Spring 2011 Gas-Lift Workshop Steering Committee Meeting Agenda and Minutes

Meeting Date Meeting Venue Agenda Minutes Thurs. Feb. 4, 2010 Face-to-Face Meeting in Houston, See below. See below. 5:30 pm Texas Tues. March 30, Teleconference Call See below. See below. 2010 9:00 am, CDT Wed. April 28, 2010 Teleconference Call See below. See below. 9:00 am, CDT Wed. May 26, 2010 Teleconference Call See below. See below. 9:00 am, CDT Wed. June 23, 2010 Teleconference Call See below. See below. 9:00 am, CDT Wed. July 21, 2010 Teleconference Call See below. See below. 9:00 am, CDT Thurs. Sept. 9, 2010 Teleconference Call See below. See below. 9:00 am, CDT Thurs. Oct. 7, 2010 Teleconference Call See below. See below. 9:00 am, CDT Fri. Nov. 5, 2010 9:00 Teleconference Call See below. See below am, CDT Fri. Dec. 16, 2010 Teleconference Call See below. See below. 9:00 am, CST Thurs. Jan. 6, 2011 Teleconference Call See below. See below. 9:00 am, CST Wed. Jan. 19, 2011 Teleconference Call See below. See below. 9:00 am, CST Wed. Feb. 2, 2011 Teleconference Call 9:00 am, CST 866-359-4571 281-319-9876 Code: 6616820996

Green --- Agenda Gray --- Past meetings, actions completed Yellow --- Past meetings, on-going Light Blue – Current and upcoming meeting

1. 2011 Workshop Planning Meeting Attendees  Attendees – Feb. 4, 2010 Celeste Cicerone ASME IPTI Joe Clegg Consultant Ken Decker Decker Technology Cleon Dunham Oilfield Automation Consulting Lisa Elliott ASME IPTI Mike Johnson ExxonMobil Eric Lovie Schlumberger Wayne Mabry Schlumberger Juan Carlos Mantecon SPT Group 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 2

John Martinez Production Associates Tom Nations ConocoPhillips Greg Stephenson Occidental Petroleum Ron Schmidt Weatherford Artificial Lift  Attendees – Mar. 30, 2010 Celeste Cicerone Lisa Elliott John Martinez Melanie Diaz Tim Graves Cleon Dunham Jim Hall  Attendees – April 28, 2010 Celeste Cicerone Cleon Dunham Tim Graves Ken Decker Lisa Elliott Jim Hall  Attendees – May 26, 2010 Rodney Bane Cleon Dunham Jim Hall Celeste Cicerone Torkay Lisa Elliott John Martinez Ken Decker Tim Graves Greg Stephenson  Attendees – June 23, 2010 Cleon Dunham Eric Lovie Celeste Cicerone Torkay Lisa Elliott John Martinez Tommy White Tim Graves  Attendees – July 21, 2010 Ken Decker Arun Kallal Tom Nations Cleon Dunham Eric Lovie Celeste Torkay Lisa Elliott  Attendees – Sept 9, 2010 Ken Decker Mike Johnson Tom Nations Cleon Dunham John Martinez Celeste Torkay  Attendees – Oct. 7, 2010 Ken Decker Tom Nations Celeste Torkay Cleon Dunham Stuart Scott  Attendees – Nov. 5, 2010 Ken Decker Mike Johnson Greg Stevenson Cleon Dunham Wayne Mabry Celeste Torkay Tim Graves Stuart Scott  Attendees – Dec. 16, 2010 Cleon Dunham Jim Hall John Martinez Tim Graves Eric Lovie Celeste Torkay  Attendees – Jan. 6, 2011 Ken Decker Eric Lovie Greg Stephenson Cleon Dunham Wayne Mabry Celeste Torkay Mike Johnson  Attendees – Jan. 19, 2011 Ken Decker Mike Johnson Greg Stephenson Cleon Dunham John Martinez Celeste Torkay Tim Graves Kim Micelli Tommy White Jim Hall  Attendees – Feb. 2, 2011 Ken Decker Mike Johnson Greg Stephenson Cleon Dunham Eric Lovie Celeste Torkay 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 3

2. Learnings from 2010 Workshop a. Technical sessions b. Continuing education courses c. Discussion sessions d. Breakout sessions e. Side trip f. Social events  Agenda/Minutes – Feb. 4, 2010 - Learnings from 2010 Workshop. - Celeste Cicerone  Having on-line wireless internet was very helpful.  Next year will have a printer.  Weatherford “wine savvy” reception was very good.  Need to organize presenters’ gifts for next year.  Courses were very well received.  Some people went to courses they didn’t sign up for.  Send a reminder e-mail in advance.  Use one generic background for course materials. Should be white.

- Joe Clegg  Would like to have more young, good looking gals.  Need to have a design course.

- Ken Decker  Enjoyed networking with all of the people.  Good discussion with PTC and Statoil.  They think this is the best Gas-Lift Workshop in the world.  Would like more presentations on “new” technologies.  Need to start advertising earlier.  Only two presentations by Operating Companies.  Some thought that the API meetings were part of the draw for attending.

- Cleon Dunham  Would like to have a Technical Review Committee.  Cleon Dunham and Tommy Nations will explore this.  Presentations in PDF are not good.  Need to have an author’s breakfast.

- Lisa Elliott  It is important to have good traffic at the Exhibit Booths.  Need to tell others about this.  Willing to advertise using Service Company mailing lists.

- Mike Johnson  Would have been good to have two screens in the room.  Was glad to have his supervisor come.  Glad to have new ideas presented.  Generate a general “rule” about use of company names, trade marks, etc.  Need to tell people about the “wifi” code.  Mrs. Blann really appreciated our “honoring” Jack Blann.

- Eric Lovie  Good hotel. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 4

 Good papers – better on the 2nd day.  Timing was good.  Some complained that room was too cold

- Wayne Mabry  Enjoyed Bill White, but some were turned off by him being a Democrat.  Would like more Operating Company participation.  We need to encourage Operating Company management to send their people.

- Juan Carlos Mantecon  Good food.  Good coffee.  Arrangements and planning were good.  Presentations should not be commercial.  But some limited amount may be worthwhile.

- John Martinez  Need to discuss continuing education.  Time to stop having “Artificial Lift” selection.  Need to continue a design course.  In Singapore can have a course on Dynamic Simulation?  Need to also have a course on dual gas-lift, operations, and automation.  For 2012, consider other locations in Houston.  Nice space in hotel for Exhibits, food, etc.  Need local advertising – TV, newspaper, etc.

- Tom Nations  Turnout was very good.  Maybe advertise earlier in the year.  Good Exhibitor turnout and good traffic at the exhibits.  Placement of the Exhibits was good.  Enjoyed networking opportunity and to see old friends.  ConocoPhillips was the only major Oil Company to Sponsor.

- Greg Stephenson  Lee Mathews from Qatar said this is the best Workshop in the Industry  How can we reach out to more Operating Companies?  Need Service Companies to invite their e-mail lists.  Sell “day” passes.  Somebody said to include other forms of lift.  Having the “wine” event on Wednesday was a good time.

- Ron Schmidt  Agree with other comments.  Use clip-on microphones for speakers.  Agenda/Minutes – Mar. 30, 2010 - Are there any further learnings from the 2010 Workshop? - There has been a great deal of discussion about whether or not ASME will continue to sponsor international workshops. - Initially they said they would not. - Now they are considering it. - If they won’t, there are alternatives. - The ASME Petroleum Division Executive Committee has agreed to go ahead with the 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 5

event; both domestic and international. - This is being reviewed in New York. - We should have final approval from New York this week.  Agenda/Minutes – April 28, 2010 - Tim Graves: Has approval for the 2011 Workshop in Singapore been received from ASME in New York? - Tim Graves: We do have approval from New York.

3. Gas-Lift Workshop Budgets and Finances a. Status of Financials for the 2010 Workshop. b. Budget for the 2011 Workshop.  Agenda/Minutes – April 28, 2010 - Tim Graves: What is the status of the final Financial Report for the 2010 Workshop? - Tim Graves: Is there any new information on the Budget for the 2011 Workshop? - Tim Graves: The financials for 2010 are set. - Tim Graves: The budget for 2011 is OK.

4. Venue for 2011 workshop c. Per our normal rotation, the 2011 Workshop will be in an international location. d. Are we all in agreement with having it in Singapore? e. What hotel is recommended? f. What dates are recommended?  Agenda/Minutes – Feb. 4, 2010 - Discuss the venue for the 2011 Workshop in Singapore. ======- Eric Lovie of Schlumberger is moving to Singapore and will be helpful. - We need to line up support from other companies in the area. - We need to have Presentations from the area. - Make a flier and a “request for presentations” for Schlumberger, etc. to handout. Done. - Obtain contact information on each SPE chapter in the area and “buy” an ad to be placed in their local newsletters. - Add Eric Lovie to the Steering Committee: [email protected] Done  Agenda/Minutes – Mar. 30, 2010 - Are there any additional comments on the venue for the 2011 Workshop in Singapore? - ASME and Schlumberger will work on securing the actual venue in Singapore.  Agenda/Minutes – April 28, 2010 - Celeste Cicerone: Have ASME and Schlumberger secured the actual venue in Singapore? - We need to know this so we can place this information on the web site. - Cleon Dunham will visit with Schlumberger to get this underway. (This is underway.)  Agenda/Minutes – May 26, 2010 - Celeste Cicerone: Have ASME and Schlumberger secured the actual venue in Singapore? - We need to know this so we can place this information on the web site. - We are looking at the Grand Copthorne Waterfront Hotel in Singapore. - This was selected by ASME. Schlumberger wasn’t involved with the selection. - We still need to negotiate a contact with them. This should be ready by early June.  Agenda/Minutes – June 23, 2010 - Are we all set with the venue for the 2011 Workshop? - Will it be the Grand Copthorne Waterfront Hotel in Singapore? - The Hotel wants $6,000 (Singapore $) per night for overnight storage of Exhibits that 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 6

are set up. - We agreed that is isn’t reasonable to have people take down their exhibits each evening and set them up the next morning. - Tommy White will work with his contacts in Singapore to see if this charge can be reduced or alleviated.  Agenda/Minutes – July 21, 2010 - Schlumberger has visited four hotels in Singapore. - They are waiting for formal proposals from two of them. - Has an actual venue been agreed by ASME, Schlumberger, et al? - Eric Lovie reviewed the Schlumberger visit to several hotels and a conference center in Singapore. - Eric Lovie recommends the Pan Pacific Hotel. The Conference Center is located next to the Pan Pacific. - ASME will review the proposals from the Grand Copthorne, the Pan Pacific Hotel, and Conference Center and come back with a firm recommendation by the end of the week of July 19, 2010.  Agenda/Minutes – Sept. 9, 2010 - Is agreed to hold the 2010 Workshop in the Pan Pacific Hotel in Singapore. - This is now listed on the ALRDC web site. - Are there any other issues with this at this time? - There are problems between the hotel and ASME’s Legal Dept. - There are three clauses in the hotel’s contract that ASME doesn’t agree with. - Celeste Torkay and Tim Graves of ASME will stay on top of this and let us know next week if this has been resolved. - It is hasn’t, it may be necessary for ALRDC or Schlumberger to sign a contract with the hotel.  Agenda/Minutes – Oct. 7, 2010 - Is it now fully agreed to hold the 2010 Workshop in the Pan Pacific Hotel in Singapore? - Are there any outstanding issues to be resolved? - The contract with the hotel has not been signed yet, but ASME is working on this and we are assured that it will be signed. - The contract will be worked out and signed in the near future.  Agenda/Minutes – Nov. 5, 2010 - Celeste Torkay: Has the contract been signed with the Pan Pacific Hotel? - Are there any other issues with the hotel for the Workshop in Singapore? - The Pan Pacific Hotel has agreed to not have construction during the meeting. - The Houston ASME office will ask New York to sign the contract. This will be done next week. - There are no other outstanding issues.  Agenda/Minutes – Dec. 16, 2010 - Celeste Torkay: Has the contract finally been signed with the Pan Pacific Hotel? - Are there any other issues with the hotel for the Workshop in Singapore? - The contract with the Hotel has been signed. - The current guaranteed number of rooms is 170 room nights for the week. - They will release some rooms before the event if they are not claimed. - They didn’t increase the cost for meals but added more room rental for the exhibit rooms.  Agenda/Minutes – Jan. 6, 2011 - Celeste Torkay: Are there any issues with the hotel for the Workshop in Singapore? - There were no other issues associated with the hotel. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 7

5. Costs for 2011 workshop a. How much should we charge for registration? Cost in 2010 = $575 b. How much for Continuing Education? Cost in 2010 = $545 c. How much for Exhibits? Cost in 2010 = $600, $900, $1200  Agenda/Minutes – Feb. 4 , Mar. 30, 2010 - Should we stay with the same charges for the 2011 Workshop? - Or, given the extra costs of an overseas Workshop, we could increase the costs to: - Registration: $650 - Continuing Education $600 - Exhibits: $700, $1000, $1400 - Thoughts? - The amounts listed above are agreed for the 2011 Workshop. - We will not charge a higher amount for late registration. - We will not have a one-day one day charge. - The rate for staffing a booth only will be $150 per day. - We will give a discount to active API/ISO members who are actually working on current API/ISO documents. - They will pay the full amount up front and can get a refund if they are eligible for it.  Agenda/Minutes – April 28, 2010 - Are there any more comments on the charges for the 2011 Workshop? - If not, these will be announced as the costs for the 2011 Workshop? - These costs are OK with everyone.  Agenda/Minutes – May 26, 2010 - Do we want to have separate costs for Early Bird vs. larger amount for later on? - We do want to have separate Early Bird and later costs. - The early bird rate will be good up to one month before the event and then the costs will go up $100. This has now been posted on the web site.

6. Technical agenda for 2011 workshop a. Possible technical agenda session topics b. Possible session chair persons  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - For a Workshop in Singapore, it would be good to focus on Technical Agenda topics of specific interest in the region. - What are these topics? - Who will serve on a Technical Review Committee to review Abstracts and Technical Presentations? - We need to schedule and Author’s Breakfast on Wednesday and Thursday. - Plan for two screens in the Technical Presentation room. - Use clip-on microphones for Speakers. - The topics should be favorable for the Far East. - We should look at the program we had in Kuala Lumpur. - Potential topics for the 2011 Workshop are: - Duals - PPO Valves - Facilities - Automation - Field Reviews - New Technology - Valve Testing - Subsea 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 8

- The Technical Review Committee will consist of Cleon Dunham, Jim Hall, and Tom Nations.  Agenda/Minutes – April 28, 2010 - Are there additional comments on the technical agenda for the Workshop in Singapore? - Are there any leads on actual Technical Presentations at this time? - We need to get input from Walrick van Zandvoord and Mile Dolan on this. They are new members of the Steering Committee. - Cleon Dunham will send an e-mail to people in the region. (This has been sent.)  Agenda/Minutes – May 26, 2010 - Walrick van Zandvoord responded that there should be a section on New Technology. - This is on the agenda. - ExxonMobil will make a technical presentation on an update on their experiences with Well Tracer and one on Gas-Lift Optimization.  Agenda/Minutes – June 23, 2010 - Are there any nominations for Technical Presentations for the 2011 Workshop? - John Martinez and Cleon Dunham (Done) will send e-mails to their contact lists. - All Member Companies are asked to send notes to their contacts. - Schlumberger will probably have two technical presentations.  Agenda/Minutes – July 21, 2010 - Are there any nominations for Technical Presentations for the 2011 Workshop? - Are companies sending notes to their contacts and asking for presentations? - ConocoPhillips will have a presentation from Indonesia. - We may have one or two presentations from PDVSA. - Cleon Dunham will send a copy of Ali Hernandez’s paper on the Thornhill-Craver method to Ken Decker. Done.  Agenda/Minutes – Sept. 9, 2010 - Are there any specific Technical Presentations defined at this time? - Are there any new nominations for Technical Presentations for the 2011 Workshop? - Are companies sending notes to their contacts and asking for presentations? - It is agreed to not pursue the presentation by Ali Hernandez of PDVSA on Thornhill- Craver at this time. - However, there is another paper by Ali Hernandez on a model for gas-lift valve performance. - This could be accepted for presentation at the Workshop. If Ali Hernandez wants, Ken Decker can present it. - John Martinez and Mike Johnson will be in KL in October and will try to meet with local people to see if presentations can be obtained. - Cleon Dunham will be in KL in October and will try to meet with local people.  Agenda/Minutes – Oct. 7, 2010 - Are there any specific Technical Presentations defined at this time? - Are there any new nominations for Technical Presentations for the 2011 Workshop? - Are companies sending notes to their contacts and asking for presentations? - Stuart Scott says that Shell will have two presentations; one on high reliability gas-lift valves and one on sub-sea gas-lift concept. - Tom Nations says that ConocoPhillips is working on obtaining approval for one from Indonesia. - Ken Decker reported that the PDVSA paper may not be ready in time for presentation. - Ken Decker can offer a presentation if necessary.  Agenda/Minutes – Nov. 5, 2010 - We have not yet received any abstracts for Technical Presentations. - What is the status of potential presentations from Shell, ConocoPhillips, Decker Tech.? - Petronas has said they will present one or more Technical Presentations. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 9

- Shell is working on two presentations. - ExxonMobil will have two presentations. - Oxy people in the Middle East may not be able to come since the MEALF is the same week. - Ken Decker will provide an abstract.  Agenda/Minutes – Dec. 16, 2010 - So far, eighteen (18) Technical Presentations have been nominated. - Nine abstracts have been received from: - Shell E&P - Shell Brunei - Statoil, Schlumberger - Weatherford - ExxonMobil (2) - PTC Norway (3) - Nine more abstracts are needed on Presentations that have been nominated. - Three more nominations are needed. - Schlumberger is working on another possible presentation.  Agenda/Minutes – Jan. 6, 2011 - Twenty two presentations have been nominated. - We need twenty one, so one will need to be placed on stand-by or the program will need to be extended. - So far, we’ve receive abstracts for seventeen. We’re missing abstracts from - Shell 1 - PDO 2 - Schlumberger 1 - SPT Group 1 - Are there thoughts on what we do with the extra presentation? We could place one on stand-by, or extend the program by one? - Mike Johnson is willing to have his Presentation placed on stand-by if need be. Mike’s presentation has been scheduled for the last slot in the day. If he can complete it in less than 30 minutes, this will still give time for a brief Panel Discussion. - Cleon Dunham will prepare the Lift of Abstracts and place the Abstracts on the Web Site. Done. - Cleon Dunham will send a list of the Presenters to Celeste Torkay. Done.  Agenda/Minutes – Jan. 19, 2011 - Twenty two presentations have been nominated. - So far, we’ve receive abstracts for eighteen. We’re missing abstracts from - Shell 1 - PDO 2 - PTC 1 - So far, we’ve received four PowerPoint presentations. - When is the “drop dead” date for delivery of the list of Presentations and Abstracts to Celeste Torkay for printing? - John Martinez will check with Shell Aberdeen. Done. They will submit a presentation. - Drop dead date for submitting materials to be printed is Jan. 25, 2011.  Agenda/Minutes – Feb. 2, 2011 - All of the abstracts for twenty one Technical Presentations have been received and have been sent to Celeste Torkay for placement on the Workshop Handout. - As of Feb. 2, nineteen Technical Presentations have been submitted and two are still outstanding. - We are in communication with the authors of these presentations and it appears that both will be delivered on time. - This was presented to the Steering Committee for information. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 10

7. Continuing education for 2011 workshop a. Possible continuing education topics b. Possible continuing education instructors  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - For a Workshop in Singapore, it would be good to focus on Continuing Education topics of specific interest in the region. - What are these topics? - Possibilities, for three parallel courses: - Gas-Lift Design 2 Days - Dynamic Simulation 2 Days - Dual Gas-Lift 1 Day - Gas-Lift Operations ½ Day - Gas-Lift Automation ½ Day - It is important to consider the audience. - We need a committee to review the course materials. The following people agree to be on the committee: Cleon Dunham, Jim Hall. - We need to provide a template for each Course. This will be similar (possibly the same as) the template used for the Technical Presentations. - We should establish learning objectives for each course.  Agenda/Minutes – April 28, 2010 - Sid Smith has said that he is interested in going to Singapore and teaching Gas-Lift Design. This course needs to be updated. - Ideally, Ken Decker can come and teach Gas-Lift Valve Testing and Modeling. - Juan Carlos Mantecon is willing to come to Singapore and teach a course on Dynamic Simulation. - Cleon Dunham is willing to teach Gas-Lift Automation and can teach Gas-Lift Operations if necessary. - Shall we ask Tom Ryan if he is willing to each Dual Gas-Lift? Another option for this could be Steve Gossell of Aramco. - Are there additional comments on the Continuing Education program at this time? - We can ask Sid Smith if he would add PPO design to the Gas-Lift Design course. (Message sent to Sid.) - Ken Decker will work with Sid Smith to integrate gas-lift valve testing into the Gas-Lift Design course. - We will ask Tom Ryan if he can go. If he can’t come, can he suggest someone? (Message sent to Tom.) - We don’t have experience with Steve Gossell as a teacher. - Cleon Dunham will ask Ron Schmidt if he can teach the Gas-Lift Operations course. (Message sent to Ron.)  Agenda/Minutes – May 26, 2010 - Sid Smith and Ken Decker will handle the Gas-Lift Design course. - Juan Carlos Mantecon will handle the Dynamic Simulation course. - Ron Schmidt will handle the Gas-Lift Operations course. - Cleon Dunham will handle the Gas-Lift Automation course. - Tom Ryan cannot come to Singapore. We have all of the Dual Gas-Lift course material from the 2010 Workshop. Who can teach the Dual Gas-Lift course? - Cleon Dunham will handle the Dual Gas-Lift course. - The course plan has now been updated on the web site.  Agenda/Minutes – June 23, 2010 - Are there any comments on the Continuing Education plan for the 2011 Workshop? - There were no comments on the Continuing Education plan.  Agenda/Minutes – July 21, 2010 - Are there any comments on the Continuing Education plan for the 2011 Workshop? 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 11

- There were no comments on the Continuing Education plan.  Agenda/Minutes – Sept. 9, 2010 - Are there any comments on the Continuing Education plan for the 2011 Workshop? - The names of the teachers for 2011 were reviewed with ASME. - There was no other discussion of the Continuing Education program for 2011.  Agenda/Minutes – Oct. 7, 2010 - Are there any comments on the Continuing Education plan for the 2011 Workshop? - There were no comments on the Continuing Education plan for 2011.  Agenda/Minutes – Nov. 5, 2010 - Are there any comments on the Continuing Education plan for the 2011 Workshop? - The materials for the classes need to be sent to be sent to Celeste Torkay by Jan. 7, 2011.  Agenda/Minutes – Dec. 16, 2010 - Are there any comments on the Continuing Education plan for the 2011 Workshop? - The manuals can be printed in Singapore, if necessary.  Agenda/Minutes – Jan. 6, 2011 - Are there any comments on the Continuing Education plan for the 2011 Workshop? - Have all instructors sent their course material to Celeste Torkay for printing? - Will it be printed in Houston or Singapore? - Still need to receive information from Juan Carlos Mantecon and Ron Schmidt. - Cleon Dunham will contact them. Done. - Juan Carlos Mantecon will bring his course material to Singapore. - The other course materials will be printed in Houston.  Agenda/Minutes – Jan. 19, 2011 - Are there any comments on the Continuing Education plan for the 2011 Workshop? - Have the necessary computer projectors been lined up? - Two computer projectors are lined up. - ASME will rent the third one, if another one can’t be found. - Still waiting on Ron Schmidt to submit his information. - Cleon Dunham will check with him. Done.  Agenda/Minutes – Feb. 2, 2011 - Ron Schmidt will bring his materials to the Course in Singapore. - A third PC projector been located. It will be borrowed from AsiaEDGE. It will be delivered to the Hotel on Sunday and given to Celeste Torkay or Cleon Dunham. - This was presented to the Steering Committee for information.

8. Breakout sessions for 2011 workshop a. Possible breakout session topics b. Possible breakout session facilitators  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - For a Workshop in Singapore, it would be good to focus on Breakout Session topics of specific interest in the region. - What are these topics? - The following topics: - Surveillance: methods used, recommended practices - Other topics are to be determined.  Agenda/Minutes – April 28, 2010 - Can we agree on other topics for Breakout Sessions? - Are there people who would like lead these? - The following topics will be planned: - Gas-Lift Problems. How well does the gas-lift system really work? What issues do we have with failures, etc? What types of failures do we have? 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 12

- We can poll the people in the region and see what they would like to see. - People Development.  Agenda/Minutes – May 26, 2010 - We will have Breakout Sessions on New Technology, Gas-Lift Surveillance and Problems, and People Development. - We will also have a “Breakout” Session as a site visit, if one is lined up. - Who will lead these sessions? - Do we need any other sessions? - Mike Johnson of ExxonMobil will coordinate the People Development breakout session. - Walrick vanZandvoord of Shell will coordinate the New Technology breakout session. - A person from Schlumberger or Raycom will coordinate the trip to their plant.  Agenda/Minutes – June 23, 2010 - We need to have someone to coordinate the Breakout Session on Gas-Lift Surveillance and Problems. - Schlumberger will host a visit to their plant. Who will coordinate this? - Eric Lovie will coordinate the visit to the Schlumberger Facility. - John Martinez will coordinate the Gas-Lift Surveillance and Problems Breakout Session, or will find someone local to do it. - Cleon Dunham will post appropriate information on the web site when it is submitted.  Agenda/Minutes – July 21, 2010 - We need abstracts for “New Gas-Lift Technology” (Walrick vanZandvoord), and “Gas-Lift People Problems” (Mike Johnson). - We need a biographical sketch for John Martinez. - There were no comments on the Breakout plan. - We still need information from Walrick vanZandvoord, Mike Johnson, and John Martinez.  Agenda/Minutes – Sept. 9, 2010 - We need abstracts for “New Gas-Lift Technology” (Walrick vanZandvoord), and “Gas-Lift People Problems” (Mike Johnson). - We need a biographical sketch and photograph for Seis Hussain and the person from Shell Brunei who is going to lead the session on Gas-Lift Surveillance and Problems. - John Martinez will seek to obtain these items  Agenda/Minutes – Oct. 7, 2010 - We need an abstract for Gas-Lift People Problems” (Mike Johnson). - We need a short biographical sketch for John Martinez. - There were no comments on the Breakout plan for 2011.  Agenda/Minutes – Nov. 5, 2010 - We still need an abstract for Gas-Lift People Problems” (Mike Johnson). - We still need a short biographical sketch for John Martinez. - Are there any other comments on the Breakout Sessions for the Workshop? - We agree to swap a session on Reconciling Gas-Lift Equipment Standards with the session on Gas-Lift People Problems. - This will be led by Wayne Mabry and Mike Johnson. - This has been placed on the web site. - We need an abstract for the Breakout session and a photograph and CV for Wayne Mabry.  Agenda/Minutes – Dec. 16, 2010 - We need an abstract for the Breakout Session on Reconciling Gas-Lift Equipment Standards by Wayne Mabry and Mike Johnson. - We need biographical sketches from Wayne Mabry. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 13

- We need a photograph from Wayne Mabry. - The above information is still required.  Agenda/Minutes – Jan. 6, 2011 - Are there any comments on the Breakout plan for the 2011 Workshop? - There were no new comments on the Breakout Plan.  Agenda/Minutes – Feb. 2, 2011 - Schlumberger has prepared an invitation for people to visit their Singapore Facility as one of the Breakout sessions. - The invitation has been placed on the ALRDC web site. - People need to register at Schlumberger’s booth or at the Registration Table. - This was presented to the Steering Committee for information.

9. Workshop leadership for 2011 workshop a. Candidates for General Chair b. Roles of ASME Staff c. Roles of John and Cleon  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - Tommy White of Schlumberger has been picked to be General Chair for the 2011 Workshop. - He is with Schlumberger and they will be one of the primary sponsors of the event. - Are there any comments on this matter? - This is OK with everyone.  Agenda/Minutes – Nov. 5, 2010 - We need to line up Session Chairs for the other Technical Sessions. - This was not discussed at this meeting.  Agenda/Minutes – Dec. 16, 2010 - We need to line up Session Chairs for the other Technical Sessions. - It would be good to obtain these from Asian/Pacific Operating Companies. - There has been no progress on this.  Agenda/Minutes – Jan. 6, 2011 - We have at least one Session Co-Chair for each session, but only one is from the Asia/Pacific region. - Can we obtain others from the area? - Cleon Dunham has asked Mark Ogier of Chevron is he can be a Session Co-Chair. - We could still use two more co-chairs.  Agenda/Minutes – Jan. 19, 2011 - Mark Ogier cannot attend the Workshop. - We still have two Session Chairs for one Session and only one for the others, assuming that Jim Hall can come to the Workshop. - Jim Hall doesn’t yet have confirmation that he can come. - John Martinez wants local people to be Session Chairs. - Celeste Torkay will send John Martinez and Cleon Dunham names of attendees from Shell, Chevron, and Petrobras, so they can be contacted. Note: Cleon Dunham has already asked Petrobras.  Agenda/Minutes – Feb. 2, 2011 - Lilia Palma Naveira from Petrobras has agreed to be a Session Co-Chair. - Jim Hall will attend the Workshop, so we have Co-Chairs for two sessions and a single Chair for the other two Sessions. - This was presented to the Steering Committee for information. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 14

10. Keynote Speaker for 2011 workshop a. Nominations for Keynote Speaker  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - It would be good to secure a Keynote Speaker from Petronas or some other major Operating Company in the region. - Are there suggestions? - We should try to get someone from Petronas. - John Martinez will pursue this with ExxonMobil in KL; they can help find contacts in Petronas. - We need to discuss relationships between KL and Singapore.  Agenda/Minutes – April 28, 2010 - John Martinez: Is there a nominee to be Keynote Speaker? - This is still up in the air.  Agenda/Minutes – May 26, 2010 - John Martinez: Is there a nominee to be Keynote Speaker? - Rodney Bane and John Martinez will pursue this with ExxonMobil and Petronas. - A possibility would be someone in Shell Technology India. Jim Hall will send information on how to contact them. Done.  Agenda/Minutes – June 23, 2010 - John Martinez: Is there a nominee to be Keynote Speaker? - Is there any information from Shell Technology India? - John Martinez will continue to try to gain access to Petronas. - Tommy White says that Schlumberger has contacts with Petronas and will let us know who they are.  Agenda/Minutes – July 21, 2010 - What is the progress on lining up a Keynote Speaker from Petronas or some other source such as Shell Technology India? - Eric Lovie will find some names for us at Petronas and others in the region.  Agenda/Minutes – Sept. 9, 2010 - We have written an e-mail and the Regional Schlumberger manager in Singapore has been in touch with: Zamanuri Ibrahim General Manager Production Technology Department Petroleum Engineering Division PETRONAS Carigali - He has been asked if he would be our Keynote Speaker, if Petronas can be a Sponsor, and if he can recommend attendance to several of his engineers. - He told the Schlumberger manager that he is interested and he would get back to us. - So far, we have not heard from him. - We are continuing to try to obtain agreement from Mr. Ibrahim to be the Keynote Speaker. - Mike Johnson will see if someone from ExxonMobil could do it if necessary.  Agenda/Minutes – Oct. 7, 2010 - We are still waiting to obtain a response from Mr. Zumanuri Ibrahim of PETRONAS. - Is there an alternative Keynote Speaker from ExxonMobil? - There has been no progress on obtaining a Keynote Speaker for the 2011 Workshop.  Agenda/Minutes – Nov. 5, 2010 - John Martinez met with Mr. Zumanuri Ibrahim of Petronas. - He has just informed us that he cannot be the Keynote Speaker. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 15

- So, we still need to find a speaker. - Can someone from ExxonMobil do it? - Or do we look to Schlumberger or Weatherford, or somewhere else? - Mike Johnson is working with ExxonMobil Malaysia to obtain a speaker. - Cleon Dunham needs to make sure the Workshop schedule is OK on the web site. Done.  Agenda/Minutes – Dec. 16, 2010 - Do we have a Keynote Speaker lined up for the 2011 Workshop? - John Martinez will check with Mike Johnson on this.  Agenda/Minutes – Jan. 6, 2011 - We still don’t have a Keynote Speaker. - If all else fails, can one of us (John Martinez?) do it? - There will not be a Keynote Speaker from ExxonMobil. - John Martinez and Cleon Dunham still need to discuss this.  Agenda/Minutes – Jan. 19, 2011 - We still don’t have a Keynote Speaker. - Tommy White will see if a regional Schlumberger person can be the Keynote Speaker.  Agenda/Minutes – Feb. 2, 2011 - John David Rowatt of Schlumberger will be the Keynote Speaker. - His bio, photo, and abstract are on the Web Site. - This was presented to the Steering Committee for information.

11. Registration Process for 2011 workshop a. Registration process to be used b. Shall we try again to use the ASME process, or shall we revert to the ALRDC process?  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - In 2010, there were still problems with the ASME registration process. - Will this be fixed and fully operational for the 2011 Workshop? - Or should we control registration via the ALRDC registration process? - The ASME registration process will be working for this next year.  Agenda/Minutes – April 28, 2010 - Are there any comments on the registration process for 2011 in Singapore? - Celeste Cicerone will set up the Registration process for 2011.  Agenda/Minutes – May 26, 2010 - Are there any comments on the registration process for 2011 in Singapore? - There will be a new ASME process available in July or before. - As soon as it is ready, we will test it.  Agenda/Minutes – June 23, 2010 - Celeste Torkay: Is the ASME registration process ready to be tested? - Celeste Torkay will send information on the registration process so it can be tested by the members of the Steering Committee.  Agenda/Minutes – July 21, 2010 - Celeste Torkay: Can you send the registration form to the Steering Committee members, so it can be tested? - Celeste Torkay will send the form as soon as the hotel venue in Singapore has been resolved and added to the form.  Agenda/Minutes – Sept. 9, 2010 - The registration process is available on the ASME web site. - Celeste Torkay: Is the link to this OK on the ALRDC web site? - Celeste Torkay is sending a new link to Cleon Dunham for the ALRDC web site. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 16

Done.  Agenda/Minutes – Oct. 7, 2010 - Is the registration link and process working OK for everyone? - The new registration link is up and running. - So far there are no new registrants.  Agenda/Minutes – Nov. 5, 2010 - Celeste Torkay: How many registrants are there so far? - We are conflicting date wise with the Middle East Art. Lift Forum (MEALF). - We need to avoid this conflict in the future.  Agenda/Minutes – Dec. 16, 2010 - Celeste Torkay: How many registrants are there so far? - So far there are nine registrants.  Agenda/Minutes – Jan. 6, 2011 - Celeste Torkay: How many registrants are there so far? - Celeste Torkay: Please review the information from the note you sent to Tim Graves. - At this time 24 are registered for the Workshop. - At this time 2 are registered for Continuing Education. - Many more have indicated that they will be attending, so we expect their registration in the next few days.  Agenda/Minutes – Jan. 19, 2011 - Celeste Torkay: How many registrants are there so far? - As of Wednesday, Jan. 19, the following numbers of people were registered: - Dual Gas-Lift Course: 6 - Dynamic Gas-Lift Simulation Course: 7 - Gas-Lift Design Course: 4 - Technical Workshop: 49 are officially registered and 20 more are in process.  Agenda/Minutes – Feb. 2, 2011 - Celeste Torkay. How many people have registered for the Workshop and the Courses? - There were problems in issuing Letters of Invitation for potential attendees from the Institute of Technology in Bangladesh. It has been decided to not issue these letters, since the potential attendees had not formally registered not paid to attend the Continuing Education or the Workshop. - As of Wednesday, Feb. 2, the following numbers of people were registered (to be filled in during this meeting): - Dual Gas-Lift Course: 7 - Dynamic Gas-Lift Simulation Course: 10 - Gas-Lift Design Course: 10 - Technical Workshop: 85 - Our obligation to the Hotel for rooms has been fulfilled. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 17

12. Exhibitors for 2011 workshop a. Number of Exhibitors b. Do we have any leads on Exhibitors for 2011?  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - We need to line up Exhibitors that are pertinent for the Southeast Asian region. - Let’s brainstorm a list of potential Exhibitors that we can pursue. - The following companies are potential Exhibitors for the 2011 Workshop. - Schlumberger - Weatherford - Parveen - Bill Becker – BST Lift Systems - Baker - Raycom Aerospace  Agenda/Minutes – April 28, 2010 - Are any Exhibitors lined up for the 2011 Workshop? - We can check with Raycom Aerospace. - Ken Decker will check with them about being Exhibitors and having a shop visit. - They may be obtaining a GLV AVT-2 so it would be if they would demonstrate it too.  Agenda/Minutes – May 26, 2010 - Are any Exhibitors lined up for the 2011 Workshop? - There was no new information on this topic.  Agenda/Minutes – June 23, 2010 - Are any Exhibitors lined up for the 2011 Workshop? - Schlumberger will exhibit. - Exhibits will be on Wednesday and Thursday only. They will need to be set up very early on Wednesday morning. They can be taken down on Thursday afternoon, after the last session.  Agenda/Minutes – July 21, 2010 - Celeste Torkay: Have more companies signed up to be Exhibitors? - Celeste Torkay: Have we reached a compromise on the extra charge for leaving Exhibits set up over night on Wednesday night? - Ken Decker will check with Raycom Aerospace as soon as the hotel venue for the Workshop is known. - Schlumberger will Exhibit.  Agenda/Minutes – Sept. 9, 2010 - Celeste Torkay: Have more companies signed up to be Exhibitors? - Celeste Torkay: Have we reached a compromise on the extra charge for leaving Exhibits set up over night on Wednesday night? - We will have to pay 5,000 Singapore dollars to keep the Exhibits set up over night. - Exhibits will be only on Wednesday and Thursday, so we will only need to pay for one night. - There are no Exhibitors signed up at this time.  Agenda/Minutes – Oct. 7, 2010 - Celeste Torkay: Have more companies signed up to be Exhibitors? - No new Exhibitors have signed up. - Both Schlumberger and Weatherford have said they will exhibit.  Agenda/Minutes – Nov. 5, 2010 - Celeste Torkay: How many companies have signed up to be Exhibitors? - There are no Exhibitors signed up at this time. - Cleon Dunham will send notes to Schlumberger and Weatherford. Done.  Agenda/Minutes – Dec. 16, 2010 - Celeste Torkay: How many companies have signed up to be Exhibitors? 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 18

- So far there are two exhibitors: Schlumberger and Weatherford. - Others have indicated that they plan to exhibit: PTC Norway for one.  Agenda/Minutes – Jan. 6, 2011 - Celeste Torkay: How many companies have signed up to be Exhibitors? - We have four companies signed up to be Exhibitors at the moment, in addition to ALRDC and ASME. - AsiaEDGE will also be an Exhibitor.  Agenda/Minutes – Jan. 19, 2011 - Celeste Torkay: How many companies have signed up to be Exhibitors? - Current Exhibitors signed up are: Schlumberger, PTC, Parveen, Weatherford, SPT Group, RayCom. These are loaded on the ALRDC web site.  Agenda/Minutes – Feb. 2, 2011 - Celeste Torkay: How many companies have signed up to be Exhibitors? - There are nine Exhibitors signed up and one more potential. Information for these Exhibitors is on the web site. - The map of Exhibit spaces is on the web site.

13. Sponsors for 2011 workshop a. Number of sponsors b. Method for obtaining sponsors c. Assigning specific meals, etc. for sponsors  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - It will be advantageous to have a significant number of Sponsors for the 2011 Workshop, in addition to Schlumberger. - Let’s brainstorm a list of potential Sponsors that we can pursue. - The following companies are potential Sponsors for the 2011 Workshop. - Schlumberger - Weatherford - Altec - ConocoPhillips - ExxonMobil - Shell Global Solutions - PTC  Agenda/Minutes – April 28, 2010 - Are any Sponsors other than Schlumberger lined up for the 2011 Workshop? - No other sponsors have signed up as yet.  Agenda/Minutes – May 26, 2010 - Are any Sponsors other than Schlumberger lined up for the 2011 Workshop? - There was no new information on this topic.  Agenda/Minutes – June 23, 2010 - Are any Sponsors other than Schlumberger lined up for the 2011 Workshop? - There was no new information on this topic.  Agenda/Minutes – July 21, 2010 - Celeste Torkay: Have more companies signed up to be Sponsors? - There was no new information on this topic.  Agenda/Minutes – Sept. 9, 2010 - Celeste Torkay: Have more companies signed up to be Sponsors? - There are no additional Sponsors signed up at this time.  Agenda/Minutes – Oct. 7, 2010 - Celeste Torkay: Have more companies signed up to be Sponsors? - No new Sponsors have signed up.  Agenda/Minutes – Nov. 5, 2010 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 19

- Celeste Torkay: How many companies have signed up to be Sponsors? - There are no Sponsors signed up at this time. - Cleon Dunham will send notes to Schlumberger and Weatherford. Done.  Agenda/Minutes – Dec. 16, 2010 - Celeste Torkay: How many companies have signed up to be Sponsors? - So far there are three Sponsors: Schlumberger, Weatherford, and ConocoPhillips.  Agenda/Minutes – Jan. 6, 2011 - Celeste Torkay: How many companies have signed up to be Sponsors? - We have three Companies signed up to be Sponsors, in addition to ALRDC, ASME, OAC, and Production Associates.  Agenda/Minutes – Jan. 19, 2011 - Celeste Torkay: How many companies have signed up to be Sponsors? - The sponsors are Schlumberger, Weatherford, ConocoPhillips, and PTC. They are loaded on the ALRDFC web site. - Need better Schlumberger logo for the web site. Received from Tommy White.  Agenda/Minutes – Feb. 2, 2011 - Celeste Torkay: How many companies have signed up to be Sponsors? - There are four paid Sponsors signed up for the Workshop.

14. Advertising for 2011 workshop a. Is the AMSE e-mail list process sufficient? b. Should we use the SPE mailing list again? c. Will John Martinez and Cleon Dunham (ALRDC) help with advertising? d. Will each company on the Steering Committee help with advertising? e. Who else can help?  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - It will be important to have good advertising for the 2011 Workshop. - Cleon Dunham will send to the ALRDC list (currently about 1750 members). - John Martinez will send to his e-mail list. - ASME will send to their e-mail list. - Each company will send to their internal lists. - Should we try to use an SPE mailing list? - We can use: - Celeste Cicerone. ASME’s e-mail list, for the Far East. - John Martinez. John’s e-mail list. - Cleon Dunham. Cleon’s ALRDC e-mail list. - Cleon Dunham and Celeste Cicerone. SPE’s list – Newsletter, post cards.  Agenda/Minutes – April 28, 2010 - Is there more discussion of advertising at this time? - Jim Hall will post with the Shell internal network. - Others with major oil companies will send to their networks. - ASME will send to the people who’ve attended their class in KL. It was led by Newfield. - We should contact the Thai company PTTEP. - Jim Hall will contact them.  Agenda/Minutes – May 26, 2010 - Are there comments on advertising at this time? - Celeste Cicerone and Cleon Dunham will work on an e-mail once the hotel is defined. - Cleon Dunham will communicate with the ALRDC membership.  Agenda/Minutes – June 23, 2010 - Is the hotel confirmed now? - Are we ready to send an e-mail to prospective attendees? - Schlumberger will give us a list of Operating Companies in the Asian Pacific region. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 20

- Cleon Dunham and John Martinez will contact them.  Agenda/Minutes – July 21, 2010 - Tommy White, Schlumberger: Please provide the list of Operating Companies in the Asian Pacific region. - We’ll need names and contact information for each company. - Cleon Dunham will send a note to the Operating Companies in the Asian Pacific region as soon as a list of companies and contact information is available.  Agenda/Minutes – Sept. 9, 2010 - Tommy White, Schlumberger: Please provide the list of Operating Companies in the Asian Pacific region. - We’ll need names and contact information for each company, so we can send invitations to them. - Cleon Dunham will ask Weatherford for a list of contacts in the Asian Pacific area. Done.  Agenda/Minutes – Oct. 7, 2010 - We are still waiting to obtain a list of Operating Companies in the Asian Pacific region? - Both Schlumberger and Weatherford have been asked to provide this. - ASME will send e-mail blasts on Nov. 2 and Dec. 7. - Cleon Dunham will draft the text of an e-mail for ASME. Done. - Cleon Dunham will send a note to ALRDC members. Done.  Agenda/Minutes – Nov. 5, 2010 - We are still waiting to obtain a list of Operating Companies in the Asian Pacific region? - Both Schlumberger and Weatherford have been asked to provide this. - It is becoming urgent that these lists be provided. - AsiaEDGE (PetroEDGE) in Singapore and Kuala Lumpur has agreed to help with advertising to their contacts in the Asia Pacific region. - In return, we will offer then a free Exhibit booth to show their training courses. - Petronas has agreed to advertise the Workshop within their company. - People from Petronas and Talisman who attended a gas-lift class in Kuala Lumpur have been invited to attend the Workshop. - Celeste Torkay: What is the status of the e-mail from ASME? Did one go out on Nov. 2 as planned? - John Martinez: What is the status of your e-mail campaign? - Is other advertising needed at this time? - The ASME e-mail went out but needs some work. - Kim Miceli will work on this.  Agenda/Minutes – Dec. 16, 2010 - We are still waiting to obtain a list of Operating Companies in the Asian Pacific region? - Both Schlumberger and Weatherford have been asked to provide this. - It is becoming urgent that these lists be provided. - AsiaEDGE (PetroEDGE) in Singapore and Kuala Lumpur has agreed to help with advertising to their contacts in the Asia Pacific region. We are to have a report from them this week. - In return, we will offer then a free Exhibit booth to show their training courses. - Petronas has agreed to advertise the Workshop within their company. - People from Petronas and Talisman who attended a gas-lift class in Kuala Lumpur have been invited to attend the Workshop. - Celeste Torkay: What is the status of the e-mail from ASME? Did one go out on Nov. 2 as planned? - John Martinez: What is the status of your e-mail campaign? - Is other advertising needed at this time? - John Martinez will send his notice today and tomorrow. - The ASME e-mail has gone out on Nov. 2 and Dec. 7. It will go in early January the week of 3rd. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 21

- Cleon Dunham will send another notice to ALRDC members near the end of the year.  Agenda/Minutes – Jan. 6, 2011 - We are still waiting to obtain a list of Operating Companies in the Asian Pacific region? - Both Schlumberger and Weatherford have been asked to provide this. - It is becoming urgent that these lists be provided. - AsiaEDGE (PetroEDGE) in Singapore and Kuala Lumpur has agreed to help with advertising to their contacts in the Asia Pacific region. We are to have a report from them this week. - In return, we will offer then a free Exhibit booth to show their training courses. - Petronas has agreed to advertise the Workshop within their company. - People from Petronas and Talisman who attended a gas-lift class in Kuala Lumpur have been invited to attend the Workshop. - John Martinez: Has there been response to your e-mail campaign? - Cleon Dunham: Another note has been sent to the members of ALRDC. - Is other advertising needed at this time? - Eric Lovie of Schlumberger has provided a list of contacts in the Asia/Pacific Region. - Cleon Dunham and John Martinez will contact them. - Cleon Dunham has followed up with AsiaEDGE.  Agenda/Minutes – Jan. 19, 2011 - John Martinez and Cleon Dunham have communicated with the names provided by Eric Lovie. - AsiaEDGE has provided at least two fruitful leads. - Do we know how many have responded based on the notes sent by John Martinez and Cleon Dunham? - We need to encourage people to sign up for rooms now.  Agenda/Minutes – Feb. 2, 2011 - Are there any last-minute advertising or notification actions needed? - There were no last minute suggestions for advertising or notifications.

15. Special events for 2011 workshop a. De we want to plan any special events?  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - Do we want to plan any special events for the 2011 Workshop? - If yes, what would be pertinent? - This will be discussed further in the future. - One option may be a boat tour around Singapore Harbor.  Agenda/Minutes – April 28, 2010 - Is there more discussion of a special event associated with the 2011 Workshop? - This is a free tour. It is very interesting. We’ll ask our Singapore Hotel to arrange this.  Agenda/Minutes – May 26, 2010 - Is there more discussion of a free boat tour associated with the 2011 Workshop? - When should it be held? - We will go with the “free” boat ride on Monday evening. - Celeste Cicerone will organize this with the hotel.  Agenda/Minutes – June 23, 2010 - Is there any discussion on the free boat tour on Monday evening? - Celeste Torkay will organize this with the hotel when selection of the hotel has been finalized.  Agenda/Minutes – July 21, 2010 - Celeste Torkay: Has there been any progress on lining up a free boat tour of Singapore harbor? - Celeste Torkay will organize this with the hotel when selection of the hotel has been 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 22

finalized.  Agenda/Minutes – Sept. 9, 2010 - Celeste Torkay: Has there been any progress on lining up a free boat tour of Singapore harbor? - There has been no progress on this.  Agenda/Minutes – Oct. 7, 2010 - Celeste Torkay: Has there been any progress on lining up a free boat tour of Singapore harbor? - There has been no progress on this.  Agenda/Minutes – Nov. 5, 2010 - Celeste Torkay: Has there been any progress on lining up a free boat tour of Singapore harbor? - There has been no progress on this  Agenda/Minutes – Dec. 16, 2010 - Celeste Torkay: Has there been any progress on lining up a free boat tour of Singapore harbor? - Celeste Torkay is discussing this with the hotel.  Agenda/Minutes – Jan. 6, 2011 - Celeste Torkay: Are we all set with the free boat tour of Singapore harbor? - This will be further pursued when we know more about the number of attendees.  Agenda/Minutes – Jan. 19, 2011 - Celeste Torkay: Are we all set with the free boat tour of Singapore harbor? - There was no discussion of this.  Agenda/Minutes – Feb. 2, 2011 - Celeste Torkay: We are all set with the free boat tour of Singapore harbor. - It will it be on Tuesday evening. - People will sign up at the Registration desk. - This was presented to the Steering Committee for information.

16. Side trips for 2011 workshop a. Do we want to plan any side trip(s)?  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - Do we want to plan any side trips for the 2011 Workshop? - Can we plan a trip to a Schlumberger plant or shop in Singapore? - Could we plan a trip to an Operating Company site on the following week? - The following are potential site visits while in Singapore. - Raycom plant. - Schlumberger plant, if pertinent.  Agenda/Minutes – April 28, 2010 - Is there more discussion of a side trip associated with the 2011 Workshop? - We will ask Raycom and/or Schlumberger to sponsor this side trip.  Agenda/Minutes – May 26, 2010 - Is there more discussion of a side trip associated with the 2011 Workshop? - Are Raycom and Schlumberger willing to host tours? - Should we choose one or the other? - This will be one of the Breakout Sessions. - Ken Decker will talk with Raycom. - Cleon Dunham will talk with Schlumberger. Underway. - We agree that we want just one visit with one company.  Agenda/Minutes – June 23, 2010 - There will be a visit to Schlumberger’s plant. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 23

- Who will be the Schlumberger representative to coordinate this visit? - Eric Lovie of Schlumberger will coordinate this. This is now covered under the Breakout Session topic above.

17. Web sites for 2011 workshop a. Are there comments on the ASME web site? b. On the ALRDC web site?  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - Are there comments on the ALRDC or ASME web sites? - There were no comments on the web sites at this time. - Cleon Dunham will create the ALRDC web site for the 2011 Workshop now that more information is available. Done.  Agenda/Minutes – April 28, 2010 - Are there comments on the ALRDC or ASME web sites? - The ASME web site is not updated for the gas-lift workshop.  Agenda/Minutes – May 26, 2010 - Are there comments on the ALRDC or ASME web sites? - The ALRDC web site will be updated with the information decided at this meeting. Done. - The ASME site is now up and links to the ALRDC site.  Agenda/Minutes – June 23, 2010 - Are there comments on the ALRDC or ASME web sites? - The ALRDC web site will be updated with the information decided at this meeting. Done.  Agenda/Minutes – July 21, 2010 - Are there comments on the ALRDC or ASME web sites? - There were no comments on the web sites at this time.  Agenda/Minutes – Sept. 9, 2010 - Are there comments on the ALRDC or ASME web sites? - There were no comments on the web site.  Agenda/Minutes – Oct. 7, 2010 - Are there comments on the ALRDC or ASME web sites? - There were no comments on the web site.  Agenda/Minutes – Nov. 5, 2010 - Are there comments on the ALRDC or ASME web sites? - The Workshop schedule needs to be updated on the web site. Done.  Agenda/Minutes – Dec. 16, 2010 - Are there comments on the ALRDC or ASME web sites? - The code for registering for the hotel needs to be added to the ALRDC web site. Done.  Agenda/Minutes – Jan. 6, 2011 - Are there comments on the ALRDC or ASME web sites? - There were no comments on the web sites.  Agenda/Minutes – Jan. 19, 2011 - Are there comments on the ALRDC or ASME web sites? - The ALRDC web site is being continuously updated as the event draws near.  Agenda/Minutes – Feb. 2, 2011 - Are there comments on the ALRDC or ASME web sites? - There were no comments on the web sites. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 24

16. Meals, etc. for 2011 workshop a. Need for special meals – e.g. halal, kosher, etc.  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - We need to have meal options for Jews, Muslims, vegetarians, etc. - Meals will be discussed with the hotel when the actual venue has been chosen.  Agenda/Minutes – April 28, 2010 - Is there any discussion of planning for meals at this time? - There is not action on this at this time.

17. Steering Committee for 2011 workshop a. Any new members b. Any retirees  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - Can we obtain some Steering Committee members from the Far East for this Workhsop? - The following people should be considered for the Steering Committee for the 2011 Workshop. - Jim Hall will contact the Shell people and John Martinez will contact the ExxonMobil person to see if they are willing to serve. - Marianna Jamil – Shell Brunei - Heii, Lukuoh – Shell Malaysia - Mike Dolan – Shell Global Solutions, KL - Sies Hussain - ExxonMobil  Agenda/Minutes – April 28, 2010 - Jim Hall, John Martinez: Have any of these people agreed to be on the Steering Committee for the Singapore Workshop? - Is yes, we need their contact information. - Walrick van Zandvoord and Mike Dolan have been added to the Steering Committee. - Cleon Dunham will check with Marianna Jamil. (This has been done.) - Ken Decker will ask Kimmo Karkaainen with Raycom.  Agenda/Minutes – May 26, 2010 - Are there any additional candidates for the Steering Committee? - There was no new information on this topic.

18. Venue for 2012 Workshop a. For 2012, will we return to Houston? b. Do we want to stay with the same hotel?  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - Are we happy with using the Crowne Plaza Hotel in North Houston for the 2012 Workshop? - Or do we want to consider other alternatives? - We should look at hotels on the west side of Houston. - Celeste Cicerone will check into options.  Agenda/Minutes – April 28, 2010 - Celeste Cicerone: Is there any progress on lining up a venue for the 2012 Workshop on the west side of Houston? - This still up the air.  Agenda/Minutes – May 26, 2010 - Celeste Cicerone: Is there any progress on lining up a venue for the 2012 Workshop 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 25

on the west side of Houston? - Celeste Cicerone is looking into two possibilities. - The Embassy Suites (near I-10 and Beltway) - Norris Conference Center (near I-10 and Beltway). The Norris Conference Center is the most likely.  Agenda/Minutes – June 23, 2010 - Celeste Cicerone: Is there any progress on lining up a venue for the 2012 Workshop on the west side of Houston? - The 2012 Workshop will be at the Norris Conference Center at I-10 and Beltway 8. There will be two nearby Hotel options for people to stay.  Agenda/Minutes – July 21, 2010 - Are there any further comments on the plans/venue for the 2012 Workshop at this time? - There was no further discussion of the venue for the 2012 Workshop at this time.

19. New Business for 2011 workshop a. Any new business b. Once around  Agenda/Minutes – Feb. 4, Mar. 30, 2010 - Is there any other new business? - There was no new business.  Agenda/Minutes – April 28, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – May 26, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – June 23, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – July 21, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – Sept. 9, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – Oct. 7, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – Nov. 5, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – Dec. 16, 2010 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – Jan. 6, 2011 - Is there any new business or other comments? - Schlumberger will check to see if they can provide projectors. NB. They cannot, so other options must be pursued. - Cleon Dunham will forward Celeste Torkay’s e-mail to Eric Lovie and the rest of the team. Done. 2011 Gas-Lift Workshop Jan. 19, 2011--- Meeting Agendas and Minutes Page 26

 Agenda/Minutes – Jan. 19, 2011 - Is there any new business or other comments? - There was no new business.  Agenda/Minutes – Feb. 2, 2011 - Is there any new business or other comments? - Ken Decker congratulates everyone for organizing the Workshop. - Mike Johnson said that people traveling via Moscow should pack their Blackberries in their checked baggage. - Greg Stephenson is expecting snow in Houston and hopes this doesn’t cause any travel problems.

20. Future meetings for 2011 Workshop a. Next meeting of Steering Committee? b. Do we want to plan any face-to-face meetings? c. Is yes, where and when?  Agenda/Minutes – Feb. 4, 2010 - The next meeting will be a teleconference on Tuesday, March 30, 2010, 9:00 am.  Agenda/Minutes – Mar. 30, 2010 - The next meeting will be a teleconference on Wednesday, April 28 2010, at 9:00 am.  Agenda/Minutes – April 28, 2010 - The next meeting will be a teleconference on Wednesday, May 26, 2010, at 9:00 am, CDT.  Agenda/Minutes – May 26, 2010 - The next meeting will be a teleconference on Wednesday, June 23, 2010, at 9:00 am, CDT.  Agenda/Minutes – June 23, 2010 - The next meeting will be a teleconference on Wednesday, July 21, 2010, at 9:00 am, CDT.  Agenda/Minutes – July 21, 2010 - The next meeting will be a teleconference on Thursday, Sept. 9, 2010, at 9:00 am, CDT.  Agenda/Minutes – Sept. 9, 2010 - The next meeting will be a teleconference on Thursday, Oct. 7, 2010, at 9:00 am, CDT.  Agenda/Minutes – Oct. 7, 2010 - The next meeting will be a teleconference on Friday, Nov. 5, 2010, at 9:00 am, CDT.  Agenda/Minutes – Nov. 5, 2010 - The next meeting will be a teleconference on Thursday, Dec. 16, 2010, at 9:00 am, CST.  Agenda/Minutes – Dec. 16, 2010 - The next meeting will be a teleconference on Thursday, Jan. 6, 2011, at 9:00 am.  Agenda/Minutes – Jan. 5, 2011 - The next meeting will be a teleconference on Wednesday, Jan. 19, 2011, at 9:00 am.  Agenda/Minutes – Jan. 19, 2011 - The next meeting will be a teleconference on Wednesday, Feb. 2, 2011, at 9:00 am.  Agenda/Minutes – Jan. 19, 2011 - The next meeting will be a face-to-face meeting on Thursday, Feb. 10, 2011, at 6:00 pm, at the 2011 Gas-Lift Workshop. Information on the restaurant will be given at the Registration Table in Singapore.