Discharge from the redevelopment site is primarily to

two (2) points located along Clover Street. Discharge from the access management area is

primarily to a drainage swale at the rear of the properties and to drainage inlets within the

Monroe Avenue roadway. Both the rear lot drainage swale and roadway inlets are

ultimately conveyed to a drainage swale at the north end of the redevelopment site.

Drainage leaving the site eventually discharges to an unnamed tributary to Allens Creek,

north of the Shorham Drive neighborhood. Figure 3.3.2 depicts the watershed area. Figure

3.3.2C depicts the existing area drainage patterns.

The redevelopment site drainage analysis evaluated the existing stormwater run-off of the

approximately 10.13± acre development area on a located at 2740/2750/2800 Monroe Ave,

and 175 Allen’s Creek Road. The existing impervious percentage is for the redevelopment

site drainage basin is approximately 69%.

For analysis purposes, the existing redevelopment drainage area was broken up into four

(4) sub-areas. Delineated sub-drainage areas can be described as follows:

144 Whole Foods Plaza DEIS Town of Brighton

Existing drainage area 1 (E-1) is the central portion of the site which drains overland north

and is collected via existing drainage swales before discharging to Clover Street. The

drainage shed consists primarily of the Clover Lanes Bowling Alley and associated parking

fields. The area is comprised of approximately 4.93 acres, with a curve number of 93 and

a time of concentration of 0.083 hours (minimum).

Existing drainage area 2 (E-2) is the westerly portion of the site which drains to a series of

swales and culverts which flow north towards Clover Street. The drainage shed consists

primarily of Mario’s Italian Restaurant and associated parking fields. The area is

comprised of approximately 1.52 acres, with a curve number of 94 and a time of

concentration of 0.116 hours.

Existing drainage area 3 (E-3) is the southeastern portion of the site which drains to

drainage inlets in parking areas and along Monroe Ave, which contribute to the NYSDOT

right-of-way. The drainage shed consists of portions of the Clover Lanes Bowling Alley

parking and Mamasan's’ Restaurant and associated southern parking fields. The area is

comprised of approximately 2.09 acres, with a curve number of 96 and a time of

concentration of 0.083 hours (minimum).

Existing drainage area 4 (E-4) is the northeastern portion of the site which drains to a series

of drainage inlets which collect surface runoff and direct it northeast to Clover Street. The

drainage shed consists primarily of the northern portion of the Mamasan's’ building and

northern parking fields. The area is comprised of approximately 0.63 acres, with a curve

number of 98 and a time of concentration of 0.083 hours (minimum).

145 Whole Foods Plaza DEIS Town of Brighton

Figure 3.3.2A depicts the sub-area drainage map for the redevelopment site. Table 3.2-1

details the existing peak flow rates calculated for each of these sub-areas. Full details on

the calculation parameters and methodology are contained in the Costich Engineering

report in Appendix 19.

Table 3.2-1 – Redevelopment Site Existing Peak Discharge Rates

Drainage Area Q1 Q2 Q10 Q25 Q50 Q100

(cfs) (cfs) (cfs) (cfs) (cfs0 (cfs) E-1(4.93 acres) 14.9 17.1 25.1 28.8 32.4 34.5 E-2 (1.52 acres) 3.9 4.5 6.9 8.0 9.1 9.7 E-3 (2.09 acres) 6.1 7.1 10.5 12.1 13.6 14.1 E-4 (0.63 acres) 1.6 1.8 2.6 3.0 3.4 3.6 Total (10.1 acres) 26.5 30.5 45.1 51.9 58.5 61.9

For analysis purposes, the access management drainage area was broken up into two (2)

sub-areas. Figure 3.3.2B depicts the sub-area drainage map for the access management

area. Table 3.2-2 details the existing peak flow rates calculated for each of these sub-areas.

Full details on the calculation parameters and methodology are contained in the Costich

Engineering report in Appendix 19.

Table 3.2-2 – Access Management Area Existing Peak Discharge Rates

Drainage Area Q1 Q2 Q10 Q25 Q50 Q100

(cfs) (cfs) (cfs) (cfs) (cfs0 (cfs) E-1(0.5 acres) 1.4 1.6 2.3 2.7 3.0 3.2 E-2 (0.3 acres) 2.1 2.5 3.7 4.3 4.9 5.2 Total (0.6 acres) 3.5 4.1 6.0 7.0 7.9 8.4

146 Whole Foods Plaza DEIS Town of Brighton

The design criteria used for this analysis is based on the “New York State Stormwater

Management Design Manual”, dated January 2015 in association with “SPDES General

Permit for Stormwater Discharges from Construction Activity”, dated January, 2015 (GP-

0-15-002). Existing and drainage areas have been modeled using the SCS method to

determine volume and peak rates of stormwater runoff.

With the exception of portions of the Mario’s restaurant property, no formalized

stormwater quality measures are employed within the proposed project area. The existing

facilities predate the current NYS DEC stormwater quality requirements.

An evaluation of the redevelopment site and access management areas has been performed

to assess the pollutant loading for the stormwater runoff from the project areas. Pollutant

loadings for Total Suspended Solids (TSS), Total Phosphate (TP), and Bacteria

Concentration were calculated. Table 3.2-3 summarizes the stormwater pollutant loading

for the project area.

Table 3.2-3 – Existing Stormwater Runoff Pollutant Loads Pollutant Treatment Needed Total Suspended Solid 3357.07 lb/yr Yes Total Phosphate 13.64 lb/yr Yes Bacteria Concentration 4186.85 Billion yes Colonies

Full details on the pollutant calculation parameters and methodology are contained in the Costich Engineering report in Appendix 19.

147 Whole Foods Plaza DEIS Town of Brighton

3.3 Terrestrial and Aquatic Ecology

The existing terrestrial and aquatic ecology conditions have been evaluated by Costich

Engineering D.P.C. and the Department of Environmental Science and Biology of the State

University at Brockport. Costich Engineering D.P.C. conducted an evaluation of the

woodlots and trees. The Department of Science conducted investigations on wildlife and

habitats. This section of the DEIS contains a summary of the findings. For more detail,

reference should be made to the full evaluations contained in Appendix 12 (Tree Inventory)

and (Habitat Report).

There are no State or Federal regulations charged with protecting the trees or upland

wooded areas located on the property. Woodlot EPOD and Wetland maps indicate that

there are no state or federally regulated or delineated wetlands on or near the proposed

development. Further details on the environmental resource mapping are contained in

Appendix 1 of this DEIS.

The site is a currently commercially developed area that has very little vegetation or

habitat that is considered environmentally significant. There is a row of tree and shrub

growth that borders the property to the north. A tree survery was conducted by

The NYSDEC Natural Heritage Office was contacted and there where no record of rare,

threatened or endangered species on or near the project site. Correspondance received

form the NYS-DEC is included in Appendix 12 of this DEIS.

148 Whole Foods Plaza DEIS Town of Brighton

3.3.1 Woodlots and Trees

There are no “woodlot” areas as defined by the regulations as defined in the Town Code.

The portion of the site with the most mature trees is located on the 1.0 acres that is proposed

to be preserved as a conservation easement to the Town and act as a visual mitigation to

the redeveloped site. A Tree Survey was performed and is included in Appendix 12.

The Town of Brighton has two distinct regulatory programs that attempt to protect trees

and wooded areas of importance to the community. Section 175 of the Town Code-

Preservation of Trees, sets limitation on the types of activities that occur in and around

trees located on Town owned properties or Town highway right of ways. In addition, this

ordinance provides a certification process for landscape and tree service professionals,

which operate in the Town. The purpose of these local laws is to promote the planting and

preservation of trees in the Town, because of their importance to the physical and visual

quality of the community, and to the health, safety and welfare of its residents.

Under this law, a "woodlot" is defined as an area of one or more acres of vegetation, the

majority of which is classified as woody plants, whose trunks are greater than three (3)

inches in diameter at a height of three (3) feet above the ground and whose full height

reaches a minimum of six (6) feet. A "tree" is defined as a woody plant whose trunk is

greater than five (5) inches in diameter at a height of four (4) feet above the ground and

whose full height reaches a minimum of twelve (12) feet. A Town owned tree is defined

as a tree, which is located on Town owned lands or on Town highway right of way. This

includes trees that are growing on the border of these Town public lands, if at least 50%of

their base is located on Town property.

149 Whole Foods Plaza DEIS Town of Brighton

No Town-owned properties are located immediately adjacent to the proposed development

area. Therefore it appears that there are no Town-owned trees on the property.

The second local regulatory program for trees in the Town, is the Environmental Protection

Overlay District (EPOD) for Woodlot Protection. This program is part of the

Comprehensive Development Regulations, which governs certain uses and activities in

environmentally sensitive areas in the Town.

No Woodlot Protection Districts are mapped on the property.

The wooded areas of the site are characterized as deciduous woodlot edged by conifers.

The woodlot appears to be second growth trees and scrub with sparse canopy coverage.

The tree survey indicated that there are approximately 190 trees (5” in diameter at a four

foot height above ground) within the project area. The treed area is comprised of a mix

of black walnut, boxelder and spruce trees.

3.3.2 Wildlife

The wildlife resources observed on the site are reflective of the habitats present. The

woodlot is upland habitat with no evidence of permanent or temporary water required

to complete the life cycles of the majority of amphibians and reptiles typically found in

the area. The surrounding developed landscape poses threats to development of

amphibian and reptile life. Due to the long-term conditions in the woodlot and

surrounding area only one amphibian and three reptile species could possibly complete

150 Whole Foods Plaza DEIS Town of Brighton

their lifecycles now or in the future. If they are not present in the woodlot now they are

widespread in western New York.

It is unlikely that the woodlot is inhabited by mammals. Most mammal species prefer

more sloped terrain and habitat that is not surrounded residences and roadways. Some

mammals may occupy the woodlot currently and others undoubtedly move through it.

Among the 61 species of birds that might or do breed in the surrounding area, only 30

or so species might use the woodlot. All bird species are common to western New York

capable of moving in and out of the woodlot.

3.4 Transportation

3.4.1 Existing Traffic Conditions Analysis

The study area intersections include Monroe Avenue at Edgewood Avenue, the I-590 NB

and SB Ramps, the two existing Clover Lanes/Mario’s driveways, Clover Street,

Westfall/Allen’s Creek Roads, the existing Allen’s Creek Road/site driveway intersection,

the existing Clover Street/Pittsford Animal Hospital driveway, Clover Street/Shoreham

Drive, and Clover Street/Allen’s Creek Road. The intersections of Clover Street with

Warren Avenue and Towpath Lane, as well as the Allen’s Creek Road intersections with

Schoolhouse Lane, and Whitehouse Lane were also studied during the most critical PM

peak hour only.

Monroe Avenue (NYS Route 31) is an east/west route and is functionally classified as an

Urban Minor Arterial adjacent to the site. The segment of Monroe Avenue that fronts the

151 Whole Foods Plaza DEIS Town of Brighton

site consists of two eastbound through lanes and two westbound through lanes with a center

two-way left-turn lane. The speed limit along Monroe Avenue in front of the site is 35

miles per hour (MPH). According to the most recent traffic volume data collected by the

NYSDOT in 2009, the AADT along Monroe Avenue between Route 590 Outer Loop and

Route 65 is 40,890 vehicles per day (vpd). RTS Route 47 provides transit service along

Monroe Avenue within the study area.

Given the functional characteristics of the land uses proposed for the site (supermarket,

retail, commercial, and coffee shop), the peak hours selected for analysis are the weekday

commuter AM and PM peak hours and the Saturday midday peak hour.

Traffic counts were taken at all of the study intersections on various dates throughout 2014

and 2015 as detailed in the TIS. Seasonality was reviewed given varied data collection

dates and traffic counts were balanced to provide an average existing base conditions for

2015. 4.4.1A shows the 2015 Base Conditions.

Traffic volumes from 2010 were reviewed and compared to 2015 traffic volumes. Changes

in uses along Monroe Avenue, the general economy, and NYSDOT construction projects

all impact traffic volumes. Direct comparison of peak hour volumes at Monroe Avenue

and Clover Street indicate that the majority of the movements have increased between 2010

and 2015. The few that have decreased can be attributed to all of the previously mentioned

factors.

“Operational analyses of highways focus on the peak hour, because it represents the most

critical period for traffic operations and has the highest capacity requirements. The peak

152 Whole Foods Plaza DEIS Town of Brighton

hour volume, however, is not a constant from day to day, or from season to season.

Economic considerations in the planning and design of highways make it impractical to

design for the highest expected hourly volumes (e.g. Pre-Christmas). Instead a design

hourly volume (DHV) is typically selected from consideration of the specific relationship

between the percentage of annual average daily traffic and the highest hours of the year

given the functional class and operational characteristics of the route.” 1 Traffic volumes

vary from hour to hour and from day to day. Seasonal fluctuations in traffic volumes reflect

the social and economic activity of the area served by the highway 2 (e.g. Christmas related

retail activity). It has been found that the thirtieth highest hourly volume in one year

generally is the most suitable for design purposes. The NYSDOT typically uses the thirtieth

highest hour for the DHV in their own highway design. Studies indicate that the

relationship between the thirtieth highest hour and the annual average daily traffic remains

substantially unchanged from year to year. If an hourly value that represents more seasonal

volumes (e.g. pre-Christmas) is used for highway design, a sizable increase in design

requirements and highway construction costs may accommodate only a very few hours of

the year. For these reasons, pre-Christmas season traffic is typically not analyzed and

certainly not used for design purposes although it is recognized that traffic volumes,

particularly in the vicinity of retail facilities, will be higher during the few weeks prior to

Christmas.

Snow storage for the existing properties is currently accomplished by piling snow within

parking areas resulting in a reduction in the number of parking spaces available on-site.

1 Traffic Engineering Handbook, Institute of Transportation Engineers, 1992. 2 Transportation Engineering Planning and Design; Paquette, Radnor J., Ashford, Norman, Wright, and Paul H.; 1972.

153 Whole Foods Plaza DEIS Town of Brighton

Unsignalized Intersection Delay Study

A delay study was conducted at each of the unsignalized intersections in the study area.

Data collection occurred on Thursday, October 8 and 15, 2015 during the AM and PM peak

hours identified above. The following table summarizes the peak hour results of the delay

study.

TABLE 3.4.1-1: DELAY STUDY RESULTS

Allen’s Allen’s Clover/ Clover/ Clover/ Intersection/Approach Creek/ Creek/ Shoreham Towpath Warren Schoolhouse Whitestone AM PM AM PM AM PM AM PM AM PM Vehicles Exiting 7 7 33 16 40 23 52 22 58 42 17.57 5.71 8.06 19.8 12.08 9.70 26.5 AVG Stop Time (Seconds) 8 17.63 9 22.34 41.36 LOS (Based on AVG Stop A A C B C A C D C E Time) MAX Stop Time (Seconds) 46 16 48 69 61 41 63 85 137 152 AVG Queue 0.07 0.01 0.08 0.10 0.14 0.07 0.27 0.18 0.39 0.50 MAX Queue 1 1 2 3 3 1 3 2 3 4

The delay study indicates that on average left-turn traffic experiences level of service

(LOS) “C” or better during the AM peak hour and “E” or better during the PM peak hour.

Average queues were all less than one vehicle and maximum queues observed did not

exceed four vehicles.

Construction of the proposed Whole Foods Plaza redevelopment is anticipated to reach full

build-out in approximately two (2) years. Town of Brighton and Town of Pittsford officials

were contacted to discuss projects within the study area that are under construction and/or

approved. A Dunkin Donuts recently opened at 2787 Monroe Avenue and was included in

the existing conditions. No other projects were identified in the study area. To account for

normal increases in background traffic growth and any unforeseen developments in the

154 Whole Foods Plaza DEIS Town of Brighton

project study area, a growth rate of 1.0% has been applied to the base traffic volumes for

the two-year build-out period. Figure 4.4.1B shows the 2017 Background Conditions .

3.4.2 Traffic Operations

CAPACITY ANALYSIS

Capacity analysis is a technique used for determining a measure of effectiveness for a

section of roadway and/or intersection based on the number of vehicles during a specific

time period. The measure of effectiveness used for the capacity analysis is referred to as a

Level of Service (LOS).

Existing operating conditions during the weekday AM and PM and Saturday midday peak

study periods are evaluated to determine a basis for comparison with the projected future

conditions. Capacity results for the existing base conditions and future background

conditions (i.e. future traffic conditions including background growth without the proposed

Whole Foods Plaza redevelopment) are listed in Tables 3.4.2-1 and 3.4.2-2.

155 Whole Foods Plaza DEIS Town of Brighton

TABLE 3.4.2-1: CAPACITY ANALYSIS RESULTS – EXISTING & BACKROUND CONDITIONS UNSIGNALIZED INTERSECTIONS Existing Conditions 2017 Background Conditions Intersection AM PM SAT AM PM SAT Monroe Avenue/Clover Lanes Driveway Eastbound Left - Monroe B(14.7) C(22.0) C(15.9) B(15.0) C(23.1) n/a Southbound – Proposed Dwy D(28.4) F(74.3) F(*) C(17.2) F(78.5) n/a Monroe Avenue/Mario’s Driveway Eastbound Left – Monroe Avenue C(15.2) C(22.0) n/a B(15.0) C(23.1) n/a Southbound Right – Mario’s D’way C(17.4) D(25.3) n/a C(17.2) D(26.2) n/a Southbound Left – Mario’s D’way E(41.6) F(74.3) n/a E(41.3) F(78.5) n/a Allens Creek/Mario’s Egress Southbound Left – Allens Creek n/a B(10.1) A(7.9) n/a B(10.2) A(7.9) Westbound – Mario’s Egress n/a C(21.1) B(10.4) n/a C(21.8) B(10.3) Clover St/Pittsford Animal Hosp. Northbound Left – Clover Street A(8.3) A(8.6) A(8.8) A(8.3) A(8.6) A(8.8) Eastbound – Pittsford Animal Hosp. D(11.0) B(14.4) B(14.8) B(11.2) B(14.6) B(14.9) Clover Street/Shoreham Drive Southbound Left – Clover Street A(8.3) A(8.3) A(8.0) A(8.2) A(8.4) A(8.0) Westbound – Shoreham Drive C(17.9) C(15.4) C(17.3) C(15.4) C(15.6) C(17.4) Allen’s Creek/Whitestone Northbound – Whitestone - C(19.0) - - C(19.5) - Westbound Left – Allen’s Creek - A(9.1) - - A(9.1) - Clover St/Towpath Northbound Left – Clover Street - B(10.3) - - B(10.4) - Southbound Left – Clover Street - A(10.0) - - B(10.0) - Eastbound - Towpath - F(106.2) - - F(118.9) - Westbound – Driveway - C(20.6) - - C(21.5) - Clover St/Warren Ave Northbound Left – Clover Street - B(10.2) - - B(10.3) - Eastbound – Warren Ave - F(78.3) - - F(89.0) - Allen’s Creek/Schoolhouse Southbound – Schoolhouse - C(15.8) - - B(13.0) - Eastbound Left – Allen’s Creek - A(8.1) - - A(8.1) -

156 Whole Foods Plaza DEIS Town of Brighton

TABLE 3.4.2-2: CAPACITY ANALYSIS RESULTS – EXISTING & BACKGROUND CONDITIONS SIGNALIZED INTERSECTIONS 2017 Background Existing Conditions Intersection Conditions AM PM SAT AM PM SAT Monroe/Clover Eastbound Thru - D(38.2) D(40.7) D(35.7) C(28.8) D(41.8) D(35.8) Monroe Eastbound Right - A(1.1) B(10.1) A(4.0) A(1.1) B(10.5) A(3.8) Monroe Westbound Left - C(31.5) E(74.4) E(65.2) C(20.6) E(78.0) E(65.2) Monroe Westbound Thru/Right - C(26.5) C(25.1) B(18.9) C(20.0) C(25.6) B(19.3) Monroe Northbound Left - Clover D(38.2) E(68.8) E(56.6) D(39.3) E(74.1) E(56.3) Northbound Thru/right - C(32.8) E(56.9) D(51.0) C(32.3) E(58.6) D(50.7) Clover Southbound Left - Clover D(50.9) E(62.1) E(60.3) D(40.0) E(63.2) E(59.7) Southbound Thru/right - D(44.7) E(60.0) D(47.4) D(36.2) E(61.3) D(47.3) Clover Overall LOS (delay) C(33.0) D(39.6) C(34.1) C(28.1) D(41.0) C(34.1) Monroe/I-590 NB Eastbound - Monroe A(5.0) B(10.3) A(7.4) A(4.9) B(10.5) A(6.4) Westbound Thru - A(3.2) A(3.2) A(3.0) A(2.7) A(3.3) A(2.1) Monroe Westbound Right - A(1.1) A(1.7) A(1.0) A(1.9) A(1.8) A(1.2) Monroe Northbound Left - I-590 D(46.5) D(52.0) D(51.8) D(52.0) D(52.0) D(51.8) NB Northbound Right - I-590 C(24.5) E(57.2) D(45.8) C(20.0) E(60.1) D(48.4) NB Overall LOS (delay) A(8.2) B(15.2) B(10.9) A(7.9) B(15.8) B(10.7) Monroe/I -590 SB (Exit

2B Ramp) Eastbound Thru - A(2.1) B(13.3) B(11.3) A(2.7) B(13.8) C(25.3) Monroe Westbound Left - D(39.8) C(24.1) C(21.2) D(42.0) C(23.5) C(26.8) Monroe Westbound Thru - A(0.1) A(0.2) A(0.2) A(0.2) A(0.2) A(0.2) Monroe Northbound - I-590 SB A(2.2) C(21.9) C(22.4) A(1.2) C(22.5) C(23.0) Overall LOS (delay) A(4.4) B(11.2) A(9.8) A(4.5) B(11.5) B(14.5)

157 Whole Foods Plaza DEIS Town of Brighton

Monroe/Westfall/Allens

Creek Eastbound Left - Monroe A(9.0) B(11.9) A(4.7) B(11.1) B(14.0) A(4.7) Eastbound Thru/Right - B(16.3) B(18.3) B(11.0) B(17.8) C(25.4) B(11.0) Monroe Westbound Left - B(12.5) B(13.7) A(5.5) B(14.0) B(14.0) A(5.5) Monroe Westbound Thru/Right - B(16.6) B(19.1) B(10.7) B(19.9) B(19.4) B(10.7) Monroe Northbound - Westfall C(22.2) C(33.2) C(25.5) B(19.6) C(33.6) C(25.5) Southbound Left/Thru - D(40.2) D(48.3) E(57.6) D(44.1) D(51.0) E(57.6) Allens Creek Southbound Right - A(4.9) A(5.2) A(9.1) A(4.7) A(5.2) A(9.1) Allens Creek Overall LOS (delay) B(19.0) C(22.3) B(13.9) C(20.9) C(24.5) B(13.9) Monroe/Edgewood Eastbound - Monroe A(4.1) A(5.1) A(3.6) A(4.8) A(5.2) A(3.6) Westbound - Monroe A(5.5) A(7.0) A(3.8) A(6.8) A(7.2) A(3.8) Northbound - Edgewood E(55.4) E(60.9) D(44.5) D(37.2) E(65.6) D(44.5) Southbound – Meadow C(21.0) C(29.5) C(23.6) B(17.8) C(29.8) C(23.6) Overall LOS (delay) B(12.6) B(11.3) A(6.7) B(10.5) B(11.9) A(6.7) Clover/Allen’s Creek Eastbound Left – Allen’s C(28.1) C(20.3) B(10.8) C(24.1) C(21.1) B(10.8) Creek Eastbound Thru/Right – B(14.2) C(31.0) B(10.5) B(13.5) C(33.3) B(10.8) Allen’s Creek Westbound Left – Allen’s B(13.4) E(73.6) B(12.1) B(13.1) F(103.5) B(12.1) Creek Westbound Thru/Right – C(21.1) B(14.9) B(10.9) C(20.8) B(15.1) B(10.9) Allens Creek Northbound Left - Clover B(15.9) B(13.7) A(7.1) B(15.0) B(13.8) A(7.5) Northbound Thru/right - B(16.6) C(21.6) A(8.3) B(14.5) C(21.8) A(8.5) Clover Southbound Left - Clover B(14.6) B(14.5) A(7.0) B(13.5) B(14.5) A(7.3) Southbound Thru/right - C(24.2) C(25.3) A(9.2) C(23.7) C(25.7) A(9.6) Clover Overall LOS (delay) B(19.8) C(26.5) A(9.6) B(18.9) C(28.8) A(9.9)

158 Whole Foods Plaza DEIS Town of Brighton

3.5 Land Use and Zoning

Monroe Avenue in the project site vicinity is an important commercial corridor connecting

the Town of Brighton to metropolitan Rochester and eastern suburbs. Approximately 600

feet east of the project site Monroe Avenue connects with Clover Street, Route 590

connects with Monroe Avenue at the western project limits and Allens Creek Road

connects with Monroe Avenue approximately1600 feet west of the project site.

The Monroe Avenue corridor in the project site vicinity are developed as commercial,

retail, and office uses. Large retail complexes are located approximately 3500 feet east of

the project site along the Monroe Avenue corridor within the Town of Pittsford. Areas

north and south of the Monroe Avenue commercial corridor are developed as residential

neighborhoods.

The properties on Monroe Avenue are split zoned. The site includes 7.04+/- acres located

in the BF-2 General Commercial Zoning District and 3.09 +/- acres located in the RLA

Residential- Low Density District adjacent to the north. Of the 3.09 acres in the RLA

District, a 2.2 acre area will be acquired from the First Baptist Church ("Church"). The

lands to be acquired from the Church extend to Clover Street. Only a limited portion of this

RLA property immediately adjacent to the Mario's and Clover Lanes parcels are proposed

to be developed. The RLA zoning is proposed to be maintained.

Figure 3.5.1 depicts an alternative development plan that conforms to current zoning laws

and ordinances. This alternate development plan does not reflect the goals of the Project

Sponsor or future intended tenants.

159 Whole Foods Plaza DEIS Town of Brighton

The proposed development seeks to meet the goals and recommendations of the Town’s

2000 Comprehensive Plan. The proposed plan will provide a revitalized commercial

development in a high intensity commercial district. This redevelopment will encourage

redevelopment along this section of Monroe Avenue from Clover Street to the I-590

Expressway. Increasing property values and in turn property tax revenue for the local

stakeholders is a vital benefit to the residents of the Town. Further details on the goals and

recommendations of the Town’s 2000 Comprehensive Plan are contained in Appendix 2

of this DEIS.

An Open Space Index is included in Appendix 2. The proposed project is not located in a

designated open space.

The residential neighborhoods to the north and east of the proposed development site are

traditional homes, most in the 2000-3000 square foot range built between 1930 and 1960.

The neighborhoods are well established with significant tree growth and well insulated

from the commercial development that has taken place consistently over the past 60 years.

Very little undeveloped land remains in these areas.

160 Whole Foods Plaza DEIS Town of Brighton

Table 3.5-1 – Land Use Summary BF-2 ZONING DISTRICT

PERMITTED USES NOT EXCEEDING 20,000 S.F.: • Offices • Consumer Services • Instructional Studios & Fitness Centers • Self Service Laundries • Retail Sales of Non Food Items

CONDITIONAL USES: • Neighborhood Convenience Centers, Community Shopping Centers & Single Use Retailers Occupying more than 20,000 s.f of Floor Area. • Specialty Food Stores • Restaurants • Drive Thru Facilities • Outdoor Dinning • Banks • ATMs • Commercial Recreation Facilities • Outdoor Storage • New Auto Sales • Hotels/ Motels • Animal Hospitals / Kennels • Dry Cleaners • Nursing Homes / Daycare Centers • Cultural Facilities • Places of Worship

161 Whole Foods Plaza DEIS Town of Brighton

RLA ZONING DISTRICT

PERMITTED USES: • Single Family Dwellings (1 per Lot) • Municipal Use Buildings • Family Childcare

CONDITIONAL USES: • Places of Worship • Private Non Profit Educational Facilities • Golf Courses • Fire Station • Daycare Centers • Comfort Care • Home Occupations

3.5.1 Density Analysis Study

The Monroe Avenue Corridor Density Analysis study was conducted to analyze the

density of construction and development along the Monroe Avenue Corridor,

encompassing the major retail development areas along the corridor in the Town of

Brighton. Further details of the Density Analysis Study are contained in Appendix 17 of

this DEIS.

Each major developed area was analyzed separately by calculating the total acreage of

land and total constructed square footage within said acres of development. Town and

County records were used to verify calculations. Included in the exhibits of this study are

maps showing each area analyzed with the specific areas outlined in yellow. Each map is

labeled on the upper right corner to correspond with the title on the attached density chart

analysis.

162 Whole Foods Plaza DEIS Town of Brighton

This study was conducted using the total property acreages of each parcel per Town and

county maps. The subject property borders a residential area which may affect the code

calculation depending on who and how those calculations are computed. The intent of this

study is to view an understandable and clear picture of construction density within the

Brighton Monroe Avenue corridor using a standard technique addressing each parcel and

property consistently by dividing the constructed square feet by the area of land.

The basic development codes (certain uses may vary) of Brighton allow for construction

density of 10,000 square feet (SF) of construction per acre; or a “Density” of

approximately 23% of the usable land. The results of the study conclude that each of the

major areas of development along the Monroe Avenue corridor represent substantially

more construction than the basic codes of Brighton allow. The average density for all the

developments studied within the Town of Brighton was approximately 11.9% above code.

The Whole Foods Plaza subject property falls under the Town’s average density as it will

be only 3.2% above code. Property density in Brighton will have a lowering effect on the

overall density calculations within the Town of Brighton down from 11.9% to 9.8% when

including the Whole Foods Plaza subject calculations.

In conclusion, this study finds that the subject property falls well within acceptable density

standards when comparing it to neighboring developments. This study finds that the

subject property will have one of the lowest density calculations compared to all the major

neighboring developments.

163 Whole Foods Plaza DEIS Town of Brighton

3.6 Community Services

Energy needs for the Whole Foods Plaza redevelopment project will be supplied by private

suppliers. Upgrades to the electrical or natural gas delivery system in the immediate project

area will be made by the energy supplier and/or the project sponsor. Adequate energy

supplies to meet the anticipated project demands are available.

The adequacy of the public sewer and potable water supply systems to serve the project

have been evaluated by Costich Engineering and its report with findings are contained in

Appendix 6 of this DEIS. A summary of the existing capacities is provided in this section.

3.6.1 Water Service

The proposed development is to be served by public water supply system. The public water

system is owned and operated by the Monroe County Water Authority (MCWA). A 12

inch diameter MCWA owned watermain exists within the Monroe Avenue Right-Of-Way.

Additionally an 8 inch diameter MCWA owned watermain exists at the northern portion

of the site. A 20 inch distribution main runs through the development site. Both the 12

inch and 8 inch watermains are connected to the 20 inch watermain. Due to the proximity

to the connections to the 20 inch distribution main water pressure and flow rates in the

project area is similar. Hydrant test flow data supplied by the MCWA is summarized in

Table 3.6.1-1.

164 Whole Foods Plaza DEIS Town of Brighton

Table 3.6.1-1 Hydrant Test Flow Data Summary Hydrant #837 Static Pressure 75 psi Observed Flow 1193 gpm Flow @ 20 PSI 4356 gpm Hydrant #262 Static Pressure 79 psi Observed Flow 1371 gpm Flow @ 20 PSI 5864 gpm

Further details on Water Distribution Record Mapping and Hydrant Test Flow Data are

contained in Appendix 6 of this DEIS.

3.6.2 Sanitary Sewer

The proposed development is to be served by pubic sanitary sewers. The public sewer

system is owned and operated by the Town of Brighton. Sewer discharges are conveyed

to the Monroe County Department of Environmental Services (Pure Waters) trunk sewer

which conveys sewage to the Van Lare Wastewater treatment facility.

An 8 inch diameter Town of Brighton owned sewer line exists within the Monroe Avenue

Right-Of-Way and at the northern property boundary. The sanitary sewer on Monroe

Avenue is approximately 11 feet deep. The depth of the Monroe Avenue sewer is sufficient

for connection of the proposed buildings. The Monroe Avenue sewer has a full flow

capacity of approximately 600 gallons per minute (gpm). The Monroe Avenue sewer is a

clay tile sewer. The Town of Brighton sewer department has indicated that they

experienced issues regarding the condition of the sewer on Monroe Avenue and have asked

that the design of the proposed sewer system redirect flows from the Monroe Avenue sewer

to the sewer system north of the site. Table 3.6.2-1 summarizes the existing sewer sizes,

materials and capacities.

165 Whole Foods Plaza DEIS Town of Brighton

An 8 inch diameter Town of Brighton owned sewer line exists at the north-west corner of

the Mario’s Restaurant property. The sewer flows to the west to the sewer on Allen Creek

Road. The sewer is approximately 10 feet deep. The depth of the sewer is sufficient for

connection of the proposed buildings. The sewer has a full flow capacity of approximately

420 gpm. The sewer is a polyvinyl chloride sewer.

Table 3.6.2-1 Sanitary Sewer Summary Monroe Avenue 8 inch Clay Tile Full Flow Capacity – 600 gpm Service Drive 8 inch SDR-35 Full Flow Capacity – 420 gpm

Further details on the sanitary sewer capacities is contained in Appendix 6 of this DEIS.

It is concluded that the existing utility infrastructure pose no restrictions to the proposed

redevelopment for sanitary sewer collection and water systems will adequately

accommodate the project’s needs.

3.6.3 Private Utilities

An 8 inch Rochester Gas and Electric (RG&E) owned gas main exists along the south side

of Monroe Avenue within the right of way. Overhead electric, telephone and cable

television lines exist along the east and west side of Monroe Avenue. Overhead electrical

lines exists along the eastern property border. The redevelopment site is currently served

by public utilities. There are no capacity issues with the existing private utility

166 Whole Foods Plaza DEIS Town of Brighton

infrastructure system affecting the ability to serve the project. Figure 2.2.1E, Site Utility

Plan depicts the private utility locations. Further detail on private utilities and the

Adequacy of Utility Infrastructure is contained in Appendix 6 of this DEIS.

3.6.4 Police

The project area is served by the Brighton Police Department. The Monroe County Sheriff

provides additional police service. The Brighton Police Department is located in the

Brighton Town Hall Complex located at 2300 Elmwood Avenue. The Town Police

Department consists of 40 sworn officers and 9 civilians as stated in the 2014 Brighton

Police Department's annual report.

3.6.5 Fire

The Brighton Fire District provides the fire protection in the project area. The Fire

District is a professional, publicly funded fire department. The nearest fire station is

located at Twelve Corners, less than 2 miles to the west.

3.6.6 Ambulance

Brighton Volunteer Ambulance Corp., located at Westfall Road and Winton Road,

provides emergency medical services, transports, training in CPR and acts as a source for

information and materials for those who are sick or injured.

3.6.7 Educational Services

The project area is served by the Brighton Central School District. The School District is

funded by property taxes, along with Monroe County sales tax revenue and State aid.

167 Whole Foods Plaza DEIS Town of Brighton

3.6.8 Health Care Services

The project area is served by Strong Memorial Hospital. The Hospital is funded

privately.

3.6.9 Current Town and School Taxes

The Whole Foods Plaza redevelopment lands are assessed Town of Brighton Property

Taxes, Monroe County Property Taxes, and Brighton Central School district Taxes. The

properties combined tax bill is approximately $191,000 annually. Figure 3.6.9-1

summarizes the existing property taxes for the redevelopment lands.

Figure 3.6.9-1 Existing Property Tax Summary

The retail operations pay applicable New York State Sales Taxes. Tax revenues generated

by the current business operations are approximately $658,000 annually. Figure 3.6.9-

summarizes the existing sales tax revenues taxes for the redevelopment lands.

Figure 3.6.9-2 Existing Sales Tax Summary Existing 8% Tax Rate Commerce

Mario’s $ 396,300.00 Clover Lanes $ 96,300.00 Salvatores’ Pizza $ 40,000.00 Elaine’s Antiques $ 10,000.00 Mamasan’s $ 116,300.00 $ 658,000.00

168 Whole Foods Plaza DEIS Town of Brighton

3.6.10 Recreational

The site is currently home to a section of the trail system known as the Auburn Trail.

Formally an active rail bed, this property was owned by Rochester Gas and Electric and

conveyed to the adjacent property owners. The conveyance included three distinct

easements, one for a ten foot wide pedestrian easement to the Town of Brighton, One as

an access easement from Clover Lanes property through the Mario's property, through the

Executive Square Office property and to Allen's Creek Road and One for RG&E as a

maintenance easement for the utilities still located along the property. The Auburn Trail

through the existing site is primarily undefined. The existing easement covers portions of

the rear of the site which include paved and unpaved portions of the site. Figure 2.3.3B

depicts the existing trail condition.

3.6.11 Sidewalks

Sidewalks where constructed on the south side of Monroe Avenue in 2014 as part of the

Monroe Avenue redevelopment by the New York State Department of transportation and

the I-590 / Monroe Avenue alignment. Sidewalks on the north side of Monroe Avenue

from the I-590 interchange to Clover Street where constructed by the project sponsor as

part of the Mario's Restaurant development in 1994. Those sidewalks end at the Clover

Lanes site. The proposed development will continue sidewalks to the Pittsford Animal

Hospital property at which point the New York State Department of Transportation plans

to continue them to Clover Street. The project sponsor will coordinate with NYSDOT in

the development of these sidewalks. Additionally the proposed development will link

sidewalk from the north and south sides of the road via a new crosswalk at the proposed

signalized intersection at Monroe Avenue and Whole Foods Plaza.

169 Whole Foods Plaza DEIS Town of Brighton

3.7 Visual and Cultural Resources

3.7.1 Visual

A visual impact analysis has been completed or the Whole Foods Plaza redevelopment

project. The process utilized for the visual assessment consisted of identification of the

physical/visual limits of the affected environment and development of a 3D visual model

of the project site and use of the model to create photo simulations and cross-sections.

Monroe Avenue in the project site vicinity is an important commercial corridor connecting

the Town of Brighton to metropolitan Rochester and eastern suburbs. Approximately 600

feet east of the project site Monroe Avenue connects with Clover Street, Route 590

connects with Monroe Avenue at the western project limits and Allens Creek Road

connects with Monroe Avenue approximately1600 feet west of the project site.

The Monroe Avenue corridor in the project site vicinity are developed as commercial,

retail, and office uses. Large retail complexes are located approximately 3500 feet east of

the project site along the Monroe Avenue corridor within the Town of Pittsford. Areas

north and south of the Monroe Avenue Commercial corridor are developed as residential

neighborhoods.

The site to be redeveloped encompasses approximately 10.1 acres of property from four

(4) properties. The redevelopment properties are the current Mario's Italian Restaurant

parcel (at 2740 Monroe Avenue, with tax identification number 137.19-2-70.32), the

Clover Lanes Bowling parcel (at 2750 Monroe Avenue, with tax identification number

150.07-2-8.11), the Mamasan's Restaurant parcel (at 2800 Monroe Avenue, with tax

170 Whole Foods Plaza DEIS Town of Brighton

identification number 150.07-2-7.1), and a 2.2 +/- acre portion of lands of the First Baptist

Church (at Allen’s Creek Road, with tax identification number 137.19-2.68.1) which

adjoins the Mario’s Restaurant parcel. Figure 2.1.2 depicts the properties to be

redeveloped. Figure 3.7.1 depicts the views of the project from the Monroe Avenue

Corridor. Figures 4.7.7 through 4.4.7H depict the views of the project from the surrounding

area.

The Mario’s Restaurant, Clover Lanes and Mamasan’s buildings are all single story

buildings with a prominent roadway presence. Large parking areas serving each building

existing between the buildings and roadway. Little screening of the buildings and parking

areas exist.

3.7.2 Historical and Archeological

The proposed new development will encompass 9 acres, plus or minus “area of

disturbance” and improve the existing but undesirable section of the Auburn Trail. The

project is located in an area designated as sensitive for archaeological sites and is located

within 5 miles of the Erie Canal Heritage Trail. Although past study of this area do not

indicate this site as an area of archaeological importance, a review by the New York State

Office of Parks, Recreation and Historic Preservation (OPRHP) was requested. The

OPRHP has conducted their review and found that the project will have no impact on

archeological and/or historic resources listed in or eligible for the New York State and

National Registers of Historic Places. Appendix 4 includes the documentation and findings

letter from the OPRHP.

171 Whole Foods Plaza DEIS Town of Brighton

3.8 Noise

A detailed noise study has been conducted for the property. Existing noise producing

sources within the project area consist of vehicular traffic, retail operations and overhead

airplanes. Existing ambient noise levels were measured at five (5) locations around the

perimeter of the proposed project, with a primary focus on the bordering residential

neighborhoods.

The ambient noise measurement surveys were found to have noise levels consistent with

typical land uses in suburban settings for both daytime and nighttime periods. The daytime

and nighttime noise levels do not vary significantly. The variation between daytime and

nighttime noise levels is between 3 – 4 dBA. The primary noise generator within the study

area is from traffic. Table 3.8-1 summarizes the existing ambient noise levels. Further

details on the existing noise levels and the noise evaluation are contained in Appendix 13

of this DEIS.

Table 3.8-1 Existing Ambient Noise Level Summary Sample Daytime Noise Sample Nighttime Level dBA Noise Level dBA Location 7 am to 11 pm 7 am to 11 pm (hi peak) (hi peak) School House Lane 48 (72) 44(66) First Baptist Church 46 (56) 43(50) 2229 Clover Street 45(55) 42(50) 2230 Clover Street 46(71) 42(46) Shoreham Drive 47(72) 42(60)

172 Whole Foods Plaza DEIS Town of Brighton

3.9 The Auburn-Rochester Railroad, Auburn Trail and Access

Easements

Most of the northern border of the proposed site is part of what was the Auburn Rochester

Railroad bed. This area has been historically used as a railroad, utility run, The Auburn

Trail and vehicular access. This section will give the history of this area and how it came

to become what it is today.

3.9.1 The Auburn-Rochester Railroad

The Auburn-Rochester Railroad in the Rochester, NY area that was in use from 1840 to

1960. Its name was the Rochester Auburn Railroad, presumably named after its

endpoints. It started on the east side of Rochester (originally the village of Brighton) and

travelled out of Town through Brighton, Pittsford, Victor, Farmington, and then down to

Canandaigua, where part of the line is still in use. Shortly after 1960, the property that

was the Auburn-Rochester Railroad was transferred to the local utility, now known as

Rochester Gas and Electric. Much of it is now a hiking/biking trail; some of it is

maintained by local groups, other parts by Rochester Gas and Electric, for access to their

utility lines. Some parts are not maintained. Figure 2.3.3B depicts the existing Auburn

Trail condition at the rear of the property.

173 Whole Foods Plaza DEIS Town of Brighton

4.0 Environmental Impacts and Mitigation

4.1 Geology, Topography and Soils

Impacts

The redevelopment proposal will result in the disturbance of approximately 9.4 +/- acres

of the 10.1 acre redevelopment site. The redevelopment proposal will increase the

impervious surface areas for buildings and pavement areas by approximately 1.0 +/- acre.

The existing buildings and pavements will be removed to facilitate regrading of the site,

construction of building foundations and the installation of utility infrastructure and

stormwater management facilities. The general site topography of the site is to be

maintained. Regrading of the site is to be performed to provide positive drainage of the

pavement surfaces, provide ADA accessibility throughout the site and to minimize the

amount of materials to be imported.

The grading plan developed for the site provides for a balanced earthwork approach with

respect to the overall finished grades of the existing site and the proposed redevelopment.

Figure 2.2.1F depicts the proposed redevelopment area grading plan.

Cut and fill operations for grading is limited across the site to less than five feet except in

the rear of the property where a small portion of the existing gravel parking lot and

surrounding area will be filled up to nine feet to create adequate and reasonably level

parking areas meeting ADA accessibility guidelines. Grades along the existing Monroe

Avenue Right-of-Way will be maintained. While grading of the site will occur over the

majority of the site, the impacts of the grading will generally be limited to visual impacts.

The end result of the grading operations will result in a site similar in to the existing

174 Whole Foods Plaza DEIS Town of Brighton

condition. Visual impacts are discussed in Section 4.8 of this DEIS.

The grading work will require the removal of the existing structures, removal of unsuitable

fills, and then regrading of the site. As outlined in the Geotechnical Evaluation the fill

within the proposed Whole Foods and primary retail building contain organics and debris

which do not allow the soil to be used within the future building areas. The unsuitable fill

within these proposed building footprints is estimated to be 15,491 cubic yards of soil. The

unsuitable fill will be hauled off the site and disposed of in a legal manor.

To reduce the quantity of material imported and exported from the site, existing pavements

will be rubblized and stockpiled for reuse as fills. Existing crushed stone subbase material

will also be stockpiled for reuse/augmentation of proposed pavement subbase materials.

The stormwater management system for the project will include subsurface detention

piping network will generate approximately 4,094 cubic yards of fill material for general

site work balancing. Further details on earthwork volumes are contained in Appendix 11

of this DEIS.

Topsoil striping is limited to a relatively small area of the site consisting of areas adjacent

to Monroe Avenue Right-of-Way and the rear of the property. Topsoil stripped from the

site will be stockpiled which will be reclaimed and redistributed in landscape areas to a

minimum depth of 6-inches. Additional topsoil will be brought into the site to

accommodate the additional greenspace that is included in the plan as needed.

Material removed from the site as necessary for the construction of the footings by hauling

175 Whole Foods Plaza DEIS Town of Brighton

to a receiving site using “over the road” truck transport. No impacts are anticipated from

this other than typical construction traffic. Depending on weather and soil conditions, a

truck wheel wash area will be maintained on-site in order to minimize sediment build-up

on Monroe Avenue. Material will be exported from designated stockpile locations on the

site and overseen by the Owner’s Representative. Imported material will be hauled on-site

via “over the road” truck transport. The import operation will occur in the early stages of

construction to establish grades and to be consistent with construction phasing. No impacts

are anticipated from this other than typical construction traffic.

The site configuration minimizes the amount of site clearing to be performed at the rear of

the property. Approximately 0.5+/- acres of wooded area is to be cleared to facilitate

separation of the Auburn Trail from the parking and roadway areas of the redevelopment.

Implementation of the access management plan will result in a disturbance of

approximately 1.0 +/- acres. Implementation of the access management plan will result in

the transfer of approximately 0.5 +/- acres of land from ownership by the State to private

ownership. Implementation of the access management plan will result in an increase in

approximately 0.2 +/- acres of additional impervious surface area for pavements.

Earthwork operations associated with the implementation of the plan are primarily

earthwork cutting operations associated with boxing out for pavement areas and

development of the subsurface stormwater management facility. Development of the

access management plan results in average cuts of 1-2 feet to establish positive drainage.

Approximately 372 cubic yards of topsoil is to be stripped from areas to be developed for

pavements. Approximately 1,114 cubic yards of subsurface soils are to be cut from the

site to establish the pavement subbase elevations and construction of the subsurface

176 Whole Foods Plaza DEIS Town of Brighton

stormwater detention system. Topsoil stripped from the site will be stockpiled which will

be reclaimed and redistributed to a minimum depth of 6-inches. Excess topsoil resulting

from development of the access management improvements will be transported to the

Whole Foods Plaza redevelopment area to supplement any topsoil needs for restoration of

disturbed areas. Figure 2.2.1H depicts the grading/utility plan for the access management

area. Further details on earthwork volumes are contained in Appendix 11 of this DEIS.

The primary potential impact due to site topography is the potential for soil erosion and

downstream sedimentation. Erosion control measures are to be implemented at the

perimeter of the site with attention given to down- gradient areas of all disturbed areas to

minimize the transport of sediment off-site. Sedimentation basins will be constructed with

temporary diversion swales to treat and convey stormwater runoff. Stormwater inlets and

proposed filter and engineered soil planting areas will be protected with silt fencing or

other barriers until such time that landscaping is established and other site coverage

complete. A stabilized contraction access will be provided and if warranted by weather

conditions, a truck wheel wash area will be maintained on-site in order to minimize

sediment build-up on Monroe Avenue. Exposed soils will be wetted as necessary to avoid

windblown dust erosion. Figure 2.2.1B depicts the erosion control measures to be

implemented for the redevelopment site. Figure 2.2.1C depicts the erosion control

measures to be implemented for the access management areas. Further detail on erosion

control measures are contained in Section 4.2 and Appendix 19 of this DEIS.

The construction of the trail system will involve earth moving and clearing of some

vegetation as shown in the plan. In this process, grading and construction of retaining walls

will occur near the northern property line closest to the residential neighborhoods. This

177 Whole Foods Plaza DEIS Town of Brighton

construction will take place with special attention to time of day and length of the

construction period as to mitigate the adverse impact on the neighbors.

Construction operations for the Whole Foods Plaza redevelopment project is expected to

be completed in a single phase approximately eighteen (18) months. The anticipated

construction duration for the redevelopment is expected to have an eighteen (18) month

duration. To ensure the construction of the access management improvements, the project

sponsor proposes that they be allowed to provide an assurance bond to the Town as part of

these approvals.

The anticipated sequence of construction commences with demolition of the existing

structures that are Mario's Restaurant, Clover Lanes Bowling Center and Mamasan's

Restaurant.

Demolition operations for the structures will be followed by general earthwork operations.

Mass earthwork for the site will be completed in a single phase which will include

rubblization of existing pavement surfaces for reuse, removal of unsuitable soils within the

proposed building footprints and replacement with select fills and establishing the general

lines and grades for the development of the parking areas and building pads. Mass

earthwork operations will be followed by utility infrastructure improvements for sanitary,

storm, water, gas and electric. Upon completion of the utilities infrastructure and on- site

fire protection, construction of the new buildings will commence. A five acre waiver will

be sought to allow for the mass grading to be performed in a single phase disturbing more

than five acres at one time.

178 Whole Foods Plaza DEIS Town of Brighton

The existing main access point on Monroe Avenue for the Mario’s and Clover Lanes

facilities will serve as the stabilized construction access during the initial stages of the

redevelopment construction operations. Access to the site during construction will be

limited including the re-routing and fencing off of the Auburn Trail to the north on the site

and the sidewalks along Monroe Avenue.

The installation of the traffic signal will be coordinated with the New York State

Department of Transportation and will occur during the initial site work stage of

construction, although the signal will be installed, it will most likely not be operational

until the new Whole Foods Plaza is close to completion. Construction of the site access

points and utility connections within the Monroe Avenue right-of-way will require the

implementation of a Maintenance and Protection of Traffic (MPT) plan. The MPT plan

will be developed in accordance with NYSDOT requirements and will require review and

approval from the NYSDOT. The MPT plan developed for the site will provide specific

consideration to minimize the impacts of construction vehicle traffic during the peak hour

of roadway traffic.

It is expected that the 50,000 square foot Whole Foods building will be constructed first,

followed by the remaining three structures. The Whole Foods building will require 7-9

months to complete the internal buildout of the grocery store making it likely that the

grocery store and adjoining retail stores will open at roughly the same time or within 6

months of each other. The site construction should be completed before any retail store

opens to the public with only inside buildout construction remaining thereafter.

179 Whole Foods Plaza DEIS Town of Brighton

Mitigation

The primary potential impact due to site topography is the potential for soil erosion and

downstream sedimentation. The preventative and mitigation measures for erosion control

planned for the project will meet or exceed those specified in the NYS DEC Stormwater

Design Manual, NY Guidelines for Urban Erosion and Sediment Control, and New York

State Department of Transportation clean road control measures. New York State

Department of Environmental Conservation Erosion Control requirements will be

implemented at the perimeter of the site with attention given to down- gradient areas of all

disturbed areas to minimize the transport of sediment off-site. Sedimentation basins will

be constructed with temporary diversion swales to treat and convey stormwater runoff.

Stormwater inlets and proposed filter and engineered soil planting areas will be protected

with silt fencing or other barriers until such time that landscaping is established and other

site coverage complete. Exposed soils will be wetted as necessary to avoid windblown

dust erosion.

Import and/or export of material will be accomplished through a stabilized construction

entrances. Re-graded slopes will be stabilized / reseeded in accordance with DEC

guidelines. Maintenance of erosion control measures will be the responsibility of the

project sponsor and their contractors. The erosion control measures will be depicted on

the erosion control plan and stormwater Pollution Prevention Plan (SWPPP). Inspections

will be constructed in accordance with DEC guidelines. This construction will take place

with special attention to time of day and length of the construction period as to mitigate the

adverse impact on the neighbors. Figures 2.2.1F and 2.2.1H depict the Erosion Control

Plan for the Plaza redevelopment area and access management areas.

180 Whole Foods Plaza DEIS Town of Brighton

The impacts associated earthwork operations are mitigated through the development of

grading schemes for the plaza area and access management areas that minimize the change

of proposed surface elevations from existing surface grades and that tie back into existing

surface grades as rapidly as practical. Material import to the site is minimized through the

reclamation of existing pavement surfaces and subbase material as general fill.

Development of the subsurface stormwater management facilities creates earthen fill that

can be utilized as general earth fills for areas outside the building areas requiring structural

fills.

Further mitigation to reduce the impact of the quantity of cuts and fills to be performed for

the redevelopment site include the examination of alternative building foundation designs

to reduce the quantity of unsuitable soil to be removed from the site and import of select

fill within the building pad footprints for the Whole Foods and primary retail facility.

4.2 Surface Waters /Stormwater Management

Impacts

The proposed development will result in a decrease in the stormwater discharge rates for

the redevelopment site and access management areas. Overall impervious surface area for

the Whole Foods Plaza redevelopment site will increase by approximately 1.0 +/- acres.

Overall impervious surface area for the access management plan area will increase by

approximately 0.2 +/- acres. Stormwater runoff rates and water quality will be improved

through the implementation of stormwater management facilities. Drainage patterns for

the site will be improved by modifying drainage conditions where portions of the site shed

stormwater onto the adjacent residential properties to the north of the project.

181 Whole Foods Plaza DEIS Town of Brighton

The two (2) primary discharge points, located along Clover Street, for the 40.8 acre

drainage basin are to be maintained. Stormwater surface runoff discharging to these points

will continue to flow to the unnamed tributary to Allens Creek north of the site.

Stormwater discharge patterns for the redevelopment site will be altered. Stormwater

discharge to the swale at the northern end of the redevelopment site will be will be

eliminated by the project. Figure 4.2.2 depicts the development site drainage areas and

discharge points.

Overall stormwater discharge rates from the redevelopment site and access management

areas will be reduced from the existing stormwater flow rates in accordance with Town

Code Section 215. The hydraulic design reductions were based on the drainage area for

the project being classified as a tertiary watercourse, as such the developed 10-year storm

event runoff rates are reduced to the predeveloped 2-year storm event runoff rates. All

other storm event runoff rates for the developed storm events are held to the corresponding

predeveloped runoff rates.

Stormwater discharge rates to the stormwater piping network on Monroe Avenue will be

decreased as a result of the grading scheme for the access management plan which results

in a decrease in areas draining to the roadway system.

Pollutant loading rates for stormwater runoff will be decreased for the project area drainage

basin.

182 Whole Foods Plaza DEIS Town of Brighton

DEVELOPED CONDITIONS

The redevelopment site drainage analysis evaluated the stormwater run-off of the

approximately 10.13± acre development area on a located at 2740/2750/2800 Monroe Ave,

and 175 Allen’s Creek Road. The proposed impervious percentage for the redevelopment

site drainage basin is approximately 76%.

For analysis purposes, the redevelopment drainage area was broken up into three (3) sub-

areas. Delineated sub-drainage areas can be described as follows:

Developed drainage area 1a (D-1a) is the main drainage shed which will collect the

majority of the developed site which will be directed to sub-surface detention area SD-1a.

The drainage shed consists primarily of parking fields for the development and the

proposed Whole Foods building. The area is comprised of approximately 5.08 acres, with

a curve number of 93 and a time of concentration of 0.091 hours.

Developed drainage area 1b (D-1b) consists of the area immediately northeast of the

proposed 32k SF retail facility and parking field north east of the Whole Foods building

which will be collected via catch basins and filter strips before being directed to sub-surface

detention area SD-1b. The area is comprised of approximately 2.93 acres, with a curve

number of 97 and a time of concentration of 0.083 hours (minimum).

Developed drainage area 2 (D-2) consists of a portion the proposed Whole Foods building

and pervious strip which all discharges to the swale running along the western portion of

the site. The area is comprised of approximately 0.82 acres, with a curve number of 94

183 Whole Foods Plaza DEIS Town of Brighton

and a time of concentration of 0.083 hours (minimum). Figure 4.2.2 depicts the developed

condition drainage areas for the redevelopment site.

Table 4.2-1 summarizes the redevelopment site un-detained developed peak flow rates for

the drainage areas (before stormwater management facility routing).

Table 4.2-1 – Redevelopment Site Un-detained Peak Discharge Rates

Drainage Area Q1 Q2 Q10 Q25 Q50 Q100

(cfs) (cfs) (cfs) (cfs) (cfs0 (cfs) D-1a (5.08 acres) 13.4 15.7 24.2 28.1 31.9 34.2 D-1b (2.93 acres) 9.1 10.4 15.3 17.5 19.6 21.0 D-2 (0.82 acres) 2.3 2.7 4.1 4.7 5.3 5.7 Total (10.1 acres) 24.8 28.8 43.6 50.3 56.8 60.9

All supporting data and calculations used to derive the un-detained developed peak flow

rates can be found in Appendix 19.

Stormwater runoff from the development will be treated by proposed source control surface

features before being conveyed to centralized stormwater management facilities. The

stormwater management facility will provide 1 through 100-year storm event peak flow

attenuation for the site in the form of underground detention. Design and construction

criteria conform to the “New York State Department of Environmental Conservation’s

Phase II Stormwater Rules” and the “New York State Stormwater Management Design

Manual”, dated January 2015 in association with “SPDES General Permit for Stormwater

Discharges from Construction Activity”, dated January, 2015 (GP-0-15-002).

Peak stormwater runoff rates for the redevelopment site will be attenuated though the use

184 Whole Foods Plaza DEIS Town of Brighton

of a subsurface stormwater detention facilities. The subsurface stormwater detention

facilities will be comprised of a closed system of oversized piping within the parking fields

for the site.

Table 4.2-2 – Redevelopment Site Detained Peak Discharge Rates

Q1 Q2 Q10 Q25 Q50 Q100

(cfs) (cfs) (cfs) (cfs) (cfs0 (cfs) Existing 26.5 30.5 45.1 51.9 58.5 61.9 Proposed Un-detained 24.8 28.8 43.6 50.3 56.8 60.9 Proposed Detained 7.0 8.6 17.8 24.5 39.5 48.4 Net Reduction 19.5 21.9 27.3 27.4 19.0 13.5

For analysis purposes, the access management drainage area was evaluated as a single

drainage area.

Table 4.2-3 summarizes the access management area un-detained developed peak flow

rates for the drainage area (before stormwater management facility routing).

Table 4.2-1 – Access Management Area Un-detained Peak Discharge Rates

Drainage Area Q1 Q2 Q10 Q25 Q50 Q100

(cfs) (cfs) (cfs) (cfs) (cfs0 (cfs) Total (0.6 acres) 1.89 2.24 3.5 4.08 4.65 4.99

All supporting data and calculations used to derive the un-detained developed peak flow

rates can be found in Appendix 19.

Peak stormwater runoff rates for the access management area will be attenuated though the

use of a subsurface stormwater detention facility. The subsurface stormwater detention

facility will be comprised of a closed system of oversized piping within the parking fields

for the access management area.

185 Whole Foods Plaza DEIS Town of Brighton

Table 4.2-4 – Access Management Area Detained Peak Discharge Rates

Q1 Q2 Q10 Q25 Q50 Q100

(cfs) (cfs) (cfs) (cfs) (cfs0 (cfs) Existing 1.92 2.24 3.5 4.08 4.65 4.99 Proposed Un-detained 1.89 2.24 3.5 4.08 4.65 4.99 Proposed Detained 0.32 0.36 0.57 0.70 0.86 0.98 Net Reduction 1.57 1.88 2.93 3.38 3.79 4.01

Water Quality And Channel Protection Volumes

In keeping with the goals of the NYSDEC Stormwater Pollution Prevention Control and

SPDES General Permit GP-0-15-002 associated with long term development, in order to

meet pollutant removal goals, runoff reduction and source control practices are to be

implemented to provide at least minimum required Runoff Reduction volume. The basin

has also been designed pursuant to the current NYSDEC Stormwater Management Design

Manual. In order to meet pollutant removal goals, site appropriate practices have been

implemented for the required water quality volume (WQv) for the site. Runoff Reduction

volume have been provided via green infrastructure practices wherever practical. In

addition to the water quality volume and also pursuant to the New York State Design

Manual, the channel protection volume (CPv) requirements will be met.

Stormwater quality measures are being provided for the Whole Foods Plaza redevelopment

site in accordance with the NYS-DEC Chapter 9 – Redevelopment project criteria. The

stormwater management plan proposes that a minimum of 25% of the water quality volume

(WQv) from the disturbed area is captured and treated by the implementation of standard

water quality practices. The following standard practices are to be employed for the Whole

Foods Plaza redevelopment area:

186 Whole Foods Plaza DEIS Town of Brighton

• Disconnection of Roof Top Areas (Area Reduction Practice)

• Permeable Pavement (Area Reduction Practice)

• Bioretention (Treatment Practice)

The combined practices provide approximately twice the volume of storm water quality

measures. The redevelopment area has a WQv requirement of 8,989 cubic feet.

Disconnection of a portion of the Whole Foods building roof and the 6,300 square-foot

retail building reduce the WQv required to 7,162 cubic feet. Approximately 22,842 square-

feet of permeable pavement is to be constructed which further reduces the WQv required

to 5,369 cubic feet. The filter bed sizing required to provide 5,369 cubic feet of WQv is

4,474 square-feet. The redevelopment proposal provides 9,400 square-feet of filter bed

area.

An evaluation of the redevelopment site and access management areas has been performed

to assess the pollutant loading for the stormwater runoff from the project areas. Pollutant

loadings for Total Suspended Solids (TSS), Total Phosphate (TP), and Bacteria

Concentration were calculated. Tables 4.2-5, 4.2-6, 4.2-7, & 4.2-8 summarize the

stormwater pollutant loading and reductions for the project area.

187 Whole Foods Plaza DEIS Town of Brighton

Table 4.2-5 –Stormwater Runoff Post Development Pollutant Loads – No Treatment Pollutant Treatment Needed Total Suspended Solid 5039.14 lb/yr Yes Total Phosphate 21.02 lb/yr Yes Bacteria Concentration 6128.55 Billion yes Colonies Table 4.2-6 –Stormwater Runoff Post Development Pollutant Loads – Post Treatment Pollutant Treatment Needed Total Suspended Solid 28.35 lb/yr no Total Phosphate 2.84 lb/yr no Bacteria Concentration 612.85 Billion no Colonies

Table 4.2-7 –Stormwater Runoff Post Development Pollutant Loads – Load Removal in Treatment Pollutant Total Suspended Solid 5010.79 lb/yr Total Phosphate 18.18 lb/yr Bacteria Concentration 5515.69 Billion Colonies

Table 4.2-8 –Stormwater Runoff Post Development Pollutant Loads – Reduction in Pollutant Loading from Existing Conditions Pollutant Total Suspended Solid 3328.72 lb/yr Total Phosphate 10.8 lb/yr Bacteria Concentration 3574.00 Billion Colonies

188 Whole Foods Plaza DEIS Town of Brighton

Full details on the pollutant calculation parameters and methodology are contained in the

Costich Engineering report in Appendix 19.

Stormwater runoff from snow storage and ice melting operations is captured in the inlets

within the parking fields and filter area at the north of the site and are treated for water

quality by the proposed stormwater management practices.

Green infrastructure practices to be implemented include, preservation of undisturbed

areas, development within less sensitive areas, disconnection of roof areas, vegetated filter

areas, permeable pavement, and subsurface detention. Stormwater runoff for the

redevelopment project will be collected through inlets and subsurface collection piping and

conveyed by a closed piping network to a network of subsurface detention piping.

Discharge rates from the collection system will be controlled through the use of outlet

piping sizing and orifice plates to result in decreased runoff rates for the redevelopment

project from the existing site conditions. Figure 2.2.7 depicts the locations of the proposed

green infrastructure practices. Figures 4.2.2 & 4.2.2A depict the proposed outlet control

structure configurations to be employed for the subsurface stormwater detention facility to

attenuate stormwater runoff rates for the redevelopment site and access management area.

Erosion And Sediment Control Measures

All erosion and sediment control measures will be designed in accordance with the “New

York State Standards and Specifications for Erosion and Sediment Control.” The site

contractor shall adhere to all erosion and sediment control measures. All temporary

measures will be installed as outlined in construction documents to control any potential

189 Whole Foods Plaza DEIS Town of Brighton

pollutants leaving the construction site.

Temporary stabilization practices for this site include siltation fence, stone and block inlet

protection in paved areas, filter fabric drop inlet protection of new inlets, stone filter check

dam(s) and a stabilized construction entrance.

Permanent stabilization practices for this site include new pavement, crushed stone and

final seeding of all lawn areas.

Mitigation

A stormwater management plan has been developed in accordance with the current

NYSDEC stormwater management design manual, Irondequoit Drainage Basin

Collaborative, and Town Code Requirements.

The stormwater management practices reduce pollutant loading and peak flow rates for the

project area. Stormwater quality is improved through pretreatment filter areas and a

subsurface detention network. Filter areas include engineered soil, stone edge

treatments and plantings. The subsurface detention network will consists of a series

of interconnected oversized storm piping which connects to the filter areas, drainage inlets

and outfall locations. Two (2) primary detention bed areas are planned to serve the

redevelopment. Stormwater quality measures are being provide for the access management

areas by means of permeable pavement and a bioretention filter area. Stormwater runoff

rate attenuation for the access management area is being provided by means of a subsurface

stormwater detention system.

190 Whole Foods Plaza DEIS Town of Brighton

Permanent stabilization practices for this site include new pavement, crushed stone and

permanent seeding of all lawn areas.

Sequence Of Major Activities

The contractor will be responsible for implementing all erosion control and stormwater

management control measures. The contractor may designate these tasks to certain

subcontractors as he sees fit, but the ultimate responsibility for implementing these

controls and ensuring their proper functioning remains with the contractor. A detailed

order of activities will be provided with final construction documents.

The developed drainage areas are shown on the Developed Drainage Area Maps figures

4.2.2 and 4.2.2B and in Appendix 19. Under developed conditions, the majority of the

developed site, and all new impervious areas will be treated for runoff reduction by green

infrastructure practices wherever practical (as consistent with NYSDEC SWDM Chapter

5: Green Infrastructure Practices, and Chapter 9: Redevelopment Projects). Stormwater

for developed areas will be collected using drainage inlets and directed to centralized

underground detention areas (see conceptual detention areas on Developed Drainage Area

Map). All site discharges will be temporarily detained and attenuated to below existing

conditions at all proposed discharge points.

The developed drainage shed has been evaluated to determine specific discharge points for

various portions of the site. Delineated sub-drainage areas can be described as follows:

191 Whole Foods Plaza DEIS Town of Brighton

4.3 Terrestrial and Aquatic Ecology

Impacts

The Whole Foods Plaza redevelopment will result in the removal of approximately 0.5

+/- acres of trees/scrubland vegetation. The implementation of the access management

plan will result in the removal of approximately 0.4 acres of scrubland. The disturbed

areas do not represent significant wildlife habitat.

4.3.1 Woodlots and Trees

Within the approximately 0.5 +/- acre treed area of the Whole Foods Plaza

redevelopment area approximately ninety-one (91) trees whose trunks are greater than

five (5) inches in diameter at a height of four (4) feet above the ground are to be removed

associated with construction of parking areas and the Auburn Trail upgrades. Of the

ninety-one (91) trees to be removed forty (40) of the trees are black walnut trees, twenty

(20) of the trees are spruce trees and the remaining trees are a mix of box elder, butternut,

sumac, and ash trees.

Within the approximately 0.4 +/- acres area to be disturbed for the implementation of

the access management plan only scrub growth is to be removed, and will have no

impact on woodlots and trees.

Construction of the Whole Foods Plaza includes the redevelopment of the Auburn Trail.

This redevelopment will preserve most of the buffer that currently exists between the

commercially zoned site and the residential district to its north.

192 Whole Foods Plaza DEIS Town of Brighton

Further details on the tree survey and trees to be removed are contained in Appendix 12

of this DEIS.

The Tree Inventory (Appendix 12) shows and quantifies the loss of trees. Figures 2.2.8,

the proposed Landscaping Plan, shows the buffer that will be preserved and where

necessary, reconstructed. There is very little other vegetation that acts as screening or

buffering. That which is removed will be replaced with comparable and more effective

screening.

4.2.1 Wildlife

Within the project area wildlife habitat for mammals, reptiles and amphibians will not be

effected. The project will result in the loss of scrubland area which provides habitat for

birds.

The proposed stormwater runoff reductions for the redevelopment site and access

management areas will have no impact adverse impacts on woodlots, trees, and wildlife

habitat. The stormwater management facility improvements to be implemented for the

project will decrease stormwater pollutant loading on downstream areas. Further details

on the runoff reductions and pollutant loadings are contained in Section 4.2 of this DEIS.

Mitigation

To mitigate for the loss of some trees in the construction of the Auburn Trail, the Project

Sponsor proposes to properly establish ground cover and plant trees on the site per the

landscape plan and 2.5”to 3” caliper in size. The landscaping plan for redevelopment

193 Whole Foods Plaza DEIS Town of Brighton

proposal includes the installation of approximately 175 trees, of which approximately

54 are within the existing wooded area of the site. The end result will be more vegetation

on the site than currently exists. The implementation of a conservation easement on the

1 acre parcel that borders Clover Street, will act as a legally protected and forever wild

buffer area. The establishment of the Auburn trail through this section of commercial

district protected by a legal pedestrian easement to the Town of Brighton, will forever

preserve the boundary between the commercial and residential district.

The landscape plantings proposed for the project will help to serve as additional habitat

for birds. The loss of the scrubland area does not affect the overall environment for the

birds. All bird species are common to western New York capable of moving in and out

of the woodlot.

4.4 Transportation

Compliance with the Town of Brighton Monroe Avenue Corridor Community Vision

Plan, February 2011

The Town of Brighton’s Community Vision Plan, driven by community residents,

merchants, local Steering Committee, and crafted in conjunction with the Rochester

Regional Community Design Center (RRCDC), envisions the following for this section of

Monroe Avenue per the February 2011 Vision Plan Report:

• Provide for pedestrian and bicycle friendly area

• Improve sidewalks and crossings

• Provide improved tree lawns and green buffer

• Enhance commercial districts and provide cohesion

194 Whole Foods Plaza DEIS Town of Brighton

• Establish area as a recognizable major gateway to the Town

• Improve circulation

• Create a parking strategy

• Provide a safe environment for all modes of transportation

• Improve street lights, overhead utilities, and improved landscape

• Develop green spaces

• Mitigate hardscaping

In order to realize this vision, a Monroe Avenue – East End Plan was developed that

includes these principal strategies:

Planted Median – introduce landscaped medians;

Redevelopment Support – reorganize parking and traffic flow to allow for rear lot

access road roads for new development and redevelopment;

Reduce Curb Cuts – promote cross access and shared parking

Crosswalks – introduce a safe way for pedestrians to cross Monroe Avenue

A key solution noted in the Vision Plan, that facilitates many of these principal design

strategies involves the creation of a new signalized intersection within this section that

allows both safe side road ingress and egress for customers, as well as safe pedestrian

crossing.

The Vision Plan calls for future build out and interconnection of properties along both the

north and south sides of Monroe Avenue between I-590 and Clover Street. The Whole

Foods Plaza redevelopment project will unite many of the properties along the north side

195 Whole Foods Plaza DEIS Town of Brighton

of Monroe Avenue, and provide cross access and a centralized ingress/egress point.

The Vision Plan shows properties along the south side of Monroe Avenue with a

frontage/rear lot access road network that connects the properties and consolidates

driveways along Monroe Avenue. The Whole Foods Plaza redevelopment plan presents an

opportunity to significantly accelerate the advancement of the overall Vision Plan with

unified access, circulation and parking with potentially a new traffic signal on Monroe

Avenue. The new signal would be located on the alignment with the existing Sakura Home

driveway. It is likely that six of the existing properties on the south side of Monroe Avenue

would be able to develop cross access between the properties to gain access to the new

signal immediately. Over time, four additional properties could connect to the signal.

Traffic related to properties on the south side of Monroe Avenue is included in the

background traffic volumes. Nationally accepted ITE trip generation information was used

to estimate driveway volumes for properties on the south side of Monroe Avenue for the

purpose of analyzing traffic entering and exiting the properties at a single access point

opposite the Whole Foods Plaza redevelopment. It is anticipated that traffic on the south

side of Monroe Avenue will follow travel patterns similar to the Whole Foods Plaza

redevelopment traffic.

Description of Proposed Development

The Proposed Action (Alternative 1) for the proposed Whole Foods Plaza Redevelopment

includes the following land uses: a 50,000 square-foot supermarket (Whole Foods), a 2,000

square-foot coffee shop (Starbucks with drive-thru window – relocated from the NE corner

at Clover Street), and two buildings (6,300 square-foot and 31,700 square-foot) that will

196 Whole Foods Plaza DEIS Town of Brighton

include various specialty retail type uses. There is an additional 3,900 square-foot of

mezzanine space for the Whole Foods. This space will be utilized by store customers and

employees for seating and office purposes and is not expected to add to the trip generation

for the overall store hence it was not included in trip generation calculations. The proposed

site encompasses the lands currently occupied by Mario’s Italian Restaurant, Clover Lanes,

and Mamasan’s Restaurant. The existing uses will be eliminated and/or relocated

elsewhere.

Access to the site under the redevelopment proposal (Alternative 1) will be provided by

existing/relocated driveways as follows:

• Main Signalized Driveway located approximately on current Clover Lanes Driveway

alignment opposite Sakura Home;

• Restricted Whole Foods driveway (located approximately on existing Mario’s

Driveway alignment) – Right In, Left In, Right Out Only.

Site Traffic Generation

The next step in the evaluation is to determine the additional traffic attributable to the

development as defined, vehicle trips entering and exiting the site. Trip Generation, 9th

Edition is used as a reference for this information.

Inherent in the trip generation estimate for the proposed development, is the “multi-use”

traffic component of traffic entering and exiting the site. According to the Institute of

Transportation Engineers, Trip Generation Handbook, 2004, “…a multi-use development

is typically a single real-estate project that consists of two or more ITE land use

197 Whole Foods Plaza DEIS Town of Brighton

classifications between which trips can be made without using the off-site road system. In

addition, for certain types of developments, the total number of trips generated is

different from the amount of new traffic added to the adjacent highway network by the

generator. Retail and service-oriented developments (such as supermarkets, coffee shops,

and shopping centers) often locate adjacent to busy streets in order to attract the motorists

already passing the site on the adjacent street. These sites attract a portion of their trips

from traffic passing the site. The “pass-by” traffic refers to the amount of existing traffic

already on the roadway adjacent to the site that, as it “passes by” the site, will enter the

site driveways to patronize the project site.

The combination of “multi-use” and “pass-by” trips has the net result of reducing the

volume of new traffic that is added to the site driveways and/or adjacent roadways. Table

4.4-1 shows the total site generated trips, pass-by trips, driveway trips, and resulting

primary trips that are added to the existing highway system for full development of the

project under the Preferred Plan. A total of eight alternative site plans have been

evaluated. Trip generation for each alternative is summarized in the TIS.

TABLE 4.4-1: SITE GENERATED TRIPS W/TRIP ADJUSTMENTS

AM Peak PM Peak SAT Peak Land Use Size Enter Exit Enter Exit Enter Exit Whole Foods Supermarket 50,000 SF 105 65 238 228 310 298 Starbucks Coffee Shop 2,000 SF 103 98 43 43 85 84 Specialty Retail 38,000 SF 34 10 63 76 63 76 Total Unadjusted Trips 242 173 344 347 458 458 Multi -use Trips -12 -9 -17 -17 -23 -23 Pass -by Trips -98 -85 -124 -123 -152 -150 Total Primary Trips 132 79 203 207 283 285

LL DEVELOPMENT VOLUMES

198 Whole Foods Plaza DEIS Town of Brighton

The distribution of traffic entering and exiting the Whole Foods Plaza redevelopment is

based upon several parameters, including the following:

• Proximity and access to I-590;

• Location of nearby employment and residential areas;

• Access drive locations;

• Existing highway network;

• Existing traffic patterns; and

• Existing traffic conditions and controls

The projected design hour traffic volumes were developed for the weekday AM and PM

and Saturday midday peak hours by combining the 2017 background traffic conditions with

the full build out volumes for the Whole Foods Plaza redevelopment. In addition,

connections on the south side of Monroe Avenue are also evaluated.

The future traffic conditions generated by the proposed development were analyzed to

assess the operations of the intersections in the study area. Capacity analysis results for the

2017 Background Conditions and future full development conditions for the

redevelopment project (Alternative 1) are listed in Tables 4.4-2 and 4.4-3. The discussion

following the tables summarizes capacity conditions.

199 Whole Foods Plaza DEIS Town of Brighton

TA BL E 4 . 4 - 2 : CAPACITY ANALYSIS RESULTS – UNSIGNALIZED INTERSECTIONS

Redevelopment Project (Alt 2017 Background 1) Full Development Intersection Conditions Conditions AM PM SAT AM PM SAT Monroe Avenue/Mario’s Driveway Eastbound Left – Monroe Avenue B(15.0) C(23.1) n/a C(17.6) D(28.6) D(30.1) Southbound Right – Mario’s D’way C(17.2) D(26.2) n/a C(20.2) E(38.1) F(52.6) Southbound Left – Mario’s D’way E(41.3) F(78.5) n/a n/a Allens Creek/Mario’s Egress Southbound Left – Allens Creek n/a B(10.2) A(7.9) n/a B(11.9) A(8.3) Westbound – Mario’s Egress n/a C(21.8) B(10.3) n/a D(31.8) B(11.5) Clover St/Pittsford Animal Hosp. Northbound Left – Clover Street A(8.3) A(8.6) A(8.8) A(8.3) A(8.6) A(8.8) Eastbound – Pittsford Animal Hosp. B(11.2) B(14.6) B(14.9) B(11.0) B(14.6) B(14.9) Clover Street/Shoreham Drive Southbound Left – Clover Street A(8.2) A(8.4) A(8.0) A(8.4) A(8.4) A(8.0) Westbound – Shoreham Drive C(15.4) C(15.6) C(17.4) C(18.5) C(15.7) C(18.4) Allen’s Creek/Whitestone Northbound – Whitestone - C(19.5) - - C(20.1) - Westbound Left – Allen’s Creek - A(9.1) - - A(9.2) - Clover St/Towpath Northbound Left – Clover Street - B(10.4) - - B(10.5) - Southbound Left – Clover Street - B(10.0) - - B(10.2) - Eastbound - Towpath - F(118.9) - - F(*) - Westbound – Driveway - C(21.5) - - C(24.2) - Clover St/Warren Ave Northbound Left – Clover Street - B(10.3) - - B(10.5) - Eastbound – Warren Ave - F(89.0) - - F(107.0) - Allen’s Creek/Schoolhouse Southbound – Schoolhouse - B(13.0) - - B(13.2) - Eastbound Left – Allen’s Creek - A(8.1) - - A(8.2) -

200 Whole Foods Plaza DEIS Town of Brighton

TA BL E 4 . 4 - 3 : CAPACITY ANALYSIS RESULTS – SIGNALIZED INTERSECTIONS

Redevelopment Project (Alt 2017 Background 1) Full Development Conditions Intersection Conditions AM PM SAT AM PM SAT Monroe/Clover Eastbound Thru - C(28.8) D(41.8) D(35.8) C(31.6) D(52.6) D(42.7) Monroe Eastbound Right - A(1.1) B(10.5) A(3.8) A(1.2) B(11.1) A(5.1) Monroe Westbound Left - C(20.6) E(78.0) E(65.2) C(23.5) F(87.3) E(78.3) Monroe Westbound Thru/Right - C(20.0) C(25.6) B(19.3) C(21.5) C(26.1) C(21.1) Monroe Northbound Left - Clover D(39.3) E(74.1) E(56.3) D(49.9) E(77.6) E(63.9) Northbound Thru/right - C(32.3) E(58.6) D(50.7) D(36.8) E(58.8) D(54.3) Clover Southbound Left - Clover D(40.0) E(63.2) E(59.7) D(44.8) E(68.0) E(66.8) Southbound Thru/right - D(36.2) E(61.3) D(47.3) D(39.6) E(66.9) D(51.2) Clover Overall LOS (delay) C(28.1) D(41.0) C(34.1) C(32.5) D(45.5) D(38.6) Monroe/Proposed Driveway Eastbound Left - Monroe B(15.0) C(23.1) n/a B(19.2) C(24.6) C(27.2) Eastbound Thru - - - - A(8.7) A(5.2) A(8.3) Monroe Westbound Left - - - - A(6.9) F(*) F(*) Monroe Westbound Thru/Right - - - - A(7.0) C(22.4) D(42.2) Monroe Northbound Left – South - - - E(71.1) D(46.9) D(46.6) Side Dwy Northbound Thru/right – - - - A(0.3) B(12.2) A(0.4) S. Side Dwy Southbound Left - C(17.2) F(78.5) n/a D(50.9) F(*) F(*) Proposed Dwy Southbound Right - - - - B(18.2) A(4.5) A(9.0) Proposed Dwy Overall LOS (delay) - - - B(11.0) C(25.4) D(43.0)

201 Whole Foods Plaza DEIS Town of Brighton

Monroe/I-590 NB Eastbound - Monroe A(4.9) B(10.5) A(6.4) A(6.6) B(10.4) B(10.9) Westbound Thru - A(2.7) A(3.3) A(2.1) A(4.8) A(2.6) A(1.2) Monroe Westbound Right - A(1.9) A(1.8) A(1.2) A(0.9) A(1.3) A(0.7) Monroe Northbound Left - I-590 D(52.0) D(52.0) D(51.8) D(46.5) D(52.0) D(51.8) NB Northbound Right - I-590 C(20.0) E(60.1) D(48.4) C(28.3) E(65.2) D(52.1) NB Overall LOS (delay) A(7.9) B(15.8) B(10.7) A(9.5) B(16.1) B(12.4) Monroe/I -590 SB (Exit

2B Ramp) Eastbound Thru - A(2.7) B(13.8) C(25.3) A(7.9) B(14.3) B(12.5) Monroe Westbound Left - D(42.0) C(23.5) C(25.8) D(38.6) C(26.5) C(24.4) Monroe Westbound Thru - A(0.2) A(0.2) A(0.2) A(0.2) A(0.3) A(0.3) Monroe Northbound - I-590 SB A(1.2) C(22.5) C(23.0) A(4.6) C(23.7) C(24.5) Overall LOS (delay) A(4.5) B(11.5) B(14.5) A(6.3) B(11.9) B(10.6) Monroe/Westfall/Allens

Creek Eastbound Left - Monroe B(11.1) B(14.0) A(4.7) B(13.5) B(13.4) A(4.4) Eastbound Thru/Right - B(17.8) C(25.4) B(11.0) C(25.0) C(20.5) A(9.7) Monroe Westbound Left - B(14.0) B(14.0) A(5.5) B(15.9) B(18.6) A(4.0) Monroe Westbound Thru/Right - B(19.9) B(19.4) B(10.7) C(21.5) C(27.5) A(6.2) Monroe Northbound - Westfall B(19.6) C(33.6) C(25.5) C(24.2) C(31.8) C(21.2) Southbound Left/Thru - D(44.1) D(51.0) E(57.6) D(43.8) E(70.5) E(68.7) Allens Creek Southbound Right - A(4.7) A(5.2) A(9.1) A(4.7) A(5.1) A(8.5) Allens Creek Overall LOS (delay) C(20.9) C(24.5) B(13.9) C(23.5) C(27.0) B(12.0) Monroe/Edgewood Eastbound - Monroe A(4.8) A(5.2) A(3.6) A(4.6) A(5.4) A(4.0) Westbound - Monroe A(6.8) A(7.2) A(3.8) A(6.0) A(7.4) A(4.3) Northbound - Edgewood D(37.2) E(65.6) D(44.5) D(43.2) E(56.0) D(44.5) Southbound – Meadow B(17.8) C(29.8) C(25.9) B(19.8) C(29.3) C(23.6) Overall LOS (delay) B(10.5) B(11.9) A(6.6) B(10.8) B(11.0) A(6.9)

202 Whole Foods Plaza DEIS Town of Brighton

Clover/Allen’s Creek Eastbound Left – Allen’s C(24.1) C(21.1) B(10.8) C(26.7) C(24.0) B(12.5) Creek Eastbound Thru/Right – B(13.5) C(33.3) B(10.8) B(13.8) D(37.5) B(12.9) Allen’s Creek Westbound Left – Allen’s B(13.1) F(103.5) B(12.1) B(13.3) F(*) B(13.8) Creek Westbound Thru/Right – C(20.8) B(15.1) B(10.9) C(21.0) B(15.5) B(11.6) Allens Creek Northbound Left - Clover B(15.0) B(13.8) A(7.5) B(15.2) B(14.0) A(8.0) Northbound Thru/right - B(14.5) C(21.8) A(8.5) B(14.5) C(21.4) B(10.3) Clover Southbound Left - Clover B(13.5) B(14.5) A(7.3) B(13.7) B(14.5) A(7.7) Southbound Thru/right - C(23.7) C(25.7) A(9.6) C(24.3) C(26.0) B(12.6) Clover Overall LOS (delay) B(18.9) C(28.8) A(9.9) B(19.4) C(31.9) B(12.0) Notes: B(10.6) = Level Of Service (delay in seconds per vehicle) N/A = Approach does not exist/was not analyzed during this condition. F(*) = Delays greater than two minutes per vehicle

Synchro Calibration and Queuing Analysis

The Synchro model was calibrated to reflect existing conditions. A queuing analysis of the

most critical PM commuter peak hour period is included for comparison purposes. The

NYSDOT approval letter indicates that the new signal would need to be coordinated with

other signals in corridor to minimize queuing impacts. NYSDOT also states “For the best

overall operation of the Route 31 corridor, the proposed traffic signal would need to be

coordinated with the existing signals to the west at certain times of day, and to the east at

others. This means that at certain times of the day, the proposed traffic signal will need to

operate at a very long cycle length which offsets the reduction of delay of development

traffic that a signal provides.” Table 4.4-4 summarizes the PM peak hour queuing analysis

results for 2017 Background and the Redevelopment Project (Alt 1) conditions.

203 Whole Foods Plaza DEIS Town of Brighton

TA BL E 4 . 4 - 4 : QUEUING ANALYSIS RESULTS* – PM PEAK HOUR

2017 Redevelopment Project Intersection Background (Alt 1) Full Development Conditions Conditions Monroe/Clover Eastbound Thru - Monroe 616’ 615’ Eastbound Right - Monroe 450’ 450’ Monroe/Proposed Driveway Eastbound Left - Monroe 225’ 124’ Eastbound Thru - Monroe 204’ 233’ Westbound Left - Monroe 96’ 212’ Westbound Thru/Right - Monroe 151’ 614’ Monroe/I -590 NB Eastbound Thru - Monroe 152’ 171’ Westbound Thru - Monroe 172’ 121’ Northbound Left - I-590 NB 180’ 138’ Northbound Right - I-590 NB 225’ 291’ Monroe/I -590 SB Eastbound Thru - Monroe 170’ 142’ Westbound Left - Monroe 204’ 136’ Northbound - I-590 SB 293’ 318’

* Maximum queues from Simtraffic analysis in feet

Impacts and Mitigation

The peak hour capacity analysis results indicate that in general, most of the approaches at

the study intersections will operate similar to 2017 Background Conditions with a new

traffic signal at the proposed driveway. Following are discussions of operating conditions

at locations where there are decreases in levels of service.

1. Monroe Avenue at Clover Street

Currently traffic exiting properties on the north side of Monroe Avenue experience such

great difficulty making a left turn onto Monroe Avenue during peak hours, that the majority

of motorists (approximately 90%) choose to turn right onto Monroe Avenue instead and

use Allens Creek Road to access Clover Street southbound and then either continue south

204 Whole Foods Plaza DEIS Town of Brighton

on Clover Street or turn left onto Monroe Avenue at the Clover Street signal. This is

evidenced by existing traffic counts at the driveways. Installing a signal at the Monroe

Avenue driveway will alter this travel pattern by allowing motorists to turn left directly

onto Monroe Avenue (thereby avoiding Allens Creek Road and the segment of Clover

Street between Allens Creek Road and Monroe Avenue) shortening their travel time by

two and a half minutes and the distance traveled by almost one mile.

During the AM peak hour, the northbound thru/right turn movement experiences a 4.5

second increase in delay resulting in a change in LOS from “C” to “D”. The westbound

left turn movement from Monroe Avenue to Clover Street is expected to decrease from

LOS “E” to “F” during the PM peak hour with a moderate increase in delay of 9.3 seconds

per vehicle. During the Saturday peak hour, the westbound through/right turn movement

on Monroe Avenue will decrease from LOS “B” to “C” with a small increase in delay of

1.8 seconds per vehicle.

2. Monroe Avenue at the Proposed Signal

Even with the proposed traffic signal in place, traffic exiting the proposed site will

experience delays during the peak hours as more green time will be provided to Monroe

Avenue traffic to minimize queueing and delays for Monroe Avenue traffic. Left turns

exiting the proposed site will operate at LOS “D” and “F” with long delays during the PM

and Saturday peak hours. It is noted, however, that the new signal will provide significant

benefits to properties along the south side of Monroe Avenue while providing a much safer

entrance and exit for the properties along both sides of Monroe Avenue. Northbound lefts

will operate at LOS “E” during the AM peak hour (primarily a result of Dunkin Donuts

traffic) and “D” during the PM and Saturday peak hours.

205 Whole Foods Plaza DEIS Town of Brighton

In addition, the new signal will create gaps in eastbound traffic providing properties along

the south side of Monroe Avenue to the east of Dunkin Donuts additional gaps in traffic to

facilitate safer and more efficient ingress and egress.

3. Monroe Avenue at Westfall-Allen’s Creek Roads

During the AM peak hour, the eastbound through movement decreases from LOS “B” to

“C” with a decrease in delay of 7.2 seconds per vehicle. The westbound through/right turn

and the northbound approach also decrease from LOS “B” to “C” during the AM peak hour

as a result of borderline conditions and small increases in delay. During the PM peak hour,

the westbound through/right turn movement will decrease from “B” to “C” with an increase

in delay of 8.1 seconds per vehicle and the southbound left turn/through movement will

decrease from LOS “D” to “E”.

Clover Street at Allen’s Creek Road

During the PM peak hour the eastbound through/right turn movement is expected to

decrease from LOS “C” to “D” due to a borderline condition with a small increase in delay

of 4.2 seconds per vehicle. The Northbound thru/right turn and the southbound

through/right turn movements will decrease from LOS “A” to “B” during the Saturday

peak hour.

The new traffic signal will be coordinated with others in the corridor as determined by

NYSDOT.

206 Whole Foods Plaza DEIS Town of Brighton

Queuing Discussion

The PM peak hour capacity and queuing analysis results indicate that in general, most of

the approaches at the study intersections will operate similar to ETC conditions or better

with a new traffic signal at the proposed driveway. Following are two exceptions to this

generalization:

1. Westbound Monroe Avenue at the Proposed Signal

Maximum westbound queuing on Monroe Avenue is expected to reach approximately

614’. The distance between the westbound stop bar at the proposed signal and the west side

of the Clover Street intersection is approximately 750’. Therefore queuing at the proposed

traffic signal is not expected to impact operations at the Clover Street intersection.

2. Northbound Right Turn from I-590 ramp to Monroe Avenue

This movement will be minimally impacted by additional queuing on Monroe Avenue that

will result from the new traffic signal. The capacity analysis indicates that the delay will

increase less than six (6) seconds per vehicle for the northbound right turn movement

during the PM peak hour. The queuing analysis indicates a corresponding increase in queue

length of 66’ with a maximum queue of 291’. Given the length of the off ramp (over 1,100’)

there is more than sufficient storage on the ramp to accommodate potential future queuing

without concern for spillback onto the I-590 mainline.

Warren Avenue Traffic Evaluation and Potential for Neighborhood Cut-Through

Traffic

An origin and destination study (license plate survey) was conducted to determine the

volume of eastbound and westbound traffic that travels along Warren Avenue without

207 Whole Foods Plaza DEIS Town of Brighton

stopping at one of the homes. The data collection occurred from 4:45 and 5:45 PM on

Thursday October 15, 2015. The last four digits of each license plate were recorded during

the peak hour at each location. Matches between the locations indicate vehicles that are

traveling through on Warren Avenue from one end to the other. All of the license plate data

is attached.

The license plate survey indicated that 21 out of 58 total vehicles that traveled eastbound

during the PM peak hour were through traffic and 23 out of 62 vehicles that traveled

westbound during the PM peak hour. This indicates that approximately 36% of the

eastbound traffic and 37% of the westbound traffic is through traffic during the PM peak

hour.

The proposed Whole Foods Plaza redevelopment is not expected to significantly impact

the volume of through traffic during the PM peak hour.

Cut-through traffic on nearby residential streets is unlikely. It would take two to three times

as long to travel through the Shoreham neighborhood as it would to use Clover Street and

Allen’s Creek Road. Similarly, for Warren Avenue Google Maps indicates that it takes 1

min longer to travel to and from a destination on Edgewood Avenue that is south of Warren

Avenue by traveling via Warren Avenue as opposed to traveling via Monroe Avenue and

Edgewood Avenue. It is likely that a small portion of traffic would still choose to Warren

Avenue as it may be viewed as a shorter route even when it is not actually shorter.

However, Warren Avenue connects a Monroe County highway and a New York State

highway with a fairly short segment (just under 4,000 ft.) of relatively straight roadway. It

is likely used as a cut-through today for traffic between Edgewood Avenue and Clover

208 Whole Foods Plaza DEIS Town of Brighton

Street. The proposed development is not expected to add significantly to any existing cut-

through traffic.

Increases In Segment Volumes

Increases in segment volumes have been estimated for the segments of: Monroe Avenue

between Clover Street and the proposed driveway, Clover Street between the existing

driveway and Allen’s Creek Road, and Allen’s Creek Road between the existing driveway

and Clover Street. Table 4.4-5 summarizes the segment volumes.

TA BL E 4 . 4 - 5 : SEGMENT VOLUME SUMMARY

Clover Street between Allen’s Creek Road Monroe Ave West of Shoreham Drive & between the existing

Clover Street Allen’s Creek Road driveway & Clover Street AM PM SAT AM PM SAT AM PM SAT Background 2804 4112 3380 765 918 800 1000 1194 409 Original Conceptual Site 2915 4237 3647 783 951 860 1020 1231 458 Plan Original Plan - 2899 4224 3624 779 947 855 1017 1229 453 No bank Alternative 1 2917 4280 3712 772 928 829 1025 1247 479 Alternative 2 2913 4268 3698 772 928 828 1023 1244 475 Alternat ive 3 2899 4224 3624 792 974 888 1004 1202 419 Alternative 4 2917 4280 3712 772 928 829 1025 1247 479 Alternat ive 5 2884 4229 3537 774 939 829 1009 1219 433 Alternative 6 2925 4264 3642 782 947 856 1019 1229 454

Table VIII shows that the segment volumes are expected to increase from background to

full development between 80(112)[157] vehicles per hour (vph) and 121(168)[332] vph

during the AM(PM)[SAT] peak hours respectively on Monroe Avenue. Similarly, the

segment volumes are expected to increase between 7(10)[28] vph and 27(56)[88] vph on

Clover Street and between 4(8)[10] vph and 25(53)[70] vph on Allen’s Creek Road.

209 Whole Foods Plaza DEIS Town of Brighton

Gap Analysis

A Gap Analysis was performed at several unsignalized intersection locations to determine

the availability of gaps for traffic to enter (left-turns) and exit (left and right turns) the

various side roads. These intersections include: Clover Street/Shoreham Drive, Clover

Street/Towpath Lane, Clover Street/Warren Avenue, Allen’s Creek Road/Schoolhouse

Lane, Allen’s Creek Road/Whitestone Lane. For un-signalized intersections such as these,

gap availability can be used as a surrogate methodology for evaluating the ability of side

road traffic to enter and exit the fronting traffic stream.

The availability of gaps within the traffic stream primarily determines the side road driver

behavior and delay for both entering and exiting motorists. A gap study counts the actual

gaps in existing traffic available for a vehicle to enter or exit the side road. The difference

between the actual number of gaps and the projected demand for a particular traffic

movement can then be calculated as a reserve or deficit capacity.

The 2010 Highway Capacity Manual provides data relative to gap sizes that motorists find

acceptable to execute the required maneuver. SRF & Associates performed a gap analysis

at the locations listed above during the AM and PM peak hours on Thursday, October 8,

2015 and Thursday, October 15, 2015 to evaluate existing and potential future operating

conditions. Table 4.4-6 indicates the acceptable gap duration, the theoretical number of

gaps based on the duration, the projected traffic volume for the movement, and the resulting

theoretical reserve (or deficit) capacity during the AM and PM peak hours.

210 Whole Foods Plaza DEIS Town of Brighton

T A B L E 4 . 4 - 6 : PEAK HOUR GAP ANALYSIS RESULTS THEORETICAL ACCEPTABLE EXISTING GAPS THEORETICAL EXISTING INTERSECTION MOVEMENT GAP BASED ON RESERVE VOLUME DURATION COLLECTED CAPACITY DATA Right turns 6.2 sec 306(302) 11(12) 295(290) exiting site Clover Left turns Street/Shoreham 6.4 sec 182(193) 30(11) 152(182) exiting site Drive Left turns 4.1 sec 449(502) 6(23) 443(479) entering site Right turns 6.9 sec 250(148) 15(11) 235(137) exiting site Clover Left turns Street/Towpath 7.5 sec 41(29) 37(11) 4(18) exiting site Lane Left turns 4.1 sec 453(259) 6(7) 447(252) entering site Right turns 6.2 sec 430(212) 12(15) 418(197) exiting site Clover Left turns Street/Warren 6.4 sec 142(92) 46(30) 96(62) exiting site Avenue Left turns 4.1 sec 721(359) 10(17) 711(342) entering site Right turns 6.2 sec 372(466) 4(5) 368(461) exiting site Allen’s Creek Left turns Road/Schoolhouse 6.4 sec 208(110) 3(2) 205(108) exiting site Lane Left turns 4.1 sec 605(567) 4(5) 601(562) entering site Right turns 6.2 sec 374(296) 14(8) 360(288) exiting site Allen’s Creek Left turns Road/Whitestone 6.4 sec 200(174) 19(8) 181(166) exiting site Lane Left turns 4.1 sec 553(493) 3(11) 550(482) entering site Note: 00(00) = AM(PM) Peak Hour

Based on the field observations, gap study, and existing traffic volumes, there are sufficient

gaps during the weekday AM and PM peak hours to accommodate the existing turning

movements at the unsignalized intersections studied. The theoretical reserve capacity

indicates the additional gaps available for turning movements into and out of the side roads.

All of the locations and movements have a theoretical reserve capacity greater than 60

211 Whole Foods Plaza DEIS Town of Brighton

vehicles during the two peak hours based on existing conditions with the exception of left

turns exiting the Towpath Lane intersection.

There are currently 37(11) left turns exiting Towpath Lane during the AM(PM) peak hours.

The theoretical reserve capacity would allow for 4(18) additional left turns under existing

conditions. The Whole Foods Plaza Redevelopment will add approximately 30 vph in each

direction during the PM peak hour. This is one additional vehicle every two minutes. While

this may reduce the number, duration and/or frequency of the gaps it is unlikely to

significantly impact the current conditions for left turns exiting Towpath Lane. In addition,

Towpath Lane is a cul de sac that provides access to single family homes and apartments

that are completely built out. While traffic volumes entering and exiting Towpath Lane

may fluctuate during the peak hours, it is unlikely that traffic entering and exiting Towpath

Lane would increase or decrease significantly in the future.

The proposed Whole Foods Plaza Redevelopment is unlikely to have a significant impact

on gap availability during the peak hours at the other intersections studied which all have

more than adequate gap availability.

Conceptual Access Management Plan

To effectively manage the transportation and land use cycle, both NYSDOT and the local

agencies must address both the transportation system and the adjacent land development.

NYSDOT has indicated in their December 23, 2014 approval letter that “Access

management, which includes consolidation and elimination of driveways and cross-access

easements or service roads, should be planned and carried out for this and any future

212 Whole Foods Plaza DEIS Town of Brighton

development to take advantage of the signal. All properties between I590 and Route 65

should be subject to an access management plan.”

The intent of the Access Management Plan is to provide NYSDOT, and the local Officials

and Planning Boards, a framework for assisting with decision-making regarding access,

circulation, and safety for future development along the corridor. The Plan is also intended

to preserve and enhance the economic viability of the adjacent businesses, particularly on

the south side of Monroe Avenue. The Plan should be used as a framework for guiding

future growth and decision-making over time, as the corridor redevelops. The concept plan

shows recommendations for consolidating driveways, providing cross access and shared

access connections, the proposed new signal location, a rear access road for properties

along the south side of Monroe Avenue, unified parking and circulation, and a potential

median. The proposed Plan considers and is consistent with the Town of Brighton Monroe

Avenue Corridor Community Vision Plan [Appendix 2] Conclusions and

Recommendations.

This segment of Monroe Avenue is heavily traveled and presents numerous challenges for

motorists to enter and exit adjacent properties. The Whole Foods Plaza redevelopment

project proposes to redevelop properties along the north side of Monroe Avenue in keeping

with the Town of Brighton’s Community Vision Plan (Appendix 2). In addition, the

Development Plan also improves access to properties along the south side of Monroe

Avenue by providing a new signalized intersection that potentially services most of the

south side properties between I-590 and Clover Street with various cross access agreements

and rear lot access road roads. This new signal also provides a safe pedestrian crossing

across Monroe Avenue, particularly for patrons of the existing hotels and restaurants.

213 Whole Foods Plaza DEIS Town of Brighton

Currently, the closest signal controlled crosswalk is at the Clover Street intersection. In

addition, the new signal will create gaps in eastbound traffic providing properties along the

south side of Monroe Avenue to the east of Dunkin Donuts additional gaps in traffic to

facilitate safer and more efficient ingress and egress.

The results of this traffic study indicate that a new signal at the full access driveway is

warranted with full development of the Whole Foods Plaza project. The existing Mario’s

driveway should allow right-in/right-out/left-in turns only. Left-turns out should be

prohibited. The access management plan, Figure 2.2.1E, with a new traffic signal and

properties along the south side connected with easements and a rear lot access road , shows

that the study intersections will experience small to moderate increases in delay during the

weekday AM and PM, and Saturday midday peak hours.

The future growth and vitality of this segment of the Monroe Avenue Corridor depends

largely on achieving a better balance between the future transportation and land use

demands within the corridor. In reaching that balance, a number of issues must be

considered and trade-offs made as identified in this report.

Air pollution emissions in the general site vicinity are primarily associated with vehicle

emissions. NYS Routes 31 and 590 are located immediately south and west of the site.

The presence of these indirect air pollutant emission sources will not change as result of

the project proposal and have not resulted in any recognized degradation of air quality in

the project vicinity.

The Whole Foods Plaza redevelopment project encourages the use of alternative energy

214 Whole Foods Plaza DEIS Town of Brighton

transportation and is examining the inclusion of electric car charging stations within the

parking areas reserved for alternate energy vehicles.

The project has been revised by the project sponsor to limit the number of drive-through

operations on site to one (1) facility to reduce the emissions from vehicles idling while

circulating through a drive-through operation.

All transportation alternatives evaluated include pedestrian connectivity to the

surrounding areas.

4.5 Land Use and Zoning

Impacts

The Whole Foods Plaza redevelopment proposal will result in the removal of three existing

commercial uses from the project area. Two restaurant facilities and a bowling center are

to be closed. Redevelopment of the properties will result in the removal of the existing

structures and reconfiguration of pavement areas and site access points.

The Whole Foods Plaza redevelopment project involves proposed incentives associated

with redevelopment of the site and implementation of the access management plan. The

proposed incentive categories relate to bulk area requirements, relief from obtaining

individual special use permits for the uses proposed, and signage. Table 2.3.4-1

Summarizes the Requested Incentives by Lot.

The bulk area incentives relate primarily to dimensional deviations from the Code, in large

215 Whole Foods Plaza DEIS Town of Brighton

part dictated by the split zoning of the development lands. The addition of 1.2 acres of RLA

zoned land to the northern portion of the site (behind the current Mario's and Clover Lanes

properties) generates the need for a use incentive to allow commercial improvements and

activity to extend into the 1.2 acres of the adjacent RLA District. Other use incentives

proposed relate to conditional permit uses which carry a favorable legal presumption of

being permitted and in harmony with the neighborhood. To that end, the incentives seek

to avoid unnecessary duplication in the review process. The site includes 7.04 +/- acres

located in the BF-2 General Commercial Zoning District and 3.09 +/- acres located in the

RLA Residential- Low Density District adjacent to the north. The zoning classifications

and boundaries are to be maintained as they currently exist.

Bulk area incentives related to the implementation of the access management plan serve to

address preexisting non-conforming site conditions. These conditions are beyond the

control of the project sponsor. Bulk area incentives are summarized in Table 2.3.4-1.

Deviations for bulk area requirements are typically handled by means of obtaining area

variances from the Zoning Board of Appeals. The redevelopment of the project area also

proposed allow uses that typically require obtaining special use permits form the Town

Board. To ensure that the project proposal undergoes a thorough comprehensive review of

all uses proposed and deviations in bulk area requirements an Incentive Zoning Application

has been prepared for the project. The incentives fall into the following main categories:

A. Use. The lands to be acquired from the Church are located in the RLA Zoning

District. Limited activities involving parking and access are proposed to extend onto the

property to be acquired from the Church. While commercial uses are not generally

216 Whole Foods Plaza DEIS Town of Brighton

permitted in the RLA District, pursuant to Code Section 201-9(A) (3), the commercial use

is permitted to encroach into the residential district by 30 ft. The proposed incentive is to

permit commercial development to extend into the RLA District beyond the permitted 30

ft. zone. Notwithstanding this fact, the remaining approximately 1 +/- acre of land

extending between the Whole Foods Plaza development and Clover Street is proposed to

remain undeveloped open space providing an additional buffer between the commercial

and residential areas, with no access onto Clover Street

The bulk of the property is located in the BF-2 District. The identified proposed uses

include a food market, a specialty coffee shop/restaurant, and general retail. The coffee

shop requires a drive through operation. Outdoor seating may be desired by the restaurant

and/or food market. All of these uses are conditional permit uses in the BF-2 District.

Incentives are proposed to waive the conditional use permit requirement associated with

these uses, as these uses will be thoroughly reviewed as part of both the incentive zoning

application by the Town Board and site plan approval process by the Planning Board. This

request is not designed to avoid scrutiny by the Town Board or the Planning Board, but

only to confirm that the proposed use of the property is permitted as part of this overall

Incentive Zoning package.

B. Drive-Thru Location . The proposed development includes a drive through

operation for the specialty coffee shop. Pursuant to Code Section 207-14.3, drive through

operations shall not be located in the front yard. A proposed incentive is to allow the

proposed drive-thru to be located in the front yard. This relief is appropriate and necessary

for the development of the coffee shop as an “outparcel” in the larger shopping center. The

layout of the site is constrained largely by the placement of the traffic signal. The visibility

217 Whole Foods Plaza DEIS Town of Brighton

of the drive-thru is in keeping with the nature of development along this portion of Monroe

Avenue, which includes a new Dunkin Donuts with a drive thru on the south side of

Monroe Avenue.

C. Signs. Town Code Section 207-32 allows limited business identification and

directional signage. Section B allows a single attached sign on the principal building

entrance. The total area of the business identification sign permitted may not exceed 10%

of the first-floor area of the building face or 150 square ft., whichever is less. A requested

incentive is to allow a sign package which is designed to meet the needs of the individual

businesses for signage in the context of the business plaza, with visibility from both

Monroe Avenue and internal to the plaza. The sign package will exceed the amount

permitted by Code and include: (1) signage on multiple building faces (for the food market

and outparcel buildings), (2) appropriate drive thru signage, which typically requires

specialized signage (such as a menu sign), (3) an attractive monument sign identifying the

plaza and tenants, (4) signage greater than 150 square feet on Building 1, (5) logo greater

than 25% of any individual sign, and(6) additional signage contained in a sign package to

be provided in final form to the Town Board prior to the scheduling of the public hearing

on the Incentive Zoning application. A preliminary Sign Package chart and accompanying

plan is attached in Appendix 15.

D. Bulk Requirements. Among the requested incentives are relief to a limited

number of building setbacks, lot coverage, density, and pavement setbacks, as detailed on

the Conceptual Site Plan. Bulk area determinations for the redevelopment site reflect the

split-zoning of the lands. Bulk requirement for the BF-2 were applied to the BF-2 area, and

requirements applicable to the RLA are applied to the RLA area. A summary of the bulk

218 Whole Foods Plaza DEIS Town of Brighton

area requirements and conformity of the proposed redevelopment project is depicted in

Figure 2.2.5A. As outlined in the Bulk Area Summary figure, the proposed redevelopment

project is in general conformance with the preponderance of the bulk requirements under

Code.

Evaluation of the bulk area requirements under the split zoning categories effects the lot

coverage and development intensity calculations for the project. With respect to

impervious surface coverage, the Code provides for a maximum of 65 % impervious

surface coverage. The proposed lot coverage within the BF-2 portion of the site is 88% (the

existing impervious surface area coverage within the BF-2 portion of the development is

86%). Code provides for a maximum density of 10,000 square feet per acre in the BF-2

District. The proposed density, applied to the BF-2 portion of the site, is 13,384 square

feet per acre for Lot 1 and 12,096 square feet per acre for Lot 2. These numbers reflect the

exclusion of the RLA lands in the calculations. It should be noted that if the Code allowed

the entire proposed site to be included in these calculations, the impervious surface area of

this proposed project would be 76% and the proposed density would be 9,297 square feet

per acre. The resultant building density would be below that allowed by code and the

impervious surface coverage would be within 11% of that allowed by code.

The proposed incentives include relief from pavement setback regulations of the Town

Code applicable to the BF-2 and RLA Districts. Table 2.3.4.1 summarizes the incentives

requested by lot.

The acquisition of lands from the First Baptist Church, and the proposed resubdivision of

the Church lands will not create additional non-conformities with the bulk area requirement

219 Whole Foods Plaza DEIS Town of Brighton

for the Church lands. It is noted that the existing setback on Allen Creek, for the Church,

is non-conforming and will remain so. The Church is setback at 59.4 ft. where the Code

requires a front setback of 100 ft.

The use of RG&E lands, under license agreement from RG&E, for the redevelopment of

the Auburn Trail will not create non-conformities with the bulk area requirements for the

RG&E lands.

Redeveloping the three properties in a comprehensive retail plaza redevelopment affords

the ability to reduce the impervious surface area that would be associated with the

redevelopment of the three properties separately. The comprehensive redevelopment plan

allow for the shared use of vehicular access points, drives, walkways and parking areas.

Drive isle widths and parking stall dimensions are limited to those required by code.

Excess parking is not being developed for the project. The redevelopment proposal

provides parking in accordance with code requirements. 473 parking spaces are being

provide where the code requires 470. Delineation of parking fields and main access ways

within the plaza are delineated by landscape islands and lawn areas that also serve to

provide visual interest, break up views, and provide screening throughout the project area.

In addition to delineating the parking fields and access routes throughout the project the

islands serve to offset the heat island effect of the asphalt parking areas. Additional

measures to address the heat island affect associated with asphalt parking areas include the

use concrete pavements for sidewalks and truck loading areas and dumpster pads.

Landscaping inlands have been incorporated into sidewalk islands within the larger parking

field associated with the Whole Foods building. These islands provide additional

220 Whole Foods Plaza DEIS Town of Brighton

mitigation for the heat island affect from the asphalt parking areas, buffering, and visual

interest along the pedestrian routes. Permeable pavement is to be incorporated within

perimeter parking fields for the redevelopment site where practical based on the grading

plan. These perimeter parking areas account for approximately 22,842 square-feet of

permeable pavement for the redevelopment site. Permeable pavement is incorporated into

the access management plan areas or the southern perimeter parking areas as well. These

perimeter parking areas account for approximately 10,206 square-feet of permeable

pavement for the access management areas. Figure 2.2.1I depicts the Landscaping Plan

for the project. Figure 2.2.7A depicts the green infrastructure practice locations for the

redevelopment site. Figure 2.2.7B depicts the green infrastructure practice locations for

the access management area.

The project will provide enhanced multimodal connectivity to the surrounding residential

neighborhoods and Monroe Avenue corridor. Multimodal improvements will include the

construction of sidewalks, pedestrian gathering area, bus shelter, and wayfinding kiosk

located along the Monroe Avenue project frontage. Figure 2.2.9 depicts the sidewalk

network to enhance multimodal connectivity. Figures 2.2.10 depict the pedestrian

gathering area and bicycle rack area associated with the Auburn Trail improvements.

The centralized pedestrian gathering area with wayfinding Kiosk and bicycle racks

provides a connection hub for the trail system, Whole Foods Plaza, and adjoining Monroe

Avenue corridor. The hub provides trail users with a defined safe connection point to the

Plaza and Monroe Avenue corridor. The bicycle rack area allows bicyclists with a safe

and secure location to store their bicycles while visiting retails by foot. The sidewalk

network which connects to the hub is designed to promote users of the trail system to

221 Whole Foods Plaza DEIS Town of Brighton

frequent Plaza businesses and the Monroe Avenue corridor. The hub serves to transition

the trail traffic from shared use traffic to pedestrian traffic within the plaza. By

transitioning the bicycle/pedestrian traffic to pedestrian traffic entering the Plaza the

potential for conflicts are decreased to traditional pedestrian/ vehicle conflicts. The site

layout and sidewalk system layout has been designed to minimize those conflicts.

The site layout for the redevelopment site has been designed to complement the odd

geometry of the site. The anchor Whole Foods building has been placed to the western

portion of the site to take advantage of the increased depth of the parcel at this location.

The Whole Foods building is the larger building of the proposed buildings and has been

placed at the portion of the site where the site has its largest depth. This has allowed for

the development of the main parking field and loading areas for the building to complement

the building design. Although the building has been placed closer to the Monroe Avenue

Right-of Way, the configuration of the Right-of-Way, due to the northbound on-ramp for

NYS Route 590, allows for significant green space between the roadway and building face.

The site is also encumbered by a 20-inch MCWA distribution man which crosses the site.

The distribution main limits the ability to move the building to the north. The main retail

facility has been placed to the rear of the site adjacent to the distribution main. The

placement of the building takes advantage of the nature of multi-tenant retail building

needs. These buildings have a limitation on the practicality of their depth. Tennant spaces

typically run from the front of the building to the back. Tennant spaces are developed in a

linear fashion resulting in a shallower longer building. The placement of the main multi-

tenant space at the eastern portion of the site takes advantage of the building geometry and

reduced depth of the site in this area. The smaller out-parcel styled buildings are placed

closer to the Monroe Avenue corridor to enhance the street scape appearance of the

222 Whole Foods Plaza DEIS Town of Brighton

redevelopment and to take advantage of shared parking fields and access routes. The odd

geometry of the site has been capitalized on in the development of landscape islands,

pedestrian gathering areas and stormwater filter areas.

The redevelopment will utilize a cohesive architectural theme to be consistent with the

anchor tenant, including the use of regional materials and a waste management plan that

will look to re-use material from the existing buildings that are proposed to be demolished.

Re-use of materials will include reclamation and re-use of materials on site and reclamation

of materials for reuse regionally. Materials to be reclaimed for use regionally include the

bowling lane beds and machines from the Clover Lanes facility and the clay tile roof

shingles from the Mario’s facility. Materials to be reclaimed for re-use on-site include

timber from the roof trusses and lumber from the bowling lane approached and setae areas

from the Clover Lanes facility. Rubblization of asphalt pavement surfaces and reclamation

of pavement subbase materials from the entire redevelopment area for reuse as general fill

materials and augmentation for use as pavement subbase material. In addition to reuse of

building materials the project will incorporate sustainability/green infrastructure practices

for redevelopment of the site. The buildings will incorporate light colored roof systems

and concrete pavement in areas will be utilized to help mitigate the "heat island" effect

associated with parking areas and rooftops for the development. Landscape islands

combing trees, shrubs, ornamental grasses and annual and perennial vegetation are

proposed within parking areas and adjacent to building areas to aid in mitigating the “heat

island effect” and provide visual interest and screening within the development. Figures

2.2.1.G and 2.2.1.H depict the Landscaping Plan and island planting details. Figures

2.2.7A and 2.2.7B depict the Permeable pavement and engineered soil planting beds and

filter strips will be utilized to reduce stormwater surface runoff rates and provide water

223 Whole Foods Plaza DEIS Town of Brighton

quality measures. Figure 2.2.7 depicts the stormwater green infrastructure practice areas.

The Whole Foods building will be constructed to U.S. Green Building Council (USGBC)

Silver LEED standards and incorporate architectural features and materials appropriate to

the Rochester area. The additional buildings of the retail plaza will be designed to

complement the Whole Foods building, providing an architectural theme consistent

throughout the development. USGBC certification for the buildings will not be sought.

The proposed redevelopment is consistent with the Climate Smart Communities effort,

specifically;

• The redevelopment of buildings that are 22-75 years old and where built

without regard to the Climate Smart standards will incorporate the most modern

and energy efficient building systems

• The re-use of building materials from the razed structures will minimize the

waste going to land fills

• The use of LED lighting will dramatically increase efficiency on the property

from its current lighting infrastructure

• The promotion of pedestrian and bicycle use through on site bicycle parking

and linkages through the improved Auburn trail system will promote an

alternative to traditional automotive use

• The installation of electric vehicle charging stations as part of the anchor tenants

parking plan along with special parking for car pool and low emission vehicles

is unique to Brighton and in keeping with Climate Smart strategies

• The anchor tenants commitment to building to Silver LEED standards

• Integration of public transit accessibility to the proposed development

224 Whole Foods Plaza DEIS Town of Brighton

• The anchor tenant's commitment to anti-idling delivery policy

• The anchor tenant's commitment to promoting local food systems

• Dramatically minimizing untreated stormwater run-off

• Strengthens development towards existing community centers and urban areas

The proposed development seeks to meet the goals and recommendations of the Town’s

Comprehensive Plan. The project proposal will provide a revitalized commercial

development in a high intensity commercial district. This redevelopment will encourage

redevelopment along this section of Monroe Avenue from Clover Street to the I-590

Expressway. As a result of the Whole Foods Plaza redevelopment project, commercial

property values will increase in value and in turn property tax revenue for the local

stakeholders is a vital benefit to the residents of the Town.

Future retail use along Monroe Avenue should not be impacted negatively, conversely, the

addition of Whole Foods Plaza has already increased property values and has spurred

redevelopment along the Monroe Avenue corridor based on recent commercial property

sales, new leases signed and market data for the Monroe Avenue corridor.

Furthermore, the Monroe Avenue corridor is almost entirely developed with preclude

projects that are similar to or compliment this type of project.

The potential impacts resulting from commercial truck deliveries, snowplowing

operations, refuse removal are comparable to what exists in the currently developed site.

The elimination of two very busy restaurants that currently operate and the replacement

225 Whole Foods Plaza DEIS Town of Brighton

with uses that generate much less organic waste, will have a positive impact on odors from

refuse. Truck deliveries and snowplowing operations will be comparable to what exists

today and therefore have no negative impact on the surrounding properties or

neighborhoods.

The redevelopment project will provide site lighting in accordance with Town Code

requirements and in accordance with current Illumination Engineering Society (EIS)

recommendations. The site lighting system will incorporate energy saving LED fixtures.

Special consideration is applied to night sky compliance, selection of lighting distributions,

shielding of fixtures, and pole heights with providing safe, uniform lighting with the focus

on keeping light trespass and spillage as minimal as possible.

Target lighting levels of 1.0 -2.0 fc are to be maintained throughout the parking areas and

walkways. The average lighting level computed for the design is 0.54 foot-candles (fc).

Lighting level calculations reflect the additive effect of all fixtures and was prepared

utilizing LitePro version 2.037 software. Lighting levels were analyzed based on a ten-

foot (10’) square grid.

Lighting control systems shall be installed to automatically control the operation of the

lighting system. Site lighting controls will turn the system on at dusk and will turn the

system off ½ hour after the anchor tenant has closed. The lighting control system will

allow for general security lighting to be provided during the hours the plaza is closed.

Area lighting will be integrated throughout the site to provide a level of security to all

patrons and visitors of the new Whole Foods Plaza. Light poles will be located to provide

226 Whole Foods Plaza DEIS Town of Brighton

the uniform illumination with limited disruption to the existing neighbors and proposed

residents of the development. Similar style light fixtures will be installed throughout the

development, as well as illuminated building mounted signage. Figure 2.2.1K depicts the

Lighting Plan for the project. The proposed resultant lighting levels are depicted on the

Lighting plan. Further details on the proposed lighting system including product

specification sheets and lighting level recommendations, and lighting calculation summary

report are included in Appendix 8 of this DEIS

The proposed lighting on the site will not be seen from the Shoreham / Clover

neighborhoods or the Schoolhouse / Allen's Creek neighborhoods and therefore have no

negative impact. The lighting will be night sky compliant and is designed to remain on the

developed site.

There are no anticipated cumulative impacts resulting from the proposed project. The

project is a redevelopment project of commercial properties to ensure continued viability

of the project area.

Mitigation

The proposed development seeks to meet the goals and recommendations of the Town’s

2000 Comprehensive Plan [Appendix 2]). The proposed plan will provide a revitalized

commercial development in a high intensity commercial district. This redevelopment will

encourage redevelopment along this section of Monroe Avenue from Clover Street to the

I-590 Expressway. Increasing property values and in turn property tax revenue for the

local stakeholders is a vital benefit to the residents of the Town.

227 Whole Foods Plaza DEIS Town of Brighton

The proposed project seeks to meet the goals and recommendations of the Monroe Avenue

Corridor Plan in at that it provides a number of distinct elements from the plan. Those

elements are both aesthetic in nature (dealing with placement of buildings) and safety-

related. The safety related items are addressed through the location of access points for the

redevelopment project and implementation of the access management plan for the

properties on the south side of Monroe Avenue. Safety improvements relate to vehicular,

pedestrian, multimodal and bicycle access.

The proposed seeks to meet the goals and recommendations of the Bicycle and Pedestrian

Master Plan / Bike Walk Brighton Community in that it provides a number of distinct

element from the plan. The project provides the following elements from the plan:

• Improves safety through implementation of improvement to the Auburn Trail.

• Provides links and connections between existing active transportation assets to

support the growth of a safe, attractive and identifiable Bike Walk Brighton

network.

• Makes the best of existing infrastructure and opportunities to provide a cost-

effective and sustainable active transportation system.

The proposed redevelopment is consistent with the Climate Smart Communities effort as

outlined above.

Light colored roof systems and use of concrete in certain areas will mitigate the "heat

island" effect associated with parking lots. Additionally, more trees and vegetation are

228 Whole Foods Plaza DEIS Town of Brighton

proposed within parking areas than currently exist in the currently developed parcel.

Special attention to providing trees that will provide a substantial canopy to provide

shading and visual mitigation to the parking area. Planted islands within the parking fields

will provide visual interest and screen views of the proposed buildings. In addition, the

islands create a tree lined edge to drive aisles, reduce the heat island effect, and help

demark/provide buffering for safe pedestrian access through the Whole Foods Plaza site.

The project's layout was developed to address the awkward geometry of the access

driveways interior traffic flow. The addition of the traffic signal and elimination of one

curb cut on Monroe Avenue improves the integration of this retail site to Monroe Avenue.

The proposed redevelopment plans to provide sole access to the redevelopment site via two

driveways on Monroe Avenue and the implementation of an access management plan for

Monroe Avenue inclusive of a signalized intersection.

The new Lifestyle Center design will also improve vehicular access and circulation. A

new traffic signal with crosswalk will be installed on Monroe Avenue. The anticipated

location will align the Clover Lanes property and the Sakura Home restaurant site. The

existing curb cut at the Mamasan's property will be eliminated. The signal location has

been dictated by the New York State Department of Transportation (NYSDOT), which

maintains jurisdiction over Monroe Avenue. Multimodal transportation improvements, in

cooperation with the Rochester Genesee Regional Transportation Authority, are

contemplated. Included in the development will be electronic vehicle charging stations,

dedicated spots for HOV (high occupancy vehicles) and LEV (low emission vehicles).

Tesla, a leader in electric automobile technology, is contemplating the site for a Tesla Super

Charger station, the first in the Monroe County area.

229 Whole Foods Plaza DEIS Town of Brighton

The Rochester Genesee Regional Transportation Authority has been consulted and has

reviewed and commented on the proposed development to insure safe and convenient

access to mass transit on both the north and south side of Monroe Avenue along this

corridor are contemplated and made a part of this plan. The RGRTA has stated that they

do not intend on accessing the site internally.

The proposed food market building incorporates sustainability. The design will respect the

local landscape. Recycled materials from the Clover Lanes building, including wood from

bowling lanes and timber from the roofing system will be incorporated into the building.

The natural and organic foods market/grocery building will be constructed to U.S. Green

Building Council (USGBC) Silver LEED standards and incorporate architectural features

and materials appropriate to the Rochester area. The two outparcel buildings and retail

plaza building will be designed to complement the new food market, providing an

architectural theme consistent throughout the development.

4.5.1 Density Analysis Study

Impacts

The Monroe Avenue Corridor Density Analysis study was conducted to analyze the density

of construction and development along the Monroe Avenue Corridor, encompassing the

major retail development areas along the corridor in the Town of Brighton. Refer to

Appendix 17.

Each major developed area was analyzed separately by calculating the total acreage of land

and total constructed square footage within said acres of development. Town and County

230 Whole Foods Plaza DEIS Town of Brighton

records were used to verify calculations. Included in the exhibits of this study are maps

showing each area analyzed with the specific areas outlined in yellow. Each map is labeled

on the upper right corner to correspond with the title on the attached density chart analysis.

This study was conducted using the total property acreages of each parcel per Town and

county maps. The subject property borders a residential area which may affect the code

calculation depending on who and how those calculations are computed. The intent of this

study is to view an understandable and clear picture of construction density within the

Brighton Monroe Avenue corridor using a standard technique addressing each parcel and

property consistently by dividing the constructed square feet by the area of land.

The basic development codes (certain uses may vary) of Brighton allow for construction

density of 10,000 square feet (SF) of construction per acre; or a “Density” of approximately

23% of the usable land. The results of the study conclude that each of the major areas of

development along the Monroe Avenue corridor represent substantially more construction

than the basic codes of Brighton allow. The average density for all the developments

studied within the Town of Brighton was approximately 11.9% above code. The Whole

Foods Plaza subject property falls under the Town’s average density as it will be only 3.2%

above code. Property density in Brighton will have a lowering effect on the overall density

calculations within the Town of Brighton down from 11.9% to 9.8% when including the

Whole Foods Plaza subject calculations.

In conclusion, this study finds that the subject property falls well within acceptable density

standards when comparing it to neighboring developments. This study finds that the subject

property will have one of the lowest density calculations compared to all the major

231 Whole Foods Plaza DEIS Town of Brighton

neighboring developments.

4.6 Community Services

4.6.1 Water Service

Impacts

The proposed redevelopment will increase domestic water consumption/demand by

approximately 288 gallons per day. The average domestic water demand has been

estimated to be 9,000 gpd. The average domestic water demand was calculated based on

the New York State Design Standards for Intermediate Sized Wastewater Treatment

Systems, dated March 2014, Table B-3 Typical Per Unit Hydraulic Loading Rates. The

redevelopment project hydraulic loading rate is 0.1 gallons per day per square-foot. The

anticipated domestic water demand has been estimated to be 18.4 gallons per minute (gpm).

The anticipated fire flows has been estimated to be 1,000 gpm per building. The fire flow

demands were calculated based on NYS Building Code and NFPA requirements.

The pubic water system has adequate pressure and flow capacity to accommodate the water

system demands of the redevelopment project.

The implementation of the access management plan will have no effect on water

consumption or system demands.

Two water service connections will be made for the redevelopment project. One water

service will connect to the public watermain at the west side of the project and will serve

232 Whole Foods Plaza DEIS Town of Brighton

the Whole Foods building. The second water service will connect to the watermain on

Monroe Avenue and will serve the balance of the redevelopment project. Fire hydrants

will be installed throughout the redevelopment project. The hydrants will be part of the

private water distribution system for the site and their placement will in accordance with

NYS Building Code requirements. Cross contamination control devices will be engineered

and installed on the proposed water service connections in accordance with MCWA and

MCDOH requirements. Figure 2.2.1G depicts the proposed water services and hydrant

locations.

Hydrant test flow data supplied by the MCWA is summarized in Table 3.6.1-1.

Further details on domestic and fire flow demands for the redevelopment are contained in

Appendix 6 of this DEIS.

Mitigation

Given that no adverse impacts have been identified and the project will be assessed the

appropriate service fees, no further mitigation measures are proposed.

4.6.2 Sanitary Sewer

Impacts

The proposed redevelopment will increase sanitary sewer flows by approximately 288

gallons per day. The average sanitary sewer flows has been estimated to be 9,000 gpd.

The average sanitary sewer flows for the proposed redevelopment was calculated based on

the New York State Design Standards for Intermediate Sized Wastewater Treatment

Systems, dated March 2014, Table B-3 Typical Per Unit Hydraulic Loading Rates. The

233 Whole Foods Plaza DEIS Town of Brighton

redevelopment project hydraulic loading rate is 0.1 gallons per day per square-foot

The implementation of the access management plan will have no effect on sanitary sewer

flows.

The proposed redevelopment proposal could connect to two (2) existing eight-inch (8”)

diameter dedicated Town of Brighton sanitary sewers. One of the sewers being along the

project frontage on Monroe Avenue and the other sewer adjoining the project at the west

side of the project which connects to the dedicated sewer on Allens Creek Road. However

as suggested by the Town Engineer, the project will eliminate sanitary sewer discharges to

the Monroe Avenue sewer and direct them to the Allens Creek sewer. Both sewers

discharge to a larger trunk sewer within close proximity to the project location.

Sanitary sewer flows to the Monroe Avenue sewer will be reduced by 7.9 gpm (0.076 cfs)

for a 2,844 gallon per day reduction by eliminating sewer connections to the Monroe

Avenue sewer.

Sanitary sewer flows to the Allens Creek Road sewer will increase by 8.7 gpm (0.0193 cfs)

for a 3,132 gallon per day increase.

The redevelopment project will increase overall sanitary sewer discharge volumes to the

dedicated sewer system by approximately 0.8 gallons per minute or 288 gallons per day.

The Allens Creek sanitary sewer has a full flow capacity of 420 gallons per minute which

is sufficient to convey the 19.2 gallons per minute discharges from the project. The Town

sewer system has sufficient capacity to service the additional flows from the project.

234 Whole Foods Plaza DEIS Town of Brighton

Table 4.6.2-1 Sanitary Sewer Summary Service Drive 8 inch SDR-35 Full Flow Capacity – 420 gpm Project Flows – 19.2 gpm

Further details on the sanitary sewer capacities is contained in Appendix 6 of this DEIS.

Grease interceptors will be installed in accordance with the Monroe County Department of

Health and Monroe County Department of Environmental Services (Pure Waters)

requirements for restaurant uses.

The proposed project will not result in any significant off-site impacts related to sanitary

sewer volumes. Thus sewer capacity for downstream sanitary sewers should remain

essentially unaffected by the proposed redevelopment.

Mitigation

Sanitary sewer flows for the redevelopment site will be eliminated from the Monroe

Avenue sanitary sewer and conveyed to the Allens Creek sanitary sewer system in

accordance with the recommendations of Town staff. Installation of the sanitary sewer

system will be in accordance with the Town of Brighton Sewer District, MC-DES, and

DEC requirements. Grease interceptors will be installed in accordance with the Monroe

County Department of Health and Monroe County Department of Environmental Services

(Pure Waters) requirements for restaurant uses.

Given that no adverse impacts have been identified and the project will be assessed the

appropriate district fees, no further mitigation measures are proposed.

235 Whole Foods Plaza DEIS Town of Brighton

4.6.3 Private Utilities

Impacts

An 8 inch Rochester Gas and Electric (RG&E) owned gas main exists along the south side

of Monroe Avenue within the right of way. Overhead electric, telephone and cable

television lines exist along the east and west side of Monroe Avenue. Overhead electrical

lines exists along the eastern property border. The redevelopment site is currently served

by public utilities. There are no capacity issues with the existing private utility

infrastructure system affecting the ability to serve the project. Figure 2.2.1E, Site Utility

Plan depicts the private utility locations. Further detail on private utilities and the

Adequacy of Utility Infrastructure is contained in Appendix 6 of this DEIS.

RG&E has provided the project sponsor with an intent to serve letter indicating there are

no capacity issues associated with proving energy to the redevelopment site.

The implementation of the access management plan will have no effect on private utility

demands.

Mitigation

Given that no adverse impacts have been identified and the project will be assessed the

appropriate usage fees, no further mitigation measures are proposed.

236 Whole Foods Plaza DEIS Town of Brighton

4.6.4 Police

Impacts

Police protection is provided by the Town of Brighton Police Department with back-up

protection available from the Monroe County Sheriff road patrol and the NYS Police.

The proposed project includes a similar use and intensity to that which currently exists and

therefore no additional impacts on public safety services is anticipated by the new

development.

The implementation of the access management plan will have no effect police protection

demands.

Improved Monroe Avenue corridor traffic flows and safety improvement have the potential

to reduce the number of responses by the police department associated with motor vehicle

accidents within the project area.

Mitigation

Given that no adverse impacts were identified and contributions to the Town fund through

increased property tax revenue, the resulting impact will be a positive one for the Town of

Brighton.

4.6.5 Fire

Impacts

Fire protection will be provided by the Brighton Fire Department. The closest Brighton fire

Station is located at Twelve Corners approximately 2 miles the east.

237 Whole Foods Plaza DEIS Town of Brighton

The proposed project includes a similar use and intensity to that which currently exists and

therefore no additional impacts on fire protection services is anticipated by the new

development.

The implementation of the access management plan will have no effect fire protection

demands.

Improved Monroe Avenue corridor traffic flows and safety improvement have the potential

to reduce the number of responses by the fire department associated with motor vehicle

accidents within the project area.

Mitigation

Given that no adverse impacts were identified and contributions to the Town fund through

increased property tax revenue, the resulting impact will be a positive one for the Town of

Brighton.

4.6.6 Ambulance

Impacts

Brighton Volunteer Ambulance Corp., located at Westfall Road and Winton Road,

provides emergency medical services, transports, training in CPR and acts as are source

for information and materials for those who are sick or injured.

The proposed project includes a similar use and intensity to that which currently exists

and therefore no additional impacts on emergency medical and transport services is

anticipated by the new development.

238 Whole Foods Plaza DEIS Town of Brighton

Improved Monroe Avenue corridor traffic flows and safety improvement have the

potential to reduce the number of responses by the ambulance corps associated with motor

vehicle accidents within the project area.

Mitigation

Given that no adverse impacts were identified and contributions to the Town fund through

increased property tax revenue, the resulting impact will be a positive one for the Town

of Brighton.

4.6.7 Educational Services

Impacts

The redevelopment project will increase tax revenues for the Brighton Central School

District. The School District is funded by property taxes, along with Monroe County sales

tax revenue and State aid. The retail portion of the project will be fully taxable, with an

estimated $340,000 increase in annual tax revenue going to the Brighton School District

inclusive of the increase of both property and sales taxes. The anchor grocery tenant is

typically involved with the local school district and will most likely contribute generously

to the local school district.

The implementation of the access management plan will serve to ensure the continued

viability of the commercial properties on the south side of Monroe Avenue and has the

potential to increase the property values of the properties thereby representing further

opportunities for increased tax revenues for the School District.

239 Whole Foods Plaza DEIS Town of Brighton

There will be no new residences as a result of this project, therefore the development will

not have an adverse impact to the Brighton School District as there are no residents of

school age.

Mitigation

Given that no adverse impacts were identified and contributions to the Town fund through

increased property tax revenue, the resulting impact will be a positive one for the Town of

Brighton.

4.6.8 Health Care Services

Impacts

The project area is served by Strong Memorial Hospital. The redevelopment of the site

will have no effect on health care services.

The implementation of the access management plan will have no effect on health care

services.

Mitigation

Given that no adverse impacts were identified effecting health care services, the resulting

impact will be a positive one for the Town of Brighton.

240 Whole Foods Plaza DEIS Town of Brighton

4.6.9 Recreational

Impacts

The redevelopment project provide increased recreational opportunities by providing

connectivity to the surrounding commercial and residential neighborhoods and upgrading

the connectivity of the trail system components to the east and west of the project area.

Improvements to the mixed use trail include constructing approximately 1060 lineal feet

(1060’) of asphalt trail. The trail is to be reconstructed to a width of ten feet (10’) wide to

comply with the American Association of State Highway (AASHTO) guidelines for

mixed use pathways. The trail is being separated from the parking areas to enhance user

safety. The radiuses, pavement cross slope, running slope, and pavement surface are in

accordance with the AASHTO recommendations for shared use trails. A pedestrian

gathering area with pedestrian linkages to the retail facilities and Monroe Avenue

corridor, wayfinding signage and centralized bicycle parking area with bicycle parking

for sixteen (16) bicycles is included in the trail system upgrades to promote access to the

site by users of the trail system. The proximity to the trail will provide enhanced

pedestrian connections between the retail and residential neighborhoods.

Mitigation

Given that no adverse impacts were identified, no mitigation measures are proposed.

4.6.10 Sidewalks

Impacts

The Whole Foods Plaza redevelopment project and implementation of the access

management plan will increase pedestrian access routes and connectivity by incorporating

241 Whole Foods Plaza DEIS Town of Brighton

approximately 2,368 lineal feet of sidewalks. The sidewalk network for the redevelopment

project have been broken down into three classifications. The classifications include

primary routes, tertiary routes and connector routes. Pedestrian access is provided

throughout the project with a sidewalk system network within the center and connecting to

the sidewalk system within the Monroe Avenue Corridor. The sidewalk network includes

a system of sidewalks designed to provide safe pedestrian access from parking areas to

buildings, from building to building and to and from the public sidewalk system on Monroe

Avenue and the multi-use Auburn Trail. Cross walk locations and pedestrian routes have

been designed to avoid pedestrian-vehicle conflicts. All walkways within the development

will be compliant with the American with Disabilities Act (ADA) guidelines. Figure 2.2.9

depicts the proposed sidewalk network system.

The design, construction and maintenance of sidewalks, pedestrian gathering area, bus

shelter, and wayfinding kiosk located along the Monroe Avenue project frontage will be

borne by the project sponsor. All improvements within the NYSDOT Right-of-Way shall

be publicly owned and operated. All improvements outside the NYSDOT Right-of-Way

shall be privately owned and access easements will be granted to facilitate public use.

Mitigation

Given that no adverse impacts were identified and the proposed redevelopment project and

access management plan will provide increased pedestrian routes and connectivity within

the project area, the resulting impact will be a positive one for the Town of Brighton.

242 Whole Foods Plaza DEIS Town of Brighton

4.6.11 Town Tax Rate/Budget and Fiscal Impacts

Impacts

The proposed development will generate a significant increase in tax revenues. The yearly

taxes currently generated are $190,661 +/-and includes tax exempt property. The future

projected taxes (using current tax rates) are expected to be $483,300.

While this property may be eligible for a payment in lieu of taxes (PILOT) Agreement and

substantial benefits under programs sponsored by the County of Monroe Industrial

Development Agency the project sponsor has committed that they will, in accordance with

the Town of Brighton's preference, forgo any request for such benefits.

By comparing the current property values, tax revenues and sales tax revenues in the

current condition versus the completed project and a conservative estimate of the increased

values of adjacent and surrounding properties and the revenues they will generate for the

Town of Brighton, the conservative estimate is an increase in property taxes collected in

the $753,900 to $1,000,000 range per year.

All special district fees (i.e. fire, sewer) will be paid as the project is developed.

In addition, no tax abatements will be sought from COMIDA that would have minimized

the positive impact on community resources. Forgoing any request for COMIDA will

apply to any and all buildings or uses of the site.

In summary, the new Whole Foods Plaza project will have a positive fiscal impact of

$753,900 to $1,000,000 range per year.

243 Whole Foods Plaza DEIS Town of Brighton

Mitigation

Given that no adverse impacts were identified, no mitigation measures are proposed.

4.7 Visual and Cultural

4.7.1 Visual

A visual impact analysis has been completed or the Whole Foods Plaza redevelopment

project. The process utilized for the visual assessment consisted of identification of the

physical/visual limits of the affected environment and development of a 3D visual model

of the project site and use of the model to create photo simulations and cross-sections.

Impacts

The redevelopment project will significantly upgrade the Monroe Avenue corridor in the

project area by providing a cohesive redevelopment of three properties which will meld

upscale architectural elements, landscaping elements which will enhance the building

architecture and provide enhanced visual interest, screening, and buffering to the

surrounding neighborhoods.

The proposed buildings are all single-story buildings with architectural features which

provide visual interest to the building facades. Buildings are set back at varying distances

from the roadway with shared parking fields. The varied building sizes and setbacks serves

to break up the scale and massing of the project elements to minimize the visual impact of

the redevelopment and to provide areas within the project for landscape islands to soften

the sightlines of the building from the Monroe Avenue corridor.

244 Whole Foods Plaza DEIS Town of Brighton

A six foot privacy fence, as required by code, will be installed along the northern project

disturbance limit adjoining the residential properties. The privacy fence will be augmented

with the construction of an earthen berm with landscape plantings to limit sightlines from

the residences north of Clover Street and motorists traveling along Clover Street.

Currently there is no consistent architectural pattern in the area, the proposed development

would not be out of character with the surrounding properties. Therefore, there will be no

significant adverse visual impacts as a result of this development.

In fact, the amount of visible vegetation and greenspace interspersed throughout the

project, will dramatically improve the vista of this site compared to its existing condition.

The positioning of the proposed buildings, entrance into the property, landscaping, trail

system and pedestrian walkways help to create a vibrant gateway to the Town of Brighton.

The architectural design will be more cohesive that the current structures. Design features

will include re-use of materials and feature materials and elements from the historic and

natural area.

Considering the current conditions of the site and the fact that it is located at one of the

prime entrances to the Town, the proposed project would result in a significant visual

improvement. As it is today, the site is viewed as a disjointed mix of many different styles

and material that have little to no architectural value. The proposed project would

significantly change the aesthetics of the site due to the impressive architectural design of

the buildings, varied formats of the structures and landscaping along the road frontage and

245 Whole Foods Plaza DEIS Town of Brighton

within the site.

The project sponsor proposes to redevelop the properties as Whole Foods Plaza, a Retail

Shopping Center anchored by a 50,000 sq. ft. natural and organic foods market/grocery,

shown on the Conceptual Site Plan [Figure 2] as Building I. The proposed development

includes a new 31,780 square ft. retail plaza building, and two outparcel buildings. The

existing buildings will be demolished for the cohesive redevelopment of the site. One of

the buildings is anticipated to include a specialty coffee shop with a drive through.

The goal of the design and layout is to create a retail center that is inviting and convenient

for shoppers of all ages. The new Whole Foods Plaza is intended to provide amenities

attractive to the residents of Brighton and the surrounding communities. These amenities

include trail linkages, bicycle racks, parking for HOV and Electric cars complete with

charging stations.

The anchor tenant has traditionally opened their sites up to a "public market" feel including

outdoor displays, entertainment and food service outdoors.

The architecture of the anchor building is intended to marry the old with the new; using

high quality local materials that evoke a taste of the past like the Erie Canal, while at the

same time re-using a significant amount of material from the Clover Lanes bowling alley,

specifically the wood from the bowling lanes and the large trusses that are usable from the

bowling alleys roof system. The building will also be designed and built with the

possibility of being re purposed some day in the event that the anchor grocery store where

to not be there in the distant future.

246 Whole Foods Plaza DEIS Town of Brighton

The main in line retail center is intended to be 31,780 square feet and although not matching

the main anchor building, share similar design influences and colors as to make the

buildings work together. It is likely that 6-10 different retail stores will occupy this

building; for this reason, the building will be constructed so the units are modular in nature

and can be reconfigured to accommodate different size tenants and uses in the future.

There are two outparcels in the design. The western most outparcel is designed to be 2,300

square feet and is committed to be a coffee shop with a drive through. The popularity of

coffee has grown tremendously and become a staple of social interaction. This parcel is

designed to accommodate a limited amount of outdoor seating visible to the main roadway.

This intentional display of a vibrant and welcoming atmosphere builds on the Lifestyle

Center feeling that this center will evoke.

It should be noted that although there are many different uses proposed for the center, there

will be a significant amount of patrons who come into the center with multiple stops at

different outlets. This is important when evaluating the effect on traffic and is indicative

of a Lifestyle Center.

The proposed architecture for the new Whole Foods Plaza project includes features that tie

the new construction to aspects of Brighton's past including aspects of the Erie Canal

Heritage using high quality natural materials, soft natural colors and creating a unique

center that is unlike the cookie cutter shopping centers of today.

The site has been designed to respond to the natural constraints of the land while meeting

247 Whole Foods Plaza DEIS Town of Brighton

the goals of the Project Sponsor. The layout is sensitive to the residential community to

the north of the project in that the largest building, the anchor grocery store, has been pulled

as far from the neighborhoods as possible. This accomplishes a significantly lower visual

impact to the residential community, it mitigates noise as well as odors and other naturally

occurring commercial byproducts. In consulting with the Town of Brighton Planning

Board, it was also a desire of that board to not have one large buildings, but instead, have

some larger buildings up front on the main road and several smaller structures throughout

the project. The idea is not to have a traditional strip mall look where the entire parking

field is in front of the retail.

The proposed redevelopment plans to provide sole access to the redevelopment site via two

driveways on Monroe Avenue. Implementation of an access management plan to benefit

commercial properties on the south side of Monroe Avenue and motorists traveling the

Monroe Avenue Corridor within the project area.

Mitigation

The site development will introduce and establish the amount of visible vegetation and

greenspace interspersed throughout the project, will dramatically improve the vista of this

site compared to its existing condition. The public vantage point is from Monroe Avenue.

The view from Clover Street will include an enhanced buffer between the residential and

commercial properties delineated by the improved Auburn Trail and landscaping designed

to screen the commercial area where one marginally exists now. The development is at

one of the gateways to the Town of Brighton.

Building and parking lighting will be quality and type that is clean, inconspicuous and does

248 Whole Foods Plaza DEIS Town of Brighton

not spill outside of the areas intended to be lit. Building materials will consist of a variety

of natural finishes.

This project will not cause an undesirable change to the visual characteristics of the area.

While there is no consistent architectural pattern in the area, the proposed development

would not be out of character with the surrounding properties. Therefore, there will be no

significant adverse visual impacts as a result of this development. The positioning of the

proposed buildings, formal entrance into the property, naturalist landscaping, maintained

lawn and pedestrian walkways help to create a vibrant gateway to the Town of Brighton.

4.7.2 Historical and Archeological

Impacts

The Whole Foods Redevelopment project and implementation of the access management

plan will have no adverse effect on historical or archeological resources. The New York

State Office of Parks, Recreation and Historic Preservation (OPRHP) was contacted and

they have conducted their review and found that the project will have no impact on

archeological and/or historic resources listed in or eligible for the New York State and

National Registers of Historic Places. Appendix 4 includes the documentation and findings

letter from the OPRHP.

Mitigation

Given that no adverse impacts were identified relating to historical and archeological

resources, the resulting impact will be a positive one for the Town of Brighton.

249 Whole Foods Plaza DEIS Town of Brighton

4.8 Noise

Impacts

The Whole Foods Plaza redevelopment project will result in increased noise levels at the

adjacent residential properties by 3 to 4 dBA. The increased noise levels are considered

unnoticeable to tolerable to the human ear.

Noise impacts have been evaluated for the proposed project based on the Town of Brighton

Zoning ordinance and NYS-DEC regulatory noise threshold levels. The NYS-DEC report

entitled Assessing and Mitigating Noise Impacts identifies that noise level increases less

than 5 dBA are considered unnoticed and tolerable to humans, and as such are considered

to have no impact. No noise abatement measures to be implemented for increases less than

5 dBA.

The potential noise-producing elements associated with the project include increased

traffic on the adjoining roadway system, commercial truck circulation, general parking lot

operations, loading dock activities, rooftop air-handling units, ground mounted mechanical

equipment (refrigeration compressors, and trash compactors), and project related

construction noise.

The FHWA Traffic Noise Model (TNM) was utilized to calculate traffic level noise

emission for the proposed redevelopment project. Projected traffic volumes were input

form the TIS prepared for the project. The model included truck delivery vehicles

circulating within the site and loading dock areas.

250 Whole Foods Plaza DEIS Town of Brighton

The combined total predicted proposed noise levels, from traffic sources, point sources,

plus existing ambient noise levels were calculated for eight locations. The locations

represented adjacent residential properties. The total combined noise sources are added

using logarithmic addition. Other noise factors including shielding are considered in the

noise calculations.

Table 4.8-1 summarizes the ambient future noise levels.

251 Whole Foods Plaza DEIS Town of Brighton

Table 4.8-1 – Ambient / Future Noise Levels and Human Reaction

Noise Levels (dBA) Site Period Existing Proposed Change Human Reaction Ambient Total Daytime 49 51 +2 Unnoticed to Tolerable R1 Nighttime 45 47 +2 Unnoticed to Tolerable

Daytime 48 50 +2 Unnoticed to Tolerable R2 Nighttime 44 47 +3 Unnoticed to Tolerable

Daytime 46 49 +3 Unnoticed to Tolerable R3 Nighttime 43 47 +4 Unnoticed to Tolerable

Daytime 45 47 +2 Unnoticed to Tolerable R4 Nighttime 42 45 +3 Unnoticed to Tolerable

Daytime 45 47 +2 Unnoticed to Tolerable R5 Nighttime 42 45 +3 Unnoticed to Tolerable

Daytime 45 47 +2 Unnoticed to Tolerable R6 Nighttime 42 45 +3 Unnoticed to Tolerable

Daytime 46 48 +2 Unnoticed to Tolerable R7 Nighttime 42 44 +2 Unnoticed to Tolerable

Daytime 47 49 +2 Unnoticed to Tolerable R8 Nighttime 42 44 +2 Unnoticed to Tolerable

FHWA’s Roadway Construction Noise Model (RCNM) data was used to estimate the noise

levels at the residences during snow plowing operations. The noise evaluation for snow

plowing operations modeled the equipment utilized in modern snow removal operations

for plazas. The model was based on a front end loader, with a reference noise level of 80

dBA at 50 feet. Snow plowing operations only occur during winter months when

residential activity primarily occurs indoors. Indoor noise levels are decreased by

approximately 20 dBA. Snow plowing operations will generate noise levels at the adjacent

252 Whole Foods Plaza DEIS Town of Brighton

residential properties which are below the US Department of Housing and Urban

Development (HUD) interior noise level goals of 45 dBA. Snow plowing operations are

currently undertaken for the site, redevelopment of the project area will not have an impact

beyond that which occurs on the site now.

Typical site construction equipment and operations will generate short-term impacts. The

impacts will vary in duration and magnitude based on equipment use and operations being

performed. Typical site construction equipment to be utilized in the redevelopment of the

site and implementation of the access management plan includes, but is not limited to:

• Bulldozers

• Excavators

• Backhoes

• Motor Graders

• Air Compressors and Pneumatic Tools

• Generators and Pumps

• Gasoline Powered Cut-off Saws

Noise emissions from construction equipment is in the range of 73 to 76 dBA, at a reference

distance of 200 feet from the source.

Implementation of the access management plan will not have an impact on area noise

levels.

253 Whole Foods Plaza DEIS Town of Brighton

Further details on the Noise Study methodology and findings are contained in Appendix

13 of this DEIS.

Mitigation

Although the 3 to 4 dBA increase in noise levels resulting from the redevelopment project

are categorized as having unnoticed or tolerable impacts the resultant noise levels are

mitigated by the construction of the earthen berm with landscaping, the installation of the

six-foot high privacy fence, and building orientations.

Additional operation practices to mitigate noise impacts include:

• Limiting any parking lot sweeping operations to daytime hours.

• Limiting refuse pickups to daytime hours.

Construction noise impacts for the redevelopment project and implementation of the

access management plan include:

• Location stationary equipment away from residential sound receivers when

possible.

• Locating material stockpiles and haul routes away from residential sound receivers

when possible.

• Coordinating construction truck traffic and deliveries with local traffic.

• All construction activities will occur during the hours of 7:00 am and 7:00 pm

Monday through Friday, and between 9:00 am and 6:00 pm Saturday and Sunday

in conformance with Town Code section 102-3.

254 Whole Foods Plaza DEIS Town of Brighton

• Limiting / scheduling of particularly load construction activities by time of day to

minimize impacts.

4.9 Construction

Impacts

The Whole Foods Plaza redevelopment project and implementation of the access

management plan will create short-term impacts. The impacts will vary in magnitude

based on the phase of construction. Typical construction impacts associated with the

project include but are not limited to:

• Noise

• Dust

• Soil & Erosion Control

• Construction Activities

• Construction Vehicle Traffic

• Pedestrian Detours

Construction operations for the Whole Foods Plaza redevelopment project is expected to

be completed in a single phase. The anticipated construction duration for the

redevelopment is expected to have an eighteen (18) month duration. The anticipated

construction period will include construction of the improvements necessary to implement

the access management plan and Auburn Trail improvements.

255 Whole Foods Plaza DEIS Town of Brighton

The anticipated sequence of construction commences with demolition of the existing

structures that are Mario's Restaurant, Clover Lanes Bowling Center and Mamasan's

Restaurant.

The demolition of the existing buildings and redevelopment of the site provide

opportunities for material reclamation and reuse of materials regionally. The project

sponsor has committed to a material reclamation and regional reuse plan. The planned

reuse of materials include reclamation of the clay tile roof shingles from the Mario’s

facility, reuse of the timber from the Bowling Center roof truss system, reuse of a portion

of the lumber from the bowling approaches and setae areas, reclamation of the bowling

lane beds for reuse, and rubblization of pavement surfaces for use as fill materials. All

debris that is not reclaimed or reused from the demolition of the structures will be disposed

of off-site in a legal manor.

Demolition operation for the structures will be followed by general earthwork operations.

Mass earthwork for the site will be completed in a single phase which will include

rubblization of existing pavement surfaces for reuse, removal of unsuitable soils within the

proposed building footprints and replacement with select fills and establishing the general

lines and grades for the development of the parking areas and building pads. Mass

earthwork operations will be followed by utility infrastructure improvements for sanitary,

storm, water, gas and electric. Upon completion of the utilities infrastructure and on- site

fire protection, construction of the new buildings will commence. A five acre waiver will

be sought to allow for the mass grading to be performed in a single phase disturbing more

than five acres at one time.

256 Whole Foods Plaza DEIS Town of Brighton

Further details on the volume of soils to be exported and imported from the site are included

in Section 4.1 and Appendix 11 of this DEIS.

The existing main access point on Monroe Avenue for the Mario’s and Clover Lanes

facilities will serve as the stabilized construction access during the initial stages of the

redevelopment construction operations. Access to the site during construction will be

limited including the re-routing and fencing off of the Auburn Trail to the north on the site

and the sidewalks along Monroe Avenue.

The installation of the traffic signal will be coordinated with the New York State

Department of Transportation and will occur during the initial site work stage of

construction, although the signal will be installed, it will most likely not be operational

until the new Whole Foods Plaza is close to completion. Construction of the site access

points and utility connections within the Monroe Avenue right-of-way will require the

implementation of a Maintenance and Protection of Traffic (MPT) plan. The MPT plan

will be developed in accordance with NYSDOT requirements and will require review and

approval from the NYSDOT. The MPT plan developed for the site will provide specific

consideration to minimize the impacts of construction vehicle traffic during the peak hour

of roadway traffic.

The installation of the access management improvement will be performed on a similar

timeline with the installation of the signalized intersection improvements.

It is expected that the 50,000 square foot Whole Foods building will be constructed first,

followed by the remaining three structures. The Whole Foods building will require 7-9

257 Whole Foods Plaza DEIS Town of Brighton

months to complete the internal buildout of the grocery store making it likely that the

grocery store and adjoining retail stores will open at roughly the same time or within 6

months of each other. The Whole Foods building will be constructed to U.S. Green

Building Council (USGBC) Silver LEED standards and incorporate architectural features

and materials appropriate to the Rochester area. The additional buildings of the retail plaza

will be designed to complement the Whole Foods building, providing an architectural

theme consistent throughout the development. USGBC certification for the buildings will

not be sought.

The site construction should be completed before any retail store opens to the public with

only inside buildout construction remaining thereafter.

All construction activities will occur during the hours of 7:00 am and 7:00 pm Monday

through Friday, and between 9:00 am and 6:00 pm Saturday and Sunday in conformance

with Town Code section 102-3. The project sponsor does not intent to have construction

activities occurring routinely on Sundays. Construction activities on Sundays for site

related construction will be limited to completing time sensitive elements and delays due

to inclement weather. Once the building shells are completed, indoor construction

activities which will not impact the neighboring residential district may occur during the

hours allowed under the Code.

All construction equipment and materials will be stored onsite in a safe and secure manor.

The construction access point for deliveries and workers will be clearly demarked.

Erosion control measures are to be implemented at the perimeter of the site with attention

258 Whole Foods Plaza DEIS Town of Brighton

given to down- gradient areas of all disturbed areas to minimize the transport of sediment

off-site. Sedimentation basins will be constructed with temporary diversion swales to treat

and convey stormwater runoff. Stormwater inlets and proposed filter and engineered soil

planting areas will be protected with silt fencing or other barriers until such time that

landscaping is established and other site coverage complete. A stabilized contraction

access will be provided and if warranted by weather conditions, a truck wheel wash area

will be maintained on-site in order to minimize sediment build-up on Monroe Avenue.

Exposed soils will be wetted as necessary to avoid windblown dust erosion. Figure 2.2.1F

depicts the erosion control measures to be implemented for the redevelopment site. Figure

2.2.1H depicts the erosion control measures to be implemented for the access management

areas. Further detail on erosion control measures are contained in Section 4.2 and

Appendix 19 of this DEIS.

Mitigation

Dust will be monitored daily during construction and will be controlled with water on an

as needed basis. Erosion and sediment control devices will be installed at the start of the

construction activity and inspected and repaired as needed. A truck tire washing station

will be set up at a stabilized construction access if needed to remove soil from the truck

tires. Signs will be installed directing users of the Auburn trail along temporary detours to

navigate safely around the construction area. Work on the main road will be done in

cooperation with NYSDOT to minimize the negative impact on traffic.

Construction related impacts are anticipated to be limited to a single construction phase

that is anticipated to last 18 months or less. During the construction period impacts will

include dust and noise generation; limited impairment to local traffic flow associated with

259 Whole Foods Plaza DEIS Town of Brighton

construction vehicle traffic, utility extensions and curb cuts and general visual changes.

Noise impacts will be limited to daytime hours and the working hours permitted by the

Town of Brighton. Ambient noise levels during construction will be higher than existing

noise levels. However, construction equipment will meet industry standards for noise

control. No blasting is anticipated during construction.

Traffic impacts during construction will be monitored and any work on the roadway will

be controlled by methodology of the NYS Manual of Uniform Traffic Control Devices and

Monroe County Department of Transportation regulations.

Signs will be installed directing users of the Auburn trail along temporary detours to

navigate safely around the construction area.

260 Whole Foods Plaza DEIS Town of Brighton

5.0 Unavoidable Environmental Impacts

The proposed Whole Foods Plaza redevelopment project and associated implementation of

the Monroe Avenue access management plan will result in the loss of approximately 1.0

acre of shrub land/treed areas. The vegetated areas will be converted to parking areas,

mixed use pathway, pedestrian gathering area and lawn area. The development of these

areas will increase the impervious surface area of the project area.

The redevelopment of the site will alter the visual character of the Monroe Avenue corridor.

The existing Mario’s Restaurant, Clover Lanes, and Mamasan’s Restaurant facilities will

be closed and demolished.

Although the redevelopment project has a significant commitment to materials reclamation

the demolition of the existing structures will result in increased landfill debris.

Redevelopment of the site and implementation of the access management plan will result

in the irreversible and irretrievable of natural resources associated with construction

materials, equipment and fuel.

In addition to the commitment of resources for the construction redevelopment of the site

and implementation of the access management plan are short duration construction impacts

of varying magnitude. The following short term irreversible construction impacts include:

• Noise

• Dust

• Soil & Erosion Control

261 Whole Foods Plaza DEIS Town of Brighton

• Construction Vehicle Traffic

• Pedestrian Detours

The full build analysis, with a new traffic signal and properties along the south side

connected with easements and a rear-lot access road, shows that the study intersections will

experience small to moderate increases in delay during the weekday AM and PM, and

Saturday midday peak hours.

6.0 Alternatives

6.1 Development of the Site Under Existing Zoning Regulations

Redevelopment of the site under existing zoning regulations results in a site redevelopment

plan which does not require incentives for deviations from bulk area requirements.

Although “incentives” for the uses would be eliminated it would not preclude uses which

would require special use permits as permitted by Town Code. Redevelopment of the site

under existing zoning regulations results in a reduction in requested incentives but does not

offset the loss of amenities which would be provided by the proposed action and

implementation of the access management plan. Redevelopment of the site under existing

zoning regulations would not include construction and maintenance of the signalized

intersection on Monroe Avenue, implementation of an access management plan,

multimodal connectivity and pedestrian connectively to the south side of Monroe Avenue.

Redevelopment of the site under existing zoning regulations results in a reduction in the

increase in property tax and sales tax revenues from the redevelopment project.

262 Whole Foods Plaza DEIS Town of Brighton

Redevelopment of the site under existing zoning regulations results in similar impacts to

soils, stormwater, lighting, and utilities.

Due to the odd lot configuration the redevelopment of the site which optimizes the property

results in “Strip Plaza” style layout which does not meet Comprehensive Plan objectives.

This style development plan does not meet Town Comprehensive Plan and Monroe Avenue

Corridor objectives.

Redevelopment of the site under existing zoning regulations is not a financially viable

alternative and would result in a negative return on investment.

These alternate development plans and uses do not reflect the goals of the Project Sponsor

or future intended tenants.

6.2 Alternate Developed Use

Alternate uses of the project site in compliance with the current BF-2 and RLA zoning

districts include, but is not limited to: offices, consumer services, fitness centers, single

family dwellings and family childcare. Additional conditional uses include, but are not

limited to: banks, restaurants, new auto sales, hotels/motels, nursing homes, places of

worship, private non-profit educational facilities.

The project sponsor has contemplated several other uses including a hotel or mixed use

development. The hotel alternative was the part of an original concept plan that was

discussed with Town staff as depicted in the Hotel Site Plan Alternative 1 &2 (Figures 10A

& 10B) and Hotel Site Layout Alternative (Figure 10C). The Mixed Use Alternatives 1 &

263 Whole Foods Plaza DEIS Town of Brighton

2 (Figures 10D & 10E), concepts contemplated a mixed use residential and commercial

use. These alternatives do not meet the stated desires of the Comprehensive Plan and entail

a more dense use with the need for more variances and deviation from the adopted Town

building codes include height requirements, 4-5 floors, which would have a significant

adverse effect on the residential developments to the north. Neither the Hotel nor Mixed

use alternatives are marketable when meeting the height or density maximums required by

code. Alternative developed uses include different variations of mixed residential and

commercial use, again, this would require building height variances which would have a

significant impact on the residential vista. Additionally, these uses are not consistent with

the uses along this Monroe Avenue corridor.

Redevelopment of the site under alternate uses would result in similar impacts to soils,

stormwater, lighting, public and private utilities.

Alternate uses of the site in compliance with the current zoning district permitted uses has

the potential to increase demands on the public water system and community resources

associated with hotel/motel, fitness center or nursing home uses.

These alternate development plans and uses do not reflect the goals of the Project Sponsor

or future intended tenants.

6.3 Alternate Site Plans

Alternate project sizes are a theoretical possibility for any development. In this case any

significant downsizing will present an economic challenge that puts the entire project at

risk. Due to the properties geometry, soil conditions and acquisition costs the

264 Whole Foods Plaza DEIS Town of Brighton

redevelopment of the site is expensive. The project sponsor has carefully balanced the

need for leasable square-footage and the need for the anchor tenant facility size.

Based on discussions with the Planning Board and feedback from neighbors and Town

staff, the project sponsor has developed alternate site designs in order to try to achieve a

redevelopment plan that complies with current codes. These Option Alternatives are

depicted in Appendix 5 and where presented to the Brighton Planning Board as considered

alternatives with pros and cons listed on each alternative option. These designs do not

inspire creativity nor a project that is in keeping with the designs that work for the more

sophisticated consumer and retailers that it is built to attract.

As detailed in the Density Study [Appendix 17], the proposed density of the redevelopment

is in keeping with and in most cases less than is in keeping with the developed parcels in

this area of Monroe Avenue and other commercial areas in Brighton and surrounding

Towns.

In contemplating the site layout, design and economic viability, several combinations of

alternative uses and square footages where considered. A primary force driving the

proposed development is the economic viability based on market rents and tenant demand,

additionally, the anchor tenant, Whole Foods Grocery Store, has very specific needs and

has committed to coming into an area of the country with a competitor that is known as a

top performer in the grocery industry requiring the anchor tenant to make this store special

and to a level that can compete with Wegman's.

The project sponsor has further evaluated numerous alternatives that contemplate

265 Whole Foods Plaza DEIS Town of Brighton

variations to the project proposal with variations to building sizes, site access, uses and

drive through operations.

Eleven alternatives were further developed and evaluated to assess their impacts on the

transportation network. Ten of the alternative included in some form secondary access to

the site. Variations in secondary access were evaluated that considered full access to both

Allens Creek Road and Clover Street to limiting secondary site access to delivery vehicles.

There has been much discussion about the secondary access points for this project that have

been contemplated on Allens Creek Road and Clover Street. Based on community input

the project sponsor has revised the proposed redevelopment plans to provide sole access to

the redevelopment site via two driveways on Monroe Avenue.

The alternative considered included a outparcel style bank with drive up tell, general retail

size variations, restaurant uses and access schemes. Table 6.3-1 depicts the 11 alternatives

evaluated.

Redevelopment of the site under alternate site plans represent similar impacts for all

variations. The overall magnitude of redevelopment is similar in that the project effects a

project area approximately 10.1 acres in size. The alternative variations do not change

impact categories or benefits. The largest variations related to alternative site plans are

associated with traffic. The variation in traffic generations for the alternates are minimal

when compared to overall traffic conditions. The largest variation associated with the

alternatives is the impacts related to providing secondary access points for the

redevelopment to Allens Creek Road and Clover Street.

One alternative contemplated is to reduce the size of the anchor tenant grocery store from

266 Whole Foods Plaza DEIS Town of Brighton

the proposed 50,000 square foot store to a store that is either 20,000 square feet as permitted

by code or some square footage less than 50,000 square feet. While reducing the square

footage of the grocery tenant would reduce traffic in and out of the center to some degree,

the anchor tenant has expressed that the 50,000 square foot store is the minimum they

would consider for this location as necessary in order to compete with the 125,000 square

foot grocery store in the area and create the value and variety this market demands.

Economically, part of what makes a shopping center viable, is the inclusion of smaller

retail tenants to complement the anchor tenant and creating a blended rent number that

works financially for the proposed development. As is common with most retail

developments, the anchor tenant pays much less per square foot than the accompanying

tenants. If the square footage of the retail stores is reduced, it effects the economics of the

project by a greater proportion that just the proportion of square footage lost to the total

square footage of the center.

The economic viability of this project is based upon the blended rents of both the anchor

tenant and other tenants, therefore, reducing the size of the retail stores alternate

development plan does not reflect the goals of the Project Sponsor or intended tenants.

These alternate development plans and uses do not reflect the goals of the Project Sponsor

or future intended tenants.

Further details on alternatives considered are contained in Appendix 5 of this DEIS.

267 Whole Foods Plaza DEIS Town of Brighton

Table 6.3-1 Summary of Plans and Alternatives

268 Whole Foods Plaza DEIS Town of Brighton

6.4 Potential Allowable Future Uses of Buildings

Potential allowable future uses of the buildings to be constructed will not create any change

in impacts from the development proposal. The general retail buildings are to be

constructed to allow flexibility of partitioning interior space to meet changing retail needs.

The Foods building could be adapted for general retail or other allowable commercial use.

Change in retail tenants will not have an effect on parking demands, energy usage, or

overall traffic generations. Parking for the project has been based on shopping center

parking demand rates of 5/spaces per 1000 square-feet which would be sufficient for all

uses. Changes in use would have no significant impact on energy use, water consumption,

sewer flows. Changes in uses may result in minor shifts in trip generation peaks. Traffic

volumes are more closely related to overall square-footage of the development.

6.5 No Action Alternative

The “no-action” alternative results from the project not receiving approvals form the Town

of Brighton. Under this option the site would not be redeveloped and the access plan would

not be implemented. This plan would also assume that the existing business entities remain

open and viable commercial entities.

No redevelopment of the property would leave several parcels of property underdeveloped

and in disrepair. The largest structure, the bowling alley, has a roof system that is in

substandard condition and perhaps unsafe. It is cost prohibitive to repair the roof system

so abandonment or demolition are inevitable in a relatively short period of time.

269 Whole Foods Plaza DEIS Town of Brighton

Site access safety concerns, limited pedestrian accessibility issues, pedestrian safety issues,

untreated stormwater runoff, parking issues, limed commercial viability/sustainability of

properties.

The no-action alternative would eliminate the benefits of the redevelopment project and

access management plan.

This option does not meet the goals of the Project Sponsor.

270