East Link Light Rail

Total Page:16

File Type:pdf, Size:1020Kb

East Link Light Rail East Link light rail: Neighborhood Workshop Summary January 2010 2 Contents East Link Project Overview ..............................................................................4 Workshop Overview ........................................................................................9 South Bellevue ................................................................................................15 Downtown Bellevue .......................................................................................26 Bel-Red Corridor ............................................................................................34 Overlake/Redmond ........................................................................................38 Additional Comments ....................................................................................43 Next Steps ......................................................................................................44 Appendices: ....................................................................................................45 Appendix A- Workshop Participants Appendix B- Workbook and Comment Form Transcriptions Appendix C- Workshop Station Comment Transcriptions Appendix D- Email Comments Appendix E- Aerial Photos Appendix F- Workshop Handouts and Displays Appendix G- Notification Materials Appendix H- Presentation Appendix I- Attendees Live/Work Location 3 East Link Light Rail Project Overview East Link is Sound Transit’s voter-approved project to build light rail between Seattle and Overlake. Sound Transit is also conducting environmental review on a future extension between Overlake and downtown Redmond. In May 2009, the Sound Transit Board of Directors identified a preferred East Link alternative with eastside stations serving Mercer Island, south Bellevue, downtown Bellevue, Bel-Red, Overlake, and downtown Redmond, connecting to Seattle via I-90. By 2030, East Link will connect the Eastside’s biggest population and employment centers, serving 40,000 – 45,000 daily riders on one of the region’s most congested travel corridors. Since the Eastside is one of the region’s fastest growing economic and residential centers, the job and population growth is putting increasing demand on the Eastside’s transportation system. East Link will provide an alternative to driving on congested roads. Because light rail trains operate in their own right-of-way, they provide fast, smooth, and reliable service no matter the weather or traffic conditions. East Link will also connect directly to the Central Link light rail line, currently running between downtown Seattle and the Sea-Tac Airport. Sound Transit is currently conducting an environmental review of the East Link project in order to understand the environmental impacts of the proposed project, as required by the National and State Environmental Policy Acts (NEPA/ SEPA). Sound Transit is advancing the design of the preferred alternative, which includes modifications that the Sound Transit Board identified. The East Link Final Environmental Impact Statement (EIS) will evaluate the preferred alternative and each of the alternatives identified in the Draft EIS. East Link Timeline 2009–2010 Preliminary Engineering 2011–2013 Final Design 4 East Link Preferred Alternative Identified by Sound Transit Board of Directors, May 2009 To Lynnwood 202 908 N Downtown Redmond New location for the Downtown Station NE REDM Redmond Station, subject to OND WAY further evaluation. Kirkla n d University of 520 SE Redmond Washington Station Red mond Lake Overlake Sammamish Lake Transit Center 520 Union Station 520 Locate D2A on the north side 99 of NE 24th Street, subject to Ashwood/ 124th 130th Overlake Clyde further evaluation. Hospital Station Station Village Hill Station Station 1 5 6 T H A 1 3 2 N D M e d ina 124TH AVE NE V E N E Lake A V E N E Future consideration of C3T tunnel as Bellevue Transit 152ND AVE NE 108TH AVE SE 1110TH AVE SE Washington the preferred alternative, if additional1112TH AVE SE Center Station East Link Light Rail Bellevue S eat tle funding sources are identified. Alternatives East Main International Station Station SE 8TH ST District/2 3 R D A V E Elliott Route Profile Chinatown Bay Station At-Grade BELLEVU Elevated LAKE W ASHINGTON BLVD Move B3 to at-grade on the east side E WA Tunnel Mercer Island of Bellevue Way SE and 112th Avenue Station Y S SE, subject to further evaluation. Retained Cut Rainier E Station South Bellevue ST Board Modification RAI N Station IER 8 0 T H S E 76TH AVE SE A 72ND AVE SE VE Central Link Light Rail S M ercer Island Central Link Alignment and Station Central Link Extention To Sea-Tac Airport 0 0.5 1 Mile 2013/2014 Construction 2020/2021 Service Begins 5 East Link light rail >ÃÌÊÊÃÊ-Õ`Ê/À>Ã̽ÃÊÛÌiÀ>««ÀÛi`Ê«ÀiVÌÊÌÊLÕ`Ê} ÌÊÀ>ÊLiÌÜiiÊ-i>ÌÌiÊ >`Ê"ÛiÀ>i°Ê-Õ`Ê/À>ÃÌÊÃÊ>ÃÊV`ÕVÌ}ÊiÛÀiÌ>ÊÀiÛiÜÊÊÌ iÊvÕÌÕÀiÊ Get Involved, Stay Informed! 1«Ê iÝÌ iÝÌiÃÊLiÌÜiiÊ"ÛiÀ>iÊ>`Ê`ÜÌÜÊ,i``°Ê/ iÊ-Õ`Ê/À>ÃÌÊ >À`ÊvÊ QÊÊ -Õ`Ê/À>ÃÌÊÃÊVÕÀÀiÌÞÊ`iÃ}}ÊÌ iÊ«ÀiviÀÀi`Ê>ÌiÀ>ÌÛi]ÊVÕ`}Ê>}Ê`wV>ÌÃÊ ÀiVÌÀÃÊÀiViÌÞÊ`iÌvi`Ê>Ê«ÀiviÀÀi`Ê >ÃÌÊÊ>ÌiÀ>ÌÛiÊÜÌ Êi>ÃÌÃ`iÊÃÌ>ÌÃÊ -Õ`Ê/À>Ã̽ÃÊ >ÃÌÊÊ«ÀiVÌÊÌi>ÊÜÊLiÊÃii}Ê«ÕLVÊ«>ÀÌV«>ÌÊ`ÕÀ}Ê>ÊÃiÀiÃÊvÊ ÜÀà «ÃÊLi}}ÊÌ ÃÊ>]ÊvÜi`ÊLÞÊ«iÊ ÕÃiÃÊÊ-«À}ÊÓä£ä°Ê ÕÀ}ÊÌ iÃiÊ«ÕLVÊ Ì >ÌÊÜiÀiÊ`iÌwi`ÊLÞÊÌ iÊ-Õ`Ê/À>ÃÌÊ >À`°Ê ÃiÀÛ}ÊiÀViÀÊÃ>`]ÊÃÕÌ Ê iiÛÕi]Ê`ÜÌÜÊ iiÛÕi]Ê i,i`]Ê"ÛiÀ>i]Ê>`Ê iiÌ}Ã]Ê«>ÀÌV«>ÌÃÊÜÊ >ÛiÊÌ iÊ««ÀÌÕÌÞÊÌ\ QÊÊ ÊV}ÊÌ Ã]ÊÌ iÊ >ÃÌÊÊ«ÀiVÌÊÌi>ÊÜÊLiÊViVÌ}ÊVÀÌV>ÊÃÕÀÛiÞÊvÀ>Ì]Ê `ÜÌÜÊ,i``]ÊViVÌ}ÊÌÊ-i>ÌÌiÊÛ>Êä° VÕ`}Ê`À}Ê}iÌiV V>ÊLÀ}Ã]Êii`i`ÊÌÊVÀi>ÌiÊ>ÊL>ÃiÊ>«ÊvÊÌ iÊ«ÀiviÀÀi`Ê QÊÊ i>ÀÊ>LÕÌÊÌ iÊ >ÃÌÊÊ} ÌÊÀ>ÊÃÞÃÌi >ÌiÀ>ÌÛi°Ê ÞÊÓäÎä]Ê >ÃÌÊÊ} ÌÊÀ>ÊÜÊViVÌÊÌ iÊ >ÃÌÃ`i½ÃÊL}}iÃÌÊ««Õ>ÌÊ>`Ê QÊÊ *ÀÛ`iÊvii`L>VÊÌÊvÀÊÌ iÊ«Ài>ÀÞÊi}iiÀ}ÊvÊÌ iÊ«ÀiVÌ i«ÞiÌÊViÌiÀÃ]ÊÃiÀÛ}Ê{ä]äääÊqÊ{x]äääÊ`>ÞÊÀ`iÀÃÊÊiÊvÊÌ iÊÀi}½ÃÊ QÊÊ /iÊÕÃÊÀiÊ>LÕÌÊÞÕÀÊVÕÌÞÊ>`Ê ÜÊ >ÃÌÊÊV>ÊLiÃÌÊÃiÀÛiÊÞÕ° QÊÊ Ê>Ê ÛÀiÌ>Ê«>VÌÊ-Ì>ÌiiÌÊ­ -®ÊÃÊLi}Ê«Ài«>Ài`ÊÕÃ}ÊÌ iÊ«ÀiviÀÀi`Ê ÃÌÊV}iÃÌi`ÊÌÀ>ÛiÊVÀÀ`Àð >ÌiÀ>ÌÛi]Ê>ÃÊÜiÊ>ÃÊÌ iÊÌ iÀÊ>ÌiÀ>ÌÛiÃÊvÀÊÌ iÊ À>vÌÊ -°Ê/ iÊ>Ê -ÊÜÊ`VÕiÌÊ /Êi>ÀÊÀiÊ>LÕÌÊÕ«V}Ê >ÃÌÊÊiiÌ}Ã]Ê«i>ÃiÊÛÃÌÊÌ iÊ-Õ`Ê/À>ÃÌÊ7iLÊÃÌi]ÊÃ}ÊÕ«Ê >`ÊÀië`ÊÌÊ>ÊViÌÃÊÀiViÛi`Ê`ÕÀ}ÊÌ iÊ À>vÌÊ -ÊViÌÊ«iÀ`Ê>`Ê`iÃVÀLiÊ ÀÊ`iÌ>i`Ê>«Ã]ÊÌ iÊ«ÀiV̽ÃÊiÛÀiÌ>Ê`VÕiÌÃÊ>`ÊvÀiµÕiÌÞÊ>Ãi`Ê vÀÊi>ÊÕ«`>ÌiÃ]ÊÀÊVÌ>VÌÊ>ÌiÊÕViL>]Ê ÕÌÞÊ"ÕÌÀi>V Ê-«iV>ÃÌ]Ê>ÌÊÓäÈÎnx{xÊÀÊ «À«Ãi`ÊÌ}>ÌÊVÌiÌð µÕiÃÌÃÊÃiiÊÜÜÜ°ÃÕ`ÌÀ>ÃÌ°À}Éi>ÃÌ° >Ìi°ÕViL>JÃÕ`ÌÀ>ÃÌ°À}° 92ND AVE NE AVE 92ND To University NE AVE 100TH Q of Washington ÊÊ ÊÓä£ä]ÊvÜ}ÊV«iÌÊvÊÌ iÊ>Ê -]ÊÌ iÊ-Õ`Ê/À>ÃÌÊ >À`ÊÜÊ>iÊ>Êw>Ê NE 12TH ST `iVÃÊÊÌ iÊ >ÃÌÊÊ«ÀiVÌÊÃV«i° At-Grade Route Tunnel Route Station ST Board Modification NE 8THLEGEND ST Elevated Route Adjacent Segment New and/or Expanded E MADISON ST NE 6TH ST Preferred Alternative Identified B E L L E V U E Retained-Cut Route Park-and-Ride Lot BOREN AVE SEATTLE TUNNEL S E A T T L E SEATTLE TUNNEL MAIN ST SeattleSeattle and& Mercer MercerE CHERRY ST Island Island ­ÕÃ}Êä® South Bellevue Downtown Bellevue Bel-Red/Overlake Corridor Redmond ­vÕÌÕÀiÊiÝ«>Ã]ÊÌÊVÕÀÀiÌÞÊvÕ`i`ÊVÃÌÀÕVÌ® 92ND AVE NE AVE 92ND To University NE AVE 100TH of Washington BELLEVUE NE 12TH ST SE 6TH ST SE 6TH ST NE 12TH ST SE 6TH ST NE 85TH ST NE 85TH ST NE 12TH ST BNSF Ashwood/ BNSF NE 161ST NE 85TH ST NE 12TH ST NE 161ST Ashwood/ BNSF Ashwood/ NE 161ST East Link Preferred Alternative E Hospital iÜÊV>ÌÊvÀÊÌ iÊ E E Hospital Hospital N N N NE 12TH ST NE 12TH ST NE 12TH ST 520 E YESLER WAY 520 SE 6TH ST 520 D D D 108TH AVE SE AVE 108TH R NE 8TH ST SE AVE 108TH R 108TH AVE SE AVE 108TH 112TH AVE SE AVE 112TH R Station Station SE AVE 112TH ÜÌÜÊ,i``Ê NE 85TH ST Station SE AVE 112TH NE 12TH ST WAY SE BNSF E E E MADISON ST International NE 6TH ST Ashwood/ L E L NE 161ST 108TH AVE NE AVE 108TH L 110TH AVE NE AVE 110TH 108TH AVE NE AVE 108TH A 110TH AVE NE AVE 110TH A 108TH AVE NE AVE 108TH 110TH AVE NE AVE 110TH T NE 40TH ST BNSF -Ì>Ì]ÊÃÕLiVÌÊÌÊ BNSF D A D B E L L E V U E ST S NE 40TH ST D N E District/ S JACKSON ST T SE 8TH Hospital NE 40TH ST BNSF N NE 80TH ST Lake SE 8TH S NE 80TH ST N O N Lake SE 8TH NE 12TH ST O NE 80TH ST V 520 Lake V O D 23RD AVE 23RD A Chinatown NE 10TH ST Bellevue SE AVE 108TH vÕÀÌ iÀÊiÛ>Õ>Ì° R BOREN AVE Overlake A V The following are descriptions of the preferred alternative along each area that SE AVE 112TH Station NE REDMOND WAY NE 10TH ST Bellevue 405 Overlake A NE 10TH ST Bellevue 405 Overlake Transit NE REDMOND WAY E Station 405 NE REDMOND WAY L 108TH AVE NE AVE 108TH 110TH AVE NE AVE 110TH Transit Transit Overlake Center A ST NE 40TH ST BNSF D Overlake Center Overlake Center SE 8TH NE 80TH ST N S E A T T L E Lake Transit Center NE O SEATTLE TUNNEL V Transit Center E Y A SEATTLE TUNNEL NE 10TH ST Bellevue N W Downtown NE 8TH STMAIN ST East Link will serve. SE AVE 118TH Transit Center Station E Overlake NE REDMOND WAY LAKE Y N Y 405 202 E CHERRY ST NE 8TH ST NE AVE 116TH W Downtown Y R Transit NE 8TH ST SE AVE 118TH Station W DowntownA Redmond 118TH AVE SE AVE 118TH Station Y E NE 8TH ST 202 L Overlake Center NE 8TH ST WASHINGTON NE AVE 116TH R Redmond Y Station 202 116TH AVE NE NE AVE 116TH A BELLEVUENE 8TH ST BELLEVUE R E A Redmond L Transit Center E BLVD Mercer BELLEVUE E N BELLEVUE Bellevue Station L BEAR CREEK PKWY Y BELLEVUE NE 6TH ST Bellevue REDMOND Station W Downtown Island SE AVE 118TH Station PARK NE 8TH ST BNSF BELLEVUE BELLEVUE Bellevue Transit Transit BNSF Y 202 NE 6TH ST Bellevue BELLEVUENE 8TH ST BEAR CREEK PKWY NE AVE 116TH R Redmond Bellevue S WAY AIRPORT Center ON THE LID Station REDMOND A NE 6TH ST Center NE AVE 134TH BEAR CREEK PKWY REDMOND NE AVE 152ND E Bellevue Rainier NE 112TH AVE BNSF BELLEVUE NE AVE 116TH L Transit Transit SE AVE 72ND
Recommended publications
  • Annual Meeting TUESDAY, MAY 16Th, 6:00Pm for 6:30Pm BELLEVUE CHURCH of CHRIST – 1212 104TH AVE SE
    Surrey Downs Community Club Annual Meeting TUESDAY, MAY 16th, 6:00pm for 6:30pm BELLEVUE CHURCH OF CHRIST – 1212 104TH AVE SE Suggested Annual Dues of $30 per household can be paid at the meeting PROPOSED OFFICERS FOR 2017-18 President: Scott Lampe First Vice-President: Ken Rosenow Secretary: David Slight Treasurer: Charles Fisher Vice-Presidents: Rossen Atanassov, Mary Hoole, Tim Horsfall, Leonard Marino, Beth Muller, Steve Hall, Rich Strophy, Jim Tran, Keith Zhang Other topics … • Treasurer's Report • Park Redevelopment • Light Rail • Construction update • South Bellevue Park n Ride • Traffic Mitigation • Calendar of Activities • Any Other Business Treasurer’s Report Revenue from dues and donations: $1710 Expenses: $ 436 Balance: $1591 Expenses were much reduced in 2016-2017 Annual picnic was very inexpensive this year at $259 Holiday party was also inexpensive (Church Rental only ) Annual meeting costs No change in amount of expenses foreseen The court house has gone ☺ First markers showing the position of new buildings City has the park redesign in the 2018/2019 budget Primary Path designed for asphalt, secondary paths crushed gravel Walking paths have been pulled away from residents property lines (increased buffer with plantings) Construction will start in March / April 2018 Surrey Downs Park Plan With access to the park removed from 112th, the only park access will be from within Surrey Downs community Park will be a neighborhood park versus a community park which means no scheduled activities 1 4 Park design decreased in intensity and major features pulled away from neighboring houses 5 1. Small Parking lot – entrance on North end.
    [Show full text]
  • 17411 Ne Union Hill Road | Building a 17425 Ne Union Hill Road | Building B
    A T B E A R C R E E K 17411 NE UNION HILL ROAD | BUILDING A 17425 NE UNION HILL ROAD | BUILDING B Redmond, Washington 98052 IMPROVEMENTS UNDERWAY Building B Common Lobby Refresh PROJECT IMPROVEMENTS TO INCLUDE: • Speculative Suite • Lobby Refresh • Improved Access to Bear Creek Parking ratio: By 2024, Redmond Recent courtyard Abundant nearby 3.06/1,000 SF will be connected improvements amenities including free surface parking to the Light Rail include new Redmond Town Center’s system through four outdoor seating & numerous shopping, Redmond stations bocce ball court dining & entertainment options Bike share program Fiber optics Regional Park & Ride available for tenants provided by Frontier located across sole use, perfect for Communications the street from the use on the numerous property surrounding bike trails 520 163 8 405 SITE PLAN 52 15 805 15 5 105 SR-520 210 90 110 AVO 134 95 680 ND ALE NE UNION HILL RO R OAD EXT 56 195 ENS ION Building B 47 91 AD 110 Building A 17 85 N N N N N N N N N N N N N N N N Speculative Suite Reception Rendering CONNECTING PEOPLE TO THE COMMUNITY SOUND TRANSIT EAST LINK EXTENSION BELLEVUE CBD BELLEVUE OVERLAKE VILLAGE STATION Opening 2023 REDMOND TECHNOLOGY CENTER STATION Opening 2023 LAKE SAMMAMISH MARYMOOR PARK FUTURE ESTIMATED LIGHT RAIL TRAVEL TIMES SeaTac Airport Station > SE Redmond Station 68 minutes Westlake Station > SE Redmond Station 39 minutes International District Station > SE Redmond Station 34 minutes Downtown Bellevue Station > SE Redmond Station 15 minutes Overlake Village Station > SE
    [Show full text]
  • Addendum 3.1
    ADDENDUM 3.1 SECTION 00 73 00 SPECIAL CONDITIONS ADDENDUM 3.1 TABLE OF CONTENTS Note: Special Conditions SC-1.01 through SC-11.04 are numbered to correspond to the General Conditions. SC-1.01 DEFINITIONS .......................................................................................... 3 SC-2.04 CONTRACTOR’S PROJECT MANAGEMENT AND SUPERVISION ...... 3 SC-3.02 COORDINATION WITH OTHERS ........................................................... 4 SC-6.01 CONTRACT TIME ................................................................................ 21 SC-7.08 PERMITS, FEES, AND NOTICES ........................................................ 36 SC-7.11 OWNERSHIP OF WORK PRODUCT ................................................... 38 SC-9.02 SCHEDULE OF VALUES ..................................................................... 42 SC-10.02 DELAYS ................................................................................................ 44 SC-11.04 PARTNERING ....................................................................................... 46 APPENDIX A KING COUNTY METRO TRACK ACCESS PERMIT PROCESS .......... 48 APPENDIX B TRACK ALLOCATION REQUEST/WORK PERMIT FORM .................. 51 APPENDIX C DOWNTOWN TUNNEL/STATION ACCESS PERMIT/WORK PERMIT REQUEST FORM .................................................................................. 53 Northgate & East Link Extensions Section 00 73 00 RFFP No. CN 0115-14 Systems GC/CM Special Conditions Link Contract N830/E750 DECEMBER 2017 CO 001 MARCH 2018 CO 008 JUNE 2018 CO 016
    [Show full text]
  • Sound Transit Procurement & Contracts Division Date
    Request for Information Downtown Redmond Link Extension (DRLE) Project To: Prospective Proposers From: Sound Transit Procurement & Contracts Division Date: January 16, 2018 Downtown Redmond Link Extension (DRLE) Project Sound Transit is requesting industry comments on its upcoming Downtown Redmond Link Extension (DRLE) Project, located in the City of Redmond in King County, Washington. Sound Transit anticipates utilizing the Design-Build delivery method for this Project. The Project will extend light rail for 3.4 miles from the Redmond Technology Center Station at NE 40th Street to Downtown Redmond. Project elements include a double-track guideway (elevated and at-grade), one elevated station, one at-grade station, structured and surface parking, civil and site work, roadway work, and bus transit facilities. Sound Transit is providing prospective proposers interested in the Project an opportunity to review the Project and provide feedback. At this time, Sound Transit is only requesting comments and will not provide any responses. Sound Transit requests that prospective Proposers submit comments by January 26, 2018. Please submit all comments to: Petra Payne Sr. Design & Construction Contracts Specialist Sound Transit 401 S. Jackson Street Seattle, WA 98104-2826 Email: [email protected] The information contained in this document is subject to change prior to the issuance of the Request for Qualifications. Downtown Redmond Link Extension RFI P a g e | 1 January 2018 Request for Information Downtown Redmond Link Extension (DRLE) Project Sound Transit is particularly seeking the industry’s perspective and feedback related to: Whether there are concerns with performing the Design-Build work for the DRLE Project near and under SR-520 corridor, rebuilding the on and off ramps at the SR-202/SR-520 interchange, and working in downtown? Potential locations for staging areas are identified in the attached drawings.
    [Show full text]
  • RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) And/Or Design-Build (DB)
    State of Washington Capital Projects Advisory Review Board (CPARB) Project Review Committee (PRC) APPLICATION FOR RECERTIFICATION OF PUBLIC BODY RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) and/or Design-Build (DB) The CPARB PRC will consider recertification applications based upon agency’s experience, capability, and success in undertaking Alternative Public Works Contracting utilizing the General Contractor/Construction Manager (GCCM) and/or Design-Build (DB) project delivery process. Incomplete applications may delay action on your application. 1. Identification of Applicant a) Legal name of Public Body (your organization): Central Puget Sound Regional Transit (dba Sound Transit) b) Address: 401 S. Jackson Street, Seattle, WA 98104-2826 c) Contact Person Name: Nick Datz Title: Manager, Procurement and Contracts d) Phone Number: 206-398-5236 Fax: N/A E-mail: [email protected] e) Effective Dates of current Certification GC/CM 5/28/2018 DB f) Type of Certification Being Sought GC/CM X DB 2. Experience and Qualifications for Determining Whether Projects Are Appropriate for GCCM and/or DB Alternative Contracting Procedure(s) in RCW 39.10 (RCW 39.10.270 (2)(a)) Limit response to two pages or less. If there have been any changes to your agency’s processes addressing items (a) and (b) below, please submit the revised process chart or list. (a) The steps your organization takes to determine that use of GCCM and/or DB is appropriate for a proposed project; and (b) The steps your organization
    [Show full text]
  • Public Involvement Summary Table of Contents
    East Link Extension February 25, 2014 East Main Station Segment 60% Design Open House Public Involvement Summary Table of Contents 1 Background 2 Overview 2 Notification 3 Open house overview 4 Comment summary 4 East Main Station Design 7 Construction impacts 8 How do you plan to use East Link? 9 Permanent station naming 10 Next steps Sound Transit East Link Background East Link Extension is a key element of the regional mass stretching more than 50 miles. By 2030, about 50,000 transit system approved by voters in 2008. This 14-mile riders will use East Link every day. light rail line will benefit local communities and support East Link is advancing in final design. During this phase, regional growth with fast, frequent and reliable light project architects and engineers define the light rail system, rail service, connecting Seattle to the Eastside’s biggest determining the technical specifications for the stations, population and employment centers. bridges, tracks and other elements as well as construction The project builds on the Central Link light rail system methods and sequencing. The Sound Transit art program, running between Sea-Tac Airport and downtown Seattle STart, also begins work to select station artists and artworks and the University Link and S. 200th Link Extensions that during final design. Sound Transit hosted a public meeting are scheduled to open in 2016. East Link is part of the new in May 2013 to share design plans and we have since light rail extensions being built north, south and east from advanced design to approximately 60 percent completion.
    [Show full text]
  • East Link Light Rail
    East Link light rail Segment C: Downtown Bellevue July 2011 Segment Details Segment C serves downtown Bellevue with alternatives running from approximately SE 6th and NE 12th Streets. Sound Transit evaluated 10 alternatives in the 2011 Final Environmental Impact C9T Statement (FEIS). C11A There are two preferred alternatives in this segment: a cut-and- cover tunnel along 110th Avenue NE (C9T) and an at-grade alignment on 108th Avenue NE (C11A). C9T begins on the east side of 112th Avenue SE, then transitions C9T C11A to the west side at SE 6th Street before turning west into a tunnel C9T portal on Main Street. C9T then turns north under 110th Avenue C11A NE to the Bellevue Transit Center Station at NE 4th Street. C9T turns east at NE 6th Street and exits the tunnel portal, transitions to an elevated profile in the center of NE 6th Street, and then crosses to the north side of NE 6th Street to pass over 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor. C11A begins on the east side of 112th Avenue SE, then travels C9T & C11A on the south side of Main Street in a retained cut to the 108th Station and turns north at-grade over Main Street to the center of 108th Avenue NE. At NE 6th Street, C11A turns east in the center of the street to the at-grade Bellevue Transit Center Station. C11A then crosses 110th Avenue NE at-grade, transitioning to a C9T & C11A (Preferred Alternatives) and other EIS Alternatives retained-fill and then an elevated profile before crossing 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor.
    [Show full text]
  • The Bulletin in MEMORIAM: WILLIAM J
    ERA BULLETIN — SEPTEMBER, 2020 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 63, No. 9 September, 2020 The Bulletin IN MEMORIAM: WILLIAM J. MADDEN, 1947-2020 Published by the Electric Railroaders’ by Jeff Erlitz Association, Inc. P. O. Box 3323 Grand Central Station New York, NY 10163 For general inquiries, or Bulletin submissions, contact us at bulletin@erausa. org or on our website at erausa. org/contact Editorial Staff: Jeff Erlitz Editor-in-Chief Ron Yee Tri-State News and Commuter Rail Editor Alexander Ivanoff North American and World News Editor David Ross Production Manager Copyright © 2020 ERA This Month’s Cover Photo: Public Service of New Jer- sey double-truck motor cars 2282 and 2235 on Main Avenue & Glendale Street in Nutley, New Jersey on February 11, 1936. Unknown photographer William J (Bill) Madden during a station stop on the Canadian at Thunder Bay, Ontario, July 24, 1977. Jeff Erlitz photograph With deep sadness, I must pass along the around 1970, initially on Saturday mornings In This Issue: news that William Madden passed away on and then on Monday evenings. Like most of Assorted Wednesday, August 12, at the age of 73 due us, he could be found collating, stamping Travels from to complications from COVID-19. envelopes, and bagging sacks of mail for Bill, as everyone knew him, joined the Elec- both the New York Division Bulletin and Na- the First Half of tric Railroaders’ Association on February 21, tional’s Headlights. When the ERA began 2020…Page 18 1964 and was member number 3062. He offering Life memberships, Bill was one of probably started volunteering at headquar- the few members who took up that offer.
    [Show full text]
  • East Link Extension Update System Expansion Committee
    East Link Extension Update System Expansion Committee 01/14/21 Why we are here • Provide a project update on the East Link Extension construction progress • Increase contract contingency request for: • E130 contingency increase request (M2021-04) • E340 contingency increase request (M2021-05) • E335 contingency increase request (M2021-06) 2 2012-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 Final Design We are here E130 – Seattle to South Bellevue (I-90) E320 South Bellevue E330 Downtown Bellevue Tunnel E335 Downtown Bellevue to Spring District E340 Bel-Red E360 SR520 to Redmond E750 Systems Pre-Revenue Float Revenue Service Challenges / Upcoming Milestones Challenges • COVID-19 Impacts • Station Schedules and Systems Access • Redmond Technology Station Garage Upcoming Milestones • Mercer Island Transit Interchange – Bids Due (Q1 2021) • South Bellevue (E320) Substantial Completion (Q1 2021) • Bel-Red (E340) Substantial Completion (Q1 2021) • I-90 (E130) Substantial Completion (Q2 2021) • Overlake (E360) Substantial Completion (Q2 2021) 4 Judkins Park Station 5 Mercer Island Station 6 Mercer Island Transit Interchange 7 South Bellevue Station 8 East Main Station 9 Bellevue Downtown Station 10 Wilburton Station 11 Spring District/120th Station 12 Bel-Red/130th Station 13 Overlake Village Station 14 Redmond Technology Station 15 Redmond Technology Station Garage 16 Q2 2021 Weekend Closures • Weekend #1: • Pioneer Square Temp Platform Removal • Weekend #2: • Signaling Work • Traction Power • Weekend #3: • Pioneer Square Temp Platform Removal
    [Show full text]
  • Motion No. M2021-46 Easements with City of Bellevue As Part of the East Link Extension
    Motion No. M2021-46 Easements with City of Bellevue as part of the East Link Extension Meeting: Date: Type of action: Staff contact: System Expansion Committee 08/12/2021 Recommend to Board Ron Lewis, DECM Executive Director Board 08/26/2021 Final action Faith Roland, Director, Real Property Rhonda Thomsen, Real Property Project Manager Proposed action Authorizes the chief executive officer to grant two permanent easements to the City of Bellevue to construct, operate, and maintain sewer facilities on Sound Transit owned property as part of the East Link Extension at no cost to the City. Key features summary • Resolution No. R2018-40, the Board’s Procurement and Delegated Authority Policy, requires all permanent easements (excluding standard utility easements that service Sound Transit) be approved by the Board. • This action will grant two permanent easements to the City of Bellevue comprising of air, surface, and subsurface rights on the portion of Sound Transit property located between 111th Ave SE and 112th Ave SE in Bellevue, WA. • Easement locations and size: o Easement 1: EL193, Lots 27 through 31, Block 8 of Surrey Downs No 2, for 217 square feet o Easement 2: EL197/198, Lots 1 and 2, Block 8, Surrey Downs No 1, for 2,164 square feet • The City of Bellevue requires these easements to construct, operate, and maintain their sewer facilities. • No monetary consideration need be exchanged due to Sound Transit’s guideway and station location interfering with the City of Bellevue’s existing sewer line. • Granting the easements to the City of Bellevue will not impact Sound Transit’s planned use of the property to construct, operate, and maintain facilities for the East Link light rail project.
    [Show full text]
  • Agency Progress Report: 2019 Q4
    Agency Progress Report Capital Programs U District Station 120th Ave. Station Northgate Link Ext. East Link Ext. Hilltop Tacoma Link Ext. OMF OMF East December | 2019 Prepared by Project Control & VE | Design, Engineering & Construction Management Editor’s Note Sound Transit’s Quarterly Agency Progress Report summarizes projects and major contracts status, risk, and performance for capital projects. Due to timing differences in the production of the APR and the ST financial statements, actual cost data presented in the APR may not match the quarterly financial statements. However, the actual cost data is reconciled to the financial statements on a monthly basis. We always appreciate any suggestions you might have for future refinements to this document. To be added to the distribu- tion list for this report or to make suggestions, please contact Aniekan Usoro at (206) 398-5000. The Agency Progress Report can also be found on the web at http://www.soundtransit.org/get-to-know-us/documents- reports/agency-progress-reports. SOUND TRANSIT Central Puget Sound Regional Transit Authority Union Station 401 S. Jackson St. Seattle, WA 98104-2826 Reception: (206) 398 5000 Facsimile: (206) 398 5499 CHAIR Agency Progress Report John Marchione Redmond Mayor TABLE of CONTENTS VICE CHAIRS Executive Summary 1 Kent Keel University Place Mayor Link Light Rail 5 Paul Roberts University Link Extension 11 Everett Councilmember Northgate Link Extension 15 Lynnwood Link Extension 35 BOARD MEMBERS Nancy Backus I-90 Two-way Transit/HOV Ops 51 Auburn Mayor East
    [Show full text]
  • Creating Connections
    PURPOSE OF THIS REPORT The legislation that established the Regional Advisory Council (RAC) described several expectations for the group’s work, including • Coordinate planning and development activities to the extent possible to ensure effective use of the southern portion of the Eastside Rail Corridor (ERC) and the Redmond Spur. • Oversee the partner planning process including implementing and coordinating the trail, high-capacity transit, and utility uses in the ERC. • Coordinating with affected cities around local planning and development. • Address both near-term and long-term recommendations. • Recommend any needed changes to the county’s countywide planning policies. • Reach out to a broad spectrum of stakeholders. This report provides a summary of the RAC’s work to accomplish those objectives, and identifies actions necessary to continue this collaborative approach among the owners. The report begins by describing the RAC’s vision for the corridor, the history of the ERC, and the process used by the RAC to develop these recommendations. In the subsequent chapters the report • Details the current conditions in the corridor, broken into five planning segments. It describes current uses adjacent to the corridor, the major constraints that will need to be resolved (pinch points, steep slopes, narrow trestles, etc.), opportunities for connections (trails, high-capacity transit, parks, utility corridors, etc.), and any significant plans of neighboring communities that could impact the corridor. • Presents several Principles developed by the RAC to guide more detailed recommendations. • Makes recommendations divided into several sections: Creation of a regional legacy for future generations, outlining plans to promote the corridor as a regional spine for mobility and economic development, be developed to capture local culture, history, and scenic values, and reflect the values of public health, public safety, equity and social justice, and sustainability.
    [Show full text]