Project informations

Bankwest Stadium ()

© 2020 www.austadiums.com

Project description mageba scope Highlights & facts The new Western Stadium up- mageba was commissioned to supply grade is part of the Gov- 4 RESTON®SPHERICAL bearings of type KE mageba products: ernment’s $1.6 billion stadia strategy, that (guided sliding) to the steel and roof con- Type: RESTON®SPHERICAL aims to improve sporting infrastructure nections of the stadium‘s West Stand. bearings across the state. The bearings were designed to restrain LASTO®PAD single The new stadium forms the centrepiece the uplift and rotation forces, which makes layered elastomeric for the transformation of the these products different compared to the pad suburb and enhances a sense of place in standard spherical bearings. Feature: Bearings restrict uplift and rotation the revitalised district within its historic Besides the spherical bearings, ­mageba Installed: 2019 parkland setting. also produced and delivered 1,850 The upgraded venue can now host 30,000 LASTO®PAD single layered elastomeric Structure: spectators instead of the previous capacity pads to support the precast elements and City: Sydney of 20,000. connections between the steel and con- Country: Australia The structure as a whole was completed crete structure throughout the stadium. Completion: 2019 in early 2019, with the final internal and Owner: NSW Government landscaping works being finished prior to Contractor: Lendlease Building the official opening that took place on the Engineer: Aurecon 14th of April in the same year.

The stadium is situated in the heart of Sydney, A LASTO®PAD single layered elastomeric pad Australia Testing one of the elastomeric pads for uplift installed in its final position

Sydney

© 2020 Google

2021.01 AU-EN ©mageba mageba (Australia) Pty. Ltd. – Unit 8, 42 Peter Brock Drive, Eastern Creek NSW 2766 – Australia – T +61 2 8188 5850 – [email protected]