Frideswide Square, Oxford Stage 2 Road Safety Audit

Total Page:16

File Type:pdf, Size:1020Kb

Frideswide Square, Oxford Stage 2 Road Safety Audit Frideswide Square, Oxford Stage 2 Road Safety Audit Oxfordshire County Council 5th November 2014 Frideswide Square, Oxford Stage 2 Road Safety Audit Notice This document and its contents have been prepared and are intended solely for Oxfordshire County Councils information and use in relation to the specific purpose of a Stage 2 Road Safety Audit of works proposed on Frideswide Square, Oxford. Atkins Highways and Transportation (Atkins) assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 43 pages including the cover. Document history Job number: 5117195.005 Document ref: Frideswide Square Stage 2 RSA Revision Purpose description Originated Checked Reviewed Authorised Date P01 For issue KF DD GB GB Nov 2014 Client signoff Client Oxfordshire County Council Project Frideswide Square, Oxford Stage 2 Road Safety Audit Document Title Frideswide Square, Oxford Stage 2 Road Safety Audit Job no. 5106655 Copy no. 001 Document Frideswide Square Stage 2 RSA reference Private and confidential Atkins Frideswide Square, Oxford Stage 2 RSA | Version 1.0 | October 2014 Frideswide Square, Oxford Stage 2 Road Safety Audit Table of contents Chapter Pages 1. Introduction 4 2. Scheme Description 6 3. Problems Raised by the Stage 1 RSA 8 4. Problems Raised by this Stage 2 RSA 14 5. Audit Team Statement 38 Appendices 39 Appendix A. List of Drawings and Documents Provided as Review Brief 40 Appendix B. Proposed Design Drawings 41 Appendix C. Problem Location Plan 42 Figures Figure 2-1 Scheme Location Plan- Frideswide Square, Oxford 6 Figure 2-2 - Proposed courtesy crossing 7 Figure 4-4 - Illustration Cam1-1_220914 showing landscaping vegetation 14 Figure 4-14 - Photograph showing rutting and polishing on Frideswide Square 16 Figure 4-15 - Photograph showing rutting and polishing on Botley Road 16 Figure 4-23 - Extract from drawing 1466-01F showing proposed roundabouts 17 Figure 4-6 - Illustration Cam3-3_220914 proposed bus lay-bys 18 Figure 4-13 - Extract from drawing 1466-01F showing short links 19 Figure 4-9 - Extract from drawing 1466-01F showing Rewley Road junction 20 Figure 4-11 - Extract from drawing 1466-01F roundabout central islands 21 Figure 4-12 - Extract from drawing 1466-01F roundabout central islands 22 Figure 4-18 - Extract from drawing 1466-01F showing visibility splay affected by proposals 23 Figure 4-19 - Extract from drawing 1466-01F showing area of likely footway over run by large vehicles 24 Figure 4-20 - Extract from drawing 1466-01F showing right turn into station 25 Figure 4-1 - Illustration Cam1-1_220914 showing shared surface notification on footway 26 Figure 4-2 - Illustration Cam3-3_220914 showing station access road 27 Figure 4-3 - Illustration Cam1-1_220914 showing water feature 28 Figure 4-5 - Illustration Cam3-3_220914 proposed bus lay-bys 29 Figure 4-7 - Illustration Cam3-3_220914 showing location of bus footway overrun 30 Figure 4-8 - Illustration Cam3-3_220914 showing location of bus footway overrun 31 Figure 4-10 - Extract from drawing 1466-01F showing potential pedestrian desire lines 33 Figure 4-16 - Extract from drawing 1466-01F showing proposed uncontrolled crossing point across station access road 34 Figure 4-21 - Extract from drawing 1466-01F showing right turn into station 35 Figure 4-22 - Extract from drawing 1466-01F showing right turn into station 36 Figure 4-24 - Extract from drawing 1466-01F showing proposed wide footway areas 37 Figure 5-1 - Problem Location Plan 42 Private and confidential Atkins Frideswide Square, Oxford Stage 2 RSA | Version 1.0 | October 2014 Frideswide Square, Oxford Stage 2 Road Safety Audit 1. Introduction Commission and Terms of Reference 1.1. Atkins (Highways and Transportation) has been commissioned by Oxfordshire County Council to undertake a Stage 2 Road Safety Audit (RSA) of works proposed on Frideswide Square, Oxford. 1.2. The audit has been conducted with reference to the procedures and scope set out in the Highways Agency’s ‘Design Manual for Roads and Bridges’ (DMRB), Volume 5, Section 2, Part 2, ‘Road Safety Audit’ Standard HD 19/03. 1.3. The Audit Team membership was as follows: Audit Team Leader: Geoff Butler CMILT IHIE Managing Consultant Atkins Highways and Transportation, Euston Tower Audit Team Member: Kevin Freimanis BSc Managing Consultant Atkins Highways and Transportation, Euston Tower Audit Team Observer: Anthony Kirkwood Road Safety Manager Oxfordshire County Council Procedure 1.4. The audit comprised an examination of drawings and a site visit, which was carried out on Wednesday 23rd October 2014. The site visit was carried out during day light hours (Overcast, dull and showery). Vehicle traffic flows were observed to be heavy during the site visits. Pedestrian traffic was observed t0o busy with many cyclists 1.5. The brief was provided by Atkins Managing Consultant, Paul Gannon, and consisted of scheme email brief and drawings. 1.6. Section 2 provides a description of the proposed work. 1.7. Section 3 comprises issues raised during the previous Stage 1 Road Safety Audit (document S- 000122 Frideswide Square, Oxford) issued December 2012. 1.8. Section 4 comprises issues raised during this Stage 2 RSA audit, and Section 5 comprises the Audit Team Statement. 1.9. Appendix A of this report lists the contents of the audit brief. Appendix B contains the design drawings used in this audit. Appendix C contains the Problem Location Plan. 1.10. Atkins has examined and reported on only the road safety implications of the measures as presented. The designs were not specifically examined or verified for compliance to any other criteria. However, to clearly explain a safety problem or the recommendation to resolve a problem, the Audit Team may, on occasion, refer to a design standard without undertaking a technical audit. Issues 1.11. The RSA brief did not provide the following details and, as a result, the audit does not take these into account: Any departures from standards; Private and confidential Atkins Frideswide Square, Oxford Stage 2 RSA | Version 1.0 | October 2014 4 Frideswide Square, Oxford Stage 2 Road Safety Audit Lighting levels; Site clearance; Accident data; Classified traffic counts; and Vehicle speeds. 1.12. The drawings supplied to audit were not to “issue for construction” or end of detailed design stage. The audit team have only received concept drawings and illustrations of the proposals. This road safety audit report should be seen in the context of the information provided. Clarifications 1.13. No clarifications were required. Private and confidential Atkins Frideswide Square, Oxford Stage 2 RSA | Version 1.0 | October 2014 5 Frideswide Square, Oxford Stage 2 Road Safety Audit 2. Scheme Description Location 2.1. Frideswide Square is located in central Oxford and incorporates the junctions of the A420 Park End Street/ Hollybush Row and the A4144 Hythe Bridge Street. A number of unclassified roads also lead into the square, Rewley Road, Park End Road (east) and Becket Street. Frideswide Square also provides pedestrian and vehicular access and egress to and from Oxford railway station which is located on the north side of the square. 2.2. Frideswide Square comprises a number of commercial properties which include the Said Business School on the north side and the Royal Oxford Hotel to the east. A parade of shops and offices is located adjacent to the bus access lane on the south side of the square. 2.3. The speed limit on Frideswide Square and adjacent road is 20mph. Figure 2-1 Scheme Location Plan- Frideswide Square, Oxford N Scheme location Source: Google Maps™ mapping service Scheme Description 2.4. Works are being proposed on Frideswide Square for the following objectives: To improve the sense of arrival for those entering the city via Frideswide Square, particularly from the railway station; To reflect the character of Oxford in the materials and landscaping of the space; To improve pedestrian, cyclist and bus user journey time and experience; To create a simple, uncluttered layout that is easy for all users to navigate without taking unnecessary detours; To reduce accidents; To improve actual and perceived journey times through the square; To promote sustainable transport and establish a balance between all modes of movement – pedestrian, cyclist, public transport, private vehicle; To create a stronger sense of place – promote public life within the space; Private and confidential Atkins Frideswide Square, Oxford Stage 2 RSA | Version 1.0 | October 2014 6 Frideswide Square, Oxford Stage 2 Road Safety Audit To boost regeneration of the West End; To accommodate the potential for events in the space; To create a public space which complements and enhances its context and provides a welcoming gateway to Oxford; To enable everyone to move through the space safely and efficiently; To co-ordinate the surrounding road network with Frideswide Square to protect buses from congestion and improve air quality in the city centre; and To give priority to movement by pedestrians, cyclists and public transport users. 2.5. To do this the following has been proposed: The proposed development significantly revises the existing arrangement of Frideswide Square. Traffic signals will be removed with traffic movements being managed by roundabout junctions instead; Buses will no longer be segregated from the through traffic and stands will be provided in lay-bys on the north and south sides of Frideswide Square; The lane widths are significantly reduced on the approaches to and through Frideswide Square in an effort to reduce and regulate traffic speed; The absence of traffic signals removes the formal crossings for pedestrians who are now catered for with a series of informal crossings on or close to the anticipated desire lines; and Becket Street, the northern part of which is currently a one way street that only permits access to Frideswide Square, will be made into a two way junction.
Recommended publications
  • NR05 Oxford TWAO
    OFFICIAL Rule 10(2)(d) Transport and Works Act 1992 The Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006 Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 202X Report summarising consultations undertaken 1 Introduction 1.1 Network Rail Infrastructure Limited ('Network Rail') is making an application to the Secretary of State for Transport for an order under the Transport and Works Act 1992. The proposed order is termed the Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order ('the Order'). 1.2 The purpose of the Order is to facilitate improved capacity and capability on the “Oxford Corridor” (Didcot North Junction to Aynho Junction) to meet the Strategic Business Plan objections for capacity enhancement and journey time improvements. As well as enhancements to rail infrastructure, improvements to highways are being undertaken as part of the works. Together, these form part of Oxford Station Phase 2 Improvements ('the Project'). 1.3 The Project forms part of a package of rail enhancement schemes which deliver significant economic and strategic benefits to the wider Oxford area and the country. The enhanced infrastructure in the Oxford area will provide benefits for both freight and passenger services, as well as enable further schemes in this strategically important rail corridor including the introduction of East West Rail services in 2024. 1.4 The works comprised in the Project can be summarised as follows: • Creation of a new ‘through platform’ with improved passenger facilities. • A new station entrance on the western side of the railway. • Replacement of Botley Road Bridge with improvements to the highway, cycle and footways.
    [Show full text]
  • Oxford Road Corridoor in Manchester Is Being Converted to a Pedes- Trian/Bus/Cycle Only Route, Despite Being a Major Traffic Route Into the City
    Top: Grenoble Station has been redeveloped linked to a new office quarter. Middle: Cannes Station has incorporated all of the station functions as part of a traditional street scene. Bottom: Oxford Road Corridoor in Manchester is being converted to a pedes- trian/bus/cycle only route, despite being a major traffic route into the city. The area should be uniied by a pedestrian cycle network with ive new light bridges to create a web of routes that link a series of existing and new public spac- es as part of each of the sites. The University has released plans for the redevelopment of Osney Mead to transform the industrial estate into a knowledge park. This will include engineering, laboratories and a Oxford range of business space from start up accommodation to headquarter The Botley Road bridge under the builings. The plan also includes stu- railway is an impossible problem. C e n t r a l W e s t dent and graduate housing. The city could spend millions on the problem and it will still be substand- ard and the works themselves will cause gridlock. We suggest that cars are removed and the Botley Road is A new city quarter turned into a bus/pedestrian/cycle route (and potentially Oxford’s irst tram line) Osney Mead The station should be developed in stages as funding allows. The new platforms and through tracks will happen irst with each element linked to subsequent commercial development as part of a clear The masterplan that is integrated into Station the rest of the area.
    [Show full text]
  • 1257738 Ocford Traffic Table X85.Indd
    OXFORDSHIRE COUNTY COUNCIL ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1) & (5) Notice of Temporary Traffic Order Oxford – Frideswide Square Area Temporary Traffic Restrictions Date of Order: 5 February 2018 Coming into force: 11 February 2018 This Order is being introduced because of kerb-line improvement works which are anticipated to take until 3 March to complete. The effect of the Order is to temporarily impose the following restrictions: One-Way Restriction Road Section of RoadDuration Diversion westbound Park End Street/ Hollybush Row 11/02/18 - Becket Street Frideswide to Becket Street 23/02/18 – Osney Lane Square & Hollybush southboundBecket Street Park End Street 11/02/18 - Row to Osney Lane 23/02/18 eastboundOsney LaneBecket Street to 11/02/18 - Hollybush/Oxpens 23/02/18 Road southboundWorcester Street George Street to 25/02/18 - Hythe Bridge New Road 16/03/18 Street westbound Park End Street New Road to 25/02/18 - – Worcester Frideswide Square 16/03/18 Street & Park End Street eastbound Hythe Bridge Frideswide Square 25/02/18 - Street to Worcester Street 16/03/18 No Left Turn Railway Station Exit onto Frideswide 11/02/18 - Uses of the Square Oxpens Road onto Osney Lane 23/02/18 one-way No Right Turn Rewley Road onto Hythe Bridge Street 25/02/18 - diversion route Upper Fisher Row onto Hythe Bridge Street 16/03/18 Worcester Street onto Hythe Bridge Street George Street Mews onto Worcester Street New Road onto Worcester Street Park End Place onto Park End Street Hollybush Row onto Park End Street Park End Street (Frideswide Square) onto Park End Street/Hollybush Row Appropriate traffic signs will be displayed to indicate when the measures are in force.
    [Show full text]
  • Frideswide Square Is One of Oxford's Highest Profile
    Frideswide Square Frequently Asked Questions Why are you doing this work? Frideswide Square is one of Oxford’s highest profile public areas and is a vital link between major road routes into the city. Tens of thousands of car, bus, cycle and pedestrians pass through each day and the area is also the destination for thousands of rail passengers. The county council is tackling what has been seen as a perennial problem for travellers coming into the city – our work will see improved journey times, far better facilities for pedestrians and cyclists and be part of a modern gateway for Oxford. We are investing in a better system for traffic and creating some excellent public space that is in keeping with nearby facilities such as the business school and future developments such as the revamped train station. The finished Fridewide Square will reflect the regeneration taking place in and around Oxford and the county as a whole. How much are you spending on this? £5.5million. This is a major investment into Oxford and just one of the pieces of work being done to ensure the city has the transport infrastructure to match its ambition to be a world class city. What does the work involve? There are two stages to the implementation of the project. The first stage of works, recently completed, involved reallocating parking from Becket Street to Osney Lane and St Thomas Street. There were also minor adjustments to the road layout at the junctions of Becket Street/Botley Road, Becket Street Osney Lane and Osney Lane/Hollybush Row.
    [Show full text]
  • Frideswide Square
    43 8 REWLEY ROAD 42a FRIDESWIDE SQUARE - FUTURE IMPROVEMENTS Shelters 42 HYTHE BRIDGE STREET Beaver House 40 41 STATION ACCESS TRAFFIC MANAGEMENT, PHASE 1 39 1 to 2 Sunday 11 February 2018 - Friday 23 February 2018 Railway Station Access PH From Railway Station Exit temporary prohibition of left turn to 23 to 38 9a6 to 9 Frideswide Square. 3 to 5 Said Business School Key: Shelter PH Works area Hythe Bridge Street 10 Existing westbound bus stop to remain 1 Existing eastbound bus stop to remain Royal Vlora House 9 8 7 6 5 Youth Hostel 15 13 12 11 Oxford 14 Hotel 16 Traffic movements PARK END STREET FB 2a PARK END STREET LB S Gantry Park End Street PARK36 END PLACE 39 Cantay PH Botley Road Park End Place House 40 to 41 2 Frideswide Square LB TCBs 27 King Charles House 22 24 18 1 Hotel 3 1 The Lampl Hollybush Row Building 5 1 Vicarage 78 8 10 to 12 3 PH 14 to 19 12 to 18 Becket Street The Old Bakery 79a Club 5 Castle Mews 54 to 57 11 20 to 28 1 to 11 19 to 28 73 St Thomas's Church 1 to 9 79e (C of E) PH Bookbinders' 40 44 HOLLYBUSH ROW 22 20 59 23 The Kite 17 27 ST THOMAS' STREET 69 28 (PH) BECKET STREET Corner House 16 15 RUSSELL STREET 1 to 32 67 Single lane of Becket Jackson Cole House 1 MILL STREET 7 Street open to WOODBINE 60 to 61 1 to 44 23 southbound traffic only.
    [Show full text]
  • 2. Hidden Heritage
    HIDDEN HERITAGE: WALK 2 - ST EBBE'S & ST THOMAS' Continue past the City of Oxford College building (where you reach the sign for 'City Centre') Walk along the footpath until the fork in the watercourse Leave Bonn Square (OX1 1EU) past the entrance to New Road Do not cross the footbridge on the left but follow the route to Baptist Church to New Road 10 the right through to the City Centre Cross New Road Turn right into Paradise Street 1 Note the Courthouse on the left Cross Castle Street and climb the steps up Church Lane . It is recorded that the last public execution took place here in 1863. Before taking the escalator down on the right, look up at the mosaic At the bottom of the escalator, turn left across Greyfriars Place into Turn Again Lane Turn left to the Old Prison (now Malmaison Hotel) along Justice Walk Turn right into Castle Yard This is where the Oxford Preservation Trust offices are located. Pass the old Castle Mound on the south side 11 2 Walk past the entrance to Oxford Castle & Prison Note the 17th-century houses on the left Turn left into Littlegate Street Turn left into Mill Stream Walk Walk onto the bridge over Castle Mill Stream Turn into Brewer Street on your right noting to the north the wall of Pembroke 3 You will soon see the Castle Tower and walls College that is part of the medieval walls 12 Walk under the glass bridge At the road junction, the bridge on the left is called 'Quaking Bridge' This was built in 2012 and has been nicknamed the 'Bridge of Thighs'.
    [Show full text]
  • Oxford City Council Core Strategy 2011-2026
    Oxford Core Strategy 2026 Adopted 14th March 2011 SPATIAL PORTRAIT VISION AND OBJECTIVES THE SPATIAL CONTENTS STRATEGY AND STRATEGIC LOCATIONS FOR CONTENTS . .1 APPENDICES DEVELOPMENT FOREWORD . 3 Appendix 1: Glossary . .155 RESPONDING TO KEY DIAGRAM . .4 Appendix 2: Replacement of policies in the CLIMATE CHANGE INTRODUCTION . .5 Oxford Local Plan 2001-2016 . .160 PROVIDING Appendix 3: Quality assurance . .162 INFRASTRUCTURE Appendix 4: Housing delivery and trajectory . .163 TO SUPPORT NEW SECTION 1 SPATIAL PORTRAIT . .10 DEVELOPMENT Appendix 5: Neighbourhood Centres . .168 1.1 Spatial portrait of Oxford . .11 PROMOTING 1.2 Oxford’s role in the region . .15 SOCIAL INCLUSION 1.3 Issues and challenges . .16 FIGURES AND IMPROVING QUALITY OF LIFE Figure 1: Key diagram . .4 Figure 2: Core Strategy timetable . .5 MAINTAINING SECTION 2 VISION AND OBJECTIVES . 20 A BALANCED Figure 3: The Oxford Local Development HOUSING SUPPLY 2.1 Vision to 2026 . .21 Framework . .6 2.2 Strategic objectives . .23 Figure 4: Key Plans and Strategies informing STRENGTHENING the Core Strategy . .8 PROSPERITY Section 3 THE SPATIAL STRATEGY AND Figure 5: Central Oxfordshire Sub-Region . .15 IMPLEMENTING AND STRATEGIC LOCATIONS FOR Figure 6: Index of Multiple Deprivation MONITORING THE by Ward . .35 CORE STRATEGY DEVELOPMENT . 26 Figure 7: District Areas of Oxford including 3.1 The spatial strategy . .27 future development distribution . .60 3.2 Reducing the need to travel . .28 Figure 8: Headington district Area . .61 3.3 Regeneration and the reuse of Figure 9: Cowley Road district Area . .62 previously developed land . .33 Figure 10: Cowley/Blackbird Leys district area . .63 3.4 Meeting Oxford’s housing and Figure 11: Summertown district area .
    [Show full text]
  • 4C Bus Time Schedule & Line Route
    4C bus time schedule & line map 4C Oxford - Botley (Deans Court) View In Website Mode The 4C bus line (Oxford - Botley (Deans Court)) has 2 routes. For regular weekdays, their operation hours are: (1) Dean Court: 9:43 AM - 5:28 PM (2) Oxford City Centre: 9:10 AM - 4:58 PM Use the Moovit App to ƒnd the closest 4C bus station near you and ƒnd out when is the next 4C bus arriving. Direction: Dean Court 4C bus Time Schedule 15 stops Dean Court Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 9:43 AM - 5:28 PM Police Station, Oxford City Centre Tuesday 9:43 AM - 5:28 PM Speedwell Street, Oxford City Centre 2 Speedwell Street, Oxford Wednesday 9:43 AM - 5:28 PM Westgate, Oxford City Centre Thursday 9:43 AM - 5:28 PM New Road, Oxford Friday 9:43 AM - 5:28 PM Park End Street, Oxford City Centre Saturday Not Operational 40-41 Park End Street, Oxford Frideswide Square, Oxford City Centre Frideswide Square, Oxford 4C bus Info Osney Island, Oxford Direction: Dean Court 106 Bridge Street, Oxford Stops: 15 Trip Duration: 21 min Binsey Lane, Oxford Line Summary: Police Station, Oxford City Centre, 93 Botley Road, Oxford Speedwell Street, Oxford City Centre, Westgate, Oxford City Centre, Park End Street, Oxford City Lamarsh Road, Oxford Centre, Frideswide Square, Oxford City Centre, Osney 170 Botley Road, Oxford Island, Oxford, Binsey Lane, Oxford, Lamarsh Road, Oxford, Seacourt Park And Ride, Oxford, Minns Seacourt Park And Ride, Oxford Industrial Estate, Botley, Elms Parade Shops, Botley, 234 Botley Road, Oxford Tilbury Lane, Botley,
    [Show full text]
  • Full Business Case (Stage 2 Commit to Construct)
    Capital Governance Approval Document Full Business Case (Stage 2 Commit to Construct) Project/Programme Name: Oxford: Frideswide Square area transport and public realm improvements Total Capital Budget: £5.478m, increasing to £5.842m. Divisions Affected: Jericho & Osney, Isis, University Parks, North Hinksey Purpose of this report: This report requests approval to contractually commit to construction the second phase of this project i.e. Main Works, and to allocate additional funding of £0.364m. Approval No: H316 Sign-off & Approval In preparing this report input must be obtained from the following: Responsible Owner Name Date Service Manager/ Client / Project Sponsor (Contributor) Daniel Round (S&I) 02.12.2014 Marie Kanayan 08.01.2015 Delivery Team Representative / Project Lead (Author) Paul Gannon / Andy 13-1-15 Warren Service Finance Business Partner or Senior Financial Rob Finlayson 13-1-15 Adviser (Contributor) The Capital Finance Team (Contributor) Kathryn Goldsby-West 13-1-15 Other Contributors as applicable (e.g. developer funding, asset strategy) Final approval as per the Financial Procedure Rules must be obtained from: Approval Level Required Name Date Over £5m - Cabinet / On behalf of Cabinet (Leader of the Cabinet 27 January Council]) 2015 * In the case of Highways & Transport or Property projects the relevant Service Manager and Deputy Director are those responsible for delivery. 1 Capital Governance Approval Document 1 Description & Objectives of the Proposal / Desired Outcomes & Business Benefits This scheme is part of the West End Area Action Plan (adopted 2008) and was part of Transform Oxford (launched in autumn 2008). It is also part of the County Council’s current draft city centre transport strategy, which has been updated in recent months to take account of proposals emerging for Oxford station, Oxpens and the Westgate centre, three of the largest development sites in the city.
    [Show full text]
  • George Street/Hythe Bridge Street/Worcester Street Junction – Proposed Amended Junction Layout and Pedestrian & Cycle Provision
    Division(s): Jericho and Osney CABINET MEMBER FOR ENVIRONMENT – 12 JULY 2018 OXFORD – GEORGE STREET/HYTHE BRIDGE STREET/WORCESTER STREET JUNCTION – PROPOSED AMENDED JUNCTION LAYOUT AND PEDESTRIAN & CYCLE PROVISION Report by Director for Planning & Place Introduction 1. This report presents responses received during a statutory consultation on the proposal to amend the layout of the George Street/Hythe Bridge Street/Worcester Street junction in central Oxford. In the light of these responses, the Cabinet Member for Environment is recommended to approve changes to the Traffic Regulation Order (TRO) for permitted traffic movements at the junction and changes to pedestrian crossings that were formally advertised in May and June of this year. 2. However, in the light of the response to the consultation, officers recommend that the road layout proposals that accompanied the TRO consultation are not implemented at this stage in order to allow the design team to explore further improvements to the design of the junction which would then be brought to a future Cabinet Member Decision meeting for approval. 3. The delay in implementation would also allow officers to carry out a wider review of the operation of the junction, taking into account the emerging detailed proposals for the Botley Road corridor and the conclusions of the forthcoming transport study of city centre movement by Phil Jones Associates. Both of these could have implications for the design of this junction. Background 4. The George Street/Hythe Bridge Street/Worcester Street junction was changed in 2014 to facilitate various traffic diversions during the construction of the improvements in Frideswide Square and to allow - in the finished scheme - some traffic to avoid Frideswide Square, which traffic modelling at the time indicated was necessary to the overall functioning of the network in the area.
    [Show full text]
  • Frideswide Square, Oxford Stage 2 Road Safety Audit
    Frideswide Square, Oxford Stage 2 Road Safety Audit Oxfordshire County Council 5th November 2014 Frideswide Square, Oxford Stage 2 Road Safety Audit Notice This document and its contents have been prepared and are intended solely for Oxfordshire County Councils information and use in relation to the specific purpose of a Stage 2 Road Safety Audit of works proposed on Frideswide Square, Oxford. Atkins Highways and Transportation (Atkins) assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 43 pages including the cover. Document history Job number: 5117195.005 Document ref: Frideswide Square Stage 2 RSA Revision Purpose description Originated Checked Reviewed Authorised Date P01 For issue KF DD GB GB Nov 2014 Client signoff Client Oxfordshire County Council Project Frideswide Square, Oxford Stage 2 Road Safety Audit Document Title Frideswide Square, Oxford Stage 2 Road Safety Audit Job no. 5106655 Copy no. 001 Document Frideswide Square Stage 2 RSA reference Private and confidential Atkins Frideswide Square, Oxford Stage 2 RSA | Version 1.0 | October 2014 Frideswide Square, Oxford Stage 2 Road Safety Audit Table of contents Chapter Pages 1. Introduction 4 2. Scheme Description 6 3. Problems Raised by the Stage 1 RSA 8 4. Problems Raised by this Stage 2 RSA 14 5. Audit Team Statement 38 Appendices 39 Appendix A. List of Drawings and Documents Provided as Review Brief 40 Appendix B. Proposed Design Drawings 41 Appendix C. Problem Location Plan
    [Show full text]
  • Oxford Heritage Walks Book 4
    Oxford Heritage Walks Book 4 On foot from Paradise Square to Sheepwash by Malcolm Graham © Oxford Preservation Trust, 2016 This is a fully referenced text of the book, illustrated by Edith Gollnast with cartography by Alun Jones, which was first published in 2016. Also included are a further reading list and a list of common abbreviations used in the footnotes. The published book is available from Oxford Preservation Trust, 10 Turn Again Lane, Oxford, OX1 1QL – tel 01865 242918 Contents: Paradise Street to Osney Abbey 1-10 Osney Cemetery to Sheepwash Channel 10-17 Rewley Abbey to Quaking Bridge 17-21 St. Thomas’s Street and Church 22-28 Tidmarsh Lane to Railway Station 28-34 Abbreviations 34 Further reading 34-36 Chapter One – Paradise Street to Osney Abbey The walk begins in Paradise Street, beside St. George’s Tower and the Castle Mill Stream, a branch of the river Thames that brings nature into the very heart of the city. You are standing just outside Oxford Castle, a motte and bailey castle built by Robert d’Oilly in 1071 just five years after the Norman Conquest. The castle was used as a gaol as early as the 12th century, and prisoners continued to be held in the later County Gaol and HM Prison until 1996.1 You are also outside the West Gate of medieval Oxford which stood further along Paradise Street near the junction with Castle Street until the mid 17th century.2 Paradise Street and the nearby Paradise Square are named after the Paradise garden of the Grey Friars who became established in St.
    [Show full text]